Method and device for measuring grounding resistance of transmission tower
By obtaining the signals of the current pole and the voltage pole, using the Beidou system and the voltage distance fitting curve, the accuracy problem of obstacles in the measurement of ground resistance of the transmission pole tower is solved, achieving higher measurement accuracy and reliability.
Patent Information
- Application Number
- CN202411210699.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-12
AI Technical Summary
When measuring the grounding resistance of the transmission pole tower, the current line and the voltage line are difficult to lay straight line due to obstacles in the field or urban area measurement locations, which in turn affects the measurement accuracy and leads to a low accuracy in the measurement of the grounding resistance.
By obtaining the signals of the current pole and the voltage pole, using the Beidou system to obtain coordinate information, draw the voltage distance fitting curve, determine the zero potential point and the corresponding resistance value, and calculate the difference of the resistance value to obtain the resistance of the transmission pole tower on the same line and the minimum resistance value in the plane is determined through iterative calculations to improve the accuracy of the measurement.
It improves the accuracy of the ground resistance measurement of the transmission pole tower, ensures that the measurement results are close to the true minimum resistance value, meet the preset error range, and enhances the reliability of the measurement.
Smart Images

Figure CN118937803A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of grounding resistance measurement, and in particular to a method and device for measuring the grounding resistance of a transmission tower. Background Art
[0002] The transmission line tower grounding system is crucial to the safe and stable operation of the power system, and the grounding resistance is an important technical indicator to measure the quality of the grounding system. Generally speaking, the smaller the grounding resistance, the higher the lightning resistance level of the transmission line tower grounding system. If the grounding resistance exceeds the normal range, it will cause serious damage to the power system equipment in the event of an electric shock. In order to ensure the safe and reliable operation of various electrical equipment and electrical equipment grounding devices, the grounding resistance value of the grounding system must be measured on-site.
[0003] The existing technology mainly uses the three-level method to measure the grounding resistance of transmission line towers. The three-level method requires a current line and a voltage line to be drawn from the grounding electrode of the transmission tower respectively, and the grounding resistance is calculated by the horizontal distance between the two lines and their angle. However, most of the current measurement sites are located in the wild or urban areas, where there are many obstacles. The current line and the voltage line often cannot be laid in a straight line. Therefore, the measurement of the horizontal distance between the two lines is inaccurate, which leads to low accuracy of grounding resistance measurement.
[0004] Application Contents
[0005] The present application provides a method and device for measuring the grounding resistance of a transmission tower to improve the accuracy of grounding resistance measurement.
[0006] In a first aspect, the present application provides a method for measuring the grounding resistance of a transmission tower, comprising:
[0007] Respectively acquiring a current signal of a current electrode and a voltage signal of each voltage electrode, wherein each voltage electrode is located between a grounding electrode of a transmission tower and the current electrode;
[0008] Based on the current signal and the voltage signals corresponding to the voltage poles, a first resistance value of the transmission towers on the same straight line is obtained;
[0009] By determining the minimum value of the first resistance values in multiple directions, the actual resistance value of the transmission tower in the plane is obtained.
[0010] The embodiment of the present application can accurately obtain the signals corresponding to the current electrode and the voltage electrode by respectively obtaining the current signal of the current electrode and the voltage signal of each voltage electrode, so as to facilitate the subsequent calculation of the first resistance value of the corresponding point; based on the current signal and the voltage signal corresponding to each voltage electrode, the first resistance value of the transmission tower on the same straight line is obtained, and the first resistance value of the transmission tower on the same straight line can be quickly calculated, so as to facilitate the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line; by determining the minimum value of the first resistance value, the minimum value of the resistance in the entire plane can be found, and the resistance value of the transmission tower obtained by determining the transmission tower is closest to the minimum value of the resistance, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0011] Furthermore, the steps of respectively acquiring the current signal of the current electrode and the voltage signal of each voltage electrode are specifically as follows:
[0012] Obtain the coordinate information of the transmission tower grounding electrode and the current electrode respectively through the Beidou system, and obtain the coordinate information corresponding to a plurality of the voltage electrodes between the transmission tower grounding electrode and the current electrode;
[0013] Acquiring a current signal of the current electrode through an ammeter;
[0014] The voltage signals corresponding to the voltage poles are respectively obtained through a voltmeter.
[0015] In this way, by respectively acquiring the current signal of the current electrode and the voltage signal of each voltage electrode, the signals corresponding to the current electrode and the voltage electrode can be accurately acquired, which facilitates the subsequent calculation of the first resistance value of the corresponding point.
[0016] Further, the first resistance value of the transmission tower on the same straight line is obtained based on the current signal and the voltage signal corresponding to each voltage pole, specifically:
[0017] Drawing a voltage distance fitting curve based on the voltage signal of each voltage electrode, and determining a zero potential point in each voltage electrode and a second resistance value corresponding to the zero potential point based on the voltage distance fitting curve;
[0018] Acquire a voltage signal corresponding to the zero potential point, and calculate a third resistance value corresponding to the zero potential point based on the voltage signal and the current signal;
[0019] Based on the difference between the second resistance value and the third resistance value, a first resistance value of the transmission tower on the same straight line is obtained.
