Method for improving toughness of power distribution network through cooperative scheduling of maintenance and switch operators

Through network pre-reconstruction and personnel pre-deployment before and after disasters, the use of distributed power supplies and remote operational switches, the problem of insufficient resilience in extreme weather events in traditional distribution networks is solved, and the rapid recovery and resource optimization of distribution networks are achieved Utilization improves resistance and recovery efficiency to extreme weather.

CN118944078APending Publication Date: 2024-11-12TIANJIN UNIVERSITY OF TECHNOLOGY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411030047.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When facing extreme weather events, traditional distribution networks are not resilient and rely on manual switching operations, resulting in high dependence on human resources, low recovery efficiency, and difficulty in effectively responding and recovering.

Method used

Through pre-disaster failure prediction and personnel pre-deployment, a network pre-reconstruction and personnel scheduling model is established before and after disasters, and distributed power supplies and remote operational switches are used to achieve rapid response after disasters and optimize resource utilization, improving the recovery efficiency of the distribution network and resilience.

Benefits of technology

It significantly enhances the distribution network's resistance to extreme weather and post-disaster recovery capabilities, and achieves rapid recovery of distribution network load and efficient utilization of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944078A_ABST
    Figure CN118944078A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network toughness improvement method for cooperative scheduling of maintenance and switch operators, and the method comprises the steps: employing a random optimization method based on a scene, and taking the minimum loss load of a power distribution network under an extreme event as a target function; the method comprises the following steps: establishing a power distribution network radial network reconstruction constraint in a prevention stage before disasters, a pre-deployment constraint of maintenance personnel and switch operators, a power distribution network flow and safety constraint, a degradation stage fault area constraint, a power distribution network loss load constraint, a power distribution network radial network reconstruction constraint in a recovery stage after disasters, and a power distribution network flow and safety constraint; the model is a mixed integer linear programming model of a fault area constraint, a maintenance personnel and switch operator scheduling constraint, a maintenance personnel fault repair constraint and a switch operator manual switch switching constraint. Through network pre-reconstruction in a pre-disaster prevention stage, pre-deployment of a maintenance personnel and switch operator team, and real-time scheduling of maintenance personnel and switch operators in a post-disaster recovery stage, fault recovery and network dynamic reconstruction are cooperated, and rapid recovery of a power distribution network load is realized. Coupling among links such as human resource scheduling, network reconstruction and fault recovery is comprehensively considered, and through optimal scheduling of emergency resources before and after disasters, the ability of the power distribution network to resist extreme weather and the ability of the power distribution network to recover after the disasters are remarkably enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system resilience, and in particular relates to a method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators. Background Art

[0002] Against the backdrop of global warming, various extreme events such as typhoons and torrential rains occur frequently. The powerful destructive power brought by these extreme events poses a serious threat to the stable operation of urban power systems. Taking the heavy rains in Henan in 2021 as an example, extreme events caused more than 800 distribution lines to suffer heavy damage, seriously affecting the daily power supply of nearly one million users. Therefore, it is necessary to formulate and implement a series of resilience enhancement strategies to effectively reduce the adverse effects of extreme events on the safe and reliable operation of the power system and ensure the continuous and stable supply of urban electricity.

[0003] The resilience of the power system refers to the ability to not only withstand the impact and disturbance caused by extreme disasters, but also to quickly recover and reach a normal and stable operating state. In the reliability research of traditional distribution networks, the focus is often on low-impact and high-frequency events to improve the ability of distribution networks to cope with small-scale disturbances. Therefore, a highly reliable power grid is not necessarily highly resilient. Compared with the transmission network, the automation level of the distribution network is relatively low, and it still relies on a large number of manual switches for operation. As a result, the distribution network has a high degree of reliance on human resources during fault handling.

[0004] Therefore, a method for improving the resilience of distribution networks through collaborative scheduling of maintenance and switch operators is studied. Through network pre-reconstruction in the pre-disaster prevention phase, pre-deployment of maintenance personnel and switch operators, and real-time scheduling of maintenance personnel and switch operators in the post-disaster recovery phase, collaborative fault repair, and dynamic network reconstruction, the rapid recovery of distribution network load is achieved. The coupling between human resource scheduling, network reconstruction, and fault repair is fully considered. Through the optimized scheduling of emergency resources before and after the disaster, the distribution network's ability to resist extreme weather and post-disaster recovery is significantly enhanced. Summary of the invention

[0005] In order to improve the resilience of the distribution network under extreme events, the purpose of the present invention is to provide a distribution network resilience improvement method for collaborative scheduling of maintenance and switch operators. Before a disaster occurs, maintenance and switch operators are pre-deployed through fault prediction, and network reconstruction is implemented to ensure rapid response after the accident. After the disaster occurs, maintenance and switch operators are efficiently and collaboratively scheduled according to the actual fault scenario, and resources such as distributed power manual switches and remotely operable switches in the system are coordinated to ensure that resources can be used most reasonably and efficiently between different recovery stages, thereby maximizing resource utilization and improving the recovery efficiency and resilience of the distribution network.

