Anchoring plate assembly for turnout concrete switch tie end

By using anchor plate components in concrete splints, the concrete cracking problem caused by the embedded casing is solved, the overall stability and support are enhanced, and driving safety and service life are ensured.

CN118958056APending Publication Date: 2024-11-15CHINA RAILWAY BAOJI BRIDGE GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411289450.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-15

Smart Images

  • Figure CN118958056A_ABST
    Figure CN118958056A_ABST
Patent Text Reader

Abstract

The invention provides an anchoring plate assembly for a turnout concrete switch tie end. The anchoring plate assembly is composed of a hooked bar, an inner friction plate, an anchoring end plate and a slurry-proof cap. The inner friction plate is vertically and fixedly connected with the anchoring end plate; the upper surface of the inner friction plate is flush with the upper surface of the switch tie; the inner side surface of the inner friction plate is vertically and fixedly connected with the end part of the anchoring end plate; the anchoring end plate is arranged at the end part of the switch tie and is tightly attached and aligned to the end part of the switch tie; anchoring holes and reinforcing steel bar holes are reserved in the anchoring end plates; the anchoring hole is used for fixing the anchoring end plate; the reinforcing steel bar holes are used for tensioning longitudinal reinforcing steel bars; the inner friction plate is provided with a slurry-proof cap; the inner friction plate is vertically connected with the hook rib; the hooked bars are embedded in concrete and used for improving the bonding performance of the anchoring plate assembly and the concrete. The supporting performance of the concrete switch tie is enhanced, the distance between the embedded sleeve and the end of the concrete switch tie is effectively shortened, the special requirement for small-space arrangement is met, the disease problems of concrete cracking, embedded sleeve damage and the like are solved, and driving safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of railway sleepers for fixing buildings, and in particular relates to an anchoring plate assembly for an end of a concrete turnout sleeper. Background Art

[0002] With the rapid development of national railway equipment, conventional railway turnouts have gradually achieved the process of eliminating wooden sleepers. Concrete turnout sleepers have become the mainstream sub-rail foundation form in turnout areas due to their strong stability, long service life, good insulation and low maintenance costs.

[0003] At present, domestic concrete switch sleepers usually adopt the structure of embedded casing and tensioned steel bars. Compared with line sleepers, switch sleepers in turnout areas have more types and more complex structures.

[0004] However, due to space limitations and special turnout group design, the embedded casing is too close to the end of the concrete turnout sleeper in some parts, resulting in insufficient concrete wrapping. During operation, the impact of external forces such as vibration will cause concrete cracking and embedded casing damage, which seriously affects driving safety. In this regard, the following improved technical solutions are proposed. Summary of the invention

[0005] The technical problem solved by the present invention is: to provide an anchor plate assembly for the end of a concrete turnout sleeper, which can effectively shorten the distance from the embedded sleeve to the end of the concrete turnout sleeper by strengthening the support of the concrete turnout sleeper, meet the special needs of small space arrangement, solve the problems of concrete cracking, embedded sleeve damage and other diseases, and ensure driving safety.

[0006] The technical solution adopted by the present invention is as follows: an anchor plate assembly for the end of a concrete turnout sleeper, which is composed of hook bars, an inner friction plate, an anchor end plate, and an anti-slurry cap; the inner friction plate is vertically fixed to the anchor end plate; the upper surface of the inner friction plate is flush with the upper surface of the turnout sleeper; the inner side surface of the inner friction plate is vertically fixed to the end of the anchor end plate; the anchor end plate is arranged at the end of the turnout sleeper and is closely aligned with the end of the turnout sleeper; the anchor end plate is pre-set with anchor holes and steel bar holes; the anchor holes are used to fix the anchor end plate; the steel bar holes are used to tension longitudinal steel bars; the inner friction plate is installed with an anti-slurry cap; the inner friction plate is vertically connected to the hook bars; the hook bars are buried in concrete to improve the bonding between the anchor plate assembly and the concrete.

[0007] In the above technical solution, as a further improvement of the present invention: the inner friction plate and the anchoring end plate are vertically welded and fixedly connected as one.

[0008] In the above technical solution, as a further improvement of the present invention: the inner friction plate is vertically welded and fixedly connected with the hook reinforcement.

[0009] In the above technical solution, as a further improvement of the present invention: the anchoring end plate is fixed on the switch sleeper mold template, and concrete is poured after the longitudinal steel bars are tensioned through the steel bar holes.

