Thick film heating body heating control method
By using the vaporization heat formula in drinking water equipment for boiling point detection and control, the problems of low accuracy and steam spraying in traditional methods are solved, and the accurate heating of the liquid is achieved to the critical boiling point, improving user experience and equipment performance.
Patent Information
- Application Number
- CN202411086203.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
AI Technical Summary
The traditional boiling point detection method has problems of low accuracy and complex operation. In order to prevent steam spraying, the thick film heating technology lowers the maximum water outlet temperature and fails to reach the true boiling point, affecting the user experience.
Using boiling point detection device and control method based on the vaporization heat formula, the inlet and outlet water temperature is measured through NTC, combined with the thick film heating body and the water pump, the water vaporization heat formula is used to calculate the real-time flow rate, and the heating body power and the water pump voltage are accurately controlled to ensure heating. Go to the critical boiling point and avoid steam spraying.
Accurate measurement and precise control of the boiling point of the liquid are achieved, the heating effect and user experience of the equipment are improved, and the risk of steam spraying is avoided.
Smart Images

Figure CN118948108A_ABST
Abstract
Description
[Technical field]
[0001] The invention relates to the technical field of drinking water and water supply products, and in particular to the technical field of control of a heating module in drinking water equipment. [Background technology]
[0002] With the improvement of living standards and the development of smart homes, the intelligent heating and temperature control systems of water dispensers need to continuously pursue higher energy efficiency and intelligence levels. In addition to water use in daily life, the boiling point detection of liquids is of great significance in the fields of chemical industry, food, medicine, and pure drinking water equipment. Traditional boiling point detection methods are usually achieved by directly measuring the temperature or manually setting the boiling point, but these methods have disadvantages such as low accuracy and complex operation. In addition, the current thick film heating technology reduces the maximum water outlet temperature point to prevent steam spraying, and does not reach the true boiling point, which becomes a pain point for users. By using the heat of vaporization formula, the boiling point of the liquid can be calculated more accurately, and the water outlet temperature can be accurately controlled to the critical boiling point, thereby improving the user experience and being more intelligent. [Summary of the invention]
[0003] In response to the problems existing in the prior art, the present invention provides a boiling point detection device and a control method based on the vaporization heat formula, which accurately measures and calculates the boiling point of water in the drinking water device under the current conditions, optimizes the heating process, accurately controls the heating to the critical boiling point and avoids steam spraying, thereby improving the heating effect in the equipment and enhancing the user experience of the product.
[0004] The present invention relates to a heating control method for a thick film heater, which is characterized in that the heating equipment includes an NTC, a thick film heater, a water pump, and an electric control board, wherein the NTC includes an NTC for measuring an inlet water temperature and an outlet water temperature, the thick film heater directly contacts and heats water, the water pump is used to pump water and send it to the thick film heater for heating, and the electric control board is used to read the value of the NTC, control the heater power and the water pump voltage after running a calculation process; the efficiency and power of the thick film heater, the heat required for heating a certain amount of water, and the heat required for water vaporization are substituted into the water vaporization heat formula to calculate the real-time flow value, and the water pump and the thick film heater are controlled to work according to the calculated value to perform heating.
[0005] The water vaporization heat formula is:
[0006] Q=ηPt=CmΔT+mΔG
[0007] ηPt=CqρtΔT+qρtΔG
[0008]
[0009] in,
[0010] Q——heat, in J joules;
[0011] η——Heating efficiency, calculated by default as 96% of the value provided by the supplier;
[0012] C——Specific heat capacity. When the ambient temperature is 25℃, the specific heat capacity of water is 4.2*10 3 J / (㎏·℃) is 4.2J / g·℃, and the specific heat capacity of steam is half that of water;
[0013] m——mass, in g;
[0014] P——heating body power, in W watts;
[0015] ρ——density. When the ambient temperature is 25℃, the density of water is 1g / ml, 1g / cm 3 ;
[0016] t——time, in seconds;
[0017] q——flow rate, in ml / min;
[0018] ΔT——temperature difference, in degrees Celsius;
[0019] ΔG——Specific latent heat of vaporization. The latent heat of vaporization of water at one atmosphere pressure and 100°C is 2257.2 kJ / kg or 2257.2 J / g.
[0020] When the boiling point is known, the critical point temperature can be precisely controlled by the system.
