Information supervision system and method for realizing intelligent management of engineering data
By analyzing the work ability index and historical information of construction personnel during construction projects, establishing a construction time analysis model, dividing construction areas and managing monitoring data, the problem of invalid accumulation and deletion of monitoring terminal data is solved, and the accuracy of construction abnormal judgment is improved and data management efficiency.
Patent Information
- Application Number
- CN202411048990.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-15
AI Technical Summary
During the construction process of construction projects, the construction data stored in the monitoring terminal loses its reference significance as the construction area is completed, resulting in the accumulation of invalid data. It is difficult for the existing technology to quickly screen valid data when deleting data, which affects the accuracy of abnormal conditions judgment. And may interfere with data transmission.
Using engineering information collection module, storage reference data generation module, monitoring data storage division module and data screening management module, analyzing the work ability index and historical information of construction personnel, establish a construction time analysis model, divide the construction area and select the data storage location. , realize intelligent screening and management of monitoring data.
It improves the accuracy of judging construction abnormal conditions, reduces the accumulation of invalid data, avoids the deletion of effective data, reduces the risk of insufficient storage space, and improves the efficiency of data deletion.
Smart Images

Figure CN118966688A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering data supervision, and in particular to an information supervision system and method for realizing intelligent management of engineering data. Background Art
[0002] Construction projects are usually carried out in multiple areas. To ensure construction safety, it is necessary to monitor the safety of construction operations in each area in real time during the construction process, and transmit and store the monitored real-time data to the construction monitoring terminal. The purpose of storing the monitoring data during construction is to use the stored data as reference data to judge abnormal conditions during construction operations when the same construction work is carried out later during the construction process, which can improve the accuracy of abnormal condition judgment results.
[0003] However, during the construction of a building project, if a certain construction work has been completed and the corresponding project will not carry out the corresponding completed construction work later, the monitoring data of the corresponding construction work stored in the monitoring terminal will no longer have reference significance. Failure to delete the monitoring data of the corresponding construction work in time will aggravate the accumulation of invalid data in the monitoring terminal. Since the construction of a building project is generally a long-term construction process, the monitoring terminal will accumulate a large amount of monitoring data. The existing technology generally deletes the data when it is found that the data storage space of the monitoring terminal is insufficient. There are the following disadvantages: First, it is impossible to quickly filter out the monitoring data that needs to be deleted, and some valid data may be deleted, which may lead to the lack of reference data for subsequent abnormal construction condition judgment, thereby reducing the accuracy of the judgment result; second, the insufficient storage space has already occurred, which will cause certain interference to the success rate of monitoring data transmission before taking data deletion measures.
[0004] Therefore, people need an information supervision system and method that can realize intelligent management of engineering data to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide an information supervision system and method for realizing intelligent management of engineering data, so as to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: an information supervision system for realizing intelligent management of engineering data, the system comprising: an engineering information acquisition module, a storage reference data generation module, a monitoring data storage partitioning module and a data screening management module;
[0007] Collecting current project plan information and construction history information through the project information collection module;
[0008] The storage reference data generation module is used to analyze the work ability index of the personnel performing the construction work, the work ability index and the construction history information are combined into reference data for the construction monitoring data storage planning, and the construction time analysis model is established after fitting the reference data;
[0009] Retrieving the current engineering plan information through the monitoring data storage division module, inputting the current engineering plan data into the construction time analysis model to obtain the output result, dividing the construction area according to the output result, and selecting the storage location of the monitoring data according to the division result;
[0010] The data screening management module is used to perform screening management on the stored monitoring data during the engineering construction process.
[0011] Furthermore, the engineering information collection module includes a construction area information collection unit, a planned construction data collection unit and a construction personnel information collection unit;
[0012] The construction area information collection unit is used to collect the construction work information that needs to be completed in different construction areas of the current construction site;
[0013] The planned construction data collection unit is used to collect the number of personnel information currently scheduled to complete the corresponding construction work for each construction area that needs to complete the same construction work and the historical information of the arranged personnel. The construction areas that currently need to complete the same construction work are all scheduled to start the corresponding construction work at the same time. The historical information of the arranged personnel includes the personnel's working years information and the number of times they were scheduled to complete the corresponding same construction work before the current time;
[0014] The construction personnel information collection unit is used to collect the number of personnel who have completed the same corresponding construction work in the past and the time information taken to complete the same corresponding construction work in the past. The construction personnel information collection unit is also used to collect the number of years of work of the personnel when performing the corresponding construction work in the past and the number of times they were arranged to complete the same construction work before performing the corresponding construction work.
