Power system fault recovery method considering frequency deviation under large-scale wind power access
By establishing a frequency response model of the power system and a segmented linearization method, the problem of frequency deviation in the power system under large-scale wind power access is solved, ensuring that the power system has sufficient backup capacity and economy during the failure recovery process, and improving the Frequency safety and stability.
Patent Information
- Application Number
- CN202411058379.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-15
AI Technical Summary
In large-scale wind power access power systems, it is difficult for the existing technology to effectively consider frequency deviations, resulting in insufficient backup capacity and unstable frequency during power system failure recovery, and unable to effectively deal with wind power fluctuations, affecting the system's frequency safety.
A frequency response model of the power system under large-scale wind power access was established, and the frequency deviation amount was derived based on the pull-type final value theorem, and the quadratic nonlinear term in the power generation cost was converted into a linear planning function through the segmented linear linearization method. The weighting method solves the multi-objective function aimed at system recovery, power generation cost and backup cost, ensuring that the power system has sufficient backup capacity to deal with wind fluctuations during the failure recovery process.
It realizes the selection of the optimal backup recovery plan under different wind power fluctuations, ensures the amount of fault recovery and economic benefits, provides better frequency safety guarantees, and improves the stability and reliability of the power system.
Smart Images

Figure CN118971031A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to power system fault recovery, in particular to a power system fault recovery method taking frequency deviation into consideration under large-scale wind power access. Background Art
[0002] With the integration of large-scale wind power into the power grid, the proportion of synchronous generators has gradually decreased, the system's inertia level and frequency regulation capability have been greatly reduced, and the frequency stability of the power system is facing severe challenges. During the fault recovery process of the power system, the backup capacity is used to maintain frequency stability and provide system security. If a large-scale fault occurs in the power system, the conventional power supply is withdrawn, resulting in insufficient backup power in the power system, and the system will have a chain reaction due to insufficient power supply. [4] Therefore, in view of the fact that the power system is prone to insufficient reserve capacity and unstable frequency during fault recovery under large-scale wind power access, it is necessary to study the maximum adjustable reserve capacity of the unit considering frequency deviation, and establish a power system fault recovery model under large-scale wind power access based on the studied reserve capacity to meet the fault recovery of the power system with optimal reserve.
[0003] At present, extensive research has been conducted on fault recovery strategies for power systems under extreme weather conditions at home and abroad. According to the traditional practice of power systems, these fault recovery strategies can be classified from the perspective of planning and operation; and the operation can be further divided into three operating states, namely planning measures (such as line reinforcement, vegetation management, etc.), pre-disaster prevention measures (such as advance deployment of distributed generators, personnel, etc.), and disaster / post-disaster recovery measures (such as topology switching, use of new energy generation, energy storage devices, microgrids, etc.). These measures effectively improve the pre-disaster defense capability of the power system, reduce the probability of damage to key loads or power generation units in the network, and significantly improve the speed of post-disaster recovery of key loads and the quality of power supply. Many scholars have conducted research on the problems in the process of power system fault recovery. Traditional recovery strategies mainly include network reconstruction, power restoration sequence, and emergency repair strategies. Other scholars use distributed power sources, energy storage, electric vehicles, and microgrids (MGs) to restore the power-off loads during the fault process. For example, reference [1] proposes a multi-stage recovery plan to maximize the recovery of power-off loads using distributed power sources. Reference [2] proposed a short-term recovery strategy to build a power island and maintain the normal operation of the load inside the island in the event of a fault. Traditional load recovery strategy research is mainly based on a specific fault scenario or a single fault to improve the reliability of the system. However, faults caused by extreme disaster events often have characteristics such as large load loss and disconnection from the upstream power supply. Its modeling technology cannot dynamically characterize the load recovery capacity of the distribution network under the influence of extreme disaster events. Reference [3] pointed out that microgrids can be used as an emergency power source when extreme events occur, and can continuously supply power to key loads, thereby improving the operational resilience of the distribution network. References [4-5] proposed to use microgrids to supply power to key loads in the distribution network, and used the shortest path search method to convert the model into a linear integer program (LIP) problem to maximize the load recovery amount. Reference [6] In the event of a fault, the distribution network is decomposed into multiple microgrids for optimal scheduling. By maintaining the continuous power supply of the distribution network to users, the purpose of enhancing the resilience of the distribution network is achieved. Reference [7] uses microgrid network interconnection to restore loads after the distribution network disaster, which can shorten the power outage time and effectively enhance the resilience of the distribution network.
