Control method for shortening AGC response delay of hydroelectric generating set
By introducing the feedforward coefficient and head feedforward function adjusted by variable parameters in the hydroelectric unit, the guide vane control instructions are optimized, and the AGC response time extension of the water-electric unit under frequent, short-term and small-scale reverse frequency regulation requirements is solved, and the assessment is reduced Costs and overshoot risks improve adjustment accuracy.
Patent Information
- Application Number
- CN202411002481.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-12
AI Technical Summary
When the hydraulic power unit faces the frequent short-term and small reverse AGC adjustment needs in areas with high-tech energy proportion, it is difficult to meet the assessment requirements under the new situation due to hydraulic inertia and mechanical dead zones, resulting in the extended AGC response time and huge assessment costs.
By combining the feedforward influence of the previous power adjustment on this power adjustment, the feedforward coefficient adjusted by variable parameters is calculated, the feedforward function and head feedforward function that weakens the impact of the previous power adjustment are constructed, the comprehensive feedforward coefficient is calculated, and the guidance is optimized. Leaf control instruction to shorten the AGC response time of the hydroelectric unit.
It effectively shortens the AGC response time of the hydroelectric unit, reduces the overshoot problem under frequent, short-term and small-scale reverse frequency regulation conditions, reduces the assessment cost of the "two rules" and improves the accuracy of power regulation.
Smart Images

Figure CN118944125A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a hydroelectric power generation control technology, and in particular to a control method for shortening the AGC response delay of a hydroelectric generator set. Background Art
[0002] At present, the country generally adopts response time, regulation rate and regulation accuracy and other assessment indicators to evaluate the performance of AGC services provided by grid-connected generators. Due to differences in power sources and grid structures in different regions, the emphasis of AGC assessment index standards also varies. At present, regions with a high proportion of renewable energy power generation have stricter requirements for AGC response time and regulation rate. Among them, hydropower units have the advantages of fast, stable and sustainable power regulation, and can better provide high-real-time AGC services. Some hydropower plants even bear the heavy responsibility of the main frequency regulation power plants in the region, frequently participate in the frequency regulation in the region, and play an important role in ensuring the stability of regional frequency.
[0003] However, when faced with the new demand for frequent, short-term, small-amplitude reverse AGC regulation in areas with a high proportion of new energy, for hydropower units, due to the inherent characteristics of large hydraulic inertia, the current power regulation performance is greatly affected by the previous power regulation, and the AGC response time of the hydropower units is difficult to meet the assessment requirements of the "two rules" under the new situation, and they are beginning to face huge assessment costs.
[0004] At present, the control strategy of hydropower units does not take into account the frequent, short-term, small-amplitude reverse frequency regulation needs. Unless in special circumstances, pure PID power control is still used. In fact, it has not been able to perform the main frequency regulation duties in the region well, and is facing huge "two detailed rules" assessments. Even if the existing feedforward control method is used as a reference, since its feedforward coefficient is only related to the power setting value and water head of the current regulation cycle, from the perspective of control principle, this control method is difficult to meet the frequent, short-term, small-amplitude reverse frequency regulation needs.
[0005] After searching, it is found that the research on improving the power response performance of hydropower units is mainly focused on fine power regulation, PID control parameter optimization, guide vane continuous control, guide vane mechanical dead zone compensation, etc. Most hydropower units still use pure PID regulation models, and the application scenarios of using feedforward to improve the power response time of units are mainly limited to units that are not suitable for using strong PID control parameters due to objective factors such as the length of the tailwater pipeline, and the feedforward coefficient is only related to the power setting value and water head of the current regulation cycle, and the impact of the previous power regulation on this power regulation is not considered. The actual operation assessment scores of hydropower frequency regulation power plant units show that for the frequency regulation needs of frequent short-term small-amplitude reverse power response, it is defective to only use conventional PID or feedforward + PID regulation.
[0006] Among them, Chinese patent publication number CN113864108A discloses a "power control method for a hydropower unit using PI control to adjust a given opening". Specifically, in the monitoring system, the opening gain conversion module is used to directly calculate the given opening value sent to the speed governor, thereby realizing continuous adjustment of the guide vane, rather than using the traditional pulse method to control the speed governor to perform intermittent adjustment of the guide vane opening. That is, a function similar to the continuous guide vane control in the power control mode of the speed governor is realized in the monitoring system, which can improve the active power regulation rate and regulation accuracy of the unit in the guide vane opening control mode. However, for the case of short-term and small-amplitude reverse power regulation, the unit power must complete the positive power response in a relatively short time. Therefore, whether it is in the speed governor or in the monitoring, it is difficult to realize power closed-loop PID continuous guide vane control. It is necessary to add an additional feedforward link to quickly overcome the hydraulic inertia of the unit and the mechanical dead zone of the guide vane, and shorten the AGC response time of the unit. In addition, many speed governor systems do not support directly receiving guide vane opening instructions issued by the monitor to adjust the guide vanes, and the speed governor system needs to undergo corresponding secondary development. Therefore, the implementation of this patented method also has certain limitations.
