Residential area energy scheduling method and device based on energy segmentation management, and storage medium

By combining photovoltaic output and electricity consumption information in residential areas, energy storage and power grid purchasing strategies are formulated, and the problems of low photovoltaic power utilization efficiency and high power grid purchasing cost are solved, and the problem of low photovoltaic power utilization efficiency and high power grid purchasing cost is achieved. It can meet electricity demand and efficient energy utilization.

CN118944152AActive Publication Date: 2024-11-12YUNCHENG POWER SUPPLY COMPANY OF STATE GRID SHANXI ELECTRIC POWER
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410423641.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-12
Estimated Expiration
2044-04-09

AI Technical Summary

Technical Problem

In the application of existing mixed use of energy storage and renewable energy in smart grids and energy Internet, it is difficult to effectively solve the power supply pressure caused by the random fluctuations of photovoltaics and wind farms, and it is difficult to efficiently utilize photovoltaics, resulting in power purchases in the power grid. The cost is high and it is difficult to meet the electricity needs of each building.

Method used

Through a residential area energy scheduling method and device based on energy segment management, the electricity consumption period type, photovoltaic output information and electricity consumption information of each building are obtained, the charging and discharging strategies of energy storage equipment and the power grid purchasing strategy are formulated, and the photovoltaics are used to utilize photovoltaics Electric energy is powered and charged during the photovoltaic output period, energy storage equipment is used to discharge electricity when electricity consumption peaks or photovoltaic output is insufficient, and electricity is purchased through the power grid during the non-photovoltaic output period to meet electricity demand.

Benefits of technology

It has achieved more efficient use of photovoltaic power, reduced the cost of power purchase in the power grid, ensured that the electricity demand for various buildings is met, and improved the efficient utilization of energy and energy conservation and emission reduction effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944152A_ABST
    Figure CN118944152A_ABST
Patent Text Reader

Abstract

The invention discloses a residential area energy scheduling method and device based on energy segmentation management, a storage medium and computer equipment. The method comprises the steps of obtaining an electricity consumption time period type of a target time period of a scheduled residential area, photovoltaic output information and electricity consumption information of each building; and for any building, according to the power consumption time period type, the photovoltaic output information and the power consumption information, determining an energy scheduling strategy of the building in a target time period, and carrying out power consumption scheduling of energy storage equipment and power grid electricity purchase on each building, the energy scheduling strategy comprises a charging and discharging strategy for energy storage equipment and an electricity purchasing strategy for a power grid. According to the invention, photovoltaic electric energy can be utilized more effectively, the power purchase cost of a power grid is reduced, and meanwhile, the power demand of each building is met. And the purposes of efficient utilization of energy, energy conservation and emission reduction can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of energy scheduling, and in particular to a residential area energy scheduling method and device, storage medium, and computer equipment based on energy segmentation management. Background Art

[0003] As the flexibility and reliability of battery energy storage systems continue to improve, the hybrid use of energy storage and renewable energy is playing an increasingly important role in accelerating the development of smart grids and energy Internet. Photovoltaic and wind farms have strong random fluctuation characteristics, and the development of distributed batteries is one of the effective ways to solve this problem. By configuring multiple distributed energy storage batteries to jointly optimize and coordinate, sufficient production capacity can be provided to ensure the power grid, alleviate the pressure on power supply, and achieve stable operation of the power system. Summary of the invention

[0004] In view of this, the embodiments of the present application provide a residential energy scheduling method and device based on energy segmentation management, a storage medium, and a computer device, which can more effectively utilize photovoltaic power, reduce the cost of purchasing electricity from the power grid, and ensure that the electricity demand of each building is met. This helps to achieve the goal of efficient use of energy and energy conservation and emission reduction.

[0005] According to one aspect of the present application, a residential area energy scheduling method based on energy segmentation management is provided, the method comprising:

[0006] Obtain the power consumption period type, photovoltaic output information and power consumption information of each building in the target period of the dispatched residential area;

[0007] For any building, the energy scheduling strategy for the target period of the building is determined according to the type of power consumption period, the photovoltaic output information and the power consumption information, and the power consumption of the energy storage equipment and the power purchase from the power grid are scheduled for each building, wherein the energy scheduling strategy includes the charging and discharging strategy for the energy storage equipment and the power purchase strategy for the power grid.

[0008] Optionally, the photovoltaic output information is used to indicate that the target period is a photovoltaic output period or a non-photovoltaic output period, and is also used to indicate the photovoltaic output of the target period belonging to the photovoltaic output period; the electricity consumption information includes the total electricity load of the target period;

[0009] For any building, according to the power consumption period type, the photovoltaic output information and the power consumption information, an energy scheduling strategy for the target period of the building is determined, including:

[0010] If the target time period is a photovoltaic output time period, and the photovoltaic output is greater than or equal to the total power load, photovoltaic power is used to supply power to the power load of the building, and the first charging power of the energy storage device is determined according to the maximum charging power of the energy storage device, the photovoltaic output and the total power load, and the remaining photovoltaic power is used to charge the energy storage device of the building at the first charging power; when the energy storage device is fully charged, the remaining photovoltaic power is input into the power grid;

[0011] If the target time period is a photovoltaic output time period, and the photovoltaic output is less than the total power load, the first discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the photovoltaic output, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the first discharge power and the photovoltaic output meet the demand of the total power load; if so, the energy storage device and photovoltaic power of the building are used to supply power to the power load of the building; otherwise, first power purchase information is determined according to the total power load, the photovoltaic output, the converter conversion efficiency and the first discharge power, and power is purchased from the power grid according to the first power purchase information.