[0004] In general, the existing research on power system fault recovery issues is conducted from three different stages of disasters, using different optimization algorithms to form various recovery strategies for fault recovery research. In addition, in the research of this type of problem, only the fault recovery volume and operating cost of the power system are considered, and the frequency problem brought to the power system after the access of new energy sources is not considered, especially the recovery process of the power system after a major fault occurs. In large-scale power systems, there are many generator units and sufficient spare capacity. In the process of using spare capacity, the change of frequency is easily ignored. Therefore, sufficient spare capacity needs to be guaranteed in fault recovery to prevent the secondary drop of frequency caused by uncertain factors such as faults.
[0005] At present, most of the frequency safety research focuses on inertia and frequency control. In addition to the frequency regulation of conventional synchronous units, fully exploring the frequency response capabilities of different links of source-grid-load-storage is a research hotspot. Renewable energy units achieve inertial response and primary frequency regulation capabilities similar to synchronous units by adding frequency control links. DC control systems can obtain primary frequency regulation capabilities through rapid active power regulation. Energy storage systems and flexible loads achieve rapid frequency response through rapid charging and discharging and demand-side management technologies, respectively. Based on various frequency response methods, power system optimization research considering frequency safety focuses on economic dispatch, unit combination and other operational aspects, and responds to frequency safety accidents by changing the unit startup mode and optimizing frequency regulation reserves.
[0006] At present, frequency analysis is mainly based on three methods: full-state simulation, equivalent model calculation, and artificial intelligence technology. In order to quickly calculate the system frequency, the use of equivalent methods to reasonably approximate the full-state model has become a research trend. The equivalent model calculation method for power system frequency analysis mainly uses a single-machine or multi-machine with concentrated load model to characterize the frequency response curve. There are two main methods: average system frequency (ASF) model and system frequency response (SFR) model. The ASF model aggregates the motion equations of all generator rotors in the entire network into a single-machine model, but retains the independent response of the prime mover-speed control system of each unit, and has high-order nonlinear characteristics. Based on the ASF model, references [8-9] derive the average frequency expression of the entire network through the frequency response model to construct frequency constraints. This model can only provide an average frequency, cannot reflect the dynamic differences in frequency in different regions, and cannot consider the frequency regulation characteristics of wind turbines. References [10-11] use the SFR equivalent model to construct the lowest point frequency constraint and add it to the unit combination model. The SFR model can take into account the impact of various types of generators and loads on the frequency in the system, and the model has been developed and applied due to its simple form, fast calculation and strong scalability.
[0007] In the above analysis of frequency models, system frequency is mostly considered in the unit combination scenario, and the process of power system fault recovery is not mentioned. At the same time, when faced with a large number of generator sets in the power system under large-scale wind power access, sufficient unit backup is required to cope with wind power fluctuations in order to maintain system frequency stability.
[0008] [1]SHEN C,KAUFMANN P,HACHMANN C,et al.Three-stage power systemrestoration methodology considering renewable energies[J].InternationalJournal of Electrical Power&Energy Systems,2018,94:287-299.
[0009] [2] Liu Weijia, Sun Lei, Lin Zhenzhi, et al. Short-term power restoration strategy for distribution islands with intermittent power sources, energy storage and electric vehicles [J]. Automation of Electric Power Systems, 2015, 39(16): 49-58.
[0010] [3]KKWASINSKI A,KRISHNAMURTHY V,SONG J,et al.Availability evaluation of micro-grids for resistant power supply during natural disasters[J].IEEETransactions on Smart Grid,2012,3(4):2007-2018.
[0011] [4]XU Y, LIU CC, SCHNEIDER K, et al. Microgrids for service restoration to critical load in a resilient distribution system [J]. IEEE Transactions onSmart Grid, 2018, 9 (1): 426-437.
[0012] [5]GAO H, CHEN Y,
[0013] [6]CHEN C,WANG J,QIU F,et al.Resilient distribution system bymicrogrids formation after natural disasters[J].IEEE Transactions on SmartGrid,2016,7(2):958-966.
[0014] [7]ARIF A,WANG Z.Networked microgrids for service restoration inresilient distribution systems[J].Iet Generation Transmission&Distribution,2017,11(14):3612-3619.
[0015] [8]AHMADI H,GHASEMI H. Security-constrained unit commitment with linearized system frequency limit constraints[J].IEEE Transactions on Power Systems, 2014, 29(4):1536-1545.[9]Zhang Hengxu, Li Changgang, Liu Yutian, et al. Review of research on dynamic frequency analysis and application of power system[J]. Transactions of China Electrotechnical Society, 2010, 25(11):169-176.
