Large-scale energy base integrated joint scheduling system

By designing an integrated joint scheduling system for large-scale energy bases, the problem of simple data integration and control strategies is solved, the optimization scheduling of multi-energy power generation plans is realized, and the overall scheduling efficiency and resource utilization of the energy base are improved.

CN118970931APending Publication Date: 2024-11-15NR ELECTRIC CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411068730.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Large new energy bases cannot achieve integrated scheduling, and there are problems such as multi-source data acquisition monitoring, coordinated control, and optimization scheduling. The control strategy is simple, data integration and utilization are insufficient, and comprehensive analysis and data mining are lacking.

Method used

Design an integrated joint scheduling system of large-scale energy bases, built on a unified application support platform, including data interface layer, data processing layer and application layer, and realize multi-energy power generation plan through multi-source data collection, optimization calculation and simulation simulation. Optimize scheduling and control.

Benefits of technology

The global optimization scheduling of large-scale energy bases has been realized, the scheduling efficiency between the power grid and the energy base has been improved, the cost of separate construction of monitoring systems has been saved, and the resource utilization rate has been enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970931A_ABST
    Figure CN118970931A_ABST
Patent Text Reader

Abstract

The invention discloses a large-scale energy base integrated joint scheduling system, which is established on a unified application support platform, is provided with a historical data interface, a real-time database interface, a knowledge base, a rule base and a third-party system data interface, and realizes collection of multi-source data. Basic data are provided for intelligent monitoring, wind, light, fire and heat storage centralized monitoring, section monitoring and tie line power analysis of an application layer through collection and monitoring, multi-source coordinated power generation control and multi-energy complementary optimization scheduling are achieved through an optimization calculation engine and an analogue simulation engine, and the requirement for integrated joint scheduling of various wind, light, fire and heat storage devices is met. The method can be widely applied to various types of energy bases, and the scheduling efficiency and the new energy consumption rate are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy dispatching, and in particular to an integrated joint dispatching system for a large energy base. Background Art

[0003] At present, the research on the problem of large-scale joint transmission of multiple types of energy mainly focuses on utilizing the characteristics of multi-energy complementarity to improve the stability of system output. However, problems such as excessively high system construction investment costs, low operating returns, and low resource utilization are still common. There is a lack of integrated control and operation planning from multiple dimensions such as "source-grid-load-storage", making it difficult to achieve the overall optimization goals.

[0004] Some large wind power companies have done a lot of work in digital and intelligent construction, but there are still some shortcomings, including the lack of information collection methods that can meet the needs of different types of energy subsystems and unified data interfaces, but lack of intelligent evaluation systems and methods for operation and maintenance safety supervision. There are generally multiple control systems coexisting, and the underlying data collection cannot be effectively integrated and utilized; on the other hand, the control strategy is still based on simple control strategies, and the control effect is not satisfactory. Due to the large number of various business systems, scattered data, and different formats, there is often a lack of comprehensive analysis and data mining. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the problems and defects in the prior art that large-scale new energy bases cannot achieve integrated scheduling, and to provide an integrated joint scheduling system for large-scale energy bases to solve the problems of multi-source data collection monitoring, coordinated control, and optimized scheduling.

[0006] To achieve the above object, the present invention is implemented by the following technical solutions:

[0007] The present invention provides a large-scale energy base integrated joint dispatching system, which is built on a unified application support platform and includes:

[0008] The data interface layer is used to collect multi-source data and send it to the data processing layer; the multi-source data includes monitoring and operation data of each new energy station and generator set of the energy base, knowledge base data, rule base data and third-party prediction and simulation data;

[0009] The data processing layer is used to collect monitoring and operation data of each new energy station and generator set in the energy base and send it to the application layer; and optimize calculation and simulation of multi-energy power generation plan; the multi-energy includes photovoltaic, wind power and thermal power;

[0010] The application layer is used to monitor multiple energy sources and optimize the scheduling and allocation of multi-energy power generation plans.

