Method and system for evaluating adjustable load potential of power system

By evaluating the adjustable load potential of the power system, and using real-time status information and preset models to calculate the reduced working power of the cold station, the problem of underutilization of load resources in the power system is solved, and the efficiency and accuracy of load regulation are improved, so as to meet the needs of the The demand for new energy consumption and power grid suppression.

CN118944059APending Publication Date: 2024-11-12SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410970543.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-07-18
Filing Date
2024-07-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively evaluate and manage the adjustable load potential of the power system, resulting in the insufficient exploration of the demand-side resources and the load regulation strategy cannot meet the efficient allocation needs of massive adjustable load resources.

Method used

An evaluation method and system are proposed to obtain real-time status information of adjustable resource equipment, and use preset single building load model and cold station power approximate aggregation model to calculate the cold station when adjusting to the highest comfort temperature and the lowest comfort temperature. Reduce the operating power to output maximum adjustable potential.

Benefits of technology

Real-time analysis of large-scale load characteristics and baseline loads is realized, the calculation efficiency and accuracy of dynamic adjustable loads is improved, the initiative and enthusiasm of load participation in regulation is enhanced, and the requirements of instantaneous absorption of new energy and large-scale grid suppression are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944059A_ABST
    Figure CN118944059A_ABST
Patent Text Reader

Abstract

The invention provides a method and system for evaluating the adjustable load potential of a power system, and the method comprises the steps: obtaining the real-time state information of adjustable resource equipment, and carrying out the processing of the real-time state information according to a preset single building load model, and obtaining a corresponding load characteristic parameter; and processing the load characteristic parameters through a preset cold station power approximate aggregation model to obtain reduced working power when the cold station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and outputting the reduced working power as the maximum reduced potential. According to the method, the dynamic adjustable load calculation efficiency and precision are improved, and the adjustable load potential of load aggregation is efficiently evaluated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of evaluating the adjustable load potential of an electric power system, and in particular to a method and system for evaluating the adjustable load potential of an electric power system. Background Art

[0002] Against the backdrop of new power system construction and power system reform, the traditional demand response model based mainly on administrative means (orderly power consumption) can no longer adapt to the requirements of instantaneous absorption of new energy and large-scale grid smoothing. Grid companies are in urgent need of exploring new demand-side management models, strengthening the operation of load resource management systems, improving the real-time monitoring and dispatching command capabilities of demand-side resources, and promoting power users to actively participate in power demand response.

[0003] However, in reality, there are still problems such as insufficient exploration of demand-side resource potential, inability of load aggregation and regulation strategies to meet the needs of efficient configuration of massive adjustable load resources, and lagging market evolution of market-oriented load aggregation business models. For power grid companies or market-oriented load aggregators, exploring the potential resources of adjustable loads, efficiently aggregating adjustable resources, and high-frequency operation and optimization will become the key to gaining future market competitive advantages. Summary of the invention

[0004] The purpose of the present invention is to propose a method and system for evaluating the adjustable load potential of an electric power system, so as to solve the technical problem of how to evaluate the adjustable load potential of load aggregation.

[0005] In one aspect, a method for evaluating the adjustable load potential of a power system is provided, comprising:

[0006] Obtaining real-time status information of adjustable resource equipment, and processing the real-time status information according to a preset single building load model to obtain corresponding load characteristic parameters;

[0007] The load characteristic parameters are processed by a preset cooling station power approximation aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and the reduced working power is output as the maximum adjustable potential.

[0008] Preferably, the processing of the real-time status information according to the preset single building load model specifically includes:

[0009] Determine the relationship between temperature change at the end of a single building and time variables;

[0010] Under the condition that the set temperature and ambient temperature of the cooling station at the end of the single building are determined, when the cooling load of the cooling station is in a stable operating state, the temperature can be adjusted downward;

[0011] Determine the relationship between the operating power of the cooling station and the adjustable temperature scale.

[0012] Preferably, the relationship between the temperature change at the end of the single building and the time variable is determined according to the following formula:

[0013]

[0014] in, The indoor temperature of the single building at time t+1 when the cooling station is supplying cooling. The indoor temperature of the single building at time t when the cooling station is supplying cooling; is the ambient temperature at time t; is the ambient temperature at time t+1; Q t is the cooling capacity of the cold station at time t; R is the equivalent thermal resistance in the single building; C is the equivalent heat capacity in the single building; e is the relationship change coefficient; Δt is the time difference.

[0015] Preferably, the temperature can be adjusted downward according to the following formula:

[0016]

[0017] Among them, ST AD (T in ) is the indoor temperature T in The temperature can be adjusted downward; T in The indoor temperature of a single building when supplying cooling to the cooling station; T min is the minimum value of the user's temperature comfort range; T max The maximum value of the user's temperature comfort range.