[0016]
[10] Sheng Siqing, Qiu Hao, Zhang Wenchao, et al. Comprehensive evaluation method for renewable energy consumption considering steady-state and dynamic active power balance constraints[J]. Power System Protection and Control, 2019, 47(10): 51-56.
[0017]
[11] Zhang Chengming, Liu Lu, Cheng Haozhong, et al. Review and Prospect of Research on Power System Planning and Operation Optimization Considering Frequency Security[J]. Power System Technology, 2022, 46(01): 250-265. Summary of the invention
[0018] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for power system fault recovery taking into account frequency deviation under large-scale wind power access.
[0019] The object of the present invention is achieved by the following technical solution: A method for power system fault recovery considering frequency deviation under large-scale wind power access, comprising the following steps:
[0020] Step S1: Establish a frequency response model of the power system taking into account large-scale wind power access, derive the frequency deviation by combining the La-type terminal value theorem, and calculate the power fluctuation;
[0021] Step S2: The maximum adjustable reserve capacity of the power system takes into account the limitations of the unit output boundary, ramp rate and steady-state frequency deviation. In order to maximize the regulation capability of the generator, the minimum value among the power fluctuation amount, the generator output boundary and the ramp rate is taken as the maximum adjustable reserve capacity of the unit to ensure that there is sufficient reserve capacity to cope with wind fluctuations during the power system recovery process; Step S3: Establish a power system fault recovery model considering frequency deviation under large-scale wind power access. For the multi-objective nonlinear problem in the power system fault recovery model, the piecewise linearization method is used to transform the quadratic nonlinear term in the power generation cost into a linear programming function, and the weighted sum method is used to solve the multi-objective function with system recovery amount, power generation cost and reserve cost as the target.
[0022] Specifically, the power system frequency response model in step S1 is:
[0023]
[0024] In the formula, is the static adjustment coefficient of the i-th wind turbine; T W,i is the time constant of the speed regulator of the i-th wind turbine; H eq is the equivalent inertia time constant of the system; D is the load damping coefficient; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; T i is the time constant of the nth generator speed regulator; R i is the static adjustment coefficient of the nth generator; s is the complex variable in the transfer function; n is the number of generators; m is the number of wind turbines.
[0025] The fans in the power system are of the same model. and T W,i Unified and T W, after simplifying formula (1), the equivalent model of wind farm is established as shown below:
[0026]
[0027] Specifically, the equivalent inertia time constant H eq for:
[0028]
[0029] Where n and m are the number of generator sets and wind turbine sets respectively; S g,i is the rated capacity of the i-th generator; H g,i is the inertia time constant of the i-th generator; S W is the capacity of a single wind turbine; H W is the inertia time constant of a single wind turbine. Specifically, in step S2, the time constants of all wind turbines and generators are set to T R , the frequency response expression after wind power is connected to the grid can be derived as:
[0030]
[0031] Where: △P D is the system power fluctuation; ξ is the damping ratio; due to the governor time constant T of different units i With T W,i The influence on the system frequency deviation is small within the allowable range, so T i With T W,i All replaced by a unified time constant T R ; D is the load damping coefficient; F is the generator equivalent high-pressure turbine power coefficient; R T is the equivalent static regulation coefficient of the generator; is the natural frequency, w n for The value after the square root; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; R i is the static adjustment coefficient of the nth generator; By formula represents a function with wind power as a variable, where is the variable power of the wind farm; △f max It is the maximum value of the deviation that the power system frequency can bear.
[0032] Specifically, the steady-state frequency deviation Δf(s) in step S2 represents the system frequency anti-disturbance capability. According to equation (3) and combined with the Lasker terminal value theorem, Δf(s) can be calculated:
[0033]
[0034] Specifically, the maximum adjustable reserve capacity of the unit considering the steady-state frequency deviation is as follows:
[0035]
[0036] Where: is the lower limit of the output of unit i during period t; is the upper limit of the output of unit i during period t; is the lower limit of the ramp rate of unit i during period t; is the upper limit of the ramp rate of unit i during period t; △f c K Gi is the power fluctuation; is the actual output value of unit i during period t.
[0037] Specifically, the objective function of the power system fault recovery model in step S3 is:
[0038] minC=ω1C rec +ω2C gen +ω3C res (9)
[0039] Where: C rec is the load loss; C gen is the output cost of the unit; C res is the system backup cost; ω1, ω2 and ω3 are weight coefficients; C is the objective function.
