Method and device for predicting electric energy loss of overhead ground wire of power transmission line and medium
By acquiring and preprocessing historical load and weather data, combining electromagnetic induction and electrostatic induction principles, an electric energy loss prediction model is built, which solves the problem of inaccurate power loss prediction in the existing technology, improves the prediction accuracy and supports the transformation of OPGW optical cable lines.
Patent Information
- Application Number
- CN202411084592.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-08
AI Technical Summary
When predicting the power loss of overhead ground lines of high-voltage transmission lines, the prior art fails to accurately consider the impact of precipitation on conductivity and load, resulting in low prediction accuracy.
By acquiring historical load data and weather characteristic data, performing preprocessing and clustering analysis, building an electrical energy loss prediction model, combining electromagnetic induction and electrostatic induction principles, considering the impact of precipitation and load on electrical energy loss, using an improved gray prediction model and Clustering algorithms make predictions.
It improves the prediction accuracy of overhead ground wires, promotes the insulation transformation of OPGW optical cable lines, and provides more accurate power loss values.
Smart Images

Figure CN118940187A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power engineering, and in particular to a method, a device and a medium for predicting power loss of overhead ground wires of power transmission lines. Background Art
[0002] Overhead ground wire is the most basic lightning protection measure for transmission lines. Through the shunting effect of lightning current, it can effectively reduce the intensity of lightning current entering the grounding tower, thereby reducing the potential at the top of the tower. It is of great significance to the safe and stable operation of the power grid. However, with the increase of the voltage level of the transmission line, the energy loss of the overhead ground wire is also becoming larger and larger.
[0003] At present, high-voltage transmission line OPGW basically adopts the method of base-by-base grounding, while ordinary lightning arresters mostly adopt the method of segmented insulation and single-point grounding. The tower-by-tower grounded OPGW forms a loop with the earth, and the induced current causes huge power loss. Due to the rapid development of industry, a large amount of power resources are wasted unknowingly. The traditional prediction method mainly focuses on the prediction research using the overhead transmission line structure, and fails to consider the influence of precipitation on the conductivity value of the overhead ground wire and the influence of load on the electromagnetic induction voltage and electrostatic induction voltage of the overhead ground wire, making the prediction of the power loss of the overhead ground wire not accurate enough. Summary of the invention
[0004] The purpose of the present invention is to provide a method, device and medium for predicting the power loss of overhead ground wire of a transmission line, which can improve the prediction accuracy of the power loss of overhead ground wire, and has important reference value for reflecting the power loss value of OPGW optical cable line and promoting the accuracy of OPGW insulation transformation.
[0005] To achieve the above object, the present invention provides the following solutions:
[0006] A method for predicting power loss of overhead ground wire of a power transmission line, the method comprising:
[0007] Obtain historical load data of the overhead ground wire of the target transmission line and historical weather characteristic data and corresponding date characteristic data within the target area where the overhead ground wire of the target transmission line is located; the historical weather characteristic data includes historical temperature data, historical precipitation data, historical humidity data, historical air pressure data and historical wind speed data; the date characteristic data includes working days and non-working days.
[0008] Preprocessing the historical load data and the historical weather characteristic data to obtain optimized historical load data and historical weather characteristic data; the preprocessing operation includes removing abnormal values and making corrections;
[0009] Filtering target weather characteristic data from the optimized historical weather characteristic data; the correlation between the target weather characteristic data and the optimized historical load data meets a first preset requirement;
[0010] Acquire forecast weather characteristic data that meets the second preset requirement, and apply a clustering algorithm to the forecast weather characteristic data that meets the second preset requirement and the corresponding date characteristic data to obtain a forecast weather characteristic data cluster and a date characteristic data cluster; the forecast weather characteristic data includes forecast temperature data, forecast precipitation data, forecast humidity data, forecast air pressure data, and forecast wind speed data;
[0011] The predicted weather characteristic data cluster and the date characteristic data cluster are input into the load forecasting model to obtain predicted load data; the load forecasting model is obtained by training the improved grey forecasting model with the load forecasting training data set; the load forecasting training data set includes historical weather characteristic data cluster samples, corresponding date characteristic data cluster samples and corresponding load data samples; the historical weather characteristic data cluster samples are obtained by applying a clustering algorithm to the target weather characteristic data;
[0012] According to the relationship between the conductivity of the insulator and the precipitation, and the relationship between the electromagnetic induction voltage and the electrostatic induction voltage of the overhead ground wire and the load, an accurate prediction model for initial power loss is constructed;
[0013] The predicted weather characteristic data, the predicted load data and the target transmission line overhead ground wire parameter data are input into the power loss prediction model to obtain the power loss data of the target transmission line overhead ground wire; the power loss prediction model is obtained by training the initial power loss precise prediction model using the power loss prediction training data set; the power loss prediction training data set includes the historical weather characteristic data, the historical load data, the target transmission line overhead ground wire parameter data and the corresponding historical power loss data of the target transmission line overhead ground wire; the target transmission line overhead ground wire parameter data includes the overhead ground wire electromagnetic induction voltage value, electrostatic induction voltage value and insulator conductivity value.
[0014] Optionally, preprocessing the historical load data and the historical weather characteristic data to obtain optimized historical load data and historical weather characteristic data specifically includes:
[0015] Performing outlier detection on the historical load data and the historical weather characteristic data;
[0016] Eliminating the abnormal value from the historical load data and the historical weather characteristic data;
[0017] A mean algorithm is applied to perform mean correction on the historical load data and the historical weather characteristic data after the abnormal values are eliminated, so as to obtain optimized historical load data and historical weather characteristic data.
