Optimization method and device for collecting ring of water-turbine generator set and electronic equipment

By determining and implementing optimization strategies for the current collector ring in the water turbine generator set, including material replacement, carbon brush matching and ventilation adjustment, the problem of excessive temperature of the current collector ring is solved, and temperature control and safety guarantee are achieved.

CN118940890APending Publication Date: 2024-11-12HUANENG LANCANG RIVER HYDROPOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410990287.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The operating temperature of the collector ring in the water turbine generator set is abnormally increased, resulting in wear and safety hazards of carbon brushes, and lack of effective temperature control methods.

Method used

By determining the optimization strategy set of current collector rings, including material replacement, carbon brush matching, carbon brush spring update, control of bearing oil stains, regulating ventilation of current collector ring chamber and dynamic surface polishing, optimization tasks are generated to control temperature.

Benefits of technology

Effectively reduce the temperature of the current collector ring, extend the service life, improve safety, and ensure the stable operation of the hydrowheel generator set.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940890A_ABST
    Figure CN118940890A_ABST
Patent Text Reader

Abstract

The invention provides an optimization method and device for a collecting ring of a water-turbine generator set and electronic equipment, and relates to the technical field of hydroelectric generation, and the optimization method for the collecting ring of the water-turbine generator set comprises the steps that an optimization strategy set of the collecting ring is determined, and the optimization strategy set comprises a first strategy group and a second strategy group, selecting at least one strategy from the first strategy group as a first target strategy; selecting at least one strategy from the second strategy group as a second target strategy; based on the first target strategy and the second target strategy, an optimization task is generated, and the optimization task comprises the execution sequence and the execution opportunity of each target strategy; and executing an optimization task on the collector ring, thereby solving the technical problem that the collector ring temperature optimization control with a relatively good effect does not exist in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hydropower generation, and in particular to a method, device and electronic equipment for optimizing a collector ring of a hydro-turbine generator set. Background Art

[0002] At present, it is common for the collector ring operating temperature to rise abnormally in hydro-turbine generator sets. Excessive collector ring temperature will aggravate the wear of the carbon brushes, and may also cause safety hazards such as ring fire and strand breakage, and damage the collector ring surface, further deteriorating the operating environment. There is currently no corresponding temperature control method as a reference, so research on the operating temperature control method of the collector ring of the hydro-turbine generator is urgent. Summary of the invention

[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, the first purpose of the present application is to propose a method for optimizing the collector rings of a hydro-generator set to achieve effective collector ring temperature control.

[0005] The second objective of the present application is to provide an optimization device for the collector ring of a hydro-generator set.

[0006] The third objective of the present application is to provide an electronic device.

[0007] A fourth objective of the present application is to provide a computer-readable storage medium.

[0008] A fifth object of the present application is to provide a computer program product.

[0009] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a method for optimizing the collector ring of a hydro-generator set, comprising:

[0010] Determine an optimization strategy set for the collector ring, the optimization strategy set comprising: a first strategy group and a second strategy group, wherein the first strategy group comprises at least one of replacement of collector ring material, matching of collector ring carbon brushes, and renewal of carbon brush springs, and the second strategy group comprises at least one of treatment of bearing oil stains, adjustment of collector ring chamber ventilation, and dynamic grinding of collector ring surfaces;

[0011] Selecting at least one strategy from the first strategy group as a first target strategy;

[0012] Selecting at least one strategy from the second strategy group as a second target strategy;

[0013] Based on the first target strategy and the second target strategy, generating an optimization task, wherein the optimization task includes an execution order and an execution timing of each target strategy;

[0014] The optimization task is performed on the slip ring.

[0015] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a device for optimizing the collector ring of a hydro-generator set, comprising:

[0016] An acquisition module is used to determine an optimization strategy set for the collector ring, wherein the optimization strategy set includes: a first strategy group and a second strategy group, wherein the first strategy group includes at least one of replacement of the collector ring material, matching of the collector ring carbon brush, and renewal of the carbon brush spring, and the second strategy group includes at least one of treatment of bearing oil stains, adjustment of collector ring chamber ventilation, and dynamic grinding of the collector ring surface;

[0017] A first selection module, configured to select at least one policy from the first policy group as a first target policy;

[0018] A second selection module, used for selecting at least one policy from the second policy group as a second target policy;

[0019] A task generation module, configured to generate an optimization task based on the first target strategy and the second target strategy, wherein the optimization task includes an execution order and an execution timing of each target strategy;

[0020] An optimization module is used to perform the optimization task on the slip ring.