[0012] Optionally, for any building, determining the energy scheduling strategy for the target period of the building according to the power consumption period type, the photovoltaic output information and the power consumption information, further includes:

[0013] If the target time period is a non-photovoltaic output time period, and the type of the power consumption time period is not a power consumption valley, the second discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the second discharge power meets the demand of the total power load, and if so, the energy storage device of the building is used to supply power to the power load of the building; otherwise, the second power purchase information is determined according to the total power load, the converter conversion efficiency, and the second discharge power, and power is purchased from the power grid according to the second power purchase information;

[0014] If the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment in the building and to charge the energy storage device in the building.

[0015] Optionally, the method further comprises:

[0016] According to the historical electricity consumption information of each building, the average electricity load of each building during off-peak hours and the electricity load of each off-peak hour are calculated;

[0017] The valley time periods in which the power load is less than the average power load of the valley time period are divided into the first valley time period, and the remaining valley time periods are divided into the second valley time period.

[0018] Optionally, if the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency, and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the power purchased from the power grid is used to power the power consumption equipment of the building and to charge the energy storage device of the building, including:

[0019] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the first valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fourth power purchase information is determined according to the total power load, the conversion efficiency of the converter, and the second charging power, and power is purchased from the power grid according to the fourth power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage equipment of the building;

[0020] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the second valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fifth electricity purchase information is determined according to the total power load, the conversion efficiency of the converter, and the third charging power, and electricity is purchased from the power grid according to the fifth electricity purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage device of the building; wherein the state of charge of the energy storage device at the end of the first valley time period is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the number of the first valley time periods, the second charging power, the charging efficiency of the energy storage device, and the capacity of the energy storage device.

[0021] Optionally, determining the second charging power of the energy storage device according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of a preset valley time period, the capacity of the energy storage device, the number of first valley time periods, and the maximum charging power of the energy storage device includes:

[0022] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time periods, and the maximum charging power of the energy storage device; otherwise, the energy storage device is not charged.

[0023] Optionally, determining the third charging power of the energy storage device according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter includes:

[0024] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device and the conversion efficiency of the converter; otherwise, the energy storage device is not charged.

[0025] According to another aspect of the present application, a residential area energy scheduling device based on energy segmentation management is provided, wherein the device is used for:

[0026] Obtain the power consumption period type, photovoltaic output information and power consumption information of each building in the target period of the dispatched residential area;

[0027] For any building, the energy scheduling strategy for the target period of the building is determined according to the type of power consumption period, the photovoltaic output information and the power consumption information, and the power consumption of the energy storage equipment and the power purchase from the power grid are scheduled for each building, wherein the energy scheduling strategy includes the charging and discharging strategy for the energy storage equipment and the power purchase strategy for the power grid.

[0028] Optionally, the photovoltaic output information is used to indicate that the target period is a photovoltaic output period or a non-photovoltaic output period, and is also used to indicate the photovoltaic output of the target period belonging to the photovoltaic output period; the electricity consumption information includes the total electricity load of the target period;

[0029] The device is also used for:

[0030] If the target time period is a photovoltaic output time period, and the photovoltaic output is greater than or equal to the total power load, photovoltaic power is used to supply power to the power load of the building, and the first charging power of the energy storage device is determined according to the maximum charging power of the energy storage device, the photovoltaic output and the total power load, and the remaining photovoltaic power is used to charge the energy storage device of the building at the first charging power; when the energy storage device is fully charged, the remaining photovoltaic power is input into the power grid;

[0031] If the target time period is a photovoltaic output time period, and the photovoltaic output is less than the total power load, the first discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the photovoltaic output, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the first discharge power and the photovoltaic output meet the demand of the total power load; if so, the energy storage device and photovoltaic power of the building are used to supply power to the power load of the building; otherwise, first power purchase information is determined according to the total power load, the photovoltaic output, the converter conversion efficiency and the first discharge power, and power is purchased from the power grid according to the first power purchase information.

[0032] Optionally, the device is also used for:

[0033] If the target time period is a non-photovoltaic output time period, and the type of the power consumption time period is not a power consumption valley, the second discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the second discharge power meets the demand of the total power load, and if so, the energy storage device of the building is used to supply power to the power load of the building; otherwise, the second power purchase information is determined according to the total power load, the converter conversion efficiency, and the second discharge power, and power is purchased from the power grid according to the second power purchase information;

[0034] If the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment in the building and to charge the energy storage device in the building.

[0035] Optionally, the device is also used for:

[0036] According to the historical electricity consumption information of each building, the average electricity load of each building during off-peak hours and the electricity load of each off-peak hour are calculated;

[0037] The valley time periods in which the power load is less than the average power load of the valley time period are divided into the first valley time period, and the remaining valley time periods are divided into the second valley time period.

