Industrial automation control system and method

By introducing production energy consumption analysis, equipment identification monitoring and load monitoring modules into the industrial automation control system, we optimize production task allocation and equipment operation, and solve the problems of high production costs and equipment failure rates in the existing system, achieving more efficient Safe production process.

CN118938769AActive Publication Date: 2024-11-12HEILONGJIANG ZHONGFEILI EQUIP CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411178515.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-12
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

The existing industrial automation control system fails to effectively control the production plan of equipment, resulting in increased production costs and failure to classify and adjust the accuracy according to the energy consumption characteristics of the product, resulting in high energy waste and equipment failure rates.

Method used

The production energy consumption analysis module, equipment identification monitoring module and equipment load monitoring module are adopted to analyze historical data and real-time data, assign production tasks, adjust the accuracy of the identification device and the transportation rate of raw materials, and optimize the peak period and low peak period and Pinggu period. production plan.

Benefits of technology

Reduces production costs and equipment failure rates, improves production efficiency and equipment safety, and optimizes energy use and equipment load through precise control of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118938769A_ABST
    Figure CN118938769A_ABST
Patent Text Reader

Abstract

The invention discloses an industrial automation control system and method, and relates to the technical field of automation control, and the system comprises a production energy consumption analysis module, an equipment identification monitoring module and an equipment load monitoring module. On the one hand, high-energy-consumption products and low-energy-consumption products are obtained, then a production scheme is set, the production cost is reduced, production data of equipment are analyzed through the equipment identification monitoring module, the precision index of the equipment is obtained, the precision grade of the identification device is adjusted according to the precision index of the equipment, and on the other hand, the equipment load monitoring module is used for monitoring the equipment load. The load data of the equipment is analyzed to obtain the load index of the equipment, and the raw material transportation rate of the equipment is controlled according to the load index of the equipment, so that the identification cost in the production process is reduced, and the safety of the equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of automation control technology, and in particular to an industrial automation control system and method. Background Art

[0002] In modern industrial production, the application of automated control systems has become indispensable. In order to overcome the limitations of existing technologies and to comprehensively consider production efficiency, cost, quality, safety, resource utilization, environmental impact, corporate competitiveness and other requirements, a new type of industrial automated control system is needed to adapt to the ever-changing industrial production environment and market demand.

[0003] Prior art, such as the invention patent application with announcement number CN107102626A, discloses an industrial automation control system, including a remote control terminal, a PLC controller, an input-output module, a programmable controller, a relay, a servo system, a measuring unit, and a monitoring unit; the remote control terminal is connected to the PLC controller; the programmable controller, the measuring unit, and the monitoring unit are all connected to the PLC controller; the input-output module is connected to the programmable controller, the relay is connected to the input-output module, and the servo system is connected to the relay. The present invention has a reasonable design, is easy to use, and greatly reduces the human operation, so it is suitable for promotion and application.

[0004] With respect to the above scheme, the applicant of the present invention has found that the above technology has at least the following technical problems: 1. The above scheme does not control the production plan of each device, the production cost of the product may change due to different power consumption time periods, the products are not classified according to their energy consumption, different production plans are not set during peak, off-peak and flat periods, and the production plan of the equipment is not controlled, which increases the production cost.

[0005] 2. The above scheme does not collect specific data of each device to analyze the accuracy of each product. The accuracy required for producing different products is different, and the energy consumed by each accuracy of the identification device is different. The above scheme only uses the same identification accuracy for different products, which will cause waste of device identification costs. At the same time, the above scheme does not control the specific modules of each device, does not collect the load data of the equipment, and cannot accurately control industrial production automation, which is likely to increase the failure rate of equipment and increase production costs. Summary of the invention

[0006] In view of the above-mentioned technical deficiencies, the object of the present invention is to provide an industrial automation control system and method.

[0007] To solve the above technical problems, the present invention adopts the following technical solutions: The present invention provides an industrial automation control system, comprising the following modules: a production energy consumption analysis module, which is used to analyze the historical production energy consumption data in the database, obtain various high-energy consumption products and various low-energy consumption products, and then allocate production tasks.

[0008] The equipment identification monitoring module is used to collect the production data of the target equipment, thereby analyzing the production data of the target equipment, obtaining the accuracy index of the target equipment, and then adjusting the identification device of the target equipment.