[0011] Preferably, the data interface layer includes:

[0012] Historical data interface, real-time database interface, knowledge base, rule base and third-party system data interface; the third-party system data interface includes a new energy power prediction system, a load prediction system and a new energy real-time digital simulation system.

[0013] Preferably, the data processing layer includes:

[0014] The data acquisition and monitoring module is used to collect monitoring and equipment operation data of booster stations, collection stations, transmission stations, wind farms, photovoltaic power stations, energy storage systems, thermal power units, and cogeneration units through telecontrol devices in accordance with the IEC-104 protocol. It performs event and alarm processing, real-time operation monitoring, control and regulation, report service management, data storage and statistical analysis based on the collected data, and provides basic data for the application layer;

[0015] An optimization calculation engine module is used to optimize the calculation of a multi-energy power generation plan based on multi-energy historical data and real-time data; the multi-energy power generation plan includes photovoltaic and wind power output, start-stop combination of thermal power units and power generation plan;

[0016] The simulation engine module is used to establish digital simulation models of wind power generation models, photovoltaic power generation models, energy storage systems, thermal power units and base power grids based on the knowledge base and rule base. The dispatching end sends control instructions to each unit, including thermal power unit instructions and new energy power generation instructions. It adopts the mode of planned value tracking and automatic power generation control to simulate the operation of actual equipment and systems and verify the correctness of the control instructions.

[0017] Preferably, the application layer includes:

[0018] Smart monitoring module, used for correlation analysis, performance calculation, efficiency calculation and parameter tracking of multi-energy loads;

[0019] The centralized monitoring module for wind, solar, thermal and storage is used for centralized monitoring of booster stations, cockpit indicator construction, energy base power supply collection overview, station-side smart monitoring, comprehensive analysis of power flow and centralized monitoring of wind, solar, thermal and storage;

[0020] The section monitoring and tie line power tracking module is used to monitor the active power of the tie line section sent out by the energy base in real time, and adjust the power generation unit according to the control target value of the superior dispatch to ensure that the measured value of the tie line is within a certain deviation range from the target value;

[0021] Multi-source coordinated power generation control module, used for coal consumption characteristic analysis, photovoltaic characteristic analysis, wind power characteristic analysis, multi-operating condition operation analysis and control mode analysis, as well as automatic power generation optimization allocation at the plant level based on the optimization calculation results of the optimization calculation engine module;

[0022] Multi-energy complementary optimization scheduling is used to formulate the day-ahead power generation plan based on the optimization calculation results of the optimization calculation engine module, and to perform intra-day rolling optimization and safety verification iterations, as well as to interact with the superior scheduling through power generation plan management.

[0023] Preferably, the smart monitoring module is specifically used for:

[0024] Based on systematic economic indicators, safety indicators, and early warning thresholds, we use big data correlation analysis, professional knowledge, operating experience, and advanced evaluation algorithms to conduct load segment correlation analysis, performance calculation, efficiency calculation, and parameter tracking.

[0025] Preferably, the simulation engine is specifically used for:

[0026] After the multi-source coordinated power generation control module performs power generation optimization allocation, it drives the digital simulation model to perform simulation calculations and closed-loop operation, and evaluates the operation and control effects based on the expert experience in the rule base to achieve closed-loop verification of the optimization results.

[0027] Preferably, the optimization calculation engine is specifically used for:

[0028] A two-tier dispatching mode is adopted to formulate a two-stage power generation plan.

[0029] The first level of scheduling is used to calculate the output of new energy sources;

[0030] The second-level scheduling is used to optimize the power generation output of the remaining thermal power units after the output of new energy is determined, and consider the heating demand of the heating units, the benefits of the peak-shaving units, and the operating economy between the units, and finally determine the power generation output of each unit in each time period.