[0006] The present invention is implemented by adopting the following technical scheme:

[0007] A method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators, comprising the following steps:

[0008] By using the random optimization method to extract the original data of typical fault scenarios, the objective function of minimizing the load loss of the distribution network under extreme weather events is obtained according to the following formula:

[0009]

[0010] Among them, constraint (1) is the minimum constraint of weighted load loss of distribution network under extreme events; p c is the probability of the failure scenario; T deg is the duration of the degradation phase; T rec is the duration of the recovery phase; j is the load weight of node j;

[0011] The extreme weather response model for the distribution network in the prevention phase is constructed by adjusting the objective function of minimizing the loss of distribution network load through the radial network reconstruction constraints of the distribution network, the pre-deployment constraints of maintenance personnel and switch operators, and the distribution network flow and safety constraints;

[0012] The extreme weather response model of the distribution network in the prevention phase is controlled by the fault area constraint and the distribution network load loss constraint to construct the extreme weather response model of the distribution network in the degradation phase;

[0013] The extreme weather response model of the distribution network in the degradation phase is controlled by the distribution network radial network reconstruction constraints, distribution network power flow and safety constraints, fault area constraints, maintenance personnel and switch operator scheduling constraints, maintenance personnel fault repair constraints, and switch operator manual switch switching constraints to construct the distribution network extreme weather response model in the recovery phase;

[0014] The extreme weather response plan for the output distribution network is optimized through the extreme weather response model of the distribution network in the recovery phase.

[0015] Furthermore, the distribution network extreme weather response model process in the prevention phase is constructed by adjusting the objective function of minimizing the load loss of the distribution network through the radial network reconstruction constraints of the distribution network, the pre-deployment constraints of maintenance personnel and switch operators, and the distribution network flow and safety constraints; including:

[0016] The radial network reconstruction constraint of the distribution network in the pre-disaster prevention stage is expressed as:

[0017]

[0018]

[0019]

[0020]

[0021] Among them, constraint (2) is the node virtual flow injection constraint; constraint (3) is the restriction constraint of the line flow through the virtual flow; constraint (4) is the coupling constraint of the number of closed lines and the number of root nodes; constraint (5) is that the line without a switch is always closed; λ i and δ i is the parent node and child node set of node i; Ω L is the line set; Ω BUS is a node set; It is a 0-1 variable, indicating whether the line ij is closed during the prevention phase. If it is closed, it is 1; N bus is the total number of nodes; Y i pre is a 0-1 variable, indicating whether node i is a source node in the prevention phase, if yes, it is 1; M is a maximum constant; The commodity flow through the line ij in the prevention stage; Ω MS A collection of circuits equipped with manual switches; Ω RCS A collection of circuits equipped with remotely operable switches;

[0022] The pre-deployment constraints of maintenance personnel and switch operators in the pre-disaster prevention phase are expressed as:

[0023]

[0024]

[0025]

[0026]

[0027]

[0028]

[0029] Among them, constraint (6) is that each maintenance team is pre-deployed in a site; constraint (7) is the number of maintenance teams that the warehouse can bear; constraint (8) is that the maintenance team will not be deployed outside the candidate site; constraint (9) is that each switch operation team is pre-deployed in a site; constraint (10) is the number of switch operation teams that the warehouse can bear; constraint (11) is that the switch operation team will not be deployed outside the candidate site; Ω MC Gather the maintenance team;Ω DE is a set of candidate sites; is a 0-1 variable. In the prevention phase, if the kth maintenance team is deployed to position m, then it is 1; C MC Indicates the upper limit of the maintenance personnel team that the warehouse can accommodate; Ω RC Assemble the switch operator team; is a 0-1 variable. In the prevention phase, the kth switch operator team is deployed to position m. C RC Indicates the upper limit of the switch operator team that the warehouse can accommodate;

[0030] The power flow and safety constraints of the distribution network before the disaster are expressed as:

[0031]

[0032]

[0033]

[0034]

[0035]

[0036]

[0037]

[0038]

[0039]

[0040]

[0041] Among them, constraints (12) and (13) are respectively the active and reactive injection balance constraints of the nodes; constraint (14) is the linearized Distflow power flow balance constraint; constraint (15) is the upper and lower voltage limit constraints of the nodes; constraints (16) and (17) are line capacity constraints; constraints (18) to (21) are respectively the active and reactive output range constraints of distributed generation and substation; λ j and δ j is the parent node and child node set of node j; and is the active and reactive loads of node j; and Active and reactive power of the line for the prevention phase; and The active and reactive power injected by the distributed generation at node j in the prevention phase; and is the active and reactive power injected by the substation at node j during the prevention phase; is the voltage of node i in the prevention phase; r ij and x ij are the resistance and reactance of the line respectively; U R is the reference voltage; and are the upper and lower limits of the voltage at node i; and is the reactive and active capacity of the line; and The upper limit of active and reactive power of distributed generation; and It is the upper limit of active and reactive power of substation.