[0021] Step 1: Assuming the ambient temperature is 25°C, the initial temperature T0 is obtained through NTC, and it needs to be heated to the boiling point T 沸 , the temperature at this time is T 沸 =100℃, then the heating temperature difference ΔT = T 沸 -T0, there is no vaporization in the initial state, that is, the vaporization heat consumption G = 0 at this time, and the required flow rate q is calculated by the water vaporization heat formula;
[0022] Step 2: Introduce the maximum water flow rate of the current pipeline to be q max , then the gas flow rate that can accommodate the maximum water vapor is q 汽 =q max -q;
[0023] Step 3: Under standard atmospheric pressure, calculate the weight of the maximum water vapor flow rate obtained in step 2;
[0024] Step 4: Calculate the heat consumed to convert the weight of water vapor as Q1 by using the specific latent heat of vaporization and the weight of the maximum water vapor flow rate calculated in step 3 at 100°C;
[0025] Step 5: Convert the heat Q1 in step 4 into the water flow value q1 that can be fine-tuned by the water pump, then q1 = Q1 / (4.2*ΔT);
[0026] Step 6: According to the relationship between the water pump flow rate q and the voltage v, q=kv+b, the constants k and b in the calculation formula of the water pump flow rate and voltage are converted;
[0027] Step 7: When the heating element is heated to the boiling point critical value, adjust the water pump voltage to accurately reach the boiling point and avoid steam spraying. At this time, the maximum voltage amplitude that the water pump can adjust is less than V1, where
[0028] A method for controlling boiling point is provided, comprising the following steps:
[0029] S1. When the boiling point is unknown, set the initial flow value according to the boiling point at the highest altitude. Assume that the boiling point at the highest altitude is T 沸 ', in T 沸 The specific latent heat of vaporization at 'temperature is ΔG2;
[0030] S2. The initial temperature of water obtained by NTC is T1, and the temperature difference when heated to boiling is ΔT1 = T 沸 '-T1, because there is no vaporization at the beginning, that is, the heat consumed by vaporization G=0 at this time, calculate the water flow rate q2 required for initial heating;
[0031] S3, according to the relationship between the water pump flow rate q and the voltage v, q=kv+b, where v is the voltage, k and b are known constants, the water pump voltage v2 at this time is calculated;
[0032] S4. Turn on all thick film heaters and set the water pump voltage to v2 until the water temperature trend approaches 0. Fine-tune the water pump voltage by reducing it by 0.1v every 1s to detect the change in water temperature until vaporization occurs. At this time, the vaporization temperature detected by the outlet water NTC exceeds 6-7°C instantly, and the current boiling point temperature T can be inferred. 沸 '.
[0033] S5, the boiling point temperature T obtained in step S4 沸 'Substitute into the previous steps for precise control.
[0034] The thick film heater control method involved in the present invention uses the vaporization specific latent heat calculation formula to accurately calculate the flow value of water vapor that the corresponding system can accommodate, and converts the corresponding heat consumption. The voltage formula is used to calculate the adjustable voltage amplitude at the critical boiling point, and the voltage is adjusted within the limited voltage adjustment amplitude to accurately control the heating body to reach the true boiling point while avoiding the risk of steam spraying.
Brief Description of the Drawings
[0035] Figure 1 It is a boiling point self-checking curve diagram involved in the present invention; [Specific implementation method]
[0036] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments, examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0037] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0038] Please refer to the attached Figure 1 A heating control method for a thick film heater is proposed. The invention aims to solve the problem that during the heating process of the existing thick film heater, the system control of the temperature hysteresis is not accurate enough, which leads to the potential safety hazard of steam spraying, or the maximum water outlet temperature is lowered to prevent steam spraying, which actually fails to reach the technical pain point of the real boiling point water outlet. By using the heat of vaporization formula, a method for flow rate and heating control that can achieve accurate boiling point temperature is accurately obtained.
[0039] The water supply heating equipment on which the heating control method is based includes a heating equipment including an NTC, a thick film heater, a water pump, and an electric control board, wherein the NTC includes an NTC for measuring the inlet water temperature and an NTC for measuring the outlet water temperature. The thick film heater directly contacts and heats water. The water pump is used to pump water into the thick film heater for heating. The electric control board is used to read the value of the NTC, control the power of the heater and the voltage of the water pump after running the calculation process. First of all, the equipment to which the control method is applied must at least have such hardware conditions in order to complete the measurement, collection, calculation and control processes required by the control method.
[0040] The efficiency and power of the thick film heater, the heat required to heat a certain amount of water, and the heat required for water vaporization are substituted into the water vaporization heat formula to calculate the real-time flow value, and the water pump and the thick film heater are controlled to work according to the calculated value for heating.
