Fast-assembly variable-amplitude telescopic material distribution device

Through the design of the quick-loaded telescopic fabric device, the combination of the first-level standard fabric device and the second-level telescopic fabric device is used to solve the problem of large space occupied by the pump truck and inconvenient chute displacement, and realize the efficient fabric of concrete and pouring improves construction efficiency and quality.

CN118958295AActive Publication Date: 2024-11-15SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD

Patent Information

Application Number
CN202411111687.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-15
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

In the prior art, the large space occupied by pump trucks leads to limited release quantity and inconvenient chute shifting and transitioning.

Method used

A quick-loaded telescopic fabric device is designed, including a first-level standard fabric device and a second-level telescopic fabric device. It is detachably installed on the fixed members of the building by clamping components, and uses rotary components and telescopic components. The pump pipe realizes flexible conveying of concrete, solving the problems of large space occupied by the pump truck and inconvenient chute displacement.

Benefits of technology

The casting construction efficiency of large bottom plates and other parts is improved, and the efficient fabric and casting of concrete is achieved, which solves the problems of limited number of pump trucks and inconvenient chute displacement, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958295A_ABST
    Figure CN118958295A_ABST
Patent Text Reader

Abstract

The invention provides a fast-assembly variable-amplitude telescopic material distribution device which comprises a first-stage standard material distribution device and a second-stage telescopic variable-amplitude material distribution device, and the first-stage standard material distribution device and the second-stage telescopic variable-amplitude material distribution device are detachably installed on a fixing component of a building through clamping assemblies. A feeding port of the first-level standard material distributing device is located below a discharging port of the pump truck, a discharging port of the first-level standard material distributing device extends to the position above a feeding port of the second-level telescopic variable-amplitude material distributing device, and a discharging port of the second-level telescopic variable-amplitude material distributing device extends to the pouring position. And concrete in the pump truck is pumped to a pouring position through the first-stage standard material distribution device and the second-stage telescopic variable-amplitude material distribution device. The invention relates to the technical field of concrete distribution devices, and can solve the problems of limited number of simultaneously put trucks and pumps and inconvenience in chute displacement and transition in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete placing devices, and in particular to a quick-installation variable-length telescopic placing device. Background Art

[0002] At present, during the pouring of large base plates, concrete is usually pumped by concrete pump trucks. Although the concrete distribution of pump trucks is more flexible, the hydraulic legs need to be deployed when the pump truck is set up, which occupies a large area, restricting the number of pump trucks deployed at the same time, and thus limiting the pouring speed of the large base plate.

[0003] The chute is a traditional concrete conveying device. It relies on the concrete to slide down and can greatly increase the concrete spreading speed. Compared with the concrete spreading method of the pump truck, the chute saves more concrete spreading costs. However, the traditional chute adopts a fixed installation and requires a stable and reliable erection point. It has disadvantages such as difficult erection, inconvenient shifting and transfer, and fixed spreading range.

[0004] Therefore, it is necessary to provide a quick-installation variable-length telescopic material distribution device that can solve the problems in the prior art of limited number of vehicle pumps that can be put into operation at the same time and inconvenient chute shifting and transfer. Summary of the invention

[0005] The object of the present invention is to provide a quick-installation variable-length telescopic material placing device, which can solve the problems in the prior art of limited number of simultaneous delivery of vehicle pumps and inconvenient chute shifting and transfer.

[0006] In order to achieve the above object, the technical solution of the present invention is:

[0007] A quick-installation variable-length telescopic material distribution device comprises: a primary standard material distribution device and a secondary telescopic variable-length material distribution device, wherein the primary standard material distribution device and the secondary telescopic variable-length material distribution device are both detachably mounted on a fixed component of a building through a clamping assembly, and a feed port of the primary standard material distribution device is located below a discharge port of a pump truck, a discharge port of the primary standard material distribution device extends to above a feed port of the secondary telescopic variable-length material distribution device, and a discharge port of the secondary telescopic variable-length material distribution device extends to a pouring position, so that concrete in the pump truck is pumped to the pouring position through the primary standard material distribution device and the secondary telescopic variable-length material distribution device.

[0008] The first-level standard material distribution device and the second-level telescopic variable-length material distribution device both include a hopper, a rotary assembly and a material distribution pump pipe; the clamping assembly is installed on the outer wall of the hopper, so that the hopper is fixed to the fixed component of the building through the clamping assembly; the rotary assembly is rotatably connected between the discharge port at the bottom of the hopper and the upper end of the material distribution pump pipe, the hopper of the first-level standard material distribution device is located below the discharge port of the pump truck, the lower end of the material distribution pump pipe of the first-level standard material distribution device extends to above the hopper of the second-level telescopic variable-length material distribution device, and the lower end of the material distribution pump pipe of the second-level telescopic variable-length material distribution device extends to the casting position.

[0009] The rotary assembly comprises a rotary pump pipe, a rotary arm and a variable amplitude pump pipe; the fixed pipe section of the rotary pump pipe is fixedly connected to the discharge port at the bottom of the hopper, and the rotary arm is fixedly arranged on the rotary pipe section of the rotary pump pipe; the bottom of the rotary pipe section of the rotary pump pipe is rotatably connected to the top of the variable amplitude section of the variable amplitude pump pipe through a latch, the variable amplitude section of the variable amplitude pump pipe forms an obtuse angle with the pump pipe section, and the pump pipe section of the variable amplitude pump pipe is connected to the upper end of the material distribution pump pipe.

[0010] In the first-level standard material distribution device, the material distribution pump pipe includes several sections of standard pump pipe main body, and the several sections of standard pump pipe main body are connected end to end in sequence to form a first-level pumping pipeline; the upper end of the first-level pumping pipeline is connected to the pump pipe section of the variable-length pump pipe, and the lower end of the first-level pumping pipeline extends to above the hopper of the second-level telescopic variable-length material distribution device.

