Completion inspection data system based on industrial standard form batch reference

Through a batch citation system based on industry standard forms, the problem of duplicate creation and inefficiency caused by differences in the standards of the acceptance approval form during the construction of infrastructure construction is solved, and efficient unified management and accurate processing of acceptance data is realized, and the digitalization of enterprises is supported. Transformation.

CN118940727APending Publication Date: 2024-11-12GUIZHOU ELECTRIC POWER DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410974625.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the infrastructure construction process, the approval form required for project acceptance requires diversified data creation and inefficiency due to the diversity of different departments and industry standards.

Method used

Adopt a batch citation system based on industry standard forms, including the verification form module, acceptance standard form module, data collection module, storage module and data reference module. By combining the verification form with the acceptance standard form, a unified completion verification data is generated. .

Benefits of technology

It reduces the manpower work of repeatedly creating forms, realizes efficient interaction of acceptance data and unified reference of standards, improves the accuracy and efficiency of data processing, and supports the digital transformation of enterprises.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940727A_ABST
    Figure CN118940727A_ABST
Patent Text Reader

Abstract

The invention discloses a completion inspection data system based on industrial standard form batch reference. The system comprises an inspection form module, an acceptance standard form module, a data acquisition module, a storage module and a data reference module, by adding the project identifier and the project code, the project acceptance and application form is combined with the acceptance standard form, so that the manual work of an enterprise for repeatedly creating the forms in different regions and different supervision environments is reduced, and the efficient interaction of the acceptance data and the unified reference of the standard are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of infrastructure construction management systems, and in particular relates to a completion inspection data system based on batch reference of industry standard forms. Background Art

[0002] The "Overall Layout Plan for the Construction of Digital China" clearly states that the coordinated transformation of digitalization and greening should be accelerated, and a green and intelligent lifestyle should be actively promoted. Under this policy orientation, e-paper, as an advanced technology product, has received widespread attention and application for its convenient paperless office function. However, in the process of building a digital infrastructure platform, enterprises face a challenge: the inspection documents required for project acceptance are generally divided into acceptance standard form documents and inspection and approval forms. The acceptance standard forms are all standard format documents, but the inspection and approval forms have different standards for the completion materials required by different project management departments, ministries, provinces and cities, and different industries. Therefore, there are differences in the inspection and approval forms. This leads to different information required by different approval departments for the same project, resulting in repeated creation of information and low efficiency in project acceptance. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a completion inspection document system based on batch reference of industry standard forms to solve the problems of repeated document creation and low efficiency in project acceptance.

[0004] The technical solution adopted by the present invention is: a completion inspection data system based on batch reference of industry standard forms, including Inspection form module: create inspection form; Acceptance criteria form module: create acceptance criteria form; Data collection module: input acceptance standard form data and inspection form data; Storage module: stores inspection form data and acceptance criteria form data; Data reference module: Combine the inspection form with the acceptance standard form to obtain the completion inspection data.

[0005] Furthermore, it is characterized in that: the attributes of the inspection form include project name, project code, process comparison name and acceptance unit.

[0006] Furthermore, it is characterized in that: the acceptance standard form attributes include project name, project code, process comparison name, acceptance unit and data identification.

[0007] Furthermore, it is characterized in that: the acceptance standard form includes hidden project quality inspection documents, inspection batch quality inspection documents, sub-project quality inspection documents and construction certification documents.

[0008] Furthermore, it is characterized in that: the completion inspection data is used in combination by aligning the project codes and process control names of the inspection form and the acceptance standard form.

[0009] Furthermore, the feature is that: a data identifier is set for fixed data in the acceptance standard form, and the fixed data in the acceptance standard form can be mapped to the acceptance report form.