[0038] Optionally, the device is also used for:

[0039] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the first valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fourth power purchase information is determined according to the total power load, the conversion efficiency of the converter, and the second charging power, and power is purchased from the power grid according to the fourth power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage equipment of the building;

[0040] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the second valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fifth electricity purchase information is determined according to the total power load, the conversion efficiency of the converter, and the third charging power, and electricity is purchased from the power grid according to the fifth electricity purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage device of the building; wherein the state of charge of the energy storage device at the end of the first valley time period is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the number of the first valley time periods, the second charging power, the charging efficiency of the energy storage device, and the capacity of the energy storage device.

[0041] Optionally, the device is also used for:

[0042] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time periods, and the maximum charging power of the energy storage device; otherwise, the energy storage device is not charged.

[0043] Optionally, the device is also used for:

[0044] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device and the conversion efficiency of the converter; otherwise, the energy storage device is not charged.

[0045] According to another aspect of the present application, a storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the above-mentioned residential area energy scheduling method based on energy segmentation management is implemented.

[0046] According to another aspect of the present application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein when the processor executes the program, the above-mentioned residential energy scheduling method based on energy segmentation management is implemented.

[0047] By means of the above technical solution, the embodiment of the present application provides a residential area energy scheduling method and device based on energy segmentation management, a storage medium, and a computer device, which collect relevant information about the residential area in a specific target period, including: Power consumption period type: This usually refers to whether the period is a peak power consumption period, a flat power consumption period, or a valley power consumption period. Different time period types may affect the electricity price and the tightness of power supply. Photovoltaic output information: This refers to the amount of electric energy generated by the photovoltaic system (such as solar panels) in the residential area during the target period. Photovoltaic output is affected by factors such as weather conditions (such as sunshine intensity) and time (such as day or night). Power consumption information of each building: This includes the expected or actual power consumption of each building during the target period, as well as their respective power demand and characteristics. After collecting the necessary information, the next step is to formulate an energy scheduling strategy. This step is performed for each building in the residential area, and the specific operations include: Analyze information: The system performs a comprehensive analysis based on the collected power consumption period type, photovoltaic output information, and power consumption information of each building. This involves evaluating the supply and demand of electricity, and considering how to use photovoltaic power, energy storage equipment and power purchase from the grid to meet the electricity demand of each building. Determine the energy scheduling strategy: Based on the above analysis, the system formulates a specific energy scheduling strategy for each building. These strategies include: Charging and discharging strategies for energy storage equipment: Determine when to charge the energy storage equipment (for example, when the photovoltaic output is greater than the electricity demand), and when to discharge from the energy storage equipment (for example, during peak hours or when the photovoltaic output is insufficient). Power purchase strategy for the grid: Based on the power supply and demand and electricity price information, decide how much electricity to purchase from the grid and when to purchase it. This usually involves a trade-off between the cost of purchasing electricity and the demand for electricity. Execute power scheduling: According to the determined energy scheduling strategy, the system schedules the electricity consumption of each building. This may include controlling the charging and discharging operations of energy storage equipment and arranging power purchase transactions with the grid. Through such an energy scheduling strategy, the system can more effectively use photovoltaic power, reduce the cost of purchasing electricity from the grid, and ensure that the electricity demand of each building is met. This helps to achieve the goals of efficient use of energy and energy conservation and emission reduction.

[0048] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0050] Figure 1A schematic diagram of a process of a residential area energy scheduling method based on energy segmentation management provided in an embodiment of the present application is shown;

[0051] Figure 2 A schematic diagram of a process of another residential area energy scheduling method based on energy segmentation management provided in an embodiment of the present application is shown;

[0052] Figure 3 A flow chart of another residential area energy scheduling method based on energy segmentation management provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0053] The present application will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0054] In this embodiment, a residential area energy scheduling method based on energy segmentation management is provided. Figure 1 As shown, the method includes:

[0055] Step 101, obtaining the electricity consumption period type, photovoltaic output information and electricity consumption information of each building in the target period of the scheduled residential area.

[0056] The photovoltaic output information is used to indicate whether the target period is a photovoltaic output period or a non-photovoltaic output period, and is also used to indicate the photovoltaic output of the target period belonging to the photovoltaic output period; the power consumption information includes the total power load of the target period. Energy optimization scheduling is performed with 30 minutes as a period.

[0057] Step 102, for any building, determine the energy scheduling strategy for the target time period of the building according to the type of power consumption period, the photovoltaic output information and the power consumption information, and perform power consumption scheduling of energy storage equipment and power purchase from the power grid for each building, wherein the energy scheduling strategy includes a charging and discharging strategy for the energy storage equipment and a power purchase strategy for the power grid.