[0040] Specifically, the load loss amount, the unit output cost and the system standby cost are calculated as follows:
[0041]
[0042] Where: N is the set of power system nodes; T is the set of 24 time periods; P L,j is the original power of the load at node j; is the power of the load at node j during period t; G is the generator set; a i 、b i 、c i are the three cost coefficients of the unit; are the cost coefficients of the upper and lower spin standby of the i-th unit respectively; are the upper and lower spinning reserve capacities of the i-th unit that need to be reserved at time t to cope with wind power fluctuations; is the actual output value of unit i in period t. Specifically, the constraints of the power system fault recovery model include power balance constraints, power flow constraints, generator output constraints, wind farm output constraints, ramp constraints and standby constraints.
[0043] Specifically, the method for solving the objective function in step S3 is:
[0044] The objective function is transformed into a single objective function using a weighted method;
[0045] Establish the coal consumption function and linearize it piecewise into m segments. gen The transformation is as follows:
[0046]
[0047] Where: K i,s It represents the slope of each section of the coal consumption function after piecewise linearization; u i t The power-on status of the unit, 1 for power-on and 0 for power-off; c 0,i Indicates that the unit is turned on and at minimum output P gen,i,min Coal consumption generated by operation; is the output of the unit in segment s, satisfying the following formula:
[0048]
[0049] In the formula, is the output of the unit segment; P i,max and P i,min are the maximum output of the unit and the maximum output of the unit respectively; a i 、b i 、c i are the three cost coefficients of the unit;
[0050] For power flow constraints, the node power equation is linearized and approximated, the initial voltage v0 and initial phase angle θ0 are provided, and the node injection power equation is linearized successively using the first-order Taylor series expansion to obtain:
[0051]
[0052] Where P i and Q i are the active power and reactive power of node i respectively; G ij and B ij are the real and imaginary parts of the admittance matrix between node i and node j respectively; V i and V j are the voltages at node i and node j respectively; θ ij is the phase angle difference between node i and node j; N is the set of power system nodes; v i v j and v i v j θ ijIt is still a nonlinear term, which is transformed as follows through Taylor expansion and mathematical transformation:
[0053]
[0054] Where N' is the set of all nodes connected to node i in the power system; and are the initial voltages at node i and node j respectively; is the initial phase angle difference between node i and node j; From the square sum formula, we can get 2 The term is considered as a whole υ, then will become a linear expression At the same time, in the transmission network, the voltage difference between nodes is very small, v ij is a relatively small value, not to mention the squared Therefore, the linear expression The nonlinear term v can be represented with a smaller error i v j To improve the calculation accuracy, a Taylor expansion is used to Further linearization is performed by introducing a non-negative slack variable ε ij , the nonlinear terms are converted into linear terms as follows:
[0055]
[0056] Through the above method, the nonlinear terms in the objective function and power flow constraints are linearized, and finally solved using CPLEX and GUROBI solvers.
[0057] The present invention has the following advantages:
[0058] 1. Good applicability. Prior to this, relevant research has been carried out at home and abroad on the problem of fault recovery of power systems, but there is almost no research considering frequency stability during the fault recovery process. The present invention combines the frequency response model of the power system under large-scale wind power access, focuses on the parameter of frequency deviation, and combines the problem of power system fault recovery to carry out research, which provides a better research basis for the frequency safety problem in the fault recovery process of subsequent new energy access to the power system.
[0059] 2. The model algorithm is objective and clear: The present invention adopts piecewise linear method and weighted method to solve the fault recovery model for the power system, which can objectively reveal the relationship between the fault recovery amount and cost (operating cost and standby cost), and the overall model is simple and clear.
[0060] 3. Strong economy: The present invention can select the best backup recovery from different backup recovery schemes under different wind power fluctuations, ensuring the best economic benefits while ensuring the fault recovery amount. It can be seen that the present invention has good economy. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 This is a frequency response model diagram of a power system with large-scale wind power access according to the present invention;
[0062] Figure 2 The maximum adjustable spare capacity diagram of a single unit of the present invention;
[0063] Figure 3 This is a flow chart for solving the power system fault recovery model of the present invention;. DETAILED DESCRIPTION
[0064] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the embodiments described are only part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.
[0065] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.
