Day-ahead joint optimization scheduling method and system considering multivariate resource inertia
By building a power grid with multiple resources participating in joint optimization scheduling model recently, the problem of grid safety and stability under large disturbances was solved, the coordinated scheduling of multiple resources was realized, the frequency safety margin was improved, and the operating costs were reduced, and the single resource-dependent frequency modulation was solved. limitations of the way.
Patent Information
- Application Number
- CN202410849676.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-06-27
AI Technical Summary
Under large disturbances, it is difficult for the existing technology to effectively maintain the safety and stability of the power grid, especially when obtaining a frequency modulation auxiliary service, the frequency modulation method that depends on a single resource has limitations and cannot fully utilize the potential of multiple resources.
A recently-joint joint optimization scheduling method considering the inertia of multiple resources is proposed, and a model of multi-resource participation inertia and primary frequency modulation auxiliary services including thermal power units, wind power, photovoltaics, energy storage and frequency-active support loads is proposed. By constructing a large power grid, it is recently optimized. The scheduling model, the objective function is the sum of resource electrical energy and auxiliary service costs, and the constraints include load balancing, backup capacity, line current and system frequency safety. The Lagrangian multiplier method is used to solve dual problems to obtain electrical energy and frequency modulation. Marginal electricity price for ancillary services.
It realizes the safe and stable inertia and primary frequency modulation auxiliary services for maintaining the power grid under large disturbances. Through the coordinated scheduling of multiple resources, the system frequency safety margin is improved and the operating costs are reduced, which accurately reflects the safe and stable operation of multiple resources in the system. value in.
Smart Images

Figure CN118970871A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of safe and stable operation of power systems, and in particular to a day-ahead joint optimization dispatching method and system considering the inertia of multiple resources. Background Art
[0002] With the increasing proportion of new energy in the new power system, the stable operation of the power system faces unprecedented challenges. In order to maintain the stability and reliability of the system, frequency regulation auxiliary services have become an indispensable part of the operation of the power system. Traditional frequency regulation services mainly rely on the regulation capabilities of large generators, which respond to changes in system frequency by adjusting their power generation to maintain system stability. However, this frequency regulation method that relies on a single resource has many limitations. In recent years, with the widespread access to multiple resources and the continuous development of power electronic equipment, multiple resources including wind power, photovoltaics, and adjustable loads have provided new possibilities for frequency regulation services in power systems. In view of the above phenomenon, in order to promote the development of multiple resource frequency security auxiliary service technology in my country and promote the construction of a new power system frequency security auxiliary service market, it is necessary to study a joint optimization scheduling method for the day-ahead that considers the inertia of multiple resources and primary frequency regulation auxiliary services. Summary of the invention
[0003] In view of the problems existing in the prior art, the present invention is proposed.
[0004] Therefore, the problem to be solved by the present invention is how to solve the technical problem of obtaining inertia and primary frequency regulation auxiliary services to maintain safe and stable power grid under large disturbance conditions.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] In a first aspect, an embodiment of the present invention provides a day-ahead joint optimization scheduling method considering the inertia of multiple resources, which includes constructing a model for multiple resources participating in inertia and primary frequency regulation auxiliary services including thermal power units, wind power, photovoltaics, energy storage and frequency active support type loads;
[0007] A large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation ancillary services is constructed. The objective function is the sum of the electric energy of various resources and the cost of ancillary services. The constraints include load balance, spare capacity, line flow and system frequency security.
[0008] Perform day-ahead optimization scheduling calculations and perform linearization processing on nonlinear terms in frequency security constraints;
[0009] Based on the Lagrange multiplier method, the dual problem of day-ahead optimal dispatch is solved, and the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services are obtained as the settlement basis for various resources.
[0010] As a preferred solution of the day-ahead joint optimization scheduling method considering the inertia of multiple resources described in the present invention, the construction of the model based on the participation in inertia of multiple resources and primary frequency regulation auxiliary services includes the following steps:
[0011] The construction of the thermal power unit model includes the operation constraints of the thermal power unit and the primary frequency regulation capacity constraints provided by the thermal power unit; the operation constraints of the thermal power unit include the upper and lower limit constraints of output, the climbing constraints and the start and stop time constraints, which are respectively expressed as follows:
[0012] The upper and lower limits of thermal power unit output:
[0013] u i,t P i,min ≤P i,t ≤u i,t P i,max -R i,t
[0014] Thermal power unit climbing constraints:
[0015]
[0016] Start and stop time constraints of thermal power units:
[0017]
[0018] Among them, P i,min , P i,max are the minimum and maximum active output of thermal power unit i respectively; P i,t represents the active power of thermal power unit i at time t; R i,t is the primary frequency regulation capacity of thermal power unit i at time t; u i,t is a 0-1 variable describing the start / stop status of thermal power unit i at time t, u i,t =1 means the unit is running, u i,t =0 means the unit is shut down; P i,UR With P i,DR are the maximum increase and decrease of active power of thermal power unit i in period t; X i,t The continuous operation of unit i to time t (X i,t is positive) or continuous shutdown (X i,t is a negative value); M i,GT With M i,DT are the minimum operating time and minimum downtime of unit i respectively;
[0019] The primary frequency regulation capacity constraint provided by the thermal power unit is expressed as follows:
[0020]
[0021] in, It represents the climbing limit of the primary frequency regulation capacity of thermal power unit i;
[0022] In addition, the inertia time constant of the thermal power unit It is related to the setting of the unit itself and is usually an unchangeable constant.
[0023] As a preferred solution of the day-ahead joint optimization scheduling method considering the inertia of multiple resources described in the present invention, the construction of the model based on the participation in inertia of multiple resources and primary frequency regulation auxiliary services includes the following steps:
[0024] The construction of the wind turbine model includes wind turbine operation constraints, wind turbine capacity constraints for primary frequency regulation, and wind turbine inertia constraints. The rotational inertia of the wind turbine transmission shaft system can provide a certain inertia support for the system. Wind power needs to reserve a certain capacity in the output power to provide primary frequency regulation services to the system. The wind turbine operation constraints can be expressed as follows:
[0025]
[0026] Among them, P w,i,t and They represent the active power and predicted power of wind power i at time t respectively; R w,i,t represents the primary frequency regulation power capacity of wind power i at time t;
[0027] The wind turbine provides a frequency regulation capacity constraint that can be expressed as follows:
[0028]
[0029] Among them, ε w,i It represents the proportional coefficient of the primary frequency regulation capacity of fan i.
[0030] The inertia constraint provided by the wind turbine can be expressed as follows:
[0031]
[0032] in, and They represent the inertia time constant of wind power i at time t and its set value respectively; A 0-1 decision variable describing the inertial support service provided by wind power. Indicates that wind power provides inertia support at time t, Indicates that it is not provided;
[0033] In addition, in order to avoid secondary oscillation caused by the absorption of active power from the system during the process of wind turbine speed recovery after providing inertia support, the time for wind turbine speed recovery is delayed until the primary frequency regulation of the system fully responds through control methods. The active power required for wind turbine recovery is jointly borne by all primary frequency regulation resources. The maximum inertia support power required by wind power is expressed as follows:
[0034]
[0035] in, represents the rated power of wind power i; Indicates the maximum frequency change rate allowed by the system; f0 indicates the rated frequency of the system;
[0036] The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services also includes the following steps: constructing a photovoltaic unit model, the photovoltaic unit model includes photovoltaic operation constraints and photovoltaic primary frequency regulation capacity constraints, and the photovoltaic array provides virtual inertia and primary frequency regulation services by configuring energy storage; the photovoltaic operation constraint adopts the following expression:
[0037]
[0038] Among them, P v,i,t and They represent the active power and predicted power of PV i at time t respectively;
[0039] The primary frequency regulation capacity constraint provided by photovoltaic power generation is expressed as follows:
[0040]
[0041] in, Represents the rated discharge power of photovoltaic i configuration energy storage; ε v,i Represents the proportional coefficient of the primary frequency modulation capacity of photoelectric i; R v,i,t represents the primary frequency modulation power capacity of photovoltaic i at time t;
[0042] Inertia time constant of photovoltaic i Defined by software, its value needs to comprehensively consider the performance of the configured energy storage.