[0021] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;

[0022] The memory stores computer-executable instructions;

[0023] The processor executes the computer-executable instructions stored in the memory to implement the method described in the embodiment of the first aspect.

[0024] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer-readable storage medium is stored computer execution instructions, and when the computer execution instructions are executed by a processor, they are used to implement the method described in the first aspect embodiment.

[0025] To achieve the above-mentioned purpose, the fifth aspect of the present application proposes a computer program product, including a computer program, which implements the method described in the first aspect when executed by a processor.

[0026] The optimization method, device and electronic equipment for the collector ring of a hydro-turbine generator set provided in the present application determine a first strategy group and a second strategy group, and determine a first target strategy from the first strategy group, and determine a second target strategy from the second strategy group, and generate an optimization task with the first target strategy and the second target strategy. The optimization task includes a variety of optimization strategies, and the optimization scope is more comprehensive. The optimization task is performed on the collector ring, thereby achieving effective collector ring temperature optimization control, solving the problem that there is currently no effective collector ring temperature optimization control.

[0027] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0029] Figure 1 A schematic flow chart of a method for optimizing a collector ring of a hydro-generator set provided in an embodiment of the present application;

[0030] Figure 2 A schematic flow chart of another method for optimizing the collector ring of a hydro-generator set provided in an embodiment of the present application;

[0031] Figure 2A A schematic diagram of a collector ring with a changed material provided in an embodiment of the present application;

[0032] Figure 2B A schematic diagram of a structure for controlling oil mist in a collector ring provided in an embodiment of the present application;

[0033] Figure 2C A schematic diagram of the structure of a grinding device and a collector ring provided in an embodiment of the present application;

[0034] Figure 3 A schematic structural diagram of a device for optimizing the collector ring of a hydro-turbine generator set provided in an embodiment of the present application. DETAILED DESCRIPTION

[0035] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0036] The following describes the optimization method, device and electronic equipment of the collector ring of the hydro-generator set according to the embodiment of the present application with reference to the accompanying drawings.

[0037] Figure 1 A schematic flow chart of a method for optimizing a collector ring of a hydro-turbine generator set provided in an embodiment of the present application.

[0038] like Figure 1 As shown, the method comprises the following steps:

[0039] S101, determining an optimization strategy set for a slip ring, where the optimization strategy set includes: a first strategy group and a second strategy group.

[0040] Among them, the first strategy group includes at least one of replacing the material of the collector ring, matching the carbon brush of the collector ring, and updating the carbon brush spring; the second strategy group includes at least one of treating bearing oil pollution, adjusting the ventilation of the collector ring chamber, and dynamically polishing the collector ring surface.

[0041] In some implementations, if the material of the collector ring is not suitable for the current environment of the hydro-turbine generator set, it will cause a large temperature difference between the positive and negative poles of the collector ring, and there will be slight wear on the surface of the collector ring, affecting the working performance of the collector ring. Therefore, the material of the collector ring can be replaced to make it more suitable for the current environment of the hydro-turbine generator set.

[0042] It is understandable that different carbon brushes have different related property parameters such as hardness, volume density and friction coefficient, and the power plants that the carbon brushes are suitable for will be different. For example, different carbon brushes are suitable for thermal power plants and hydropower plants. Therefore, the appropriate carbon brushes can be matched for use based on the actual environment of the hydropower generator set.

[0043] In some implementations, as the running time goes by, the pressure of the carbon brush spring will decrease, which will affect the operation of the slip ring, so the carbon brush spring can be updated from time to time.

[0044] Bearing oil contamination refers to the oil mist of the upper guide bearing entering the collector ring chamber, contaminating the collector ring surface and failing to form a good oxide film protective layer, which results in a large contact resistance between the carbon brush and the contaminated collector ring, causing the carbon brush temperature of the large motor to be too high, affecting the normal operation of the collector ring. The oil mist of the upper guide bearing needs to be treated to reduce the impact on the collector ring.

[0045] Poor ventilation in the collector ring room will cause changes in the ambient temperature inside the collector ring room. Therefore, the ventilation of the collector ring room can be adjusted, and the air circulation inside the collector ring room can be enhanced based on the ventilation circulation system to reduce the temperature inside the collector ring room.

[0046] Dynamic grinding of the collector ring surface can ensure the smoothness of the collector ring surface, make the collector ring and the carbon brush in good contact, and reduce the contact resistance between the collector ring and the carbon brush.

[0047] S102: Select at least one policy from the first policy group as a first target policy.