[0042] Furthermore, the extreme weather response model of the distribution network in the prevention phase is controlled by the fault area constraint and the distribution network load loss constraint to construct the extreme weather response model process of the distribution network in the degradation phase; including:

[0043] The fault region constraint in the degradation stage is expressed as:

[0044]

[0045]

[0046]

[0047] Among them, constraint (22) means that if a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (23) and (24) mean that the nodes at both ends of the closed line will belong to the same fault area or non-fault area; Ω C is a set of fault scenarios; f ij,cIt is a 0-1 variable, indicating whether line ij is faulty in the degradation stage (scenario c), and is 1 if faulty; is a 0-1 variable. In the degradation stage (scenario c), whether node i is connected to the fault area node, if so, it is 1;

[0048] The load loss constraint of the distribution network in the degradation stage is expressed as:

[0049]

[0050]

[0051] Among them, constraints (25) and (26) are that the nodes in the fault area will lose all active and reactive power; and In the degradation stage (scenario c), the active and reactive loads of node j are lost.

[0052] Furthermore, the extreme weather response model of the distribution network in the degradation stage is controlled to construct the extreme weather response model process of the distribution network in the recovery stage through the distribution network radial network reconstruction constraints, distribution network power flow and safety constraints, fault area constraints, maintenance personnel and switch operator scheduling constraints, maintenance personnel fault repair constraints, and switch operator manual switch switching constraints; including:

[0053] The radial network reconstruction constraint of the distribution network in the post-disaster recovery phase is expressed as:

[0054]

[0055]

[0056]

[0057]

[0058] Among them, constraint (27) is that only lines equipped with remotely operable switches and manual switches can be reconfigured; constraint (28) is the node virtual flow injection constraint; constraint (29) is the restriction constraint on the line flow through the virtual flow; constraint (30) is the coupling constraint of the number of closed lines and the number of root nodes. Ω T is the time collection of the recovery phase; It is a 0-1 variable, indicating whether the line is equipped with a remotely operable switch, if so, it is 1; It is a 0-1 variable, indicating whether line ij is closed at time t in the recovery phase, and if closed, it is 1; It is a 0-1 variable, indicating whether the line is equipped with a manual operation switch, if so, it is 1; is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t during the recovery phase;

[0059] The power flow and safety constraints of the distribution network in the post-disaster recovery phase are expressed as:

[0060]

[0061]

[0062]

[0063]

[0064]

[0065]

[0066]

[0067]

[0068]

[0069]

[0070]

[0071]

[0072] Among them, constraints (31) and (32) are respectively the active and reactive injection balance constraints of the nodes; constraint (33) is the linearized Distflow balance constraint; constraints (34) and (35) are respectively the active and reactive flow capacity constraints of the lines; constraint (36) is the upper and lower voltage limit constraints of the nodes; constraints (37) to (40) are respectively the active and reactive output range constraints of the distributed generation and substation; constraints (41) and (42) are that the nodes in the fault area will lose all active and reactive power during the recovery phase; and The active and reactive power of the line at time t in the recovery phase; and is the active and reactive power injected by the distributed generation of node j at time t in the recovery phase; and is the active and reactive power injected by the substation at node j at time t in the restoration phase; is the voltage of node i at time t in the recovery phase; and is the active and reactive load loss power of node j at time t in the recovery phase;

[0073] The fault area constraint in the post-disaster recovery phase is expressed as:

[0074]

[0075]

[0076]

[0077]

[0078] Among them, constraint (43) is that if a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (44) and (45) are that the nodes at both ends of the closed line will belong to the same fault area or non-fault area; constraint (46) is that the fault area should not be expanded by switching the remote operable switch and the manual switch; is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t during the recovery phase; It is a 0-1 variable. In the recovery phase, at time t, whether node i is connected to the fault area node, if so, it is 1;

[0079] The scheduling constraints for maintenance personnel and switch operators in the post-disaster recovery phase are expressed as:

[0080]

[0081]

[0082]

[0083]

[0084]

[0085]

[0086]

[0087]

[0088] Among them, constraint (47) is the initial position of the maintenance personnel; constraint (48) is that the maintenance personnel only go to the fault location to repair the fault; constraint (49) is that a maintenance personnel team can only be located at one location; constraint (50) is the transfer time constraint of the maintenance personnel team between different locations; constraint (51) is the initial position of the switch operator; constraint (52) is that the switch operator goes to the fault location to repair the fault; constraint (53) is that a switch operator team can only be located at one location; constraint (54) is the transfer time constraint of the switch operator team between different locations; is a 0-1 variable. In the recovery phase (scenario c), the kth maintenance personnel is at position m at time t. Then T0 is the start time of the recovery phase; Ω FA,C is the set of fault lines in scenario c; represents the time it takes for the maintenance personnel to go from position m to n; T mc Indicates the time consumed for maintenance; is a 0-1 variable. In the recovery phase (scenario c), the kth switch operator is at position m at time period t. Then represents the time for the switch operator to go from m to n; T ms Indicates the time required for the switch operator to operate the manual switch;