[0018] Optionally, 3-sigma outlier detection is performed on the historical load data and the historical weather characteristic data.
[0019] Optionally, filtering target weather characteristic data from the historical weather characteristic data specifically includes:
[0020] Using the Spearman correlation coefficient method to calculate the correlation coefficient between the historical weather characteristic data and the historical load data;
[0021] According to the correlation coefficient, the correlation degree between the historical weather characteristic data and the historical load data is determined; the correlation degree includes strong correlation, weak correlation and no correlation; when the correlation coefficient is greater than or equal to a first preset threshold, the correlation degree is strong correlation; when the correlation coefficient is less than the first preset threshold and greater than the second preset threshold, the correlation degree is weak correlation; when the correlation coefficient is less than or equal to the second preset threshold, the correlation degree is no correlation;
[0022] Determining whether the degree of correlation is the strong correlation or the weak correlation;
[0023] When the correlation degree is the strong correlation and the weak correlation, the corresponding historical weather characteristic data is the target weather characteristic data.
[0024] Optionally, obtaining predicted weather characteristics that meet the second preset requirement, and applying a clustering algorithm to the predicted weather characteristic data and the date characteristic data to obtain predicted weather characteristic data clusters and date characteristic data clusters, specifically includes:
[0025] Acquire initial weather characteristic data of each meteorological monitoring station in the target area at each preset time within a preset time period;
[0026] Filtering the initial weather characteristic data whose correlation with the historical load data meets a second preset requirement from the initial weather characteristic data to obtain filtered weather characteristic data;
[0027] The average value of the filtered weather characteristic data is calculated to obtain the weather characteristic data at each preset time in the target area, and the weather characteristic data at each preset time in the target area is used as the predicted weather characteristic data within a preset time period.
[0028] The predicted weather characteristic data and the corresponding date characteristic data are processed by using a k-means clustering algorithm to obtain a cluster of predicted weather characteristic data and a cluster of date characteristic data.
[0029] Optionally, the process of constructing the initial power loss accurate prediction model specifically includes:
[0030] According to the electromagnetic coupling principle, a first relationship is constructed, and the electromagnetic induction voltage of the overhead ground wire of the transmission line is calculated according to the first relationship; the first relationship is the relationship between the electromagnetic induction voltage of the overhead ground wire of the transmission line and a first parameter of the transmission line; the first parameter of the transmission line includes the total number of towers of the transmission line, predicted load data, line voltage, power factor, rotation factor, spacing between the overhead ground wire and the conductor in the base tower, and an electromagnetic induction voltage correction factor;
[0031] According to the electrostatic induction principle, a second relationship is constructed, and the electrostatic induction voltage of the overhead ground wire of the transmission line is calculated according to the second relationship; the second relationship is the relationship between the electrostatic induction voltage of the overhead ground wire of the transmission line and the second parameter of the transmission line; the second parameter of the transmission line includes the charge coefficient of the conductor, the charge on the conductor, the charge coefficient on the overhead ground wire, the charge on the overhead ground wire in the base tower, and the electrostatic induction voltage correction factor;
[0032] According to the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the first state of the first classification, a third relationship is determined, and the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode is calculated; the first classification is the overhead ground wire of the transmission line in the tower-by-tower grounding mode; the first state is the non-no-load state of the transmission line; the third relationship is the relationship between the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode and the third parameter of the transmission line; the third parameter of the transmission line includes the electromagnetic induction voltage of the overhead ground wire, the electrostatic induction voltage of the overhead ground wire, the self-impedance of the overhead ground wire, the mutual impedance of the overhead ground wire and the grounding resistance of the transmission line tower;
[0033] According to the second state of the first classification, a fourth relationship is determined, and the second electric energy loss of the overhead ground wire under the tower-by-tower grounding mode is calculated according to the fourth relationship; the second state is a no-load state of the transmission line; the fourth relationship is a relationship between the second electric energy loss of the overhead ground wire under the tower-by-tower grounding mode and a fourth parameter of the transmission line; the fourth parameter of the transmission line includes the charge on the overhead ground wire in the base tower, the angular frequency and the grounding resistance of the base tower of the transmission line;
[0034] According to the first state of the second classification, a fifth relationship is determined, and the conductance of the overhead ground wire insulator under the segmented insulation mode is calculated according to the fifth relationship; the second classification is the overhead ground wire of the transmission line in the segmented insulation mode; the fifth relationship is the relationship between the conductance of the overhead ground wire insulator under the segmented insulation mode and the fifth parameter of the transmission line; the fifth parameter includes the effective area of the insulator surface, the relative humidity of the weather, the rainfall intensity and the surface conductivity variation coefficient;
[0035] According to the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the second state of the second classification, a sixth relationship is determined, and the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is in a non-no-load state is calculated according to the sixth relationship; the sixth relationship is the relationship between the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is in a non-no-load state and a sixth parameter; the sixth parameter includes the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line, the conductivity of the ground wire insulator affected by precipitation, the self-impedance of the overhead ground wire and the number of segments;
[0036] According to the second state of the second classification, a seventh relationship is determined, and according to the seventh relationship, the power loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is unloaded is calculated; the seventh relationship is the relationship between the power loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is unloaded and a seventh parameter; the seventh parameter includes the electrostatic induction voltage of the overhead ground wire of the transmission line and the conductivity of the ground wire insulator affected by precipitation;
[0037] According to the predicted load data and the predicted precipitation data that meets the second preset requirement, an eighth relationship is determined, and according to the eighth relationship, one is selected from the candidate models as the initial power loss accurate prediction model; the candidate models include the fourth relationship, the fifth relationship, the sixth relationship, the seventh relationship and 0.