[0015] Furthermore, the storage reference data generation module includes a historical data retrieval unit, a personnel information analysis unit and a construction time analysis model establishment unit;
[0016] The historical data retrieval unit is used to retrieve the information of the years of service of the currently scheduled personnel and the number of times the personnel were scheduled to complete the same construction work before the current time to the personnel information analysis unit, and at the same time retrieve the information of the years of service of the personnel when the corresponding construction work was performed in the past and the number of times the personnel were scheduled to complete the same construction work before the corresponding construction work was performed to the personnel information analysis unit;
[0017] The personnel information analysis unit is used to analyze the work ability index of personnel who are currently assigned to complete the same construction work in different construction areas and the historical work ability index of personnel who were assigned to complete the same construction work at different times in the past;
[0018] The construction time analysis model building unit is used to combine the historical work capacity coefficient of personnel, the number of personnel who have completed the same construction work in the past, and the time spent on completing the same construction work in the past into data points, and to build a construction time analysis model after fitting the data points.
[0019] Further, the monitoring data storage division module includes a completion time prediction unit, a region division unit and a monitoring data storage unit;
[0020] The completion time prediction unit is used to substitute the work ability index of the personnel currently scheduled to complete the same construction work in different construction areas and the number of personnel scheduled to complete the corresponding construction work in different areas into the construction time analysis model to predict the time required to complete the same construction work in different construction areas;
[0021] The area division unit is used to divide the current construction area according to the time required to complete the same construction work, monitor the construction process in real time when the corresponding construction work starts in the construction area, and transmit the monitored data to the construction monitoring terminal;
[0022] The monitoring data storage unit is used to store data monitored in construction areas divided into the same group in the same location.
[0023] Further, the data screening management module includes a progress viewing time selection unit and a monitoring data screening unit;
[0024] The progress checking time selection unit is used to select the time to check the progress of the corresponding construction work in different construction areas according to the construction area division result;
[0025] The monitoring data screening unit is used to retrieve the monitoring data of the corresponding group of construction areas stored in the same location from the construction monitoring terminal if it is found at a selected time that all the corresponding construction work in the construction areas divided into the same group has been completed, and delete the data monitored in the corresponding group of construction areas. The deleted data is the data monitored in real time during the corresponding construction work after the same construction work is started in the corresponding group of construction areas.
[0026] An information supervision method for realizing intelligent management of engineering data comprises the following steps:
[0027] Z1: Collect current project plan information and construction history information;
[0028] Z2: Analyze the work ability index of the personnel performing construction work, and use the work ability index and construction history information to form reference data for construction monitoring data storage planning. After fitting the reference data, establish a construction time analysis model;
[0029] Z3: Retrieve the current project plan information, input the current project plan data into the construction time analysis model to obtain the output result, divide the construction area according to the output result, and select the storage location of the monitoring data according to the division result;
[0030] Z4: Screening and management of stored monitoring data during the construction process.
[0031] Further, in step Z1: collect the information of construction work to be completed in different construction areas of the current construction site, screen out the construction areas that need to complete the same construction work, and collect the number of personnel to complete the corresponding construction work for the construction area that needs to complete a random construction work, which is W = {W1, W2, ... W i , …W r}, where r represents the number of construction areas that need to complete a random construction work, and the set of working years of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas is M = {M1, M2, …, M n}, the number of times that n personnel are scheduled to complete the same construction work before the current time is A = {A1, A2, ..., A n}, where n represents the number of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas, and the number of personnel who completed the same construction work in each previous construction project is E = {E1, E2, ..., E m}, the time set spent on completing the corresponding construction work in the past is t = {t1, t2, ..., t m}, m represents the number of historical construction times, and collects information on the working years of personnel each time the corresponding construction work was carried out and the number of times the personnel were arranged to complete the same construction work before the corresponding construction work was carried out.
[0032] Further, in step Z2: according to U i =(∑ n j=1 (M j )+∑ n j=1 (A j )) / nCalculate the work ability index U of the personnel currently assigned to complete the same construction work in the i-th construction area i, the work ability index set of the personnel assigned to complete the same construction work in r construction areas is U = {U1, U2, ...U i , …U r}, retrieve the set of working years of personnel in the previous e-th construction project when performing the same construction work as that in the previous construction project, which is V = {V1, V2, ..., V g}, the number of times the same construction work is scheduled to be completed before the corresponding construction work is c = {c1, c2, ..., c g}, according to P e =(∑ g f=1 (V f )+∑ g f=1 (c f )) / g Calculate the historical work ability index P of the personnel who were assigned to complete the same construction work as the current work for the eth time in the past e , where V f represents the number of years the fth person has worked in the same construction work in the previous eth construction project, c f represents the number of times the fth person was assigned to complete the same construction work before performing the corresponding construction work, and the historical work ability index set of the people who were assigned to complete the same construction work as the current work is P = {P1, P2, ...P e , …P m}, forming reference data points {(E1, P1, t1), (E2, P2, t2), … (E e , P e , t e ),…(E m , P m , t m )}, and then build the construction time analysis model after fitting the reference data points:
[0033] z=β0*x+β1*y+β2;
[0034] Among them, β0, β1 and β2 represent the fitting coefficients, x represents the first independent variable in the model referring to the number of personnel, y represents the second independent variable in the model referring to the work ability index, and z represents the dependent variable in the model referring to the time spent to complete the construction work.