[0007] Chinese patent publication number CN115453931A discloses "a method and device for optimizing active power control of a hydropower unit monitoring system", which specifically optimizes the main control parameters of the monitoring system through an improved multi-objective genetic algorithm to improve the active power control quality of the hydropower unit monitoring system. However, this method only optimizes the control parameters on the original conventional power control model. For the case of short-term small-amplitude reverse power regulation, the original conventional power control model has deficiencies in the control parameter setting, and fails to distinguish whether two adjacent power regulation instructions are in the same direction or in the opposite direction. There may be a situation where the pulse width is too large, resulting in increased mechanical wear. In addition, this method requires a large amount of data for training, and the control effect is difficult to guarantee in the early stage of the unit's commissioning. It also involves matrix operations, which have high requirements on the running memory and operation cycle of the controller. Since the genetic algorithm cannot guarantee that all results are global optimal solutions, the control parameters after optimization may not have a good control effect.
[0008] Chinese patent publication number CN113013897A discloses "a method and device for compensating the mechanical dead zone of the guide vanes of a hydropower unit", which specifically ensures that the hydropower unit can respond to changes in the grid frequency according to the normal power action amount by making the guide vanes always in the middle position of the mechanical dead zone of the guide vanes. However, this method ignores the influence of hydraulic characteristics and only unilaterally considers the idle stroke caused by the mechanical dead zone of the guide vanes. The hysteresis effect of hydraulic characteristics on power regulation in different load ranges, different load adjustment amounts, and different load adjustment directions is not considered. This method is difficult to solve the problem of long AGC response time for short-term small-amplitude reverse power regulation.
[0009] Therefore, how to further tap the frequency regulation capability of hydropower units in new power systems has become a technical problem that needs to be solved. Summary of the invention
[0010] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a control method for shortening the AGC response delay of a hydropower unit.
[0011] The purpose of the present invention can be achieved by the following technical solutions:
[0012] According to one aspect of the present invention, there is provided a control method for shortening the AGC response delay of a hydropower unit. The method combines the feedforward influence coefficient of the previous power regulation on the current power regulation to perform variable parameter adjustment on the feedforward effect of the current power regulation, wherein the input variables of the feedforward influence coefficient include the interval time between the previous and current power regulation instructions, the direction of the previous power regulation instruction, the direction of the current power regulation instruction, the amplitude of the previous power regulation instruction and the amplitude of the current power regulation instruction.
[0013] As a preferred technical solution, the method specifically includes:
[0014] Considering the influence characteristics of the previous power regulation on the current power regulation, calculate the corresponding feedforward influence coefficient;
[0015] Construct a feedforward function G(K) to weaken the influence of the previous power regulation, and construct a head feedforward function F(P, H) that takes into account the nonlinear characteristics of the power regulation of the guide vanes of the hydropower unit, and calculate the comprehensive feedforward coefficient K_FF of this power regulation by summing them up;
[0016] Calculate guide vane control commands.
[0017] As a preferred technical solution, the input variables of the feedforward influence coefficient include the power regulation instruction interval time, whether the previous and next power regulation instructions are reversed, and the amplitudes of the two previous and next power regulation instructions.
[0018] As a preferred technical solution, the power adjustment instruction interval time is calculated specifically as follows:
[0019] The time interval T_Intrv between the power adjustment and the last power adjustment is recorded, and a function is constructed to calculate the power adjustment interval time feedforward influence coefficient K_Intrv.
[0020] As a preferred technical solution, whether the front and rear power adjustment instructions are reversely calculated is specifically:
[0021] The direction of the previous power regulation is recorded and compared with the current power regulation direction, and a function is constructed to calculate the regulation direction feedforward influence coefficient K_Dirct.
[0022] As a preferred technical solution, the two power adjustment instruction amplitude calculations are specifically as follows:
[0023] The amplitudes of the previous and current power adjustments P_Ampl_Old and P_Ampl_New are recorded, and according to the numerical value of P_Ampl_New relative to the rated power Pe of the unit, a function is constructed to calculate the adjustment amplitude feedforward influence coefficient K_Ampl.
