Traffic intersection diversion control method based on scene analysis

Through the traffic intersection diversion control method based on scenario analysis, the traffic flow is monitored in real time and the traffic light duration is adjusted, the problem of poor timeliness of traditional traffic control is solved, the timeliness and diversion efficiency of road diversion is improved, and road congestion and waiting are reduced time.

CN118942252APending Publication Date: 2024-11-12SHANDONG UNIV OF SCI & TECH
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411233030.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional traffic control methods have poor timeliness, which makes it difficult to effectively solve the problem of road congestion. They rely on manual operations to consume manpower, reduce travel efficiency and may cause traffic accidents.

Method used

Using a traffic intersection diversion control method based on scenario analysis, the traffic flow data is obtained in real time through monitoring equipment, the maximum cargo capacity of the traffic flow is calculated, and the control plan is generated based on the predicted traffic flow situation, the traffic light duration is adjusted to diversion traffic and improve road diversion. Controlling timeliness.

Benefits of technology

It improves the timeliness of road diversion control, reduces or avoids road congestion, improves the diversion efficiency and vehicle traffic speed, solves the problem of too long waiting time in traditional methods, and saves traffic data statistics time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942252A_ABST
    Figure CN118942252A_ABST
Patent Text Reader

Abstract

The invention discloses a traffic intersection diversion control method based on scene analysis. The method comprises the following steps: acquiring a to-be-controlled target area and road basic information of the target area; acquiring a traffic flow data set on the target area in real time through monitoring equipment, and transmitting the traffic flow data set to a central computer; the central computer obtains the maximum traffic flow bearing capacity according to the traffic flow data set and the road basic information; and obtaining a control scheme according to the maximum traffic flow bearing capacity, and controlling a flow guide module to work according to the control scheme. The technical problem of road congestion caused by poor timeliness of road diversion control in the prior art is solved, the vehicle diversion control scheme is generated by predicting the road traffic flow, and the timeliness of road diversion control can be improved, so that the road congestion is reduced or avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of traffic control, and in particular relates to a traffic intersection diversion control method based on scene analysis. Background Art

[0002] Traffic lights play an important role in controlling road conditions. The allocation of travel time and waiting time directly determines whether the road is unobstructed. In addition, traffic lights with different road conditions should be allocated different travel time intervals to ensure the smooth flow of the road. Traditional traffic control uses manual traffic diversion to extend the travel time and shorten the waiting time in congested sections, but this method is labor-intensive and the traffic on site is in a chaotic stage while waiting for the traffic police to arrive, which reduces people's travel efficiency and is prone to traffic accidents.

[0003] Traffic diversion control is a traffic management strategy that aims to guide and divert vehicle flow to improve traffic flow and reduce congestion. This control can be achieved in many ways, including traffic signs, traffic lights, curb design, traffic strategies, and traffic management systems. Existing traffic diversion control methods usually only carry out traffic control after traffic congestion occurs. This control method has poor timeliness and cannot solve the problem of traffic congestion well. Therefore, there is an urgent need for a traffic diversion control method at traffic intersections based on scenario analysis. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a traffic intersection diversion control method based on scene analysis, which can improve the timeliness of road diversion control, thereby reducing or avoiding road congestion.

[0005] To achieve the above object, the present invention provides a traffic intersection diversion control method based on scene analysis, comprising:

[0006] Acquire the target area to be controlled and basic information of roads in the target area;

[0007] Acquire a vehicle flow data set in the target area in real time through a monitoring device, and transmit the vehicle flow data set to a central computer;

[0008] The central computer obtains the maximum vehicle flow capacity according to the vehicle flow data set and the basic road information;

[0009] A control scheme is obtained according to the maximum vehicle flow carrying capacity, and the diversion module is controlled to operate according to the control scheme.

[0010] Optionally, the basic road information includes: the number of road lanes and the road speed limit value.

[0011] Optionally, obtaining a set of vehicle flow data in the target area in real time through a monitoring device includes:

[0012] Select the traffic flow sensors to be extracted from the smart integrated street light poles on both sides of the road according to the preset distance;

[0013] According to the vehicle flow sensor to be extracted, the vehicle flow data of the vehicle flow sensor to be extracted is acquired in real time, and a vehicle flow data set is constructed, wherein the vehicle flow data has a time node identifier.

[0014] Optionally, obtaining the maximum vehicle flow carrying capacity includes:

[0015] Performing a weight analysis on the number of road lanes and the road speed limit value based on a coefficient of variation method to determine a weight coefficient for the number of road lanes and the road speed limit value;

[0016] The number of lanes on the road and the speed limit value on the road are weightedly calculated according to the weight ratio, and the weighted calculation result is used as the maximum traffic carrying capacity.