[0058] By applying the technical solution of this embodiment, relevant information about the residential area in a specific target period is collected, including: Type of power consumption period: This usually refers to whether the period is a peak power consumption period, a flat power consumption period or a valley power consumption period. Different time period types may affect the electricity price and the tightness of power supply. Photovoltaic output information: This refers to the amount of electricity generated by the photovoltaic system (such as solar panels) in the residential area during the target period. Photovoltaic output is affected by factors such as weather conditions (such as sunshine intensity) and time (such as day or night). Power consumption information of each building: This includes the expected or actual power consumption of each building during the target period, as well as their respective power demand and characteristics. After collecting the necessary information, proceed to the next step, that is, to formulate an energy scheduling strategy. This step is performed for each building in the residential area, and the specific operations include: Analyze information: The system performs a comprehensive analysis based on the collected power consumption period type, photovoltaic output information and power consumption information of each building. This involves evaluating the supply and demand of electricity, and considering how to use photovoltaic power, energy storage equipment and grid power purchase to meet the power demand of each building. Determine the energy dispatch strategy: Based on the above analysis, the system formulates a specific energy dispatch strategy for each building. These strategies include: Charging and discharging strategy of energy storage equipment: Determine when to charge the energy storage equipment (for example, when the photovoltaic output is greater than the electricity demand), and when to discharge from the energy storage equipment (for example, during peak hours or when the photovoltaic output is insufficient). Grid power purchase strategy: Based on the power supply and demand and electricity price information, decide how much electricity to purchase from the grid and when to purchase it. This usually involves a trade-off between the cost of purchasing electricity and the demand for electricity. Execute power dispatch: According to the determined energy dispatch strategy, the system dispatches the electricity consumption of each building. This may include controlling the charging and discharging operations of the energy storage equipment and arranging power purchase transactions with the grid. Through such an energy dispatch strategy, the system can use photovoltaic power more efficiently, reduce the cost of purchasing electricity from the grid, and ensure that the electricity demand of each building is met. This helps to achieve the goals of efficient use of energy and energy conservation and emission reduction.

[0059] In the embodiment of the present application, specifically, for the photovoltaic power output period, step 102 includes:

[0060] Step 102-1, if the target time period is a photovoltaic output time period, and the photovoltaic output is greater than or equal to the total power load, photovoltaic power is used to supply power to the power load of the building, and a first charging power of the energy storage device is determined according to the maximum charging power of the energy storage device, the photovoltaic output, and the total power load, and the remaining photovoltaic power is used to charge the energy storage device of the building at the first charging power; when the energy storage device is fully charged, the remaining photovoltaic power is input into the power grid;

[0061] Step 102-2, if the target time period is a photovoltaic output time period, and the photovoltaic output is less than the total power load, then determine the first discharge power of the energy storage device according to the maximum discharge power of the energy storage device, the photovoltaic output, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; judge whether the first discharge power and the photovoltaic output meet the demand of the total power load, if so, use the energy storage device and photovoltaic power of the building to supply power to the power load of the building, otherwise determine the first power purchase information according to the total power load, the photovoltaic output, the converter conversion efficiency and the first discharge power, and purchase power from the power grid according to the first power purchase information

[0062] In the above embodiment, if Figure 2 As shown, the relationship between photovoltaic output (i.e., the electric energy generated by the photovoltaic system) and the total power load (the electric energy required by the building) and the characteristics of the energy storage device (such as maximum charging power, maximum discharge power, discharge efficiency, converter conversion efficiency, etc.) are used to determine how to supply power. First, if the target period is the photovoltaic output period, and the photovoltaic output is large enough, at least equal to the total power load, then the system will first use photovoltaic power to power the building's power load. Next, the system will consider the maximum charging power of the energy storage device, the current photovoltaic output, and the total power load to determine a suitable charging power (here referred to as the first charging power). Then, the remaining photovoltaic power is used to charge the energy storage device at this first charging power. If there is any remaining photovoltaic power after the energy storage device is fully charged, this part of the power will be input into the power grid. On the other hand, if the target period is also the photovoltaic output period, but the photovoltaic output is less than the total power load, that is, the photovoltaic power is not enough to meet the total power demand of the building, then the system will first determine a suitable discharge power (here referred to as the first discharge power) based on the characteristics of the energy storage device (such as maximum discharge power, discharge efficiency, converter conversion efficiency, etc.), as well as the current photovoltaic output and total power load. Then, the system will determine whether this first discharge power and the current photovoltaic output are sufficient to meet the demand of the total power load. If sufficient, the power load of the building will be powered by the energy storage device and photovoltaic power. If insufficient, the system will determine how much electricity needs to be purchased from the power grid (here referred to as the first power purchase information) based on the total power load, photovoltaic output, converter conversion efficiency and the first discharge power, and purchase electricity from the power grid according to this first power purchase information to meet the power demand of the building. By rationally utilizing photovoltaic power and energy storage equipment, power supply to the building is achieved during the photovoltaic output period, and when necessary, electricity is purchased from the power grid to make up for the shortage of electricity.

[0063] In a specific application scenario, when p pv,i ≥p L,iWhen the photovoltaic power meets the total household load, the battery is charged, and the remaining power is connected to the grid.

[0064] p essc,i (t) = min{p esscmax,i ,(p pv,i (t)-p L,i (t))η essc}

[0065] Where: p pv,i (t) is the photovoltaic output of building i during period t, p L,i (t) is the total power load p of building i in period t esscmax,i is the maximum charging power of the battery (energy storage device) in building i; η essc It is the battery charging efficiency.

[0066] When the battery is fully charged, the remaining photovoltaic power is connected to the grid. At this time, the battery is not working. The charge state of the battery in building i is:

[0067] λ SOC-ess,i (t) = λ SOC-ess,i (t-1)(1-γ)

[0068] Where: γ is the natural discharge rate of the battery when it is not working, which is 0.01 / day.

[0069] When p pv,i <p L,i When the battery is insufficient, it will purchase electricity from the grid.

[0070] Building i battery discharge power

[0071]

[0072] Where: p essdmax,i is the maximum discharge power of the battery in building i; η essd is the battery discharge efficiency; η DC-DC is the converter conversion efficiency.