[0089] The fault repair constraints of maintenance personnel in the post-disaster recovery phase are expressed as:

[0090]

[0091]

[0092]

[0093]

[0094]

[0095]

[0096] Among them, constraint (55) is that if it is repaired, its next maintenance state is "repaired"; constraint (56) is the initial maintenance state of the line; constraint (57) is that if the line needs to be repaired, it must be repaired within the considered time period; constraint (58) is the coupling constraint between the line maintenance state and the scheduling of maintenance personnel; constraint (59) is that after the maintenance work is completed, the line remains in a normal state; constraint (60) is that the undamaged line always remains in a normal state; In the recovery phase (scenario c), whether the line at position m at time t is repaired or not, the repair completion is 1;

[0097] The manual switch switching constraints of the switch operator in the post-disaster recovery phase are expressed as:

[0098]

[0099]

[0100] Among them, constraint (61) is that when the line equipped with a manual switch is normal, it can be opened and closed normally. When the line equipped with a manual switch fails, the line can be opened for fault isolation, but cannot be closed to increase the fault area; constraint (62) is the coupling constraint between the manual switch action and the switch operator scheduling. In the recovery phase (scenario c), whether the line at position m at time t is closed, if closed, it is 1.

[0101] Furthermore, the extreme weather response model of the distribution network in the recovery phase uses the Yalmi p toolkit to call Gurobi for optimization processing.

[0102] Beneficial Effects

[0103] Compared with the prior art, the present invention has the following beneficial effects:

[0104] The scenario-based random optimization method of the present invention takes into account the minimum load loss of the distribution network under extreme events, and comprehensively considers fault scenario prediction, disaster duration, scheduling time, etc. Through network pre-reconstruction in the pre-disaster prevention stage, pre-deployment of maintenance personnel and switch operators, and real-time scheduling of maintenance personnel and switch operators in the post-disaster recovery stage, coordinated fault repair and dynamic network reconstruction, the rapid recovery of the distribution network load is achieved. The coupling between various links such as human resource scheduling, network reconstruction and fault repair is fully considered. Through the optimized scheduling of emergency resources before and after the disaster, the distribution network's resistance to extreme weather and post-disaster recovery capabilities are significantly enhanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] Figure 1 A flow chart of a method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators provided by the present invention. DETAILED DESCRIPTION

[0106] The present invention will be described in detail below in conjunction with the accompanying drawings:

[0107] The invention provides a method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators, comprising the following steps:

[0108] Step 1: Input the original data of typical fault scenario data units, including fault scenario prediction, disaster duration, dispatch time, etc.; where:

[0109] :A scenario-based stochastic optimization method is used to consider the minimum load loss of the distribution network under extreme events as the objective function, where the minimum load loss of the distribution network under extreme events is considered as the objective function, which is expressed as:

[0110] Among them, constraint (1) is the minimum constraint of weighted load loss of distribution network under extreme events. c is the probability of the failure scenario; T deg is the duration of the degradation phase; T rec is the duration of the recovery phase; j is the load weight of node j.

[0111] The present invention establishes a mixed integer linear programming model including the radial network reconstruction constraints of the distribution network in the pre-disaster prevention stage, the pre-deployment constraints of maintenance personnel and switch operators, the distribution network flow and safety constraints, the fault area constraints in the degradation stage, the distribution network load loss constraints, the radial network reconstruction constraints of the distribution network in the post-disaster recovery stage, the distribution network flow and safety constraints, the fault area constraints, the scheduling constraints of maintenance personnel and switch operators, the maintenance personnel fault repair constraints, and the manual switch switching constraints of the switch operators, which is the optimal distribution network extreme weather response model. Among them:

[0112] Step 2: Establish the radial network reconstruction constraints of the distribution network in the pre-disaster prevention stage, the pre-deployment constraints of maintenance personnel and switch operators, and the distribution network flow and safety constraints.

[0113] The radial network reconstruction constraints of the distribution network in the pre-disaster prevention stage are expressed as:

[0114]

[0115]

[0116]

[0117] Among them, constraint (2) is the node virtual flow injection constraint; constraint (3) is the restriction constraint of the line flow through the virtual flow; constraint (4) is the coupling constraint of the number of closed lines and the number of root nodes; constraint (5) is that the lines without switches are always kept closed. i and δ i is the parent node and child node set of node i; Ω L is the line set; Ω BUS is a node set; It is a 0-1 variable, indicating whether the line ij is closed during the prevention phase. If it is closed, it is 1; N bus is the total number of nodes; Y i preis a 0-1 variable, indicating whether node i is a source node in the prevention phase, if yes, it is 1; M is a maximum constant; The commodity flow through the line ij in the prevention stage; Ω MS A collection of circuits equipped with manual switches; Ω RCS A collection of circuits equipped with remotely operable switches.