[0031] Preferably, the first layer scheduling is specifically implemented as follows:

[0032] Analyze the uncertainty of photovoltaic and wind power, establish the uncertainty models of photovoltaic and wind power, conduct probability evaluation on the uncertainty of photovoltaic and wind power generation prediction results, and obtain the photovoltaic and wind power generation prediction errors;

[0033] The Latin hypercube sampling method is used to sample the generation prediction errors of photovoltaic and wind power N times;

[0034] The objective function is established by maximizing the combined output of photovoltaic and wind power:

[0035] ;

[0036] in, Combined power generation for photovoltaic and wind power, is the scheduling period, and They are The actual output of wind power and photovoltaic power generation at each moment;

[0037] The objective function is converted into a minimization objective problem, and we get:

[0038] ;

[0039] in, and They are Short-term power forecasting of wind power and photovoltaic power generation at any moment;

[0040] The minimization objective problem is solved based on the sampling data and the power prediction data to obtain wind power and photovoltaic processing.

[0041] Preferably, the second layer scheduling is specifically implemented as follows:

[0042] The objective function is established with the lowest total power generation cost of thermal power units:

[0043] ;

[0044] In the formula, is the total electricity generation cost; is the energy consumption cost of thermal power units; , , , Divided into SO2, CO2, NO x and environmental costs caused by smoke and dust emissions;

[0045] The objective function is established with the minimum deviation of static output of the sending-end tie line. On the basis of satisfying the wind and solar power abandonment rate constraints, the wind and solar power abandonment rates in each period are optimized in combination with short-term power forecast data to obtain the optimal wind and solar power grid-connected power curve for each period.

[0046] ;

[0047] In the formula, is the variance between the planned power and the actual power generated by the sending-end tie line, is the scheduling period; For the contact line The planned power at the moment; for The total power generation plan at the moment is the sum of the power of all units in the energy base;

[0048] Based on the power generation plan of the heating unit in the "heat-to-electricity" mode, the objective function of the heating unit is established as follows:

[0049] ;

[0050] In the formula, For heating units The additional penalty coefficient for non-heating units is 0. is the number of heating units, For heating units exist The planned output is always in the "heat-to-electricity" mode. For heating units exist Always make real efforts, For heating units Output adjustment range setting value;

[0051] Will , , , Integrate and establish a comprehensive optimization objective function, namely:

[0052] ;

[0053] in, To optimize the overall cost; , , , Weight coefficients for multi-objective optimization; , , is the equivalent substitution coefficient of the target;

[0054] For deep peak load units, the energy consumption cost of the units is broken down into:

[0055] ;

[0056] In the formula, is the energy consumption cost of the deep peak load regulation unit, for Thermal power unit The power generation capacity, For thermal power units Rated output; , Thermal power units The lower limit of basic peak regulation and the lower limit of deep peak regulation; The cost incurred by investing in plasma during deep adjustment of the unit;

[0057] The operating cost of thermal power units in the basic peak load regulation stage is:

[0058] ;

[0059] In the formula, , , For thermal power units The consumption coefficient, is the number of thermal power units, is the unit price of cost;

[0060] If the thermal power units are allowed to start and stop for peak load regulation when the day-ahead plan is formulated, the start and stop costs are as follows:

[0061] ;

[0062] In the formula, is the start / stop variable, the value is 0 or 1; is the cost of a single start and stop;

[0063] Under the constraints of system power balance, minimum number of units in operation, system spare capacity, system output upper and lower limits, moment of inertia, unit output, unit regulation rate, line safety and energy storage charging and discharging, the branch and bound method is adopted, and the cutting platform method is used to tighten the linear programming relaxation, solve the two-layer optimization scheduling model, and generate the start-stop combination and power generation plan of each unit and station.