[0017] Optionally, according to the maximum vehicle flow carrying capacity, before obtaining the control scheme, the following steps are further included:

[0018] The traffic flow is predicted based on the traffic flow data set and the maximum traffic flow carrying capacity.

[0019] Optionally, predicting the traffic flow includes:

[0020] The central computer predicts the occupancy of the lanes according to the different lanes occupied by vehicles in the historical traffic flow data set;

[0021] The traffic flow prediction value is obtained according to the occupancy situation and the maximum traffic flow carrying capacity.

[0022] Optionally, obtaining the control scheme according to the maximum vehicle flow carrying capacity includes:

[0023] When the predicted value of the traffic flow is greater than the maximum carrying capacity of the traffic flow, the monitoring device and the central computer are used to calculate the congestion time and determine the occupancy of the lanes, and generate a first control plan;

[0024] When the predicted value of the traffic flow is less than the maximum traffic flow carrying capacity, a second control scheme is generated.

[0025] Optionally, the first control scheme is:

[0026] When there are more vehicles in the straight lane, adjust the display time of the green light for the straight lane. When there are more vehicles in the turning lane, adjust the display time of the green light for the turning lane.

[0027] Compared with the prior art, the present invention has the following advantages and technical effects:

[0028] 1. In the present invention, when a road is congested, it can be diverted immediately, and the green light display time can be changed in time according to the number of vehicles in the lane to increase the vehicle passing time. At the same time, large-area guidance of vehicles can be achieved according to the setting of surrounding intersection information, thereby improving the diversion efficiency and operation speed, and solving the problem of long waiting time caused by manual traditional traffic diversion.

[0029] 2. The present invention solves the technical problem in the prior art that the timeliness of road diversion control is poor, causing road congestion. By generating a vehicle diversion control plan through road traffic flow prediction, the timeliness of road diversion control can be improved, thereby reducing or avoiding road congestion.

[0030] 3. The present invention can reduce the amount of traffic data statistics without affecting the accuracy of traffic data collection by selecting traffic flow sensors, save traffic data statistics time, and improve data statistics efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0032] Figure 1 This is a flow chart of a traffic intersection diversion control method based on scene analysis according to an embodiment of the present invention;

[0033] Figure 2 4 is a structural diagram of a monitoring device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0034] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0035] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0036] To achieve the above objectives, the present invention provides a traffic intersection diversion control method based on scene analysis, such as Figure 1 As shown, specifically including:

[0037] Obtain the target area to be controlled and basic information of the roads in the target area;

[0038] Obtain the vehicle flow data set in the target area in real time through monitoring equipment, and transmit the vehicle flow data set to the central computer;

[0039] The central computer obtains the maximum traffic capacity based on the traffic data set and basic road information;

[0040] According to the maximum carrying capacity of the traffic flow, a control plan is obtained, and the diversion module is controlled according to the control plan.

[0041] Specifically, the monitoring equipment consists of a high-speed camera, a speed measurement module, a sensor module, a warning module, a collaborative terminal, and a diversion module;

[0042] Among them, the high-speed camera captures the current road scene and the vehicle's steering target;

[0043] The speed measurement module constantly detects the current road vehicle speed to avoid congestion caused by speeding or slow driving;

[0044] When the speed measurement module detects that the vehicle is traveling at a fast or slow speed, the speed measurement module transmits the obtained information to the warning module, and the warning module displays the vehicle information to make the driver pay attention to the current driving speed;

[0045] The sensor module is used to obtain the traffic flow data of the traffic flow sensor to be extracted;

[0046] The traffic diversion module is used to control the display duration of traffic light equipment at intersections.

[0047] Furthermore, the basic road information includes: the number of road lanes and the road speed limit value.

[0048] Furthermore, the vehicle flow data set in the target area is obtained in real time through the monitoring device, including:

[0049] Select the traffic flow sensors to be extracted from the smart integrated street light poles on both sides of the road according to the preset distance;

[0050] According to the vehicle flow sensor to be extracted, the vehicle flow data of the vehicle flow sensor to be extracted is obtained in real time, and a vehicle flow data set is constructed, wherein the vehicle flow data has a time node identifier.

[0051] Specifically, the traffic flow sensors in the smart integrated street light poles on both sides of the road are used to continuously count the vehicles on the road. First, a preset distance is obtained. The preset distance can be set based on actual conditions. The longer the preset distance, the lower the accuracy of the traffic flow data statistics; the shorter the preset distance, the higher the accuracy of the traffic flow data statistics; for example: the preset distance is set to 100 meters.

[0052] According to the preset distance, the traffic flow sensors to be extracted are selected from the smart integrated street light poles on both sides of the road. By selecting the traffic flow sensors, the traffic flow data statistics can be reduced without affecting the accuracy of traffic flow data collection, which can save traffic flow data statistics time and improve data statistics efficiency.

