Ventilation monitoring system for double-track main tunnel construction of extra-long inclined shaft auxiliary tunnel

Through the combination of a multi-dimensional monitoring system and RNN algorithm model, the tunnel and meteorological data are analyzed in real time, and the problems of single data and poor decision-making flexibility in traditional systems are solved, and efficient ventilation monitoring and adjustment are achieved to adapt to complex conditions.

CN118959090APending Publication Date: 2024-11-15CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411311418.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The ventilation monitoring system for the construction of the dual-line main tunnel of the traditional special-length inclined shaft auxiliary tunnel has a single data source, and the ventilation decisions are flexible and adaptable. It is impossible to adjust the delivery effect of fresh air in a timely and effective manner, especially under complex terrain and variable climate conditions.

Method used

Using a multi-dimensional monitoring system, including wind direction monitoring device, data acquisition module and quality evaluation module, the tunnel, monitoring, air and meteorological data are collected and analyzed in real time through the RNN algorithm model, and the generated space ratio and impact index are calculated to judge the ventilation state and adjust it. Ventilation strategy.

Benefits of technology

It achieves high accuracy in multi-dimensional monitoring of air quality, flexibly adjusts ventilation strategies, improves the adaptability and efficiency of ventilation effects, and can respond to complex terrain and climate changes in a timely manner.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959090A_ABST
    Figure CN118959090A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel ventilation, and discloses an extra-long inclined shaft auxiliary tunnel double-track main tunnel construction ventilation monitoring system which comprises a wind direction monitoring device, a data acquisition module and a quality evaluation module. The system intuitively reflects the air flow state of each section of space in a tunnel through wind direction monitoring devices which are fixedly mounted at the joint of an extra-long inclined shaft and the inner wall of the tunnel, at the opening of the tunnel and at the deepest position of the tunnel and uniformly distributed at the top in the tunnel; the data collection module collects a tunnel data set, a monitoring data set, an air data set and a meteorological data set in a classified mode, the multi-dimensional monitoring air quality accuracy is high, the quality evaluation module is provided with an RNN algorithm model, a space ratio, a ventilation data set and an influence index are calculated and generated, and then the ventilation state in a tunnel is judged. And the ventilation effect of the extra-long inclined shaft auxiliary tunnel double-track main tunnel construction is correspondingly adjusted, and the ventilation effect is better by flexibly adjusting the ventilation strategy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel ventilation, and in particular to a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel. Background Art

[0002] The construction of double-line main tunnels with extra-long inclined shafts as auxiliary tunnels is an efficient construction method for long and large tunnel projects. By establishing inclined shafts to assist the construction of the main tunnel and realize dual-line synchronous operation, the construction efficiency is greatly improved. At the same time, scientific monitoring and management are used to ensure the safety of the construction process and the quality of the project. This construction technology is particularly important in long and large tunnel projects, which can effectively shorten the construction period and solve the problems of ventilation and logistics transportation in the construction of long tunnels. Extra-long inclined shafts are auxiliary tunnels that intersect obliquely with the main tunnel. They are usually entered obliquely from the side or top of the main tunnel to increase the working surface, improve the construction environment, facilitate slag discharge and feeding, and provide ventilation. The setting of auxiliary tunnels enables construction personnel to create more working surfaces inside the tunnel and realize multi-point simultaneous operation. Double-line construction not only improves work efficiency, but also helps to balance the forces and reduce the problem of uneven structural stress caused by different construction progress because the two lines are advanced simultaneously.

[0003] At present, the traditional ventilation monitoring system for double-track main tunnel construction of extra-long inclined shaft auxiliary tunnels relies solely on fixed gas sensors in the tunnel to obtain air quality data. Only when the oxygen content is lower than the preset standard or the harmful gas is higher than the preset standard can the poor air quality in the tunnel be detected, and then multiple high-power air supply fans are started for ventilation. Faced with complex terrain and changeable climatic conditions, the delayed monitoring data is difficult to provide support for immediate decision-making, the system control strategy has poor adaptability and flexibility, and cannot timely and effectively adjust the fresh air delivery effect. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a ventilation monitoring system for the double-track main tunnel construction of an extra-long inclined shaft auxiliary tunnel, which has the advantages of high accuracy of multi-dimensional monitoring of air quality, flexible adjustment of ventilation strategies for better ventilation effects, etc., and solves the problems of a single data source, poor flexibility and adaptability of ventilation decisions and poor results in traditional ventilation monitoring systems for double-track main tunnel construction of extra-long inclined shaft auxiliary tunnels.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel, comprising an extra-long inclined shaft, a monitoring device, a gas sensor and a ventilator, wherein the extra-long inclined shaft runs through the inner wall of the tunnel, the monitoring device is used to take images of the interior of the tunnel, the gas sensor is used to monitor the oxygen content, harmful gas content and dust particle concentration in the tunnel, and the ventilator is used to supply or exhaust air to the interior of the tunnel, comprising a wind direction monitoring device, a data acquisition module and a quality assessment module;