[0009] The equipment load monitoring module is used to collect the status data of the target equipment, thereby analyzing the status data of the target equipment to obtain the load index of the target equipment, analyzing the historical production rate data in the database to obtain the preset production rate of the target equipment, and then adjusting the raw material transportation rate of the target equipment according to the load index of the target equipment and the preset production rate.

[0010] Preferably, the production energy consumption historical data in the database is analyzed, and the specific analysis process is as follows: the production energy consumption historical data includes the production energy consumption and production capacity of each product, and the production energy consumption historical data is substituted into the high energy consumption index calculation formula The high energy consumption index γ of product b is obtained + b , b is the product number, b=1,2......n, n>2, M b and N b are the production energy consumption and production capacity of product b respectively, M′ and N′ are the preset standard production energy consumption and standard production capacity respectively, η1 and η2 are the preset first production energy consumption weight factor and first production capacity weight factor respectively, η1>0, η2>0, η1+η2=1.

[0011] If the high energy consumption index of a product is greater than or equal to the preset high energy consumption index, the product is recorded as a high energy consumption product. If the high energy consumption index of a product is less than the preset high energy consumption index, the product is recorded as a non-high energy consumption product.

[0012] Substitute the production energy consumption and production capacity of each non-high energy consumption product into the low energy consumption index calculation formula The low energy consumption index γ of non-high energy consumption product g is obtained - g , g is the number of non-high energy consumption products, g = 1, 2...... w, w > 2, M g and N gare the production energy consumption and production capacity of the non-high energy consumption product g respectively, η3 and η4 are the preset second production energy consumption weight factor and the second production capacity weight factor respectively, η3>0, η4>0, η3+η4=1, if the low energy consumption index of a non-high energy consumption product is greater than or equal to the preset low energy consumption index, then the non-high energy consumption product is recorded as a low energy consumption product; if the low energy consumption index of a non-high energy consumption product is less than the preset low energy consumption index, then the non-high energy consumption product is recorded as a normal energy consumption product.

[0013] Preferably, the specific allocation process of the production tasks is as follows: during the daily low electricity consumption period, the high-energy consumption products are sorted in descending order according to the high energy consumption index, and each device produces the high-energy consumption products in order. When the production of the first high-energy consumption product reaches the set daily demand, the second high-energy consumption product is produced until the production of the high-energy consumption products is completed.

[0014] During the peak period of electricity consumption every day, the low-energy products are sorted in descending order according to the high energy consumption index, and each device produces the low-energy products in order. When the production of the first low-energy product reaches the set daily demand, the second low-energy product will be produced until all the low-energy products are produced.

[0015] During the daily off-peak period of electricity consumption, the profit of each normal energy consumption product in the database is divided by the electricity consumption to obtain the electricity consumption rate of each normal energy consumption product. The normal energy consumption products are sorted in order from large to small according to the high energy consumption index. Each device produces according to the order of the normal energy consumption products. When the production of the first normal energy consumption product reaches the set daily demand, the second normal energy consumption product is produced until the production of the normal energy consumption products is completed.

[0016] Preferably, the specific adjustment process of adjusting the identification device of the target device is as follows: obtaining the standard accuracy index required for the production product type in the current production stage from the database; if the accuracy index of the target device in the current production stage is less than the standard accuracy index, then replacing the production accuracy of the identification device of the target device with a production accuracy scheme of a higher accuracy level; if the accuracy index of the target device in the current production stage is greater than the standard accuracy index, then replacing the production accuracy of the identification device of the target device with a production accuracy scheme of a lower accuracy level.

[0017] Preferably, the raw material transportation rate of the target device is adjusted, and the specific adjustment process is as follows: obtain the standard load index and the expected production rate of the target device in the current production stage from the database; if the load index of the target device is greater than the standard load index, reduce the raw material transportation rate of the target device until the load index of the target device is equal to the standard load index; if during the reduction of the raw material transportation rate of the target device, the production rate of the target device is equal to the expected production rate, stop reducing the raw material transportation rate of the target device; if the load index of the target device is less than the standard load index, increase the raw material transportation rate of the target device until the load index of the target device is equal to the standard load index.

[0018] On the other hand, the present invention provides an industrial automation control method, comprising the following steps: Step 1, production energy consumption analysis: analyzing the historical production energy consumption data in the database to obtain various high-energy consumption products and various low-energy consumption products, and then allocating production tasks.

