Informatization management and control system for fabricated building
By introducing project management, production management, resource management, collaborative operations and BIM application modules into the prefabricated building information management and control system, the problem that existing systems cannot create visual three-dimensional models and simulation analysis is solved, real-time monitoring and intelligent decision-making are realized and efficient construction effects.
Patent Information
- Application Number
- CN202411015817.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
AI Technical Summary
The existing information management and control system cannot create a visual three-dimensional building information model, and cannot simulate and energy analysis of the building, making it difficult for designers, construction parties and operation and maintenance personnel to view and update project information in real time, which has certain limitations.
Provide a prefabricated building information management and control system, including project management module, production management module, resource management module, collaborative operation module, decision support module and BIM application module, through which project information is integrated, shared and collaborated. Work, create and manage three-dimensional building information models, and support collaborative operations and intelligent decision-making in multiple departments.
Realize real-time monitoring and efficient management of project information, improve construction efficiency and quality, reduce costs, enhance the intelligent and collaborative operation capabilities of the system, support the collaborative work of multiple departments, simulate and plan the construction process through BIM technology, and solve it in advance Potential problems.
Smart Images

Figure CN118941239A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information management and control systems, and in particular to an information management and control system for assembled buildings. Background Art
[0002] Prefabricated buildings are a type of building that is manufactured in factories and then transported to construction sites for on-site assembly and installation. With the help of modern information technology, the entire process of prefabricated buildings can be finely managed and monitored, and real-time monitoring and efficient management of each link of prefabricated building design, production, transportation, installation, operation and maintenance can be achieved. However, the existing information management and control system still has defects and deficiencies in some aspects that need to be improved;
[0003] For example, a method and system for information management and control of building materials based on a building information model is disclosed with publication number CN111339112A, the method comprising: using a building information model, performing one-to-one information association processing on each virtual building material in a real storage area belonging to a real construction site and each real building material in a virtual storage area belonging to a virtual construction site, respectively, to obtain corresponding building material information association results, and dynamically updating all virtual building materials in the building information model according to all building material information association results, so that the status of all virtual building materials presented in the virtual construction site and being pushed into the virtual construction process is consistent with the status of all real building materials presented in the real construction site and being pushed into the real construction process, thereby simplifying the operation of repeatedly scanning the barcodes on the real building materials, enhancing the consistency between the status of the virtual building materials and the status of the real building materials, and improving the timeliness of the information management and control of building materials.
[0004] Most of the existing information management and control systems fail to create a visual three-dimensional building information model, cannot simulate and analyze the energy of the building, and are not convenient for designers, construction parties, operation and maintenance personnel, etc. to view and update project information in real time, which has certain limitations.
[0005] Therefore, we proposed an information management and control system for prefabricated buildings to solve the above problems. Summary of the invention
[0006] The purpose of the present invention is to provide an information management and control system for prefabricated buildings to solve the problem raised by the above background technology that most of the current market cannot create a visual three-dimensional building information model and cannot simulate and analyze the energy of the building.
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an information management and control system for prefabricated buildings, comprising S1, a project management module; S2, a production management module; S3, a resource management module; S4, a collaborative operation module; S5, a decision support module; S6, a BIM application module,
[0008] S1. Project Management Module
[0009] It includes four groups of functions: project creation and planning, schedule control, quality management and risk management. Through the project management module, projects can be managed comprehensively and systematically to ensure that the projects are completed on time, with the required quality and within the budget. At the same time, these modules also provide flexibility and scalability, and can be customized and adjusted according to the needs of specific projects.
[0010] S2. Production management module
[0011] It includes three groups of functions: component management, production planning and equipment management. The production management module is an important tool for improving production efficiency, reducing costs and ensuring product quality. By implementing the production management module, enterprises can achieve transparency and traceability of the production process and improve overall competitiveness and market position.