[0006] The wind direction monitoring device is fixedly installed at the connection between the extra-long inclined shaft and the inner wall of the tunnel, at the tunnel opening and at the deepest part of the tunnel, and is evenly distributed at the top of the tunnel. The wind direction monitoring device is composed of a plurality of wind direction flags;

[0007] The data acquisition module includes a tunnel data unit, a wind direction monitoring unit, an air monitoring unit and a meteorological data unit. The tunnel data unit collects a tunnel data set in real time by connecting to a database through a network. The tunnel data set includes tunnel construction data and extra-long inclined shaft construction data. The wind direction monitoring unit collects a monitoring data set by connecting to a monitoring device through a network. The monitoring data set includes image data of the wind direction monitoring device inside the tunnel taken by the monitoring device. The air monitoring unit collects an air data set by connecting to a gas sensor through a network. The air data set includes oxygen content, harmful gas content and dust particle concentration regularly monitored by the gas sensor. The meteorological data unit collects a meteorological data set by connecting to a big data platform through a network. The meteorological data set includes environmental condition data of the terrain area where the tunnel is located. The data acquisition module transmits the tunnel data set, the monitoring data set, the air data set and the meteorological data set to the quality assessment module through the network.

[0008] The quality assessment module includes a dual-line analysis unit, a ventilation analysis unit, a meteorological analysis unit and an integrated management unit. The quality assessment module is provided with an RNN algorithm model. The dual-line analysis unit calculates and generates a space ratio Kjb based on a tunnel data set, and transmits it to the integrated management unit through a network. The ventilation analysis unit substitutes a monitoring data set and an air data set into the RNN algorithm model, calculates and generates a ventilation data group Tfsj, and transmits it to the integrated management unit through a network. The meteorological analysis unit substitutes a meteorological data set into the RNN algorithm model, calculates and generates an influence index Yxzs, and transmits it to the integrated management unit through a network. The integrated management unit judges the ventilation status inside the tunnel based on the space ratio Kjb, the ventilation data group Tfsj and the influence index Yxzs, and adjusts the ventilation effect of the dual-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel accordingly.

[0009] Furthermore, the expression of the tunnel data set is: to It corresponds to the tunnel construction data and the extra-long inclined shaft construction data after each update of the database, s represents the time point when the database updates the data, l represents the object targeted by the database data, and 1 to n represents the number of times the database updates the data n times.

[0010] Furthermore, the expression of the monitoring data set is {J1 t 、J2 t 、J3 t ,...,Jk t}, J1 t To Jkt The image data of the wind direction monitoring device inside the tunnel taken by the monitoring device each time correspond to each time, t represents the time point when the monitoring device takes the image of the wind direction monitoring device inside the tunnel, and 1 to k represent that there are k groups of image data of the wind direction monitoring device inside the tunnel taken by the monitoring device.

[0011] Furthermore, the expression of the air data set is {K1 d , K2 d 、K3 d , ..., Kq d}, K1 d To Kq d They correspond to the oxygen content, harmful gas content and dust particle concentration regularly monitored by the gas sensor each time, d represents the time point of regular monitoring by the gas sensor, and 1 to q represent the number of regular monitoring times by the gas sensor, which is q times.

[0012] Furthermore, the expression of the meteorological data set is {Q1 m 、Q2 m 、Q3 m , ..., Qx m}, Q1 m To Qx m It corresponds to the environmental condition data of the terrain area where the tunnel is located provided by the big data platform each time. The environmental condition data includes temperature, air pressure and natural wind speed. m represents the time point when the big data platform provides the environmental condition data, and 1 to x represents the number of times the big data platform provides the environmental condition data.