[0019] Step 2: Equipment identification monitoring: Collect the production data of the target equipment, analyze the production data of the target equipment, obtain the accuracy index of the target equipment, and then adjust the identification device of the target equipment.

[0020] Step 3: Equipment load monitoring: Collect the status data of the target equipment, analyze the status data of the target equipment, obtain the load index of the target equipment, analyze the historical production rate data in the database, obtain the preset production rate of the target equipment, and then adjust the raw material transportation rate of the target equipment according to the load index and preset production rate of the target equipment.

[0021] The beneficial effects of the present invention are as follows: 1. The present invention classifies various products through historical data of production energy consumption, obtains a high energy consumption index for each high-energy consumption product and a low energy consumption index for each low-energy consumption product, produces low-energy consumption products during peak electricity consumption periods, and produces high-energy consumption products during low electricity consumption periods, and then arranges production plans, changes the accuracy of the collection equipment for the production data of the current production stage, and analyzes the load data at the same time to change the transportation rate of the transportation equipment. On the one hand, the present invention reduces production costs and reduces urban electricity consumption pressure by setting production plans for different products in different electricity consumption periods. On the other hand, the present invention increases the recognition cost of the recognition equipment, reduces the failure rate of the equipment, and increases the safety of the equipment through analysis of production data and load data. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 It is a schematic diagram of the system structure connection of the present invention.

[0024] Figure 2 The present invention is a schematic flow chart of the steps for implementing the method. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] according to Figure 1 As shown, the present invention provides an industrial automation control system, including the following modules: a production energy consumption analysis module, an equipment identification monitoring module and an equipment load monitoring module.

[0027] The production energy consumption analysis module is connected to the database and the equipment identification monitoring module respectively, and the equipment load monitoring module is connected to the equipment identification monitoring module.

[0028] The production energy consumption analysis module is used to analyze the historical production energy consumption data in the database, obtain the high-energy consumption products and the low-energy consumption products, and then allocate production tasks.

[0029] In a specific embodiment, the production energy consumption historical data in the database is analyzed, and the specific analysis process is as follows: the production energy consumption historical data includes the production energy consumption and production capacity of each product, and the production energy consumption historical data is substituted into the high energy consumption index calculation formula The high energy consumption index γ of product b is obtained + b , b is the product number, b=1,2......n, n>2, M b and N b are the production energy consumption and production capacity of product b respectively, M′ and N′ are the preset standard production energy consumption and standard production capacity respectively, η1 and η2 are the preset first production energy consumption weight factor and first production capacity weight factor respectively, η1>0, η2>0, η1+η2=1.

[0030] It should be noted that the average energy consumption cost H and the average profit I of producing a single product during the low electricity consumption period are obtained from the database.

[0031] If the high energy consumption index of a product is greater than or equal to the preset high energy consumption index, the product is recorded as a high energy consumption product. If the high energy consumption index of a product is less than the preset high energy consumption index, the product is recorded as a non-high energy consumption product.

[0032] It should be noted that high-energy consumption products are products with high energy consumption when the production capacity is high.

[0033] Substitute the production energy consumption and production capacity of each non-high energy consumption product into the low energy consumption index calculation formula The low energy consumption index γ of non-high energy consumption product g is obtained - g , g is the number of non-high energy consumption products, g = 1, 2...... w, w > 2, M g and N g are the production energy consumption and production capacity of the non-high energy consumption product g respectively, η3 and η4 are the preset second production energy consumption weight factor and the second production capacity weight factor respectively, η3>0, η4>0, η3+η4=1, if the low energy consumption index of a non-high energy consumption product is greater than or equal to the preset low energy consumption index, then the non-high energy consumption product is recorded as a low energy consumption product; if the low energy consumption index of a non-high energy consumption product is less than the preset low energy consumption index, then the non-high energy consumption product is recorded as a normal energy consumption product.

[0034] It should be noted that low-energy consumption products are products with low energy consumption when the production capacity is high. The average energy consumption cost J and the average profit I of producing a single product during the peak electricity consumption period are obtained from the database.

[0035] In a specific embodiment, the production tasks are allocated, and the specific allocation process is as follows: during the daily low electricity consumption period, the high-energy consumption products are sorted in descending order according to the high energy consumption index, and each device produces the high-energy consumption products in the order of each high-energy consumption product. When the production of the first high-energy consumption product reaches the set daily demand, the second high-energy consumption product is produced until the production of the high-energy consumption products is completed.