[0011] In the two-stage telescopic variable-length material distribution device, the material distribution pump pipe includes a telescopic rail pump pipe, a telescopic large pump pipe and a telescopic adjustment component. The upper end of the telescopic rail pump pipe is connected to the pump pipe section of the variable-length pump pipe; a telescopic rail is formed on the telescopic rail pump pipe, and a track guide wheel matching the telescopic rail is installed on the telescopic large pump pipe, so that the telescopic large pump pipe can be telescopically connected to the telescopic rail pump pipe; the telescopic adjustment component is installed on the slewing arm and the variable-length pump pipe of the two-stage telescopic variable-length material distribution device and is connected to the telescopic large pump pipe, so that the lower end of the telescopic large pump pipe can be telescopically extended to the casting position or over an obstacle.

[0012] The telescopic adjustment component includes an electric hoist, a basket hook, a wire rope, a wire rope guide wheel group and a pulley group; the electric hoist is arranged on the slewing arm, and one end of the wire rope is connected to the variable-length pump pipe through the basket hook; at least one group of wire rope guide wheel groups is installed on the pump pipe section of the variable-length pump pipe, and several groups of wire rope guide wheel groups are installed at intervals on the outer wall of the telescopic large pump pipe. The pulley group is installed on the outer wall of the telescopic large pump pipe and is located between the several groups of wire rope guide wheel groups, so that the other end of the wire rope is connected to the pulley group after winding through each group of wire rope guide wheel groups in turn.

[0013] The fixed component of the building comprises a trestle board and a supporting beam, and the clamping assembly comprises a first clamping assembly clamped on the trestle board and a second clamping assembly clamped on the supporting beam.

[0014] The first clamping assembly includes several groups of clamping units arranged on both sides of the hopper, and each group of clamping units includes a vertical plate, an adjusting rail, a first fixed plate, a clamping plate, an adjusting rail wheel, connecting bolts and a clamping hook plate; the vertical plate is fixedly installed on the outer wall of the hopper, one end of the adjusting rail is vertically fixedly connected to the vertical plate, the first fixed plate is fixedly installed on the top of the adjusting rail, and the clamping plate is fixedly installed on the bottom of the adjusting rail; two groups of adjusting rail wheels are slidably arranged on the adjusting rail; several connecting bolts are arranged at intervals on the top of the two groups of adjusting rail wheels and are fixedly connected to the upper end of the clamping hook plate, a number of waist-shaped holes are formed on the first fixed plate, and a number of connecting bolts pass through the several waist-shaped holes respectively; the bottom of the clamping hook plate is an L-shaped structure, so that the clamping plate and the horizontal sections of the L-shaped structure of the clamping hook plate are clamped on the top and bottom surfaces of the trestle plate respectively.

[0015] The second clamping assembly includes a second fixed plate, a support foot track, a hopper support foot, a leg, a spiral push rod, a roller, a hopper support plate and an operating platform; one end of the second fixed plate and the support foot track are respectively arranged on the outer wall of the hopper, and a group of rollers are respectively installed on the top of the hopper support foot, and the rollers are slidably installed on a support foot track and locked and fixed; one end of a pair of legs and one end of the spiral push rod are connected to the hopper support plate, and the other end of the pair of legs slides through the hopper support foot, and the spiral push rod rotates through the hopper support foot, so that the hopper support plate can be adjustably installed on the hopper support foot and is arranged opposite to the other end of the second fixed plate, so that the other ends of the hopper support plate and the second fixed plate can be clamped on the two side surfaces of the support beam respectively; the operating platform is installed on the hopper support foot.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] 1. The present invention is provided with a primary standard material distribution device and a secondary telescopic variable-length material distribution device. The primary standard material distribution device can be installed on the trestle board through the first clamping assembly, and the secondary telescopic variable-length material distribution device can be installed on the support beam through the second clamping assembly. The concrete is transported to the primary standard material distribution device by the pump truck on the trestle board, and the primary standard material distribution device transports the concrete to the secondary telescopic variable-length material distribution device, and then the secondary telescopic variable-length material distribution device transports the concrete to the pouring position, so as to complete the concrete distribution and pouring operations, thereby solving the problem that the pump truck in the prior art occupies a large space and cannot be poured in large quantities. At the same time, the convenient disassembly and assembly of the first clamping assembly and the second clamping assembly solves the problem of inconvenient chute shifting and transfer in the prior art, which is conducive to improving the pouring construction efficiency of large base plates and the like.

[0018] 2. In the present invention, due to the first clamping assembly and the second clamping assembly, the first clamping assembly is clamped on the trestle board by multiple groups of clamping units symmetrically arranged on both sides of the hopper, which can adapt to trestle boards of different thicknesses; the second clamping assembly is clamped on the two side surfaces of the support beam by a pair of second fixed plates and multiple hopper support plates, which can adapt to support beams of different widths and can simultaneously ensure the convenience of disassembly and assembly and the firmness of installation of the first-level standard cloth device and the second-level telescopic variable-length cloth device; at the same time, according to actual installation requirements, the first-level standard cloth device and the second-level telescopic variable-length cloth device can be flexibly combined with the first clamping assembly and the second clamping assembly, which has higher adaptability and flexibility for different installation scenarios.