[0013] Furthermore, the calculation formula of the space ratio Kjb is as follows:

[0014] According to the tunnel data set, the n-th updated tunnel construction data and extra-long inclined shaft construction data are counted. The tunnel construction data includes the built length D, width W and height H of the tunnel. The extra-long inclined shaft construction data includes the built depth XS, top diameter XTD and bottom diameter XDD of the extra-long inclined shaft.

[0015]

[0016]

[0017]

[0018] In the formula, Kjb represents the space ratio, Indicates the ratio of the main tunnel volume to the extra-long inclined shaft volume.

[0019] Furthermore, the calculation formula of the ventilation data set Tfsj is as follows:

[0020]

[0021] In the formula, Tfsj represents the ventilation data group, G represents the ventilation power of the ventilator, and Ji t represents the image data of the i-th group of tunnel internal wind direction monitoring devices in the monitoring data set, ∑ RNN ∑ k (G×Ji t ) indicates that the RNN algorithm model determines the working status of the ventilator according to the image data of the wind direction monitoring device inside the tunnel, and then obtains the air volume that the k-group ventilator has supplied or exhausted to the tunnel according to the working status of the ventilator and the ventilation power, Kh d represents the hth oxygen content, harmful gas content and dust particle concentration in the air data set, C represents the constant in the calculation formula of the ventilation data set, that is, the critical value of oxygen content, the critical value of harmful gas content and the critical value of dust particle concentration, ∑ RNN ∑ q (Kh d -C) indicates that the RNN algorithm model synchronizes the gas sensor and calculates the difference between the oxygen content, harmful gas content and dust particle concentration and their critical values ​​q times.

[0022] Furthermore, the calculation formula of the impact index Yxzs is as follows:

[0023] According to the meteorological data set, the environmental condition data of the terrain area where the tunnel is located provided by the big data platform for the xth time is counted. The environmental condition data includes temperature WD, air pressure Pa and natural wind speed v;

[0024]

[0025] In the formula, Yxzs represents the impact index, α represents the weight of the impact index calculation formula for ambient temperature, β represents the weight of the impact index calculation formula for ambient air pressure, and γ represents the weight of the impact index calculation formula for ambient natural wind speed. It means that the weighted average of multiple environmental condition data is calculated according to the α weight, β weight and γ weight, which is the influence index affecting the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel.

[0026] Furthermore, the comprehensive management unit is provided with a space ratio threshold. If the space ratio Kjb exceeds the space ratio threshold, the comprehensive management unit determines that the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel is poor, and reminds the management personnel to increase and expand the extra-long inclined shaft. If the difference between the oxygen content, harmful gas content and dust particle concentration in the ventilation data group Tfsj and its critical value is greater than or equal to 0, the comprehensive management unit determines that the air quality in the tunnel is poor, and reminds the management personnel to increase the ventilation efficiency and evacuate the personnel inside the tunnel.

[0027] Furthermore, the comprehensive management unit is provided with an impact threshold. If the impact index Yxzs does not exceed the impact threshold, the comprehensive management unit determines that the environmental conditions of the terrain area where the tunnel is located are not conducive to the ventilation of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel, and reminds the management personnel to increase the ventilation efficiency.

[0028] Compared with the prior art, the present invention provides a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel, which has the following beneficial effects:

[0029] 1. The present invention intuitively reflects the air flow state of each space inside the tunnel by fixedly installing the wind direction monitoring device at the connection between the extra-long inclined shaft and the inner wall of the tunnel, the tunnel opening and the deepest part of the tunnel, and evenly distributed on the top of the tunnel. The wind direction monitoring device is composed of a plurality of wind direction flags, which indicate the direction of the wind by fluttering, so as to facilitate the subsequent rapid judgment of whether the tunnel is in an air supply state or an exhaust state. The data acquisition module classifies and collects the tunnel data set, the monitoring data set, the air data set and the meteorological data set, and transmits them to the quality evaluation module, so that the multi-dimensional monitoring of air quality is highly accurate.