[0048] The first strategy group includes at least one of the following: material replacement of the collector ring, carbon brush matching of the collector ring, and updating of the carbon brush spring. The first target strategy is at least one strategy of the first strategy group, that is, the first target strategy can be material replacement of the collector ring, or the first target strategy can be carbon brush matching of the collector ring, or the first target strategy can be updating of the carbon brush spring; the first target strategy can also be a random combination of material replacement of the collector ring, carbon brush matching of the collector ring, and updating of the carbon brush spring, and the temperature of the collector ring is controlled based on the first target strategy.

[0049] S103: Select at least one policy from the second policy group as a second target policy.

[0050] The second strategy group includes at least one of controlling bearing oil pollution, adjusting the ventilation of the collector ring chamber and dynamically polishing the collector ring surface. The second target strategy is at least one of the second strategy group, that is, the second target strategy can be controlling bearing oil pollution, or the second target strategy can be adjusting the ventilation of the collector ring chamber, or the second target strategy can be dynamically polishing the collector ring surface; the second target strategy can also be a random combination of controlling bearing oil pollution, adjusting the ventilation of the collector ring chamber and dynamically polishing the collector ring surface, and the temperature of the collector ring is controlled based on the second target strategy.

[0051] S104: Generate an optimization task based on the first target strategy and the second target strategy.

[0052] In some implementations, the optimization task may be a specific execution task, wherein the optimization task includes the execution order and execution timing of each target strategy. In some implementations, each optimization task may be executed step by step according to the execution order, or some optimization tasks may be executed synchronously, and the execution timing is the timing of starting execution when the execution condition is met.

[0053] As an example, assuming that the first target strategy is to replace the material of the collector ring and match the carbon brush of the collector ring, and the second target strategy is to control the bearing oil pollution, adjust the collector ring chamber ventilation and dynamically polish the collector ring surface, then the optimization tasks include: optimization task 1 determines whether the material of the collector ring needs to be replaced, optimization task 2 matches the carbon brush suitable for the collector ring, optimization task 3 controls the bearing oil pollution, optimization task 4 adjusts the ventilation of the collector ring chamber, and optimization task 5 dynamically polishes the collector ring surface, wherein optimization task 1, optimization task 2, optimization task 3, optimization task 4 and optimization task 5 also include corresponding execution order and execution time. The execution time of optimization task 1 can be when the material of the collector ring meets the replacement conditions, and the execution time of optimization task 2 can be when a suitable collector ring is matched. When the carbon brush is used, the execution time of optimization task 3 may be when the bearing oil needs to be treated, the execution time of optimization task 4 may be when the collector ring chamber needs to be ventilated, and the execution time of optimization task 5 may be when the collector ring surface is to be dynamically polished; the execution order of optimization task 1, optimization task 2, optimization task 3, optimization task 4 and optimization task 5 may be partially or completely the same, for example, optimization tasks 1 to 5 may be executed synchronously at the beginning of the optimization strategy, or optimization tasks 1 and 2 may be executed at the same time; optimization tasks 1 to 5 may also be executed sequentially, that is, optimization task 2 is executed after optimization task 1 is executed, optimization task 3 is executed after optimization task 2 is executed, and so on until all optimization tasks are executed.

[0054] S105, performing an optimization task on the collector ring.

[0055] It is understandable that the optimization tasks are executed sequentially according to the execution timing and execution order of each optimization task, such as replacing the carbon brush material, controlling the bearing oil mist or dynamically polishing the collector ring surface to achieve optimization of the collector ring temperature control.

[0056] In this embodiment, an optimization strategy set including a first strategy group and a second strategy group is determined, and at least one strategy is selected from the first strategy group and the second strategy group in the optimization strategy set as the first target strategy and the second target strategy respectively, and strategy selection is performed on multiple aspects such as carbon brush material, carbon brush type, carbon brush spring, bearing oil mist, collector ring chamber ventilation, and dynamic polishing of the collector ring surface, so as to generate an optimization task to execute on the collector ring, improve the optimization effect of temperature control of the collector ring, so that the collector ring can operate at an appropriate temperature, and ensure the safe operation of the hydro-turbine generator set.

[0057] Figure 2 A schematic flow chart of another method for optimizing the collector ring of a hydro-generator set provided in an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:

[0058] S201, determining an optimization strategy set for a collector ring, where the optimization strategy set includes: a first strategy group and a second strategy group.

[0059] In the embodiment of the present application, the implementation method of step S201 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0060] S202: Select at least one policy from the first policy group as a first target policy.

[0061] In the embodiment of the present application, the implementation method of step S202 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0062] S203, the first target strategy is to replace the material of the collector ring.

[0063] In some implementations, the temperature of the positive and negative carbon brushes of the collector ring and the surface image of the collector ring may be collected; optionally, the temperature may be collected based on a sensor, and the surface image may be collected based on an image acquisition device.