[0043] As a preferred solution of the day-ahead joint optimization scheduling method considering the inertia of multiple resources described in the present invention, the construction of the model based on the participation in inertia of multiple resources and primary frequency regulation auxiliary services includes the following steps:
[0044] The construction of energy storage model includes operation constraints under energy storage discharge state, operation constraints under energy storage charging state, energy storage charge and discharge state constraints, and energy storage charge state constraints.
[0045] The operating constraints under the energy storage discharge state can be expressed as follows:
[0046]
[0047]
[0048]
[0049]
[0050]
[0051] in, They represent the discharge power and maximum value of energy storage i at time t respectively; With R ess,i,max They respectively represent the primary frequency modulation power capacity of energy storage i at time t when it is in the discharge state and the maximum primary frequency modulation capacity of energy storage i; is a 0-1 variable describing the energy storage discharge state, Indicates that the energy storage is in a discharging state. Indicates that the energy storage is in charging state; It represents the maximum inertial support power of energy storage i in the discharge state; and They represent the inertia time constant of energy storage i in the discharge state and the maximum inertia time constant of energy storage i respectively. It is a continuously adjustable decision variable, and the same is true for the charging state;
[0052] The operating constraints under the energy storage charging state can be expressed as follows:
[0053]
[0054]
[0055]
[0056]
[0057] in, They represent the discharge power and maximum value of energy storage i at time t respectively; It represents the primary frequency modulation power capacity provided by energy storage i at time t in the charging state; A 0-1 variable that modifies the energy storage charge state. Indicates that the energy storage is in charging state. Indicates that the energy storage is in a discharging state; It represents the maximum inertial support power of energy storage i in the charging state; represents the inertia time constant of energy storage i in the charging state;
[0058] The charge and discharge state constraints of energy storage can be expressed as follows:
[0059]
[0060] The energy storage state of charge constraint can be expressed as follows:
[0061]
[0062]
[0063] S ess,i,0 =S ess,i,T
[0064] Among them, S ess,i,t is the charge state of energy storage i at time t; E i,ess is the rated capacity of energy storage i, in kw·h; S ess,i,min With S ess,i,max are the minimum and maximum capacities of energy storage i under stable operation, respectively; and Respectively represent the energy storage i charging and discharging efficiency; It is represented as the reserved energy of energy storage i at time t; This is to ensure that the energy storage has enough energy released to support frequency safety when the energy storage is discharged. The expression is as follows:
[0065]
[0066]
[0067]
[0068] in, and They represent the energy required to be reserved for the energy storage i to provide inertia and primary frequency regulation services at time t; T ess Indicates the delivery time of energy storage primary frequency regulation service. The origin of is the integration of the primary frequency modulation response curve of the energy storage, and this paper adopts linear approximation;
[0069] The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps:
[0070] The construction of the frequency active support load model includes the frequency active support load operation constraints and the frequency active support load providing primary frequency regulation capacity constraints;
[0071] The frequency active support load operation constraint can be expressed as follows:
[0072]
[0073]
[0074]
[0075]
[0076] Where T is the number of scheduling period periods; W ad,max,i With W ad,min,i They are the maximum and minimum values of power after the frequency active support type load i is adjusted; P ad,i,t , They represent the load baseline and dispatched power of the frequency active support load i at time t respectively; and They represent the upward and downward power regulation of the frequency active support load respectively; P ad,i,max Adjust the power upper limit for the frequency active support load i at time t; and They represent the maximum power allowed to be increased and decreased by the frequency active support load i; η ad,i,t is a 0-1 variable describing the upward or downward adjustment of the frequency active support load, η ad,i,t =0 means the frequency active support type load is reduced, η ad,i,t =1 means the frequency active support load is adjusted upward;
[0077] The primary frequency regulation capacity constraint provided by the active frequency support load can be expressed as follows:
[0078]
[0079] Among them, R ad,i,t It represents the primary frequency regulation power capacity of the frequency active support load i at time t.
[0080] As a preferred solution of the day-ahead joint optimization dispatching method considering the inertia of multiple resources described in the present invention, wherein: the day-ahead optimization dispatching model of a large power grid based on building a model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services includes the following steps:
[0081] Construct the objective function:
[0082] minF=F g +F w +F ess +F ad
[0083] Among them, F is the overall purchase cost. g 、F w 、F ess 、Fad They represent the costs of thermal power units, wind power, photovoltaic power, energy storage and frequency active support loads respectively; the specific expressions are as follows:
[0084]
[0085] Among them, N G 、N s Respectively represent the total number of thermal power units and the number of output stages of thermal power units; ρ i,t,k and They represent the k-th segment quotation and corresponding output of thermal power unit i at time t respectively; Indicates the quotation of primary frequency regulation capacity of thermal power units; and They represent the startup and shutdown costs of thermal power unit i respectively, and the following expressions are used:
[0086]
[0087] Among them, N w represents the total amount of wind power; It represents the price quote for primary frequency regulation service of wind turbines;
[0088]
[0089] Among them, N ess Indicates the total amount of energy storage; They represent the charging and discharging quotations of energy storage i peak load shaving services respectively; They represent the quotations for energy storage primary frequency regulation service and inertia support service respectively;
[0090]
[0091] Among them, N ad Indicates the total number of frequency active support type loads; They represent the upper and lower price quotes for peak load regulation service of frequency active support type load i at time t respectively; Indicates the price quotation of primary frequency regulation service for active frequency support type load;
[0092] The constraints include system load power balance constraints, system positive and negative reserve capacity constraints, branch power flow safety constraints, and system frequency safety constraints;
[0093] The system load power balance constraint is expressed as follows:
[0094] The system needs to ensure that the load power balance requirements are met during the operation period. For each period t, the load power balance constraint can be described as:
[0095]
[0096] Among them, P i,t represents the winning bid power of thermal power unit i at time t; P load,t represents the predicted load of the system at time t; P i,t The analytical formula is as follows:
[0097]
[0098] The system positive and negative reserve capacity constraints are expressed as follows:
[0099]
[0100] Among them, R L,t is the active reserve required for the corresponding load at time t; R w,t,up With R w,t,down are the positive and negative spinning reserves required by wind power at time t, where R L,t , R w,t,up and R w,t,down They are respectively determined by a certain ratio of load output and wind power output;
[0101] The branch power flow safety constraint is expressed as follows:
[0102]
[0103] Among them, N bus is the number of system nodes; N b is the number of lines; P l,max is the active power transmission limit of line l; G j,l is the power transfer factor of node j to line l; P g,j,t , P w,j,t , P v,j,t are respectively the active power of conventional units, wind turbines, and photovoltaics at node j in period t; are the energy storage charging and discharging power at node j during period t; P load,j,t and They are respectively the active load and the frequency active support load at node j in period t;
[0104] The system frequency safety constraint is expressed as follows:
[0105] In order to meet the demand for computing efficiency under large-scale power grid, the frequency response of thermal power units and resources based on virtual synchronous machines are linearly approximated. The resources of the virtual synchronous machine include wind power, photovoltaic power, energy storage and frequency active support load. Let T g With T VSM Respectively represent the delivery time of thermal power units and multi-resource primary frequency regulation services; t del,g With t del,VSMThey represent the response delays of thermal power units and multiple resources respectively;
[0106] Its RoCoF constraint is expressed as follows:
[0107]
[0108] Among them, P L is the active power shortage when disturbance occurs; H sys Represents the total inertia of the system, and its expression is as follows:
[0109]
[0110] The frequency minimum point constraint is expressed as follows:
[0111]
[0112] Where Δf max Indicates the maximum frequency deviation allowed by the system; and They represent the total capacity of thermal power units and resources based on virtual synchronous machines participating in primary frequency regulation, respectively, using the following expression:
[0113]
[0114]
[0115] The quasi-steady-state constraint is expressed as follows:
[0116]
[0117] Among them, ε PFR It indicates the ratio coefficient of the required primary frequency regulation capacity to the active power shortage.