[0066] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including a..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0067] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description. Figures 1 to 3As shown in FIG. 1 , a power system fault recovery method considering frequency deviation under large-scale wind power access includes the following steps:
[0068] Step S1: Establish a frequency response model of the power system taking into account large-scale wind power access, derive the frequency deviation by combining the La-type terminal value theorem, and calculate the power fluctuation;
[0069] The uncertainty and intermittency of wind power will have a certain degree of impact on the frequency response of the power system. In order to solve this problem, the present invention proposes a simplified method for the wind turbine model based on the existing SFR model, and constructs a fast simulation model based on the simplified model of the wind turbine and the SFR model of the power system, thereby significantly improving the computational efficiency of wind power participating in the study of power system frequency support. At the same time, by introducing differentiated inertia proportional coefficients and frequency modulation control coefficients into the SFR model, the dynamic characteristics of different types of wind turbines responding to the system frequency, as well as the frequency stability and frequency modulation capability of the system can be more carefully and accurately portrayed.
[0070] In order to better consider the frequency response characteristics of wind turbines to cope with frequency changes, the present invention establishes a frequency response model of the power system under large-scale wind power access on the basis of retaining the differences in the speed regulation parameters of each synchronous machine:
[0071]
[0072] In the formula, is the static adjustment coefficient of the i-th wind turbine; T W,i is the time constant of the speed regulator of the i-th wind turbine; H eq is the equivalent inertia time constant of the system; D is the load damping coefficient; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; T i is the time constant of the nth generator speed regulator; R i is the static adjustment coefficient of the nth generator; s is the complex variable in the transfer function; n is the number of generators; m is the number of wind turbines.
[0073] The fan model of the present invention is the same. and T W,i Unified and T W , after simplifying formula (1), the equivalent model of wind farm is established as shown below.
[0074]
[0075] Considering the virtual inertia control of wind turbines, the system equivalent inertia time constant H can be obtained: eqfor:
[0076]
[0077] Where n and m are the number of generator sets and wind turbine sets respectively; S g,i is the rated capacity of the i-th generator; H g,i is the inertia time constant of the i-th generator; S W is the capacity of a single wind turbine; H W is the inertia time constant of a single wind turbine.
[0078] Set the time constants of all wind turbines and generators to T R , the frequency response expression after wind power is connected to the grid can be derived as:
[0079]
[0080]
[0081] Where: △P D is the system power fluctuation; ξ is the damping ratio; due to the governor time constant T of different units i With T W,i The influence on the system frequency deviation is small within the allowable range, so T i With T W,i All replaced by a unified time constant T R ; D is the load damping coefficient; F is the generator equivalent high-pressure turbine power coefficient; R T is the equivalent static regulation coefficient of the generator; is the natural frequency, w n for The value after the square root; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; R i is the static adjustment coefficient of the nth generator; By formula represents a function with wind power as a variable, where is the variable power of the wind farm; △f max It is the maximum value of the deviation that the power system frequency can bear.
[0082] The steady-state frequency deviation △f(s) represents the system frequency anti-disturbance capability. According to equation (3) and combined with the Lasker final value theorem, △f(s) can be calculated as:
[0083]
[0084] After a power system failure, frequency fluctuations are usually affected by the size of the generator set's spare capacity. Spare capacity refers to the system's ability to quickly take over the load through other spare units when the generator set is shut down or fails. The regulation effect of the generator and the frequency regulation response of the load, plus sufficient spare capacity, can effectively suppress frequency deviations, thereby maintaining the stability and reliability of the power system. Therefore, when a power system failure occurs, considering the role of generators with spare capacity in the recovery process, the system's ability to respond to frequency fluctuations can be significantly improved, ensuring that the system can respond to unexpected situations more reliably and ensuring the stability of power supply.
[0085] In order to ensure that the system can adjust quickly and effectively when the frequency changes, and to maximize the use of the generator's adjustment ability to maintain the stable operation of the system, the maximum adjustable reserve capacity of the system should take into account the unit output boundary, ramp rate and steady-state frequency deviation. The regulation "Power Quality Power System Frequency Deviation" stipulates that the steady-state frequency deviation should be within ±0.2Hz to ensure the safe and stable operation of the power system frequency. Therefore, the present invention sets the frequency deviation △f c The value is the minimum value of the obtained frequency deviation △f(s) and ±0.2Hz, that is, △f c =min[△f(s),0.2], the maximum adjustable capacity of a single generator like Figure 2 As shown in the figure, K Gi The slope of the curve represents the unit regulation power of the i-th generator; To take into account the frequency deviation, the frequency deviation is -△f c The maximum adjustable capacity of the unit at this time; The frequency deviation is -△f when the frequency deviation is not taken into account. n The maximum adjustable capacity of the system at this time.