[0036] During the peak period of electricity consumption every day, the low-energy products are sorted in descending order according to the high energy consumption index, and each device produces the low-energy products in order. When the production of the first low-energy product reaches the set daily demand, the second low-energy product will be produced until all the low-energy products are produced.

[0037] During the daily off-peak period of electricity consumption, the profit of each normal energy consumption product in the database is divided by the electricity consumption to obtain the electricity consumption rate of each normal energy consumption product. The normal energy consumption products are sorted in order from large to small according to the high energy consumption index. Each device produces according to the order of the normal energy consumption products. When the production of the first normal energy consumption product reaches the set daily demand, the second normal energy consumption product is produced until the production of the normal energy consumption products is completed.

[0038] The equipment identification monitoring module is used to collect the production data of the target equipment, thereby analyzing the production data of the target equipment, obtaining the accuracy index of the target equipment, and then adjusting the identification device of the target equipment.

[0039] In a specific embodiment, the production data of the target device is collected, and the specific collection process is as follows: the number of defects of each product in the current production stage of the target device and the area of ​​each defect of each product are collected by an inspection camera.

[0040] If the number of defects of a product is less than or equal to the standard number of defects and the area of ​​each defect is less than or equal to the standard defect area, the product is recorded as a good product. If the number of defects of a product is greater than the standard number of defects or the area of ​​any defect is greater than the standard defect area, and the number of defects of the product is less than or equal to the maximum number of defects and the area of ​​each defect is less than or equal to the maximum defect area, the product is recorded as a defective product. If the number of defects of a product is greater than the maximum number of defects or the area of ​​any defect is greater than the maximum defect area, the product is recorded as a scrap product. The number of good products, defective products, scrap products and total production of the target equipment in the current production stage are statistically obtained.

[0041] In a specific embodiment, the production data of the target device is analyzed, and the specific analysis process is as follows: the production data of the target device includes the number of good products, the number of defective products, the number of scrapped products and the total production volume of the target device in the current production stage. The production data of the target device is substituted into the accuracy index calculation formula The precision index β of the target device is obtained. E, F and G are the number of good products, defective products and scrapped products produced by device a in the current production stage of the target device, respectively. σ′, σ″ and σ″′ are the preset standard good rate, standard defective rate and standard scrap rate, respectively. and are the preset good rate weight factor, defective rate weight factor and scrap rate weight factor, respectively.

[0042] It should be noted that the current production stage is from the start of production of the current type of product to the current time, and the past production stages are from the start of production of each product to the end of production. The average good rate of each device in the database in each past production stage is calculated to obtain the average good rate of each device, and the largest average good rate is selected as the standard good rate. Similarly, the standard defective rate and standard scrap rate are obtained. At the same time, the total number of good products U, the total number of defective products V and the total number of scrapped products W are obtained from the database.

[0043] In a specific embodiment, the specific adjustment process of the target device identification system is as follows: the standard accuracy index required for the production product type in the current production stage is obtained from the database; if the accuracy index of the target device in the current production stage is less than the standard accuracy index, the production accuracy of the target device identification device is replaced with a production accuracy scheme with a higher accuracy level; if the accuracy index of the target device in the current production stage is greater than the standard accuracy index, the production accuracy of the target device identification device is replaced with a production accuracy scheme with a lower accuracy level.

[0044] It should be noted that production accuracy plans with different accuracy levels use different identification systems. As the accuracy level of the production accuracy plan decreases from high to low, the power consumption of the production accuracy plan also decreases from more to less.

[0045] The equipment load monitoring module is used to collect the status data of the target equipment, thereby analyzing the status data of the target equipment to obtain the load index of the target equipment, analyzing the historical production rate data in the database to obtain the preset production rate of the target equipment, and then adjusting the raw material transportation rate of the target equipment according to the load index of the target equipment and the preset production rate.

[0046] In a specific embodiment, the state data of the target device is analyzed, and the specific analysis process is as follows: the state data of the target device includes the torque load and the power load of the target device in the current production stage, and the state data of the target device is substituted into the calculation formula of the load index The load index δ of the target device is obtained, X and Y are the load torque and power load of the target device in the current production stage, X′ and Y′ are the standard load torque and standard power load, ρ1 and ρ2 are the preset weight factors of the load torque and power load, ρ1>0, ρ2>0, ρ1+ρ2=1.