[0064] The beneficial effects of the present invention are:

[0065] The present invention provides an integrated joint dispatching system for a large-scale new energy base, which can realize the integrated dispatching progress of the large-scale energy base, achieve the effect of good dispatching of the source network, save the cost of separately building the monitoring system of the large-scale energy base, and improve the dispatching efficiency of the power grid and the energy base. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] Figure 1 An integrated joint dispatching system architecture for a large-scale new energy base provided by an embodiment of the present invention;

[0067] Figure 2 A schematic diagram of a two-stage power generation plan formulation process of a joint dispatching system provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0068] The specific implementation of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The embodiments described below with reference to the accompanying drawings are illustrative and intended to be used to explain the present invention, but should not be construed as limiting the present invention.

[0069] It should be noted that the term "one embodiment" or "embodiment" of the present invention refers to a specific feature, structure or characteristic that can be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.

[0070] The specific embodiments of the present invention are described in further detail below in conjunction with the accompanying drawings. The following examples are used to illustrate the present invention but are not intended to limit the scope of the present invention.

[0071] Example 1

[0072] This embodiment 1 provides a large-scale energy base integrated joint dispatching system, such as Figure 1 As shown, it is built on a unified application support platform, including data interface layer, data processing layer and application layer;

[0073] Specifically, in this embodiment, the data interface layer includes: historical data interface, real-time database interface, knowledge base, rule base and third-party system data interface, which are used to collect multi-source data and send them to the data processing layer. Among them, the third-party system data interface includes new energy power prediction system, load prediction system and new energy real-time digital simulation system.

[0074] Specifically, in this embodiment, the data processing layer includes:

[0075] The data acquisition and monitoring module is used to collect monitoring and equipment operation data of booster stations, collection stations, transmission stations, wind farms, photovoltaic power stations, energy storage systems, thermal power units, and cogeneration units, and provide basic data for the application layer's smart monitoring, wind, solar, thermal, and storage centralized monitoring, section monitoring, and tie line power tracking;

[0076] The optimization calculation engine module is used to optimize the scheduling calculation of multi-energy power generation plans based on multi-energy historical data and real-time data; the multi-energy includes photovoltaic, wind power, thermal power, thermal power and energy storage systems; the multi-energy power generation plan includes photovoltaic and wind power output, the start-stop combination of thermal power units and the power generation plan;

[0077] The simulation engine module is used to establish digital simulation models of wind power generation models, photovoltaic power generation models, energy storage systems, thermal power units, and base power grids based on the knowledge base and rule base. The dispatching end issues control instructions to each unit, including thermal power unit instructions and new energy power generation instructions. It adopts the mode of planned value tracking and automatic power generation control to simulate the operation of actual equipment and systems and verify the correctness of the control instructions.

[0078] Specifically, in this embodiment, the application layer includes:

[0079] Smart monitoring module, used for correlation analysis, performance calculation, efficiency calculation and parameter tracking of multi-energy loads;

[0080] Wind, solar, thermal and energy storage centralized monitoring module, used to monitor multiple energy sources;

[0081] The section monitoring and tie line power tracking module is used to monitor the active power of the tie line section sent out by the energy base in real time, and adjust the power generation unit according to the control target value of the superior dispatch to ensure that the measured value of the tie line is within a certain deviation range from the target value;

[0082] Multi-source coordinated power generation control module, used to analyze the characteristics of multi-energy power generation and optimize power generation allocation based on the optimization scheduling results of the optimization calculation engine module;

[0083] Multi-energy complementary optimization scheduling is used to optimize the scheduling of multi-energy day-ahead power generation plans based on the optimization scheduling results of the optimization calculation engine module.

[0084] In this embodiment, the optimization calculation engine is used to calculate the output of new energy, the start and stop combination of thermal power units and the power generation plan, and then sent to the multi-source coordinated power generation control module of the application layer. After optimization allocation, the simulation engine drives the digital simulation model in the knowledge base to perform simulation calculations and closed-loop operation, and evaluates the operation and control effects based on the expert experience in the rule base, thereby realizing closed-loop verification of the optimization results and reducing the risk of system operation.