[0086] After the frequency reaches a steady state, the maximum adjustable reserve capacity of a single generator set i is as follows: Figure 2 As shown in the figure, line segment AB represents the maximum adjustable capacity of the unit considering only the unit output boundary and ramp rate, and its value is Line segment BC represents the power fluctuation, and its value is △f c K Gi ;in, is the upper limit of the output of unit i during period t; is the actual output value of unit i during period t; is the upper limit of the ramp rate of unit i during period t.
[0087] When △f≤0, if the frequency deviation is not taken into account, the maximum adjustable reserve capacity of the unit only considers the restrictions of the ramp rate and the unit output boundary. At this time, the maximum adjustable reserve capacity of the unit is on the line segment AB; if the frequency deviation is taken into account, the maximum adjustable reserve capacity of the unit is limited by the ramp rate and the unit output boundary, and is also limited by the maximum adjustment range allowed by the current frequency deviation. At this time, Figure 2 It can be seen that the AB segment value is greater than the BC segment value, and the maximum adjustable reserve capacity of the unit is on the line segment BC. In order to ensure that the system can respond to the frequency deviation in the most effective way at the first time and ensure sufficient adjustment room, the maximum adjustable capacity of the unit should be on the line segment BC, that is, and ∆f c K Gi The smaller value of the two, the maximum adjustable reserve capacity of the unit considering the steady-state frequency deviation is defined as follows:
[0088]
[0089] Where: is the lower limit of the output of unit i during period t; is the upper limit of the output of unit i during period t; is the lower limit of the ramp rate of unit i during period t; is the upper limit of the ramp rate of unit i during period t; △f c K Gi is the power fluctuation; is the actual output value of unit i during period t.
[0090] Step S2: The maximum adjustable reserve capacity of the power system takes into account the limitations of the unit output boundary, ramp rate and steady-state frequency deviation. In order to maximize the adjustment capability of the generator, the minimum value between the power fluctuation amount, the generator output boundary and the ramp rate is taken as the maximum adjustable reserve capacity of the unit to ensure that there is sufficient reserve capacity to cope with wind fluctuations during the power system recovery process; Step S3: Establish a power system fault recovery model that takes into account frequency deviation under large-scale wind power access. For the multi-objective nonlinear problem in the power system fault recovery model, the piecewise linearization method is used to convert the quadratic nonlinear term in the power generation cost into a linear programming function, and the weighted sum method is used to solve the multi-objective function with system recovery amount, power generation cost and backup cost as the objectives. In order to ensure the recovery amount of the load after the system failure and the economy of the system operation, the reliability and stability of the system are ensured to the maximum extent. The present invention establishes an objective function with the maximum load recovery amount and the minimum unit output cost and backup cost as the objectives. By optimizing this objective function, the system can achieve the maximum load recovery at the lowest cost after the fault recovery, thereby maintaining the economy and reliability of the system;
[0091] The objective function of the power system fault restoration model is:
[0092] minC=ω1C rec +ω2C gen +ω3C res (9)
[0093] Where: C rec is the load loss; C gen is the output cost of the unit; C res is the system backup cost; ω1, ω2 and ω3 are weight coefficients; C is the objective function.
[0094] The calculation of load loss, unit output cost and system standby cost is as follows:
[0095]
[0096] Where: N is the set of power system nodes; T is the set of 24 time periods; P L,j is the original power of the load at node j; is the power of the load at node j during period t; G is the generator set; a i 、b i 、c i are the three cost coefficients of the unit; are the cost coefficients of the upper and lower spin standby of the i-th unit respectively; are the upper and lower spinning reserve capacities of the i-th unit that need to be reserved at time t to cope with wind power fluctuations; is the actual output value of unit i during period t.