[0073] Building i purchases electricity from the grid

[0074]

[0075] In the embodiment of the present application, specifically, for a period without photovoltaic output, step 102 includes:

[0076] Step 102-3, if the target time period is a non-photovoltaic output time period and the power consumption time period type is not a power consumption valley, the second discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the total power load, the discharge efficiency of the energy storage device and the converter conversion efficiency of the energy storage device; it is judged whether the second discharge power meets the demand of the total power load, if so, the energy storage device of the building is used to supply power to the power load of the building, otherwise, the second power purchase information is determined according to the total power load, the converter conversion efficiency and the second discharge power, and power is purchased from the power grid according to the second power purchase information.

[0077] Step 102-4, if the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment in the building and to charge the energy storage device in the building.

[0078] In this embodiment, when the target time period is a non-photovoltaic output time period, and the electricity consumption time period type is not the valley time (i.e., not when the electricity price is the lowest), the system will first check the status of the energy storage device. It will consider the maximum discharge power, discharge efficiency, and converter conversion efficiency of the energy storage device to determine a suitable discharge power, referred to herein as the second discharge power. Then, the system will determine whether this second discharge power can meet the current total power load demand of the building. If the second discharge power is sufficient to meet the total power load, the system will use the energy storage device to supply power to the building's power load. If the second discharge power is insufficient to meet the total power load, the system will determine how much electricity needs to be purchased from the power grid based on the total power load, converter conversion efficiency, and the second discharge power (referred to herein as the second power purchase information). Afterwards, the system will purchase electricity from the power grid based on this second power purchase information to make up for the lack of discharge power of the energy storage device and ensure that the power demand of the building is met.

[0079] On the other hand, if the target period is still a non-PV output period, but the power consumption period type has changed to the power consumption valley (i.e., when the electricity price is the lowest), the system will give priority to purchasing electricity from the power grid. At this time, it will determine a suitable power purchase information based on the total power load, the converter conversion efficiency, and the maximum charging power of the energy storage device, which is called the third power purchase information. There are two main purposes of purchasing electricity: one is to supply power to the building's electrical equipment, and the other is to charge the energy storage equipment to take advantage of the low electricity price period and reduce the overall electricity cost. In summary, under different power consumption period types and non-PV output periods, how does the system formulate energy supply strategies based on the characteristics of the energy storage equipment and the total power load, including whether to use the energy storage equipment to discharge, whether to purchase electricity from the power grid, and the determination of the purchase amount. Such a strategy aims to ensure that the power demand of the building is met while minimizing the power cost.

[0080] In specific application scenarios, during normal and peak periods when there is no photovoltaic output, the battery is discharged. When the battery output is insufficient, electricity is purchased from the grid.

[0081] Building i battery discharge power

[0082]

[0083] The amount of electricity purchased by building i from the grid is

[0084] During the valley period when there is no photovoltaic output, households purchase electricity from the grid during this period, and the battery is charged during the valley period.

[0085] The amount of electricity purchased from the building i grid is

[0086] In an embodiment of the present application, optionally, the method further includes: calculating the average power load of each building during off-peak hours and the power load of each off-peak hour based on the historical power consumption information of each building; dividing the off-peak hours in which the power load is less than the average power load of the off-peak hours into the first off-peak hours, and the remaining off-peak hours into the second off-peak hours. Step 102-4 includes: if the target time period is a non-photovoltaic output time period, and the target time period belongs to the first valley time period, then according to the energy storage device charge state at the beginning of the valley time period, the energy storage device charge state at the end of the preset valley time period, the energy storage device capacity, the number of the first valley time period, the maximum charging power of the energy storage device, and the converter conversion efficiency, determine the second charging power of the energy storage device; according to the total power load, the converter conversion efficiency, and the second charging power, determine the fourth power purchase information, and purchase electricity from the power grid according to the fourth power purchase information, use the electric energy purchased from the power grid to power the electrical equipment of the building and charge the energy storage device of the building; if the target time period is a non-photovoltaic output time period, and the target time period belongs to the second valley time period , the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fifth electricity purchase information is determined according to the total power load, the conversion efficiency of the converter, and the third charging power, and electricity is purchased from the power grid according to the fifth electricity purchase information, and the electric energy purchased from the power grid is used to supply power to the electrical equipment of the building and to charge the energy storage device of the building; wherein the state of charge of the energy storage device at the end of the first valley time period is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the number of the first valley time periods, the second charging power, the charging efficiency of the energy storage device, and the capacity of the energy storage device.

[0087] In this embodiment, first, the system will count the average power load of each building in the valley time period and the specific power load of each valley time period according to the historical power consumption information of each building. After that, the system will divide the valley time period with a power load less than the average value into the first valley time period, and the remaining valley time period into the second valley time period. This division helps the system to manage energy use in different valley time periods more accurately. Next, the system will determine the power purchase strategy according to the characteristics of the target time period and the state of the energy storage device. Specifically: If the target time period is a non-photovoltaic output period and belongs to the first valley time period, the system will first determine the second charging power of the energy storage device according to a series of parameters (such as the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, the maximum charging power of the energy storage device, and the converter conversion efficiency). Subsequently, the system will determine the amount of electricity that needs to be purchased from the power grid (i.e., the fourth power purchase information) based on the total power load, the converter conversion efficiency, and the second charging power, and then purchase electricity from the power grid according to this information. The purchased electricity will be used to meet the needs of the building's electrical equipment and to charge the energy storage equipment.