[0041] The water vaporization heat formula is:
[0042] Q=ηPt=CmΔT+mΔG
[0043] ηPt=CqρtΔT+qρtΔG
[0044]
[0045] in,
[0046] Q——heat, in J joules;
[0047] η——Heating efficiency, calculated by default as 96% of the value provided by the supplier;
[0048] C——Specific heat capacity. When the ambient temperature is 25℃, the specific heat capacity of water is 4.2*10 3 J / (㎏·℃) is 4.2J / g·℃, and the specific heat capacity of steam is half that of water;
[0049] m——mass, in g;
[0050] P——heating body power, in W watts;
[0051] ρ——density. When the ambient temperature is 25℃, the density of water is 1g / ml, 1g / cm 3 ;
[0052] t——time, in seconds;
[0053] q——flow rate, in ml / min;
[0054] ΔT——temperature difference, in degrees Celsius;
[0055] ΔG——latest heat of vaporization. The latent heat of vaporization of water at one atmosphere pressure and 100°C is 2257.2 kJ / kg or 2257.2 J / g.
[0056] When the boiling point is known, the critical point temperature can be precisely controlled by the system.
[0057] Step 1: Assuming the ambient temperature is 25°C, the initial temperature T0 is obtained through NTC, and it needs to be heated to the boiling point T 沸 , the temperature at this time is T 沸 =100℃, then the heating temperature difference ΔT = T 沸 -T0, there is no vaporization in the initial state, that is, the vaporization heat consumption G = 0 at this time, and the required flow rate q is calculated by the water vaporization heat formula;
[0058] Step 2: Introduce the maximum water flow rate of the current pipeline to be q max , then the maximum water vapor flow rate that can be accommodated is
[0059] q 汽 =qmax -q;
[0060] Step 3: Under standard atmospheric pressure, calculate the weight of the maximum water vapor flow rate obtained in step 2;
[0061] Step 4: Calculate the heat consumed to convert the weight of water vapor as Q1 by using the specific latent heat of vaporization and the weight of the maximum water vapor flow rate calculated in step 3 at 100°C;
[0062] Step 5: Convert the heat Q1 in step 4 into the water flow value q1 that can be fine-tuned by the water pump, then q1 = Q1 / (4.2*ΔT);
[0063] Step 6: According to the relationship between the water pump flow rate q and the voltage v, q=kv+b, the constants k and b in the calculation formula of the water pump flow rate and voltage are converted;
[0064] Step 7: When the heating element is heated to the boiling point critical value, adjust the water pump voltage to accurately reach the boiling point and avoid steam spraying. At this time, the maximum voltage amplitude that the water pump can adjust is less than V1 through calculation, where
[0065]
[0066] Embodiment 1:
[0067] Step 1: When the current ambient temperature is 25°C and the initial water temperature T0 in the equipment is 25°C, the boiling point temperature T 沸 =100℃, then the heating temperature difference ΔT = 75℃. Considering that there is no vaporization in the initial state, the energy consumed by vaporization is 0. The water flow rate q required to heat from the initial temperature T0 to the boiling point can be calculated by the water vaporization heat formula:
[0068]
[0069] Step 2: The maximum water flow rate q that the current pipeline can withstand max =1200mL / min, then the gas flow rate q that can accommodate the largest amount of water vapor 汽 =q max -q,q 汽 =1200-384=816mL / min;
[0070] Step 3: In the current situation, one mole of water is 18g, and the volume after it turns into steam is 22.4L, so the maximum water vapor flow rate that the pipeline can withstand per minute is converted into the weight of water vapor
[0071] because
[0072] again V=qt, we can get
[0073] Depend on Calculated
[0074] n——amount of substance in mol
[0075] m——mass g
[0076] M——molar mass g / mol
[0077] V——Volume L
[0078] V m ——Molar volume L / mol
[0079] q——Flow rate L / min
[0080] t——time min
[0081] Step 4: From the latent heat of vaporization at 100°C, which is 2257.2 kJ / kg or 2257.2 J / g, we can get q 汽 Energy Q1 is 2257.2×0.65571312≈1480J.
[0082] Step 5: Convert the consumed energy Q1 into the water flow q1 that can be fine-tuned by the water pump, then q1=1480÷4.2÷75≈4.7ml / min.
[0083] Step 6: Based on the relationship between the water pump flow rate q and the voltage v, q=kv+b, and the relationship between the specifications of the existing water pump and the voltage, k=47 and b=-5 are calculated.