[0012] S3, Resource Management Module
[0013] It includes three groups of functions: human resource management, material management and capital management. The resource management module helps to achieve optimal allocation and efficient utilization of resources, improve management efficiency and economic benefits. Through the resource management module, you can more clearly understand the status and needs of your own resources and make more scientific and reasonable decisions;
[0014] S4, Collaborative Operation Module
[0015] Including two sets of functions: multi-department collaboration and data sharing. The collaborative operation module can realize collaborative work among multiple people or multiple systems, improving work efficiency and quality;
[0016] S5. Decision support module
[0017] The decision support module includes two functions: data analysis and intelligent early warning. It helps decision makers cope with complex and uncertain decision environments and improves decision quality and efficiency by providing timely, accurate and scientific decision support.
[0018] S6, BIM application module
[0019] It includes three groups of functions: 3D modeling, collision detection and construction simulation. These modules realize the integration, sharing and collaborative work of project information by creating and managing 3D building information models.
[0020] Preferably, the project creation and planning function can support the entry, storage and sharing of project information, including basic project information, schedule plan, cost budget, etc.;
[0021] The progress control function can monitor the construction progress in real time, compare the planned and actual progress, find deviations in time and take measures to make adjustments;
[0022] The quality management function can record and analyze the quality data during the construction process, provide visual reports, and provide a basis for quality improvement;
[0023] The risk management function can identify potential risks, assess risk impacts, develop response measures, and reduce project risks.
[0024] Preferably, the component management function establishes a component library to manage the design, production, inspection and storage of components;
[0025] The production planning function can automatically generate a production plan based on the construction progress and monitor the production progress and quality in real time;
[0026] The equipment management function can monitor the operating status of production equipment, predict equipment failures, and improve equipment utilization.
[0027] Preferably, the human resource management function can manage the project team, including staffing, training, performance appraisal, etc.;
[0028] The material management function can manage the purchase, warehousing, outbound delivery and inventory of building materials, equipment and other materials.
[0029] Preferably, the multi-department collaboration function can support collaborative work among multiple departments such as design, construction, and supervision, thereby improving communication efficiency;
[0030] The data sharing function can provide a data management and sharing platform to achieve rapid transmission and communication of information.
[0031] Preferably, the data analysis function can perform in-depth analysis on the collected data to provide a scientific basis for project management;
[0032] The intelligent early warning function can warn of possible risks and provide solutions based on data analysis results.
[0033] Preferably, the three-dimensional modeling function can use BIM technology to build a three-dimensional model of the construction project to achieve visual design and management;
[0034] The collision detection function can perform collision detection in the design stage to avoid design changes and rework during the construction process;
[0035] The construction simulation function can simulate the construction process, optimize the construction plan and improve construction efficiency.
[0036] Preferably, the resource management module records and manages various types of resources (such as materials, equipment, personnel, information, etc.) in the system in detail, including basic information such as the name, specification, quantity, status, and location of the resources;
[0037] The decision support module provides richer and more intuitive visualization tools, presenting complex decision-making processes and results to decision makers in an intuitive and easy-to-understand manner, and supports interactive operations. Decision makers can explore data and analyze results in depth through operations such as dragging and zooming, helping decision makers better understand data and decision-making processes.
[0038] Preferably, the collaborative work module utilizes technologies such as artificial intelligence and machine learning to achieve intelligent decision-making and optimization of the collaborative work module, discover and solve problems in advance through intelligent analysis and prediction, and improve the efficiency and quality of collaborative work.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] (1) The project management module can collect and transmit construction data in real time, ensuring that managers can understand the construction status in a timely manner. It is real-time and provides accurate construction data support through high-precision sensors and data analysis technology. It is accurate, optimizes resource allocation, improves construction efficiency, shortens the construction period, and is highly efficient.