[0010] In the above technical solution, as a further improvement of the present invention: there are two hook bars, and the two hook bars are symmetrically arranged on the inner friction plate; the two hook bars are arranged on both sides of the embedded sleeve, and the hook bars and the embedded sleeve do not interfere with each other.

[0011] In the above technical scheme, as a further improvement of the present invention: the hook bar is formed by bending threaded steel bars, and the hook bar is embedded in the reinforcement concrete to be tightly combined with the concrete, thereby providing a gripping force for the entire turnout concrete sleeper.

[0012] In the above technical solution, as a further improvement of the present invention: the anchor plate assembly is tightly combined with the concrete and forms a whole with the switch sleeper.

[0013] In the above technical solution, as a further improvement of the present invention: the inner friction plate and the switch sleeper are in the same plane and are tightly combined; the anchoring end plate is located at the end of the switch sleeper and is tightly combined with the switch sleeper.

[0014] In the above technical solution, as a further improvement of the present invention: the inner friction plate has a prefabricated connection hole; the connection hole is a threaded hole, and the connection hole is screwed with an anti-slurry cap.

[0015] The advantages of the present invention compared with the prior art are:

[0016] 1. The present invention solves the problem that the distance from the embedded sleeve to the end of the concrete switch sleeper is too small when the concrete switch sleeper is arranged in a small space; strengthens the support of the end of the concrete switch sleeper to effectively prevent the problem of concrete cracking at the end; the anchor end plate and the inner friction plate are vertically welded together to strengthen the overall stability of the concrete switch sleeper, enhance the support of the end of the switch sleeper to the embedded sleeve, and play a role in protecting the embedded sleeve.

[0017] 2. The inner friction plate of the present invention can enhance the bonding force between the inner friction plate and concrete; hook bars are welded on the inner friction plate, and the hook bars provide gripping force for the entire component; the hook bars of the present invention are embedded in the concrete to ensure the bonding between the anchor end plate and the concrete.

[0018] 3. The present invention prevents concrete slurry from overflowing, and an anti-slurry cap is arranged on the lower side of the inner friction plate.

[0019] 4. Before pouring concrete of the present invention, a switch sleeper mold is set up and the anchor plate assembly of the present invention is fixed on the template without changing the existing template; the concrete is poured after the longitudinal steel bars are tensioned through the steel bar holes of the anchor end plate; after the pouring is completed, the anchor plate assembly and the concrete are tightly combined to form a whole with the switch sleeper. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a front view of the anchor plate assembly of the present invention;

[0021] Figure 2 For the present invention Figure 1 Front view of the anchor plate assembly being cast;

[0022] Figure 3 For the present invention Figure 2 Left view;

[0023] Figure 4 For the present invention Figure 2 Top view;

[0024] Figure 5 This is a front view of the hook bar of the present invention;

[0025] In the figure: 1-hook reinforcement, 2-internal friction plate, 3-anchor end plate, 31-anchor hole, 32-rebar hole, 4-anti-slurry cap, 5-embedded casing, 6-turnout sleeper. DETAILED DESCRIPTION

[0026] The following will be combined with the attached embodiment of the present invention Figure 1-5 , the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] (like Figure 1 , Figure 2 (As shown) An anchor plate assembly for the end of a turnout concrete sleeper is composed of a hook reinforcement 1, an inner friction plate 2, an anchor end plate 3, and an anti-slurry cap 4.

[0028] It should be noted that the design of the hook bar 1 usually takes into account the force requirements under different working conditions and can adapt to various complex railway turnout environments. The inner friction plate 2 is placed between the concrete switch sleeper 6 and the rail or other structural parts, and the friction coefficient is increased by increasing the roughness of the contact surface to prevent relative sliding and ensure the stable operation of the turnout system. During the force process, the inner friction plate 2 can disperse the stress, reduce the direct impact on the concrete switch sleeper, and extend the service life. The anchor end plate 3, as the core part of the anchor plate assembly, has a strong anchoring ability and can ensure a firm connection between the concrete switch sleeper and the foundation structure. The main function of the anti-slurry cap 4 is to prevent leakage during concrete pouring or grouting, and ensure the integrity and stability of the internal structure of the concrete switch sleeper. The anti-slurry cap 4 has good sealing performance, which can effectively prevent external moisture and impurities from entering the interior of the concrete switch sleeper and extend the service life. By preventing leakage and improving sealing, the anti-slurry cap 4 can also protect the steel bars and other structural parts inside the concrete switch sleeper from corrosion and damage to a certain extent.

