Upward sublevel open-stoping subsequent filling mining method
By dividing the ore body into stops and pillars along the strike, and using subsequent cementation and waste rock/tailings backfilling methods, combined with segmented roadways and drilling roadways to form the initial blasting space, the problems of high cost and large cutting volume in existing technologies have been solved, realizing efficient and safe segmented open space backfilling in underground metal mining.
Patent Information
- Application Number
- CN202411185014.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-15
AI Technical Summary
The existing open-field backfilling method is costly and involves a large amount of cutting in underground metal mining, especially in terms of the selection of backfill materials and the implementation of backfilling processes.
The upward segmented open-pit subsequent backfilling mining method is adopted. The ore blocks are divided into stops and pillars along the ore body strike. The pillars are backfilled with cemented cement, and the stops are backfilled with waste rock or tailings. The initial blasting space is formed by segmented roadways and drilling roadways. The ore is extracted by upward medium-deep holes and segmented ore extraction. The stope is rationally arranged to reduce the amount of mining and cutting work.
It reduced backfilling costs, optimized the underground mining site structure, effectively reduced the amount of mining and cutting work, and improved mining efficiency and safety.
Smart Images

Figure CN118958980A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground metal mining, in particular to an upward segmented empty field and subsequent filling mining method. Background Art
[0002] With the continuous development of mining resource development, resource development has gradually shifted from the surface to underground, and from shallow to deep. The occurrence conditions of underground rock masses are comprehensively affected by geological factors such as structure and hydrology, and their mechanical properties have become more complex.
[0003] The filling operation cost of the prior art empty field subsequent filling method is relatively high, especially in the selection of filling materials and the implementation of the filling process, and the cutting amount of the engineering ball in the prior art is too large. Summary of the invention
[0004] In order to solve a technical problem existing in the prior art, an embodiment of the present invention provides an upward segmented empty field subsequent filling mining method to solve the problems of high cost and large cutting amount existing in the prior art. The technical solution is as follows:
[0005] An upward segmented open pit subsequent filling mining method comprises:
[0006] S1. Divide the ore body into blocks along the ore body strike, wherein the block division includes: ore rooms and ore pillars, and perform mining and cutting on the ore rooms and ore pillars;
[0007] The ore pillars and the mine room reach each segment level through the auxiliary ramp to form a segmented tunnel, the segmented tunnel runs through the ore chute and return air shaft corresponding to each segment position, and a segmented connecting road is excavated from the segmented tunnel to the ore body to the ore body footwall;
[0008] Dig rock tunnels from the segmented connecting road to the ore body, dig cutting grooves and cutting wells at the ends of the ore pillars and mine rooms to obtain the initial blasting space;
[0009] S2, mining the pillars and using subsequent cementation filling;
[0010] S3. The mining chamber is backfilled with waste rock or tailings.
[0011] Optionally, the lime-sand ratio in the subsequent cementitious filling is 1:4.
[0012] Optionally, the mining of the pillar in S2 and subsequent cementation filling include:
[0013] S201, withdraw mining from the end of the ore pillar towards the direction of the segmented connecting road, and drill and mine in segments;
[0014] S202, the ore pillars are subsequently cemented and filled, and the filled ore pillars form artificial ore pillars at both ends of the mine room.
[0015] Optionally, the mining of the mine room in S3 and filling with waste rock or tailings thereafter include:
[0016] S301, withdraw mining from the end of the mine room toward the direction of the segmented connecting road, and drill and mine in segments;
[0017] S302, filling the mine room with waste rock or tailings.
[0018] Optionally, the ventilation mode of the mining area where the ore body is located is: local fan duct extraction ventilation;
[0019] The polluted air in the mining area where the ore body is located is extracted through the air duct arranged in the segmented connecting channel and then discharged into the return air shaft and then to the upper middle section.
[0020] Optionally, the length of the pillar is 20m, the length of the mine chamber is 60m, the widths of the pillar and the mine chamber are both the thickness of the ore body, and the segmented heights of the pillar and the mine chamber are both 20m.
[0021] The beneficial effects brought about by the technical solution provided by the embodiment of the present invention include at least:
[0022] By adopting the above technical scheme, the ore body is divided into mine rooms and pillars along the strike, and the mining is carried out in two steps. The pillars are filled with subsequent cementation, and the mine rooms are filled with waste rock / tailings. Reasonable layout is carried out according to the ore body conditions, the underground mining area is optimized, and the filling cost is reduced; connecting roads are excavated through each horizontal segmented tunnel, and rock drilling tunnels are constructed from the connecting roads to the ore body, and cutting grooves and cutting wells are excavated to form an initial blasting space; the ore is dropped from the upper medium-deep hole, and the mining is withdrawn from the end of the mine room (pillar) to the connecting road. The ore is removed in stages, the rock is drilled in stages, and the filling is concentrated. The mining and cutting projects are reasonably maximized. The rock drilling tunnel is used as the ore exit tunnel during the mining process, which effectively reduces the amount of mining and cutting projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 It is a front view of the upward segmented empty field and subsequent filling mining method of the present invention;
[0025] Figure 2A side view of the upward segmented empty field and subsequent filling mining method of the present invention;
[0026] Figure 3 It is a top view of the upward segmented empty field and subsequent filling mining method of the present invention.
