Relay test tool and test equipment

By designing multi-functional relay testing tooling and equipment, allowing loading and unloading of other relays during one relay test process, solving the problem of inefficient production efficiency of existing equipment and achieving efficient testing process and resource utilization.

CN118962423AInactive Publication Date: 2024-11-15FUQUN TECH (WUXI) CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411030596.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing industrial relay testing equipment can only be tested separately and cannot be loaded and unloaded at the same time, resulting in low production efficiency and high labor consumption.

Method used

A relay testing tooling and testing equipment was designed, using installation table, load seat, test mechanism, linear cylinder, solenoid valve, probe assembly and micro switch, allowing other relays to be loaded and unloaded during one relay test. Operate, contact or disconnect the relay pins through a linear cylinder drive probe and enable signal transmission through a relay test board and a heavy-load connector.

Benefits of technology

The recycling of multiple test stations is realized, the efficiency is increased by 2 times, the utilization rate of instruments and meters is improved, and the labor and time costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118962423A_ABST
    Figure CN118962423A_ABST
Patent Text Reader

Abstract

The invention discloses a relay test tool and test equipment. The test tool comprises a mounting table, a bearing seat and a test mechanism, wherein the bearing seat and the test mechanism are arranged on the surface of the mounting table; the bearing seat is used for placing a relay to be tested, and the testing mechanism is arranged behind the bearing seat, comprises a linear cylinder, an electromagnetic valve, a probe assembly and a microswitch, and is used for testing the relay on the bearing seat; every two sets of test tools share one set of withstand voltage tester and test power supply, and the withstand voltage tester and the test power supply are controlled by an industrial personal computer to realize synchronous switching between the two sets of test tools connected with the test tools. By integrating a plurality of testing tools on the testing equipment, products can be circularly placed for testing, so that the working efficiency is improved, the utilization rate of instruments is improved, and the cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of relay technology, and in particular to a relay testing tool and testing equipment. Background Art

[0002] Industrial relays are a common electrical switching device that is widely used in various industrial control systems. The main function of the relay is to control the connection and disconnection of the circuit, thereby realizing remote control and automated operation of the equipment. However, due to various uncertain factors in the industrial environment, such as high temperature, dust, vibration, etc., the performance and stability of industrial relays will be adversely affected, resulting in equipment failure and safety hazards. Therefore, in order to ensure the reliability and stability of industrial relays, industrial relays need to be strictly tested and inspected.

[0003] In the existing industrial relay testing equipment, most of the equipment has only one testing station, which cannot perform testing and loading and unloading operations at the same time. The next process must wait until the previous process is completed. This situation will lead to problems such as low production efficiency and low instrument utilization. Especially when a large number of tests are required, repeated loading and unloading operations will consume a lot of time and manpower. Therefore, the development of an industrial relay testing equipment that can load and unload materials and test at the same time is of great significance to improving production efficiency and reducing manpower and time costs. Summary of the invention

[0004] The purpose of the present application is to provide a relay testing tool and testing equipment, which can be used to load and unload other groups of relays during the testing process of the previous relay, without having to wait until the previous relay test is completed before unloading the tested relay and then testing other products. Other products can be placed in a cycle for testing during the testing process of the first group of relays.

[0005] In view of this, the first aspect of the present application provides a relay testing tool, comprising a mounting table, a bearing seat arranged on the surface of the mounting table, and a testing mechanism; the bearing seat is used to place a relay to be tested, and the testing mechanism is arranged behind the bearing seat, comprising a linear cylinder, a solenoid valve, a probe assembly, and a micro switch, the micro switch is used to start the testing mechanism for testing, the solenoid valve controls the extension and retraction of the piston rod of the linear cylinder, and the testing mechanism is used to test the relay on the bearing seat; Preferably, the probe assembly includes a probe mounting plate, a plurality of probes mounted on the probe mounting plate, and an aviation plug female connected to the electrical signals of the probes. The probe mounting plate is fixed to the top end of the piston rod of the linear cylinder, and the linear cylinder drives the probe mounting plate to move forward and backward to drive the probes to contact the relay pins or to detach from the relay pins. Preferably, the test fixture further comprises a relay test board for receiving and outputting a test signal, the relay test board being connected with an aviation plug male plugged into the aviation plug female plug; the mounting platform is also provided with a heavy-duty connector electrically connected to the relay test board; Preferably, a pair of positioning pins are vertically arranged on the surface of the bearing seat, and the positioning pins are made of conductive material and are used to cooperate with the positioning holes on the relay to fix the relay to be tested, and abut against the probe to transmit the relay signal; Preferably, a cover plate is hinged on the side of the mounting platform, and a limit block is provided to limit the flipping angle of the cover plate, and the cover plate provides a stable testing environment.