[0041] (2) The production management module promptly detects and handles potential safety hazards, ensures the safety of the construction process, has a certain degree of safety, integrates artificial intelligence algorithms, improves the intelligence level of the system, realizes automated management and decision support, and realizes the intelligence of the system;
[0042] (3) Through automation and intelligent means, reduce manual intervention, improve management efficiency, monitor various data in the construction process in real time, ensure that the construction quality meets the standards, optimize resource allocation, reduce waste, and reduce overall costs. Through intelligent early warning and monitoring, improve the safety of the construction process, support collaborative operations among multiple departments and multiple positions, and improve communication efficiency;
[0043] (4) Deploy the collaborative work module in the cloud to achieve cross-regional and cross-system information sharing and collaborative work. The powerful computing and storage capabilities provided by the cloud computing platform support large-scale, high-concurrency collaborative work needs. Through intelligent analysis and prediction, problems can be discovered and solved in advance, thereby improving the efficiency and quality of collaborative work.
[0044] (5) Designers can use BIM models to evaluate and improve designs, including structure, materials, equipment, and other aspects. During the construction phase, BIM technology can simulate and plan the construction process and solve potential problems in advance. Construction plans can be visualized through BIM models, including construction sequences, material requirements, etc. During the building operation phase, BIM technology can store and manage all information about the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a schematic diagram of the system flow of the present invention;
[0046] Figure 2 This is a schematic diagram of the project management module flow of the present invention;
[0047] Figure 3 This is a schematic diagram of the production management module flow of the present invention;
[0048] Figure 4 This is a schematic diagram of the resource management module flow of the present invention;
[0049] Figure 5 This is a schematic diagram of the collaborative operation module flow of the present invention;
[0050] Figure 6 This is a flow chart of the decision support module of the present invention;
[0051] Figure 7 It is a schematic diagram of the BIM application module flow of the present invention. DETAILED DESCRIPTION
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Embodiment 1: Figure 1 , Figure 2 and Figure 3 The technical solution shown in the present invention provides the following technical solution: a prefabricated building information management and control system, which discloses:
[0054] S1. Project Management Module
[0055] It includes four groups of functions: project creation and planning, schedule control, quality management and risk management. Through the project management module, projects can be managed comprehensively and systematically to ensure that the projects are completed on time, with the required quality and within the budget. At the same time, these modules also provide flexibility and scalability, and can be customized and adjusted according to the needs of specific projects.
[0056] The project creation and planning function can support the entry, storage and sharing of project information, including basic project information, schedule, cost budget, etc.;
[0057] The progress control function can monitor the construction progress in real time, compare the planned and actual progress, find deviations in time and take measures to make adjustments;
[0058] The quality management function can record and analyze the quality data during the construction process, provide visual reports, and provide a basis for quality improvement;
[0059] The risk management function can identify potential risks, assess risk impacts, develop response measures, and reduce project risks.
[0060] S2. Production management module
[0061] It includes three groups of functions: component management, production planning and equipment management. The production management module is an important tool for improving production efficiency, reducing costs and ensuring product quality. By implementing the production management module, enterprises can achieve transparency and traceability of the production process and improve overall competitiveness and market position.
[0062] The component management function establishes a component library to manage the design, production, inspection and storage of components;
[0063] The production planning function can automatically generate a production plan based on the construction progress and monitor the production progress and quality in real time;
[0064] The equipment management function can monitor the operating status of production equipment, predict equipment failures, and improve equipment utilization.
[0065] The project management module can collect and transmit construction data in real time, ensuring that managers can understand the construction status in a timely manner. It is real-time. Through high-precision sensors and data analysis technology, it provides accurate construction data support. It is accurate, optimizes resource allocation, improves construction efficiency, shortens construction cycle, and is efficient. The production management module can promptly discover and deal with potential safety hazards to ensure the safety of the construction process. It has a certain degree of security and integrates artificial intelligence algorithms to improve the intelligence level of the system, realize automated management and decision support, and realize the intelligence of the system.