[0029] The inner friction plate 2 is vertically fixed to the anchor end plate 3. The vertical connection method can ensure that the connection between the inner friction plate and the anchor end plate is tighter and firmer, thereby improving the structural stability of the entire anchor plate assembly. This stable connection can more effectively resist various forces and vibrations from the track and ensure the long-term stable operation of the turnout system. The design of vertical connection helps to optimize the force transmission path so that the force from the rails or other structural parts can be more evenly distributed to the concrete switch sleeper, thereby reducing the local stress concentration phenomenon. This helps to extend the service life of the concrete switch sleeper and reduce the risk of damage caused by stress concentration. The vertical connection method can reduce the wear and corrosion problems caused by loose connection. When the inner friction plate is tightly connected to the anchor end plate, the gap between them is reduced, thereby reducing the chance of harmful substances such as moisture and impurities entering, which helps to extend the service life of the entire anchor plate assembly.

[0030] The upper surface of the inner friction plate 2 is flush with the upper surface of the switch sleeper 6; when the upper surface of the inner friction plate 2 is flush with the upper surface of the switch sleeper 6, it can be ensured that the load from the track can be more evenly distributed on the switch sleeper. This uniform force distribution helps to reduce stress concentration and reduce the risk of damage to the switch sleeper due to local overload. The flush design makes the contact area between the inner friction plate and the switch sleeper larger and the connection more stable. This stable connection can enhance the overall stability of the turnout system and ensure that the turnout system can maintain a stable working state when the train passes. The flush design of the inner friction plate 2 and the upper surface of the switch sleeper 6 helps to improve the support force of the roadbed to the switch sleeper. This increase in support force can increase the lateral stability of the line, reduce the lateral displacement and vibration caused by the passage of the train, and ensure the safe travel of the train. The flush design makes it more convenient to perform maintenance and repair of the switch sleeper. Maintenance personnel can more easily access various parts of the switch sleeper and perform necessary inspections and maintenance operations, thereby improving the efficiency and quality of maintenance and repair. Due to the uniform force and stable connection, the wear between the switch sleeper and the inner friction plate will be reduced accordingly. This reduced wear helps extend the life of the switch ties and inner friction plates, reducing replacement frequency and cost.

[0031] The inner side surface of the inner friction plate 2 is vertically fixed to the end of the anchor end plate 3; the anchor end plate 3 is arranged at the end of the switch tie 6 and is closely aligned with the end of the switch tie 6; the anchor end plate 3 is pre-set with an anchor hole 31 and a steel bar hole 32 (combined with Figure 3 ); the anchor hole 31 is used to fix the anchor end plate 3; the steel bar hole 32 is used to tension the longitudinal steel bars; the inner friction plate 2 is installed with an anti-slurry cap 4; the inner friction plate 2 is vertically connected to the hook bar 1; the hook bar 1 is buried in the concrete to improve the bonding between the anchor plate assembly and the concrete. It should be noted that the inner side surface of the inner friction plate 2 is vertically fixed to the end of the anchor end plate 3. This design ensures the connection strength between the two and prevents loosening or displacement caused by uneven force. The anchor end plate 3 is arranged at the end of the switch sleeper 6 and is closely aligned with the end of the switch sleeper 6, which further enhances the connection stability between the anchor end plate and the switch sleeper, so that the entire anchoring system can more effectively resist external loads. The steel bar hole 32 reserved on the anchor end plate 3 is used to tension the longitudinal steel bars. This design enables the longitudinal steel bars to be arranged in a predetermined direction and position, thereby optimizing the force performance of the entire anchoring system. The hook bar 1 is embedded in the concrete and vertically connected to the inner friction plate 2, which not only improves the bonding between the anchor plate assembly and the concrete, but also enhances the crack resistance of the concrete, preventing anchor failure caused by concrete cracking. The prefabricated connection holes and threaded holes on the inner friction plate 2 simplify the installation process and improve construction efficiency. At the same time, the threaded connection also improves the reliability and stability of the connection, which is conducive to the control of construction quality.