[0006] On the other hand, the present application provides a relay testing device, comprising the above-mentioned relay testing tool, and also comprising a cabinet and an electric control component; the relay testing tool is multiple, and each two of the relay testing tools form a group and are arranged side by side on the cabinet; the electric control component comprises: A DC power supply module, used to provide DC input for the test fixture and the electronic equipment on the test equipment, including a first DC power supply V1 and a second DC power supply V2; A test module, used for providing a test signal for the test fixture, comprising at least one set of a withstand voltage tester and a test power supply, each of the withstand voltage tester and the test power supply being connected to two sets of the test fixture; The DC power supply module and the test module are connected to the test fixture via a heavy-duty connector; An industrial computer, the industrial computer is connected to the withstand voltage tester and the test power supply, and is used to control each group of the withstand voltage tester and the test power supply to achieve synchronous switching between the two connected test fixtures; Preferably, the relay testing equipment also includes a starting switch and an indicator light group, the number of the starting switches and the indicator light group is adapted to the number of the testing fixtures, each starting switch and an indicator light group is electrically connected to a testing fixture, and the indicator light group includes an NG indicator light and an OK indicator light.

[0007] Beneficial effects: (1) Integrate multiple test fixtures on one device, and place products in multiple stations for cyclic testing, which is twice as efficient as manual measurement. (2) Every two sets of test tools share a set of withstand voltage testers and test power supplies, which improves the utilization rate of instruments and improves output and production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1It is a three-dimensional structural schematic diagram of a relay testing tool described in Example 1 of the present application; Figure 2 is a top view of a relay testing tool as described in Example 1 of the present application; Figure 3 It is a left view of a relay testing tool described in Example 1 of the present application; Figure 4 It is a schematic diagram of the three-dimensional structure of a relay testing device described in Example 2 of the present application; Figure 5 It is a network topology diagram of the voltage withstand tester and the test power supply described in Example 2 of the present application; Figure 6 This is the main circuit schematic diagram described in Example 2 of the present application; Figure 7 This is a circuit connection diagram of the DC power supply module described in Example 2 of the present application; Figure 8 is a circuit connection diagram of the test module and the relay test board described in Example 2 of the present application; Fig. 9 is a schematic diagram of the signal input module described in Example 2 of the present application; Fig.10 This is a schematic diagram of the signal output module described in Example 2 of the present application.

[0009] In the figure: 1 Mounting table, 2 Bearing seat, 3 Test mechanism, 4 Base plate, 5 Handle, 6 First positioning hole, 7 Locking screw, 8 Cover plate, 9 First hinge, 10 Second hinge, 11 Limit block, 12 Heavy-duty connector, 13 Relay, 14 Mounting strip, 201 Positioning Pin, 202 Pin, 301 Linear cylinder, 302 Probe assembly, 303 Probe mounting plate, 304 Probe, 305 Protective cover, 306 Micro switch, 801 Opening, 1-1 Test fixture, 1-2 Cabinet, 1-3 Table, 1-4 Mounting plate, 1-5 Electric box, 1-6 Guide strip, 1-7 Indicator light group. DETAILED DESCRIPTION

[0010] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings of the present application. It should be noted that in the description of the embodiments of the present application, the terms "first" and "second" are only used to distinguish the descriptions and cannot be understood as indicating or implying the degree of importance.