[0085] In one embodiment, the data acquisition and monitoring module collects various data from booster stations, collection stations, transmission stations, wind farms, photovoltaic power stations, energy storage systems, thermal power units, and cogeneration units through remote control devices in accordance with the IEC-104 protocol to achieve data acquisition and processing, event and alarm processing, real-time operation monitoring, control and regulation, report service management, data storage and statistical analysis.

[0086] In one embodiment, the centralized monitoring module for wind, solar, thermal and storage is used for centralized monitoring of booster stations, cockpit indicator construction, energy base power supply collection overview, site-side smart monitoring, comprehensive analysis of power flow, and centralized monitoring of wind, solar, thermal and storage.

[0087] In one embodiment, the smart monitoring module, based on KPI data such as systematic economic indicators, safety indicators, and early warning thresholds, uses big data correlation analysis, professional knowledge, operating experience, and advanced evaluation algorithms to perform load segment correlation analysis, performance calculation, efficiency calculation, and parameter tracking.

[0088] In one embodiment, a multi-source coordinated power generation control module realizes coal consumption characteristic analysis, photovoltaic characteristic analysis, wind power characteristic analysis, multi-operating condition analysis, control mode analysis, and plant-level automatic power generation control.

[0089] In one embodiment, the multi-energy complementary optimization scheduling module realizes the formulation of the day-ahead power generation plan based on data acquisition and verification, model and constraint management, and performs intra-day rolling optimization and safety verification iteration, and exchanges data with the superior scheduling through power generation plan management.

[0090] In one embodiment, the optimization calculation engine adopts a two-layer scheduling mode to implement two-stage power generation planning. Figure 2 , specifically including:

[0091] The first level of scheduling is to calculate the output of new energy:

[0092] Step 1: Analyze the uncertainty of photovoltaic and wind power and establish an uncertainty model;

[0093] (a) Using Wasserstein probability distance The distance between two probability distributions is measured as follows:

[0094] (1)

[0095] In the formula, and are two probability density functions; is the distance measure; is the order;

[0096] (b) The optimal quantile under the Wasserstein distance indicator can be expressed as:

[0097] (2)

[0098] In the formula, The variable is The continuous probability density function of Discrete quantile pairs Approximate discrete distribution, optimal quantile , ;

[0099] (c) The probability density function of wind speed described by the wind speed uncertainty model described by Weibull distribution is:

[0100] (3)

[0101] In the formula, is the probability density function of wind speed, is the wind speed parameter; is the wind speed fluctuation shape parameter; is the wind speed in units of ;

[0102] (d) Wind power output The equation for the optimal quantile is:

[0103] (4)

[0104] In the formula, , , , is a constant parameter; is the lower incomplete gamma function;

[0105] (e) Photovoltaic power generation The continuous probability density function of is:

[0106] (5)

[0107] In the formula, is the photovoltaic power, , is the shape parameter of the Beta distribution, is the maximum photovoltaic power.

[0108] According to the uncertainty models of wind power and photovoltaic power, the uncertainty of power generation prediction results is probabilistically evaluated to obtain the prediction errors of wind power and photovoltaic power generation.

[0109] Step 2: Use Latin hypercube sampling to analyze the prediction errors of wind power and photovoltaic power generation. times sampling, recorded as:

[0110] (6)

[0111] In the formula, Mark the sampling time; is the power generation prediction error corresponding to each sampling moment.

[0112] The objective function is established based on the maximum combined output of wind power and photovoltaic power, that is:

[0113] (7)

[0114] in, Combined power generation for wind and photovoltaic power generation; is the scheduling period; and Wind power and photovoltaic power generation Actual output at the moment;

[0115] By converting formula (7) into a minimization objective problem, the following objective function can be established:

[0116] (8)

[0117] In the formula, and Wind power and photovoltaic power generation The short-term power forecast at time is a known value.