[0088] If the target period is a non-PV output period and belongs to the second valley period, the system will determine the third charging power of the energy storage device based on another set of parameters (such as the state of charge of the energy storage device at the beginning of the valley period, the state of charge of the energy storage device at the end of the first valley period, the capacity of the energy storage device, the number of second valley periods, the maximum charging power of the energy storage device, and the converter conversion efficiency). Similarly, the system will determine the fifth power purchase information based on the total power load, the converter conversion efficiency, and the third charging power, and purchase electricity from the grid accordingly. The purchased electricity is also used to meet the power demand of the building and charge the energy storage device.

[0089] In these two processes, the system also takes into account the charging efficiency and capacity of the energy storage equipment to ensure that the energy storage equipment can be charged at the right time and can provide sufficient power when needed. At the same time, by subdividing the off-peak time period and purchasing electricity based on the status of the energy storage equipment, the system can more effectively utilize low-priced electricity and reduce the overall electricity cost.

[0090] In an embodiment of the present application, optionally, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, and the maximum charging power of the energy storage device, including: when the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, and the maximum charging power of the energy storage device; otherwise, the energy storage device is not charged. The third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter, including: when the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; otherwise, the energy storage device is not charged.

[0091] In this embodiment, for the first valley time period, the system determines the second charging power of the energy storage device according to the following conditions: If the state of charge of the energy storage device is less than the state of charge of the energy storage device at the end of the preset valley time period during the target time period (i.e., the valley time period currently under consideration), the system will start calculating the charging power. This calculation will comprehensively consider the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the total capacity of the energy storage device, the number of first valley time periods (i.e., how many such periods there are), and the maximum charging power of the energy storage device. If the state of charge of the energy storage device has reached or exceeded the state of charge of the energy storage device at the end of the preset valley time period, the system will not charge the energy storage device to avoid overcharging or wasting electric energy. For the second valley time period, the system determines the third charging power of the energy storage device according to the following conditions: Similarly, if the state of charge of the energy storage device is less than the state of charge of the energy storage device at the end of the preset valley time period during the target time period, the system will start calculating the charging power. This calculation will additionally consider the conversion efficiency of the converter to ensure more precise control of the charging process. If the state of charge of the energy storage device has reached or exceeded the preset target, the system will not charge. This strategy is designed to ensure that the energy storage device can be charged effectively during the off-peak period while avoiding overcharging and waste. By adjusting the charging power according to the real-time state of charge of the energy storage device and the preset target, the system can manage energy more flexibly, improve energy efficiency, and reduce energy costs.

[0092] In specific application scenarios, operators can calculate the household electricity load history during the building valley period based on the household electricity load history during the building valley period. L,i (t) Statistical analysis is performed to obtain the average household electricity consumption during the off-peak period p μ . Statistics L,i (t) <p μ The number of time periods is recorded as the first valley time period N1, and the remaining valley time periods are recorded as N-N1 (the second valley time period). The load demand in the N1 period is small, and the load demand in the N-N1 period is large. The operator analyzes the charging demand uploaded by the battery. If the charging amount obtained by the battery in the N1 period cannot meet the required power, it will be charged in the remaining N-N1 period of the valley period.

[0093] During the N1 period, electricity is purchased from the grid to meet the total household load p L,i (t), and also charges the battery.

[0094] Building i battery charging power

[0095]

[0096] Where: SOC-esso,i The state of charge of the battery in building i at the end of the set valley period;

[0097] λ SOC-essv,i is the state of charge of the battery in building i at the beginning of the valley period, λ SOC-ess1,i (t) is the state of charge of the battery in building i during period N1.

[0098] The charging power of the building i battery during the N-N1 period is as follows:

[0099]

[0100]

[0101] Where: SOC-essN1,i is the state of charge of the battery in building i after the end of period N1; SOC-ess2,i (t) is the state of charge of the battery in building i during the period N-N1.

[0102] The battery constraints are:

[0103] 0≤p essc,i (t)≤z essc (t)p esscmax

[0104] 0≤p essd,i (t)≤z essd (t)p essdmax

[0105] z essc (t)+z essd (t)≤1

[0106] λ SOC-essmin ≤λ SOC-ess (t)≤λ SOC-essmax

[0107] Where: z essc (t) and z essd (t) is a 0-1 variable indicating that the energy storage device ESS is in the charging and discharging state during the period t. It means that the ESS will not be in the charging and discharging state in the same period; λ SOC-essmin and λ SOC-essmax They are the minimum state of charge and the maximum state of charge of the battery respectively.

[0108] By applying the technical solution of this embodiment, it is proposed to manage the energy of photovoltaic-battery in sections, which can maximize the consumption of photovoltaic output and save the charging cost of the battery. After optimizing the scheduling and management of clean energy, the energy of the battery can be reserved for use mainly during the peak period of electricity consumption. It makes its energy use more flexible and maximizes economic benefits. Optimizing the day-ahead scheduling of residential energy can reduce the peak-to-valley difference of electricity load, reduce the impact of terminal load on the power grid, and reduce the electricity bill expenditure of users.