[0118] As a preferred solution of the day-ahead joint optimization dispatching method considering the inertia of multiple resources described in the present invention, the day-ahead optimization dispatching model of the large power grid based on the consideration of the inertia of multiple resources and the primary frequency regulation auxiliary service performs the day-ahead optimization dispatching calculation, including the following steps:
[0119] For the needs of subsequent solutions, the model needs to be linearized to make it a mixed integer linear model; the frequency minimum point constraint is still a nonlinear constraint, and the following mainly linearizes this constraint;
[0120] Transforming the frequency minimum point constraint yields the following expression:
[0121]
[0122] in, are three nonlinear terms;
[0123] Item and First of all, Perform binary conversion processing, the expression is as follows:
[0124]
[0125] Among them, L represents the number of bits converted to binary. A reasonable value can be set according to the range of the primary frequency regulation capacity of the thermal power unit in the example. The setting of ε is Perform approximate rounding to convert it into an integer;
[0126] Available Item and The term expression is as follows:
[0127]
[0128]
[0129] After the transformation, the nonlinear terms in the above formula only include 0-1 decision variable term multiplied by 0-1 decision variable term and 0-1 decision variable term multiplied by continuous decision variable term. For these two terms, the following transformation method can be used:
[0130] maxzy,z∈{0,1},y∈{R +}ory∈{0,1}
[0131] The above maxzy is equivalent to:
[0132] max Y z
[0133] st-(1-z)M≤Y z -y≤(1-z)M
[0134] -zM≤Y z ≤zM
[0135] y∈R + ,Y z ∈R
[0136] In the formula, M takes a large value. This method defines a new variable Y z , convert the original nonlinear expression of 0-1 variables multiplied by positive real variables into a linear expression:
[0137] Since the primary frequency modulation power provided by VSM is less than the active power shortage of the system under large disturbance, P L Greater than May as well P * ∈[0,PL ];
[0138] (P * ) 2 From 0 to P L is monotonically increasing, and P * The value range is bounded, for (P * ) 2 Perform piecewise linear approximation and let the slope of each segment after linearization be k s , the constant term is b s , the total number of segments is N S , the right side of the expression after the frequency minimum point constraint is transformed can be transformed into:
[0139]
[0140] At this point, the linearization process is completed.
[0141] As a preferred solution of the day-ahead joint optimization scheduling method considering the inertia of multiple resources described in the present invention, wherein: the dual problem of day-ahead optimization scheduling is solved based on the Lagrange multiplier method to obtain the marginal electricity price of electric energy, inertia and primary frequency regulation auxiliary service as the settlement basis of various resources, including the following steps:
[0142] The total inertia of the system is converted into the second-order cone constraint at the lowest point, and the expression of the total inertia of the system is transformed as follows:
[0143]
[0144] Substituting the total inertia of the system with elements a, b, and c, we have:
[0145]
[0146] The frequency minimum point constraint can be transformed into:
[0147] ab≥c 2
[0148] right The expression to be binary converted is converted into the binary norm form:
[0149]
[0150] Define the dual variables in the first and second rows on the left side as λ1 and λ2 respectively, and μ on the right side;
[0151] Based on the objective function and The expression of binary conversion can obtain the Lagrangian function as follows:
[0152]
[0153] based on The expression can be used to obtain the inertia price of multiple resources based on virtual synchronous machine Electricity price Synchronous machine primary frequency modulation price Frequency modulation price based on multiple resources of virtual synchronous machine
[0154]
[0155]
[0156]
[0157]
[0158] In a second aspect, an embodiment of the present invention provides a day-ahead joint optimization scheduling system considering the inertia of multiple resources, which includes a building module for building a model of multiple resources participating in inertia and primary frequency regulation auxiliary services including thermal power units, wind power, photovoltaics, energy storage and frequency active support type loads;
[0159] Constraint module, which builds a large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services. The objective function is the sum of the electric energy of various resources and the cost of auxiliary services. The constraints include load balance, spare capacity, line flow and system frequency security.
[0160] The processing module performs day-ahead optimization scheduling calculations and linearizes nonlinear terms in frequency security constraints.
[0161] The settlement module solves the dual problem of day-ahead optimal scheduling based on the Lagrange multiplier method and obtains the marginal electricity price of electric energy, inertia and primary frequency regulation auxiliary services as the settlement basis for various resources.
[0162] In a third aspect, an embodiment of the present invention provides a computer device including a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program instructions are executed by the processor, the steps of the day-ahead joint optimization scheduling method considering the inertia of multiple resources as described in the first aspect of the present invention are implemented.
[0163] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program instructions are executed by a processor, the steps of the day-ahead joint optimization scheduling method considering the inertia of multiple resources as described in the first aspect of the present invention are implemented.
[0164] The beneficial effects of the present invention are as follows: the present invention constructs a model for the participation of multiple resources in inertia and primary frequency regulation auxiliary services, constructs a large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services, performs day-ahead optimization dispatching calculations considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services, and finally calculates the multiple resource electric energy and various auxiliary service prices based on dual multipliers. The present invention considers modeling a dispatching model that includes thermal power units, wind power, photovoltaics, energy storage, and frequency-active supporting loads to provide frequency support. The capacity constraints and corresponding energy reservations of energy storage to provide inertia and primary frequency regulation services under charging and discharging operating states are considered, the power compensation of the transmission shaft system of the doubly-fed wind turbine unit to restore the industrial frequency is considered, and a frequency-active supporting load participation peak regulation and primary frequency regulation model is established. A multi-resource FSCUC joint optimization model is established.
[0165] The present invention determines the frequency support capacity required to ensure the frequency security of the system on the basis of constructing the system frequency security constraint. Based on this, in order to obtain the missing inertia and primary frequency regulation auxiliary services, the inertia and auxiliary services provided by multiple resources are quoted to participate in the market competition. Compared with compensation, it can more accurately reflect the value of inertia and primary frequency regulation for the safe and stable operation of the system.
[0166] The technical problems of obtaining inertia and primary frequency regulation auxiliary services to maintain the safety and stability of the power grid under large disturbance conditions have been solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0167] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0168] Figure 1 The flowchart of the day-ahead joint optimization scheduling method considering the inertia of multiple resources;
[0169] Figure 2 Computer equipment diagram for the day-ahead joint optimization scheduling method considering the inertia of multiple resources. DETAILED DESCRIPTION
[0170] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0171] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0172] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
[0173] Example 1
[0174] Reference Figure 1-2 , which is the first embodiment of the present invention, provides a day-ahead joint optimization scheduling method considering the inertia of multiple resources, including:
[0175] S100: Construct a model for multiple resources including thermal power units, wind power, photovoltaics, energy storage and frequency active support loads to participate in inertia and primary frequency regulation auxiliary services;
[0176] S101: Construction of a model based on multi-resource participation in inertia and primary frequency regulation auxiliary services, including the following steps:
[0177] The construction of the thermal power unit model includes the operation constraints of the thermal power unit and the primary frequency regulation capacity constraints provided by the thermal power unit; the operation constraints of the thermal power unit include the upper and lower limit constraints of output, the ramp constraint and the start and stop time constraint, which are respectively expressed as follows:
[0178] The upper and lower limits of thermal power unit output:
[0179] u i,t P i,min ≤P i,t ≤u i,t P i,max -R i,t
[0180] Thermal power unit climbing constraints:
[0181]
[0182] Start and stop time constraints of thermal power units:
[0183]
[0184] Among them, P i,min , P i,max are the minimum and maximum active output of thermal power unit i respectively; P i,trepresents the active power of thermal power unit i at time t; R i,t is the primary frequency regulation capacity of thermal power unit i at time t; u i,t is a 0-1 variable describing the start / stop status of thermal power unit i at time t, u i,t =1 means the unit is running, u i,t =0 means the unit is shut down; P i,UR With P i,DR are the maximum increase and decrease of active power of thermal power unit i in period t; X i,t The continuous operation of unit i to time t (X i,t is positive) or continuous shutdown (X i,t is a negative value); M i,GT With M i,DT are the minimum operating time and minimum downtime of unit i respectively;
[0185] The primary frequency regulation capacity constraint provided by thermal power units is expressed as follows:
[0186]
[0187] in, It represents the climbing limit of the primary frequency regulation capacity of thermal power unit i;
[0188] In addition, the inertia time constant of the thermal power unit It is related to the setting of the unit itself and is usually an unchangeable constant.