[0053] Set the time node for extracting traffic flow data. The time node for extracting traffic flow data can be customized according to the actual situation. For example, set the time node for extracting traffic flow data to 5 minutes, that is, extract traffic flow data every 5 minutes. Obtain the traffic flow data of the traffic flow sensor to be extracted according to the time node for extracting traffic flow data, and construct a traffic flow data set based on the extracted traffic flow data, in which the traffic flow data has a time node identifier. By obtaining the traffic flow data set, data support is provided for subsequent road traffic flow trend prediction.

[0054] Furthermore, obtaining the maximum traffic carrying capacity includes:

[0055] Perform weight analysis on the number of road lanes and road speed limit values ​​based on the coefficient of variation method to determine the weight coefficients of the number of road lanes and road speed limit values;

[0056] The number of road lanes and road speed limit values ​​are weightedly calculated according to the weight ratio, and the weighted calculation result is used as the maximum traffic carrying capacity.

[0057] Specifically, the number of road lanes and the road speed limit values ​​are weighted based on the coefficient of variation method. The coefficient of variation method is a method for calculating the degree of change of each indicator of the system according to a statistical method. The indicators are weighted according to the degree of variation between the current value and the target value of each evaluation indicator. If the value difference of a certain indicator is large, it can clearly distinguish the evaluated objects, indicating that the identification information of the indicator is rich, and thus the indicator should be given a larger weight; on the contrary, if the value difference of each evaluated object on a certain indicator is small, then the ability of this indicator to distinguish the evaluated objects is weak, and thus the indicator should be given a smaller weight. In this embodiment, the weight can be set according to the degree of influence of the number of road lanes and the road speed limit value on the road carrying capacity, wherein the greater the degree of influence, the greater the corresponding weight coefficient. Determine the weight coefficient of the number of road lanes and the road speed limit value. Then, the number of road lanes and the road speed limit value are weighted according to the weight ratio to obtain the weighted calculation result, and the weighted calculation result is used as the maximum traffic flow carrying coefficient. Then, the traffic flow trend prediction result is judged according to the maximum traffic flow carrying coefficient. By setting different weights to calculate the maximum traffic flow carrying coefficient, the rationality and accuracy of the maximum traffic flow carrying coefficient can be improved.

[0058] Furthermore, according to the maximum carrying capacity of the traffic flow, before obtaining the control plan, the following steps are also included:

[0059] The traffic flow is predicted based on the traffic flow data set and the maximum traffic flow carrying capacity.

[0060] Furthermore, the prediction of traffic flow includes:

[0061] The central computer predicts lane occupancy based on the different lanes occupied by vehicles in the historical traffic flow data set;

[0062] Obtain traffic flow forecast based on occupancy and maximum traffic capacity.

[0063] Specifically, a road traffic flow trend prediction is performed based on a traffic flow data set, and a traffic flow trend prediction coordinate system is constructed by taking the time node in the traffic flow data set as the X-axis and the traffic flow data corresponding to the time node as the Y-axis; then the traffic flow data in the traffic flow data set is distributed to the traffic flow trend prediction coordinate system according to the time node; finally, the traffic flow data in the traffic flow trend prediction coordinate system is fitted and connected, and fitting and connecting refers to matching a curve or function with a given data point through mathematical or statistical methods, and then connecting multiple data points in the curve to obtain a fitting and connecting curve, and finally generating a traffic flow trend prediction curve based on the curve obtained by fitting and connecting.

[0064] Furthermore, according to the maximum vehicle flow capacity, the control scheme is obtained including:

[0065] When the predicted traffic flow value is greater than the maximum traffic flow capacity, the monitoring equipment and the central computer are used to calculate the congestion time and determine the lane occupancy to generate a first control plan;

[0066] When the predicted traffic flow value is less than the maximum traffic flow carrying capacity, no special control is required and a second control scheme is generated.

[0067] Specifically, the central computer automatically analyzes the current road conditions based on the information of vehicles on the road, and makes the next instruction based on the calculated results;

[0068] The central computer calculates the lane occupancy situation based on the lanes occupied by different vehicles. That is, when there are more vehicles in the straight lane, the display time of the green light for straight driving is adjusted; when there are more vehicles in the turning lane, the display time of the green light for the turning lane is adjusted, thereby increasing the vehicle passage time and initially improving the congestion.

[0069] At the same time, the central computer calculates the approximate duration of the current road congestion; the calculation method is: vehicle speed / current intersection length to get the time required for a single vehicle to pass, and the green light display time / single vehicle passing time to get the congestion duration of the road section;

[0070] The calculation formula is, V / L=S, T / S=A;

[0071] Among them, V is the vehicle speed, L is the current length of the intersection, S is the time required for a single vehicle to pass, T is the length of time the green light is displayed, and A is the length of time the road section is congested.