[0035] Furthermore, in step Z3: W i and U i Substitute into the construction time analysis model: Let x = W i ,y=U i , it is predicted that the time required for the personnel arranged in the i-th construction area to complete the corresponding construction work is β0*W i+β1*U i +β2, in the same way, the data in sets W and U are substituted into the construction time analysis model one by one, and the predicted time set required for personnel arranged in r areas to complete the corresponding construction work is T = {T1, T2, ...T i ,…T r}, arrange the r construction areas in ascending order according to the elements in the set T, and randomly divide the sorted construction areas into d groups. The predicted time required for the personnel arranged in all construction areas in the first group to complete the corresponding construction work is less than that in the second group. In a random division result, the average time required for each construction area in the d group to complete the construction work is T ’ ={T1 ’ , T2 ’ ,…T d ’}, calculate the goodness Q of a random partition result according to the following formula:
[0036] Q=[∑ d b=1 (T b ’ -(∑ d b=1 (T b ’ )) / d) 2 ] / d;
[0037] Calculate and compare the goodness of different division results, select the division result with the highest goodness as the final construction area division result, monitor the construction process in real time when the corresponding construction work starts in r construction areas, transmit the monitored data to the construction monitoring terminal, and store the monitored data in the construction areas of the same group in the same location according to the final construction area division result;
[0038] Arranging different numbers of personnel with different work experience to carry out construction work will result in different construction progress. Big data technology is used to collect information on construction personnel who have previously performed the same construction work and information on the number of personnel previously arranged to perform the same construction work. The work ability of construction personnel is analyzed based on their working hours and the number of times they have performed the same construction work. The longer the working hours and the more times they have performed the same construction work, the more experience the corresponding construction personnel have in the construction work and the stronger their work ability. The number of personnel, personnel work ability index and the time spent on completing construction in the past are combined into historical reference data. After fitting the reference data, a construction time analysis model is established to reflect the time required to complete the corresponding construction work under different circumstances. The currently planned number of personnel and personnel work ability coefficient are input into the construction time. In the analysis model, the output result is the predicted time required for different construction areas to complete the corresponding construction work under the current circumstances, which improves the accuracy of the prediction results. After predicting the time required for different construction areas to complete the same construction work, the construction areas are divided according to time, and the division result with the highest degree of excellence is selected. The time corresponding to the construction areas in each group is closest in the division result with the highest degree of excellence. The purpose of the division is to perform monitoring data management in advance: the data of the corresponding construction work monitored by the construction areas divided into the same group are stored in the same location, which is conducive to quickly finding and retrieving the data for deletion when the corresponding monitoring data needs to be deleted later. At the same time, the time to complete the construction work in the same group of construction areas is similar, which can help to delete the data at the appropriate time in the future, speeding up the speed of finding the data that needs to be deleted.
[0039] Furthermore, in step Z4: in the final construction area division result, for the construction area in the first group, the predicted time set required to complete the construction work is L = {L1, L2, ... L k}, where k represents the number of construction areas in the first group, and the longest time required to select them is L max , select the interval time L after starting the corresponding construction work max Check the progress of the corresponding construction work in the construction area of the first group at the selected time. If it is found that the construction area of the first group has completed the corresponding construction work at the selected time, the construction work will no longer be carried out after the corresponding construction work in the construction area is completed. The monitoring data of the first group of construction areas is retrieved from the construction monitoring terminal, and the data monitored in the corresponding group of construction areas is deleted together. In the same way, the time for checking the progress of the corresponding construction work in the construction areas of the remaining groups is selected and the monitoring data is deleted;
[0040] The time for checking the construction progress is selected based on the construction area division results, and the viewing time is selected based on the time predicted to complete the construction work in the same group of construction areas, and the longest time required is selected therefrom. The construction progress of the same group of construction areas is checked at the longest interval selected after the start of the construction work. The probability that the corresponding group of construction areas has completed the corresponding construction work after the longest interval is the highest, which is conducive to increasing the probability of checking that the corresponding group of construction areas has completed the construction work, reducing the workload of progress viewing, and deleting the monitoring data after the same construction work has been completed in the same group of construction areas. The corresponding construction work monitoring data has become invalid data, which effectively alleviates the accumulation of invalid data in the monitoring terminal, and performs targeted data deletion during the project, which reduces the probability of insufficient storage space on the monitoring terminal while avoiding deletion of valid data.