[0030] 2. The present invention sets a double-line analysis unit, a ventilation analysis unit, a meteorological analysis unit and a comprehensive management unit through a quality assessment module. The quality assessment module is provided with an RNN algorithm model. The double-line analysis unit calculates and generates a space ratio Kjb according to the tunnel data set, and digitally reflects the ratio of the ventilation volume of the main tunnel and the ventilation volume of the extra-long inclined shaft, which is convenient for subsequent judgment of the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel. The ventilation analysis unit substitutes the monitoring data set and the air data set into the RNN algorithm model, calculates and generates a ventilation data group Tfsj, and the meteorological analysis unit substitutes the meteorological data set into the RNN algorithm model, calculates and generates an influence index Yxzs. The comprehensive management unit judges the ventilation status inside the tunnel according to the space ratio Kjb, the ventilation data group Tfsj and the influence index Yxzs, and adjusts the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel accordingly. The ventilation strategy can be flexibly adjusted for better ventilation effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the system flow of the present invention. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] Since the traditional ventilation monitoring system for the double-track main tunnel construction of the extra-long inclined shaft auxiliary tunnel relies solely on the gas sensors installed in the tunnel to obtain air quality data, the poor air quality in the tunnel can only be detected when the oxygen content is lower than the preset standard or the harmful gas is higher than the preset standard, and then multiple high-power air supply fans are started for ventilation. In the face of complex terrain and changeable climatic conditions, the delayed monitoring data is difficult to provide support for immediate decision-making, and the adaptability and flexibility of the system control strategy are poor, and the fresh air delivery effect cannot be adjusted in a timely and effective manner. Therefore, a ventilation monitoring system for the double-track main tunnel construction of the extra-long inclined shaft auxiliary tunnel is provided. Please refer to Figure 1 , a ventilation monitoring system for double-track main tunnel construction of an extra-long inclined shaft auxiliary tunnel, comprising an extra-long inclined shaft, a monitoring device, a gas sensor and a ventilator. The extra-long inclined shaft runs through the inner wall of the tunnel, and is usually entered obliquely from the side or top of the main tunnel. The monitoring device is used to take images of the interior of the tunnel. The gas sensor is used to monitor the oxygen content, harmful gas content and dust particle concentration in the tunnel, and directly reflects the environmental safety data inside the tunnel. The ventilator is used to supply or exhaust air to the interior of the tunnel, and effectively ensures the quality of the air in the tunnel. The ventilation monitoring system for double-track main tunnel construction of an extra-long inclined shaft auxiliary tunnel comprises a wind direction monitoring device, a data acquisition module and a quality assessment module;

[0034] The wind direction monitoring device is fixedly installed at the connection between the extra-long inclined shaft and the inner wall of the tunnel, at the tunnel opening and at the deepest part of the tunnel, and is evenly distributed on the top of the tunnel. It can intuitively reflect the air flow state of each space in the tunnel. The wind direction monitoring device is composed of a plurality of wind direction flags, which indicate the direction of the wind by fluttering, so as to facilitate the subsequent rapid judgment of whether the tunnel is in the air supply state or the exhaust state.

[0035] The data acquisition module includes a tunnel data unit, a wind direction monitoring unit, an air monitoring unit, and a meteorological data unit. The tunnel data unit connects to the database through a network to collect tunnel data sets in real time. The tunnel data sets include tunnel construction data and extra-long inclined shaft construction data. The expression of the tunnel data set is: to They correspond to the tunnel construction data and the extra-long inclined shaft construction data after each update of the database. s represents the time point of updating the database data. The time point of updating the tunnel construction data and the extra-long inclined shaft construction data is determined according to the specific construction progress and has no regularity. l represents the object targeted by the database data. 1 to n represents the number of times the database data is updated.

[0036] The wind direction monitoring unit collects the monitoring data set through the network connection monitoring device. The monitoring data set includes the image data of the wind direction monitoring device inside the tunnel taken by the monitoring device. The expression of the monitoring data set is {J1 t 、J2 t 、J3 t ,...,Jkt}, J1 t To Jk t The image data of the wind direction monitoring device inside the tunnel taken by the monitoring device each time are sequentially corresponding, t represents the time point at which the monitoring device takes the wind direction monitoring device inside the tunnel, which is regular and uninterrupted, and the shooting time point of the monitoring device is in positive time sequence, 1 to k represent that there are k groups of image data of the wind direction monitoring device inside the tunnel taken by the monitoring device;

[0037] The air monitoring unit collects air data sets through network connection to gas sensors. The air data sets include oxygen content, harmful gas content and dust particle concentration regularly monitored by gas sensors. The expression of air data sets is {K1 d , K2 d 、K3 d , ..., Kq d}, K1 d To Kq d It corresponds to the oxygen content, harmful gas content and dust particle concentration monitored by the gas sensor each time. Harmful gases include but are not limited to carbon monoxide, sulfur dioxide and nitrogen oxides. d represents the time point of regular monitoring by the gas sensor. It has regularity. The gas sensor monitors regularly according to a fixed cycle. The duration of the fixed cycle can be set to every 2 minutes. 1 to q represents the number of regular monitoring times of the gas sensor.