[0011] Example 1 Combined with reference Figures 1 to 3A relay testing tool 1-1 is used to detect the product performance of a relay, comprising a mounting platform 1, a bearing seat 2 arranged on the surface of the mounting platform 1, and a testing mechanism 3; the bearing seat 2 is used to place a relay 13 to be tested, and the testing mechanism 3 is arranged behind the bearing seat 2, comprising a linear cylinder 301, a solenoid valve, a probe assembly 302 and a micro switch 306, the micro switch 306 is used to start the testing mechanism 3 for testing, and the testing mechanism 3 is used to test the relay 13 placed on the bearing seat 2.

[0012] like Figure 1 As shown, the mounting platform 1 includes four side panels and a top plate 101, the bearing seat 2 is arranged on the top plate 101, and a pair of positioning pins 201 are vertically arranged on the surface of the bearing seat 2. When the relay 13 to be tested is placed on the bearing seat, the positioning pins 201 pass through the positioning holes on the relay 13 to position the relay 13 to be tested.

[0013] like Figure 2 As shown, the linear cylinder 301 is fixed on the top plate 101 of the mounting platform; the solenoid valve is arranged inside the mounting platform, and is respectively connected to the air vents on both sides of the linear cylinder 301 (ports where compressed gas flows in or out) through a pair of PU tubes. When there is a pressure difference on both sides of the cavity of the cylinder body, the piston rod will reciprocate back and forth. Therefore, the compressed gas is input to the linear cylinder through the solenoid valve to control the reciprocating motion of the piston rod of the linear cylinder 301; the linear cylinder 301 extends its piston rod: when the compressed gas passes through the PU tube, the piston rod of the linear cylinder 301 is reciprocated. The u tube transmits the gas to the rear end vent of the cylinder body of the linear cylinder 301, thereby generating high pressure. The gas at the rear end of the cylinder body pushes the piston rod forward, causing the piston rod to extend, and also pushes the gas at the front end of the cylinder body out of the cylinder through the front end vent. The exhausted gas returns to the solenoid valve through another pu tube; the linear cylinder 301 retracts its piston rod: the solenoid valve guides the compressed gas to the front end vent of the linear cylinder 301 through the pu tube, causing the piston rod to move back, and at the same time the gas at the rear end of the cylinder body escapes from the rear end vent.

[0014] like Figure 1As shown, the probe assembly 302 includes a probe mounting plate 303, a plurality of probes 304 mounted on the probe mounting plate 303, and an aviation plug female connector connected to the electrical signals of the probes. The probe mounting plate 303 is fixed to the top end of the piston rod of the linear cylinder 301, and the linear cylinder 301 drives the probe mounting plate 303 to move forward and backward to drive the probes 304 to contact the pins of the relay 13 or to detach from the pins of the relay. When the probes move forward, the two probes on both sides abut against the pins 202 of the relay 13, and the two probes in the middle abut against the positioning Pin 201. The positioning Pin 201 is made of conductive material and is used to transmit relay signals. A protective cover 305 is also fixedly connected to both sides of the probe mounting plate 303 to protect the probe assembly 302.

[0015] The test tool also includes a relay test board for receiving and outputting test signals, and the relay test board is arranged inside the mounting platform 1. The relay test board is connected to a male aviation plug that is plugged into a female aviation plug connected to the probe. The probe 304 and the relay test board can be quickly and accurately plugged into each other through the aviation plug connection to transmit electrical signals between the two. A heavy-duty connector 12 electrically connected to the relay test board is also provided on the mounting platform 1, and the relay test board realizes signal transmission with the test equipment through the heavy-duty connector 12.

[0016] Combined with reference Figure 1 and Figure 2 The test tool also includes a base plate 4, the mounting table 1 is arranged on the base plate 4, the base plate 4 is used to support the mounting table 1, and a handle 5, a first positioning hole 6 and a locking screw 7 are arranged on one side of the base plate 4. The handle 5 can be used to conveniently carry the entire test tool. The first positioning hole 6 cooperates with the positioning pin and the guide bar on the test equipment table to realize the rapid positioning of the test tool. The locking screw 7 is screwed into the threaded hole on the test equipment table to lock and fix the test tool.