[0118] The pre-deployment constraints of maintenance personnel and switch operators in the pre-disaster prevention phase are expressed as:

[0119]

[0120]

[0121]

[0122]

[0123]

[0124] Among them, constraint (6) is that each maintenance team is pre-deployed in a site; constraint (7) is the number of maintenance teams that the warehouse can bear; constraint (8) is that the maintenance team will not be deployed outside the candidate site; constraint (9) is that each switch operation team is pre-deployed in a site; constraint (10) is the number of switch operation teams that the warehouse can bear; constraint (11) is that the switch operation team will not be deployed outside the candidate site. Ω MC Gather the maintenance team;Ω DE is a set of candidate sites; is a 0-1 variable. In the prevention phase, if the kth maintenance team is deployed to position m, then it is 1; C MC Indicates the upper limit of the maintenance personnel team that the warehouse can accommodate; Ω RC Assemble the switch operator team; is a 0-1 variable. In the prevention phase, the kth switch operator team is deployed to position m. C RC Indicates the upper limit of the number of switch operators that the warehouse can accommodate.

[0125] The power flow and safety constraints of the distribution network before the disaster are expressed as:

[0126]

[0127]

[0128]

[0129]

[0130]

[0131]

[0132]

[0133]

[0134]

[0135] Among them, constraints (12) and (13) are respectively the active and reactive injection balance constraints of the nodes; constraint (14) is the linearized Distflow power flow balance constraint; constraint (15) is the upper and lower limit constraints of the node voltage; constraints (16) and (17) are line capacity constraints; constraints (18) to (21) are respectively the active and reactive output range constraints of distributed generation and substation. j and δ j is the parent node and child node set of node j; and is the active and reactive loads of node j; and Active and reactive power of the line for the prevention phase; and The active and reactive power injected by the distributed generation at node j in the prevention phase; and is the active and reactive power injected by the substation at node j during the prevention phase; is the voltage of node i in the prevention phase; r ij and x ij are the resistance and reactance of the line respectively; U R is the reference voltage; and are the upper and lower limits of the voltage at node i; and is the reactive and active capacity of the line; and The upper limit of active and reactive power of distributed generation; and It is the upper limit of active and reactive power of substation.

[0136] Step 3: Controlling the extreme weather response model of the distribution network in the prevention phase by means of fault area constraints and distribution network load loss constraints to construct a process of the extreme weather response model of the distribution network in the degradation phase; including:

[0137] The fault region constraint in the degradation stage is expressed as:

[0138]

[0139]

[0140] Among them, constraint (22) means that if a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (23) and (24) mean that the nodes at both ends of the closed line will belong to the same fault area or non-fault area. C is a set of fault scenarios; f ij,c It is a 0-1 variable, indicating whether line ij is faulty in the degradation stage (scenario c), and is 1 if faulty; It is a 0-1 variable. In the degradation stage (scenario c), whether node i is connected to the fault area node, if so, it is 1.

[0141] The load loss constraint of the distribution network in the degradation stage is expressed as:

[0142]

[0143] Among them, constraints (25) and (26) mean that the nodes in the fault area will lose all active and reactive power. and In the degradation stage (scenario c), the active and reactive loads of node j are lost.

[0144] Step 4: Control the extreme weather response model of the distribution network in the degradation stage to construct the extreme weather response model of the distribution network in the recovery stage through the distribution network radial network reconstruction constraints, distribution network power flow and safety constraints, fault area constraints, maintenance personnel and switch operator scheduling constraints, maintenance personnel fault repair constraints, and switch operator manual switch switching constraints; including:

[0145] The radial network reconstruction constraints of the distribution network in the post-disaster recovery phase are expressed as:

[0146]

[0147]

[0148]

[0149] Among them, constraint (27) is that only lines equipped with remotely operable switches and manual switches can be reconfigured; constraint (28) is the node virtual flow injection constraint; constraint (29) is the restriction constraint on the line flow through the virtual flow; constraint (30) is the coupling constraint of the number of closed lines and the number of root nodes. Ω T is the time collection of the recovery phase; It is a 0-1 variable, indicating whether the line is equipped with a remotely operable switch, if so, it is 1; It is a 0-1 variable, indicating whether line ij is closed at time t in the recovery phase, and if closed, it is 1; It is a 0-1 variable, indicating whether the line is equipped with a manual operation switch, if so, it is 1; is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t in the recovery phase.