[0084] Step 7: When the heating element is heated to the critical point of boiling point, the voltage value that the water pump can adjust
[0085] Through the above steps, the result obtained after calculation is that when the heating body is heated to the critical boiling point, in order to prevent vaporization in the heating body and cause steam spray, the water pump adjustment amplitude should be controlled within 0.2V to ensure the stability of the water outlet temperature and prevent the occurrence of vaporization.
[0086] If the environment is non-standard and the boiling point temperature is unknown, it is necessary to add a pre-boiling point estimation calculation step before the above step 1, which includes the following steps:
[0087] S1. When the boiling point is unknown, set the initial flow value according to the boiling point at the highest altitude. Assume that the boiling point at the highest altitude is T 沸 ', in T 沸The specific latent heat of vaporization at 'temperature is ΔG2;
[0088] S2. The initial temperature of water obtained by NTC is T1, and the temperature difference when heated to boiling is ΔT1 = T 沸 '-T1, because there is no vaporization at the beginning, that is, the heat consumed by vaporization G=0 at this time, calculate the water flow rate q2 required for initial heating;
[0089] S3, according to the relationship between the water pump flow rate q and the voltage v, q=kv+b, where v is the voltage, k and b are known constants, the water pump voltage v2 at this time is calculated;
[0090] S4. Turn on all thick film heaters and set the water pump voltage to v2 until the water temperature trend approaches 0. Fine-tune the water pump voltage by reducing it by 0.1v every 1s to detect the change in water temperature until vaporization occurs. At this time, the vaporization temperature detected by the outlet water NTC exceeds 6-7°C instantly, and the current boiling point temperature T can be inferred. 沸 '.
[0091] S5, the boiling point temperature T obtained in step S4 沸 'Substitute into the previous steps for precise control.
[0092] Embodiment 2:
[0093] S1: When the boiling point is unknown, set the initial flow value according to the boiling point at the highest altitude. Assuming the highest altitude is 3000 meters, the current boiling point T 沸 ' is 90.4℃, and the latent heat of vaporization ΔG2 at 90.4℃ is about 2282.8kJ / kg or 2282.8J / g;
[0094] S2: Assuming that the current inlet water temperature is 45°C and needs to be heated to 90.4°C to reach the boiling point, the temperature difference ΔT = 65.4°C. Since there is no vaporization at the beginning, ΔG = 0, calculate the water flow rate q2 required for initial heating:
[0095]
[0096] S3: According to the relationship between water pump flow and voltage: q = 47v-5, calculate the water pump voltage V2
[0097]
[0098] S4: Turn on the thick film heater power, set the water pump voltage to 13.6V, until the outlet water temperature trend approaches 0, fine-tune the water pump voltage, reduce it by 0.1V every 1S, and probe the change of the outlet water temperature until vaporization occurs. At this time, the vaporization temperature detected by the outlet water NTC will instantly exceed 6-7℃, and the current temperature can be inferred to be the real boiling point before vaporization. Refer to the following table for the test data of the heating process:
[0099]
[0100]
[0101] Table 1: Heating process test data table
[0102] Please refer to the attached Figure 1 , where the data is a boiling point self-test curve chart drawn based on the heating process test data in Table 1.
[0103] S5: Through the above steps S1-S4, the power of the heating body is fully turned on, the initial voltage of the water pump is set to 13.6V, and the outlet water NTC detects the change of the outlet water temperature. When it is detected that the outlet water NTC reaches a certain temperature value and does not rise further, the electric control board automatically fine-tunes the water pump voltage and decreases it at a rate of 0.1V / S until steam spraying occurs. The current boiling point temperature is calculated to be 99°C by the temperature after vaporization. The actual boiling point temperature calculated by S5 is substituted into the calculation for accurately controlling the heating process of the heating body.
[0104] The thick film heater control method involved in the present invention uses the vaporization specific latent heat calculation formula to accurately calculate the flow value of water vapor that the corresponding system can accommodate, and converts the corresponding heat consumption. The voltage formula is used to calculate the adjustable voltage amplitude at the critical boiling point, and the voltage is adjusted within the limited voltage adjustment amplitude to accurately control the heating body to reach the true boiling point while avoiding the risk of steam spraying.
[0105] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention is disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modifications to equivalent embodiments of equivalent changes by using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent changes and modifications made to the above embodiments according to the technology of the present invention are within the scope of the technical solution of the present invention without departing from the content of the technical solution of the present invention.