[0020] In this way, by obtaining the first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each voltage pole, the first resistance value of the transmission tower on the same straight line can be quickly calculated, which facilitates the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line.
[0021] Furthermore, the actual resistance value of the transmission tower in the plane is obtained by determining the minimum value of the first resistance values in multiple directions, specifically:
[0022] Determine a first resistance value combination of the transmission tower in a plane by comparing the first resistance values in multiple directions, wherein the first resistance value combination includes two resistance values;
[0023] The resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration until a termination condition is met, thereby obtaining the minimum second resistance value combination in the plane;
[0024] By calculating the second resistance value combination, the actual resistance value of the transmission tower in the plane is obtained.
[0025] In this way, by continuously iteratively calculating the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination, the two minimum resistance values in the entire plane can be found, and the resistance value of the transmission tower obtained by calculation is closest to the minimum resistance value, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0026] Furthermore, the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration until the termination condition is met, thereby obtaining the minimum second resistance value combination in the plane, specifically:
[0027] If the third resistance value combination of the current iteration is greater than the first resistance value combination, or the difference between two resistance values in the third resistance value is less than a preset threshold, the termination condition is met and the smallest second resistance value combination in the plane is obtained; wherein the preset threshold is a pre-set error in the measurement of the grounding resistance of the transmission tower.
[0028] In this way, the termination condition is met when the third resistance value combination of the current iteration is greater than the first resistance value combination or the difference between two resistance values in the third resistance value is less than the preset threshold value, which can ensure that the two minimum resistance values in the plane are measured, and at the same time ensure that the error of the grounding resistance measurement of the transmission tower meets the preset threshold value, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0029] In a second aspect, the present application provides a method and device for measuring the grounding resistance of a transmission tower, comprising: an acquisition module, a first calculation module, and a second calculation module;
[0030] The acquisition module is used to respectively acquire the current signal of the current electrode and the voltage signal of each voltage electrode, wherein each voltage electrode is located between the grounding electrode of the transmission tower and the current electrode;
[0031] The first calculation module is used to obtain a first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each of the voltage poles;
[0032] The second calculation module is used to obtain the actual resistance value of the transmission tower in a plane by determining the minimum value of the first resistance values in multiple directions.
[0033] The embodiment of the present application can accurately obtain the signals corresponding to the current electrode and the voltage electrode by respectively obtaining the current signal of the current electrode and the voltage signal of each voltage electrode, so as to facilitate the subsequent calculation of the first resistance value of the corresponding point; based on the current signal and the voltage signal corresponding to each voltage electrode, the first resistance value of the transmission tower on the same straight line is obtained, and the first resistance value of the transmission tower on the same straight line can be quickly calculated, so as to facilitate the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line; by determining the minimum value of the first resistance value, the minimum value of the resistance in the entire plane can be found, and the resistance value of the transmission tower obtained by determining the transmission tower is closest to the minimum value of the resistance, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0034] Further, the acquisition module includes: a first acquisition unit, a second acquisition unit and a third acquisition unit;
[0035] The first acquisition unit is used to respectively acquire the coordinate information of the ground electrode of the transmission tower and the current electrode through the Beidou system, and obtain the coordinate information corresponding to the plurality of voltage electrodes between the ground electrode of the transmission tower and the current electrode;
[0036] The second acquisition unit is used to acquire the current signal of the current electrode through an ammeter;
[0037] The third acquisition unit is used to respectively acquire the voltage signals corresponding to each of the voltage poles through a voltmeter.
[0038] Further, the first calculation module includes: a determination unit, a fourth acquisition unit and a first calculation unit;
[0039] The determining unit is used to draw a voltage distance fitting curve based on the voltage signal of each voltage pole, and determine a zero potential point in each voltage pole and a second resistance value corresponding to the zero potential point based on the voltage distance fitting curve;
[0040] The fourth acquisition unit is used to acquire the voltage signal corresponding to the zero potential point, and calculate the third resistance value corresponding to the zero potential point based on the voltage signal and the current signal;
[0041] The first calculation unit is used to obtain a first resistance value of the transmission tower on the same straight line based on a difference between the second resistance value and the third resistance value.
[0042] Further, the second calculation module includes: a comparison unit, a second calculation unit and a third calculation unit;
[0043] The comparison unit is used to determine a first resistance value combination of the transmission tower in a plane by comparing the first resistance values in multiple directions, wherein the first resistance value combination includes two resistance values;
[0044] The second calculation unit is used to calculate the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination by continuous iteration until a termination condition is met, thereby obtaining the minimum second resistance value combination in the plane;
[0045] The third calculation unit is used to obtain the actual resistance value of the transmission tower in the plane by calculating the second resistance value combination.