[0041] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0042] The present invention uses big data technology to collect information on construction personnel who have performed the same construction work in the past and information on the number of personnel who have been arranged to perform the same construction work in the past, analyzes the work ability of the construction personnel according to the working time of the construction personnel and the number of times the same construction work has been performed, and forms historical reference data by combining the number of personnel, the personnel work ability index and the time spent on completing the construction in the past. After fitting the reference data, a construction time analysis model is established to reflect the time required to complete the corresponding construction work under different circumstances, and the number of personnel currently planned and the personnel work ability coefficient are input into the construction time analysis model. The output result is the predicted time required to complete the corresponding construction work in different construction areas under the current situation, thereby improving the accuracy of the prediction result. After predicting the time required to complete the same construction work in different construction areas, the construction areas are divided according to time, and the division result with the highest degree of excellence is selected. The purpose of the division is to perform monitoring data storage management in advance: the data of the corresponding construction work monitored by the construction areas divided into the same group when in progress is stored in the same location, which is conducive to quickly finding and retrieving the data for deletion when the corresponding monitoring data needs to be deleted later. At the same time, the time for completing the construction work in the same group of construction areas is similar, which can help to delete the data at the appropriate time later, thereby speeding up the speed of finding the data to be deleted.
[0043] The viewing time is selected based on the time predicted to complete the construction work in the same group of construction areas, and the longest time required is selected. The construction progress of the same group of construction areas is checked at the longest interval selected after the start of the construction work. The probability that the corresponding group of construction areas has completed the corresponding construction work after the longest interval is the highest, which is conducive to increasing the probability of checking that the corresponding group of construction areas has completed the construction work, reducing the workload of progress viewing, and deleting the monitoring data after the same construction work has been completed in the same group of construction areas. The corresponding construction work monitoring data has become invalid data, which effectively alleviates the accumulation of invalid data in the monitoring terminal. Targeted data deletion is performed during the project, which avoids deletion of valid data and reduces the probability of insufficient storage space on the monitoring terminal. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0045] Figure 1 This is a structural diagram of an information supervision system for realizing intelligent management of engineering data according to the present invention;
[0046] Figure 2 The present invention is a flow chart of an information supervision method for realizing intelligent management of engineering data. DETAILED DESCRIPTION
[0047] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0048] Combine the following Figure 1-Figure 2 The present invention is further described with reference to the accompanying drawings and specific embodiments.
[0049] Embodiment 1:
[0050] like Figure 1 As shown, this embodiment provides an information supervision system for realizing intelligent management of engineering data, the system includes: an engineering information collection module, a storage reference data generation module, a monitoring data storage partition module and a data screening management module;
[0051] Collect current project plan information and construction history information through the project information collection module;
[0052] The work ability index of the construction personnel is analyzed by the storage reference data generation module, and the work ability index and the construction history information are combined into reference data for the construction monitoring data storage planning. After fitting the reference data, a construction time analysis model is established;
[0053] The current project plan information is retrieved through the monitoring data storage partitioning module, the current project plan data is input into the construction time analysis model to obtain the output result, the construction area is divided according to the output result, and the storage location of the monitoring data is selected according to the division result;
[0054] The stored monitoring data is screened and managed during the construction process through the data screening management module;
[0055] The output end of the engineering plan information acquisition module is connected to the input end of the storage reference data generation module, the output end of the storage reference data generation module is connected to the input end of the monitoring data storage partition module, and the output end of the monitoring data storage partition module is connected to the input end of the data screening management module.
[0056] The engineering information collection module includes a construction area information collection unit, a planned construction data collection unit, and a construction personnel information collection unit;
[0057] The construction area information collection unit is used to collect the construction work information that needs to be completed in different construction areas of the current construction site;
[0058] The planned construction data collection unit is used to collect the number of personnel information currently scheduled for each construction area that needs to complete the same construction work and the historical information of the arranged personnel. The construction areas that currently need to complete the same construction work are all scheduled to start the corresponding construction work at the same time. The historical information of the arranged personnel includes the personnel's working years information and the number of times they were scheduled to complete the corresponding same construction work before the current time;
[0059] The construction personnel information collection unit is used to collect the number of personnel who have completed the same construction work in the past and the time spent on completing the same construction work in the past. The construction personnel information collection unit is also used to collect the number of years of service of the personnel when performing the corresponding construction work in the past and the number of times they were arranged to complete the same construction work before performing the corresponding construction work;
[0060] The output end of the construction area information collection unit is connected to the input end of the planned construction data collection unit.