[0018] Preferably, the relationship between the operating power of the cooling station and the adjustable temperature scale is determined according to the following formula:

[0019] P AD (T in )=αST AD (T in )+βT out +γ

[0020] Among them, P AD (T in ) is the relationship between the cooling station working power and the adjustable temperature scale; α, β, γ are the relationship coefficients between the cooling station working power and the adjustable temperature scale; T out is the ambient temperature.

[0021] Preferably, the method further includes determining a coefficient of relationship between the operating power of the cooling station and the adjustable temperature scale according to the following formula:

[0022]

[0023]

[0024]

[0025] Among them, σ and τ are constant coefficients of cooling capacity; ρ and μ are constant coefficients of cooling input power.

[0026] Preferably, the reduced operating power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature is determined according to the following formula:

[0027] ΔP AD,down,n =P AD,n (T min )-P AD,n (T in )=-α n ST AD,n

[0028] Among them, ΔP AD,down,n To reduce the working power; P AD,n The cooling power of the nth single building; ST AD,n The temperature at the end of the nth single building can be adjusted downward; α n It is the relationship coefficient between the working power of the cooling station at the end of the nth single building and the adjustable temperature scale.

[0029] Preferably, the method further includes determining the maximum adjustable reduction potential of the aggregated cooling power of the cooling stations of the multiple single buildings according to the following formula:

[0030]

[0031] Among them, ΔP AD,down It is the maximum adjustable reduction potential of the aggregated cooling power of the cold stations of multiple single buildings; n is the number of single building ends; i is the serial number of the single building end.

[0032] On the other hand, a system for evaluating the potential of adjustable loads in a power system is provided to implement the method for evaluating the potential of adjustable loads in a power system, comprising:

[0033] A feature extraction module is used to obtain real-time status information of adjustable resource equipment and process the real-time status information according to a preset single building load model to obtain corresponding load characteristic parameters;

[0034] The evaluation module is used to process the load characteristic parameters through a preset cooling station power approximation aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and output the reduced working power as the maximum adjustable potential.

[0035] In summary, the implementation of the embodiments of the present invention has the following beneficial effects:

[0036] Compared with the traditional demand response mode based on administrative means (orderly power consumption), the evaluation method and system for the adjustable load potential of the power system provided by the present invention can realize large-scale load characteristics and real-time analysis of baseline loads by collecting multi-load operation data of building clusters through mutual inductance devices, meeting the requirements of instantaneous absorption of new energy and large-scale grid stabilization; the adjustable load potential calculation method based on load curve cluster analysis can greatly improve the efficiency and accuracy of dynamic adjustable load calculation. The traditional method requires a lot of manpower and time to calculate dynamic loads and manually estimate adjustable loads, which cannot meet the timeliness and accuracy of grid regulation. The potential evaluation index system considering multiple factors first considers factors such as user comfort and willingness compared with the traditional demand response interruption load mode, and quantitatively analyzes the influence of indoor temperature setting efficiency, etc., to improve the initiative and enthusiasm of load participation in regulation, and lay the foundation for the business model of load regulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, without paying creative labor, other drawings obtained based on these drawings still belong to the scope of the present invention.

[0038] Figure 1 The main flow diagram of a method for evaluating the adjustable load potential of an electric power system in an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0039] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings.

[0040] like Figure 1 FIG. 1 is a schematic diagram of an embodiment of a method for evaluating the adjustable load potential of an electric power system provided by the present invention. In this embodiment, the method comprises the following steps:

[0041] Step S1, obtain the real-time status information of the adjustable resource equipment, and process the real-time status information according to the preset single building load model to obtain the corresponding load characteristic parameters; understandably, a collection device is arranged in the building, including a transformer and other equipment, for real-time acquisition of electrical equipment data, equipment status data, etc. of the cold station circuit. The collection device obtains the real-time status information of the circuit through the transformer, including the electricity quantity, current, voltage, power and other data, and then transmits the measured data through the data collection device.

[0042] In one embodiment, after receiving the collected data, a basic physical model is constructed for the single building load to analyze the load characteristics. The processing of the real-time status information according to the preset single building load model specifically includes: determining the relationship between the temperature change at the single building end and the time variable; determining the temperature can be adjusted downward when the cooling load of the cooling station is in a stable operating state, when the set temperature and ambient temperature of the cooling station at the single building end are determined; determining the relationship between the working power of the cooling station and the temperature adjustable scale.