[0118] After the output of new energy is determined, the second-level dispatching optimizes the power output of the remaining thermal power units, taking into account the heating demand of the heating units, the benefits of the peak-shaving units, and the operating economy between the units, and finally determines the power output of each unit in each period. The specific steps are as follows:

[0119] (a) The objective function is to minimize the total power generation cost, which is expressed as:

[0120] (9)

[0121] In the formula, is the total electricity generation cost; is the energy consumption cost of thermal power units; , , , Divided into SO2, CO2, NO x and environmental costs caused by smoke and dust emissions;

[0122] (b) Taking the minimum static output deviation of the sending-end tie line as the objective function, on the basis of satisfying the wind and solar power abandonment rate constraints, combined with short-term power forecast data, the wind and solar power abandonment rates in each period are optimized to obtain the optimal wind and solar power grid-connected power curve for each period.

[0123] (10)

[0124] In the formula, is the variance between the planned power and the actual power generated by the tie line, is the scheduling period; For the contact line The planned power at the moment; for The total power generation plan at the moment is the sum of the power of all units in the energy base;

[0125] (c) Based on the power generation plan of the heating unit in the "heat-to-electricity" mode, the heating unit will be maintained to operate under the given power generation plan as much as possible, while allowing the optimization algorithm to make small adjustments to the plan during the economic dispatch solution process.

[0126] (11)

[0127] Where: For heating units The additional penalty coefficient for non-heating units is 0. is the number of heating units, For heating units exist The planned output is always in the "heat-to-electricity" mode. For heating units exist Always make real efforts, For heating units Output adjustment range setting value;

[0128] (d) , , , Integrate and establish a comprehensive optimization objective function, namely:

[0129] (12)

[0130] in, To optimize the overall cost; , , , Weight coefficients for multi-objective optimization; , , is the equivalent substitution coefficient of the target;

[0131] (e) For deep peak load units, the energy consumption cost of the units can be broken down into:

[0132] (13)

[0133] In the formula, is the energy consumption cost of the deep peak load regulation unit, for Thermal power unit The power generation capacity, For thermal power units Rated output; , Thermal power units The lower limit of basic peak regulation and the lower limit of deep peak regulation; The cost incurred by investing in plasma during deep adjustment of the unit;

[0134] The operating cost of thermal power units in the basic peak load regulation stage is mainly the coal consumption cost:

[0135] (14)

[0136] In the formula, , , For thermal power units The consumption coefficient, is the number of thermal power units, is the unit price of cost;

[0137] (f) If the thermal power units are allowed to start and stop to adjust the peak load when the day-ahead plan is formulated, the start and stop costs should also be considered:

[0138] (15)

[0139] In the formula, is the start / stop variable, the value is 0 or 1; is the cost of a single start and stop;

[0140] (g) Manage and model system power balance constraints, minimum number of units in operation constraints, system reserve capacity constraints, system output upper and lower limit constraints, moment of inertia constraints, unit output constraints, unit regulation rate constraints, line safety constraints, and energy storage charging and discharging constraints;

[0141] (h) Based on the branch and bound method, the cutting platform method is used to tighten the linear programming relaxation, solve the two-level optimization scheduling model, and generate the start-stop combinations and power generation plans of various types of units or stations.

[0142] Through the above embodiments, the present invention realizes the optimization calculation of new energy output, start-stop combination and power generation plan of thermal power units, and sends them to the multi-source coordinated power generation control module. After optimization allocation, the digital simulation model in the knowledge base is driven by the simulation engine to perform simulation calculation and closed-loop operation, and the operation and control effects are evaluated based on the expert experience in the rule base, so as to realize closed-loop verification of the optimization results and reduce the risk of system operation.

[0143] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A large-scale energy base integrated joint dispatching system, built on a unified application support platform, characterized in that: include: The data interface layer is used to collect multi-source data and send it to the data processing layer; The multi-source data includes monitoring and operation data of each new energy station and generator set in the energy base, knowledge base data, rule base data and third-party prediction and simulation data; The data processing layer is used to collect monitoring and operation data of each new energy station and generator set in the energy base and send it to the application layer; and optimizing calculation and simulation of multi-energy power generation plans; the multi-energy includes photovoltaic, wind power and thermal power; The application layer is used to monitor multiple energy sources and optimize the scheduling and allocation of multi-energy power generation plans.