[0032] In the above embodiment, as a further improvement of the present invention, the inner friction plate 2 and the anchor end plate 3 are vertically welded and fixedly connected as one. It should be noted that: by vertical welding, the inner friction plate 2 and the anchor end plate 3 form a rigid connection, which has higher strength and rigidity than non-welded connection (such as bolt connection), and can more effectively resist external loads and vibrations, thereby enhancing the structural stability of the entire anchor plate assembly. The welding connection can ensure the close fit between the inner friction plate and the anchor end plate, reduce the risk of connection failure caused by looseness, and ensure the long-term stable operation of the turnout system. The design of vertical welding connection makes the force transmission path clearer and more direct, and can more effectively transfer the load from the track to the anchor end plate through the inner friction plate, and then further transfer it to the foundation structure, reducing the loss and dispersion in the force transmission process. The welding connection can ensure that the stress distribution of the connection part is more uniform, reduce the risk of local damage caused by stress concentration, and improve the bearing capacity and service life of the entire anchor plate assembly. Compared with other connection methods (such as bolt connection), the welding connection has the advantages of fast construction speed and simple process, which can shorten the construction period and reduce the construction cost. The quality of welded connections can be ensured through welding processes and welding quality inspections, which makes quality control and acceptance easier than other connection methods. Due to the stability and durability of welded connections, the maintenance workload caused by loose or damaged connections is reduced, reducing maintenance costs.

[0033] In the above embodiment, as a further improvement of the present invention, the inner friction plate 2 is vertically welded to the hook bar 1. The vertical welding connection method forms a rigid connection between the inner friction plate 2 and the hook bar 1. This connection method has high strength and stability, can effectively resist external loads and vibrations, and thus enhance the structural stability of the entire anchor plate assembly. The welding connection can ensure the tightness and stability of the connection part, and reduce the risk of connection failure caused by looseness, which is crucial to ensure the long-term stable operation of the turnout system. The design of vertical welding connection makes the force transmission path more direct and efficient, and can more effectively transfer the load from the track to the hook bar 1 through the inner friction plate 2, and further transfer it to the turnout sleeper 6, reducing the loss and dispersion in the force transmission process. Compared with other connection methods (such as bolt connection), the welding connection has the advantages of fast construction speed and simple process. At the construction site, the connection between the inner friction plate 2 and the hook bar 1 can be quickly completed by welding equipment, shortening the construction period and improving the construction efficiency. The quality of the welding connection can be guaranteed by welding process and welding quality inspection. During the construction process, the welding quality can be ensured by controlling welding parameters, selecting appropriate welding materials and welding methods, thereby improving the reliability and durability of the entire anchor plate assembly. Due to the stability and durability of the welded connection, the maintenance workload caused by loose or damaged connections is reduced, and the maintenance cost is reduced. At the same time, the additional cost caused by replacing damaged parts is reduced, and the economic benefits are improved.

[0034] In the above embodiment, as a further improvement of the present invention, the anchoring end plate 3 is fixed on the switch sleeper mold template, and the concrete is poured after the longitudinal steel bars are tensioned through the steel bar holes 32. It should be noted that the fixing of the anchoring end plate 3 ensures the precise positioning of the longitudinal steel bars before pouring, and reduces the construction error caused by the displacement of the steel bars. After the longitudinal steel bars are tensioned through the steel bar holes 32, a stable steel bar skeleton can be formed, which provides good support for concrete pouring and helps to improve the overall stability of the switch sleeper. The longitudinal steel bars can significantly increase the bending stiffness of the concrete structure, thereby enhancing its bending bearing capacity, making the switch sleeper more stable and reliable when bearing train loads. The longitudinal steel bars can cause the concrete structure to produce shrinkage deformation and shear deformation under the action of external forces such as earthquakes, effectively reduce earthquake damage, and improve the seismic performance of the switch sleeper. The addition of longitudinal steel bars can reduce the discreteness of the concrete structure, make its overall performance more uniform, and help to increase the service life of the switch sleeper. This technology simplifies the construction process, reduces the adjustment work during the construction process, and helps to speed up the construction progress. As the railway develops in the direction of heavy load, higher requirements are put forward for the bearing capacity and stability of the switch sleeper. This technology enhances the performance of concrete structures, enabling them to better adapt to the operating requirements of heavy-load trains.