[0189] S102: Construction of a model based on multi-resource participation in inertia and primary frequency regulation auxiliary services, including the following steps:
[0190] The construction of the wind turbine model includes wind turbine operation constraints, wind turbine capacity constraints for primary frequency regulation, and wind turbine inertia constraints. The rotational inertia of the wind turbine transmission shaft system can provide a certain inertia support for the system. Wind power needs to reserve a certain capacity in the output power to provide primary frequency regulation services to the system. The wind turbine operation constraints can be expressed as follows:
[0191]
[0192] Among them, P w,i,t and They represent the active power and predicted power of wind power i at time t respectively; R w,i,t represents the primary frequency regulation power capacity of wind power i at time t;
[0193] The wind turbine provides a frequency regulation capacity constraint that can be expressed as follows:
[0194]
[0195] Among them, ε w,i It represents the proportional coefficient of the primary frequency regulation capacity of fan i.
[0196] The inertia constraint provided by the wind turbine can be expressed as follows:
[0197]
[0198] in, and They represent the inertia time constant of wind power i at time t and its set value respectively; A 0-1 decision variable describing the inertial support service provided by wind power. Indicates that wind power provides inertia support at time t, Indicates that it is not provided;
[0199] In addition, in order to avoid secondary oscillation caused by the absorption of active power from the system during the process of wind turbine speed recovery after providing inertia support, the time for wind turbine speed recovery is delayed until the primary frequency regulation of the system fully responds through control methods. The active power required for wind turbine recovery is jointly borne by all primary frequency regulation resources. The maximum inertia support power required by wind power is expressed as follows:
[0200]
[0201] in, represents the rated power of wind power i; Indicates the maximum frequency change rate allowed by the system; f0 indicates the rated frequency of the system;
[0202] The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services also includes the following steps: constructing a photovoltaic unit model, the photovoltaic unit model includes photovoltaic operation constraints and photovoltaic primary frequency regulation capacity constraints, and the photovoltaic array provides virtual inertia and primary frequency regulation services by configuring energy storage; the photovoltaic operation constraint adopts the following expression:
[0203]
[0204] Among them, P v,i,t and They represent the active power and predicted power of PV i at time t respectively;
[0205] The primary frequency regulation capacity constraint provided by photovoltaic power generation is expressed as follows:
[0206]
[0207] in, Represents the rated discharge power of photovoltaic i configuration energy storage; ε v,i Represents the proportional coefficient of the primary frequency modulation capacity of photoelectric i; Rv,i,t represents the primary frequency modulation power capacity of photovoltaic i at time t;
[0208] Inertia time constant of photovoltaic i Defined by software, its value needs to comprehensively consider the performance of the configured energy storage.
[0209] S103: Construction of a model based on multi-resource participation in inertia and primary frequency regulation auxiliary services, including the following steps:
[0210] The construction of energy storage model includes operation constraints under energy storage discharge state, operation constraints under energy storage charging state, energy storage charge and discharge state constraints, and energy storage charge state constraints.
[0211] Grid-type energy storage can reserve a portion of capacity in the discharge state and reduce power in the charging state to provide inertia and primary frequency response. Unlike conventional units, the inertia time constant of energy storage can be changed by adjusting control parameters according to scheduling needs.
[0212] The operating constraints under the energy storage discharge state can be expressed as follows:
[0213]
[0214]
[0215]
[0216]
[0217]
[0218] in, They represent the discharge power and maximum value of energy storage i at time t respectively; With R ess,i,max They respectively represent the primary frequency modulation power capacity of energy storage i at time t when it is in the discharge state and the maximum primary frequency modulation capacity of energy storage i; is a 0-1 variable describing the energy storage discharge state, Indicates that the energy storage is in a discharging state. Indicates that the energy storage is in charging state; It represents the maximum inertial support power of energy storage i in the discharge state; and They represent the inertia time constant of energy storage i in the discharge state and the maximum inertia time constant of energy storage i respectively. It is a continuously adjustable decision variable, and the same is true for the charging state;
[0219] The operating constraints under the energy storage charging state can be expressed as follows:
[0220]
[0221]
[0222]
[0223]
[0224] in, They represent the discharge power and maximum value of energy storage i at time t respectively; It represents the primary frequency modulation power capacity provided by energy storage i at time t in the charging state; A 0-1 variable that modifies the energy storage charge state. Indicates that the energy storage is in charging state. Indicates that the energy storage is in a discharging state; It represents the maximum inertial support power of energy storage i in the charging state; represents the inertia time constant of energy storage i in the charging state;
[0225] The charge and discharge state constraints of energy storage can be expressed as follows:
[0226]
[0227] The energy storage state of charge constraint can be expressed as follows:
[0228]
[0229]
[0230] S ess,i,0 =S ess,i,T
[0231] Among them, S ess,i,t is the charge state of energy storage i at time t; E i,ess is the rated capacity of energy storage i, in kw·h; S ess,i,min With S ess,i,max are the minimum and maximum capacities of energy storage i under stable operation, respectively; and Respectively represent the energy storage i charging and discharging efficiency; It is represented as the reserved energy of energy storage i at time t; This is to ensure that the energy storage has enough energy released to support frequency safety when the energy storage is discharged. The expression is as follows:
[0232]
[0233]
[0234] in, and They represent the energy required to be reserved for the energy storage i to provide inertia and primary frequency regulation services at time t; T ess Indicates the delivery time of energy storage primary frequency regulation service. The origin of is the integration of the primary frequency modulation response curve of the energy storage, and this paper adopts linear approximation;
[0235] The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps:
[0236] The construction of the frequency active support load model includes the frequency active support load operation constraints and the frequency active support load providing primary frequency regulation capacity constraints;
[0237] The frequency active support load operation constraint can be expressed as follows:
[0238]
[0239]
[0240]
[0241]
[0242] Where T is the number of scheduling period periods; W ad,max,i With W ad,min,i are the maximum and minimum values of power after frequency active support load i is adjusted; P ad,i,t , They represent the load baseline and dispatched power of the frequency active support load i at time t respectively; and They represent the upward and downward power regulation of the frequency active support load respectively; P ad,i,max Adjust the power upper limit for the frequency active support load i at time t; and They represent the maximum power allowed to be increased and decreased by the frequency active support load i; η ad,i,t is a 0-1 variable describing the upward or downward adjustment of the frequency active support load, η ad,i,t =0 means the frequency active support type load is reduced, η ad,i,t =1 means the frequency active support load is adjusted upward;
[0243] The primary frequency regulation capacity constraint provided by the active frequency support load can be expressed as follows:
[0244]
[0245] Among them, R ad,i,tIt represents the primary frequency regulation power capacity of the frequency active support load i at time t.
[0246] S200: Construct a large power grid day-ahead optimization dispatching model that considers the participation of multiple resources in inertia and primary frequency regulation ancillary services. The objective function is the sum of the power of various resources and the cost of ancillary services. The constraints include load balance, spare capacity, line flow, and system frequency security.