[0109] Further, as Figure 1 The specific implementation of the method, the embodiment of the present application provides a residential energy scheduling device based on energy segmentation management, the device comprising:

[0110] Obtain the power consumption period type, photovoltaic output information and power consumption information of each building in the target period of the dispatched residential area;

[0111] For any building, the energy scheduling strategy for the target period of the building is determined according to the type of power consumption period, the photovoltaic output information and the power consumption information, and the power consumption of the energy storage equipment and the power purchase from the power grid are scheduled for each building, wherein the energy scheduling strategy includes the charging and discharging strategy for the energy storage equipment and the power purchase strategy for the power grid.

[0112] Optionally, the photovoltaic output information is used to indicate that the target period is a photovoltaic output period or a non-photovoltaic output period, and is also used to indicate the photovoltaic output of the target period belonging to the photovoltaic output period; the electricity consumption information includes the total electricity load of the target period;

[0113] The device is also used for:

[0114] If the target time period is a photovoltaic output time period, and the photovoltaic output is greater than or equal to the total power load, photovoltaic power is used to supply power to the power load of the building, and the first charging power of the energy storage device is determined according to the maximum charging power of the energy storage device, the photovoltaic output and the total power load, and the remaining photovoltaic power is used to charge the energy storage device of the building at the first charging power; when the energy storage device is fully charged, the remaining photovoltaic power is input into the power grid;

[0115] If the target time period is a photovoltaic output time period, and the photovoltaic output is less than the total power load, the first discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the photovoltaic output, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the first discharge power and the photovoltaic output meet the demand of the total power load; if so, the energy storage device and photovoltaic power of the building are used to supply power to the power load of the building; otherwise, first power purchase information is determined according to the total power load, the photovoltaic output, the converter conversion efficiency and the first discharge power, and power is purchased from the power grid according to the first power purchase information.

[0116] Optionally, the device is also used for:

[0117] If the target time period is a non-photovoltaic output time period, and the type of the power consumption time period is not a power consumption valley, the second discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the second discharge power meets the demand of the total power load, and if so, the energy storage device of the building is used to supply power to the power load of the building; otherwise, the second power purchase information is determined according to the total power load, the converter conversion efficiency, and the second discharge power, and power is purchased from the power grid according to the second power purchase information;

[0118] If the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment in the building and to charge the energy storage device in the building.

[0119] Optionally, the device is also used for:

[0120] According to the historical electricity consumption information of each building, the average electricity load of each building during off-peak hours and the electricity load of each off-peak hour are calculated;

[0121] The valley time periods in which the power load is less than the average power load of the valley time period are divided into the first valley time period, and the remaining valley time periods are divided into the second valley time period.

[0122] Optionally, the device is also used for:

[0123] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the first valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fourth power purchase information is determined according to the total power load, the conversion efficiency of the converter, and the second charging power, and power is purchased from the power grid according to the fourth power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage equipment of the building;

[0124] If the target time period is a non-photovoltaic output time period, and the target time period belongs to the second valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fifth electricity purchase information is determined according to the total power load, the conversion efficiency of the converter, and the third charging power, and electricity is purchased from the power grid according to the fifth electricity purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage device of the building; wherein the state of charge of the energy storage device at the end of the first valley time period is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the number of the first valley time periods, the second charging power, the charging efficiency of the energy storage device, and the capacity of the energy storage device.

[0125] Optionally, the device is also used for:

[0126] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time periods, and the maximum charging power of the energy storage device; otherwise, the energy storage device is not charged.

[0127] Optionally, the device is also used for:

[0128] When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device and the conversion efficiency of the converter; otherwise, the energy storage device is not charged.

[0129] It should be noted that for other corresponding descriptions of the functional units involved in the residential energy scheduling device based on energy segmentation management provided in the embodiment of the present application, reference can be made to Figures 1 to 3 The corresponding description in the method will not be repeated here.

[0130] The embodiment of the present application also provides a computer device, which can be a personal computer, a server, a network device, etc. The computer device includes a bus, a processor, a memory and a communication interface, and can also include an input and output interface and a display device. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store location information. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps in each method embodiment are implemented.

[0131] Those skilled in the art will appreciate that the structure of the above-mentioned computer device is only a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components, or combine certain components, or have a different arrangement of components.

[0132] In one embodiment, a computer-readable storage medium is provided. The computer-readable storage medium may be non-volatile or volatile, and stores a computer program thereon. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0133] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0134] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.

[0135] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0136] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0137] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A residential energy scheduling method based on energy segmentation management, It is characterized in that The method comprises: Obtain the power consumption period type, photovoltaic output information and power consumption information of each building in the target period of the dispatched residential area; For any building, the energy scheduling strategy for the target period of the building is determined according to the type of power consumption period, the photovoltaic output information and the power consumption information, and the power consumption of the energy storage equipment and the power purchase from the power grid are scheduled for each building, wherein the energy scheduling strategy includes the charging and discharging strategy for the energy storage equipment and the power purchase strategy for the power grid.