[0035] In the above embodiment, as a further improvement of the present invention: (such as Figure 4 As shown in the figure, there are two hook bars 1, which are symmetrically arranged on the inner friction plate 2; the two hook bars 1 are arranged on both sides of the embedded sleeve 5, and the hook bars 1 and the embedded sleeve 5 do not interfere with each other. It should be noted that the two hook bars 1 are symmetrically arranged on the inner friction plate 2. This layout can ensure the uniform transmission and dispersion of force and avoid structural deformation or damage caused by uneven force on one side. The firm connection between the hook bars 1 and the inner friction plate 2 and their being part of the overall structure enhance the stability of the entire anchoring system, making the entire structure more stable and reliable when subjected to external force. The arrangement of the two hook bars 1 enables them to share the load from the track together, reduces the force burden of a single hook bar, and improves the bearing capacity of the entire structure. The non-interference design of the hook bars 1 and the embedded sleeve 5 ensures a clear and efficient force transmission path and avoids force transmission loss or reduced efficiency caused by mutual interference. During the construction process, since the layout of the hook bars 1 and the embedded sleeve 5 is reasonable and non-interfering, construction personnel can more easily install and position them, simplifying the construction process.

[0036] In the above embodiment, as a further improvement of the present invention: (such as Figure 5As shown in the figure, the hook bar 1 is formed by bending a threaded steel bar, and the hook bar 1 is embedded in the concrete to be tightly combined with the concrete, thereby providing a gripping force for the entire turnout concrete sleeper. It should be noted that the surface of the threaded steel bar is threaded, and these threads can increase the contact area with the concrete, thereby forming a stronger mechanical bite force after the concrete solidifies. This bite force helps to tightly combine the hook bar with the concrete, thereby improving the stability and durability of the overall structure. The hook bar embedded in the concrete will produce a chemical reaction and physical combination with the concrete during the pouring and solidification of the concrete to form an inseparable whole. This tight combination can effectively prevent the relative sliding and separation between the hook bar and the concrete, ensuring that the turnout sleeper maintains stable performance during long-term use. As a reinforcing bar in the concrete structure, the hook bar can share the load from the track and transfer it to the surrounding concrete. This sharing effect can reduce the force burden of the concrete, improve its bearing capacity, and thus extend the service life of the turnout sleeper. When the turnout sleeper is subjected to a bending moment, the hook bar can exert its bending resistance and resist bending deformation together with the concrete. This synergy can significantly improve the bending stiffness and load-bearing capacity of the turnout sleeper, ensuring that it maintains a stable shape and performance when the train passes. The use of hook bars bent from threaded steel bars for pre-embedded construction can simplify the construction process and reduce the adjustment and correction work during the construction process. This simplification not only improves construction efficiency, but also helps to reduce construction costs. The hook bars bent from threaded steel bars can be customized and processed according to specific working conditions and needs to adapt to turnout sleepers of different sizes, shapes and requirements. This flexibility makes hook bars have a wide range of application prospects in railway construction. Because the hook bars are closely integrated with the concrete, potential problems can be more easily identified and located during later maintenance. This convenience helps to reduce maintenance costs and improve maintenance efficiency.

[0037] In the above embodiment, as a further improvement of the present invention, the anchor plate assembly is tightly combined with the concrete and forms an integral body with the switch sleeper 6. It should be noted that after the anchor plate assembly is tightly combined with the concrete and the switch sleeper, an integral force-bearing structure is formed. This integral structure can more effectively resist external loads and vibrations, and ensure the long-term stable operation of the turnout system. Through the overall combination, the load can be evenly dispersed, the local stress concentration phenomenon can be reduced, and the risk of structural damage can be reduced. The tight combination between the anchor plate assembly 2, the concrete and the switch sleeper 6 enables them to work together and jointly bear the load from the track. This synergy can significantly improve the bearing capacity of the entire turnout system and ensure that it can remain stable when a heavy-loaded train passes. The integrally combined structural design enhances the rigidity of the turnout system, making it less likely to deform when subjected to external forces, thereby improving its stability and durability. The tight combination of the anchor plate assembly and the concrete can reduce the wear caused by relative sliding, thereby extending the service life of the turnout system. Concrete has a certain protective effect on the anchor plate assembly, which can reduce the risk of corrosion and further extend its service life. The tight integration of the anchor plate assembly and concrete can be achieved during the concrete pouring process without the need for additional fixing steps, thus simplifying the construction process. The overall integration design of the anchor plate assembly with concrete and switch sleepers can adapt to different working conditions and load conditions, and different needs can be met by adjusting the specifications and layout of the anchor plate assembly.