[0247] S201: Based on constructing a large power grid day-ahead optimization dispatching model considering multiple resources participating in inertia and primary frequency regulation auxiliary services, the following steps are included:
[0248] Construct the objective function:
[0249] minF=F g +F w +F ess +F ad
[0250] Among them, F is the overall purchase cost. g 、F w 、F ess 、F ad They represent the costs of thermal power units, wind power, photovoltaic power, energy storage and frequency active support loads respectively; the specific expressions are as follows:
[0251]
[0252] Among them, N G 、N s Respectively represent the total number of thermal power units and the number of output stages of thermal power units; ρ i,t,k and They represent the k-th segment quotation and corresponding output of thermal power unit i at time t respectively; Indicates the quotation of primary frequency regulation capacity of thermal power units; and They represent the startup and shutdown costs of thermal power unit i respectively, and the following expressions are used:
[0253]
[0254] Among them, N w represents the total amount of wind power; It represents the price quote for primary frequency regulation service of wind turbines;
[0255]
[0256] Among them, N ess Indicates the total amount of energy storage; They represent the charging and discharging quotations of energy storage i peak load shaving services respectively; They represent the quotations for energy storage primary frequency regulation service and inertia support service respectively;
[0257]
[0258] Among them, N ad Indicates the total number of frequency active support type loads; They represent the upper and lower price quotes for peak load regulation service of frequency active support type load i at time t respectively; Indicates the price quotation of primary frequency regulation service for active frequency support type load;
[0259] The constraints include system load power balance constraints, system positive and negative reserve capacity constraints, branch power flow safety constraints, and system frequency safety constraints;
[0260] The system load power balance constraint is expressed as follows:
[0261] The system needs to ensure that the load power balance requirements are met during the operation period. For each period t, the load power balance constraint can be described as:
[0262]
[0263] Among them, P i,t represents the winning bid power of thermal power unit i at time t; P load,t represents the predicted load of the system at time t; P i,t The analytical formula is as follows:
[0264]
[0265] The system positive and negative reserve capacity constraints are expressed as follows:
[0266]
[0267] Among them, R L,t is the active reserve required for the corresponding load at time t; R w,t,up With R w,t,down are the positive and negative spinning reserves required by wind power at time t, where R L,t , R w,t,up and R w,t,down They are respectively determined by a certain ratio of load output and wind power output;
[0268] The branch power flow safety constraint is expressed as follows:
[0269]
[0270] Among them, N bus is the number of system nodes; N b is the number of lines; P l,maxis the active power transmission limit of line l; G j,l is the power transfer factor of node j to line l; P g,j,t , P w,j,t , P v,j,t are respectively the active power of conventional units, wind turbines, and photovoltaics at node j in period t; are the energy storage charging and discharging power at node j during period t; P load,j,t and They are respectively the active load and the frequency active support load at node j in period t;
[0271] The system frequency safety constraint is expressed as follows:
[0272] In order to meet the demand for computing efficiency under large-scale power grid, the frequency response of thermal power units and resources based on virtual synchronous machines are linearly approximated. The resources of virtual synchronous machines include wind power, photovoltaic power, energy storage and frequency active support loads. Let T g With T VSM Respectively represent the delivery time of thermal power units and multi-resource primary frequency regulation services; t del,g With t del,VSM They represent the response delays of thermal power units and multiple resources respectively;
[0273] Its RoCoF constraint is expressed as follows:
[0274]
[0275] Among them, P L is the active power shortage when disturbance occurs; H sys Represents the total inertia of the system, and its expression is as follows:
[0276]
[0277] The frequency minimum point constraint is expressed as follows:
[0278]
[0279] Where Δf max Indicates the maximum frequency deviation allowed by the system; and They represent the total capacity of thermal power units and resources based on virtual synchronous machines participating in primary frequency regulation, respectively, using the following expression:
[0280]
[0281]
[0282] The quasi-steady-state constraint is expressed as follows:
[0283]
[0284] Among them, ε PFR It indicates the ratio coefficient of the required primary frequency regulation capacity to the active power shortage.
[0285] S300: performing day-ahead optimization scheduling calculation and performing linearization processing on nonlinear items in frequency security constraints;
[0286] S301: Based on the large power grid day-ahead optimal dispatch model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services, the day-ahead optimal dispatch calculation is performed, including the following steps:
[0287] For the needs of subsequent solutions, the model needs to be linearized to make it a mixed integer linear model; the frequency minimum point constraint is still a nonlinear constraint, and the following mainly linearizes this constraint;
[0288] Transforming the frequency minimum point constraint yields the following expression:
[0289]
[0290] in, are three nonlinear terms;
[0291] Item and First of all, Perform binary conversion processing, the expression is as follows:
[0292]
[0293] Among them, L represents the number of bits converted to binary. A reasonable value can be set according to the range of the primary frequency regulation capacity of the thermal power unit in the example. The setting of ε is Perform approximate rounding to convert it into an integer;
[0294] Available Item and The term expression is as follows:
[0295]
[0296]
[0297] After the transformation, the nonlinear terms in the above formula only include 0-1 decision variable term multiplied by 0-1 decision variable term and 0-1 decision variable term multiplied by continuous decision variable term. For these two terms, the following transformation method can be used:
[0298] maxzy,z∈{0,1},y∈{R +}ory∈{0,1}
[0299] The above maxzy is equivalent to:
[0300] max Y z
[0301] st-(1-z)M≤Y z -y≤(1-z)M
[0302] -zM≤Y z ≤zM
[0303] y∈R + ,Y z ∈R
[0304] In the formula, M takes a large value. This method defines a new variable Y z , convert the original nonlinear expression of 0-1 variables multiplied by positive real variables into a linear expression:
[0305] Since the primary frequency modulation power provided by VSM is less than the active power shortage of the system under large disturbance, P L Greater than May as well P * ∈[0,P L ];
[0306] (P * ) 2 From 0 to P L is monotonically increasing, and P * The value range is bounded, for (P * ) 2 Perform piecewise linear approximation and let the slope of each segment after linearization be k s , the constant term is b s , the total number of segments is N S , the right side of the expression after the frequency minimum point constraint is transformed can be transformed into:
[0307]
[0308] At this point, the linearization process is completed.
[0309] S400: Based on the Lagrange multiplier method, the dual problem of day-ahead optimal scheduling is solved to obtain the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services as the settlement basis for various resources.
[0310] S401: Based on the Lagrange multiplier method, the dual problem of the day-ahead optimal dispatch is solved to obtain the marginal electricity price of electric energy, inertia and primary frequency regulation auxiliary service as the settlement basis for various resources, including the following steps:
[0311] The total inertia of the system is converted into the second-order cone constraint at the lowest point, and the expression of the total inertia of the system is transformed as follows:
[0312]
[0313]
[0314] Substituting the total inertia of the system with elements a, b, and c, we have:
[0315]
[0316] The frequency minimum point constraint can be transformed into:
[0317] ab≥c 2
[0318] right The expression to be binary converted is converted into the binary norm form:
[0319]
[0320] Define the dual variables in the first and second rows on the left side as λ1 and λ2 respectively, and μ on the right side;
[0321] Based on the objective function and The expression of binary conversion can obtain the Lagrangian function as follows:
[0322]
[0323] based on The term expression can be used to obtain the inertia price of multiple resources based on virtual synchronous machine Electricity price Synchronous machine primary frequency modulation price Frequency modulation price based on multiple resources of virtual synchronous machine
[0324]
[0325]
[0326]
[0327]
[0328] Furthermore, this embodiment also provides a day-ahead joint optimization scheduling system considering the inertia of multiple resources, including:
[0329] Building modules to construct a model for multiple resources including thermal power units, wind power, photovoltaics, energy storage and frequency active support loads to participate in inertia and primary frequency regulation auxiliary services;
[0330] Constraint module, which builds a large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services. The objective function is the sum of the electric energy of various resources and the cost of auxiliary services. The constraints include load balance, spare capacity, line flow and system frequency security.
[0331] The processing module performs day-ahead optimization scheduling calculations and linearizes the nonlinear terms in the frequency security constraints.
[0332] The settlement module solves the dual problem of day-ahead optimal scheduling based on the Lagrange multiplier method and obtains the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services as the settlement basis for various resources.
[0333] This embodiment also provides a computer device, which is applicable to the case of a day-ahead joint optimization scheduling method considering the inertia of multiple resources, including a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute the computer-executable instructions to implement the day-ahead joint optimization scheduling method considering the inertia of multiple resources as proposed in the above embodiment.
[0334] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0335] This embodiment further provides a storage medium on which a computer program is stored. When the program is executed by a processor, the day-ahead joint optimization scheduling method considering the inertia of multiple resources proposed in the above embodiment is implemented.