[0019] 3. Since the present invention is provided with a swivel assembly, a standard pump pipe body, a telescopic rail pump pipe and a telescopic large pump pipe, the swivel assembly can be used to adjust the conveying direction and angle of the standard pump pipe body, the telescopic rail pump pipe and the telescopic large pump pipe to the concrete, thereby ensuring that the concrete distribution can meet the requirements of the pouring construction, improving the construction efficiency while ensuring the construction quality; at the same time, the standard pump pipe body can be flexibly spliced ​​according to the actual distribution distance, and the telescopic rail pump pipe and the telescopic large pump pipe can be flexibly telescopically adjusted according to the pouring position and the obstacle position, which can be suitable for concrete pouring at different positions and has high safety in use. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0021] Figure 1 It is a schematic diagram of the installation of the quick-install variable-length telescopic material distribution device of the present invention;

[0022] Figure 2 It is a three-dimensional diagram of the quick-install variable-length telescopic material distribution device of the present invention;

[0023] Figure 3 It is a three-dimensional diagram of the rotary assembly in the quick-install variable-length telescopic material distribution device of the present invention;

[0024] Figure 4 It is a stereoscopic diagram of the rotary assembly, telescopic rail pump pipe and telescopic large pump pipe of the second-stage telescopic variable-luffing material distributing device in the quick-install variable-luffing telescopic material distributing device of the present invention;

[0025] Figure 5 It is a three-dimensional diagram of the hopper and the first clamping assembly in the quick-install variable-length telescopic material distribution device of the present invention;

[0026] Figure 6 It is a three-dimensional diagram of the clamping unit in the quick-installation variable-length telescopic material distribution device of the present invention;

[0027] Figure 7 It is a three-dimensional diagram of the shoulder pole beam of the clamping unit in the quick-install variable-length telescopic material distribution device of the present invention;

[0028] Figure 8 It is a three-dimensional diagram of the adjustment hook plate of the clamping unit in the quick-install variable-length telescopic material distribution device of the present invention;

[0029] Fig. 9 It is a three-dimensional diagram of the hopper and the second clamping assembly in the quick-install variable-length telescopic material distribution device of the present invention;

[0030] Fig.10 It is a three-dimensional diagram of the hopper, the second fixed plate and the support rail in the quick-install variable-length telescopic material distribution device of the present invention;

[0031] Fig.11 It is a partial side view of the second clamping assembly in the quick-install variable-length telescopic material distribution device of the present invention.

[0032] In the figure, 100 is a first-level standard material distribution device, 200 is a second-level telescopic variable-length material distribution device, 300 is a trestle board, 400 is a support beam, 1 is a hopper, 2 is a rotary assembly, 201 is a rotary pump pipe, 202 is a rotary arm, 203 is a variable-length pump pipe, 204 is a latch, 205 is an ear plate, 206 is a retaining pipe, 3 is a standard pump pipe body, 4 is a telescopic track pump pipe, 5 is a telescopic large pump pipe, 501 is a track guide wheel, 601 is an electric hoist, 602 is a flower basket hook, 603 is a steel wire rope, 604 is a steel wire rope guide wheel group, 605 is a sliding Wheel set, 606 guide wheel seat, 607 pulley seat, 7 clamping unit, 701 vertical plate, 702 adjusting track, 703 first fixed plate, 704 clamping plate, 705 adjusting track wheel, 706 connecting bolt, 707 clamping hook plate, 708 stiffening plate, 709 square steel pipe, 8 second clamping assembly, 801 second fixed plate, 802 support foot track, 803 hopper support foot, 804 support leg, 805 screw push rod, 806 roller, 807 hopper support plate, 808 operating platform. DETAILED DESCRIPTION

[0033] The following is a further detailed description of a quick-install variable-length telescopic material distribution device proposed by the present invention in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become more apparent from the following description and claims. It should be noted that the accompanying drawings are in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0034] Please see attached Figure 1 and attached Figure 2A quick-installation variable-length telescopic material distribution device comprises a primary standard material distribution device 100 and a secondary telescopic variable-length material distribution device 200. Both the primary standard material distribution device 100 and the secondary telescopic variable-length material distribution device 200 are detachably mounted on a fixed component of a building through a clamping assembly, and a feed port of the primary standard material distribution device 100 is located below a discharge port of a pump truck (not shown in the figure), a discharge port of the primary standard material distribution device 100 extends to above a feed port of the secondary telescopic variable-length material distribution device 200, and a discharge port of the secondary telescopic variable-length material distribution device 200 extends to a pouring position, so that concrete in the pump truck is pumped to the pouring position through the primary standard material distribution device 100 and the secondary telescopic variable-length material distribution device 200.

[0035] For the concrete pouring of large bottom plates and other components of deep foundation pits, due to the large pouring area and deep position, neither the traditional pump truck pouring nor the traditional chute pouring can meet the construction requirements well. The combination of the first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200 is used to replace the traditional chute, and the concrete above is transported to the pouring position at the bottom of the pit below in combination with the pump truck to achieve the distribution and pouring of concrete, which solves the problem of the limited number of pump trucks due to the large space occupied in the prior art. At the same time, the first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200 can be detachably installed on the fixed components of the building, with flexible installation positions, convenient and quick disassembly and displacement, thus solving the problem of inconvenient chute displacement and transfer in the prior art, with a high turnover rate, which is conducive to ensuring the pouring efficiency and pouring quality of the large bottom plate.

[0036] Please see attached Figure 2 The first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200 both include a hopper 1, a rotary assembly 2 and a material distribution pump pipe; the clamping assembly is installed on the outer wall of the hopper 1, so that the hopper 1 is fixed to the fixed component of the building through the clamping assembly; the rotary assembly 2 is rotatably connected between the discharge port at the bottom of the hopper 1 and the upper end of the material distribution pump pipe, the hopper 1 of the first-level standard material distribution device 100 is located below the discharge port of the pump truck, the lower end of the material distribution pump pipe of the first-level standard material distribution device 100 extends to above the hopper 1 of the second-level telescopic variable-length material distribution device 200, and the lower end of the material distribution pump pipe of the second-level telescopic variable-length material distribution device 200 extends to the casting position.