[0066] Embodiment 2: Figure 1 , Figure 4 and Figure 5 The technical solution shown in the present invention provides the following technical solution: a prefabricated building information management and control system, which discloses:
[0067] S3, Resource Management Module
[0068] It includes three groups of functions: human resource management, material management and capital management. The resource management module helps to achieve optimal allocation and efficient utilization of resources, improve management efficiency and economic benefits. Through the resource management module, you can more clearly understand the status and needs of your own resources and make more scientific and reasonable decisions;
[0069] The human resource management function can manage the project team, including staffing, training, performance appraisal, etc.;
[0070] The material management function can manage the purchase, warehousing, outbound delivery and inventory of building materials, equipment and other materials.
[0071] The resource management module records and manages various resources in the system (such as materials, equipment, personnel, information, etc.) in detail, including basic information such as the name, specification, quantity, status, and location of the resources.
[0072] Record and manage various resources in the system (such as materials, equipment, personnel, information, etc.) in detail, including basic information such as the name, specification, quantity, status, and location of the resources. Review newly added resources to ensure that they meet relevant standards and requirements. Conduct regular or irregular reviews of existing resources to maintain resource quality and availability.
[0073] S4, Collaborative Operation Module
[0074] Including two sets of functions: multi-department collaboration and data sharing. The collaborative operation module can realize collaborative work among multiple people or multiple systems, improving work efficiency and quality;
[0075] The multi-department collaboration function can support collaborative work among multiple departments such as design, construction, and supervision, thereby improving communication efficiency;
[0076] The data sharing function can provide a data management and sharing platform to achieve rapid transmission and communication of information.
[0077] The collaborative operation module uses artificial intelligence, machine learning and other technologies to achieve intelligent decision-making and optimization of the collaborative operation module, discover and solve problems in advance through intelligent analysis and prediction, and improve the efficiency and quality of collaborative operations.
[0078] Through automation and intelligent means, we can reduce manual intervention, improve management efficiency, monitor various data in the construction process in real time, ensure that construction quality meets standards, optimize resource allocation, reduce waste, and reduce overall costs. Through intelligent early warning and monitoring, we can improve safety in the construction process, support collaborative work between multiple departments and multiple positions, improve communication efficiency, deploy collaborative work modules in the cloud, realize cross-regional and cross-system information sharing and collaborative work, and support large-scale and high-concurrency collaborative work needs through the powerful computing and storage capabilities provided by the cloud computing platform. Through intelligent analysis and prediction, we can discover and solve problems in advance and improve the efficiency and quality of collaborative work.
[0079] Embodiment 3: Figure 1 , Figure 6 and Figure 7 The technical solution shown in the present invention provides the following technical solution: a prefabricated building information management and control system, which discloses:
[0080] S5. Decision support module
[0081] The decision support module includes two functions: data analysis and intelligent early warning. It helps decision makers cope with complex and uncertain decision environments and improves decision quality and efficiency by providing timely, accurate and scientific decision support.
[0082] The data analysis function can conduct in-depth analysis on the collected data to provide a scientific basis for project management;
[0083] The intelligent early warning function can warn of possible risks and provide solutions based on data analysis results.
[0084] The decision support module provides richer and more intuitive visualization tools, presenting complex decision-making processes and results to decision makers in an intuitive and easy-to-understand manner, and supports interactive operations. Decision makers can explore data and analyze results in depth through operations such as dragging and zooming, helping decision makers better understand data and decision-making processes.
[0085] S6, BIM application module
[0086] It includes three groups of functions: 3D modeling, collision detection and construction simulation. These modules realize the integration, sharing and collaborative work of project information by creating and managing 3D building information models.
[0087] The three-dimensional modeling function can use BIM technology to build a three-dimensional model of a construction project to achieve visual design and management;
[0088] The collision detection function can perform collision detection in the design stage to avoid design changes and rework during the construction process;
[0089] The construction simulation function can simulate the construction process, optimize the construction plan and improve construction efficiency.
[0090] Designers can use BIM models to evaluate and improve designs, including structures, materials, equipment, and other aspects. During the construction phase, BIM technology can simulate and plan the construction process and solve potential problems in advance. Construction plans can be visualized through BIM models, including construction sequences, material requirements, etc. During the building operation phase, BIM technology can store and manage all information about the building.