[0061] The storage reference data generation module includes a historical data retrieval unit, a personnel information analysis unit, and a construction time analysis model establishment unit;
[0062] The historical data retrieval unit is used to retrieve the information of the years of service of the currently scheduled personnel and the number of times the personnel were scheduled to complete the same construction work before the current time to the personnel information analysis unit, and at the same time retrieve the information of the years of service of the personnel when the corresponding construction work was performed in the past and the number of times the personnel were scheduled to complete the same construction work before the corresponding construction work was performed to the personnel information analysis unit;
[0063] The personnel information analysis unit is used to analyze the work ability index of personnel currently assigned to complete the same construction work in different construction areas and the historical work ability index of personnel who were assigned to complete the same construction work at different times in the past;
[0064] The construction time analysis model establishment unit is used to form data points based on the historical work capacity coefficient of personnel, the number of personnel who have completed the same construction work in the past, and the time spent on completing the same construction work in the past, and to establish a construction time analysis model after fitting the data points;
[0065] The input end of the historical data retrieval unit is connected to the output end of the planned construction data collection unit, the input end of the personnel information analysis unit is connected to the output end of the construction personnel information collection unit, and the input end of the construction time analysis model establishment unit is connected to the output end of the historical data retrieval unit and the personnel information analysis unit.
[0066] The monitoring data storage division module includes a completion time prediction unit, an area division unit and a monitoring data storage unit;
[0067] The completion time prediction unit is used to substitute the work ability index of the personnel currently scheduled to complete the same construction work in different construction areas and the number of personnel scheduled to complete the corresponding construction work in different areas into the construction time analysis model to predict the time required to complete the same construction work in different construction areas;
[0068] The area division unit is used to divide the current construction area according to the time required to complete the same construction work, monitor the construction process in real time when the corresponding construction work starts in the construction area, and transmit the monitored data to the construction monitoring terminal;
[0069] The monitoring data storage unit is used to store the data monitored in the construction areas divided into the same group in the same location;
[0070] The input end of the completion time prediction unit is connected to the output end of the construction time analysis model establishment unit, the output end of the completion time prediction unit is connected to the input end of the area division unit, and the output end of the area division unit is connected to the input end of the monitoring data storage unit.
[0071] The data screening management module includes a progress viewing time selection unit and a monitoring data screening unit;
[0072] The progress checking time selection unit is used to select the time to check the progress of the corresponding construction work in different construction areas according to the construction area division result;
[0073] The monitoring data screening unit is used to retrieve the monitoring data of the corresponding group of construction areas stored in the same location from the construction monitoring terminal if it is found at the selected time that all the corresponding construction work in the construction areas divided into the same group has been completed, and delete the data monitored in the corresponding group of construction areas at the same time. The deleted data is the data monitored in real time during the corresponding construction work after the corresponding group of construction areas starts to carry out the same construction work;
[0074] The input end of the progress checking time selection unit is connected to the output end of the completion time prediction unit, and the input end of the monitoring data screening unit is connected to the output end of the monitoring data storage unit and the progress checking time selection unit.
[0075] Embodiment 2:
[0076] like Figure 2 As shown, this embodiment provides an information supervision method for realizing intelligent management of engineering data, which is implemented based on the information supervision system in the embodiment and specifically includes the following steps:
[0077] Z1: Collect current project plan information and construction history information: Collect the construction work information that needs to be completed in different construction areas of the current construction site, filter out the construction areas that need to complete the same construction work, and collect the number of personnel who need to complete a random construction area with the same construction work and arrange to complete the corresponding construction work, which is W = {W1,
[0078] W2,…W i , …W r}, where r represents the number of construction areas that need to complete a random construction work, and the set of working years of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas is M = {M1, M2, …, M n}, the number of times that n personnel are scheduled to complete the same construction work before the current time is A = {A1, A2, ..., A n}, where n represents the number of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas, and the number of personnel who completed the same construction work in each previous construction project is E = {E1, E2, ..., E m}, the time set spent on completing the corresponding construction work in the past is t = {t1, t2, ..., t m}, m represents the number of historical constructions, which collects the information on the number of years of service of personnel in each previous corresponding construction work and the number of times they were arranged to complete the same construction work before the corresponding construction work was carried out;