[0038] The meteorological data unit collects meteorological data sets through the network connection big data platform. The meteorological data sets include the environmental condition data of the terrain area where the tunnel is located. The expression of the meteorological data set is {Q1 m 、Q2 m 、Q3 m , ..., Qx m}, Q1 m To Qx m It corresponds to the environmental condition data of the terrain area where the tunnel is located provided by the big data platform each time. The environmental condition data includes temperature, air pressure and natural wind speed. m represents the time point when the big data platform provides the environmental condition data, which is irregular. For example, the environmental condition data can be obtained according to the daily weather forecast of the big data platform. 1 to x represents the number of times the big data platform provides the environmental condition data x times;

[0039] The data acquisition module transmits the tunnel data set, monitoring data set, air data set and meteorological data set to the quality assessment module through the network, and the multi-dimensional monitoring of air quality is highly accurate;

[0040] The quality assessment module includes a dual-line analysis unit, a ventilation analysis unit, a meteorological analysis unit and a comprehensive management unit. The quality assessment module is provided with an RNN algorithm model. The dual-line analysis unit calculates and generates the space ratio Kjb based on the tunnel data set and transmits it to the comprehensive management unit through the network. The calculation formula is as follows:

[0041] According to the tunnel data set, the n-th updated tunnel construction data and extra-long inclined shaft construction data are counted. The tunnel construction data includes the built length D, width W and height H of the tunnel. The extra-long inclined shaft construction data includes the built depth XS, top diameter XTD and bottom diameter XDD of the extra-long inclined shaft.

[0042]

[0043]

[0044]

[0045] In the formula, Kjb represents the space ratio, Indicates the ratio of the main tunnel volume to the extra-long inclined shaft volume. According to the space ratio Kjb, it can digitally reflect the ratio of the main tunnel ventilation volume to the extra-long inclined shaft ventilation volume, which is convenient for subsequent judgment of the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel;

[0046] The ventilation analysis unit substitutes the monitoring data set and the air data set into the RNN algorithm model, calculates and generates the ventilation data set Tfsj, and transmits it to the comprehensive management unit through the network. The calculation formula is as follows:

[0047]

[0048] In the formula, Tfsj represents the ventilation data group, G represents the ventilation power of the ventilator, and Ji t represents the image data of the i-th group of tunnel internal wind direction monitoring devices in the monitoring data set, ∑ RNN ∑ k (G×Ji t ) indicates that the RNN algorithm model determines the working status of the ventilator according to the image data of the wind direction monitoring device inside the tunnel, and then obtains the air volume that the k groups of ventilators have supplied or exhausted to the tunnel according to the working status of the ventilator and the ventilation power, thus avoiding the problem of monitoring data leakage caused by gas sensor failure. The ventilation effect can also be detected through the wind direction monitoring device in the future. Kh d represents the hth oxygen content, harmful gas content and dust particle concentration in the air data set, C represents the constant in the calculation formula of the ventilation data set, that is, the critical value of oxygen content, the critical value of harmful gas content and the critical value of dust particle concentration, ∑ RNN ∑ q (Kh d-C) represents the RNN algorithm model synchronizing the gas sensor and calculating the difference between the oxygen content, harmful gas content and dust particle concentration and their critical values ​​q times;

[0049] The meteorological analysis unit substitutes the meteorological data set into the RNN algorithm model, calculates and generates the impact index Yxzs, and transmits it to the comprehensive management unit through the network. The calculation formula is as follows:

[0050] According to the meteorological data set, the environmental condition data of the terrain area where the tunnel is located provided by the big data platform for the xth time is counted. The environmental condition data includes temperature WD, air pressure Pa and natural wind speed v;

[0051]

[0052] In the formula, Yxzs represents the influence index, α represents the weight of the influence index calculation formula for ambient temperature, β represents the weight of the influence index calculation formula for ambient air pressure, and γ represents the weight of the influence index calculation formula for ambient natural wind speed. α, β, and γ are constants, and α+β+γ=1. It means that the weighted average of multiple environmental condition data is calculated according to the α weight, β weight and γ weight, which is the influence index affecting the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel;