[0017] like Figure 3 As shown, a cover plate 8 is hingedly connected to the side of the mounting platform 1 through a first hinge 9 and a second hinge 10. The cover plate 8 is fixed to the first hinge 9 and the second hinge 10 through a mounting strip 14. A limit block 11 is provided between the first hinge 9 and the second hinge 10 to limit the flipping angle of the cover plate 8. When the cover plate 8 is flipped open, the limit block 11 clamps the bottom end of the cover plate to fix it. Figure 1As shown, the side of the cover plate 8 is also provided with an opening 801 adapted to the shape of the protective cover 305. When the cover plate 8 is closed, it can completely cover the supporting seat 2, thereby ensuring a relatively stable environment when testing the product.

[0018] Example 2 like Figure 4 As shown, a relay testing device comprises the relay testing tool 1-1 described in any one of the above items, and also comprises a cabinet 1-2 and an electric control component; the relay testing tool 1-1 is multiple, and each two of the relay testing tools 1-1 are grouped together and arranged side by side on the cabinet 1-2. In this embodiment, the number of the relay testing tools 1-1 is 6, and the cabinet 1-2 comprises a rack, a table 1-3 is arranged on the rack, a mounting plate 1-4 and an electric box 1-5 are arranged on the table 1-3, and a plurality of guides are arranged on the surface of the table 1-3 The guide strips 1-6 and a plurality of second positioning holes, the guide strips 1-6 are parallel to the shorter side edges of the table 1-3, and are arranged on the table 1-3 in a group of two at intervals, the spacing between the guide strips 1-6 is adapted to the size of the base plate 4, and are used to fix the test fixture 1-1, the number of groups of guide strips 1-6 is the same as the number of the test fixtures, the second positioning hole cooperates with the first positioning hole 6 and the positioning pin on the base plate 4 for positioning, and the table 1-3 is also provided with a threaded hole that cooperates with the locking screw 7 on the base plate to lock and fix the base plate 4.

[0019] The electric control assembly is arranged in the electric box 1-5, and includes: A DC power supply module, used to provide DC input for the test fixture 1-1 and the electronic equipment on the test equipment, including a first DC power supply V1 and a second DC power supply V2; A test module, used for providing a test signal for the test fixture 1-1, comprising at least one set of a withstand voltage tester and a test power supply, each of the withstand voltage tester and the test power supply being connected to two sets of the test fixtures 1-1; The DC power supply module and the test module are connected to the test fixture 1-2 via a heavy-duty connector 12; Industrial computers, such as Figure 5 As shown, the industrial computer is connected to the withstand voltage tester and the test power supply, and is used to control each group of the withstand voltage tester and the test power supply to achieve synchronous switching between the two connected test fixtures.

[0020] The relay test equipment also includes a start switch and an indicator light group 1-7 arranged on the mounting plate 1-4. The number of the start switch and the indicator light group 1-7 is adapted to the number of the test fixtures 1-1. Each start switch and an indicator light group 1-7 are electrically connected to a test fixture. The indicator light group includes an NG indicator light and an OK indicator light. When a product is tested poorly, the NG indicator light will light up and the buzzer will sound. Press the start switch to turn off the NG indicator light and the buzzer before testing the next product.

[0021] The mounting plate 1-4 is also provided with a display screen for displaying the test results.

[0022] The test device also includes a control circuit such as Figure 6 As shown, the main circuit of the control circuit includes: The main circuit includes a first air switch Q2, a main switch Q1 and a power supply inlet terminal block X1 which are connected in series in sequence, wherein the first air switch Q2 is provided with a contact system on both the live wire and the neutral wire; The first input branch includes a second air switch Q3 and an input terminal board U1 connected in series, wherein the second air switch Q3 is arranged on a live line; a second input branch connected in parallel with the first input branch, the second input branch having the same structure as the first input branch; The main circuit, the first input branch and the second input branch are all derived from a live wire and a neutral wire.