[0079] Z2: Analyze the work ability index of the personnel doing the construction work, and use the work ability index and construction history information to form reference data for construction monitoring data storage planning. After fitting the reference data, establish a construction time analysis model: According to U i =(∑ n j=1 (M j )+∑ n j=1 (A j )) / nCalculate the work ability index U of the personnel currently assigned to complete the same construction work in the i-th construction area i , the work ability index set of the personnel assigned to complete the same construction work in r construction areas is U = {U1, U2, ...U i , …U r}, retrieve the set of working years of personnel in the previous e-th construction project when performing the same construction work as that in the previous construction project, which is V = {V1, V2, ..., V g}, the number of times the same construction work is scheduled to be completed before the corresponding construction work is c = {c1, c2, ..., c g}, according to P e =(∑ g f=1 (V f )+∑ g f=1 (c f )) / g Calculate the historical work ability index P of the personnel who were assigned to complete the same construction work as the current work for the eth time in the past e , where V f represents the number of years the fth person has worked in the same construction work in the previous eth construction project, c f represents the number of times the fth person was assigned to complete the same construction work before performing the corresponding construction work, and the historical work ability index set of the people who were assigned to complete the same construction work as the current work is P = {P1, P2, ...P e , …P m}, forming reference data points {(E1, P1, t1), (E2, P2, t2), … (E e , P e , t e ),…(E m , P m , t m)}, and then build the construction time analysis model after fitting the reference data points:
[0080] z=β0*x+β1*y+β2;
[0081] Among them, β0, β1 and β2 represent the fitting coefficients, x represents the first independent variable in the model referring to the number of personnel, y represents the second independent variable in the model referring to the work ability index, z represents the dependent variable in the model referring to the time spent on completing the construction work, and * represents the multiplication sign;
[0082] Z3: Retrieve the current project plan information, input the current project plan data into the construction time analysis model to obtain the output result, divide the construction area according to the output result, and select the storage location of the monitoring data according to the division result: i and U i Substitute into the construction time analysis model: Let x = W i ,y=U i , it is predicted that the time required for the personnel arranged in the i-th construction area to complete the corresponding construction work is β0*W i +β1*U i +β2, in the same way, the data in sets W and U are substituted into the construction time analysis model one by one, and the predicted time set required for personnel arranged in r areas to complete the corresponding construction work is T = {T1, T2, ...T i ,…T r}, arrange the r construction areas in ascending order according to the elements in the set T, and randomly divide the sorted construction areas into d groups. The predicted time required for the personnel arranged in all construction areas in the first group to complete the corresponding construction work is less than that in the second group. In a random division result, the average time required for each construction area in the d group to complete the construction work is T ’ ={T1 ’ , T2 ’ ,…T d ’}, calculate the goodness Q of a random partition result according to the following formula:
[0083] Q=[∑ d b=1 (T b ’ -(∑ d b=1 (T b ’ )) / d) 2 ] / d;
[0084] Calculate and compare the goodness of different division results, select the division result with the highest goodness as the final construction area division result, monitor the construction process in real time when the corresponding construction work starts in r construction areas, transmit the monitored data to the construction monitoring terminal, and store the monitored data in the construction areas of the same group in the same location according to the final construction area division result;
[0085] For example: It is predicted that the time set required for personnel arranged in r areas to complete the steel bar binding construction work in the area is T = {T1, T2, T3, T4, T5, T6, T7} = {1, 1.5, 1.2, 5, 10, 12, 5.5}, the unit is: day, r = 7, the 7 construction areas are arranged in the order of the elements in the set T from small to large, and the sorted construction areas are randomly divided into 3 groups. The random division result is obtained: the time sets required for the 3 groups of construction areas to complete the construction work are {1, 1.2}, {1.5, 5} and {5.5, 10, 12} respectively. In the corresponding division results, the average time set required for each of the 3 groups of construction areas to complete the construction work is T ’ ={T1 ’ , T2 ’ , T3 ’}={1.1, 3.25, 9.2}, the goodness of the corresponding division result is calculated to be 11.7, the division result with the highest goodness is selected as the final construction area division result, and the division result with the highest goodness is: the time sets required to complete the construction work in the three construction areas are {1, 1.2, 1.5}, {5, 5.5} and {10, 12} respectively, and the monitoring data of the steel bar binding construction work monitored in the construction areas corresponding to T1, T2 and T3, for example: the image data of the binding process is transmitted to the construction monitoring terminal and stored in the same location; the monitoring data of the steel bar binding construction work monitored in the construction areas corresponding to T4 and T7 is transmitted to the construction monitoring terminal and stored in the same location; the monitoring data of the steel bar binding construction work monitored in the construction areas corresponding to T5 and T6 is transmitted to the construction monitoring terminal and stored in the same location;
[0086] Z4: Screening and managing the stored monitoring data during the construction process: In the final construction area division result, for the construction area in the first group, the predicted time set required to complete the construction work is L = {L1, L2, ... L k}, where k represents the number of construction areas in the first group, and the longest time required to select them is L max , select the interval time L after starting the corresponding construction work maxCheck the progress of the corresponding construction work in the construction area of the first group at the selected time. If it is found that the construction area of the first group has completed the corresponding construction work at the selected time, the monitoring data of the first group of construction areas is retrieved from the construction monitoring terminal, and the data monitored in the corresponding group of construction areas are deleted together. In the same way, the time for checking the progress of the corresponding construction work in the construction areas of the remaining groups is selected and the monitoring data is deleted;
[0087] For example, for the construction area in the second group, the predicted time set required to complete the construction work is {5, 5.5}, and the longest time required is L max =5.5, choose to check the progress of the corresponding construction work in the construction area of the second group 5.5 days after the start of the corresponding construction work. If 5.5 days after the start of the corresponding construction work, it is found that the construction areas in the second group have completed the corresponding same construction work, the monitoring data of the second group of construction areas will be retrieved from the construction monitoring terminal, and the data monitored in the second group of construction areas will be deleted together.