[0038] In the above embodiment, as a further improvement of the present invention: the inner friction plate 2 and the switch sleeper 6 are in the same plane and are tightly combined; the anchoring end plate 3 is located at the end of the switch sleeper 6 and is tightly combined with the switch sleeper 6. It should be noted that the inner friction plate 2 and the switch sleeper 6 are tightly combined in the same plane, so that the entire structure can evenly distribute the load when subjected to force, reducing the possibility of local stress concentration, thereby improving the stability of the structure. The anchoring end plate 3 is located at the end of the switch sleeper 6 and is tightly combined with the switch sleeper, forming a strong anchoring effect, further enhancing the overall connection strength of the turnout structure, and ensuring that it will not loosen or move when the train passes. The tight combination of the inner friction plate 2 and the switch sleeper 6, and the anchoring effect of the anchoring end plate 3, enable the three to work together and jointly bear the load from the track. This collaborative load-bearing mechanism improves the load-bearing capacity of the turnout, ensuring that it can remain stable when a heavy-loaded train passes. The tight combination of the overall structure also increases the rigidity of the turnout, making it less likely to deform when subjected to external forces, thereby improving its load-bearing capacity and stability. The inner friction plate 2 and the switch sleeper 6 are tightly combined in the same plane, reducing the wear caused by relative sliding, thereby extending the service life of the turnout. The tight combination of the anchor end plate 3 and the switch sleeper 6 can also reduce the erosion of the internal structure by the external environment, such as rainwater, salt, etc., further protecting the durability of the turnout. This tightly combined design simplifies the construction process, reduces the steps of installation and adjustment, and improves construction efficiency. The tight combination of the overall structure also makes it easier to identify and locate potential problems during later maintenance, reducing maintenance costs and improving maintenance efficiency. This tightly combined design enables the turnout to adapt to different working conditions and load conditions, and to meet different needs by adjusting the specifications and layout of the inner friction plate 2 and the anchor end plate 3.

[0039] In the above embodiment, as a further improvement of the present invention, the inner friction plate 2 is prefabricated with a connection hole; the connection hole is a threaded hole, and the connection hole is screwed with the anti-slurry cap 4. It should be noted that the connection hole adopts a threaded design, so that the anti-slurry cap 4 can be easily connected or disassembled with the inner friction plate 2 by rotation. This connection method not only simplifies the installation process, but also improves the construction efficiency. When the anti-slurry cap 4 needs to be replaced or repaired, the threaded connection allows for quick and convenient disassembly and reinstallation, reducing maintenance time and cost. The threaded connection can ensure a tight fit between the anti-slurry cap 4 and the inner friction plate 2, effectively preventing the concrete slurry from penetrating into the connection hole during the pouring process, and ensuring the integrity and cleanliness of the structure. Compared with welding or other non-threaded connection methods, the threaded connection shows higher reliability in preventing liquid or gas leakage, especially under high pressure or high temperature environment. By adjusting the size and position of the threaded hole, it can adapt to anti-slurry caps 4 of different specifications and models to meet different engineering needs. During the installation process, if it is found that the fit between the anti-slurry cap 4 and the inner friction plate 2 is not tight enough or there are other problems, it can be adjusted by rotating the anti-slurry cap 4 to ensure the stability and reliability of the connection. The anti-slurry cap 4 can protect the connection hole from corrosion by concrete slurry and other impurities, thereby extending the service life of the connection hole. Threaded connection reduces the wear caused by relative sliding, reduces the loss rate of the connection parts, and further extends the service life of the overall structure. Threaded connection is a standardized connection method that helps to achieve standardization and normalization of the construction process and improve construction quality and efficiency. Compared with traditional welding or other non-standardized connection methods, threaded connection can reduce problems caused by construction errors and improve the stability and safety of the overall structure.