[0023] The air switch is used to protect the safety of the DC power module circuit and other circuits connected to the main circuit. When the current in the circuit exceeds the rated value, the air switch will automatically disconnect the circuit to play an overload protection role. In addition, if there is a short circuit, overcurrent or other fault in the circuit, the air switch will also quickly disconnect the circuit to prevent the fault from expanding and protect the safety of equipment and operators.

[0024] like Figure 7As shown, the DC power supply module includes a first DC power supply V1 and a second DC power supply V2, the AC input ends of the first DC power supply V1 and the second DC power supply V2 are both connected to the live wire and the neutral wire, the positive pole of the output end of the first DC power supply V1 outputs a 24V DC voltage, the positive pole of the output end of the second DC power supply V2 outputs a 12V DC voltage, the negative poles of the output ends of the first DC power supply V1 and the second DC power supply V2 both output a 0V voltage relative to the ground, the output ends of the first DC power supply V1 and the second DC power supply V2 are also respectively connected to a terminal row, the DC power supply module is connected to other electronic devices through the terminal row to provide them with current working voltage; the first DC power supply V1 and the second DC power supply V2 are also respectively provided with a power supply air switch 1Q1 and a power supply air switch 1Q2 on the AC input ends connected to the live wire.

[0025] The connection circuit between the test module and the relay test board is as follows: Figure 8 As shown, the relay test board includes a control input terminal, a DC input terminal, a test signal input terminal and a signal output terminal. The control input terminal is respectively connected to the industrial computer and the output terminal of the first DC power supply V1, the DC input terminal is connected to the output terminal of the second DC power supply V2, and the test signal input terminal is respectively connected to the withstand voltage tester and the output terminal of the test power supply. The test power supply is a programmable linear DC power supply. The test power supply has dual output channels. The OUT1 interface and the OUT2 interface can output different test voltages respectively, and the output of each channel can be independently controlled. The withstand voltage tester can output high voltage electricity for testing the AC withstand voltage test and insulation resistance test of the product to be tested. The signal output terminals are respectively connected to the probes.

[0026] The control circuit also includes a signal input module, such as Fig. 9 As shown, it includes a micro switch SW, a first magnetic switch MS1, a second magnetic switch MS2 and a reset button S1. The micro switch SW, the first magnetic switch MS1, the second magnetic switch MS2 and the reset button S1 are all connected to the positive electrode of the output terminal of the first DC power supply V1. The reset button S1 is a normally open button. The first magnetic switch MS1 and the second magnetic switch MS2 are connected to the linear cylinder through an aviation plug. The magnetic switch is used to detect whether the cylinder extends or retracts to a specified position. Therefore, a magnetic switch is generally installed at the front end and the rear end of the cylinder. The first magnetic switch MS1 is used to detect whether the cylinder piston rod is in place, and the second magnetic switch MS2 is used to detect whether the cylinder piston rod is extended to the maximum position.

[0027] Signal output modules, such as Fig.10As shown, the signal output of the solenoid valve, the OK indicator light and the NG indicator light are controlled. The solenoid valve, the OK indicator light and the NG indicator light are all connected to the positive pole of the output terminal of the first DC power supply V1. When the magnetic switch detects that the cylinder is accurately in place, it sends a signal to control the solenoid valve to control the movement of the cylinder piston rod to realize the extension and retraction of the cylinder.