[0091] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An information management and control system for prefabricated buildings, comprising S1, a project management module; S2, a production management module; S3, a resource management module; S4, collaborative operation module; S5, decision support module; S6, BIM application module; It is characterized in that Also includes: S1. Project Management Module It includes four groups of functions: project creation and planning, schedule control, quality management and risk management. Through the project management module, projects can be managed comprehensively and systematically to ensure that the projects are completed on time, with the required quality and within the budget. At the same time, these modules also provide flexibility and scalability, and can be customized and adjusted according to the needs of specific projects. S2. Production management module It includes three groups of functions: component management, production planning and equipment management. The production management module is an important tool for improving production efficiency, reducing costs and ensuring product quality. By implementing the production management module, enterprises can achieve transparency and traceability of the production process and improve overall competitiveness and market position. S3, Resource Management Module It includes three groups of functions: human resource management, material management and capital management. The resource management module helps to achieve optimal allocation and efficient utilization of resources, improve management efficiency and economic benefits. Through the resource management module, you can more clearly understand the status and needs of your own resources and make more scientific and reasonable decisions; S4, Collaborative Operation Module Including two sets of functions: multi-department collaboration and data sharing. The collaborative operation module can realize collaborative work among multiple people or multiple systems, improving work efficiency and quality; S5. Decision support module The decision support module includes two functions: data analysis and intelligent early warning. It helps decision makers cope with complex and uncertain decision environments and improves decision quality and efficiency by providing timely, accurate and scientific decision support. S6, BIM application module It includes three groups of functions: 3D modeling, collision detection and construction simulation. These modules realize the integration, sharing and collaborative work of project information by creating and managing 3D building information models.
2. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The project creation and planning function can support the entry, storage and sharing of project information, including basic project information, schedule, cost budget, etc.; The progress control function can monitor the construction progress in real time, compare the planned and actual progress, find deviations in time and take measures to make adjustments; The quality management function can record and analyze the quality data during the construction process, provide visual reports, and provide a basis for quality improvement; The risk management function can identify potential risks, assess risk impacts, develop response measures, and reduce project risks.
3. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The component management function establishes a component library to manage the design, production, inspection and storage of components; The production planning function can automatically generate a production plan based on the construction progress and monitor the production progress and quality in real time; The equipment management function can monitor the operating status of production equipment, predict equipment failures, and improve equipment utilization.
4. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The human resource management function can manage the project team, including staffing, training, performance appraisal, etc.; The material management function can manage the purchase, warehousing, outbound delivery and inventory of building materials, equipment and other materials.
5. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The multi-department collaboration function can support collaborative work among multiple departments such as design, construction, and supervision, thereby improving communication efficiency; The data sharing function can provide a data management and sharing platform to achieve rapid transmission and communication of information.
6. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The data analysis function can conduct in-depth analysis on the collected data to provide a scientific basis for project management; The intelligent early warning function can warn of possible risks and provide solutions based on data analysis results.
7. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The three-dimensional modeling function can use BIM technology to build a three-dimensional model of a construction project to achieve visual design and management; The collision detection function can perform collision detection in the design stage to avoid design changes and rework during the construction process; The construction simulation function can simulate the construction process, optimize the construction plan and improve construction efficiency.
8. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The resource management module records and manages various resources in the system (such as materials, equipment, personnel, information, etc.) in detail, including basic information such as resource name, specification, quantity, status, location, etc.; The decision support module provides richer and more intuitive visualization tools, presenting complex decision-making processes and results to decision makers in an intuitive and easy-to-understand manner, and supports interactive operations. Decision makers can explore data and analyze results in depth through operations such as dragging and zooming, helping decision makers better understand data and decision-making processes.
9. The information management and control system for prefabricated buildings according to claim 1 is characterized in that: The collaborative operation module uses artificial intelligence, machine learning and other technologies to achieve intelligent decision-making and optimization of the collaborative operation module, discover and solve problems in advance through intelligent analysis and prediction, and improve the efficiency and quality of collaborative operations.