[0043] Specifically, the cooling load at the single building end of the cold station uses an equivalent parameter model to establish the relationship between the temperature change at the single building end under the action of internal and external cold and heat sources such as ambient temperature and indoor equipment set temperature and time and other variables. The relationship between the temperature change at the single building end and the time variable is determined according to the following formula:

[0044]

[0045] in, The indoor temperature of the single building at time t+1 when the cooling station is supplying cooling. The indoor temperature of the single building at time t when the cooling station is supplying cooling; is the ambient temperature at time t; is the ambient temperature at time t+1; Q t is the cooling capacity of the cold station at time t; R is the equivalent thermal resistance in the single building; C is the equivalent heat capacity in the single building; e is the relationship change coefficient; Δt is the time difference.

[0046] Specifically, when the set temperature and ambient temperature of the cooling station at the single building end are determined, it is assumed that the ambient temperature maintains T out When the cooling load of the cooling station is in a stable operating state, the indoor temperature is equal to the set temperature of the cooling station single building end load. The user's temperature comfort range is [T min , T max ], when the temperature of the single building end is closer to T min The smaller the temperature range that can be adjusted downward at the single building end of the cold station, the less likely it is that the cold station will adjust the temperature upward. Therefore, the temperature adjustment scale ST AD The temperature can be adjusted downwards according to the following formula:

[0047]

[0048] Among them, ST AD (T in ) is the indoor temperature T in The temperature can be adjusted downward; T in The indoor temperature of a single building when supplying cooling to the cooling station; T minis the minimum value of the user's temperature comfort range; T max The maximum value of the user's temperature comfort range.

[0049] Specifically, the smaller the temperature adjustment scale is, the smaller the range of cooling station power reduction is. AD The relationship between the operating power of the cooling station and the adjustable temperature scale is determined by the following formula:

[0050] P AD (T in )=αST AD (T in )+βT out +γ

[0051] Among them, P AD (T in ) is the relationship between the cooling station working power and the adjustable temperature scale; α, β, γ are the relationship coefficients between the cooling station working power and the adjustable temperature scale; T out is the ambient temperature.

[0052] The relationship coefficient between the cooling station working power and the adjustable temperature scale is determined according to the following formula:

[0053]

[0054]

[0055]

[0056] Among them, σ and τ are constant coefficients of cooling capacity; ρ and μ are constant coefficients of cooling input power.

[0057] Step S2, the load characteristic parameters are processed by a preset cooling station power approximate aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and the reduced working power is output as the maximum adjustable potential. It can be understood that due to its periodic characteristics, the cooling station power approximate aggregation model is established according to inequality transformation and the law of large numbers to solve the cooling station power interval, and the cooling working power at the end of the nth single building is defined as P AD,n , the temperature can be adjusted down to ST AD,n .

[0058] In one embodiment, the reduced operating power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature is determined according to the following formula:

[0059] ΔP AD,down,n =P AD,n (T min )-P AD,n (Tin )=-α n ST AD,n

[0060] Among them, ΔP AD,down,n To reduce the working power; P AD,n The cooling power of the nth single building; ST AD,n The temperature at the end of the nth single building can be adjusted downward; α n It is the relationship coefficient between the working power of the cooling station at the end of the nth single building and the adjustable temperature scale.

[0061] Specifically, the maximum adjustable reduction potential of the aggregated cooling power of the cooling stations of multiple single buildings is determined according to the following formula:

[0062]

[0063] Among them, ΔP AD,down It is the maximum adjustable reduction potential of the aggregated cooling power of the cold stations of multiple single buildings; n is the number of single building ends; i is the serial number of the single building end.

[0064] An embodiment of the present invention further provides a system for evaluating the potential of adjustable loads in an electric power system, which is used to implement the method for evaluating the potential of adjustable loads in an electric power system, comprising:

[0065] A feature extraction module is used to obtain real-time status information of adjustable resource equipment and process the real-time status information according to a preset single building load model to obtain corresponding load characteristic parameters;

[0066] The evaluation module is used to process the load characteristic parameters through a preset cooling station power approximation aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and output the reduced working power as the maximum adjustable potential.

[0067] It should be noted that the system described in the above embodiment corresponds to the method described in the above embodiment. Therefore, the undetailed parts of the system described in the above embodiment can be obtained by referring to the contents of the method described in the above embodiment, and will not be repeated here.