[0028] The specific operation process of using the test equipment to detect the relay is as follows: In this embodiment, the number of test fixtures is 6. First, the operator manually places the product to be tested on the support seat 2 of the test fixture No. 1, closes the cover plate 8 and triggers the micro switch 303. At this time, the test fixture No. 1 is in the detection-allowed state. The first magnetic switch detects that the cylinder piston rod is in the initial state, and sends a signal to control the solenoid valve to deliver compressed gas to the rear end vent of the cylinder body of the linear cylinder 301, thereby generating high pressure to push the piston rod forward, so that the piston rod extends, driving the probe 304 to contact the product to be tested. Test the pin of relay 13. At this time, the industrial computer detects that the No. 1 test fixture is in use, controls the withstand voltage tester and the test power supply to supply power to the relay test board of the No. 1 test fixture. When the test is completed, the industrial computer returns a test signal according to the test result. If the relay to be tested is a good product, a signal is sent to the OK indicator light connected to the No. 1 test fixture, and the OK indicator light is turned on. The OK indicator light is displayed as a green light. If the relay to be tested is a defective product, a signal is sent to the NG indicator light, and the NG indicator light is turned on. The specific test data can be shown on the display. During the test of the No. 1 test fixture, the operator can immediately use the No. 2 test fixture to test the second relay. A total of 6 relays can be placed in sequence without having to wait for the previous relay test to be completed before unloading the tested relay, and then testing other relays. When the No. 1 test fixture is completed, the reset button can be pressed, and a new product can be placed in the No. 1 test fixture for testing.

[0029] Obviously, the embodiments described in this application are only some embodiments of this application, not all embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

Claims

1. A relay testing tool, characterized in that: It includes a mounting platform, a bearing seat arranged on the surface of the mounting platform, and a testing mechanism; the bearing seat is used to place the relay to be tested, and the testing mechanism is arranged behind the bearing seat, including a linear cylinder, a solenoid valve, a probe assembly and a micro switch, the micro switch is used to start the testing mechanism for testing, the solenoid valve controls the extension and retraction of the linear cylinder piston rod, and the testing mechanism is used to test the relay on the bearing seat.

2. A relay testing tool according to claim 1, characterized in that: The probe assembly includes a probe mounting plate, a plurality of probes mounted on the probe mounting plate, and an aviation plug female connector connected to the electrical signals of the probes. The probe mounting plate is fixed to the top end of the piston rod of the linear cylinder, and the linear cylinder drives the probe mounting plate to move forward and backward to drive the probes to contact the relay pins or detach from the relay pins.

3. A relay testing tool according to claim 2, characterized in that: The test tool also includes a relay test board for receiving and outputting test signals, and the relay test board is connected to a male aviation plug that is plugged into the female aviation plug; the mounting platform is also provided with a heavy-duty connector that is electrically connected to the relay test board.

4. A relay testing tool according to claim 2, characterized in that: A pair of positioning pins are vertically arranged on the surface of the bearing seat. The positioning pins are made of conductive material and are used to cooperate with the positioning holes on the relay to fix the relay to be tested and abut against the probe to transmit the relay signal.

5. The multi-station relay testing tool according to claim 1, characterized in that: A cover plate is hinged on the side of the mounting platform, and a limit block is also provided to limit the flipping angle of the cover plate. The cover plate provides a stable testing environment.

6. A relay testing device, characterized in that: The invention comprises the relay test fixture according to claims 1 to 5, and also comprises a cabinet and an electric control component; the relay test fixture is multiple, and each two relay test fixtures form a group; the electric control component comprises: A DC power supply module, used to provide DC input for the test fixture and the electronic equipment on the test equipment, including a first DC power supply V1 and a second DC power supply V2; A test module, used for providing a test signal for the test fixture, comprising at least one set of a withstand voltage tester and a test power supply, each of the withstand voltage tester and the test power supply being connected to two sets of the test fixture; The DC power supply module and the test module are connected to the test fixture via a heavy-duty connector; An industrial computer is connected to the withstand voltage tester and the test power supply, and is used to control each group of the withstand voltage tester and the test power supply to achieve synchronous switching between the two connected test fixtures.

7. The relay testing device according to claim 6, characterized in that: The relay testing equipment also includes a starting switch and an indicator light group, the number of which is consistent with the number of the testing fixtures, each starting switch and an indicator light group are electrically connected to a testing fixture, and the indicator light group includes an NG indicator light and an OK indicator light.

Citation Information

Patent Citations

  • Relay capable of improving PIN fixing stability

    CN112382537A

  • Direct current contactor insulation performance detection device

    CN112858830A

  • Relay detection device

    CN115407190A

  • Railway system relay test system and test method

    CN118150995A

  • Promote PIN needle stationary stable's relay

    CN206639746U