2. A large-scale energy base integrated joint dispatching system according to claim 1, characterized in that: The data interface layer comprises: Historical data interface, real-time database interface, knowledge base, rule base and third-party system data interface; the third-party system data interface includes a new energy power prediction system, a load prediction system and a new energy real-time digital simulation system.

3. A large-scale energy base integrated joint dispatching system according to claim 2, characterized in that: The data processing layer includes: The data acquisition and monitoring module is used to collect monitoring and equipment operation data of booster stations, collection stations, transmission stations, wind farms, photovoltaic power stations, energy storage systems, thermal power units, and cogeneration units through telecontrol devices in accordance with the IEC-104 protocol. It performs event and alarm processing, real-time operation monitoring, control and regulation, report service management, data storage and statistical analysis based on the collected data, and provides basic data for the application layer; An optimization calculation engine module is used to optimize the calculation of a multi-energy power generation plan based on multi-energy historical data and real-time data; the multi-energy power generation plan includes photovoltaic and wind power output, start-stop combination of thermal power units and power generation plan; The simulation engine module is used to establish digital simulation models of wind power generation models, photovoltaic power generation models, energy storage systems, thermal power units and base power grids based on the knowledge base and rule base. The dispatching end sends control instructions to each unit, including thermal power unit instructions and new energy power generation instructions. It adopts the mode of planned value tracking and automatic power generation control to simulate the operation of actual equipment and systems and verify the correctness of the control instructions.

4. A large-scale energy base integrated joint dispatching system according to claim 3, characterized in that: The application layer includes: Smart monitoring module, used for correlation analysis, performance calculation, efficiency calculation and parameter tracking of multi-energy loads; The centralized monitoring module for wind, solar, thermal and storage is used for centralized monitoring of booster stations, cockpit indicator construction, energy base power supply collection overview, station-side smart monitoring, comprehensive analysis of power flow and centralized monitoring of wind, solar, thermal and storage; The section monitoring and tie line power tracking module is used to monitor the active power of the tie line section sent out by the energy base in real time, and adjust the power generation unit according to the control target value of the superior dispatch to ensure that the measured value of the tie line is within a certain deviation range from the target value; Multi-source coordinated power generation control module, used for coal consumption characteristic analysis, photovoltaic characteristic analysis, wind power characteristic analysis, multi-operating condition operation analysis and control mode analysis, as well as automatic power generation optimization allocation at the plant level based on the optimization calculation results of the optimization calculation engine module; Multi-energy complementary optimization scheduling is used to formulate the day-ahead power generation plan based on the optimization calculation results of the optimization calculation engine module, and to perform intra-day rolling optimization and safety verification iterations, as well as to interact with the superior scheduling through power generation plan management.

5. A large-scale energy base integrated joint dispatching system according to claim 4, characterized in that: The smart monitoring module is specifically used for: Based on systematic economic indicators, safety indicators, and early warning thresholds, we use big data correlation analysis, professional knowledge, operating experience, and advanced evaluation algorithms to conduct load segment correlation analysis, performance calculation, efficiency calculation, and parameter tracking.

6. A large-scale energy base integrated joint dispatching system according to claim 4, characterized in that: The simulation engine is specifically used for: After the multi-source coordinated power generation control module performs power generation optimization allocation, it drives the digital simulation model to perform simulation calculations and closed-loop operation, and evaluates the operation and control effects based on the expert experience in the rule base to achieve closed-loop verification of the optimization results.

7. A large-scale energy base integrated joint dispatching system according to claim 4, characterized in that: The optimization calculation engine is specifically used for: A two-tier dispatching mode is adopted to formulate a two-stage power generation plan. The first level of scheduling is used to calculate the output of new energy sources; The second-level scheduling is used to optimize the power generation output of the remaining thermal power units after the output of new energy is determined, and consider the heating demand of the heating units, the benefits of the peak-shaving units, and the operating economy between the units, and finally determine the power generation output of each unit in each time period.