[0064] According to the operating parameters and the surface image, it is identified whether the material of the collector ring is compatible with the power station environment of the power station where the hydro-turbine generator set is located; optionally, the temperature difference can be determined according to the temperatures of the positive and negative carbon brushes; the surface image is input into a pre-trained image recognition model, and the image recognition model recognizes the surface image of the collector ring and outputs the surface wear of the collector ring; in response to the temperature difference being greater than a preset temperature difference threshold and the surface wear being greater than a set value, it is determined that the material of the collector ring is not compatible with the power station environment.

[0065] For example, assuming that the temperature difference threshold is 5 degrees, and the set value of surface wear is 0, that is, there is no wear; the temperature of the positive carbon brush of the collector ring is 70 degrees, and the temperature of the negative carbon brush is 110 degrees, then the temperature difference is 40 degrees, which is greater than the preset temperature difference threshold; the collected surface image is output to the pre-trained image recognition model, and it is recognized that there is wear on the surface of the collector ring, which is greater than the set value, then it is determined that the material of the collector ring is not compatible with the current power station environment.

[0066] In response to the incompatibility of the material of the collector ring with the power station environment, the target material of the collector ring is determined according to the power station environment, and the material of the collector ring is replaced; optionally, the target material can be determined by investigation based on the current actual power station environment. For example, if the original collector ring material is Q345 steel, and it is found through investigation that forged steel 16Mn is more suitable for the current power station environment, the collector ring material of the current hydro-turbine generator set is replaced from Q345 steel to forged steel 16Mn, that is, the positive electrode carbon brush and the negative electrode carbon brush of the collector ring are both replaced with forged steel 16Mn material, such as Figure 2AAs shown, the temperature of the positive and negative carbon brushes of the replaced collector ring is uniform, which improves the overall performance of the collector ring.

[0067] S204, the first target strategy is to match the carbon brushes of the slip rings.

[0068] In some implementations, the power station environment of the power station where the hydro-generator set is located can be determined; according to the power station environment, a target carbon brush matching the power station environment is selected from a carbon brush mapping relationship table. Optionally, the target carbon brush related parameters matching the power station environment can be determined from the mapping relationship table; the target carbon brush related parameters are matched with the related parameters of each candidate carbon brush in the carbon brush set, and a candidate carbon brush that meets the target carbon brush related parameters is obtained from the carbon brush set as the target carbon brush matching the power station environment.

[0069] Optionally, the mapping relationship table can be a relationship table matching the power station environment and the carbon brush parameters, that is, the mapping relationship table includes the carbon brush parameters adapted to each power station environment. Therefore, according to the current power station environment, the matching target carbon brush related parameters can be queried in the mapping relationship table, and further according to the target carbon brush related parameters, the candidate carbon brush that meets the target carbon brush related parameters can be selected from the carbon brush set as the target carbon brush matching the power station environment.

[0070] In some implementations, the candidate carbon brushes in the carbon brush set and their carbon brush parameters may be as shown in Table 1 below:

[0071] Table 1

[0072]

[0073] Optionally, different brands of carbon brushes in the carbon brush set can be applied to different environments; NG16 is suitable for hydroelectric generator collector rings, AY is suitable for general DC motors and also for hydroelectric generator collector rings, GVL2 is suitable for general DC motors and also for hydroelectric generator collector rings, D172 is suitable for DC welding machines and DC motors and AC motor collector rings with a voltage of 80-120 volts, and NCC634 has excellent current collection performance and is widely used in high-speed turbine AC generator collector rings; candidate carbon brushes that are more suitable for the current power station environment are matched from the carbon brush set as target carbon brushes, so that the carbon brush application effect is better.

[0074] S205, the first target strategy is to update the carbon brush spring.

[0075] In some implementations, the push-pull force of the carbon brush spring can be measured during the use of the carbon brush of the collector ring to obtain the measured push-pull force of the carbon brush spring; in response to the measured push-pull force not meeting the requirements, the carbon brush spring is updated. That is, when the pressure of the carbon brush spring is weakened and does not meet the elastic force requirements, the carbon brush spring is replaced in time to ensure that the pressure of the carbon brush spring is reliable.

[0076] S206: Select at least one policy from the second policy group as the second target policy.

[0077] In the embodiment of the present application, the implementation method of step S206 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0078] S207, the second target strategy is to treat bearing oil pollution.