[0150] The power flow and safety constraints of the distribution network in the post-disaster recovery phase are expressed as:

[0151]

[0152]

[0153]

[0154]

[0155]

[0156]

[0157]

[0158]

[0159]

[0160]

[0161]

[0162] Among them, constraints (31) and (32) are respectively the active and reactive injection balance constraints of the nodes; constraint (33) is the linearized Distflow balance constraint; constraints (34) and (35) are respectively the active and reactive flow capacity constraints of the lines; constraint (36) is the voltage upper and lower limit constraints of the nodes; constraints (37) to (40) are respectively the active and reactive output range constraints of the distributed generation and substation. Constraints (41) and (42) mean that the nodes in the fault area will lose all active and reactive power during the recovery phase. and The active and reactive power of the line at time t in the recovery phase; and is the active and reactive power injected by the distributed generation of node j at time t in the recovery phase; and is the active and reactive power injected by the substation at node j at time t in the restoration phase; is the voltage of node i at time t in the recovery phase; and is the active and reactive load loss power of node j at time t in the recovery phase.

[0163] The fault area constraint in the post-disaster recovery phase is expressed as:

[0164]

[0165]

[0166]

[0167] Among them, constraint (43) is that when a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (44) and (45) are that the nodes at both ends of the closed line will belong to the same fault area or non-fault area; constraint (46) is that the fault area should not be expanded by switching the remote operable switch and the manual switch. is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t in the recovery phase. It is a 0-1 variable. At time t in the recovery phase, it indicates whether node i is connected to the fault area node. If so, it is 1.

[0168] The scheduling constraints for maintenance personnel and switch operators in the post-disaster recovery phase are expressed as:

[0169]

[0170]

[0171]

[0172]

[0173]

[0174]

[0175]

[0176] Among them, constraint (47) is the initial position of the maintenance personnel; constraint (48) is that the maintenance personnel only go to the fault location to repair the fault; constraint (49) is that a team of maintenance personnel can only be located at one location; constraint (50) is the transfer time constraint of the maintenance personnel team between different locations; constraint (51) is the initial position of the switch operator; constraint (52) is that the switch operator goes to the fault location to repair the fault; constraint (53) is that a team of switch operators can only be located at one location; constraint (54) is the transfer time constraint of the switch operator team between different locations. is a 0-1 variable. In the recovery phase (scenario c), the kth maintenance personnel is at position m at time t. Then T0 is the start time of the recovery phase; Ω FA,C is the set of fault lines in scenario c; represents the time it takes for the maintenance personnel to go from position m to n; T mc Indicates the time consumed for maintenance; is a 0-1 variable. In the recovery phase (scenario c), the kth switch operator is at position m at time period t. Then represents the time for the switch operator to go from m to n; T ms Indicates the time required for a switch operator to operate a manual switch.

[0177] The fault repair constraints of maintenance personnel in the post-disaster recovery phase are expressed as:

[0178]

[0179]

[0180]

[0181]

[0182]

[0183] Among them, constraint (55) is that if it is repaired, its next maintenance state is "repaired"; constraint (56) is the initial maintenance state of the line; constraint (57) is that if the line needs maintenance, it must be repaired within the considered time period; constraint (58) is the coupling constraint between the line maintenance state and the scheduling of maintenance personnel; constraint (59) is that after the maintenance work is completed, the line remains in a normal state; constraint (60) is that the undamaged line always remains in a normal state. In the recovery phase (scenario c), the line at position m at time t is repaired, and the repair completion is 1.

[0184] The manual switch switching constraints of the switch operators in the post-disaster recovery phase are expressed as:

[0185]

[0186] Among them, constraint (61) is that when the line equipped with a manual switch is normal, it can be opened and closed normally. When the line equipped with a manual switch fails, the line can be opened for fault isolation, but cannot be closed to increase the fault area; constraint (62) is the coupling constraint between the manual switch action and the switch operator scheduling. In the recovery phase (scenario c), whether the line at position m at time t is closed, if closed, it is 1.

[0187] Step 5: The distribution network extreme weather response model in the recovery phase adopts optimization processing to establish the distribution network extreme weather response model output; wherein the optimization processing is to call Gurobi through the Yalmi p toolkit to optimize and solve the optimal distribution network extreme weather response model as the distribution network extreme weather response plan output.

Claims

1. A method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators, characterized in that: The steps include: The original data of typical fault scenarios are extracted by random optimization method, and the objective function of minimizing the load loss of distribution network under extreme weather events is obtained as follows: Among them, constraint (1) is the minimum constraint of weighted load loss of distribution network under extreme events; p c is the probability of the failure scenario; T deg is the duration of the degradation phase; T rec is the duration of the recovery phase; j is the load weight of node j; The distribution network extreme weather response model in the prevention phase is constructed by adjusting the objective function of minimizing the load loss of the distribution network through the radial network reconstruction constraints of the distribution network, the pre-deployment constraints of maintenance personnel and switch operators, and the distribution network flow and safety constraints; The extreme weather response model of the distribution network in the prevention phase is controlled by the fault area constraint and the distribution network load loss constraint to construct the extreme weather response model of the distribution network in the degradation phase; The distribution network extreme weather response model in the degradation phase is controlled by the distribution network radial network reconstruction constraints, distribution network power flow and safety constraints, fault area constraints, maintenance personnel and switch operator scheduling constraints, maintenance personnel fault repair constraints, and switch operator manual switch switching constraints to construct the distribution network extreme weather response model in the recovery phase; The distribution network extreme weather response model in the recovery phase adopts optimization processing to establish the distribution network extreme weather response model output.