[0027] Reference numerals:
[0028] 1- chute, 2- middle transport tunnel, 3- segment tunnel, 4- segment connecting road, 5- rock drilling tunnel, 6- cutting trough, 7- cutting well, 8- return air well, 9- water filtration filling retaining wall, 10- mine pillar, 11- mine room, 12- cementation filling body, 13- tailings filling body, 14- auxiliary ramp, 15- filling false tunnel. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one", "one" or "the" do not indicate a quantitative limitation, but indicate the existence of at least one. Words such as "include" or "comprise" mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.
[0031] It should be noted that the terms "up", "down", "left", "right", "front", "back", etc. used in the present invention are only used to indicate relative position relationships. When the absolute position of the object being described changes, the relative position relationship may also change accordingly.
[0032] The empty-site and subsequent filling mining method is widely used in the mining of steeply inclined ore deposits. This mining method combines the empty-site method with the filling method. The empty-site method is used to recover the ore pillars in the mine room, and the filling method is combined to fill the empty area of the mining site.
[0033] The method of the present invention optimizes the structure of the mine room and the ore pillar, and uses the rock drilling tunnel to carry out the mining work in the later stage, thereby reducing the amount of mining and cutting engineering, improving the engineering construction efficiency, and having great significance for realizing the safe and efficient mining of steeply inclined ore beds. According to the strike of the ore body, the ore block is divided into the mine room and the ore pillar, and the mining is carried out in two steps. The ore pillar is filled with subsequent cementation, and the mine room is filled with waste rock / tailings; by excavating connecting roads with each horizontal segmented tunnel, the rock drilling tunnel is constructed from the connecting road to the ore body, and the cutting groove and cutting well are excavated to form the initial blasting space; the ore is dropped from the upper medium-deep hole, and the mining is withdrawn from the end of the mine room (pillar) to the connecting road, and the mining is carried out in stages, the rock is drilled in stages, and the filling is concentrated; the present invention arranges the mining field reasonably according to the ore body conditions, reduces the filling cost, reasonably maximizes the use of mining and cutting engineering, and uses the rock drilling tunnel as the mining tunnel, which effectively reduces the amount of mining and cutting engineering. The specific scheme is as follows:
[0034] like Figures 1 to 3 As shown, an upward segmented empty field and subsequent filling mining method comprises:
[0035] S1, dividing the ore body into blocks along the ore body strike, wherein the ore block division includes: a mine room 11 and a mine pillar 10, and performing mining and cutting on the mine room 11 and the mine pillar 10;
[0036] The ore pillars 10 and the mine room 11 reach the level of each segment through the auxiliary ramp 14 to form a segmented tunnel 3, and the segmented tunnel 3 penetrates the ore chute 1 and the return air shaft 8 corresponding to each segment position, and a segmented connecting road 4 is excavated from the segmented tunnel 3 to the ore body to the ore body footwall;
[0037] A rock drilling tunnel 5 is excavated from the segmented connecting road 4 to the ore body, and a cutting groove 6 and a cutting shaft 7 are excavated at the ends of the ore pillar 10 and the ore room 11 to obtain an initial blasting space;
[0038] S2, mining the pillar 10 and using subsequent cementing filling, wherein the lime-sand ratio in the subsequent cementing filling is 1:4;
[0039] S201, withdrawing mining from the end of the ore pillar 10 toward the direction of the segmented connecting road 4, and drilling and mining in segments;
[0040] S202 , the ore pillars 10 are subsequently cemented and filled, and the filled ore pillars 10 form artificial ore pillars 10 at both ends of the mine room 11 .
[0041] S3, recovering the ore chamber 11 and filling it with waste rock or tailings.
[0042] S301, withdraw mining from the end of the mine room 11 toward the direction of the segmented connecting road 4, and drill and mine in segments;
[0043] S302, filling the mine room 11 with waste rock or tailings.
[0044] Wherein, the ventilation mode of the mining area where the ore body is located is: local fan duct extraction ventilation;
[0045] The polluted air in the mining area where the ore body is located is extracted through the air duct arranged in the segmented connecting road 4 and then discharged into the return air shaft 8 and discharged to the upper middle section.