Claims
1. A heating control method for a thick film heater, the equipment includes an NTC, a thick film heater, a water pump, and an electric control board, wherein the NTC includes an NTC for measuring the inlet water temperature and the outlet water temperature, the thick film heater directly contacts and heats water, the water pump is used to pump water into the thick film heater for heating, and the electric control board is used to read the value of the NTC, run the calculation process, and then control the power of the heater and the voltage of the water pump; characterized in that: The device calculates the real-time flow value by substituting the efficiency and power of the thick film heating body, the heat required to heat a certain amount of water, and the heat required for water vaporization into the water vaporization heat formula, and controls the water pump and the thick film heating body to work according to the calculated value to perform heating; when the boiling point is known, the method of accurately controlling the critical point temperature by the device includes the following steps: Step 1: Assuming the ambient temperature is 25°C, the initial temperature T0 is obtained through NTC, and it needs to be heated to reach the boiling point T0 at this time. 沸 , the temperature at this time is T 沸 =100℃, the heating temperature difference ΔT = T 沸 -T0, there is no vaporization in the initial state, that is, the vaporization heat consumption G = 0 at this time, and the required flow rate q is calculated by the water vaporization heat formula; Step 2: Introduce the maximum water flow rate of the current pipeline to be q max , then the gas flow rate that can accommodate the maximum water vapor is q 汽 =q max -q; Step 3: Under standard atmospheric pressure, calculate the weight of the maximum water vapor flow rate obtained in step 2; Step 4: Calculate the heat consumed to convert the weight of water vapor as Q1 by using the specific latent heat of vaporization and the weight of the maximum water vapor flow rate calculated in step 3 at 100°C; Step 5: Convert the heat Q1 in step 4 into the water flow value that can be fine-tuned by the water pump. q1, then q1=Q1 / (4.2*ΔT); Step 6: According to the relationship between the water pump flow rate q and the voltage v, q=kv+b, the constants k and b in the calculation formula of the water pump flow rate and voltage are converted; Step 7: When the heating element is heated to the boiling point critical value, adjust the water pump voltage to accurately reach the boiling point and avoid steam spraying. At this time, the maximum voltage amplitude that the water pump can adjust is less than V1, where 2. The thick film heater heating control method according to claim 1, characterized in that: The water vaporization heat formula is: Q=ηPt=CmΔT+mΔG ηPt=CqρtΔT+qρtΔG in, Q——heat, in J joules; η——Heating efficiency, calculated by default as 96% of the value provided by the supplier; C——Specific heat capacity. When the ambient temperature is 25℃, the specific heat capacity of water is 4.2*10 3 J / (㎏·℃) is 4.2J / g·℃, and the specific heat capacity of steam is half that of water; m——mass, in g; P——heating body power, in W watts; ρ——density. When the ambient temperature is 25℃, the density of water is 1g / ml, 1g / cm 3 ; t——time, in seconds; q——flow rate, in ml / min; ΔT——temperature difference, in degrees Celsius; ΔG——latest heat of vaporization. The latent heat of vaporization of water at one atmosphere pressure and 100°C is 2257.2 kJ / kg or 2257.2 J / g.
3. The thick film heater heating control method according to claim 2, characterized in that: When the boiling point is unknown, the heating control method also needs to include the following pre-steps: S1. When the boiling point is unknown, set the initial flow value according to the boiling point at the highest altitude. Assume that the boiling point at the highest altitude is T 沸 ', in T 沸 The specific latent heat of vaporization at 'temperature is ΔG2; S2. The initial temperature of water obtained by NTC is T1, and the temperature difference when heated to boiling is ΔT1 = T 沸 '-T1, because there is no vaporization at the beginning, that is, the heat consumed by vaporization G=0 at this time, calculate the water flow rate q2 required for initial heating; S3, according to the relationship between the water pump flow rate q and the voltage v, q=kv+b, where v is the voltage, k and b are known constants, the water pump voltage v2 at this time is calculated; S4. Turn on all thick film heaters and set the water pump voltage to v2 until the water temperature trend approaches 0. Fine-tune the water pump voltage by reducing it by 0.1v every 1s to detect the change in water temperature until vaporization occurs. At this time, the vaporization temperature detected by the outlet water NTC exceeds 6-7°C instantly, and the current boiling point temperature T can be inferred. 沸 'Numerical value; S5, the boiling point temperature T obtained in step S4 沸 'Substitute into the previous steps for precise control.
Citation Information
Patent Citations
Accurate control method of open-loop instant heating control system
CN115268535A
Boiling point identification method and device, water dispenser and storage medium
CN115931963A
Control method for water drinking equipment and water drinking equipment
CN116687211A
Solar drop ice coffee maker apparatus
TW201204298A