[0046] Furthermore, the second calculation unit is specifically:
[0047] If the third resistance value combination of the current iteration is greater than the first resistance value combination, or the difference between two resistance values in the third resistance value is less than a preset threshold, the termination condition is met and the smallest second resistance value combination in the plane is obtained; wherein the preset threshold is a pre-set error in the measurement of the grounding resistance of the transmission tower. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 It is a schematic diagram of the straight line method field measurement wiring method of the three-level method provided by the present application;
[0049] Figure 2 It is a flow chart of an embodiment of a method for measuring the grounding resistance of a transmission tower provided by the present application;
[0050] Figure 3 is a schematic diagram of a voltage-distance fitting curve provided in this application;
[0051] Figure 4 It is a schematic diagram of the in-plane resistance value of a transmission tower provided by the present application;
[0052] Figure 5 It is a structural schematic diagram of an embodiment of a transmission tower grounding resistance measuring device provided in the present application. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0054] It should be understood that the step numbers used in this article are only for the convenience of description and are not intended to limit the order in which the steps are executed.
[0055] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, the singular forms "a", "an" and "the" are intended to include plural forms unless the context clearly indicates otherwise.
[0056] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0057] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.
[0058] The grounding system of the transmission line tower is crucial to the safety of the power system, and the grounding resistance is a key indicator to measure the quality of the grounding system. The smaller the grounding resistance, the higher the lightning resistance level of the transmission line tower grounding system. If the grounding resistance exceeds the normal range, it may cause serious damage to the power system equipment. In order to ensure the safe operation of the power system, on-site measurements must be carried out. At present, the three-level method is mainly used to measure the grounding resistance. The current line and voltage line need to be drawn out and calculated by distance and angle. However, due to the many obstacles at the measurement site, it is difficult to lay the line in a straight line, resulting in inaccurate measurement and affecting the reliability of the results.
[0059] It should be noted that a method for measuring the grounding resistance of a transmission tower can be applied to software, web pages, terminal systems, etc., and this application does not limit it.
[0060] Please refer to Figure 1 , Figure 1 It is a schematic diagram of the straight line method field measurement wiring method of the three-level method provided by the present application;
[0061] Among them, the transmission tower grounding electrode G, voltage electrode P and current electrode C are arranged on the same straight line, that is, at this time, the angle between the current electrode C and the transmission tower grounding electrode G and the voltage line between the voltage electrode and the transmission tower G is 0 degrees or 180 degrees. The injected current forms a current loop with the earth through the current line between the grounding electrode G and the current electrode C. By arranging an ammeter and a voltmeter on the current line and the voltage line respectively, the current of the corresponding current electrode C and the voltage of the voltage electrode P can be measured, and the resistance value of the corresponding coordinate of the voltage electrode P can be calculated by R=V / I.
[0062] Please refer to Figure 2 , Figure 2 It is a flow chart of an embodiment of a method for measuring the grounding resistance of a transmission tower provided by the present application, including steps S1 to S3;
[0063] Step S1, respectively obtaining a current signal of a current electrode and a voltage signal of each voltage electrode, wherein each voltage electrode is located between a grounding electrode of a transmission tower and the current electrode;
[0064] It is understandable that the coordinate information of the transmission tower grounding electrode and the current electrode can be obtained respectively through Beidou satellite positioning technology, and the distance D between the transmission tower grounding electrode and the current electrode at several distances from the current electrode can be automatically calculated. GC As a voltage electrode, the coordinate information corresponding to several voltage electrodes is obtained at the same time; the current signal of the current electrode is obtained through the ammeter; and the voltage signal corresponding to each voltage electrode is obtained through the voltage meter. For example, when the coordinate information of the ground electrode is G and the coordinate information of the current electrode is C, the 0.2D between G and C will be automatically calculated. GC , 0.3D GC , 0.4D GC , 0.5D GC , ..., 0.9DGC, and display it. By the user constantly changing the coordinate position of the voltage electrode P between G and C, the voltage signals at different positions can be measured. Since the current signal I is constant, at this time, the voltage electrode P is measured by the voltmeter at 0.3D GC The voltage signal V at this coordinate position 1 , and record the current coordinate information 0.2D GC And voltage signal V 1 , when the user thinks that the coordinate information at this time is 0.2D GC Inaccurate, you can also adjust the coordinate information 0.2D GC And voltage signal V 1 Make changes. When the changes are completed, the map and system will prompt the user to reach the next coordinate information 0.3D GC , and record the 0.2D between G and C in the same way GC, 0.3D GC , 0.4D GC , 0.5D GC ,……,0.9DGC voltage signal V at multiple points.
[0065] In this way, by respectively acquiring the current signal of the current electrode and the voltage signal of each voltage electrode, the signals corresponding to the current electrode and the voltage electrode can be accurately acquired, which facilitates the subsequent calculation of the first resistance value of the corresponding point.