[0037] The hopper 1 of the primary standard material distribution device 100 is used to receive the concrete pumped by the pump truck, and transport it to the secondary telescopic variable-length material distribution device 200 through its material distribution pump pipe. The hopper 1 of the secondary telescopic variable-length material distribution device 200 is used to receive the concrete transported by the material distribution pump pipe of the primary standard material distribution device 100, and transport it to the pouring position through its material distribution pump pipe to achieve concrete distribution.

[0038] The material distribution pump pipes of the first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200 are arranged in an oblique downward direction. The rotary component 2 has a rotation function, which can rotate and adjust the arrangement direction of the material distribution pump pipes of the first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200, so as to facilitate the accurate downward transportation of concrete to the pouring position.

[0039] Please see attached Figure 3 The rotary assembly 2 includes a rotary pump pipe 201, a rotary arm 202 and a variable amplitude pump pipe 203; the fixed pipe section of the rotary pump pipe 201 is fixedly connected to the discharge port at the bottom of the hopper 1 through a flange, and the rotary arm 202 is fixedly arranged on the rotary pipe section of the rotary pump pipe 201; the bottom of the rotary pipe section of the rotary pump pipe 201 is rotatably connected to the top of the variable amplitude section of the variable amplitude pump pipe 203 through the pin 204 and the ear plate 205, the variable amplitude section of the variable amplitude pump pipe 203 forms an obtuse angle with the pump pipe section, and the pump pipe section of the variable amplitude pump pipe 203 is connected to the upper end of the material distribution pump pipe.

[0040] Preferably, the rotary pump pipe 201 may include a fixed pipe section and a rotary pipe section, the fixed pipe section and the rotary pipe section are coaxially plugged circular pipe structures, the fixed pipe section is used to be fixedly connected to the hopper 1 through a flange and bolts, and is easy to disassemble and assemble, and the rotary pipe section can rotate relative to the fixed pipe section with its central axis as the rotation axis, thereby driving the variable amplitude pump pipe 203 and the material distribution pump pipe to rotate synchronously, and realizing the adjustment of the pumping direction of the concrete. The rotary pump pipe 201 is a common component in concrete pump pipes, and its specific structure and rotation process are not repeated here.

[0041] The diameter of the rotating pipe section of the rotary pump pipe 201 is slightly larger than the diameter of the fixed pipe section. The rotating arm 202 is installed on the rotating pipe section of the rotary pump pipe 201. The rotating arm 202 rotates synchronously with the rotating pipe section of the rotary pump pipe 201 to form a cantilever arm, which is convenient for the installation of other components such as wire ropes.

[0042] Preferably, the bottom of the rotating pipe section of the rotary pump pipe 201 is rotatably connected to the ear plate 205 at the top of the variable amplitude section of the variable amplitude pump pipe 203 through the pin 204, so that the variable amplitude pump pipe 203 can rotate upward or downward around the pin 204, thereby adjusting the concrete delivery and distribution angle of the distribution pump pipe and controlling the sliding speed of the concrete.

[0043] Please see attached Figure 2 In the first-level standard material distribution device 100, the material distribution pump pipe includes several sections of standard pump pipe main body 3, and the several sections of standard pump pipe main body 3 are connected end to end in sequence through flanges to form a first-level pumping pipeline; the upper end of the first-level pumping pipeline is connected to the pump pipe section of the variable amplitude pump pipe 203, and the lower end of the first-level pumping pipeline extends to above the hopper 1 of the second-level telescopic variable amplitude material distribution device 200.

[0044] According to the hopper spacing of the first-level standard material distribution device 100 and the second-level telescopic variable-length material distribution device 200, the standard pump pipe body 3 of appropriate length and quantity can be selected, and two adjacent standard pump pipe bodies 3 can be connected by flanges and bolts to meet the concrete transportation distance requirements in different projects.

[0045] Preferably, a lifting lug can be installed on each section of the standard pump pipe body 3, and a plurality of lifting holes can be reserved on the swivel arm 202. The lifting lugs of the plurality of standard pump pipe bodies 3 are respectively connected to the plurality of lifting holes of the swivel arm 202 through steel wire ropes, thereby facilitating the pulling of the standard pump pipe body 3, thereby ensuring the installation and use stability of the primary pumping pipeline, and facilitating the rotation of the primary pumping pipeline up and down to adjust the pumping angle, so as to ensure that the lower end of the primary pumping pipeline can accurately extend to above the hopper 1 of the secondary telescopic variable amplitude material distribution device 200.

[0046] Please see attached Figure 4 In the two-stage telescopic variable-length material distribution device 200, the material distribution pump pipe includes a telescopic rail pump pipe 4, a telescopic large pump pipe 5 and a telescopic adjustment component. The upper end of the telescopic rail pump pipe 4 is connected to the pump pipe section of the variable-length pump pipe 203; a telescopic rail (not shown in the figure) is formed on the telescopic rail pump pipe 4, and a track guide wheel 501 matching the telescopic rail is installed on the telescopic large pump pipe 5, so that the telescopic large pump pipe 5 can be telescopically connected to the telescopic rail pump pipe 4; the telescopic adjustment component is installed on the rotating arm 202 and the variable-length pump pipe 203 of the two-stage telescopic variable-length material distribution device 200 and is connected to the telescopic large pump pipe 5, so that the lower end of the telescopic large pump pipe 5 can be telescopically extended to the casting position or over an obstacle.

[0047] The large telescopic pump pipe 5 can make coaxial telescopic motion relative to the telescopic track pump pipe 4 through the telescopic track and the telescopic guide wheel 501, so that the concrete can be transported to a suitable pouring height more accurately. At the same time, the large telescopic pump pipe 5 can be raised to avoid obstacles such as beams during displacement, thereby preventing the large telescopic pump pipe 5 from colliding with obstacles in the building structure and being damaged, thereby ensuring the mobility and safety of the entire device.