[0038] Optionally, the power loss prediction method further includes:
[0039] The accuracy of the power loss prediction model is determined based on the power loss data of the overhead ground wire of the target transmission line output by the power loss prediction model and the actual power loss data of the overhead ground wire of the target transmission line.
[0040] Optionally, the power loss prediction method further includes:
[0041] The initial power loss precise prediction model is modified according to the predicted power loss data output by the initial power loss precise prediction model and the corresponding measured power loss data.
[0042] A computer device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the above-mentioned methods for predicting power loss of overhead ground wires of transmission lines.
[0043] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements any of the above-mentioned methods for predicting power loss of overhead ground wires of transmission lines.
[0044] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0045] The present invention provides a method, device and medium for predicting the power loss of overhead ground wires of power transmission lines. The power loss prediction model is constructed by considering the influence of precipitation on conductivity value and load on electromagnetic induction and electrostatic induction voltage values. The prediction model is corrected by calculating residuals and correction factors in combination with actual measurement data, which can improve the prediction accuracy and has important reference value for reflecting the power loss value of OPGW optical cable lines and promoting the accuracy of OPGW insulation transformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0047] Figure 1 A schematic diagram of a flow chart of a method for predicting power loss of overhead ground wires of a transmission line provided in Embodiment 1 of the present invention;
[0048] Figure 2 It is the normal distribution curve of the 3-sigma model;
[0049] Figure 3 This is a diagram of the internal structure of a computer device. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] The purpose of the present invention is to provide a method, device and medium for predicting power loss of overhead ground wire of a transmission line, aiming to improve the prediction accuracy of power loss of overhead ground wire of a transmission line.
[0052] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0053] Example 1
[0054] like Figure 1 As shown, the method for predicting power loss of overhead ground wire of a transmission line in this embodiment includes:
[0055] Step S1: Obtain historical load data of the overhead ground wire of the target transmission line and historical weather characteristic data and corresponding date characteristic data within the target area where the overhead ground wire of the target transmission line is located; the historical weather characteristic data includes historical temperature data, historical precipitation data, historical humidity data, historical air pressure data and historical wind speed data; the date characteristic data includes working days and non-working days.
[0056] The load data will differ significantly on weekdays and non-workdays each week due to residents' living and working patterns.
[0057] In the subsequent steps, the temperature, precipitation, humidity, air pressure and wind speed data are first selected by the 3-sigma algorithm, and then the weather data that meets the selection of the 3-sigma algorithm is used to predict the load using the clustering algorithm and the improved grey prediction algorithm.
[0058] Step S2: pre-processing the historical load data and the historical weather characteristic data to obtain optimized historical load data and historical weather characteristic data; the pre-processing operation includes removing abnormal values and making corrections.
[0059] S2 specifically includes:
[0060] Step S21: performing outlier detection on the historical load data and the historical weather characteristic data.
[0061] After the historical load data and historical weather characteristic data are collected, some of the data may be very high or very low. In order to make the historical load data and historical weather characteristic data more meaningful for reference, it is necessary to eliminate and clean the abnormal data in the historical load data and the abnormal data in the historical weather characteristic data.
[0062] Specifically, 3-sigma outlier detection is performed on the historical load data and the historical weather characteristic data.
[0063] Step S22: Eliminate the abnormal values from the historical load data and the historical weather characteristic data.
[0064] Step S23: applying a mean algorithm to perform mean correction on the historical load data and the historical weather characteristic data after removing abnormal values, so as to obtain optimized historical load data and historical weather characteristic data.
[0065] In practical applications, 3-sigma outlier detection is performed on historical load data and historical weather characteristic data respectively. By calculating the mean and standard deviation σ of the historical data, it is determined whether each value in the data is within the interval [μ-3σ,μ+3σ]. For example, Figure 2 As shown, the maximum threshold and minimum threshold of the data within the historical time range are obtained. The maximum threshold is the mean of the historical data plus three times the standard deviation, and the minimum threshold is the mean of the historical data minus three times the standard deviation. If it is not within the threshold range, it is marked as an outlier, and then the mean method is used to replace the outlier. The outlier is replaced by taking the average value of the historical data corresponding to the time points before and after the outlier, so as to obtain the optimized historical load data and historical weather characteristic data.
[0066] Step S3: Filter target weather characteristic data from the optimized historical weather characteristic data; the target weather characteristic data is historical weather characteristic data whose correlation with the historical load data meets a first preset requirement.
[0067] S3 specifically includes:
[0068] Step S31: applying the Spearman correlation coefficient method to calculate the correlation coefficient between the historical weather characteristic data and the historical load data.
[0069] Step S32: According to the correlation coefficient, determine the degree of correlation between the historical weather characteristic data and the historical load data; the degree of correlation includes strong correlation, weak correlation and no correlation; when the correlation coefficient is greater than or equal to a first preset threshold, the degree of correlation is strong correlation; when the correlation coefficient is less than the first preset threshold and greater than the second preset threshold, the degree of correlation is weak correlation; when the correlation coefficient is less than or equal to the second preset threshold, the degree of correlation is no correlation.
[0070] Step S33: Determine whether the correlation degree is the strong correlation or the weak correlation.
[0071] Step S34: When the correlation degree is the strong correlation and the weak correlation, the corresponding historical weather characteristic data is the target weather characteristic data.