[0024] As a preferred technical solution, the P_Ampl_Old participates in the feedforward correction adjustment in the form of adjusting the interval time feedforward influence coefficient K_Intrv threshold function.
[0025] As a preferred technical solution, the feedforward influence coefficient is specifically calculated as follows:
[0026] (a) The feedforward influence coefficient of the power regulation instruction interval decreases as the interval increases. When it exceeds a certain threshold, the influence coefficient is 0;
[0027] (b) If the power regulation direction of this time is opposite to the previous regulation, the regulation direction feedforward influence coefficient is assigned a non-zero value, otherwise it is assigned a value of 0;
[0028] (c) If the power regulation command amplitude is less than the set threshold, the feedforward influence coefficient of the regulation amplitude adopts the enhanced value, otherwise the normal value is adopted.
[0029] As a preferred technical solution, the comprehensive feedforward coefficient K_FF is specifically calculated as follows:
[0030] K_FF=G(K_Intrv, K_Direct, K_Ampl)+F(P, H)
[0031] The dimensions of the feedforward functions G(K) and F(P, H) are both percentages.
[0032] As a preferred technical solution, the guide vane control instruction is calculated as follows:
[0033] Define the feedforward variable K_FF, and calculate the guide vane control instruction by summing the feedforward variable K_FF and PID.
[0034] Compared with the prior art, the present invention has the following advantages:
[0035] 1) The present invention fully considers the potential constraints of the previous power regulation on the current power regulation and introduces a variable feedforward coefficient to improve the pure PID power control strategy;
[0036] 2) The present invention provides a method for setting and calculating the feedforward coefficient with low computing power consumption, which solves the problems of long power response time and large overshoot under the condition of frequent short-term and small-amplitude reverse frequency modulation of hydropower units, and reduces the assessment costs of the "two rules". BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a logical principle diagram of the method of the present invention;
[0038] Figure 2 It is a specific flow chart of the method of the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0040] At present, the method for dealing with the problem of frequent short-term and small-amplitude reverse frequency regulation of hydropower units fails to take into account the potential constraints of the previous power regulation on the current power regulation. This patent application combines the characteristics of the previous power regulation and optimizes the calculation method for setting the feedforward coefficient, so that the power control strategy of the hydropower unit can better meet the needs of frequent short-term and small-amplitude reverse frequency regulation.
[0041] The present application adopts a variable feedforward regulation method to weaken the restrictions of the previous power regulation characteristics on the current power regulation performance. Considering the adjustment characteristic data such as the interval time between the previous and current power regulation instructions, the direction of the previous power regulation instruction, the direction of the current power regulation instruction, the amplitude of the previous power regulation instruction, and the amplitude of the current power regulation instruction, the feedforward effect of this power regulation is adjusted with variable parameters, thereby shortening the power response delay of the hydropower unit while taking into account the power regulation accuracy, avoiding power overshoot caused by shortening the response time.
[0042] The technical solution of this patent application is as follows: Figure 1 As shown:
[0043] (1) This patent proposes a control method that combines PID with a variable feedforward coefficient to shorten the AGC response delay of a hydropower unit and avoid overshoot;
[0044] (2) This control method calculates the variable feedforward coefficient based on the influence characteristics of the previous power regulation on the current power regulation;
[0045] (3) The influence characteristics of the previous power regulation on the current power regulation considered by the control method include: the interval between the previous and current power regulation instructions, the direction of the previous power regulation instruction, the direction of the current power regulation instruction, the amplitude of the previous power regulation instruction, the amplitude of the current power regulation instruction, and other regulation characteristic data;
[0046] (4) This control method calculates the feedforward influence coefficients of factors such as the power adjustment instruction interval, whether the previous power adjustment instructions are reversed, and the amplitudes of the two previous power adjustment instructions according to the influence characteristics of the previous power adjustment on the current power adjustment;
[0047] (4.1) The feedforward influence coefficient of the power regulation instruction interval decreases as the interval increases. When it exceeds a certain threshold, the influence coefficient is 0. The threshold is a variable value and is a function of the amplitude of the previous power regulation instruction;
[0048] (4.2) If the power regulation direction of this time is opposite to the previous regulation, the regulation direction feedforward influence coefficient is assigned a non-zero value, otherwise it is assigned to 0;
[0049] (4.3) If the power adjustment command amplitude of this time is a small adjustment, the feedforward influence coefficient of this adjustment amplitude adopts the enhanced value, otherwise the normal value is adopted;
[0050] (5) This control method constructs a feedforward function that weakens the influence of the previous power regulation based on the feedforward influence coefficient calculated by (4);
[0051] (6) This control method sums the feedforward function that weakens the impact of the previous power regulation and the head feedforward function that considers the nonlinear characteristics of the power regulation of the guide vanes of the hydropower unit to calculate the comprehensive feedforward coefficient of this power regulation.