[0048] Please see attached Figure 4The telescopic adjustment component includes an electric hoist 601, a basket hook 602, a wire rope 603, a wire rope guide wheel group 604 and a pulley group 605; the electric hoist 601 is arranged on the slewing arm 202, and one end of the wire rope 603 is connected to the variable amplitude pump pipe 203 through the basket hook 602; at least one group of wire rope guide wheel groups 604 is installed on the pump pipe section of the variable amplitude pump pipe 203 through the guide wheel seat 606, and a plurality of groups of wire rope guide wheel groups 604 are installed on the outer wall of the telescopic large pump pipe 5 at intervals through the guide wheel seat 606, and the pulley group 605 is installed on the outer wall of the telescopic large pump pipe 5 through the pulley seat 607 and is located between the plurality of groups of wire rope guide wheel groups 604, so that the other end of the wire rope 603 is connected to the pulley group 605 after winding through each group of wire rope guide wheel groups 604 in turn.

[0049] The electric hoist 601 can be connected to the wire rope 603 to provide a pulling force for the wire rope 603, so that the wire rope 603 pulls the telescopic large pump pipe 5 upwards, causing it to rise axially relative to the telescopic track pump pipe 4, or the wire rope 603 releases the telescopic large pump pipe 5 downwards, causing it to descend axially relative to the telescopic track pump pipe 4 by its own weight. The electric hoist 601 is used to effectively control the telescopic large pump pipe 5 to a suitable height and then stop, and the wire rope 603 is fixed to the variable amplitude pump pipe 203 through the basket hook 602 to keep the connection length between the telescopic large pump pipe 5 and the telescopic track pump pipe 4 fixed.

[0050] Preferably, two steel wire ropes 603 can be used, symmetrically arranged on both sides of the telescopic track pump pipe 4 and the telescopic large pump pipe 5; the wire rope guide wheel group 604 is used to provide guidance and traction for the two steel wire ropes 603, and the pulley group 605 is used to connect the ends of the two steel wire ropes 603 to ensure that the telescopic large pump pipe 5 can be stably telescoped under the traction control of the two steel wire ropes 603.

[0051] Please see attached Figure 1 and attached Figure 2 The fixed components of the building include a trestle board 300 and a support beam 400, and the clamping assembly includes a first clamping assembly clamped on the trestle board 300 and a second clamping assembly 8 clamped on the support beam 400.

[0052] During the construction of a deep foundation pit, a trestle board 300 is usually constructed on the top of the first support beam 400 to allow pump trucks and other machinery to pass through. Preferably, the first clamping assembly through which the first-level standard material distribution device 100 passes can be fixed on the trestle board 300, which is stable to install and easy and quick to disassemble.

[0053] With the construction of the deep foundation pit, multiple support beams 400 are constructed downward in sequence. The secondary telescopic variable amplitude material distribution device 200 can be fixed to the support beam 400 of the corresponding height through the second clamping assembly 8 according to the casting height requirement. The installation is stable and the disassembly and assembly are convenient and quick.

[0054] The first clamping assembly and the second clamping assembly enable the entire device to be flexibly installed on the existing fixed components of the building in the foundation pit. The first clamping assembly and the second clamping assembly can be adaptively selected according to the size and shape of the fixed components, achieving quick installation and quick removal functions while ensuring reliable installation.

[0055] Please see attached Figure 5 To Attachment Figure 8 The first clamping assembly includes a plurality of groups of clamping units 7 arranged on both sides of the hopper 1, and each group of clamping units 7 includes a vertical plate 701, an adjusting track 702, a first fixed plate 703, a clamping plate 704, an adjusting track wheel 705, a connecting bolt 706 and a clamping hook plate 707; the vertical plate 701 is fixedly mounted on the outer wall of the hopper 1 by a plurality of bolts, one end of the adjusting track 702 is vertically fixedly connected to the vertical plate 701 by a stiffening plate 708, the first fixed plate 703 is fixedly mounted on the top of the adjusting track 702 by a square steel pipe 709, and the clamping plate 704 is fixedly installed at the bottom of the adjusting track 702; two groups of adjusting track wheels 705 are slidably arranged on the adjusting track 702; a number of connecting bolts 706 are spaced apart at the top of the two groups of adjusting track wheels 705 and are fixedly connected to the upper end of the clamping hook plate 707, a number of waist-shaped holes are formed on the first fixed plate 703, and a number of connecting bolts 706 respectively penetrate the number of waist-shaped holes; the bottom of the clamping hook plate 707 is an L-shaped structure, so that the clamping plate 704 and the horizontal section of the L-shaped structure of the clamping hook plate 707 are respectively clamped on the top and bottom surfaces of the trestle plate 300.

[0056] The vertical plate 701, the adjustment track 702, the first fixed plate 703, and the clamping plate 704 constitute a shoulder beam, which is installed on the hopper 1 through the vertical plate 701 by bolts, so as to facilitate the installation and use of the hopper 1. The vertical plate 701, the first fixed plate 703, the clamping plate 704, and the stiffening plate 708 can be made of steel plates, and the adjustment track 702 can be made of I-beams. The shoulder beam is welded into an integrated structure with high structural strength.

[0057] The adjusting track wheel 705, the connecting bolt 706 and the clamping hook plate 707 constitute the adjusting hook plate. The two sets of adjusting track wheels 705 can roll along the waist-shaped holes on both sides of the web of the I-beam, so that the clamping hook plate 707 has a small adjustment function. The connecting bolt 706 can be installed above the adjusting track wheel 705 through the mounting plate, and a nut can be installed on the mounting plate. The connecting bolt 706 is controlled to move upward or downward through the thread transmission by the rotation of the nut. The connecting bolt 706 drives the clamping hook plate 707 to move upward or downward synchronously, thereby adjusting the distance between the horizontal section of the L-shaped structure of the clamping hook plate 707 and the clamping plate 704 to adapt to different thicknesses of the trestle board 300, ensuring that the clamping unit 7 is firmly and reliably clamped on the trestle board 300.