2. According to the method for improving the resilience of distribution network by collaborative scheduling of maintenance and switch operators in claim 1, the process of constructing a distribution network extreme weather response model process in the prevention stage is constructed by adjusting the objective function of minimizing the load loss of the distribution network through the radial network reconstruction constraints of the distribution network, the pre-deployment constraints of maintenance personnel and switch operators, and the distribution network flow and safety constraints; comprising: The radial network reconstruction constraint of the distribution network in the pre-disaster prevention stage is expressed as: Among them, constraint (2) is the node virtual flow injection constraint; constraint (3) is the restriction constraint of the line flow through the virtual flow; constraint (4) is the coupling constraint of the number of closed lines and the number of root nodes; constraint (5) is that the line without a switch is always closed; λ i and δ i is the parent node and child node set of node i; Ω L is the line set; Ω BUS is a node set; It is a 0-1 variable, indicating whether the line ij is closed during the prevention phase. If it is closed, it is 1; N bus is the total number of nodes; Y i pre is a 0-1 variable, indicating whether node i is a source node in the prevention phase, if yes, it is 1; M is a maximum constant; The commodity flow through line ij in the prevention stage; Ω MS A collection of circuits equipped with manual switches; Ω RCS A collection of circuits equipped with remotely operable switches; The pre-deployment constraints of maintenance personnel and switch operators in the pre-disaster prevention phase are expressed as: Among them, constraint (6) is that each maintenance team is pre-deployed in a site; constraint (7) is the number of maintenance teams that the warehouse can bear; constraint (8) is that the maintenance team will not be deployed outside the candidate site; constraint (9) is that each switch operation team is pre-deployed in a site; constraint (10) is the number of switch operation teams that the warehouse can bear; constraint (11) is that the switch operation team will not be deployed outside the candidate site; Ω MC Gather the maintenance team;Ω DE is a set of candidate sites; is a 0-1 variable. In the prevention phase, if the kth maintenance team is deployed to position m, then it is 1; C MC Indicates the upper limit of the maintenance personnel team that the warehouse can accommodate; Ω RC Assemble the switch operator team; is a 0-1 variable. In the prevention phase, the kth switch operator team is deployed to position m. C RC Indicates the upper limit of the number of switch operators that the warehouse can accommodate; The power flow and safety constraints of the distribution network before the disaster are expressed as: Among them, constraints (12) and (13) are respectively the active and reactive injection balance constraints of the nodes; constraint (14) is the linearized Distflow power flow balance constraint; constraint (15) is the upper and lower voltage limit constraints of the nodes; constraints (16) and (17) are line capacity constraints; constraints (18) to (21) are respectively the active and reactive output range constraints of distributed generation and substation; λ j and δ j is the parent node and child node set of node j; and is the active and reactive loads of node j; and For the prevention phase, the active and reactive power of the line; and The active and reactive power injected by the distributed generation at node j in the prevention phase; and is the active and reactive power injected by the substation at node j during the prevention phase; is the voltage of node i during the prevention phase; r ij and x ij are the resistance and reactance of the line respectively; U R is the reference voltage; and are the upper and lower limits of the voltage at node i; and is the reactive and active capacity of the line; and The upper limit of active and reactive power of distributed generation; and It is the upper limit of active and reactive power of substation.

3. According to the method for improving the resilience of a distribution network by collaborative scheduling of maintenance and switch operators in claim 1, the extreme weather response model of the distribution network in the prevention phase is controlled by the fault area constraint and the distribution network load loss constraint to construct the extreme weather response model process of the distribution network in the degradation phase; comprising: The fault region constraint in the degradation stage is expressed as: Among them, constraint (22) means that if a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (23) and (24) mean that the nodes at both ends of the closed line will belong to the same fault area or non-fault area; Ω C is a set of fault scenarios; f ij,c It is a 0-1 variable, indicating whether line ij is faulty in the degradation stage (scenario c), and is 1 if faulty; is a 0-1 variable. In the degradation stage (scenario c), whether node i is connected to the fault area node, if so, it is 1; The load loss constraint of the distribution network in the degradation stage is expressed as: Among them, constraints (25) and (26) are that the nodes in the fault area will lose all active and reactive power; and In the degradation stage (scenario c), the active and reactive loads of node j are lost.