[0079] One of the reasons why the temperature of the generator carbon brush is too high is that the oil mist of the upper guide bearing enters the collector ring chamber and pollutes the collector ring surface. No good oxide film protective layer is formed, resulting in a large contact resistance between the carbon brush and the polluted collector ring. Optionally, the carbon brush temperature of the collector ring can be detected during the operation of the hydro-turbine generator set; in response to the carbon brush temperature reaching the first set temperature, the oil-gas separation device and the oil mist overflow respirator are started. That is, when the carbon brush temperature reaches the set temperature, the oil-gas separation device is started to separate the generated oil and gas, and the oil mist overflow respirator is started to prevent the oil mist from overflowing; the set temperature can be a value close to the starting temperature, so as to ensure that the collector ring starts the oil-gas separation device and the oil mist overflow device as soon as possible after operation, so as to ensure that the oil and gas can be fully separated and the oil mist is prevented from polluting the collector ring surface.

[0080] It can be understood that during the operation of the turbine unit, as the bearing temperature and oil temperature of the upper guide bearing increase, air pressure is generated in the oil pan. When the air pressure is discharged, it carries the oil to produce oil mist. The generated oil mist passes into the oil-gas separation device, and the filter element in the device adsorbs the oil, cools and separates it, and flows back to the oil pan. The gas is discharged through the small holes set on the top of the device to reduce the pressure, thereby achieving the purpose of oil-gas separation.

[0081] In some implementations, in order to solve the problem of oil mist overflow caused by the existing straight-through oil basin respirator during operation, a hollow straight pipe is added under the straight-through respirator, and a breathing head is arranged above the hollow straight pipe, with a spherical filter installed inside; a plurality of spoilers are arranged at intervals in the hollow straight pipe, and each spoiler is high on the outside and low on the inside, forming an inclination angle of 10-20°. When working, the spoiler slows down, blocks, and cools down the hot oil mist generated by the operation of the upper guide bearing, and the hot oil mist condenses into oil droplets and flows back to the oil basin. A small amount of rising oil mist is filtered and cooled through the filter in the breathing head and flows back to the oil basin to prevent the oil mist from overflowing.

[0082] In some implementations, such as Figure 2B As shown, four oil-gas separation devices can be welded on the outer ring of the upper oil guide basin, so that the oil and gas generated by the increase in bearing oil temperature can be separated during the operation of the turbine generator set; two anti-oil mist overflow respirators are symmetrically installed on the oil basin sealing cover (inner ring) to prevent oil mist from overflowing, avoiding oil mist from contaminating the surface of the collector ring and destroying the formation of oxide film.

[0083] S208, the second target strategy is to adjust the ventilation of the collector ring chamber.

[0084] It is understandable that poor ventilation will affect the ambient temperature of the collector ring chamber. In some implementations, four manholes can be opened on the side of the collector ring, and one or more ventilation and heat dissipation air inlet holes can be set on the manholes, so that air can flow into the collector ring chamber from the side; the original collector ring carbon powder recovery device only collects the carbon powder of the collector ring, and the top hot air is discharged into the collector ring chamber. In this embodiment, four ventilation holes are opened on the top cover of each collector ring chamber. The outer diameter of the ventilation hole can be 200mm, and there is a 45-degree inclination with the air inlet hole on the side of the collector ring chamber, so that air can flow into the air inlet hole and flow out from the top ventilation hole, thereby strengthening the air circulation in the collector ring chamber and forming a cold and hot air automatic circulation system with side air intake and upper exhaust.

[0085] In some implementations, the ambient temperature in the collector ring chamber can be detected during the operation of the hydro-turbine generator set; in response to the ambient temperature reaching the second set temperature, the number and opening angle of the vents in the collector ring chamber are determined according to the difference between the ambient temperature and the second set temperature; and the vents in the collector ring chamber are opened according to the number and opening angle of the vents. That is, when the ambient temperature in the collector ring chamber is high, the vents in the collector ring chamber are opened. The vents include air inlets and vents. The number and opening angle can be determined according to the actual ambient temperature. When the ambient temperature is high, all the air inlets and vents can be opened to allow for more normal air circulation.

[0086] It is understandable that, since there are ventilation holes on the top, this embodiment can also exhaust the hot air on the top of the carbon powder recovery device to the outside of the collector ring through the air duct, thereby reducing the indoor ambient temperature of the collector ring.

[0087] S209, the second target strategy is dynamic grinding of the collector ring surface.

[0088] It is understandable that when the unit is running, the surface of the collector ring and the carbon brush will be in contact and rubbed for a long time, which will cause burrs or damage, affecting the contact between the collector ring and the carbon brush. In this embodiment, during the operation of the hydro-turbine generator set, based on the surface image of the collector ring, the damage degree of the collector ring surface can be detected; that is, whether the collector ring surface has burrs or damage.