8. A large-scale energy base integrated joint dispatching system according to claim 7, characterized in that: The specific implementation of the first-layer scheduling is as follows: Analyze the uncertainty of photovoltaic and wind power, establish the uncertainty models of photovoltaic and wind power, conduct probabilistic evaluation of the uncertainty of photovoltaic and wind power generation prediction results, and obtain the photovoltaic and wind power generation prediction errors; The Latin hypercube sampling method is used to analyze the generation prediction errors of photovoltaic and wind power. subsampling; The objective function is established by maximizing the combined output of photovoltaic and wind power: ; in, Combined power generation for photovoltaic and wind power, is the scheduling period, and They are The actual output of wind power and photovoltaic power generation at each moment; The objective function is converted into a minimization objective problem, and we get: ; in, and They are Short-term power forecasting of wind power and photovoltaic power generation at any moment; The minimization objective problem is solved based on the sampling data and the power prediction data to obtain wind power and photovoltaic processing.

9. A large-scale energy base integrated joint dispatching system according to claim 8, characterized in that: The specific implementation of the second layer scheduling is as follows: The objective function is established with the lowest total power generation cost of thermal power units: ; In the formula, is the total electricity generation cost; is the energy consumption cost of thermal power units; , , , Divided into SO2, CO2, NO x and environmental costs caused by smoke and dust emissions; The objective function is established with the minimum deviation of static output of the sending-end tie line. On the basis of satisfying the wind and solar power abandonment rate constraints, the wind and solar power abandonment rates in each period are optimized in combination with short-term power forecast data to obtain the optimal wind and solar power grid-connected power curve for each period. ; In the formula, is the variance between the planned power and the actual power generated by the sending-end tie line, is the scheduling period; For the contact line The planned power at the moment; for The total power generation plan at the moment is the sum of the power of all units in the energy base; Based on the power generation plan of the heating unit in the "heat-to-electricity" mode, the objective function of the heating unit is established as follows: ; In the formula, For heating units The additional penalty coefficient for non-heating units is 0. is the number of heating units, For heating units exist The planned output is always in the "heat-to-electricity" mode. For heating units exist Always make real efforts, For heating units Output adjustment range setting value; Will , , , Integrate and establish a comprehensive optimization objective function, namely: ; in, To optimize the overall cost; , , , Weight coefficients for multi-objective optimization; , , is the equivalent substitution coefficient of the target; For deep peak load units, the energy consumption cost of the units is broken down into: ; In the formula, is the energy consumption cost of the deep peak load regulation unit, for Thermal power unit The power generation capacity, For thermal power units Rated output; , Thermal power units The lower limit of basic peak regulation and the lower limit of deep peak regulation; The cost incurred by investing in plasma during deep adjustment of the unit; The operating cost of thermal power units in the basic peak load regulation stage is: ; In the formula, , , For thermal power units The consumption coefficient, is the number of thermal power units, is the unit price of cost; If the thermal power units are allowed to start and stop for peak load regulation when the day-ahead plan is formulated, the start and stop costs are as follows: ; In the formula, is the start / stop variable, the value is 0 or 1; is the cost of a single start and stop; Under the constraints of system power balance, minimum number of units in operation, system spare capacity, system output upper and lower limits, moment of inertia, unit output, unit regulation rate, line safety and energy storage charging and discharging, the branch and bound method is adopted, and the cutting platform method is used to tighten the linear programming relaxation, solve the two-layer optimization scheduling model, and generate the start-stop combination and power generation plan of each unit and station.

Citation Information

Cited By

  • Real-time control system and method for integration of wind, light, fire and energy storage

    CN119921387A

  • Dynamic energy-saving optimization method based on machine vision and behavior habit prediction

    CN121069792A