[0088] Finally, it should be noted that the above description is only a preferred example of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An information supervision system for realizing intelligent management of engineering data, characterized in that: The system includes: an engineering information acquisition module, a storage reference data generation module, a monitoring data storage partitioning module and a data screening management module; Collecting current project plan information and construction history information through the project information collection module; The storage reference data generation module is used to analyze the work ability index of the personnel performing the construction work, the work ability index and the construction history information are combined into reference data for the construction monitoring data storage planning, and the construction time analysis model is established after fitting the reference data; Retrieving the current engineering plan information through the monitoring data storage division module, inputting the current engineering plan data into the construction time analysis model to obtain the output result, dividing the construction area according to the output result, and selecting the storage location of the monitoring data according to the division result; The data screening management module is used to perform screening management on the stored monitoring data during the engineering construction process.
2. The information supervision system for realizing intelligent management of engineering data according to claim 1, characterized in that: The engineering information collection module includes a construction area information collection unit, a planned construction data collection unit and a construction personnel information collection unit; The construction area information collection unit is used to collect the construction work information that needs to be completed in different construction areas of the current construction site; The planned construction data collection unit is used to collect the number of personnel currently scheduled to complete the corresponding construction work for each construction area that needs to complete the same construction work and the historical information of the scheduled personnel, the historical information of the scheduled personnel including the personnel's working years information and the number of times they were scheduled to complete the corresponding same construction work before the current time; The construction personnel information collection unit is used to collect the number of personnel who have completed the same corresponding construction work in the past and the time information taken to complete the same corresponding construction work in the past. The construction personnel information collection unit is also used to collect the number of years of work of the personnel when performing the corresponding construction work in the past and the number of times they were arranged to complete the same construction work before performing the corresponding construction work.
3. The information supervision system for realizing intelligent management of engineering data according to claim 2, characterized in that: The storage reference data generation module includes a historical data retrieval unit, a personnel information analysis unit and a construction time analysis model establishment unit; The historical data retrieval unit is used to retrieve the information of the years of service of the currently scheduled personnel and the number of times the personnel were scheduled to complete the same construction work before the current time to the personnel information analysis unit, and at the same time retrieve the information of the years of service of the personnel when the corresponding construction work was performed in the past and the number of times the personnel were scheduled to complete the same construction work before the corresponding construction work was performed to the personnel information analysis unit; The personnel information analysis unit is used to analyze the work ability index of personnel who are currently assigned to complete the same construction work in different construction areas and the historical work ability index of personnel who were assigned to complete the same construction work at different times in the past; The construction time analysis model building unit is used to combine the historical work capacity coefficient of personnel, the number of personnel who have completed the same construction work in the past, and the time spent on completing the same construction work in the past into data points, and to build a construction time analysis model after fitting the data points.
4. The information supervision system for realizing intelligent management of engineering data according to claim 3, characterized in that: The monitoring data storage division module includes a completion time prediction unit, a region division unit and a monitoring data storage unit; The completion time prediction unit is used to substitute the work ability index of the personnel currently scheduled to complete the same construction work in different construction areas and the number of personnel scheduled to complete the corresponding construction work in different areas into the construction time analysis model to predict the time required to complete the same construction work in different construction areas; The area division unit is used to divide the current construction area according to the time required to complete the same construction work, monitor the construction process in real time when the corresponding construction work starts in the construction area, and transmit the monitored data to the construction monitoring terminal; The monitoring data storage unit is used to store data monitored in construction areas divided into the same group in the same location.
5. The information supervision system for realizing intelligent management of engineering data according to claim 4, characterized in that: The data screening management module includes a progress viewing time selection unit and a monitoring data screening unit; The progress checking time selection unit is used to select the time to check the progress of the corresponding construction work in different construction areas according to the construction area division result; The monitoring data screening unit is used to retrieve the monitoring data of the corresponding group of construction areas stored in the same location from the construction monitoring terminal if it is found at a selected time that all the corresponding construction work in the construction areas divided into the same group has been completed, and delete the data monitored in the corresponding group of construction areas. The deleted data is the data monitored in real time during the corresponding construction work after the same construction work is started in the corresponding group of construction areas.
6. An information supervision method for realizing intelligent management of engineering data, characterized in that: The following steps are involved: Z1: Collect current project plan information and construction history information; Z2: Analyze the work ability index of the personnel performing construction work, and use the work ability index and construction history information to form reference data for construction monitoring data storage planning. After fitting the reference data, establish a construction time analysis model; Z3: Retrieve the current project plan information, input the current project plan data into the construction time analysis model to obtain the output result, divide the construction area according to the output result, and select the storage location of the monitoring data according to the division result; Z4: Screening and management of stored monitoring data during the construction process.