[0058] During installation, a unit plate of the trestle plate 300 can be disassembled, and the hopper 1 is placed in the hollowed-out portion of the disassembled unit plate, and is fixed to the unit plates on both sides of the unit plate through four groups of clamping units 7 to ensure the installation reliability of the hopper 1. Preferably, four groups of clamping units 7 can be provided, and the number of clamping units 7 can also be adjusted according to actual needs. The clamping units 7 can be symmetrically or asymmetrically arranged, so as to ensure that the clamping can also adapt to the installation on the installation surfaces of different heights on both sides.

[0059] Please see attached Fig. 9 To Attachment Fig.11 The second clamping assembly 8 includes a second fixed plate 801, a support rail 802, a hopper support 803, a leg 804, a screw push rod 805, a roller 806, a hopper support plate 807 and an operating platform 808; one end of the second fixed plate 801 and the support rail 802 are respectively arranged on the outer wall of the hopper 1, a group of rollers 806 are respectively installed on the top of the hopper support 803, and the rollers 806 are slidably installed on a support rail 802 and fixed by bolts; a pair of legs 804 One end and one end of the spiral push rod 805 are connected to the hopper support plate 807, the other end of a pair of legs 804 slides through the hopper support foot 803, and the spiral push rod 805 rotates and passes through the hopper support foot 803, so that the hopper support plate 807 can be adjustably installed on the hopper support foot 803 and is arranged opposite to the other end of the second fixed plate 801, so that the other ends of the hopper support plate 807 and the second fixed plate 801 can be clamped on the two side surfaces of the support beam 400 respectively; the operating platform 808 is installed on the hopper support foot 803.

[0060] Preferably, the second fixed plate 801 and the support foot rail 802 are symmetrically arranged in a pair, and a hopper support foot 803 is correspondingly installed on each support foot rail 802 through a roller 806. The hopper support foot 803 can move along the support foot rail 802 through the roller 806, so as to adjust the distance between the hopper support foot 803 and the second fixed plate 801 (that is, adjust the distance between the hopper support plate 807 and the second fixed plate 801), so that the hopper support plate 807 and the second fixed plate 801 are clamped on the two side surfaces of the support beam 400, and the support foot rail 802 is placed on the top surface of the support beam 400, and the roller 806 is locked by means of bolt locking, etc., so as to ensure that the second clamping assembly 8 stably fixes the hopper 1 on the support beam 400.

[0061] Preferably, the two legs 804, the screw push rod 805 and the hopper support plate 807 serve as a set of fine-tuning components, and two sets of fine-tuning components can be arranged on each hopper support foot 803. The screw push rod 805 is vertically screwed to the hopper support foot 803 through a thread, and the two legs 804 vertically penetrate the hopper support foot 803 and are located above and below the screw push rod 805, respectively, to improve the adjustment stability and linearity of the screw push rod 805. When the screw push rod 805 rotates forward or backward, it can drive the hopper support plate 807 to move away from the hopper support foot 803 or close to the hopper support foot 803, so that the hopper support plate 807 is pressed against the side of the support beam 400 or separated from the support beam 400, thereby ensuring the pressing effect of the hopper support foot 803 on the support beam 400.

[0062] An operating platform 808 is installed between the two hopper legs 803 to provide a standing space for construction workers, thereby facilitating the clamping or loosening adjustment operations of each group of fine-tuning components.

[0063] Please see attached Figure 1 To Attachment Fig.11 The conventional installation method of the present invention is: the primary standard material distribution device 100 is installed on the trestle board 300 through the first clamping assembly, the pump truck travels on the trestle board 300, and pumps concrete into the hopper 1 of the primary standard material distribution device 100. The secondary telescopic variable-length material distribution device 200 is installed on the support beam 400 of the foundation pit through the second clamping assembly 8, and the hopper 1 of the secondary telescopic variable-length material distribution device 200 is located at the lower end of the primary pumping pipeline of the primary standard material distribution device 100, and the lower end of the telescopic large pump pipe 5 of the secondary telescopic variable-length material distribution device 200 extends to the pouring position, so that the concrete is transported to the pouring position through the primary standard material distribution device 100 and the secondary telescopic variable-length material distribution device 200, so as to realize the distribution and pouring construction of concrete.

[0064] Among them, the installation method of the first-level standard material distribution device 100 on the trestle board 300 is: four groups of clamping units 7 of the first clamping assembly are installed on both sides of the hopper 1, and the four groups of clamping units 7 are connected to the two unit plates of the trestle board 300 on both sides of the hopper 1, so as to fix the hopper 1 on the trestle board 300.

[0065] According to the direction of concrete delivery, the extension direction of the variable amplitude pump pipe 203 is adjusted by horizontally rotating the rotary pump pipe 201. At the same time, according to the delivery requirements of concrete, the variable amplitude pump pipe 203 is rotated up and down by the latch 204 so that the angle between its pump pipe section and the horizontal plane meets the concrete distribution requirements to ensure that the concrete can be transported downward at the designed speed. Preferably, a stopper 206 can be provided on the latch 204 to limit the rotation angle of the variable amplitude section of the variable amplitude pump pipe 203.

[0066] After the adjustment is completed, the ear plate 205 and the latch 204 are locked and fixed, and then according to the installation height of the secondary telescopic variable-length material distribution device 200, a suitable number of standard pump pipe bodies 3 are selected and connected to the pump pipe sections of the variable-length pump pipe 203 in sequence through bolts and flanges, so that they extend to the hopper of the secondary telescopic variable-length material distribution device 200. After each section of the standard pump pipe body 3 is installed, it can be connected to the hoisting holes reserved on the slewing arm 203 through steel wire ropes, thereby improving the load-bearing capacity of the standard pump pipe body 3.