[0046] The specific principles of this method are as follows:
[0047] First, the ore body is divided into ore blocks along the strike direction. The ore blocks include a mine room 11 and a mine pillar 10. The mine pillar 10 and the mine room 11 are mined and cut;
[0048] Then, the mining column 10 is first mined and subsequently cemented and filled with a lime-sand ratio of 1:4;
[0049] Finally, the mining chamber 11 is mined and filled with waste rock / tailings;
[0050] The ore pillars 10 and the mine room 11 reach the level of each section through the auxiliary ramp 14 to form the section tunnel 3, which runs through the chute 1 and the return air shaft 8 between each section. From the section tunnel 3, the section connecting road 4 is excavated to the ore body to the foot wall of the ore body, and the rock drilling tunnel 5 is excavated from the section connecting road 4 to the ore body. To the end of the ore pillar 10 (room), the cutting groove 6 and the cutting shaft 7 are excavated to form the initial blasting space.
[0051] The mining of the mine room 11 and the mine pillar 10 includes the following steps:
[0052] 1) First, drill and mine, using upward fan-shaped medium-deep holes to mine, withdraw from the end of the mine room 11 (column) to the direction of the segmented connecting road 4, drill and mine in sections. Drill and mine are all carried out under the stable ore body roof to ensure production safety;
[0053] 2) Then filling is carried out. After the mining of the ore chamber 11 is completed, both ends of the ore chamber 11 are filled with cemented filling bodies to form artificial ore pillars 10, and the ore chamber 11 is filled with waste rock / tailings.
[0054] The ore is mined by drilling in sections and the middle section is filled in a centralized manner to complete the mining and filling work of the ore pillar 10. After the artificial ore pillar 10 is formed, the mining of the mine room 11 is carried out.
[0055] The mine ventilation adopts local fan + duct exhaust ventilation. The mine polluted air is extracted through the duct arranged in the segmented connecting channel 4 and then discharged into the return air shaft 8 and discharged to the upper middle section.
[0056] The length of the ore pillar 10 is 20 m, the length of the ore chamber 11 is 60 m, the widths of the ore pillar 10 and the ore chamber 11 are both equal to the thickness of the ore body, and the segmented heights of the ore pillar 10 and the ore chamber 11 are both 20 m.
[0057] In the goaf formed after the mining of the pillar 10 is completed, an artificial false tunnel is pre-buried in the segmented connecting road 4 of the lowest section to form the next middle section filling false tunnel 15, and the void area is cemented and filled to form an artificial pillar 10 to provide support for the mining of the mine room 11; in the goaf formed after the mining of the mine room 11 is completed, the bottom 5m height is cemented and filled to form a false roof for the mining of the next middle section of the mine room 11, and the remaining void area is filled with waste rock / tailings.
[0058] In a specific implementation method, a certain mine is affected by a fault, and the ore deposit is not exposed on the surface. It is a concealed layered ore deposit. At the same time, it is affected by weathering. The ore deposit can be divided into an oxidation zone, a mixed zone and a primary zone from top to bottom. The mining section includes two ore bodies (15m and 13m thick respectively), which are located in two high-grade mineralized layers. The two ore bodies are parallel in occurrence, with a dip of SE and a dip angle of about 70°. The lithology of the mineralized layers is talc shale, breccia and siltstone.
[0059] The stope is arranged along the strike of the ore body. Pillar 10 is 20m long, chamber 11 is 60m long, and the width of pillar 10 (chamber) is the thickness of the ore body. The ore block includes one chamber 11 and one pillar 10, and the section height is 20m. Three sections in the middle section are mined simultaneously, and the rock is drilled and the ore is mined in sections, and the middle section is filled in a centralized manner. The mining and filling work of pillar 10 is completed first, and the mining work of chamber 11 is carried out after the artificial pillar 10 is formed. The RSF and SDB ore bodies are mined simultaneously, and the SDB ore body is mined slightly ahead of the RSF ore body. The mining order between the middle sections is from top to bottom.
[0060] Through the auxiliary ramp 14, the segmented tunnels 3 are formed at the level of each segment, and the chute 1 and the return air shaft 8 between each segment are connected. From the segmented tunnel 3, the segmented connecting road 4 is excavated toward the ore body to the SDB ore body footwall, and the rock drilling tunnel 5 is excavated from the segmented connecting road 4 toward the ore body to the end of the ore pillar 10 (room), and the cutting groove 6 and the cutting shaft 7 are excavated to form the initial blasting space.
[0061] The mine is mined in upward fan-shaped medium-deep holes with a blasthole spacing of 2m. The blasting sequence is from top to bottom, and the mining is withdrawn from the end of the mine room 11 (column) to the direction of the segmented connecting road 4. The rock drilling and ore extraction are carried out in sections. Rock drilling and ore extraction are carried out under the stable ore body roof to ensure production safety.
[0062] The mine ventilation adopts local fan + duct exhaust ventilation. The mine polluted air is extracted through the duct arranged in the segmented connecting channel 4 and then discharged into the return air shaft 8 and discharged to the upper middle section.