[0066] Step S2, obtaining a first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each of the voltage poles;
[0067] It can be understood that after obtaining the voltage signals of multiple points between G and C, first, a voltage distance fitting curve is drawn based on the voltage signals of each voltage pole and the corresponding coordinate information, and the zero potential point in each voltage pole and the second resistance value corresponding to the zero potential point are determined based on the voltage distance fitting curve; secondly, the zero potential point is displayed on the map to guide the user to reach the zero potential point. When the user reaches the zero potential point, the voltage signal corresponding to the zero potential point is obtained through a voltmeter, and the third resistance value corresponding to the zero potential point is calculated based on the voltage signal and the current signal; finally, since the second resistance value fitted by the system according to the voltage distance fitting curve may deviate from the third resistance value actually measured, when the difference between the second resistance value and the third resistance value meets the preset resistance error, it can be considered that the third resistance value at this time is the grounding resistance of the transmission tower on the same straight line. The voltage distance fitting curve is as follows: Figure 3 As shown, after drawing the voltage-distance fitting curve, it can be seen Figure 3 There is a flat section in the map, and the voltage signal corresponding to the flat section is considered to be the voltage signal of the transmission tower relative to infinity, that is, the zero potential point. For example, when the voltage signal of the zero potential point is confirmed to be 220V and the current signal is 50A from the voltage distance fitting curve, the fitted second resistance value is 4.4Ω. When the user reaches the zero potential point on the map, due to the error, the measured voltage signal may be 230V, and the current signal is still 50A. At this time, the third resistance value actually measured is 4.6Ω. At this time, the difference between the second resistance value and the third resistance value is 4.6Ω. The difference between them is 4.6Ω-4.4Ω=0.2Ω. If the preset resistance error is 0.3Ω, then the calculated difference 0.2Ω is less than the preset resistance error 0.3Ω. Therefore, it can be determined that the third resistance 4.6Ω is the grounding resistance of the transmission towers on the same straight line; and if the preset resistance error is 0.1Ω, then the calculated difference 0.2Ω is greater than the preset resistance error 0.1Ω. At this time, the user will be reminded to re-test until the calculated difference is less than the preset resistance error. Only then can the grounding resistance of the transmission towers on the same straight line be determined.
[0068] In this way, by obtaining the first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each voltage pole, the first resistance value of the transmission tower on the same straight line can be quickly calculated, which facilitates the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line.
[0069] Step S3: Obtain the actual resistance value of the transmission tower in the plane by determining the minimum value of the first resistance values in multiple directions.
[0070] It can be understood that after confirming the grounding resistance on the same straight line through the transmission tower, first, the first resistance values in multiple directions are compared to determine the two smallest resistance values of the transmission tower in the plane to form a first resistance value combination, and the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration, and then the resistance values in the plane are continued to be compared to determine the two smallest resistance values of the transmission tower in the plane as the third resistance value combination. The resistance value in the plane of the transmission tower is as follows: Figure 4 As shown, for example, the grounding resistance Z corresponding to the point C1 of the transmission tower on the straight lines in four directions is first calculated. P1 , the grounding resistance Z corresponding to point C3 P3 , the grounding resistance Z corresponding to point C5 P5 The grounding resistance Z corresponding to point C7 P7 , through the grounding resistor Z P1 , Z P3 , Z P5 and Z P7 For comparison, when determining the grounding resistance Z corresponding to points C1 and C7 P1 and Z P7 is the smallest resistance value combination in the plane, then calculate the grounding resistance Z corresponding to point C8 in the middle of the arc between point C1 and point C7 P8 , and compare the grounding resistance Z corresponding to points C1, C7 and C8 P1 , Z P7 and Z P8 The size of the resistor is further determined from it, and the smallest two resistance combinations are determined. If the smallest resistance combination is determined to be Z P7 and Z P8, then the grounding resistance corresponding to the point in the middle of the arc between points C1 and C8 is further calculated in the same way to find the smallest grounding resistance combination in the plane, which will not be repeated here; and when the resistance between points C1 and C5 is the smallest resistance value combination in the plane, or the resistance between points C3 and C7 is the smallest resistance value combination in the plane, it is impossible to determine which half-interval has a smaller resistance value, so it is necessary to simultaneously measure the grounding resistance corresponding to points C2, C4, C6, and C8 in the middle of the arc between points C1, C3, C5, and C7 to find the smallest resistance value combination in the plane again, and use the same method to find the smallest grounding resistance combination in the plane, which will not be repeated here.
[0071] If the third resistance value combination of the current iteration is greater than the first resistance value combination, it means that the original first resistance value combination is the smallest resistance value combination Z in the plane. min1 , Z min2 , if the minimum resistance value Z min2 Greater than the minimum resistance value Z measured min1 The preset value indicates the minimum resistance value Z min1 It is the actual resistance value of the transmission tower in the plane. If the second minimum resistance value Z min2 Not greater than the minimum resistance value Z measured min1 The actual resistance value Z of the transmission tower in the plane can be obtained by weighted summation, where the calculation formula of the weighted summation is:
[0072]
[0073] Z=α 1 Z min1 +α 2 Z min2 ;
[0074] If the number of iterations exceeds the preset number of iterations, the resistance value combination of the current iteration is the smallest resistance value combination Z in the plane. min1 , Z min2 Based on the same method, first determine Z min2 Is it greater than the minimum resistance value Z min1 Default value, if Z min2 Not greater than Z min1 The preset value is then obtained by weighted summation to obtain the actual resistance value Z of the transmission tower in the plane. The specific process of obtaining the actual resistance value of the transmission tower in the plane by calculating the two minimum resistance values in the plane has been detailed above and will not be repeated here. It should be noted that the preset number of iterations can be freely set and is not limited in this application.