[0336] In summary, the present invention constructs a model for the participation of multiple resources in inertia and primary frequency regulation auxiliary services, constructs a large power grid day-ahead optimization scheduling model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services, performs day-ahead optimization scheduling calculation considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services, and finally calculates the multiple resource electric energy and various auxiliary service prices based on the dual multiplier. The present invention considers modeling a scheduling model that includes thermal power units, wind power, photovoltaics, energy storage and frequency active supporting loads to provide frequency support. The capacity constraints and corresponding energy reservations of energy storage to provide inertia and primary frequency regulation services under charging and discharging operating states are considered, and the power compensation of the transmission shaft system of the doubly fed wind turbine unit to restore the industrial frequency is considered. A model for the participation of frequency active supporting loads in peak regulation and primary frequency regulation is established. A joint optimization model of FSCUC for multiple resources is established.
[0337] The present invention determines the frequency support capacity required to ensure the frequency security of the system on the basis of constructing the system frequency security constraint. Based on this, in order to obtain the missing inertia and primary frequency regulation auxiliary services, the inertia and auxiliary services provided by multiple resources are quoted to participate in the market competition. Compared with compensation, it can more accurately reflect the value of inertia and primary frequency regulation for the safe and stable operation of the system.
[0338] The technical problems of obtaining inertia and primary frequency regulation auxiliary services to maintain the safety and stability of the power grid under large disturbance conditions have been solved.
[0339] Example 2
[0340] Reference Figure 1 - Figure 2 , which is the second embodiment of the present invention, and this embodiment provides a day-ahead joint optimization scheduling method considering the inertia of multiple resources. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0341] In order to verify the effectiveness of the day-ahead joint optimization scheduling method considering the inertia of multiple resources proposed in this invention, the following simulation experiment is designed. Taking a regional power grid as an example, the regional power grid has three municipal power grids under its jurisdiction, including 15 220kV substations and 40 110kV substations. The generator sets include 6 300MW thermal power units and 8 200MW thermal power units, with a total installed capacity of 3200MW; 500MW wind power installed capacity, including 400MW of doubly fed wind power and 100MW of direct-drive wind power; 300MW photovoltaic power generation installed capacity; 100MW / 200MWh electrochemical energy storage. The typical daily load shows obvious "double peak" characteristics, with peaks occurring around 10:00 and 19:00, with a maximum load of 2500MW, a minimum load of 1200MW, and an average load of 1900MW.
[0342] The parameters of each type of resource are set as follows: the inertia time constant of thermal power units is 6s, the frequency regulation response delay is 1s, the inertia time constant of virtual inertia resources (wind power, photovoltaic, energy storage) is 0.5-2s, the maximum virtual inertia support time is 0.5s, and the virtual inertia response delay is taken as the sum of the measurement delay and the communication delay, which is about 0.2s. Combined with the delay difference of frequency response, the frequency regulation service delivery time is set to 10s and 1s respectively.
[0343] Based on the above data, a simulation analysis is conducted on a typical day with multiple resources connected to the grid for 24 hours. Three scenarios are formulated: (1) Traditional scenario, only thermal power units participate in day-ahead scheduling; (2) Introduction of auxiliary service scenario, adding inertia and frequency regulation auxiliary services provided by thermal power units on the basis of the traditional scenario; (3) The scenario of the present invention, further introducing virtual inertia and rapid frequency regulation provided by wind power, photovoltaics and energy storage on the basis of scenario 2. The three scenarios simultaneously carry out joint optimization scheduling of electric energy and auxiliary services on the day-ahead to obtain the unit startup plan. In order to verify the system frequency response effect, load disturbances at 9:00 and 21:00 are simulated respectively, and the disturbance amplitude is set at 5% of the system load.
[0344] For the sake of simplicity, the optimization dispatch results under each scenario are compared and analyzed using 9:00 as an example, as shown in Table 1. It can be seen that after the introduction of auxiliary services (scenario 2 and 3), the system inertia and total frequency regulation capacity are significantly improved, the frequency stability margin is increased, and scenario 3 makes more use of the fast and flexible characteristics of wind, solar and storage, which effectively reduces the operating cost while ensuring the system inertia level. It is worth mentioning that after the introduction of new energy and energy storage, due to its low frequency regulation cost and flexible charging and discharging, the demand for deep peak regulation of thermal power can be significantly reduced, further saving costs.
[0345] Table 19:00 Comparison of optimized scheduling results
[0346]
[0347]
[0348] The following is a comparison of the system frequency dynamic response in each scenario after load disturbance.
[0349] In scenario 1 (traditional dispatch), due to the lack of sufficient inertia and frequency regulation support, the system frequency drops sharply after the disturbance occurs, the rate of decrease (RoCoF) is large, and the lowest frequency deviates from the rated value by a large margin. The frequency recovery process is also relatively slow.
[0350] Under scenario 2 (introduction of thermal power auxiliary services), the frequency response curve should be significantly improved compared with scenario 1. The rate and amplitude of frequency drop when disturbance occurs are reduced, the minimum frequency is increased, the overall waveform is relatively smoother, and the frequency recovery time is also shortened. This is because the rotational inertia and primary frequency modulation provided by the thermal power unit improve the system's ability to resist disturbances.
[0351] Under scenario 3 (considering new energy auxiliary services), the system frequency response will be even better. The frequency drop rate will be further slowed down, and the minimum frequency will be closer to the rated value. At the same time, due to the rapid response capability of new energy and energy storage, the recovery process after the frequency drop will also be significantly accelerated. The entire curve waveform will be the smoothest, and the frequency fluctuation will be minimal.
[0352] In conclusion, Figure 1 It intuitively shows the process of continuous improvement of the system dynamic frequency response quality with the introduction of auxiliary services such as virtual inertia. Qualitatively, curve 1 is steep and has large fluctuations; curve 2 is flatter than curve 1; and curve 3 is the smoothest with the smallest frequency change.
[0353] When the system is subject to load disturbance, the system frequency deviates greatly under the traditional dispatching mode, with RoCoF as high as 0.5Hz / s and the minimum frequency close to 49.3Hz; after the introduction of the ancillary service market, the system frequency characteristics are significantly improved, with RoCoF and minimum frequency optimized to 0.3Hz / s and 49.6Hz respectively; after further introducing wind, solar and storage resources, the frequency response quality is further improved, with RoCoF less than 0.1Hz / s, the minimum frequency close to 49.8Hz, and the frequency fluctuations are smoother.
[0354] In summary, the day-ahead joint optimization scheduling method proposed in the present invention considering the inertia of multiple resources and frequency regulation services can significantly reduce the system operation cost while ensuring the system frequency safety margin. The main innovations are:
[0355] Coordinate multiple resources such as sources, networks, and loads, especially consider emerging resources such as new energy and energy storage, and use advanced control methods to simulate the characteristics of synchronous machines and provide virtual inertia, which greatly enriches the source of system inertia and improves the frequency safety level.
[0356] Auxiliary service products such as inertia response and primary frequency regulation are auctioned and optimized together with electric energy, and the source-end flexibility resources are matched with the grid frequency stability requirements in the preventive day-ahead stage, fully tapping the regulation potential of multiple resources.
[0357] The differences and complementarities between thermal power units and virtual inertia resources in inertia response and frequency regulation are rationally considered, and coordinated interaction between the two is achieved through sophisticated modeling and flexible market mechanisms, thereby meeting higher frequency safety requirements at a lower cost.
[0358] Different from the inertial response measures of post-compensation, a forward-looking market mechanism for inertia auxiliary services is proposed. Through the guidance of price signals, multiple resources including new energy are encouraged to actively participate in the frequency regulation of the power grid, forming a new power operation and dispatching paradigm with coordinated source, grid, load and storage.
[0359] Compared with the traditional dispatching mode that only relies on the regulation of thermal power units and post-accident management, the present invention examines the safe, stable and economic operation of the power system from a more open perspective. In the context of large-scale access to new energy, through the combination of technological innovation and mechanism innovation, multiple subjects such as source, network, load, and storage are integrated at multiple time scales and multiple spatial dimensions, which greatly improves the flexibility and intelligence level of power grid operation, and is of great significance to promoting energy revolution and power system reform. At the same time, the present invention is groundbreaking in both theory and engineering application, and can provide key support for building a new clean, low-carbon, safe and efficient power system.