[0072] Furthermore, the first control scheme is:

[0073] When there are more vehicles in the straight lane, adjust the display time of the green light for the straight lane. When there are more vehicles in the turning lane, adjust the display time of the green light for the turning lane.

[0074] When the road congestion cannot be alleviated, the central computer transmits the obtained signal to the cooperative terminal. At this time, the cooperative terminal communicates with the vehicle's on-board equipment through the wireless network module to remind the driver of the current road conditions and the estimated travel time. At the same time, the warning module reminds some vehicles to change roads to alleviate the current road congestion. When the next section that the current section of the vehicle needs to travel is congested at the same time, the display function of the cooperative terminal and the warning module reminds and guides the vehicle in the current section of the road ahead. At the same time, the central computer integrates the road condition data of the surrounding sections, and guides the vehicle in time according to the information of the surrounding intersections to reduce large-scale congestion.

[0075] Through the above method, when the road is congested, it can be diverted in the first time, and the green light display time can be changed in time according to the number of vehicles in the lane to increase the vehicle's travel time. At the same time, large-area guidance of vehicles can be achieved based on the surrounding intersection information and the setting of the collaborative terminal, thereby improving the diversion efficiency and the operating speed, solving the problem of long waiting time caused by manual traditional traffic diversion, and realizing shared traffic control.

[0076] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A traffic intersection diversion control method based on scene analysis, It is characterized in that include: Acquire the target area to be controlled and basic information of roads in the target area; Acquire a vehicle flow data set in the target area in real time through a monitoring device, and transmit the vehicle flow data set to a central computer; The central computer obtains the maximum vehicle flow capacity according to the vehicle flow data set and the basic road information; A control scheme is obtained according to the maximum vehicle flow carrying capacity, and the diversion module is controlled to operate according to the control scheme.

2. According to the traffic intersection diversion control method based on scene analysis according to claim 1, It is characterized in that The basic road information includes: the number of road lanes and the road speed limit value.

3. According to the traffic intersection diversion control method based on scene analysis according to claim 1, It is characterized in that Acquiring a vehicle flow data set in the target area in real time through monitoring equipment includes: Select the traffic flow sensors to be extracted from the smart integrated street light poles on both sides of the road according to the preset distance; According to the vehicle flow sensor to be extracted, the vehicle flow data of the vehicle flow sensor to be extracted is acquired in real time, and a vehicle flow data set is constructed, wherein the vehicle flow data has a time node identifier.

4. According to the traffic intersection diversion control method based on scene analysis according to claim 2, It is characterized in that Obtaining the maximum vehicle flow carrying capacity includes: Performing a weight analysis on the number of road lanes and the road speed limit value based on a coefficient of variation method to determine a weight coefficient for the number of road lanes and the road speed limit value; The number of lanes on the road and the speed limit value on the road are weightedly calculated according to the weight ratio, and the weighted calculation result is used as the maximum traffic carrying capacity.

5. According to the traffic intersection diversion control method based on scene analysis according to claim 1, It is characterized in that According to the maximum vehicle flow carrying capacity, before obtaining the control scheme, the following steps are further included: The traffic flow is predicted based on the traffic flow data set and the maximum traffic flow carrying capacity.

6. A traffic intersection diversion control method based on scene analysis according to claim 5, It is characterized in that Predicting the traffic flow includes: The central computer predicts the occupancy of the lanes according to the different lanes occupied by vehicles in the historical traffic flow data set; A traffic flow prediction value is obtained according to the occupancy situation and the maximum traffic flow carrying capacity.

7. A traffic intersection diversion control method based on scene analysis according to claim 6, It is characterized in that According to the maximum vehicle flow carrying capacity, obtaining the control scheme includes: When the predicted value of the traffic flow is greater than the maximum carrying capacity of the traffic flow, the monitoring device and the central computer are used to calculate the congestion time and determine the occupancy of the lanes, and generate a first control plan; When the predicted value of the traffic flow is less than the maximum traffic flow carrying capacity, a second control scheme is generated.

8. A traffic intersection diversion control method based on scene analysis according to claim 7, It is characterized in that The first control scheme is: When there are more vehicles in the straight lane, adjust the display time of the green light for the straight lane. When there are more vehicles in the turning lane, adjust the display time of the green light for the turning lane.

Citation Information

Patent Citations

  • Road jam prediction method for emergent incident and system

    CN106971537A

  • Traffic road condition prediction method by using detector data under large-scale road network

    CN110120154A

  • Road condition detection method based on intelligent road testing equipment

    CN110428629A

  • Lane-level traffic state estimation method, device and system based on trajectory data

    CN114333335A

  • Traffic control method for vehicle-road cooperation

    CN116543569A