[0075] If the difference between the two resistance values in the third resistance value is less than the preset error of the transmission tower grounding resistance measurement, the termination condition is met, and the minimum two resistance value combination Z in the plane can be obtained. min1 , Z min2 ; Based on the same method, first determine Z min2 Is it greater than the minimum resistance value Z min1 Default value, if Z min2 Not greater than Z min1 The preset value is then obtained by weighted summation to obtain the actual resistance value Z of the transmission tower in the plane. The specific process of obtaining the actual resistance value of the transmission tower in the plane by calculating the two minimum resistance values in the plane has been detailed above and will not be repeated here. It should be noted that the preset error can be set freely and is not limited in this application.
[0076] It should be noted that the preset value of the sub-minimum resistance value greater than the minimum resistance value obtained by measurement can be freely set and is not limited in this application.
[0077] In this way, by continuously iteratively calculating the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination, the two minimum resistance values in the entire plane can be found, and the resistance value of the transmission tower obtained by calculation is closest to the minimum resistance value, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0078] The embodiment of the present application can accurately obtain the signals corresponding to the current electrode and the voltage electrode by respectively obtaining the current signal of the current electrode and the voltage signal of each voltage electrode, so as to facilitate the subsequent calculation of the first resistance value of the corresponding point; based on the current signal and the voltage signal corresponding to each voltage electrode, the first resistance value of the transmission tower on the same straight line is obtained, and the first resistance value of the transmission tower on the same straight line can be quickly calculated, so as to facilitate the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line; by determining the minimum value of the first resistance value, the minimum value of the resistance in the entire plane can be found, and the resistance value of the transmission tower obtained by determining the transmission tower is closest to the minimum value of the resistance, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0079] Please refer to Figure 5 , Figure 5 It is a structural schematic diagram of an embodiment of a transmission tower grounding resistance measuring device provided by the present application, comprising an acquisition module 01, a first calculation module 02 and a second calculation module 03;
[0080] The acquisition module 01 is used to respectively acquire the current signal of the current electrode and the voltage signal of each voltage electrode, wherein each voltage electrode is located between the grounding electrode of the transmission tower and the current electrode;
[0081] Specifically, the acquisition module includes 01: a first acquisition unit, a second acquisition unit and a third acquisition unit; the first acquisition unit is used to respectively acquire the coordinate information of the transmission tower grounding electrode and the current electrode through the Beidou system, and obtain the coordinate information corresponding to the transmission tower grounding electrode and several voltage electrodes between the current electrode; the second acquisition unit is used to acquire the current signal of the current electrode through an ammeter; the third acquisition unit is used to respectively acquire the voltage signals corresponding to each voltage electrode through a voltmeter.
[0082] It is understandable that the coordinate information of the transmission tower grounding electrode and the current electrode can be obtained respectively through Beidou satellite positioning technology, and the distance D between the transmission tower grounding electrode and the current electrode at several distances from the current electrode can be automatically calculated. GC As a voltage electrode, the coordinate information corresponding to several voltage electrodes is obtained at the same time; the current signal of the current electrode is obtained through the ammeter; and the voltage signal corresponding to each voltage electrode is obtained through the voltage meter. For example, when the coordinate information of the ground electrode is G and the coordinate information of the current electrode is C, the 0.2D between G and C will be automatically calculated. GC , 0.3D GC , 0.4D GC , 0.5D GC , ..., 0.9DGC, and display it. By the user constantly changing the coordinate position of the voltage electrode P between G and C, the voltage signals at different positions can be measured. Since the current signal I is constant, at this time, the voltage electrode P is measured by the voltmeter at 0.3D GC The voltage signal V at this coordinate position 1 , and record the current coordinate information 0.2D GC And voltage signal V 1 , when the user thinks that the coordinate information at this time is 0.2D GC Inaccurate, you can also adjust the coordinate information 0.2D GC And voltage signal V 1 Make changes. When the changes are completed, the map and system will prompt the user to reach the next coordinate information 0.3D GC , and record the 0.2D between G and C in the same way GC , 0.3D GC , 0.4D GC , 0.5D GC ,……,0.9DGC voltage signal V at multiple points.
[0083] In this way, by respectively acquiring the current signal of the current electrode and the voltage signal of each voltage electrode, the signals corresponding to the current electrode and the voltage electrode can be accurately acquired, which facilitates the subsequent calculation of the first resistance value of the corresponding point.