[0047] It should be noted that the maximum load torque and maximum electric energy load of each non-faulty device in the database are recorded as the standard load torque and standard electric energy load. At the same time, the number of device failures P caused by load torque overload and the number of device failures Q caused by electric energy load overload are obtained from the database.

[0048]

[0049] In a specific embodiment, the production rate historical data in the database is analyzed, and the specific analysis process is as follows: the production rate historical data includes the number of equipment failures and the number of defective products at each production rate when the target equipment produces the product in the current production stage. The production rate historical data is substituted into the production index calculation formula The production index α of the target equipment’s production rate when producing the product in the current production stage is obtained c , c is the number of production rate, c = 1, 2, ... v, v > 2, A' and B' are the preset number of standard equipment failures and standard equipment defectives, respectively, A c and B c are the number of equipment failures and the number of defective products at the c production rate when the target equipment produces the products of the current production stage, ε1 and ε2 are the weight factors of the preset number of failures and the weight factors of the number of defective products, ε1>0, ε2>0, ε1+ε2=1.

[0050] It should be noted that the average number of equipment failures and the average number of defective products produced at each production rate when each equipment produces each product are calculated to obtain the average number of equipment failures and the average number of defective products produced when each equipment produces each product, the average number of equipment failures and the average number of defective products produced when each equipment produces each product are calculated to obtain the average number of equipment failures and the average number of defective products produced for each equipment, the maximum average number of equipment failures and the maximum average number of defective products produced for each equipment are selected as the standard number of equipment failures and the standard number of defective products, and at the same time, the number of failures of each equipment is divided by the service time to obtain the failure rate of each equipment, the number of defective products produced by each equipment is divided by the total number of productions to obtain the defective rate of each equipment, the average value of the failure rate of each equipment is calculated to obtain the standard failure rate, the average value of the defective rate of each equipment is calculated to obtain the standard defective rate, and the number of equipment C with equipment failure rate higher than the standard failure rate and the number of equipment D with defective rate higher than the standard defective rate are statistically obtained.

[0051] If the production index of a certain production rate when the target device produces the product of the current production stage is greater than the preset production index, it indicates that the production rate when the target device produces the product of the current production stage is a qualified rate, and the maximum qualified production rate when the target device produces the product of the current production stage is selected as the preset production rate when the target device produces the product of the current production stage.

[0052] In a specific embodiment, the raw material transportation rate of the target device is adjusted, and the specific adjustment process is as follows: obtain the standard load index and the expected production rate of the target device in the current production stage from the database; if the load index of the target device is greater than the standard load index, reduce the raw material transportation rate of the target device until the load index of the target device is equal to the standard load index; if during the reduction of the raw material transportation rate of the target device, the production rate of the target device is equal to the expected production rate, stop reducing the raw material transportation rate of the target device; if the load index of the target device is less than the standard load index, increase the raw material transportation rate of the target device until the load index of the target device is equal to the standard load index.

[0053] It should be noted that by reducing the raw material transportation rate of the target equipment and increasing the equipment rest time per unit time, the metal fatigue of the equipment force arm is reduced, the equipment service life is increased, the failure rate is reduced, and at the same time, the heat dissipation time of the wires is increased, reducing the overheating of the wires and cables.

[0054] A database is used to store historical data on production rates, electricity usage records, historical data on production energy consumption, daily demand for each product, the number of standard defects corresponding to each product type, the standard defect area corresponding to each product type, the maximum number of defects corresponding to each product type, the maximum defect area corresponding to each product type, the standard accuracy index required for each product type, the standard accuracy index required for each product type, the equipment standard load index and the estimated production rate of each equipment corresponding to each product.

[0055] according to Figure 2 As shown, the present invention provides an industrial automation control method, comprising the following steps:

[0056] Step 1: Production energy consumption analysis: Analyze the historical production energy consumption data in the database to obtain high-energy consumption products and low-energy consumption products, and then allocate production tasks;

[0057] Step 2: Equipment identification monitoring: Collect the production data of the target equipment, analyze the production data of the target equipment, obtain the accuracy index of the target equipment, and then adjust the identification device of the target equipment;

[0058] Step 3: Equipment load monitoring: Collect the status data of the target equipment, analyze the status data of the target equipment, obtain the load index of the target equipment, analyze the historical production rate data in the database, obtain the preset production rate of the target equipment, and then adjust the raw material transportation rate of the target equipment according to the load index and preset production rate of the target equipment.