[0052] The embodiment of the present invention provides a control method for shortening the AGC response delay of a hydropower unit, comprising:
[0053] Step 1: The power control strategy of the hydropower unit adopts the method of PID plus feedforward coefficient;
[0054] Step 2: Calculate the power regulation instruction interval time, whether the previous and next power regulation instructions are reversed, and the feedforward influence coefficients of the previous and next power regulation instruction amplitudes respectively;
[0055] Step 3: Construct feedforward functions that weaken the impact of the previous power regulation and consider the nonlinear characteristics of the power regulation of the guide vanes of the hydropower unit, and sum up and calculate the comprehensive feedforward coefficient of this power regulation.
[0056] Specifically, in one embodiment of the present invention, step 1 includes:
[0057] The feedforward calculation output variable K_FF is defined in the guide vane control instruction calculation program.
[0058] Specifically, in one embodiment of the present invention, step 2 includes:
[0059] Statistically record the time interval T_Intrv between the last power adjustment and the last power adjustment, and construct a function to calculate the adjustment interval time feedforward influence coefficient K_Intrv;
[0060] The direction of the previous power regulation is statistically recorded and compared with the current power regulation direction, and a function is constructed to calculate the feedforward influence coefficient K_Dirct of the regulation direction;
[0061] The amplitudes of the previous and current power adjustments P_Ampl_Old and P_Ampl_New are statistically recorded. Considering the numerical value of P_Ampl_New relative to the rated power Pe of the unit, a function is constructed to calculate the adjustment amplitude feedforward influence coefficient K_Ampl. P_Ampl_Old participates in the feedforward correction adjustment in the form of the adjustment interval time feedforward influence coefficient K_Intrv threshold function;
[0062] It should be noted that, in this embodiment, the functions for calculating each feedforward influence coefficient according to the characteristic data index may be different. To facilitate the calculation of the comprehensive feedforward coefficient, the magnitudes of the feedforward influence coefficients should not differ too much.
[0063] Specifically, in one embodiment of the present invention, step 3 includes:
[0064] Construct feedforward functions G(K) and F(P, H) based on the power regulation instruction interval, whether the previous and next power regulation instructions are reversed, the feedforward influence coefficients of the previous and next power regulation instruction amplitudes, and the current power P-water head H, and sum and calculate the comprehensive feedforward coefficient K_FF=G(K_Intrv, K_Dirct, K_Ampl)+F(P, H) of this power regulation;
[0065] It should be noted that, in this embodiment, the influence of different water heads and nonlinearity of guide vane power regulation on the calculation of the comprehensive feedforward coefficient is taken into consideration, and the dimensions of the feedforward functions G(K) and F(P, H) are both percentages.
[0066] In order to more clearly illustrate the technical solution and advantages of the present invention, a control method for shortening the AGC response delay of a hydropower unit provided by the present invention is further illustrated below. Figure 2 shown.
[0067] First, define the feedforward variable K_FF, and calculate the guide vane control instruction by summing the feedforward variable K_FF and PID.
[0068] Secondly, considering the influence characteristics of the previous power regulation on this power regulation, calculate the corresponding feedforward influence coefficient, that is: K_Intrv = K1(T_Intrv), if T_Intrv is greater than T(P_Ampl_Old), K_Intrv is 0; if the direction of this power regulation is opposite to the previous one, K_Dirct is assigned to 1, otherwise K_Dirct is assigned to 0; K_Ampl = K2(P_Ampl_New, Pe), among which K1 and K2 are functions of the feedforward influence coefficient of the current power regulation instruction amplitude and the interval time between the two power regulation instructions respectively, and T is the threshold function of the adjustment interval feedforward influence coefficient K_Intrv considering the amplitude of the previous power regulation instruction.
[0069] Finally, the feedforward function G(K) that weakens the influence of the previous power regulation is constructed by the summation and multiplication method, and the head feedforward function F(P, H) that considers the nonlinear characteristics of the guide vane power regulation of the hydropower unit is constructed by the power setting-head two-dimensional function table method. The comprehensive feedforward coefficient K_FF=K_Intrv*K_Dirct*K_Ampl+F(P, H) of this power regulation is calculated by summing up.