[0084] The first calculation module 02 is used to obtain a first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each voltage pole;
[0085] Specifically, the first calculation module 02 includes: a determination unit, a fourth acquisition unit and a first calculation unit; the determination unit is used to draw a voltage distance fitting curve based on the voltage signal of each voltage pole, and determine the zero potential point in each voltage pole and the second resistance value corresponding to the zero potential point based on the voltage distance fitting curve; the fourth acquisition unit is used to obtain the voltage signal corresponding to the zero potential point, and calculate the third resistance value corresponding to the zero potential point based on the voltage signal and the current signal; the first calculation unit is used to obtain the first resistance value of the transmission tower on the same straight line based on the difference between the second resistance value and the third resistance value.
[0086] It can be understood that after obtaining the voltage signals of multiple points between G and C, first, a voltage distance fitting curve is drawn based on the voltage signals of each voltage pole and the corresponding coordinate information, and the zero potential point in each voltage pole and the second resistance value corresponding to the zero potential point are determined based on the voltage distance fitting curve; secondly, the zero potential point is displayed on the map to guide the user to reach the zero potential point. When the user reaches the zero potential point, the voltage signal corresponding to the zero potential point is obtained through a voltmeter, and the third resistance value corresponding to the zero potential point is calculated based on the voltage signal and the current signal; finally, since the second resistance value fitted by the system according to the voltage distance fitting curve may deviate from the third resistance value actually measured, when the difference between the second resistance value and the third resistance value meets the preset resistance error, it can be considered that the third resistance value at this time is the grounding resistance of the transmission tower on the same straight line. The voltage distance fitting curve is as follows: Figure 3 As shown, after drawing the voltage-distance fitting curve, it can be seen Figure 3There is a flat section in the map, and the voltage signal corresponding to the flat section is considered to be the voltage signal of the transmission tower relative to infinity, that is, the zero potential point. For example, when the voltage signal of the zero potential point is confirmed to be 220V and the current signal is 50A from the voltage distance fitting curve, the fitted second resistance value is 4.4Ω. When the user reaches the zero potential point on the map, due to the error, the measured voltage signal may be 230V, and the current signal is still 50A. At this time, the third resistance value actually measured is 4.6Ω. At this time, the difference between the second resistance value and the third resistance value is 4.6Ω. The difference between them is 4.6Ω-4.4Ω=0.2Ω. If the preset resistance error is 0.3Ω, then the calculated difference 0.2Ω is less than the preset resistance error 0.3Ω. Therefore, it can be determined that the third resistance 4.6Ω is the grounding resistance of the transmission towers on the same straight line; and if the preset resistance error is 0.1Ω, then the calculated difference 0.2Ω is greater than the preset resistance error 0.1Ω. At this time, the user will be reminded to re-test until the calculated difference is less than the preset resistance error. Only then can the grounding resistance of the transmission towers on the same straight line be determined.
[0087] In this way, by obtaining the first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each voltage pole, the first resistance value of the transmission tower on the same straight line can be quickly calculated, which facilitates the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line.
[0088] The second calculation module 03 is used to obtain the actual resistance value of the transmission tower in a plane by determining the minimum value of the first resistance values in multiple directions.
[0089] Specifically, the second calculation module includes: a comparison unit, a second calculation unit and a third calculation unit; the comparison unit is used to determine the first resistance value combination of the transmission tower in the plane by comparing the first resistance values in multiple directions, wherein the first resistance value combination includes two resistance values; the second calculation unit is used to calculate the resistance value corresponding to the intermediate coordinates of the coordinate information corresponding to the first resistance value combination by continuous iteration until the termination condition is met, and obtain the minimum second resistance value combination in the plane; the third calculation unit is used to obtain the actual resistance value of the transmission tower in the plane by calculating the second resistance value combination. The second calculation unit is specifically: if the third resistance value combination of the current iteration is greater than the first resistance value combination, or the difference between the two resistance values in the third resistance value is less than a preset threshold, the termination condition is met, and the minimum second resistance value combination in the plane is obtained; wherein the preset threshold is a preset error in the measurement of the grounding resistance of the transmission tower.