4. According to the method for improving the resilience of distribution network by collaborative scheduling of maintenance and switch operators in claim 1, the extreme weather response model of the distribution network in the degradation stage is controlled to construct the extreme weather response model of the distribution network in the recovery stage through the radial network reconstruction constraints of the distribution network, the power flow and safety constraints of the distribution network, the fault area constraints, the scheduling constraints of maintenance personnel and switch operators, the fault repair constraints of maintenance personnel, and the manual switch switching constraints of switch operators; comprising: The radial network reconstruction constraint of the distribution network in the post-disaster recovery phase is expressed as: Among them, constraint (27) is that only lines equipped with remotely operable switches and manual switches can be reconfigured; constraint (28) is the node virtual flow injection constraint; constraint (29) is the restriction constraint on the virtual flow through the line; constraint (30) is the coupling constraint of the number of closed lines and the number of root nodes. Ω T is the time collection of the recovery phase; It is a 0-1 variable, indicating whether the line is equipped with a remotely operable switch, if so, it is 1; It is a 0-1 variable, indicating whether line ij is closed at time t in the recovery phase, and if closed, it is 1; It is a 0-1 variable, indicating whether the line is equipped with a manual operation switch, if so, it is 1; is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t during the recovery phase; The power flow and safety constraints of the distribution network in the post-disaster recovery phase are expressed as: Among them, constraints (31) and (32) are respectively the active and reactive injection balance constraints of the nodes; constraint (33) is the linearized Distflow power flow balance constraint; constraints (34) and (35) are respectively the active and reactive power flow capacity constraints of the lines; constraint (36) is the upper and lower voltage limit constraints of the nodes; constraints (37) to (40) are respectively the active and reactive output range constraints of the distributed generation and substation; constraints (41) and (42) are that the nodes in the fault area will lose all active and reactive power during the recovery phase; and The active and reactive power of the line at time t in the recovery phase; and is the active and reactive power injected by the distributed generation of node j at time t in the recovery phase; and is the active and reactive power injected by the substation at node j at time t in the restoration phase; is the voltage of node i at time t in the recovery phase; and is the active and reactive load loss power of node j at time t in the recovery phase; The fault area constraint in the post-disaster recovery phase is expressed as: Among them, constraint (43) is that if a fault occurs on the closed line, the nodes at both ends of the line will be in the fault area; constraints (44) and (45) are that the nodes at both ends of the closed line will belong to the same fault area or non-fault area; constraint (46) is that the fault area should not be expanded by switching the remote operable switch and the manual switch; is a 0-1 variable, indicating whether node i is a source node at time t in the recovery phase, if yes, it is 1; is the commodity flow through route ij at time t during the recovery phase; It is a 0-1 variable. In the recovery phase, at time t, whether node i is connected to the fault area node, if so, it is 1; The scheduling constraints for maintenance personnel and switch operators in the post-disaster recovery phase are expressed as: Among them, constraint (47) is the initial position of the maintenance personnel; constraint (48) is that the maintenance personnel only go to the fault location to repair the fault; constraint (49) is that a maintenance personnel team can only be located at one location; constraint (50) is the transfer time constraint of the maintenance personnel team between different locations; constraint (51) is the initial position of the switch operator; constraint (52) is that the switch operator goes to the fault location to repair the fault; constraint (53) is that a switch operator team can only be located at one location; constraint (54) is the transfer time constraint of the switch operator team between different locations; is a 0-1 variable. In the recovery phase (scenario c), the kth maintenance personnel is at position m at time t. Then T0 is the start time of the recovery phase; Ω FA,C is the set of fault lines in scenario c; represents the time it takes for the maintenance personnel to go from position m to n; T mc Indicates the time consumed for maintenance; is a 0-1 variable. In the recovery phase (scenario c), the kth switch operator is at position m at time period t. Then represents the time for the switch operator to go from m to n; T ms Indicates the time required for the switch operator to operate the manual switch; The fault repair constraints of maintenance personnel in the post-disaster recovery phase are expressed as: Among them, constraint (55) is that if it is repaired, its next maintenance state is "repaired"; constraint (56) is the initial maintenance state of the line; constraint (57) is that if the line needs to be repaired, it must be repaired within the considered time period; constraint (58) is the coupling constraint between the line maintenance state and the scheduling of maintenance personnel; constraint (59) is that after the maintenance work is completed, the line remains in a normal state; constraint (60) is that the undamaged line always remains in a normal state; In the recovery phase (scenario c), whether the line at position m at time t is repaired, the repair completion is 1; The manual switch switching constraints of the switch operator in the post-disaster recovery phase are expressed as: Among them, constraint (61) is that when the line equipped with a manual switch is normal, it can be opened and closed normally. When the line equipped with a manual switch fails, the line can be opened for fault isolation, but cannot be closed to increase the fault area; constraint (62) is the coupling constraint between the manual switch action and the switch operator scheduling. In the recovery phase (scenario c), whether the line at position m at time t is closed, if closed, it is 1.

5. According to claim 1, a method for improving the resilience of a distribution network by collaboratively dispatching maintenance and switch operators, characterized in that: The extreme weather response model of the distribution network in the recovery phase uses the Yalmip toolkit to call Gurobi for optimization processing.

Citation Information

Cited By

  • Distribution network fault maintenance optimization method and system based on information physical system, terminal and medium

    CN119273336A

  • Power distribution network post-disaster dynamic ad hoc network method, system and device and storage medium

    CN120657767A