7. The information supervision method for realizing intelligent management of engineering data according to claim 6, characterized in that: In step Z1: collect the information of construction work to be completed in different construction areas of the current construction site, screen out the construction areas that need to complete the same construction work, and collect the number of personnel to complete the corresponding construction work for the construction area that needs to complete a random construction work, which is W = {W1, W2, ... W i , …W r }, where r represents the number of construction areas that need to complete a random construction work, and the set of working years of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas is M = {M1, M2, …, M n }, the number of times that n personnel are scheduled to complete the same construction work before the current time is A = {A1, A2, ..., A n }, where n represents the number of personnel scheduled to complete the corresponding construction work in a random construction area among the r areas, and the number of personnel who completed the same construction work in each previous construction project is E = {E1, E2, ..., E m }, the time set spent on completing the corresponding construction work in the past is t = {t1, t2, ..., t m }, m represents the number of historical construction times, and collects information on the working years of personnel each time the corresponding construction work was carried out and the number of times the personnel were arranged to complete the same construction work before the corresponding construction work was carried out.
8. The information supervision method for realizing intelligent management of engineering data according to claim 7, characterized in that: In step Z2: according to U i =(∑ n j=1 (M j )+∑ n j=1 (A j )) / nCalculate the work ability index U of the personnel currently assigned to complete the same construction work in the i-th construction area i , the work ability index set of the personnel assigned to complete the same construction work in r construction areas is U = {U1, U2, ...U i , …U r }, retrieve the set of working years of personnel in the previous e-th construction project when performing the same construction work as that in the previous construction project, which is V = {V1, V2, ..., V g }, the number of times the same construction work is scheduled to be completed before the corresponding construction work is c = {c1, c2, ..., c g }, according to P e =(∑ g f=1 (V f )+∑ g f=1 (c f )) / g Calculate the historical work ability index P of the personnel who were assigned to complete the same construction work as the current work for the eth time in the past e , where V f represents the number of years the fth person has worked in the same construction work in the previous eth construction project, c f represents the number of times the fth person was assigned to complete the same construction work before performing the corresponding construction work, and the historical work ability index set of the people who were assigned to complete the same construction work as the current work is P = {P1, P2, ...P e , …P m }, forming reference data points {(E1, P1, t1), (E2, P2, t2), … (E e , P e , t e ),…(E m , P m , t m )}, and then build the construction time analysis model after fitting the reference data points: z=β0*x+β1*y+β2; Among them, β0, β1 and β2 represent the fitting coefficients, x represents the first independent variable in the model referring to the number of personnel, y represents the second independent variable in the model referring to the work ability index, and z represents the dependent variable in the model referring to the time spent to complete the construction work.
9. The information supervision method for realizing intelligent management of engineering data according to claim 8, characterized in that: In step Z3: W i and U i Substitute into the construction time analysis model: Let x = W i ,y=U i , it is predicted that the time required for the personnel arranged in the i-th construction area to complete the corresponding construction work is β0*W i +β1*U i +β2, in the same way, the data in sets W and U are substituted into the construction time analysis model one by one, and the predicted time set required for personnel arranged in r areas to complete the corresponding construction work is T = {T1, T2, ...T i ,…T r }, arrange the r construction areas in ascending order according to the elements in the set T, randomly divide the sorted construction areas into d groups, and obtain a random division result. The average time required to complete the construction work in each construction area in the d groups is T ’ ={T1 ’ , T2 ’ ,…T d ’ }, calculate the goodness Q of a random partition result according to the following formula: Q=[∑ d b=1 (T b ’ -(∑ d b=1 (T b ’ )) / d) 2 ] / d; Calculate and compare the goodness of different division results, select the division result with the highest goodness as the final construction area division result, monitor the construction process in real time when the corresponding construction work starts in r construction areas, transmit the monitored data to the construction monitoring terminal, and store the monitored data in the construction areas of the same group in the same location according to the final construction area division result.
10. The information supervision method for realizing intelligent management of engineering data according to claim 9, characterized in that: In step Z4: in the final construction area division result, for the construction area in the first group, the predicted time set required to complete the construction work is L = {L1, L2, ... L k }, where k represents the number of construction areas in the first group, and the longest time required to select them is L max , select the interval time L after starting the corresponding construction work max Check the progress of the corresponding construction work in the construction area of the first group at the selected time. If it is found that the construction area in the first group has completed the corresponding construction work at the selected time, the monitoring data of the first group of construction areas will be retrieved from the construction monitoring terminal, and the data monitored in the corresponding group of construction areas will be deleted together. In the same way, select the time to check the progress of the corresponding construction work in the construction areas of the remaining groups and delete the monitoring data.