[0097] The constraints of the power system fault recovery model include:
[0098] 1.1 Power balance constraints
[0099] During the fault recovery process, the total power generation of all generator sets in the system that are in the on state is required to be no less than the total load demand:
[0100]
[0101] Where: is the actual output value of unit i during period t; P Wt is the output value of the wind farm at time t; P Lt is the load forecast value at time t; n is the number of generating units;
[0102] 1.2 Power flow constraints
[0103]
[0104]
[0105] Where: P i and Q i are the active power and reactive power of node i, V i and V j are the voltages at nodes i and j, respectively, G ij and B ij are the real and imaginary parts of the admittance matrix between node i and node j, θ ij is the phase angle difference between node i and node j, n is the number of generator sets;
[0106] 1.3 Generator output constraints
[0107]
[0108] Where: and are the upper and lower limits of the output of unit i in period t respectively; is the actual output value of unit i during period t; 1.4. Wind farm output constraints
[0109]
[0110] Where: is the predicted wind power; P Wt is the output value of the wind farm at time t;
[0111] 1.5. Climbing Constraints
[0112]
[0113] Where: is the actual output value of unit i during period t-1; and They are the upper and lower limits of the ramp rate of unit i during period t respectively; is the actual output value of unit i during period t;
[0114] 1.6. Backup Constraints
[0115] Traditional fault recovery solutions only require that the system's spinning reserve is greater than the power deficit, that is, the following constraints are met:
[0116]
[0117] Where: η is the wind power prediction error; n is the number of generator sets; and are the upper and lower limits of the output of unit i in period t respectively; is the actual output value of unit i during period t; P Wt is the output value of the wind farm at time t;
[0118] If the maximum adjustable capacity of the unit is considered when the frequency reaches the steady state, based on the above, the configuration is performed according to 5% of the maximum system load, and the following constraints are added:
[0119]
[0120] Where: P Lmax is the maximum load of the system; and are the upper and lower limits of the output of unit i in period t respectively; is the lower limit of the ramp rate of unit i during period t; is the upper limit of the ramp rate of unit i during period t; n is the number of generating units;
[0121] The above constraints do not take into account the frequency stability during the fault recovery process. In order to ensure that the system has sufficient reserve to cope with sudden wind power fluctuations or prediction errors and avoid power system instability, this paper establishes the following constraints based on the maximum adjustable reserve capacity of the system considering frequency deviation:
[0122]
[0123] In the formula, To take into account the frequency deviation, the frequency deviation is -△f c The maximum adjustable capacity of the unit at this time; The frequency deviation is -△f when the frequency deviation is not taken into account. n The maximum adjustable capacity of the system at this time; n is the number of generator sets; η is the wind power prediction error; P Wt is the output value of the wind farm at time t;
[0124] In the power system fault recovery model proposed in the present invention, the unit operation cost C of the objective function is gen There are quadratic nonlinear terms in the constraints of the power flow and the power flow. The nonlinear equations are transformed into linear programming models by piecewise linearization and relaxation respectively. For the objective function, the weighted method is used to transform the multi-objective function into a single objective function.
[0125] A coal consumption function is established and piecewise linearized into m segments. The unit output cost in the objective function is replaced as follows:
[0126]
[0127] Among them, K i,s represents the slope of each section of the coal consumption function after piecewise linearization, c 0,i Indicates that the unit is turned on and at minimum output P i,min Coal consumption during operation, is the output of the unit segment, satisfying the following formula:
[0128]
[0129] In the formula, is the output of the unit segment; P i,max and P i,min are the maximum output of the unit and the maximum output of the unit respectively; a i 、b i 、c i are the three cost coefficients of the unit;
[0130] For power flow constraints, the node power equation is linearized and approximated, the initial voltage v0 and initial phase angle θ0 are provided, and the node injection power equation is linearized successively using the first-order Taylor series expansion to obtain:
[0131]
[0132] Where P i and Q i are the active power and reactive power of node i respectively; G ij and B ij are the real and imaginary parts of the admittance matrix between node i and node j respectively; V i and V j are the voltages at node i and node j respectively; θ ij is the phase angle difference between node i and node j; N is the set of power system nodes; v i v j and v i v j θ ij It is still a nonlinear term, which is transformed as follows through Taylor expansion and mathematical transformation:
[0133]
[0134] Where N' is the set of all nodes connected to node i in the power system; and are the initial voltages at node i and node j respectively; is the initial phase angle difference between node i and node j; From the square sum formula, we can get 2 The term is considered as a whole υ, then will become a linear expression At the same time, in the transmission network, the voltage difference between nodes is very small, v ij is a relatively small value, so the linear expression The nonlinear term v can be represented with a smaller error i v j To improve the calculation accuracy, a Taylor expansion is used to Further linearization is performed by introducing a non-negative slack variable ε ij , the nonlinear terms are converted into linear terms as follows:
[0135]
[0136] Through the above method, the nonlinear terms in the objective function and power flow constraints are linearized, and finally solved using CPLEX and GUROBI solvers.
[0137] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the above-mentioned technical content without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any changes, modifications, equivalent changes and modifications made to the above embodiments based on the technology of the present invention without departing from the content of the technical solution of the present invention belong to the protection scope of the present technical solution.