[0072] In practical applications, the Spearman correlation coefficient method is used to calculate the correlation between each historical weather data and each historical load data.s The calculation is as follows:
[0073]
[0074] In the formula, ψ is the level number, d i for u and y i The level difference between them, u is the historical load data, y i It is one of the historical temperature data, historical precipitation data, historical humidity data, historical air pressure data, and historical wind speed data.
[0075] According to the size of the Spearman correlation coefficient, the judgment rule is:
[0076] When | r s |≥0.7 is considered to be strongly correlated, and when 0.2<|r s |<0.7 is considered weakly correlated. s When |≤0.2, it is considered irrelevant.
[0077] Step S4: Obtain forecast weather characteristic data that meets the second preset requirement, and apply a clustering algorithm to the forecast weather characteristic data that meets the second preset requirement and the corresponding date characteristic data to obtain forecast weather characteristic data clusters and date characteristic data clusters.
[0078] S4 specifically includes:
[0079] Step S41: acquiring initial weather characteristic data of each meteorological monitoring station in the target area at each preset time within a preset time period.
[0080] Step S42: Filtering the initial weather characteristic data whose correlation with the historical load data meets a second preset requirement from the initial weather characteristic data to obtain filtered weather characteristic data.
[0081] Step S43: Calculate the average value of the filtered weather characteristic data to obtain the weather characteristic data at each preset time in the target area, and use the weather characteristic data at each preset time in the target area as the predicted weather characteristic data within a preset time period.
[0082] Step S44: Processing the predicted weather characteristic data and the corresponding date characteristic data using a k-means clustering algorithm to obtain predicted weather characteristic data clusters and date characteristic data clusters.
[0083] In practical applications, weather characteristic data with strong and weak correlations with historical load data are collected from multiple meteorological monitoring stations in the target area within a preset time, and the average value is calculated.
[0084] Randomly select n initial points in the data set as cluster centers. For each data point in the predicted weather characteristic data and date characteristic data, calculate their distance to each center point and assign them to the nearest cluster center. For each cluster, calculate the mean of all its data points, which is the new center. Repeat the above steps until the new center no longer changes or the predetermined number of iterations is met, thereby obtaining the predicted weather characteristic data clusters and date characteristic data clusters.
[0085] Step S5: Input the predicted weather characteristic data cluster and the date characteristic data cluster into the load forecasting model to obtain predicted load data; the load forecasting model is obtained by training the improved grey forecasting model with the load forecasting training data set; the load forecasting training data set includes historical weather characteristic data cluster samples, corresponding date characteristic data cluster samples and corresponding load data samples; the historical weather characteristic data cluster samples are obtained by applying a clustering algorithm to the target weather characteristic data; the corresponding date characteristic data cluster samples are obtained by applying a clustering algorithm to the date characteristic data corresponding to the target weather characteristic data.
[0086] The predicted weather characteristic data cluster set and the date characteristic data cluster set are input into the improved grey prediction model to obtain the predicted load data, and the improved grey prediction model is corrected by residual calculation in combination with the actually measured load data.
[0087] In practical applications, grey prediction mainly uses the GM model to analyze and infer the evolution trend and law of system behavior characteristics, and can predict the time point when the system behavior becomes abnormal. It is a prediction method that uses a small amount of incomplete information to establish a mathematical model and make predictions. It has a wide range of applications in various fields, especially in predicting and analyzing future development trends based on currently available data.
[0088] When processing some data sequences with insufficient smoothness, the accuracy of the grey model will be greatly reduced. This paper first optimizes the original data through an exponential function to improve its smoothness, thereby improving the prediction accuracy.
[0089] Specifically, set the reference data to: x (0) =(x (0) (1),x (0) (2),…,x (0) (n)).
[0090] First, the original data is optimized by exponential function:
[0091] y (0) (k) = e x(0)(k),k=1,2,..,n; where e is the base; the original data is the reference data. The generated new data set is transformed according to the GM(1,1) model to obtain a new response equation. Specifically, through the exponential function, the new response sequence is obtained as follows: (0) (k+1) * =y (1) (k+1) * -y (1) (k) * .
[0092] The restored value of the original sequence is: x (0) (k) * =ln(y (0) (k) * ).
[0093] By accumulating and generating a series, the improved grey differential equation is established as: (0) (k)+λx (1) (k) = ζ, where λ is the development coefficient and ζ is the grey action. The estimated values of λ and ζ are obtained by using the least squares method, and the predicted value of the grey prediction model is:
[0094]
[0095] in, is the predicted value of the k+1th original data; is the predicted value of the first k+1 original accumulated data; is the predicted value of the first k original accumulated data.
[0096] The improved grey prediction model is modified by the field measured load data, and the residual is calculated for comparison. The residual ε(k) is as follows:
[0097]
[0098] In the formula, x (0) (k) is the load data measured on site, For the predicted load data, when ε(k)≤0.1, the output requirement is met and the values of λ and ζ are solved. If ε(k)>0.1, the output requirement is not met and the model is further modified according to the on-site measurement values, that is, the values of λ and ζ are continued to be adjusted.
[0099] The historical weather characteristic data clusters and date characteristic data clusters with strong and weak correlation strengths collected from meteorological observation stations are input into the improved grey prediction model to obtain the predicted load value.
[0100] Step S6: construct an accurate prediction model for initial power loss based on the relationship between the conductivity of the insulator and the amount of precipitation, and the relationship between the electromagnetic induction voltage and the electrostatic induction voltage of the overhead ground wire and the amount of load.