[0089] In response to the damage degree reaching the set damage degree, the operating parameters of the collector ring grinding device are determined according to the damage degree, and the collector ring grinding device is controlled to grind the surface of the collector ring based on the operating parameters. When burrs or damage appear on the collector ring surface, add a collector ring grinding device and combine the unit maintenance results, such as Figure 2CAs shown, the working parameters of the collector ring grinding device, that is, the degree of grinding of the collector ring surface, are determined according to the degree of damage. The surface of the collector ring is ground based on the working parameters to ensure the smoothness of the collector ring surface and to ensure good contact between the collector ring and the carbon brush, thereby reducing the contact resistance between the collector ring and the carbon brush.

[0090] In some implementations, the present embodiment can also finely adjust the gap between the control brush frame and the collector ring to ensure that the brush is concentric with the center of the main shaft and the gap is uniform. If the gap between the brush frame and the collector ring is too large or it is not aligned with the center of the main shaft, the carbon brush will cause jumping, jamming, heating, etc. during operation. For example, for machine No. 1, when adjusting machine No. 1, it was found that the excessive gap reached 11mm, accounting for 1 / 5 of the effective length of the carbon brush, and some carbon brushes deviated greatly from the center of the main shaft. Adjustment was made to ensure that the brush frame was concentric with the center of the main shaft and the gap was uniform.

[0091] S210, generating an optimization task based on the first target strategy and the second target strategy.

[0092] In the embodiment of the present application, the implementation method of step S210 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0093] S211, performing optimization tasks on the collector rings.

[0094] In the embodiment of the present application, the implementation method of step S211 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0095] In this embodiment, the first strategy group can be at least one of the replacement of the material of the collector ring, the matching of the carbon brush of the collector ring, and the renewal of the carbon brush spring, and the second strategy group can be at least one of the treatment of bearing oil pollution, the adjustment of the ventilation of the collector ring chamber, and the dynamic grinding of the collector ring surface. The optimization task is determined by the first strategy group and the second strategy group, and the temperature rise of the collector ring is controlled from multiple aspects such as carbon brush material, model, collector ring finish, carbon brush spring pressure, ventilation, oil mist and wear. During operation, the collector ring reduces friction heat and carbon brush wear, reduces friction coefficient and improves ventilation and oil pollution control effects, ensures good contact between the collector ring and the carbon brush, reduces the contact resistance between the collector ring and the carbon brush, effectively solves the problem of excessive operating temperature of the generator collector ring carbon brush, reduces the safety risk of collector ring operation, ensures long-term safe and stable operation of the unit, and achieves good temperature optimization control effect.

[0096] In order to implement the above-mentioned embodiment, the present application also proposes a device for optimizing the collector ring of a hydro-generator set.

[0097] Figure 3The schematic diagram of the structure of a collector ring optimization device for a hydro-generator set provided in an embodiment of the present application. Figure 3 As shown, the collector ring optimization device 300 of the hydro-generator set includes:

[0098] The acquisition module 301 is used to determine the optimization strategy set of the collector ring, and the optimization strategy set includes: a first strategy group and a second strategy group, wherein the first strategy group includes at least one of the following: replacing the material of the collector ring, matching the carbon brush of the collector ring, and updating the carbon brush spring; and the second strategy group includes at least one of treating the bearing oil stain, adjusting the ventilation of the collector ring chamber, and dynamically polishing the collector ring surface;

[0099] A first selection module 302, configured to select at least one policy from the first policy group as a first target policy;

[0100] A second selection module 303 is used to select at least one policy from the second policy group as a second target policy;

[0101] A task generation module 304 is used to generate an optimization task based on the first target strategy and the second target strategy, wherein the optimization task includes the execution order and execution timing of each target strategy;

[0102] The optimization module 305 is used to perform optimization tasks on the slip rings.

[0103] Further, in a possible implementation of the embodiment of the present application, the first target strategy is to replace the material of the slip ring, and the device 300 includes:

[0104] Collect the temperature of the positive and negative carbon brushes of the collector ring and the surface image of the collector ring;

[0105] According to the operating parameters and surface images, identify whether the material of the collector ring is compatible with the power station environment of the power station where the hydro-generator set is located;

[0106] In response to the material of the collector ring not being compatible with the power station environment, a target material of the collector ring is determined according to the power station environment, and the material of the collector ring is replaced.