[0090] It can be understood that after confirming the grounding resistance on the same straight line through the transmission tower, first, the first resistance values in multiple directions are compared to determine the two smallest resistance values of the transmission tower in the plane to form a first resistance value combination, and the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration, and then the resistance values in the plane are continued to be compared to determine the two smallest resistance values of the transmission tower in the plane as the third resistance value combination. The resistance value in the plane of the transmission tower is as follows: Figure 4 As shown, for example, the grounding resistance Z corresponding to the point C1 of the transmission tower on the straight lines in four directions is first calculated. P1 , the grounding resistance Z corresponding to point C3 P3 , the grounding resistance Z corresponding to point C5 P5 The grounding resistance Z corresponding to point C7 P7 , through the grounding resistor Z P1 , Z P3 , Z P5 and Z P7 For comparison, when determining the grounding resistance Z corresponding to points C1 and C7 P1 and Z P7 is the smallest resistance value combination in the plane, then calculate the grounding resistance Z corresponding to point C8 in the middle of the arc between point C1 and point C7 P8 , and compare the grounding resistance Z corresponding to points C1, C7 and C8 P1 , Z P7 and Z P8 The size of the resistor is further determined from it, and the smallest two resistance combinations are determined. If the smallest resistance combination is determined to be Z P7 and Z P8 , then the grounding resistance corresponding to the point in the middle of the arc between points C1 and C8 is further calculated in the same way to find the smallest grounding resistance combination in the plane, which will not be repeated here; and when the resistance between points C1 and C5 is the smallest resistance value combination in the plane, or the resistance between points C3 and C7 is the smallest resistance value combination in the plane, it is impossible to determine which half-interval has a smaller resistance value, so it is necessary to simultaneously measure the grounding resistance corresponding to points C2, C4, C6, and C8 in the middle of the arc between points C1, C3, C5, and C7 to find the smallest resistance value combination in the plane again, and use the same method to find the smallest grounding resistance combination in the plane, which will not be repeated here.
[0091] If the third resistance value combination of the current iteration is greater than the first resistance value combination, it means that the original first resistance value combination is the smallest resistance value combination Z in the plane. min1 , Z min2 , if the minimum resistance value Z min2 Greater than the minimum resistance value Z min1The preset value indicates the minimum resistance value Z min1 It is the actual resistance value of the transmission tower in the plane. If the second minimum resistance value Z min2 Not greater than the minimum resistance value Z measured min1 The actual resistance value Z of the transmission tower in the plane can be obtained by weighted summation, where the calculation formula of the weighted summation is:
[0092]
[0093] Z=α 1 Z min1 +α 2 Z min2 ;
[0094] If the number of iterations exceeds the preset number of iterations, the resistance value combination of the current iteration is the smallest resistance value combination Z in the plane. min1 , Z min2 Based on the same method, first determine Z min2 Is it greater than the minimum resistance value Z min1 Default value, if Z min2 Not greater than Z min1 The preset value is then obtained by weighted summation to obtain the actual resistance value Z of the transmission tower in the plane. The specific process of obtaining the actual resistance value of the transmission tower in the plane by calculating the two minimum resistance values in the plane has been detailed above and will not be repeated here. It should be noted that the preset number of iterations can be freely set and is not limited in this application.
[0095] If the difference between the two resistance values in the third resistance value is less than the preset error of the transmission tower grounding resistance measurement, the termination condition is met, and the minimum two resistance value combination Z in the plane can be obtained. min1 , Z min2 ; Based on the same method, first determine Z min2 Is it greater than the minimum resistance value Z min1 Default value, if Z min2 Not greater than Z min1 The preset value is then obtained by weighted summation to obtain the actual resistance value Z of the transmission tower in the plane. The specific process of obtaining the actual resistance value of the transmission tower in the plane by calculating the two minimum resistance values in the plane has been detailed above and will not be repeated here. It should be noted that the preset error can be set freely and is not limited in this application.
[0096] It should be noted that the preset value of the sub-minimum resistance value greater than the minimum resistance value obtained by measurement can be freely set and is not limited in this application.
[0097] In this way, by continuously iteratively calculating the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination, the two minimum resistance values in the entire plane can be found, and the resistance value of the transmission tower obtained by calculation is closest to the minimum resistance value, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0098] The embodiment of the present application can accurately obtain the signals corresponding to the current electrode and the voltage electrode by respectively obtaining the current signal of the current electrode and the voltage signal of each voltage electrode, so as to facilitate the subsequent calculation of the first resistance value of the corresponding point; based on the current signal and the voltage signal corresponding to each voltage electrode, the first resistance value of the transmission tower on the same straight line is obtained, and the first resistance value of the transmission tower on the same straight line can be quickly calculated, so as to facilitate the subsequent acquisition of the actual resistance value of the transmission tower based on the first resistance value on the same straight line; by determining the minimum value of the first resistance value, the minimum value of the resistance in the entire plane can be found, and the resistance value of the transmission tower obtained by determining the transmission tower is closest to the minimum value of the resistance, so as to improve the accuracy of the grounding resistance measurement of the transmission tower.
[0099] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.
Claims
1. A method for measuring the grounding resistance of a transmission tower. It is characterized in that include: Respectively acquiring a current signal of a current electrode and a voltage signal of each voltage electrode, wherein each voltage electrode is located between a grounding electrode of a transmission tower and the current electrode; Based on the current signal and the voltage signals corresponding to the voltage poles, a first resistance value of the transmission towers on the same straight line is obtained; By determining the minimum value of the first resistance values in multiple directions, the actual resistance value of the transmission tower in the plane is obtained.
2. The method for measuring the grounding resistance of a transmission tower according to claim 1, It is characterized in that The current signal of the current electrode and the voltage signal of each voltage electrode are obtained respectively, specifically: Obtain the coordinate information of the transmission tower grounding electrode and the current electrode respectively through the Beidou system, and obtain the coordinate information corresponding to a plurality of the voltage electrodes between the transmission tower grounding electrode and the current electrode; Acquiring a current signal of the current electrode through an ammeter; The voltage signals corresponding to the voltage poles are respectively obtained through a voltmeter.