[0101] S6 specifically includes:
[0102] Step S61: According to the electromagnetic coupling principle, a first relationship is constructed, and the electromagnetic induction voltage of the overhead ground wire of the transmission line is calculated according to the first relationship; the first relationship is the relationship between the electromagnetic induction voltage of the overhead ground wire of the transmission line and the first parameter of the transmission line; the first parameter of the transmission line includes the total number of towers of the transmission line, predicted load data, line voltage, power factor, rotation factor, the distance between the overhead ground wire and the conductor in the base tower, and the electromagnetic induction voltage correction factor.
[0103] Step S62: construct a second relationship based on the electrostatic induction principle, and calculate the electrostatic induction voltage of the overhead ground wire of the transmission line based on the second relationship; the second relationship is the relationship between the electrostatic induction voltage of the overhead ground wire of the transmission line and the second parameter of the transmission line; the second parameter of the transmission line includes the charge coefficient of the conductor, the charge on the conductor, the charge coefficient on the overhead ground wire, the charge on the overhead ground wire in the base tower and the electrostatic induction voltage correction factor.
[0104] Step S63: Determine a third relationship based on the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the first state of the first classification, and calculate the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode; the first classification is the overhead ground wire of the transmission line in the tower-by-tower grounding mode; the first state is a non-no-load state of the transmission line; the third relationship is the relationship between the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode and the third parameter of the transmission line; the third parameter of the transmission line includes the electromagnetic induction voltage of the overhead ground wire, the electrostatic induction voltage of the overhead ground wire, the self-impedance of the overhead ground wire, the mutual impedance of the overhead ground wire and the grounding resistance of the transmission line tower.
[0105] Step S64: Determine a fourth relationship according to the second state of the first classification, and calculate the second electric energy loss of the overhead ground wire under the tower-by-tower grounding method according to the fourth relationship; the second state is a no-load state of the transmission line; the fourth relationship is the relationship between the second electric energy loss of the overhead ground wire under the tower-by-tower grounding method and a fourth parameter of the transmission line; the fourth parameter of the transmission line includes the charge on the overhead ground wire in the base tower, the angular frequency and the grounding resistance of the base tower of the transmission line.
[0106] Step S65: Determine the fifth relationship based on the first state of the second classification, and calculate the conductivity of the overhead ground wire insulator under the segmented insulation mode based on the fifth relationship; the second classification is the overhead ground wire of the transmission line in the segmented insulation form; the fifth relationship is the relationship between the conductivity of the overhead ground wire insulator under the segmented insulation mode and the fifth parameter of the transmission line; the fifth parameter includes the effective area of the insulator surface, the relative humidity of the weather, the rainfall intensity and the surface conductivity variation coefficient.
[0107] Step S66: Determine a sixth relationship based on the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the second state of the second classification, and calculate the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is not no-loaded based on the sixth relationship; the sixth relationship is the relationship between the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is not no-loaded and a sixth parameter; the sixth parameter includes the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line, the conductivity of the ground wire insulator affected by precipitation, the self-impedance of the overhead ground wire and the number of segments.
[0108] Step S67: According to the second state of the second classification, a seventh relationship is determined, and according to the seventh relationship, the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is no-loaded is calculated; the seventh relationship is the relationship between the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is no-loaded and the seventh parameter; the seventh parameter includes the electrostatic induction voltage of the overhead ground wire of the transmission line and the conductivity of the ground wire insulator affected by precipitation.
[0109] Step S68: Determine an eighth relationship based on the predicted load data and the predicted precipitation data that meets the second preset requirement, and select one from the candidate models as the initial power loss accurate prediction model based on the eighth relationship; the candidate models include the fourth relationship, the fifth relationship, the sixth relationship, the seventh relationship and 0.
[0110] In practical applications, the construction process of the power loss accurate prediction model specifically includes:
[0111] The overhead ground wires of transmission lines that belong to the tower-by-tower grounding method are classified into the first category, and the overhead ground wires of transmission lines that belong to the segmented insulation form are classified into the second category.
[0112] During normal operation, due to the electromagnetic coupling and electrostatic induction effects, the overhead ground wire will generate electromagnetic induction voltage and electrostatic induction voltage. Under the influence of the two, the overhead ground wire of the transmission line will produce power loss.
[0113] According to the electromagnetic coupling principle, a first relationship is constructed, and according to the first relationship, the electromagnetic induction voltage of the overhead ground wire of the transmission line is determined and the model is corrected through the measurement data. The first relationship is expressed by a first formula, which is:
[0114]
[0115] In the formula, E d is the induced voltage of the overhead ground wire, n is the total number of towers of the transmission line, P is the calculated predicted load, U is the line voltage, cosφ is the power factor, θ is the rotation factor, d ia ,d ib ,d ic are the distances between the overhead ground wire and the a, b, and c conductors in the ith tower, respectively; i is the ith tower of the transmission line, j is the unit of imaginary number, γ d is the electromagnetic induction voltage correction factor, which can be expressed as l is the number of measurement data, E d,measure is the measured electromagnetic induction voltage value.
[0116] According to the electrostatic induction principle, a second relationship is constructed, and according to the second relationship, the electrostatic induction voltage of the overhead ground wire of the transmission line is determined and the model is corrected through the measurement data. The second relationship is expressed by a second formula, which is:
[0117]
[0118] In the formula, a a 、a b 、a c is the charge coefficient of the three-phase conductors a, b, and c, Q ia , Q ib , Q ic is the charge on each line of the three-phase conductor in the i-th tower a, b, c, a1 is the charge coefficient on the overhead ground wire, Q i1 is the charge on the overhead ground wire in the ith tower, γ j is the electrostatic induction voltage correction factor, which can be expressed as l is the number of measurement data, E j,measure is the measured electrostatic induction voltage value.