[0010] Beneficial effects of the present invention: The present invention can reduce the manual work of enterprises in repeatedly creating forms in different regions and different regulatory environments, and realize efficient interaction of acceptance data and unified reference of standards. Through the present invention, enterprises can manage infrastructure project data more conveniently, improve the accuracy and efficiency of data processing, and provide strong support for the digital transformation of enterprises. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the system composition of the present invention; Figure 2 It is a logic block diagram of the present invention. DETAILED DESCRIPTION

[0013] Completion inspection data system based on industry standard forms and batch reference, including Inspection form module: create inspection form; Acceptance criteria form module: create acceptance criteria form; Data collection module: input acceptance standard form data and inspection form data; Storage module: stores inspection form data and acceptance criteria form data; Data reference module: Combine the inspection form with the acceptance standard form to obtain the completion inspection data.

[0014] Furthermore, it is characterized in that: the attributes of the inspection form include project name, project code, process comparison name and acceptance unit.

[0015] Furthermore, it is characterized in that: the acceptance standard form attributes include project name, project code, process comparison name, acceptance unit and data identification.

[0016] Furthermore, it is characterized in that: the acceptance standard form includes hidden project quality inspection documents, inspection batch quality inspection documents, sub-project quality inspection documents and construction certification documents.

[0017] Furthermore, it is characterized in that: the completion inspection data is used in combination by aligning the project codes and process control names of the inspection form and the acceptance standard form.

[0018] Furthermore, the feature is that: a data identifier is set for fixed data in the acceptance standard form, and the fixed data in the acceptance standard form can be mapped to the acceptance report form.

[0019] The specific operations are as follows S1. Create an acceptance report form in the report form module, and add a project identification project code to each acceptance report form, such as acceptance report form A and acceptance report form B; S2. The acceptance standard form module builds corresponding acceptance standard forms, acceptance standard form A, acceptance standard form B, and acceptance standard form C; S3. The acceptance report form should be used in conjunction with the acceptance criteria form. Therefore, a data identifier (sys_attached_page) is added to the acceptance criteria form to identify the fixed data in the acceptance criteria form.

[0020] S4. Align the process of the acceptance report form with the acceptance standard form, for example, the acceptance report form [AF_New Form] and the acceptance standard form [AF_New Form].

[0021] S5. Find the corresponding acceptance standard form according to the project code where the acceptance report form is located, and use them in combination.

[0022] S6. When the user fills in a new document, if the content in the acceptance report form is consistent with that in the acceptance standard form, it will be automatically filled in. For example, the unit project information (dl_name_of_unit_project) needs to be filled in the acceptance report form, and the unit project information (dl_name_of_unit_project) also needs to be filled in the acceptance standard form. In this case, select one of the categories to fill in, and the associated form will automatically obtain the value.

[0023] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. The completion inspection data system based on batch reference of industry standard forms is characterized by: include Inspection form module: create inspection form; Acceptance criteria form module: create acceptance criteria form; Data collection module: input acceptance standard form data and inspection form data; Storage module: stores inspection form data and acceptance criteria form data; Data reference module: Combine the inspection form with the acceptance standard form to obtain the completion inspection data.

2. The data interaction system based on batch reference of industry standard documents according to claim 1 is characterized by: The attributes of the acceptance form include project name, project code, process comparison name and acceptance unit.

3. The data interaction system based on batch reference of industry standard documents according to claim 1 is characterized by: The acceptance criteria form attributes include project name, project code, process comparison name, acceptance unit and data identification.

4. The data interaction system based on batch reference of industry standard documents according to claim 1 is characterized by: The acceptance standard form includes hidden project quality inspection documents, inspection batch quality inspection documents, sub-project quality inspection documents and construction certification documents.

5. The data interaction system based on batch reference of industry standard documents according to claim 1 is characterized by: The completion inspection data is a combination of aligning the project codes and process control names of the inspection form and the acceptance standard form.

6. The data interaction system based on batch reference of industry standard documents according to claim 1 is characterized by: The fixed data in the acceptance standard form is set with data identifiers, and the fixed data in the acceptance standard form can be mapped to the acceptance report form.