[0070] The optimization result finally selected by the method and system of the present invention fully considers the potential constraints of the previous power regulation on the current power regulation, introduces a variable feedforward coefficient to improve the pure PID power control strategy, and provides a setting calculation method of the feedforward coefficient with low computing power overhead, so as to solve the problems of long power response time and large overshoot under the condition of frequent short-term and small-amplitude reverse frequency regulation of hydropower frequency regulation power plant units, and reduce the assessment costs of the "two rules".
[0071] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A control method for shortening the AGC response delay of a hydropower unit, characterized in that: This method combines the feedforward influence coefficient of the previous power regulation on the current power regulation, and performs variable parameter adjustment on the feedforward effect of the current power regulation, wherein the input variables of the feedforward influence coefficient include the interval time between the previous and current power regulation instructions, the direction of the previous power regulation instruction, the direction of the current power regulation instruction, the amplitude of the previous power regulation instruction and the amplitude of the current power regulation instruction.
2. A control method for shortening the AGC response delay of a hydropower unit according to claim 1, characterized in that: The method specifically includes: Considering the influence characteristics of the previous power regulation on the current power regulation, calculate the corresponding feedforward influence coefficient; Construct a feedforward function G(K) to weaken the influence of the previous power regulation, and construct a head feedforward function F(P, H) that takes into account the nonlinear characteristics of the power regulation of the guide vanes of the hydropower unit, and calculate the comprehensive feedforward coefficient K_FF of this power regulation by summing them up; Calculate guide vane control commands.
3. A control method for shortening the AGC response delay of a hydropower unit according to claim 2, characterized in that: The input variables of the feedforward influence coefficient include the power regulation instruction interval time, whether the previous and next power regulation instructions are reversed, and the amplitudes of the two previous and next power regulation instructions.
4. A control method for shortening the AGC response delay of a hydropower unit according to claim 2, characterized in that: The guide vane control command is calculated as follows: Define the feedforward variable K_FF, and calculate the guide vane control instruction by summing the feedforward variable K_FF and PID.
5. A control method for shortening the AGC response delay of a hydropower unit according to claim 3, characterized in that: The power adjustment instruction interval time is calculated as follows: The time interval T_Intrv between the power adjustment and the last power adjustment is recorded, and a function is constructed to calculate the power adjustment interval time feedforward influence coefficient K_Intrv.
6. A control method for shortening the AGC response delay of a hydropower unit according to claim 5, characterized in that: Whether the front and rear power adjustment instructions are reversely calculated is specifically: The direction of the previous power regulation is recorded and compared with the current power regulation direction, and a function is constructed to calculate the regulation direction feedforward influence coefficient K_Dirct.
7. A control method for shortening the AGC response delay of a hydropower unit according to claim 6, characterized in that: The calculation of the power adjustment command amplitudes twice before and after is specifically as follows: The amplitudes of the previous and current power adjustments P_Ampl_Old and P_Ampl_New are recorded, and according to the numerical value of P_Ampl_New relative to the rated power Pe of the unit, a function is constructed to calculate the adjustment amplitude feedforward influence coefficient K_Ampl.
8. A control method for shortening the AGC response delay of a hydropower unit according to claim 7, characterized in that: The P_Ampl_Old participates in the feedforward correction adjustment by adjusting the interval time feedforward influence coefficient K_Intrv threshold function.
9. A control method for shortening the AGC response delay of a hydropower unit according to claim 7, characterized in that: The feedforward influence coefficient is specifically calculated as follows: (a) The feedforward influence coefficient of the power regulation instruction interval decreases as the interval increases. When it exceeds a certain threshold, the influence coefficient is 0; (b) If the power regulation direction of this time is opposite to the previous regulation, the regulation direction feedforward influence coefficient is assigned a non-zero value, otherwise it is assigned a value of 0; (c) If the power regulation command amplitude is less than the set threshold, the feedforward influence coefficient of the regulation amplitude adopts the enhanced value, otherwise the normal value is adopted.
10. A control method for shortening the AGC response delay of a hydropower unit according to claim 7, characterized in that: The comprehensive feedforward coefficient K_FF is specifically calculated as follows: K_FF=G(K_Intrv, K_Direct, K_Ampl)+F(P, H) The dimensions of the feedforward functions G(K) and F(P, H) are both percentages.
Citation Information
Patent Citations
Hydroelectric generating set guide vane mechanical dead zone compensation method and device
CN113013897A
Hydroelectric generating set power control method adopting PI control to adjust given opening degree