[0119] The number l of measurement data for measuring the electrostatic induction voltage value and the electromagnetic induction voltage value is the same. Each tower of a line measures the electromagnetic induction voltage and the electrostatic induction voltage data. The measurements are performed simultaneously to ensure the consistency of the line current.
[0120] A first state is classified from both the first category and the second category, and the first state is a transmission line non-no-load situation.
[0121] A second state is classified from both the first category and the second category, and the second state is a no-load condition of the transmission line.
[0122] A third relationship is determined according to the first state under the first classification, and the overhead ground wire power loss in the tower-by-tower grounding mode is calculated according to the third relationship. The third relationship is represented by a third formula, which is:
[0123]
[0124] Where P loss1 is the power loss of the overhead ground wire in the tower-by-tower grounding mode when the transmission line is not unloaded, E i is the electromagnetic induction voltage of the overhead ground wire, E j is the electrostatic induction voltage of the overhead ground wire, Z self is the self-impedance of the overhead ground wire, Z mutual is the mutual impedance of the overhead ground wire, Z d is the grounding resistance of the transmission line tower.
[0125] A fourth relationship is determined according to the second state under the first classification, and the overhead ground wire power loss in the tower-by-tower grounding mode is calculated according to the fourth relationship. The fourth relationship is represented by a fourth formula, which is:
[0126]
[0127] Where P loss2 is the power loss of the overhead ground wire in the tower-by-tower grounding mode when the transmission line is unloaded, Q i1 is the charge on the overhead ground wire in the ith tower, j is an imaginary number, w is the angular frequency, Z id is the grounding resistance of the i-th tower of the transmission line.
[0128] Rainfall can have a significant impact on insulators, mainly because rainwater will form a layer of water film on the surface of the insulator, thereby changing the electrical conductivity characteristics of the insulator, which in turn has a greater impact on the power loss of the overhead ground wire.
[0129] A fifth relationship is determined according to the first state under the second classification, and the conductance of the overhead ground wire insulator in the segmented insulation mode is calculated according to the fifth relationship. The fifth relationship is represented by a fifth formula, which is:
[0130]
[0131] In the formula, G d is the ground wire insulator conductivity affected by precipitation, A Sis the effective area of the insulator surface, RH is the relative humidity in the predicted weather, RI is the rainfall intensity in the predicted weather, and k′ is the coefficient of variation of surface conductivity.
[0132] The sixth relationship can be determined based on the fifth relationship, and the overhead ground wire power loss when not no-loaded in the segmented insulation mode can be calculated based on the sixth relationship. The sixth relationship is represented by the sixth formula, which is:
[0133]
[0134] Where P loss3 is the power loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is not unloaded, E i is the electromagnetic induced voltage, E j is the electrostatic induced voltage, G d is the ground wire insulator conductivity affected by precipitation, Z self is the self-impedance of the overhead ground wire, and m′ is the number of segments.
[0135] The seventh relationship is determined according to the second state under the second classification, and the overhead ground wire power loss when no-load in the segmented insulation mode is calculated according to the seventh relationship. The seventh relationship is expressed by the seventh formula, which is:
[0136] P loss4 =G d ×(E j ) 2 ;
[0137] Where P loss4 When the transmission line is unloaded, the power loss of the overhead ground wire under the section insulation mode affected by precipitation, E j is the electrostatic induced voltage, G d is the conductivity of the ground wire insulator affected by precipitation.
[0138] According to the predicted load data in the data set and the precipitation data in the predicted weather conditions, an eighth relationship is generated, and the selection of the prediction model is determined according to the eighth relationship, so as to perform accurate prediction. The eighth relationship is represented by an eighth formula, and the eighth formula is:
[0139]
[0140] A ninth relationship is generated according to the predicted power loss value of the overhead ground wire of the transmission line and the actual power loss value of the overhead ground wire, and the accuracy of the prediction model is determined according to the ninth relationship. The ninth relationship is represented by a ninth formula, which is:
[0141]
[0142] Where, Li Indicates the actual loss, represents the predicted loss, q is the number of loss data; E RMSE is the root mean square error.
[0143] According to the measured data and the calculated predicted power loss data, a tenth relationship is generated, and the prediction model is corrected according to the tenth relationship. The tenth relationship is represented by a tenth formula, which is:
[0144] P correct =γ×P final ;
[0145] Where P correct is the corrected predicted value, P final is the predicted value before correction, γ is the correction factor, and its value can be expressed as P measure is the measured value of power loss, and l is the number of measured data.
[0146] Step S7: input the predicted weather characteristic data, the predicted load data and the target transmission line overhead ground wire parameter data into the power loss prediction model to obtain the power loss data of the target transmission line overhead ground wire; the power loss prediction model is obtained by training the initial power loss precise prediction model using the power loss prediction training data set; the power loss prediction training data set includes the historical weather characteristic data, the historical load data, the target transmission line overhead ground wire parameter data and the corresponding historical power loss data of the target transmission line overhead ground wire; the target transmission line overhead ground wire parameter data includes the overhead ground wire electromagnetic induction voltage value, electrostatic induction voltage value and insulator conductivity value.
[0147] In practical applications, an accurate prediction model for power loss is constructed based on the relationship between the conductivity of the insulator and the precipitation, and the relationship between the electromagnetic induction voltage value and the electrostatic induction voltage value of the overhead ground wire and the load. The data set is input into the accurate prediction model for power loss to obtain the power loss prediction data of the overhead ground wire of the target transmission line. Combined with the actual measured power loss data, the prediction model is corrected by calculating the correction factor.