[0040] The working principle of the present invention is as follows: before pouring concrete, a switch sleeper mold is set up, and the anchor plate assembly of the present invention is fixed on the template without changing the existing template; the concrete is poured after the longitudinal steel bars are tensioned through the steel bar holes 32 of the anchor end plate 3; after the pouring is completed, the anchor plate assembly and the concrete are tightly combined to form a whole with the switch sleeper 6. The present invention solves the problem that the distance from the embedded sleeve to the end of the concrete switch sleeper is too small when the concrete switch sleeper is arranged in a small space; strengthens the support of the end of the concrete switch sleeper, and effectively prevents the problem of cracking of the end concrete; the anchor end plate 3 and the inner friction plate 2 are vertically welded together to strengthen the overall stability of the concrete switch sleeper, and enhance the support of the end of the switch sleeper 6 to the embedded sleeve 5, which plays a role in protecting the embedded sleeve. The inner friction plate 2 of the present invention can enhance the bonding force between the inner friction plate 2 and the concrete; the inner friction plate 2 is welded with a hook 1, and the hook 1 provides a gripping force for the entire component; the hook 1 of the present invention is embedded in the concrete to ensure the bonding of the anchor end plate 3 with the concrete. The present invention prevents concrete slurry from overflowing, and an anti-slurry cap 4 is arranged on the lower side of the inner friction plate 2.

[0041] From the above description, it can be found that the anchor plate assembly for the end of the turnout concrete sleeper, which is composed of the hook bar 1, the inner friction plate 2, the anchor end plate 3 and the anti-slurry cap 4, has significant technical advantages in terms of enhancing connection strength, improving friction coefficient, dispersing stress, improving anchoring performance, enhancing corrosion resistance, preventing slurry leakage and improving sealing. These advantages work together on the concrete turnout sleeper system, ensuring the stability and reliability of the railway turnout and improving the safety and efficiency of railway transportation.

[0042] The design of the inner friction plate 2 vertically connected to the anchor end plate 3 of the present invention brings significant technical advantages in terms of structural stability, force transmission path optimization, friction performance improvement, construction and maintenance convenience, and overall durability. These advantages work together in the anchor plate assembly for the end of the turnout concrete tie, ensuring the stable operation and long-term reliability of the railway turnout system.

[0043] The design of the upper surface of the inner friction plate 2 being flush with the upper surface of the switch tie 6 of the present invention brings significant technical advantages in ensuring uniform force, improving overall stability, optimizing roadbed resistance, facilitating maintenance and repair, and extending service life. These advantages work together in the switch system to ensure the stability and reliability of the railway switch.

[0044] The design of the inner friction plate 2 and the anchor end plate 3 being vertically welded and fixedly connected as one body in the present invention shows significant technical advantages in terms of structural stability, force bearing performance, construction and maintenance convenience, and economic benefits. This design method can ensure the stable operation and long-term reliability of the turnout system, and provide a strong guarantee for the safety and efficiency of railway transportation.

[0045] The technical advantages of the vertically welded hook bar 1 of the inner friction plate 2 of the present invention are mainly reflected in the enhancement of structural stability, optimization of force performance, improvement of construction efficiency and quality control, and improvement of economic benefits. This connection method can ensure the stable operation and long-term reliability of the turnout system, and provide a strong guarantee for the safety and efficiency of railway transportation.

[0046] The technology of fixing the anchor end plate 3 on the turnout sleeper mold template and pouring concrete after tensioning the longitudinal steel bars through the steel bar holes 32 has significant advantages such as improving construction accuracy and stability, enhancing the performance of the concrete structure, improving construction efficiency and safety, and being suitable for modern railway construction. These advantages have led to the technology being widely used and promoted in railway turnout construction.

[0047] The hook bar 1 of the present invention has two symmetrically arranged on the inner friction plate 2 and arranged on both sides of the embedded sleeve 5 without interfering with each other, which shows significant technical advantages in terms of enhancing structural stability, improving force bearing performance, facilitating construction and maintenance, and adaptability and flexibility. These advantages make the design widely used in railway turnouts, bridges and other projects, and help improve project quality and safety.

[0048] The hook bar 1 of the present invention is formed by bending a threaded steel bar and pre-buried in concrete, providing a strong gripping force and technical advantages for the entire turnout concrete sleeper. These advantages include enhanced bonding strength, improved bearing capacity, improved construction efficiency and quality control, and adaptability and flexibility, which together ensure the stability and safety of the turnout sleeper during railway operation.

[0049] The anchor plate assembly of the present invention is closely combined with concrete and forms an integral whole with the turnout sleeper, which has significant technical advantages, not only improving the structural stability and bearing capacity of the turnout system, but also extending its service life, simplifying the construction process and improving the construction quality. These advantages together ensure the safety and reliability of the turnout system in railway operation.

[0050] The technical advantages of the inner friction plate 2 and the switch tie 6 being in the same plane and tightly combined, and the anchor end plate 3 being located at the end of the switch tie 6 and tightly combined with the switch tie are remarkable, which not only improves the structural stability and bearing capacity of the turnout, but also prolongs its service life and simplifies the construction and maintenance process. These advantages together ensure the safety and reliability of the turnout in railway operation.