[0107] Furthermore, in a possible implementation of the embodiment of the present application, the apparatus 300 includes:

[0108] Determine the temperature difference based on the temperature of the positive and negative carbon brushes;

[0109] The surface image is input into a pre-trained image recognition model, and the image recognition model recognizes the surface image of the slip ring and outputs the surface wear degree of the slip ring;

[0110] In response to the temperature difference being greater than a preset temperature difference threshold and the surface wear being greater than a set value, it is determined that the material of the collector ring is not compatible with the power station environment.

[0111] Further, in a possible implementation of the embodiment of the present application, the first target strategy is carbon brush matching of the slip ring, and the device 300 includes:

[0112] Determine the power station environment of the power station where the hydro-generator set is located;

[0113] According to the power station environment, select the target carbon brush that matches the power station environment from the carbon brush mapping relationship table.

[0114] Furthermore, in a possible implementation of the embodiment of the present application, the apparatus 300 includes:

[0115] From the mapping relationship table, determine the target carbon brush related parameters that match the power station environment;

[0116] The target carbon brush related parameters are matched with the related parameters of each candidate carbon brush in the carbon brush set, and the candidate carbon brush that meets the target carbon brush related parameters is obtained from the carbon brush set as the target carbon brush matching the power station environment.

[0117] Further, in a possible implementation of the embodiment of the present application, the first target strategy is carbon brush spring renewal, and the device 300 includes:

[0118] During the use of the carbon brush of the collector ring, the push and pull force of the carbon brush spring is measured to obtain the actual push and pull force of the carbon brush spring;

[0119] In response to the measured push-pull force not meeting the requirement, a renewal operation of the carbon brush spring is performed.

[0120] Further, in a possible implementation of the embodiment of the present application, the second target strategy is to treat bearing oil pollution, and the device 300 includes:

[0121] During the operation of the hydro-generator set, the carbon brush temperature of the collector ring is detected;

[0122] In response to the carbon brush temperature reaching the first set temperature, the oil-gas separation device and the oil mist overflow prevention respirator are started.

[0123] Further, in a possible implementation of the embodiment of the present application, the second target strategy is to adjust the ventilation of the collector ring chamber, and the device 300 includes:

[0124] During the operation of the hydro-generator set, the ambient temperature in the collector ring room is detected;

[0125] In response to the ambient temperature reaching a second set temperature, determining the number and opening angle of the vents of the collector ring chamber according to the difference between the ambient temperature and the second set temperature;

[0126] Open the vents in the collector ring chamber according to the number and opening angle of the vents.

[0127] Further, in a possible implementation of the embodiment of the present application, the second target strategy is dynamic grinding of the collector ring surface, and the device 300 further includes:

[0128] During the operation of the hydro-generator set, the damage degree of the collector ring surface is detected based on the surface image of the collector ring;

[0129] In response to the damage degree reaching the set damage degree, the operating parameters of the slip ring grinding device are determined according to the damage degree, and the slip ring grinding device is controlled to grind the surface of the slip ring based on the operating parameters.

[0130] It should be noted that the above explanation of the embodiment of the method for optimizing the collector ring of a hydro-turbine generator set is also applicable to the device for optimizing the collector ring of a hydro-turbine generator set of this embodiment, and will not be repeated here.

[0131] In an embodiment of the present application, an optimization strategy set including a first strategy group and a second strategy group is determined, and at least one strategy is selected from the first strategy group and the second strategy group in the optimization strategy set as the first target strategy and the second target strategy respectively, and strategy selection is performed on multiple aspects such as carbon brush material, carbon brush type, carbon brush spring, bearing oil mist, collector ring chamber ventilation, and dynamic polishing of the collector ring surface, so as to generate an optimization task to execute on the collector ring, improve the optimization effect of temperature control of the collector ring, so that the collector ring can operate at an appropriate temperature, and ensure the safe operation of the hydro-turbine generator set.

[0132] In order to implement the above embodiments, the present application also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.

[0133] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.

[0134] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.

[0135] The collection, storage, use, processing, transmission, provision and disclosure of user personal information involved in this application are in compliance with relevant laws and regulations and do not violate public order and good morals.

[0136] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.

[0137] The present application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, the present disclosure is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, the risk can be minimized by limiting data collection and deleting the data. In addition, when applicable, such personal information is de-identified to protect the privacy of the user.

[0138] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0139] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0140] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0141] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0142] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0143] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0144] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0145] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A method for optimizing the collector ring of a hydro-generator set, characterized in that: include: Determine an optimization strategy set for the collector ring, the optimization strategy set comprising: a first strategy group and a second strategy group, wherein the first strategy group comprises at least one of replacement of collector ring material, matching of collector ring carbon brushes, and renewal of carbon brush springs, and the second strategy group comprises at least one of treatment of bearing oil stains, adjustment of collector ring chamber ventilation, and dynamic grinding of collector ring surfaces; Selecting at least one strategy from the first strategy group as a first target strategy; Selecting at least one strategy from the second strategy group as a second target strategy; Based on the first target strategy and the second target strategy, generating an optimization task, wherein the optimization task includes an execution order and an execution timing of each target strategy; The optimization task is performed on the slip ring.