[0059] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.

Claims

1. An industrial automation control system and method, characterized in that: Includes the following modules: The production energy consumption analysis module is used to analyze the historical production energy consumption data in the database, obtain the high-energy consumption products and low-energy consumption products, and then allocate production tasks; The equipment identification monitoring module is used to collect the production data of the target equipment, thereby analyzing the production data of the target equipment, obtaining the accuracy index of the target equipment, and then adjusting the identification device of the target equipment; The equipment load monitoring module is used to collect the status data of the target equipment, thereby analyzing the status data of the target equipment to obtain the load index of the target equipment, analyzing the historical production rate data in the database to obtain the preset production rate of the target equipment, and then adjusting the raw material transportation rate of the target equipment according to the load index of the target equipment and the preset production rate.

2. The industrial automation control system according to claim 1, characterized in that: The production energy consumption historical data in the database is analyzed, and the specific analysis process is as follows: The historical data of production energy consumption includes the production energy consumption and production capacity of each product. Substitute the historical data of production energy consumption into the high energy consumption index calculation formula The high energy consumption index γ of product b is obtained + b , b is the product number, b=1,2……n, n>2, M b and N b are the production energy consumption and production capacity of product b, respectively; M′ and N′ are the preset standard production energy consumption and standard production capacity, respectively; η1 and η2 are the preset first production energy consumption weight factor and first production capacity weight factor, respectively; η1>0, η2>0, η1+η2=1; If the high energy consumption index of a product is greater than or equal to the preset high energy consumption index, the product is recorded as a high energy consumption product; if the high energy consumption index of a product is less than the preset high energy consumption index, the product is recorded as a non-high energy consumption product; Substitute the production energy consumption and production capacity of each non-high energy consumption product into the low energy consumption index calculation formula The low energy consumption index γ of non-high energy consumption product g is obtained - g , g is the number of non-high energy consumption products, g = 1, 2 ... w, w > 2, M g and N g are the production energy consumption and production capacity of the non-high energy consumption product g respectively, η3 and η4 are the preset second production energy consumption weight factor and the second production capacity weight factor respectively, η3>0, η4>0, η3+η4=1, if the low energy consumption index of a non-high energy consumption product is greater than or equal to the preset low energy consumption index, then the non-high energy consumption product is recorded as a low energy consumption product; if the low energy consumption index of a non-high energy consumption product is less than the preset low energy consumption index, then the non-high energy consumption product is recorded as a normal energy consumption product.

3. The industrial automation control system according to claim 3, characterized in that: The specific allocation process of the production task allocation is as follows: During the daily low electricity consumption period, high energy consumption products are sorted in descending order according to the high energy consumption index, and each device produces in the order of high energy consumption products. When the production of the first high energy consumption product reaches the set daily demand, the second high energy consumption product is produced until the production of the high energy consumption products is completed; During the peak period of electricity consumption every day, the low-energy consumption products are sorted in descending order according to the high energy consumption index, and each device produces the low-energy consumption products in the order of each low-energy consumption product. When the production of the first low-energy consumption product reaches the set daily demand, the second low-energy consumption product is produced until the production of the low-energy consumption products is completed; During the daily off-peak period of electricity consumption, the profit of each normal energy consumption product in the database is divided by the electricity consumption to obtain the electricity consumption rate of each normal energy consumption product. The normal energy consumption products are sorted in order from large to small according to the high energy consumption index. Each device produces according to the order of the normal energy consumption products. When the production of the first normal energy consumption product reaches the set daily demand, the second normal energy consumption product is produced until the production of the normal energy consumption products is completed.

4. The industrial automation control system according to claim 1, characterized in that: The production data of the target device is analyzed, and the specific analysis process is as follows: The production data of the target equipment includes the number of good products, defective products, scrapped products and total production in the current production stage of the target equipment. Substitute the production data of the target equipment into the accuracy index calculation formula The precision index β of the target device is obtained. E, F and G are the number of good products, defective products and scrapped products produced by device a in the current production stage of the target device, respectively. σ′, σ″ and σ″′ are the preset standard good rate, standard defective rate and standard scrap rate, respectively. and are the preset good rate weight factor, defective rate weight factor and scrap rate weight factor, respectively.