[0148] Example 2
[0149] A computer device includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for predicting power loss of overhead ground wires of a transmission line in Example 1.
[0150] Example 3
[0151] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the method for predicting power loss of overhead ground wires of a transmission line in embodiment 1.
[0152] Example 4
[0153] A computer program product includes a computer program, which implements the method for predicting power loss of overhead ground wires of a power transmission line in embodiment 1 when executed by a processor.
[0154] Example 5
[0155] A computer device, which may be a database, may have an internal structure as shown in Figure 3 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store pending transactions. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the method for predicting the power loss of overhead ground wires of transmission lines in Example 1 is implemented.
[0156] It should be noted that the object information (including but not limited to object device information, object personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in the present invention are all information and data authorized by the object or fully authorized by all parties, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.
[0157] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided by the present invention can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided by the present invention may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited thereto. The processor involved in each embodiment provided by the present invention may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited thereto.
[0158] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0159] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for predicting power loss of overhead ground wire of a transmission line, characterized in that: The power loss prediction method comprises: Obtain historical load data of the overhead ground wire of the target transmission line and historical weather characteristic data and corresponding date characteristic data within the target area where the overhead ground wire of the target transmission line is located; the historical weather characteristic data includes historical temperature data, historical precipitation data, historical humidity data, historical air pressure data and historical wind speed data; the date characteristic data includes working days and non-working days. Preprocessing the historical load data and the historical weather characteristic data to obtain optimized historical load data and historical weather characteristic data; the preprocessing operation includes removing abnormal values and making corrections; Filtering target weather characteristic data from the optimized historical weather characteristic data; the correlation between the target weather characteristic data and the optimized historical load data meets a first preset requirement; Acquire forecast weather characteristic data that meets the second preset requirement, and apply a clustering algorithm to the forecast weather characteristic data that meets the second preset requirement and the corresponding date characteristic data to obtain a forecast weather characteristic data cluster and a date characteristic data cluster; the forecast weather characteristic data includes forecast temperature data, forecast precipitation data, forecast humidity data, forecast air pressure data, and forecast wind speed data; The predicted weather characteristic data cluster and the date characteristic data cluster are input into the load forecasting model to obtain predicted load data; the load forecasting model is obtained by training the improved grey forecasting model with the load forecasting training data set; the load forecasting training data set includes historical weather characteristic data cluster samples, corresponding date characteristic data cluster samples and corresponding load data samples; the historical weather characteristic data cluster samples are obtained by applying a clustering algorithm to the target weather characteristic data; According to the relationship between the conductivity of the insulator and the precipitation, and the relationship between the electromagnetic induction voltage and the electrostatic induction voltage of the overhead ground wire and the load, an accurate prediction model for initial power loss is constructed; The predicted weather characteristic data, the predicted load data and the target transmission line overhead ground wire parameter data are input into the power loss prediction model to obtain the power loss data of the target transmission line overhead ground wire; the power loss prediction model is obtained by training the initial power loss precise prediction model using the power loss prediction training data set; the power loss prediction training data set includes the historical weather characteristic data, the historical load data, the target transmission line overhead ground wire parameter data and the corresponding historical power loss data of the target transmission line overhead ground wire; the target transmission line overhead ground wire parameter data includes the overhead ground wire electromagnetic induction voltage value, electrostatic induction voltage value and insulator conductivity value.
2. The method for predicting power loss of overhead ground wire of a transmission line according to claim 1, characterized in that: Preprocessing the historical load data and the historical weather characteristic data to obtain optimized historical load data and historical weather characteristic data specifically includes: Performing outlier detection on the historical load data and the historical weather characteristic data; Eliminating the abnormal value from the historical load data and the historical weather characteristic data; A mean algorithm is applied to perform mean correction on the historical load data and the historical weather characteristic data after the abnormal values are eliminated, so as to obtain optimized historical load data and historical weather characteristic data.
3. The method for predicting power loss of overhead ground wire of a transmission line according to claim 2, characterized in that: Perform 3-sigma outlier detection on the historical load data and the historical weather characteristic data.
4. The method for predicting power loss of overhead ground wire of a transmission line according to claim 1, characterized in that: Filtering target weather characteristic data from the historical weather characteristic data specifically includes: Using the Spearman correlation coefficient method to calculate the correlation coefficient between the historical weather characteristic data and the historical load data; According to the correlation coefficient, the correlation degree between the historical weather characteristic data and the historical load data is determined; the correlation degree includes strong correlation, weak correlation and no correlation; when the correlation coefficient is greater than or equal to a first preset threshold, the correlation degree is strong correlation; when the correlation coefficient is less than the first preset threshold and greater than the second preset threshold, the correlation degree is weak correlation; when the correlation coefficient is less than or equal to the second preset threshold, the correlation degree is no correlation; Determining whether the degree of correlation is the strong correlation or the weak correlation; When the correlation degree is the strong correlation and the weak correlation, the corresponding historical weather characteristic data is the target weather characteristic data.