[0068] In summary, the implementation of the embodiments of the present invention has the following beneficial effects:

[0069] Compared with the traditional demand response mode based on administrative means (orderly power consumption), the evaluation method and system for the adjustable load potential of the power system provided by the present invention can realize large-scale load characteristics and real-time analysis of baseline loads by collecting multi-load operation data of building clusters through mutual inductance devices, meeting the requirements of instantaneous absorption of new energy and large-scale grid stabilization; the adjustable load potential calculation method based on load curve cluster analysis can greatly improve the efficiency and accuracy of dynamic adjustable load calculation. The traditional method requires a lot of manpower and time to calculate dynamic loads and manually estimate adjustable loads, which cannot meet the timeliness and accuracy of grid regulation. The potential evaluation index system considering multiple factors first considers factors such as user comfort and willingness compared with the traditional demand response interruption load mode, and quantitatively analyzes the influence of indoor temperature setting efficiency, etc., to improve the initiative and enthusiasm of load participation in regulation, and lay the foundation for the business model of load regulation.

[0070] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope of the present invention.

Claims

1. A method for evaluating the adjustable load potential of an electric power system, characterized in that: include: Obtaining real-time status information of adjustable resource equipment, and processing the real-time status information according to a preset single building load model to obtain corresponding load characteristic parameters; The load characteristic parameters are processed by a preset cooling station power approximation aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and the reduced working power is output as the maximum adjustable potential.

2. The method according to claim 1, characterized in that The processing of the real-time status information according to the preset single building load model specifically includes: Determine the relationship between temperature change at the end of a single building and time variables; Under the condition that the set temperature and ambient temperature of the cooling station at the end of the single building are determined, when the cooling load of the cooling station is in a stable operating state, the temperature can be adjusted downward; Determine the relationship between the operating power of the cooling station and the adjustable temperature scale.

3. The method according to claim 2, characterized in that The relationship between the temperature change at the end of a single building and the time variable is determined according to the following formula: in, The indoor temperature of the single building at time t+1 when the cooling station is supplying cooling. The indoor temperature of the single building at time t when the cooling station is supplying cooling; is the ambient temperature at time t; is the ambient temperature at time t+1; Q t is the cooling capacity of the cold station at time t; R is the equivalent thermal resistance in the single building; C is the equivalent heat capacity in the single building; e is the relationship change coefficient; Δt is the time difference.

4. The method according to claim 3, characterized in that The temperature can be adjusted downwards according to the following formula: Among them, ST AD (T in ) is the indoor temperature T in The temperature can be adjusted downward; T in The indoor temperature of a single building when supplying cooling to the cooling station; T min is the minimum value of the user's temperature comfort range; T max The maximum value of the user's temperature comfort range.

5. The method according to claim 4, characterized in that The relationship between the cooling station operating power and the adjustable temperature scale is determined according to the following formula: P AD (T in )=αST AD (T in )+βT out +γ Among them, P AD (T in ) is the relationship between the cooling station working power and the adjustable temperature scale; α, β, γ are the relationship coefficients between the cooling station working power and the adjustable temperature scale; T out is the ambient temperature.

6. The method according to claim 5, characterized in that It also includes determining the relationship coefficient between the working power of the cooling station and the adjustable temperature scale according to the following formula: Among them, σ and τ are constant coefficients of cooling capacity; ρ and μ are constant coefficients of cooling input power.

7. The method according to claim 6, characterized in that The reduced operating power when the cooling station is adjusted to the highest and lowest comfortable temperatures is determined according to the following formula: ΔP AD,down,n =P AD,n (T min )-P AD,n (T in )=-α n ST AD,n Where ΔP AD,down,n To reduce the working power; P AD,n The cooling power of the nth single building; ST AD,n The temperature at the end of the nth single building can be adjusted downward; α n It is the relationship coefficient between the working power of the cooling station at the end of the nth single building and the adjustable temperature scale.

8. The method according to claim 7, characterized in that It also includes determining the maximum potential reduction in the aggregate cooling power of the cooling plants of multiple individual buildings according to the following formula: Where ΔP AD,down It is the maximum adjustable reduction potential of the aggregated cooling power of the cold stations of multiple single buildings; n is the number of single building ends; i is the serial number of the single building end.

9. A system for evaluating the adjustable load potential of a power system, for implementing the method according to any one of claims 1 to 8, characterized in that: include, A feature extraction module is used to obtain real-time status information of adjustable resource equipment and process the real-time status information according to a preset single building load model to obtain corresponding load characteristic parameters; The evaluation module is used to process the load characteristic parameters through a preset cooling station power approximation aggregation model to obtain the reduced working power when the cooling station is adjusted to the highest comfortable temperature and the lowest comfortable temperature, and output the reduced working power as the maximum adjustable potential.

Citation Information

Cited By

  • Electrified flexible source load adjustable potential evaluation method considering cold load characteristics

    CN121642904A