[0360] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A day-ahead joint optimization scheduling method considering the inertia of multiple resources, characterized by: include, Construct a model that includes multiple resources such as thermal power units, wind power, photovoltaic power, energy storage and active frequency support loads to participate in inertia and primary frequency regulation auxiliary services; A large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation ancillary services is constructed. The objective function is the sum of the electric energy of various resources and the cost of ancillary services. The constraints include load balance, spare capacity, line flow and system frequency security. Perform day-ahead optimization scheduling calculations and perform linearization processing on nonlinear terms in frequency security constraints; Based on the Lagrange multiplier method, the dual problem of day-ahead optimal dispatch is solved, and the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services are obtained as the settlement basis for various resources.
2. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 1, characterized in that: The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps: The construction of the thermal power unit model includes the operation constraints of the thermal power unit and the primary frequency regulation capacity constraints provided by the thermal power unit; the operation constraints of the thermal power unit include the upper and lower limit constraints of output, the climbing constraints and the start and stop time constraints, which are respectively expressed as follows: The upper and lower limits of thermal power unit output: u i,t P i,min ≤P i,t ≤u i,t P i,max -R i,t Thermal power unit climbing constraints: Start and stop time constraints of thermal power units: Among them, P i,min , P i,max are the minimum and maximum active output of thermal power unit i respectively; P i,t represents the active power of thermal power unit i at time t; R i,t is the primary frequency regulation capacity of thermal power unit i at time t; u i,t is a 0-1 variable describing the start / stop status of thermal power unit i at time t, u i,t =1 means the unit is running, u i,t =0 means the unit is shut down; P i,UR With P i,DR are the maximum increase and decrease of active power of thermal power unit i in period t; X i,t The continuous operation of unit i to time t (X i,t is positive) or continuous shutdown (X i,t is a negative value); M i,GT With M i,DT are the minimum operating time and minimum downtime of unit i respectively; The primary frequency regulation capacity constraint provided by the thermal power unit is expressed as follows: in, It represents the climbing limit of the primary frequency regulation capacity of thermal power unit i; In addition, the inertia time constant of the thermal power unit It is related to the setting of the unit itself and is usually an unchangeable constant.
3. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 2 is characterized by: The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps: The construction of the wind turbine model includes wind turbine operation constraints, wind turbine capacity constraints for primary frequency regulation, and wind turbine inertia constraints. The rotational inertia of the wind turbine transmission shaft system can provide a certain inertia support for the system. Wind power needs to reserve a certain capacity in the output power to provide primary frequency regulation services to the system. The wind turbine operation constraints can be expressed as follows: Among them, P w,i,t and They represent the active power and predicted power of wind power i at time t respectively; R w,i,t represents the primary frequency regulation power capacity of wind power i at time t; The wind turbine provides a frequency regulation capacity constraint that can be expressed as follows: Among them, ε w,i It represents the proportional coefficient of the primary frequency regulation capacity of fan i. The inertia constraint provided by the wind turbine can be expressed as follows: in, and They represent the inertia time constant of wind power i at time t and its set value respectively; A 0-1 decision variable describing the inertial support service provided by wind power. Indicates that wind power provides inertia support at time t, Indicates that it is not provided; In addition, in order to avoid secondary oscillation caused by the absorption of active power from the system during the process of wind turbine speed recovery after providing inertia support, the time for wind turbine speed recovery is delayed until the primary frequency regulation of the system fully responds through control methods. The active power required for wind turbine recovery is jointly borne by all primary frequency regulation resources. The maximum inertia support power required by wind power is expressed as follows: in, represents the rated power of wind power i; Indicates the maximum frequency change rate allowed by the system; f0 indicates the rated frequency of the system; The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services also includes the following steps: constructing a photovoltaic unit model, the photovoltaic unit model includes photovoltaic operation constraints and photovoltaic primary frequency regulation capacity constraints, and the photovoltaic array provides virtual inertia and primary frequency regulation services by configuring energy storage; the photovoltaic operation constraint adopts the following expression: Among them, P v,i,t and They represent the active power and predicted power of PV i at time t respectively; The primary frequency regulation capacity constraint provided by photovoltaic power generation is expressed as follows: in, Represents the rated discharge power of photovoltaic i configuration energy storage; ε v,i Represents the proportional coefficient of the primary frequency modulation capacity of photoelectric i; R v,i,t represents the primary frequency modulation power capacity of photovoltaic i at time t; Inertia time constant of photovoltaic i Defined by software, its value needs to comprehensively consider the performance of the configured energy storage.
4. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 3 is characterized by: The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps: The construction of energy storage model includes operation constraints under energy storage discharge state, operation constraints under energy storage charging state, energy storage charge and discharge state constraints, and energy storage charge state constraints. The operating constraints under the energy storage discharge state can be expressed as follows: in, They represent the discharge power and maximum value of energy storage i at time t respectively; With R ess,i,max They respectively represent the primary frequency modulation power capacity of energy storage i at time t when it is in the discharge state and the maximum primary frequency modulation capacity of energy storage i; is a 0-1 variable describing the energy storage discharge state, Indicates that the energy storage is in a discharging state. Indicates that the energy storage is in charging state; It represents the maximum inertial support power of energy storage i in the discharge state; and They represent the inertia time constant of energy storage i in the discharge state and the maximum inertia time constant of energy storage i respectively. It is a continuously adjustable decision variable, and the same is true for the charging state; The operating constraints under the energy storage charging state can be expressed as follows: in, They represent the discharge power and maximum value of energy storage i at time t respectively; It represents the primary frequency modulation power capacity provided by energy storage i at time t in the charging state; A 0-1 variable that modifies the energy storage charge state. Indicates that the energy storage is in charging state. Indicates that the energy storage is in a discharging state; It represents the maximum inertial support power of energy storage i in the charging state; represents the inertia time constant of energy storage i in the charging state; The charge and discharge state constraints of energy storage can be expressed as follows: The energy storage state of charge constraint can be expressed as follows: S ess,i,0 =S ess,i,T Among them, S ess,i,t is the charge state of energy storage i at time t; E i,ess is the rated capacity of energy storage i, in kw·h; S ess,i,min With S ess,i,max are the minimum and maximum capacities of energy storage i under stable operation, respectively; and Respectively represent the energy storage i charging and discharging efficiency; It is represented as the reserved energy of energy storage i at time t; This is to ensure that the energy storage has enough energy released to support frequency safety when the energy storage is discharged. The expression is as follows: in, and They represent the energy required to be reserved for the energy storage i to provide inertia and primary frequency regulation services at time t; T ess Indicates the delivery time of energy storage primary frequency regulation service. The origin of is the integration of the primary frequency modulation response curve of the energy storage, and this paper adopts linear approximation; The construction of the model based on multi-resource participation in inertia and primary frequency regulation auxiliary services includes the following steps: The construction of the frequency active support load model includes the frequency active support load operation constraints and the frequency active support load providing primary frequency regulation capacity constraints; The frequency active support load operation constraint can be expressed as follows: Where T is the number of scheduling period periods; W ad,max,i With W ad,min,i are the maximum and minimum values of power after frequency active support load i is adjusted; P ad,i,t , They represent the load baseline and dispatched power of the frequency active support load i at time t respectively; and They represent the upward and downward power regulation of the frequency active support load respectively; P ad,i,max Adjust the power upper limit for the frequency active support load i at time t; and They represent the maximum power allowed to be increased and decreased by the frequency active support load i; η ad,i,t is a 0-1 variable describing the upward or downward adjustment of the frequency active support load, η ad,i,t =0 means the frequency active support type load is reduced, η ad,i,t =1 means the frequency active support load is adjusted upward; The primary frequency regulation capacity constraint provided by the active frequency support load can be expressed as follows: Among them, R ad,i,t It represents the primary frequency regulation power capacity of the frequency active support load i at time t.
5. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 4 is characterized by: The large power grid day-ahead optimization dispatching model based on building a multi-resource participation inertia and primary frequency regulation auxiliary service includes the following steps: Construct the objective function: minF=F g +F w +F ess +F ad Among them, F is the overall purchase cost. g 、F w 、F ess 、F ad They represent the costs of thermal power units, wind power, photovoltaic power, energy storage and frequency active support loads respectively; the specific expressions are as follows: Among them, N G 、N s Respectively represent the total number of thermal power units and the number of output stages of thermal power units; ρ i,t,k and They represent the k-th segment quotation and corresponding output of thermal power unit i at time t respectively; Indicates the quotation of primary frequency regulation capacity of thermal power units; and They represent the startup and shutdown costs of thermal power unit i respectively, and the following expressions are used: Among them, N w represents the total amount of wind power; It represents the price quote for primary frequency regulation service of wind turbines; Among them, N ess Indicates the total amount of energy storage; They represent the charging and discharging quotations of energy storage i peak load shaving services respectively; They represent the quotations for energy storage primary frequency regulation service and inertia support service respectively; Among them, N ad Indicates the total number of frequency active support type loads; They represent the upper and lower price quotes for peak load regulation service of frequency active support type load i at time t respectively; Indicates the price quotation of primary frequency regulation service for active frequency support type load; The constraints include system load power balance constraints, system positive and negative reserve capacity constraints, branch power flow safety constraints, and system frequency safety constraints; The system load power balance constraint is expressed as follows: The system needs to ensure that the load power balance requirements are met during the operation period. For each period t, the load power balance constraint can be described as: Among them, P i,t represents the winning bid power of thermal power unit i at time t; P load,t represents the predicted load of the system at time t; P i,t The analytical formula is as follows: The system positive and negative reserve capacity constraints are expressed as follows: Among them, R L,t is the active reserve required for the corresponding load at time t; R w,t,up With R w,t,down are the positive and negative spinning reserves required by wind power at time t, where R L,t , R w,t,up and R w,t,down They are respectively determined by a certain ratio of load output and wind power output; The branch power flow safety constraint is expressed as follows: Among them, N bus is the number of system nodes; N b is the number of lines; P l,max is the active power transmission limit of line l; G j,l is the power transfer factor of node j to line l; P g,j,t , P w,j,t , P v,j,t are respectively the active power of conventional units, wind turbines, and photovoltaics at node j in period t; are the energy storage charging and discharging power at node j during period t; P load,j,t and They are respectively the active load and the frequency active support load at node j in period t; The system frequency safety constraint is expressed as follows: In order to meet the demand for computing efficiency under large-scale power grid, the frequency response of thermal power units and resources based on virtual synchronous machines are linearly approximated. The resources of the virtual synchronous machine include wind power, photovoltaic power, energy storage and frequency active support load. Let T g With T VSM Respectively represent the delivery time of thermal power units and multi-resource primary frequency regulation services; t del,g With t del,VSM They represent the response delays of thermal power units and multiple resources respectively; Its RoCoF constraint is expressed as follows: Among them, P L is the active power shortage when disturbance occurs; H sys Represents the total inertia of the system, and its expression is as follows: The frequency minimum point constraint is expressed as follows: Where Δf max Indicates the maximum frequency deviation allowed by the system; and They represent the total capacity of thermal power units and resources based on virtual synchronous machines participating in primary frequency regulation, respectively, using the following expression: The quasi-steady-state constraint is expressed as follows: Among them, ε PFR It indicates the ratio coefficient of the required primary frequency regulation capacity to the active power shortage.
6. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 5, characterized in that: The large power grid day-ahead optimal dispatch model based on considering multi-resource participation in inertia and primary frequency regulation auxiliary services performs day-ahead optimal dispatch calculation, including the following steps: For the needs of subsequent solutions, the model needs to be linearized to make it a mixed integer linear model; the frequency minimum point constraint is still a nonlinear constraint, and the following mainly linearizes this constraint; By modifying the frequency minimum point constraint, we can get the following expression: in, are three nonlinear terms; Item and First of all, Perform binary conversion processing, the expression is as follows: Among them, L represents the number of bits converted to binary. A reasonable value can be set according to the range of the primary frequency regulation capacity of the thermal power unit in the example. The setting of ε is Perform approximate rounding to convert it into an integer; Available Item and The term expression is as follows: After the transformation, the nonlinear terms in the above formula only include 0-1 decision variable term multiplied by 0-1 decision variable term and 0-1 decision variable term multiplied by continuous decision variable term. For these two terms, the following transformation method can be used: max zy,z∈{0,1},y∈{R + }ory∈{0,1} The above max zy is equivalent to: max Y z s.t.-(1-z)M≤Y z -y≤(1-z)M -zM≤Y z ≤zM y∈R + ,AND z ∈R In the formula, M takes a large value. This method defines a new variable Y z , convert the original nonlinear expression of 0-1 variables multiplied by positive real variables into a linear expression: Since the primary frequency modulation power provided by VSM is less than the active power shortage of the system under large disturbance, P L Greater than May as well P * ∈[0,P L ]; (P * ) 2 From 0 to P L is monotonically increasing, and P * The value range is bounded, for (P * ) 2 Perform piecewise linear approximation and let the slope of each segment after linearization be k s , the constant term is b s , the total number of segments is N S , the right side of the expression after the frequency minimum point constraint is transformed can be transformed into: At this point, the linearization process is completed.
7. The day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in claim 6 is characterized by: The Lagrange multiplier method is used to solve the dual problem of the day-ahead optimal dispatch, and the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services are obtained as the settlement basis for various resources, including the following steps: The total inertia of the system is converted into the second-order cone constraint at the lowest point, and the expression of the total inertia of the system is transformed as follows: Substituting the total inertia of the system with elements a, b, and c, we have: The frequency minimum point constraint can be transformed into: ab≥c 2 right The expression to be binary converted is converted into the binary norm form: Define the dual variables in the first and second rows on the left side as λ1 and λ2 respectively, and μ on the right side; Based on the objective function and The expression of binary conversion can obtain the Lagrangian function as follows: based on The term expression can be used to obtain the inertia price of multiple resources based on virtual synchronous machine Electricity price Synchronous machine primary frequency modulation price Frequency modulation price based on multiple resources of virtual synchronous machine 8. A day-ahead joint optimization scheduling system considering the inertia of multiple resources, based on the day-ahead joint optimization scheduling method considering the inertia of multiple resources as claimed in any one of claims 1 to 7, characterized in that: Also includes, Building modules to construct a model for multiple resources including thermal power units, wind power, photovoltaics, energy storage and frequency active support loads to participate in inertia and primary frequency regulation auxiliary services; Constraint module, which builds a large power grid day-ahead optimization dispatching model considering the participation of multiple resources in inertia and primary frequency regulation auxiliary services. The objective function is the sum of the electric energy of various resources and the cost of auxiliary services. The constraints include load balance, spare capacity, line flow and system frequency security. The processing module performs day-ahead optimization scheduling calculations and linearizes the nonlinear terms in the frequency security constraints. The settlement module solves the dual problem of day-ahead optimal scheduling based on the Lagrange multiplier method and obtains the marginal electricity prices of electric energy, inertia and primary frequency regulation auxiliary services as the settlement basis for various resources.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the day-ahead joint optimization scheduling method considering the inertia of multiple resources as described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the day-ahead joint optimization scheduling method considering the inertia of multiple resources as described in any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Energy and auxiliary service joint optimization method considering frequency modulation mileage demand constraints
CN112529312A
Inertia adequacy quantification method and system for resource planning
CN117543546A
Comprehensive energy system thermal inertia auxiliary service method considering system inertia evaluation
CN117634769A
System critical inertia demand quantitative evaluation method considering source load inertia supporting capacity
CN118040717A
Cited By
Scheduling operation method of new energy distribution and storage combined participation frequency modulation auxiliary service market
CN119582278A
Value evaluation method and system for providing multiple auxiliary services through energy storage
CN119648314A
Multi-type resource collaborative clearing method considering inertia and frequency modulation auxiliary service
CN119891272A
Transaction strategy for providing inertia / primary frequency modulation auxiliary service through shared energy storage
CN120049423A