5. The method for predicting power loss of overhead ground wire of a power transmission line according to claim 4, characterized in that: Acquiring predicted weather characteristics that meet the second preset requirement, and applying a clustering algorithm to the date characteristic data and the predicted weather characteristic data that meet the second preset requirement to obtain predicted weather characteristic data clusters and date characteristic data clusters, specifically including: Acquire initial weather characteristic data of each meteorological monitoring station in the target area at each preset time within a preset time period; Filtering the initial weather characteristic data whose correlation with the historical load data meets a second preset requirement from the initial weather characteristic data to obtain filtered weather characteristic data; The average value of the filtered weather characteristic data is calculated to obtain the weather characteristic data at each preset time in the target area, and the weather characteristic data at each preset time in the target area is used as the predicted weather characteristic data within a preset time period. The predicted weather characteristic data and the corresponding date characteristic data are processed by using a k-means clustering algorithm to obtain a cluster of predicted weather characteristic data and a cluster of date characteristic data.
6. The method for predicting power loss of overhead ground wire of a transmission line according to claim 1, characterized in that: The construction process of the initial power loss accurate prediction model specifically includes: According to the electromagnetic coupling principle, a first relationship is constructed, and the electromagnetic induction voltage of the overhead ground wire of the transmission line is calculated according to the first relationship; the first relationship is the relationship between the electromagnetic induction voltage of the overhead ground wire of the transmission line and a first parameter of the transmission line; the first parameter of the transmission line includes the total number of towers of the transmission line, predicted load data, line voltage, power factor, rotation factor, spacing between the overhead ground wire and the conductor in the base tower, and an electromagnetic induction voltage correction factor; According to the electrostatic induction principle, a second relationship is constructed, and the electrostatic induction voltage of the overhead ground wire of the transmission line is calculated according to the second relationship; the second relationship is the relationship between the electrostatic induction voltage of the overhead ground wire of the transmission line and the second parameter of the transmission line; the second parameter of the transmission line includes the charge coefficient of the conductor, the charge on the conductor, the charge coefficient on the overhead ground wire, the charge on the overhead ground wire in the base tower, and the electrostatic induction voltage correction factor; According to the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the first state of the first classification, a third relationship is determined, and the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode is calculated; the first classification is the overhead ground wire of the transmission line in the tower-by-tower grounding mode; the first state is the non-no-load state of the transmission line; the third relationship is the relationship between the first electric energy loss of the overhead ground wire under the tower-by-tower grounding mode and the third parameter of the transmission line; the third parameter of the transmission line includes the electromagnetic induction voltage of the overhead ground wire, the electrostatic induction voltage of the overhead ground wire, the self-impedance of the overhead ground wire, the mutual impedance of the overhead ground wire and the grounding resistance of the transmission line tower; According to the second state of the first classification, a fourth relationship is determined, and the second electric energy loss of the overhead ground wire under the tower-by-tower grounding mode is calculated according to the fourth relationship; the second state is a no-load state of the transmission line; the fourth relationship is a relationship between the second electric energy loss of the overhead ground wire under the tower-by-tower grounding mode and a fourth parameter of the transmission line; the fourth parameter of the transmission line includes the charge on the overhead ground wire in the base tower, the angular frequency and the grounding resistance of the base tower of the transmission line; According to the first state of the second classification, a fifth relationship is determined, and the conductance of the overhead ground wire insulator under the segmented insulation mode is calculated according to the fifth relationship; the second classification is the overhead ground wire of the transmission line in the segmented insulation mode; the fifth relationship is the relationship between the conductance of the overhead ground wire insulator under the segmented insulation mode and the fifth parameter of the transmission line; the fifth parameter includes the effective area of the insulator surface, the relative humidity of the weather, the rainfall intensity and the surface conductivity variation coefficient; According to the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line and the second state of the second classification, a sixth relationship is determined, and the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is in a non-no-load state is calculated according to the sixth relationship; the sixth relationship is the relationship between the electric energy loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is in a non-no-load state and a sixth parameter; the sixth parameter includes the electromagnetic induction voltage of the overhead ground wire of the transmission line, the electrostatic induction voltage of the overhead ground wire of the transmission line, the conductivity of the ground wire insulator affected by precipitation, the self-impedance of the overhead ground wire and the number of segments; According to the second state of the second classification, a seventh relationship is determined, and according to the seventh relationship, the power loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is unloaded is calculated; the seventh relationship is the relationship between the power loss of the overhead ground wire affected by precipitation in the segmented insulation mode when the transmission line is unloaded and a seventh parameter; the seventh parameter includes the electrostatic induction voltage of the overhead ground wire of the transmission line and the conductivity of the ground wire insulator affected by precipitation; According to the predicted load data and the predicted precipitation data that meets the second preset requirement, an eighth relationship is determined, and according to the eighth relationship, one is selected from the candidate models as the initial power loss accurate prediction model; the candidate models include the fourth relationship, the fifth relationship, the sixth relationship, the seventh relationship and 0.
7. The method for predicting power loss of overhead ground wire of a power transmission line according to claim 6, characterized in that: The power loss prediction method further includes: The accuracy of the power loss prediction model is determined based on the power loss data of the overhead ground wire of the target transmission line output by the power loss prediction model and the actual power loss data of the overhead ground wire of the target transmission line.
8. The method for predicting power loss of overhead ground wire of a power transmission line according to claim 1, characterized in that: The power loss prediction method further includes: The initial power loss precise prediction model is modified according to the predicted power loss data output by the initial power loss precise prediction model and the corresponding measured power loss data.
9. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that the processor executes the computer program to implement the method for predicting power loss of overhead ground wires of transmission lines as described in any one of claims 1-8.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for predicting power loss of overhead ground wire of a transmission line as described in any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Photovoltaic power generation prediction method, system and device and storage medium
CN115564126A
Method and device for calculating residual power supply capacity of active overhead distribution line and medium
CN117895483A
Grid supply load predicting method, system using the same, and storage medium
US20240063637A1