3. The method for measuring the grounding resistance of a transmission tower according to claim 1, It is characterized in that The first resistance value of the transmission tower on the same straight line is obtained based on the current signal and the voltage signal corresponding to each voltage pole, specifically: Drawing a voltage distance fitting curve based on the voltage signal of each voltage electrode, and determining a zero potential point in each voltage electrode and a second resistance value corresponding to the zero potential point based on the voltage distance fitting curve; Acquire a voltage signal corresponding to the zero potential point, and calculate a third resistance value corresponding to the zero potential point based on the voltage signal and the current signal; Based on the difference between the second resistance value and the third resistance value, a first resistance value of the transmission tower on the same straight line is obtained.
4. The method for measuring the grounding resistance of a transmission tower according to claim 1, It is characterized in that The actual resistance value of the transmission tower in the plane is obtained by determining the minimum value of the first resistance value in multiple directions, specifically: Determine a first resistance value combination of the transmission tower in a plane by comparing the first resistance values in multiple directions, wherein the first resistance value combination includes two resistance values; The resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration until a termination condition is met, thereby obtaining the minimum second resistance value combination in the plane; By calculating the second resistance value combination, the actual resistance value of the transmission tower in the plane is obtained.
5. The method for measuring the grounding resistance of a transmission tower according to claim 4, It is characterized in that The resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination is calculated by continuous iteration until the termination condition is met, and the minimum second resistance value combination in the plane is obtained, specifically: If the third resistance value combination of the current iteration is greater than the first resistance value combination, or the difference between two resistance values in the third resistance value is less than a preset threshold, the termination condition is met and the smallest second resistance value combination in the plane is obtained; wherein the preset threshold is a pre-set error in the measurement of the grounding resistance of the transmission tower.
6. A method and device for measuring the grounding resistance of a transmission tower, It is characterized in that include: An acquisition module, a first calculation module and a second calculation module; The acquisition module is used to respectively acquire the current signal of the current electrode and the voltage signal of each voltage electrode, wherein each voltage electrode is located between the grounding electrode of the transmission tower and the current electrode; The first calculation module is used to obtain a first resistance value of the transmission tower on the same straight line based on the current signal and the voltage signal corresponding to each of the voltage poles; The second calculation module is used to obtain the actual resistance value of the transmission tower in a plane by determining the minimum value of the first resistance values in multiple directions.
7. The method and device for measuring the grounding resistance of a transmission tower according to claim 6, It is characterized in that The acquisition module includes: a first acquisition unit, a second acquisition unit and a third acquisition unit; The first acquisition unit is used to respectively acquire the coordinate information of the ground electrode of the transmission tower and the current electrode through the Beidou system, and obtain the coordinate information corresponding to the plurality of voltage electrodes between the ground electrode of the transmission tower and the current electrode; The second acquisition unit is used to acquire the current signal of the current electrode through an ammeter; The third acquisition unit is used to respectively acquire the voltage signals corresponding to each of the voltage poles through a voltmeter.
8. The method and device for measuring the grounding resistance of a transmission tower according to claim 6, It is characterized in that The first calculation module includes: a determination unit, a fourth acquisition unit and a first calculation unit; The determining unit is used to draw a voltage distance fitting curve based on the voltage signal of each voltage pole, and determine a zero potential point in each voltage pole and a second resistance value corresponding to the zero potential point based on the voltage distance fitting curve; The fourth acquisition unit is used to acquire the voltage signal corresponding to the zero potential point, and calculate the third resistance value corresponding to the zero potential point based on the voltage signal and the current signal; The first calculation unit is used to obtain a first resistance value of the transmission tower on the same straight line based on a difference between the second resistance value and the third resistance value.
9. The method and device for measuring the grounding resistance of a transmission tower according to claim 6, It is characterized in that The second calculation module includes: a comparison unit, a second calculation unit and a third calculation unit; The comparison unit is used to determine a first resistance value combination of the transmission tower in a plane by comparing the first resistance values in multiple directions, wherein the first resistance value combination includes two resistance values; The second calculation unit is used to calculate the resistance value corresponding to the middle coordinate of the coordinate information corresponding to the first resistance value combination by continuous iteration until a termination condition is met, thereby obtaining the minimum second resistance value combination in the plane; The third calculation unit is used to obtain the actual resistance value of the transmission tower in the plane by calculating the second resistance value combination.
10. The method and device for measuring the grounding resistance of a transmission tower according to claim 9, It is characterized in that The second calculation unit is specifically: If the third resistance value combination of the current iteration is greater than the first resistance value combination, or the difference between two resistance values in the third resistance value is less than a preset threshold, the termination condition is met and the smallest second resistance value combination in the plane is obtained; wherein the preset threshold is a pre-set error in the measurement of the grounding resistance of the transmission tower.