[0053] The comprehensive management unit determines the ventilation status inside the tunnel according to the space ratio Kjb, the ventilation data group Tfsj and the impact index Yxzs, and adjusts the ventilation effect of the double-track main tunnel construction of the extra-long inclined shaft auxiliary tunnel accordingly. The comprehensive management unit is set with a space ratio threshold. If the space ratio Kjb exceeds the space ratio threshold, the comprehensive management unit determines that the ventilation effect of the double-track main tunnel construction of the extra-long inclined shaft auxiliary tunnel is poor, and reminds the management personnel to increase and expand the extra-long inclined shaft. If the difference between the oxygen content, the harmful gas content and the dust particle concentration in the ventilation data group Tfsj and their critical values ​​is greater than or equal to 0, the comprehensive management unit determines that the air quality in the tunnel is poor, and reminds the management personnel to increase the ventilation efficiency and evacuate the personnel inside the tunnel. The comprehensive management unit is set with an impact threshold. If the impact index Yxzs does not exceed the impact threshold, the comprehensive management unit determines that the environmental conditions in the terrain area where the tunnel is located are not conducive to the ventilation of the double-track main tunnel construction of the extra-long inclined shaft auxiliary tunnel, and reminds the management personnel to increase the ventilation efficiency and flexibly adjust the ventilation strategy for better ventilation effect.

[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel, comprising an extra-long inclined shaft, a monitoring device, a gas sensor and a ventilator, wherein the extra-long inclined shaft runs through the inner wall of the tunnel, the monitoring device is used to take images of the interior of the tunnel, the gas sensor is used to monitor the oxygen content, harmful gas content and dust particle concentration in the tunnel, and the ventilator is used to supply or exhaust air to the interior of the tunnel, and is characterized in that: It includes a wind direction monitoring device, a data acquisition module and a quality assessment module; The wind direction monitoring device is fixedly installed at the connection between the extra-long inclined shaft and the inner wall of the tunnel, at the tunnel opening and at the deepest part of the tunnel, and is evenly distributed at the top of the tunnel. The wind direction monitoring device is composed of a plurality of wind direction flags; The data acquisition module includes a tunnel data unit, a wind direction monitoring unit, an air monitoring unit and a meteorological data unit. The tunnel data unit collects a tunnel data set in real time by connecting to a database through a network. The tunnel data set includes tunnel construction data and extra-long inclined shaft construction data. The wind direction monitoring unit collects a monitoring data set by connecting to a monitoring device through a network. The monitoring data set includes image data of the wind direction monitoring device inside the tunnel taken by the monitoring device. The air monitoring unit collects an air data set by connecting to a gas sensor through a network. The air data set includes oxygen content, harmful gas content and dust particle concentration regularly monitored by the gas sensor. The meteorological data unit collects a meteorological data set by connecting to a big data platform through a network. The meteorological data set includes environmental condition data of the terrain area where the tunnel is located. The data acquisition module transmits the tunnel data set, the monitoring data set, the air data set and the meteorological data set to the quality assessment module through the network. The quality assessment module includes a dual-line analysis unit, a ventilation analysis unit, a meteorological analysis unit and an integrated management unit. The quality assessment module is provided with an RNN algorithm model. The dual-line analysis unit calculates and generates a space ratio Kjb based on a tunnel data set, and transmits it to the integrated management unit through a network. The ventilation analysis unit substitutes a monitoring data set and an air data set into the RNN algorithm model, calculates and generates a ventilation data group Tfsj, and transmits it to the integrated management unit through a network. The meteorological analysis unit substitutes a meteorological data set into the RNN algorithm model, calculates and generates an influence index Fxzs, and transmits it to the integrated management unit through a network. The integrated management unit judges the ventilation status inside the tunnel based on the space ratio Kjb, the ventilation data group Tfsj and the influence index Yxzs, and adjusts the ventilation effect of the dual-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel accordingly.

2. According to claim 1, a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel is characterized by: The expression of the tunnel dataset is: to It corresponds to the tunnel construction data and the extra-long inclined shaft construction data after each update of the database, s represents the time point when the database updates the data, l represents the object targeted by the database data, and 1 to n represents the number of times the database updates the data n times.

3. According to claim 2, a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel is characterized by: The expression of the monitoring data set is {J1 t 、J2 t 、J3 t ,...,Jk t }, J1 t To Jk t The image data of the wind direction monitoring device inside the tunnel taken by the monitoring device each time correspond to each time, t represents the time point when the monitoring device takes the image of the wind direction monitoring device inside the tunnel, and 1 to k represent that there are k groups of image data of the wind direction monitoring device inside the tunnel taken by the monitoring device.