[0067] According to the width of the support beam 400, first adjust the distance between the hopper support foot 803 and the second fixed plate 801 by the roller 806, and lock the roller 806 so that a pair of second fixed plates 801, a pair of support foot rails 802 and a pair of hopper support feet 803 form an inverted U-shaped structure with a width slightly larger than the width of the support beam 400, so that the secondary telescopic variable amplitude cloth device 200 can be hung on the support beam 400.

[0068] The construction worker stands on the operating platform 808 and rotates the screw push rod 805, and uses the threaded transmission between the screw push rod 805 and the hopper support foot 803 to move the hopper support plate 807 toward the side of the support beam 400 and press it against the support beam 400, so that the four hopper support plates 807 and a pair of second fixed plates 801 clamp the support beam 400 from both sides, thereby making the secondary telescopic variable-length material distribution device 200 stably installed on the support beam 400.

[0069] Similar to the first-level standard material distribution device 100, according to the position of concrete pouring, the extension direction of the telescopic rail pump pipe 4 and the telescopic large pump pipe 5 of the second-level telescopic variable-length material distribution device 200 is adjusted by the rotary pump pipe 201, and the extension angle of the telescopic rail pump pipe 4 and the telescopic large pump pipe 5 is adjusted by the variable-length pump pipe 203 via the pin 204 and the ear plate 205, which will not be repeated here.

[0070] The electric hoist 601 is used to pull the telescopic large pump pipe 5 through the wire rope 603, so that the telescopic large pump pipe 5 is telescopic relative to the telescopic track pump pipe 4, and the lower end of the telescopic large pump pipe 5 is extended to the pouring position, and the wire rope 603 is connected to the variable-length pump pipe 203 through the basket hook 602. After the adjustment is completed, the concrete can be transported to the first-level standard distribution device 100 by the pump truck, and then the concrete is distributed to the second-level telescopic variable-length distribution device 200 through the first-level standard distribution device 100, and finally distributed to the pouring position through the telescopic large pump pipe 5, so as to realize the efficient distribution and pouring process of concrete, and the efficiency of a single point distribution worker reaches 100-120m 3 / h.

[0071] When the pouring position changes, the primary standard material distribution device 100 and / or the secondary telescopic variable-length material distribution device 200 can be disassembled according to the actual working conditions. Since both the primary standard material distribution device 100 and the secondary telescopic variable-length material distribution device 200 have rotation and length adjustment functions, they can be disassembled and installed at the same time or independently according to the requirements of adjusting concrete delivery, thereby achieving rapid disassembly and assembly and efficient construction while meeting the concrete distribution requirements, and having higher flexibility in use. The installation of a single set of the primary standard material distribution device 100 and the secondary telescopic variable-length material distribution device 200 only takes about 30 minutes, and the flexible disassembly and assembly method of the simplified first clamping assembly and the second clamping assembly greatly improves the turnover rate of the device.

[0072] When moving or rotating the secondary telescopic variable-length material-laying device 200, interference and collision are inevitable due to the presence of building components such as the support beam 400 in the deep foundation pit. The telescopic large pump pipe 5 can be pulled by the electric hoist 601 through the wire rope 603 to move it upward to avoid obstacles and ensure the safety of construction, thereby realizing cross-warehouse material laying and greatly expanding the material laying range.

[0073] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A quick-installation variable-length telescopic material distribution device, It is characterized in that include: A first-level standard material distribution device (100) and a second-level telescopic variable-length material distribution device (200) are both detachably mounted on a fixed component of a building via a clamping assembly, and a feed port of the first-level standard material distribution device (100) is located below a discharge port of a pump truck, a discharge port of the first-level standard material distribution device (100) extends to above a feed port of the second-level telescopic variable-length material distribution device (200), and a discharge port of the second-level telescopic variable-length material distribution device (200) extends to a pouring position, so that concrete in the pump truck is pumped to the pouring position via the first-level standard material distribution device (100) and the second-level telescopic variable-length material distribution device (200).

2. The quick-installation variable-length telescopic material distribution device according to claim 1, It is characterized in that The first-level standard material distribution device (100) and the second-level telescopic variable-length material distribution device (200) both comprise a hopper (1), a rotary assembly (2) and a material distribution pump pipe; the clamping assembly is mounted on the outer wall of the hopper (1), so that the hopper (1) is fixed to a fixed component of a building through the clamping assembly; the rotary assembly (2) is rotatably connected between the discharge port at the bottom of the hopper (1) and the upper end of the material distribution pump pipe; the hopper (1) of the first-level standard material distribution device (100) is located below the discharge port of the pump truck; the lower end of the material distribution pump pipe of the first-level standard material distribution device (100) extends to above the hopper (1) of the second-level telescopic variable-length material distribution device (200); and the lower end of the material distribution pump pipe of the second-level telescopic variable-length material distribution device (200) extends to the casting position.

3. The quick-installation variable-length telescopic material distribution device according to claim 2, It is characterized in that The rotary assembly (2) comprises a rotary pump pipe (201), a rotary arm (202) and a variable amplitude pump pipe (203); the fixed pipe section of the rotary pump pipe (201) is fixedly connected to the discharge port at the bottom of the hopper (1), and the rotary arm (202) is fixedly arranged on the rotary pipe section of the rotary pump pipe (201); the bottom of the rotary pipe section of the rotary pump pipe (201) is rotatably connected to the top of the variable amplitude section of the variable amplitude pump pipe (203) via a latch (204); the variable amplitude section of the variable amplitude pump pipe (203) forms an obtuse angle with the pump pipe section, and the pump pipe section of the variable amplitude pump pipe (203) is connected to the upper end of the material distribution pump pipe.