[0051] The technical advantages of the prefabricated connection holes of the inner friction plate 2 and the threaded hole design and the screw-connected anti-slurry cap 4 of the present invention are mainly reflected in the convenience of installation and disassembly, improved sealing performance, adaptability and flexibility, extended service life and improved construction quality. These advantages together provide strong support for the construction and maintenance of turnouts or other related structures.

[0052] In summary, the present invention strengthens the support of the concrete switch sleeper, effectively shortens the distance from the embedded sleeve to the end of the concrete switch sleeper, meets the special needs of small space arrangement, solves problems such as concrete cracking and embedded sleeve damage, and ensures driving safety.

[0053] It should be understood that although the present specification is described according to an implementation method, the implementation method does not only include an independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in this embodiment can also be appropriately arranged and combined to form other implementation methods that can be understood by those skilled in the art.

[0054] The above preferred embodiments are not intended to limit the scope of implementation of the present invention, so all equivalent changes made to the contents described in the claims of the present invention should be included in the scope of the claims of the present invention; it should be noted that the components and materials used in the above embodiments are commercially available unless otherwise specified.

Claims

1. An anchor plate assembly for a turnout concrete tie end, characterized in that: It is composed of hook reinforcement (1), inner friction plate (2), anchor end plate (3) and anti-slurry cap (4); The inner friction plate (2) is vertically fixedly connected to the anchoring end plate (3); the upper surface of the inner friction plate (2) is flush with the upper surface of the switch sleeper (6); the inner side surface of the inner friction plate (2) is vertically fixedly connected to the end of the anchoring end plate (3); The anchoring end plate (3) is arranged at the end of the switch sleeper (6) and is closely aligned with the end of the switch sleeper (6); the anchoring end plate (3) is pre-prepared with an anchoring hole (31) and a steel bar hole (32); the anchoring hole (31) is used to fix the anchoring end plate (3); the steel bar hole (32) is used to tension the longitudinal steel bar; The inner friction plate (2) is installed with an anti-slurry cap (4); the inner friction plate (2) is vertically connected to the hook reinforcement (1); the hook reinforcement (1) is embedded in concrete to improve the bonding property between the anchor plate assembly and the concrete.

2. The anchor plate assembly for the end of a turnout concrete tie according to claim 1, characterized in that: The inner friction plate (2) and the anchoring end plate (3) are vertically welded and fixedly connected as one.

3. The anchor plate assembly for the end of a turnout concrete tie according to claim 1 or 2, characterized in that: The inner friction plate (2) is vertically welded and fixedly connected to the hook reinforcement (1).

4. The anchor plate assembly for the end of a turnout concrete tie according to claim 1 or 2, characterized in that: The anchoring end plate (3) is fixed on the switch sleeper mold template, and concrete is poured after longitudinal steel bars are tensioned through the steel bar holes (32).

5. The anchor plate assembly for the end of a turnout concrete tie according to claim 3, characterized in that: The hook bars (1) have two hook bars (1), which are symmetrically arranged on the inner friction plate (2); the two hook bars (1) are arranged on both sides of the embedded sleeve (5), and the hook bars (1) and the embedded sleeve (5) do not interfere with each other.

6. The anchor plate assembly for the end of a turnout concrete tie according to claim 5, characterized in that: The hook bar (1) is formed by bending a threaded steel bar. The hook bar (1) is embedded in the reinforcement concrete and is used to be tightly combined with the concrete, thereby providing a gripping force for the entire turnout concrete sleeper.

7. The anchor plate assembly for the end of a turnout concrete tie according to claim 1, characterized in that: The anchor plate assembly is tightly combined with the concrete and forms a whole with the switch sleeper (6).

8. The anchor plate assembly for the end of a turnout concrete tie according to claim 1 or 2, characterized in that: The inner friction plate (2) and the switch sleeper (6) are in the same plane and are tightly combined; the anchoring end plate (3) is located at the end of the switch sleeper (6) and is tightly combined with the switch sleeper (6).

9. The anchor plate assembly for the end of a turnout concrete tie according to claim 8, characterized in that: The inner friction plate (2) has a prefabricated connection hole; the connection hole is a threaded hole, and the connection hole is threadedly connected to an anti-slurry cap (4).