4. According to claim 3, a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel is characterized by: The expression of the air data set is {K1 d , K2 d , K3 d , ..., Kq d }, K1 d To Kq d They correspond to the oxygen content, harmful gas content and dust particle concentration regularly monitored by the gas sensor each time, d represents the time point of regular monitoring by the gas sensor, and 1 to q represent the number of regular monitoring times by the gas sensor, which is q times.

5. According to claim 4, a ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel is characterized by: The expression of the meteorological data set is {Q1 m 、Q2 m 、Q3 m ,...,Qx m }, Q1 m To Qx m It corresponds to the environmental condition data of the terrain area where the tunnel is located provided by the big data platform each time. The environmental condition data includes temperature, air pressure and natural wind speed. m represents the time point when the big data platform provides the environmental condition data, and 1 to x represents the number of times the big data platform provides the environmental condition data.

6. A ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel according to claim 5, characterized in that: The calculation formula of the space ratio Kjb is as follows: According to the tunnel data set, the n-th updated tunnel construction data and extra-long inclined shaft construction data are counted. The tunnel construction data includes the built length D, width W and height H of the tunnel. The extra-long inclined shaft construction data includes the built depth XS, top diameter XTD and bottom diameter XDD of the extra-long inclined shaft. In the formula, Kjb represents the space ratio, Indicates the ratio of the main tunnel volume to the extra-long inclined shaft volume.

7. A ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel according to claim 6, characterized in that: The calculation formula of the ventilation data set Tfsj is as follows: In the formula, Tfsj represents the ventilation data group, G represents the ventilation power of the ventilator, and Ji t represents the image data of the i-th group of tunnel internal wind direction monitoring devices in the monitoring data set, ∑ RNN ∑ k (G×Ji t ) indicates that the RNN algorithm model determines the working status of the ventilator according to the image data of the wind direction monitoring device inside the tunnel, and then obtains the air volume that the k-group ventilator has supplied or exhausted to the tunnel according to the working status of the ventilator and the ventilation power, Kh d represents the hth oxygen content, harmful gas content and dust particle concentration in the air data set, C represents the constant in the calculation formula of the ventilation data set, that is, the critical value of oxygen content, the critical value of harmful gas content and the critical value of dust particle concentration, ∑ RNN ∑ q (Kh d -C) indicates that the RNN algorithm model synchronizes the gas sensor and calculates the difference between the oxygen content, harmful gas content and dust particle concentration and their critical values ​​q times.

8. The ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel according to claim 7 is characterized by: The calculation formula of the impact index Yxzs is as follows: According to the meteorological data set, the environmental condition data of the terrain area where the tunnel is located provided by the big data platform for the xth time is counted. The environmental condition data includes temperature WD, air pressure Pa and natural wind speed v; In the formula, Yxzs represents the impact index, α represents the weight of the impact index calculation formula for ambient temperature, β represents the weight of the impact index calculation formula for ambient air pressure, and γ represents the weight of the impact index calculation formula for ambient natural wind speed. It means that the weighted average of multiple environmental condition data is calculated according to the α weight, β weight and γ weight, which is the influence index affecting the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel.

9. The ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel according to claim 8 is characterized by: The comprehensive management unit is provided with a space ratio threshold. If the space ratio Kjb exceeds the space ratio threshold, the comprehensive management unit determines that the ventilation effect of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel is poor, and reminds the management personnel to increase and expand the extra-long inclined shaft. If the difference between the oxygen content, harmful gas content and dust particle concentration in the ventilation data group Tfsj and their critical values ​​is greater than or equal to 0, the comprehensive management unit determines that the air quality in the tunnel is poor, and reminds the management personnel to increase the ventilation efficiency and evacuate the personnel inside the tunnel.

10. The ventilation monitoring system for double-line main tunnel construction of an extra-long inclined shaft auxiliary tunnel according to claim 9 is characterized in that: The comprehensive management unit is provided with an impact threshold. If the impact index Yxzs does not exceed the impact threshold, the comprehensive management unit determines that the environmental conditions in the terrain area where the tunnel is located are not conducive to the ventilation of the double-line main tunnel construction of the extra-long inclined shaft auxiliary tunnel, and reminds the management personnel to increase the ventilation efficiency.

Citation Information

Cited By

  • Multi-application scene tunnel temperature model test system and method

    CN119860808A