4. The quick-installation variable-length telescopic material distribution device according to claim 3, It is characterized in that In the first-level standard material distribution device (100), the material distribution pump pipe comprises a plurality of sections of standard pump pipe main bodies (3), and the plurality of sections of standard pump pipe main bodies (3) are connected end to end in sequence to form a first-level pumping pipeline; the upper end of the first-level pumping pipeline is connected to the pump pipe section of the variable amplitude pump pipe (203), and the lower end of the first-level pumping pipeline extends to the top of the hopper (1) of the second-level telescopic variable amplitude material distribution device (200).

5. The quick-installation variable-length telescopic material distribution device according to claim 3 or 4, It is characterized in that In the two-stage telescopic variable-length material distribution device (200), the material distribution pump pipe comprises a telescopic rail pump pipe (4), a telescopic large pump pipe (5) and a telescopic adjustment component; the upper end of the telescopic rail pump pipe (4) is connected to the pump pipe section of the variable-length pump pipe (203); a telescopic rail is formed on the telescopic rail pump pipe (4); a track guide wheel (501) matching the telescopic rail is installed on the telescopic large pump pipe (5), so that the telescopic large pump pipe (5) can be telescopically connected to the telescopic rail pump pipe (4); the telescopic adjustment component is installed on the slewing arm (202) and the variable-length pump pipe (203) of the two-stage telescopic variable-length material distribution device (200) and is connected to the telescopic large pump pipe (5), so that the lower end of the telescopic large pump pipe (5) can be telescopically extended to the casting position or over an obstacle.

6. The quick-installation variable-length telescopic material distribution device according to claim 5, It is characterized in that The telescopic adjustment component comprises an electric hoist (601), a basket hook (602), a steel wire rope (603), a steel wire rope guide wheel group (604) and a pulley group (605); the electric hoist (601) is arranged on the slewing arm (202), and one end of the steel wire rope (603) is connected to the variable amplitude pump pipe (203) through the basket hook (602); at least one group of steel wire rope guide wheel groups (604) is installed on the pump pipe section of the variable amplitude pump pipe (203), and a plurality of groups of steel wire rope guide wheel groups (604) are installed on the outer wall of the telescopic large pump pipe (5) at intervals; the pulley group (605) is installed on the outer wall of the telescopic large pump pipe (5) and is located between the plurality of groups of steel wire rope guide wheel groups (604), so that the other end of the steel wire rope (603) is connected to the pulley group (605) after winding through each group of steel wire rope guide wheel groups (604) in sequence.

7. The quick-installation variable-length telescopic material distribution device according to claim 2, It is characterized in that The fixed component of the building comprises a trestle board (300) and a support beam (400), and the clamping assembly comprises a first clamping assembly clamped on the trestle board (300) and a second clamping assembly (8) clamped on the support beam (400).

8. The quick-installation variable-length telescopic material distribution device according to claim 7, It is characterized in that The first clamping assembly comprises a plurality of groups of clamping units (7) arranged on both sides of the hopper (1), and each group of clamping units (7) comprises a vertical plate (701), an adjusting track (702), a first fixed plate (703), a clamping plate (704), an adjusting track wheel (705), a connecting bolt (706) and a clamping hook plate (707); the vertical plate (701) is fixedly mounted on the outer wall of the hopper (1), one end of the adjusting track (702) is vertically fixedly connected to the vertical plate (701), the first fixed plate (703) is fixedly mounted on the top of the adjusting track (702), and the clamping plate (704) is fixedly mounted At the bottom of the adjustment track (702); two groups of adjustment track wheels (705) are slidably arranged on the adjustment track (702); a plurality of connecting bolts (706) are arranged at intervals on the top of the two groups of adjustment track wheels (705) and are fixedly connected to the upper end of the clamping hook plate (707); a plurality of waist-shaped holes are formed on the first fixed plate (703), and a plurality of connecting bolts (706) respectively penetrate the plurality of waist-shaped holes; the bottom of the clamping hook plate (707) is in an L-shaped structure, so that the clamping plate (704) and the horizontal section of the L-shaped structure of the clamping hook plate (707) are respectively clamped on the top surface and the bottom surface of the trestle plate (300).

9. The quick-installation variable-length telescopic material distribution device according to claim 7, It is characterized in that The second clamping assembly (8) comprises a second fixed plate (801), a support rail (802), a hopper support foot (803), a support leg (804), a screw push rod (805), a roller (806), a hopper support plate (807) and an operating platform (808); one end of the second fixed plate (801) and the support rail (802) are respectively arranged on the outer wall of the hopper (1); a group of rollers (806) are respectively installed on the top of the hopper support foot (803); the rollers (806) can be slidably installed on a support rail (802) and locked and fixed; a pair of legs (804) One end and one end of the spiral push rod (805) are connected to the hopper support plate (807), the other end of a pair of legs (804) slides through the hopper support foot (803), and the spiral push rod (805) rotates through the hopper support foot (803), so that the hopper support plate (807) can be adjustably installed on the hopper support foot (803) and is arranged opposite to the other end of the second fixed plate (801), so that the other ends of the hopper support plate (807) and the second fixed plate (801) can be clamped on the two side surfaces of the support beam (400) respectively; the operating platform (808) is installed on the hopper support foot (803).

Citation Information

Patent Citations

  • Concrete placement system in floor and construction method thereof

    CN108086687A

  • Multi-stage movable concrete spreader

    CN112482767A

  • Distribution system for tunnel lining and trolley

    CN212272232U

  • Large-volume concrete pouring chute device for super-thick bottom plate of deep foundation pit in narrow site

    CN214573967U

Cited By

  • Reverse construction method well concrete pouring device

    CN120967959A