2. The method according to claim 1, characterized in that The first target strategy is to replace the material of the collector ring, and the method includes: Collecting the temperature of the positive and negative carbon brushes of the collector ring and the surface image of the collector ring; According to the operating parameters and the surface image, identifying whether the material of the collector ring is compatible with the power station environment of the power station where the hydro-generator set is located; In response to the material of the slip ring not being compatible with the power station environment, a target material of the slip ring is determined according to the power station environment, and the material of the slip ring is replaced.

3. The method according to claim 2, characterized in that The step of identifying, based on the operating parameters and the surface image, whether the material of the slip ring is compatible with the power station environment of the power station where the hydro-generator set is located comprises: Determining a temperature difference according to the temperatures of the positive and negative carbon brushes; Inputting the surface image into a pre-trained image recognition model, allowing the image recognition model to recognize the surface image of the slip ring and output the surface wear degree of the slip ring; In response to the temperature difference being greater than a preset temperature difference threshold and the surface wear being greater than a set value, it is determined that the material of the slip ring is not compatible with the power station environment.

4. The method according to claim 1, characterized in that: The first target strategy is carbon brush matching of the collector ring, and the method includes: Determine the power station environment of the power station where the hydro-generator set is located; According to the power station environment, a target carbon brush matching the power station environment is selected from a carbon brush mapping relationship table.

5. The method according to claim 3, characterized in that: The selecting, according to the power station environment, a target carbon brush matching the power station environment from a carbon brush mapping relationship table comprises: Determining target carbon brush related parameters matching the power station environment from the mapping relationship table; The target carbon brush related parameters are matched with the related parameters of each candidate carbon brush in the carbon brush set, and a candidate carbon brush that meets the target carbon brush related parameters is obtained from the carbon brush set as a target carbon brush matching the power station environment.

6. The method according to claim 1, characterized in that The first target strategy is the carbon brush spring update, and the method includes: During the use of the carbon brush of the collector ring, the push-pull force of the carbon brush spring is measured to obtain the measured push-pull force of the carbon brush spring; In response to the measured push-pull force not meeting the requirement, an updating operation of the carbon brush spring is performed.

7. The method according to claim 1, characterized in that The second target strategy is the treatment of bearing oil pollution, and the method includes: During the operation of the hydro-generator set, detecting the carbon brush temperature of the collector ring; In response to the carbon brush temperature reaching the first set temperature, the oil-gas separation device and the oil mist overflow prevention respirator are started.

8. The method according to claim 1, characterized in that: The second target strategy is to adjust the collector ring chamber ventilation, and the method includes: During the operation of the hydro-generator set, detecting the ambient temperature in the collector ring chamber; In response to the ambient temperature reaching a second set temperature, determining the number and opening angle of the vents of the collector ring chamber to be opened according to the difference between the ambient temperature and the second set temperature; The ventilation openings in the collector ring chamber are opened according to the opening number and opening angle of the ventilation openings.

9. The method according to claim 1, characterized in that: The second target strategy is dynamic grinding of the collector ring surface, and the method further includes: During the operation of the hydro-generator set, based on the surface image of the collector ring, detecting the degree of damage on the surface of the collector ring; In response to the damage degree reaching a set damage degree, working parameters of a slip ring grinding device are determined according to the damage degree, and the slip ring grinding device is controlled to grind the surface of the slip ring based on the working parameters.

10. An optimization device for the collector ring of a hydro-generator set, characterized in that: include: An acquisition module is used to determine an optimization strategy set for the collector ring, wherein the optimization strategy set includes: a first strategy group and a second strategy group, wherein the first strategy group includes at least one of replacement of the collector ring material, matching of the collector ring carbon brush, and renewal of the carbon brush spring, and the second strategy group includes at least one of treatment of bearing oil stains, adjustment of collector ring chamber ventilation, and dynamic grinding of the collector ring surface; A first selection module, configured to select at least one policy from the first policy group as a first target policy; A second selection module, used for selecting at least one policy from the second policy group as a second target policy; A task generation module, configured to generate an optimization task based on the first target strategy and the second target strategy, wherein the optimization task includes an execution order and an execution timing of each target strategy; An optimization module is used to perform the optimization task on the slip ring.