[0063] After the mining of the pillar 10 is completed, two goafs with a size of 20m×13-15m×60m are formed. An artificial false tunnel is pre-buried in the segmented connecting road 4 of the lowest section to form the next middle section filling false tunnel 15. The empty area is cemented and filled to form an artificial pillar 10 to provide support for the mining of the mine room 11. After the mining of the mine room 11 is completed, two goafs with a size of 60m×13-15m×60m are formed. The bottom 5m high is cemented and filled to form the false roof of the next middle section mine room 11, and the remaining empty area is filled with tailings.
[0064] By adopting the above technical scheme, the ore body is divided into a mine room 11 and a pillar 10 along the strike direction, and the mining is carried out in two steps. The pillar 10 is filled with subsequent cementation, and the mine room 11 is filled with waste rock / tailings. The mine is reasonably arranged according to the ore body conditions, the underground mining area is optimized, and the filling cost is reduced; by excavating connecting roads with each horizontal segmented tunnel 3, a rock drilling tunnel 5 is constructed from the connecting road to the ore body, and a cutting groove 6 and a cutting well 7 are excavated to form an initial blasting space; the ore is dropped from the upper medium-deep hole, and the mining is withdrawn from the end of the mine room 11 (pillar) to the connecting road, and the ore is removed in stages, the rock is drilled in stages, and the filling is concentrated, so as to reasonably maximize the utilization of the mining and cutting project. In the mining process, the rock drilling tunnel 5 is used as the ore exit tunnel, which effectively reduces the amount of mining and cutting projects.
[0065] The following points need to be explained:
[0066] (1) The drawings of the embodiments of the present invention only involve structures related to the embodiments of the present invention. Other structures may refer to conventional designs.
[0067] (2) For the sake of clarity, in the drawings used to describe the embodiments of the present invention, the thickness of layers or regions is exaggerated or reduced, that is, these drawings are not drawn according to the actual scale. It is understood that when an element such as a layer, film, region or substrate is referred to as being "on" or "under" another element, the element may be "directly" "on" or "under" the other element or there may be intermediate elements.
[0068] (3) In the absence of conflict, the embodiments of the present invention and the features therein may be combined with each other to obtain new embodiments.
[0069] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. The protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. An upward segmented empty field and subsequent filling mining method, characterized in that: include: S1. Divide the ore body into blocks along the ore body strike, wherein the block division includes: ore rooms and ore pillars, and perform mining and cutting on the ore rooms and ore pillars; The ore pillars and the mine room reach each segment level through the auxiliary ramp to form a segmented tunnel, the segmented tunnel runs through the ore chute and return air shaft corresponding to each segment position, and a segmented connecting road is excavated from the segmented tunnel to the ore body to the ore body footwall; Dig rock tunnels from the segmented connecting road to the ore body, dig cutting grooves and cutting wells at the ends of the ore pillars and mine rooms to obtain the initial blasting space; S2, mining the pillars and using subsequent cementation filling; S3. The mining chamber is backfilled with waste rock or tailings.
2. The upward segmented empty field subsequent filling mining method according to claim 1 is characterized in that: The lime-sand ratio in the subsequent cemented filling is 1:
4.
3. The upward segmented empty field subsequent filling mining method according to claim 2 is characterized in that: The mining of the pillars in S2 and subsequent cementation filling include: S201, withdraw mining from the end of the ore pillar towards the direction of the segmented connecting road, and drill and mine in segments; S202, the ore pillars are subsequently cemented and filled, and the filled ore pillars form artificial ore pillars at both ends of the mine room.
4. The upward segmented empty field subsequent filling mining method according to claim 3 is characterized in that: The mining of the mine room in S3 and subsequent filling with waste rock or subsequent filling with tailings include: S301, withdraw mining from the end of the mine room toward the direction of the segmented connecting road, and drill and mine in segments; S302, filling the mine room with waste rock or tailings.
5. The upward segmented empty field subsequent filling mining method according to claim 4 is characterized in that: The ventilation method of the mining area where the ore body is located is: local fan duct extraction ventilation; The polluted air in the mining area where the ore body is located is extracted through the air duct arranged in the segmented connecting channel and then discharged into the return air shaft and then to the upper middle section.
6. The upward segmented empty field subsequent filling mining method according to claim 5 is characterized in that: The length of the pillar is 20m, the length of the mine chamber is 60m, the width of the pillar and the mine chamber are both the thickness of the ore body, and the segmented height of the pillar and the mine chamber are both 20m.
Citation Information
Cited By
Method for forming two-step stope cutting well by high-stage open stope subsequent filling method
CN120968615A
A method for forming a two-step stope cutting well in a high-stage open stope subsequent filling method
CN120968615B