2. The method according to claim 1, It is characterized in that The photovoltaic output information is used to indicate whether the target period is a photovoltaic output period or a non-photovoltaic output period, and is also used to indicate the photovoltaic output of the target period belonging to the photovoltaic output period; the power consumption information includes the total power load of the target period; For any building, according to the power consumption period type, the photovoltaic output information and the power consumption information, an energy scheduling strategy for the target period of the building is determined, including: If the target time period is a photovoltaic output time period, and the photovoltaic output is greater than or equal to the total power load, photovoltaic power is used to supply power to the power load of the building, and the first charging power of the energy storage device is determined according to the maximum charging power of the energy storage device, the photovoltaic output and the total power load, and the remaining photovoltaic power is used to charge the energy storage device of the building at the first charging power; when the energy storage device is fully charged, the remaining photovoltaic power is input into the power grid; If the target time period is a photovoltaic output time period, and the photovoltaic output is less than the total power load, the first discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the photovoltaic output, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the first discharge power and the photovoltaic output meet the demand of the total power load; if so, the energy storage device and photovoltaic power of the building are used to supply power to the power load of the building; otherwise, first power purchase information is determined according to the total power load, the photovoltaic output, the converter conversion efficiency and the first discharge power, and power is purchased from the power grid according to the first power purchase information.

3. The method according to claim 2, It is characterized in that For any building, determining the energy scheduling strategy for the target period of the building according to the power consumption period type, the photovoltaic output information and the power consumption information, further comprising: If the target time period is a non-photovoltaic output time period, and the type of the power consumption time period is not a power consumption valley, the second discharge power of the energy storage device is determined according to the maximum discharge power of the energy storage device, the total power load, the discharge efficiency of the energy storage device, and the converter conversion efficiency of the energy storage device; it is judged whether the second discharge power meets the demand of the total power load, and if so, the energy storage device of the building is used to supply power to the power load of the building; otherwise, the second power purchase information is determined according to the total power load, the converter conversion efficiency, and the second discharge power, and power is purchased from the power grid according to the second power purchase information; If the target time period is a non-photovoltaic output time period and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment in the building and to charge the energy storage device in the building.

4. The method according to claim 3, It is characterized in that The method further comprises: According to the historical electricity consumption information of each building, the average electricity load of each building during off-peak hours and the electricity load of each off-peak hour are calculated; The valley time periods in which the power load is less than the average power load of the valley time period are divided into the first valley time period, and the remaining valley time periods are divided into the second valley time period.

5. The method according to claim 4, It is characterized in that If the target time period is a non-photovoltaic output time period, and the power consumption time period type is a power consumption valley, the third power purchase information is determined according to the total power load, the converter conversion efficiency, and the maximum charging power of the energy storage device, and power is purchased from the power grid according to the third power purchase information, and the power purchased from the power grid is used to power the power consumption equipment of the building and to charge the energy storage device of the building, including: If the target time period is a non-photovoltaic output time period, and the target time period belongs to the first valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fourth power purchase information is determined according to the total power load, the conversion efficiency of the converter, and the second charging power, and power is purchased from the power grid according to the fourth power purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage equipment of the building; If the target time period is a non-photovoltaic output time period, and the target time period belongs to the second valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter; the fifth electricity purchase information is determined according to the total power load, the conversion efficiency of the converter, and the third charging power, and electricity is purchased from the power grid according to the fifth electricity purchase information, and the electric energy purchased from the power grid is used to power the electrical equipment of the building and charge the energy storage device of the building; wherein the state of charge of the energy storage device at the end of the first valley time period is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the number of the first valley time periods, the second charging power, the charging efficiency of the energy storage device, and the capacity of the energy storage device.

6. The method according to claim 5, It is characterized in that Determining the second charging power of the energy storage device according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time period, and the maximum charging power of the energy storage device, including: When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the second charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the preset valley time period, the capacity of the energy storage device, the number of the first valley time periods, and the maximum charging power of the energy storage device; otherwise, the energy storage device is not charged.

7. The method according to claim 5, It is characterized in that Determining a third charging power of the energy storage device according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device, and the conversion efficiency of the converter, including: When the state of charge of the energy storage device during the target time period is less than the state of charge of the energy storage device at the end of the preset valley time period, the third charging power of the energy storage device is determined according to the state of charge of the energy storage device at the beginning of the valley time period, the state of charge of the energy storage device at the end of the first valley time period, the capacity of the energy storage device, the number of second valley time periods, the maximum charging power of the energy storage device and the conversion efficiency of the converter; otherwise, the energy storage device is not charged.

8. A residential energy dispatching device based on energy segmentation management, It is characterized in that The device is used for: Obtain the power consumption period type, photovoltaic output information and power consumption information of each building in the target period of the dispatched residential area; For any building, the energy scheduling strategy for the target period of the building is determined according to the type of power consumption period, the photovoltaic output information and the power consumption information, and the power consumption of the energy storage equipment and the power purchase from the power grid are scheduled for each building, wherein the energy scheduling strategy includes the charging and discharging strategy for the energy storage equipment and the power purchase strategy for the power grid.

9. A storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.

10. A computer device comprising a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • A power distribution network energy management method considering public building demand response resources

    CN109685396A

  • Construction site intelligent power utilization dispatching system and method based on photovoltaic energy storage

    CN116154770A

  • Electric vehicle ordered charging control method for residence community

    CN116331049A

  • Photovoltaic Energy Storage Offline Coordination System and Method Based on Demand Management

    US20240088667A1

  • Photovoltaic electric energy consumption method and apparatus, and device and storage medium

    WO2024065998A1