5. The industrial automation control system according to claim 4, characterized in that: The specific adjustment process of the identification device of the adjustment target device is as follows: The standard accuracy index required for the production product type in the current production stage is obtained from the database. If the accuracy index of the target device in the current production stage is less than the standard accuracy index, the production accuracy of the identification device of the target device is replaced with a production accuracy scheme with a higher accuracy level. If the accuracy index of the target device in the current production stage is greater than the standard accuracy index, the production accuracy of the identification device of the target device is replaced with a production accuracy scheme with a lower accuracy level.

6. The industrial automation control system according to claim 1, characterized in that: The state data of the target device is analyzed, and the specific analysis process is as follows: The status data of the target device includes the torque load and power load of the target device in the current production stage. Substitute the status data of the target device into the calculation formula of the load index The load index δ of the target device is obtained, X and Y are the load torque and power load of the target device in the current production stage, X′ and Y′ are the standard load torque and standard power load, ρ1 and ρ2 are the preset weight factors of the load torque and power load, ρ1>0, ρ2>0, ρ1+ρ2=1.

7. The industrial automation control system according to claim 6, characterized in that: The production rate historical data in the database is analyzed, and the specific analysis process is as follows: The production rate history data includes the number of equipment failures and the number of defective products at each production rate when the target equipment produces the products in the current production stage. Substitute the production rate history data into the production index calculation formula The production index α of the target equipment’s production rate when producing the product in the current production stage is obtained c , c is the number of production rate, c = 1, 2, ... v, v > 2, A' and B' are the preset number of standard equipment failures and standard equipment defective products, respectively, A c and B c are the number of equipment failures and the number of defective products of the c production rate when the target equipment produces the products of the current production stage, ε1 and ε2 are the preset weight factors of the number of failures and the number of defective products, ε1>0, ε2>0, ε1+ε2=1; If the production index of a certain production rate when the target device produces the product of the current production stage is greater than the preset production index, it indicates that the production rate when the target device produces the product of the current production stage is a qualified rate, and the maximum qualified production rate when the target device produces the product of the current production stage is selected as the preset production rate when the target device produces the product of the current production stage.

8. The industrial automation control system according to claim 7, characterized in that: The specific adjustment process of adjusting the raw material transport rate of the target equipment is as follows: The standard load index and the estimated production rate of the target equipment in the current production stage are obtained from the database. If the load index of the target equipment is greater than the standard load index, the raw material transportation rate of the target equipment is reduced until the load index of the target equipment is equal to the standard load index. If the production rate of the target equipment is equal to the estimated production rate during the reduction of the raw material transportation rate of the target equipment, the reduction of the raw material transportation rate of the target equipment is stopped. If the load index of the target equipment is less than the standard load index, the raw material transportation rate of the target equipment is increased until the load index of the target equipment is equal to the standard load index.

9. The industrial automation control system according to claim 1, characterized in that: It also includes a database for storing historical data on production rates, electricity usage records, historical data on production energy consumption, daily demand for each product, the standard number of defects corresponding to each product type, the standard defect area corresponding to each product type, the maximum number of defects corresponding to each product type, the maximum defect area corresponding to each product type, the standard accuracy index required for each product type, the standard accuracy index required for each product type, the equipment standard load index and the expected production rate of each equipment corresponding to each product.

10. An industrial automation control method using the industrial automation control system according to any one of claims 1 to 9, characterized in that: The steps include: Step 1: Production energy consumption analysis: Analyze the historical production energy consumption data in the database to obtain high-energy consumption products and low-energy consumption products, and then allocate production tasks; Step 2: Equipment identification monitoring: Collect the production data of the target equipment, analyze the production data of the target equipment, obtain the accuracy index of the target equipment, and adjust the identification device of the target equipment; Step 3: Equipment load monitoring: Collect the status data of the target equipment, analyze the status data of the target equipment, obtain the load index of the target equipment, analyze the historical production rate data in the database, obtain the preset production rate of the target equipment, and then adjust the raw material transportation rate of the target equipment according to the load index and preset production rate of the target equipment.

Citation Information

Patent Citations

  • Industrial automation control system

    CN107102626A

  • Industrial energy consumption analysis and management system

    CN109709914A

  • Energy consumption plan management method and device, electronic equipment and readable storage medium

    CN112712291A

  • Production energy data processing system based on intelligent analysis technology

    CN116757451A

  • Equipment operation mode intelligent control method and system based on Internet of Things

    CN116974230A