Claims
1. A power system fault recovery method considering frequency deviation under large-scale wind power access, characterized by: The following steps are involved: Step S1: Establish a frequency response model of the power system taking into account large-scale wind power access, derive the frequency deviation by combining the La-type terminal value theorem, and calculate the power fluctuation; Step S2: The maximum adjustable reserve capacity of the power system takes into account the limits of the unit output boundary, ramp rate and steady-state frequency deviation. In order to maximize the adjustment capability of the generator, the minimum value among the power fluctuation amount, the generator output boundary and the ramp rate is taken as the maximum adjustable reserve capacity of the unit to ensure that there is sufficient reserve capacity to cope with wind fluctuations during the power system recovery process; Step S3: Establish a power system fault recovery model considering frequency deviation under large-scale wind power access. Aiming at the multi-objective nonlinear problem in the power system fault recovery model, the piecewise linearization method is used to transform the quadratic nonlinear term in the power generation cost into a linear programming function, and the weighted sum method is used to solve the multi-objective function with system recovery amount, power generation cost and backup cost as the objectives.
2. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 1 is characterized in that: The power system frequency response model in step S1 is: In the formula, is the static adjustment coefficient of the i-th wind turbine; T W,i is the time constant of the speed regulator of the i-th wind turbine; H eq is the equivalent inertia time constant of the system; D is the load damping coefficient; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; T i is the time constant of the nth generator speed regulator; R i is the static adjustment coefficient of the nth generator; s is the complex variable in the transfer function; n is the number of generators; m is the number of wind turbines; The fans in the power system are of the same model. and T W,i Unified and T W , after simplifying formula (1), the equivalent model of wind farm is established as shown below:
3. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 2 is characterized in that: The equivalent inertia time constant H eq for: Where n and m are the number of generator sets and wind turbine sets respectively; S g,i is the rated capacity of the i-th generator; H g,i is the inertia time constant of the i-th generator; S W is the capacity of a single wind turbine; H W is the inertia time constant of a single wind turbine.
4. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 2 is characterized in that: In step S2, the time constants of all wind turbines and generators are set to T R , the frequency response expression after wind power is connected to the grid is derived as: Where: △P D is the system power fluctuation; ξ is the damping ratio; due to the governor time constant T of different units i With T W,i The influence on the system frequency deviation is small within the allowable range, so T i With T W,i All replaced by a unified time constant T R ; D is the load damping coefficient; F is the generator equivalent high-pressure turbine power coefficient; R T is the equivalent static regulation coefficient of the generator; is the natural frequency, w n for The value after the square root; K i is the mechanical power gain factor of the nth generator; F i is the high-pressure turbine power coefficient of the nth generator; R i is the static adjustment coefficient of the nth generator; By formula represents a function with wind power as a variable, where is the variable power of the wind farm; △f max It is the maximum value of the deviation that the power system frequency can bear.
5. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 4 is characterized in that: The steady-state frequency deviation △f(s) in step S2 represents the system frequency anti-disturbance capability. According to equation (3) and combined with the Lasker terminal value theorem, △f(s) can be calculated:
6. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 5 is characterized in that: The maximum adjustable reserve capacity of the unit considering the steady-state frequency deviation is as follows: Where: is the lower limit of the output of unit i during period t; is the upper limit of the output of unit i during period t; is the lower limit of the ramp rate of unit i during period t; is the upper limit of the ramp rate of unit i during period t; △f c K Gi is the power fluctuation; is the actual output value of unit i during period t.
7. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 1 is characterized in that: The objective function of the power system fault recovery model in step S3 is: min C=ω1C rec +ω2C gen +ω3C res (9) Where: C rec is the load loss; C gen is the output cost of the unit; C res is the system backup cost; ω1, ω2 and ω3 are weight coefficients; C is the objective function.
8. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 7 is characterized in that: The load loss amount, unit output cost and system standby cost are calculated as follows: Where: N is the set of power system nodes; T is the set of 24 time periods; P L,j is the original power of the load at node j; is the power of the load at node j during period t; G is the generator set; a i , b i 、c i They are the three cost coefficients of the unit; are the cost coefficients of the upper and lower spin standby of the i-th unit respectively; are the upper and lower spinning reserve capacities of the i-th unit that need to be reserved at time t to cope with wind power fluctuations; is the actual output value of unit i during period t.
9. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 8 is characterized in that: The constraints of the power system fault recovery model include power balance constraints, power flow constraints, generator output constraints, wind farm output constraints, ramp constraints and standby constraints.
10. The method for power system fault recovery considering frequency deviation under large-scale wind power access according to claim 9, characterized in that: The method for solving the objective function in step S3 is: The objective function is transformed into a single objective function using a weighted method; Establish the coal consumption function and linearize it piecewise into m segments. gen The transformation is as follows: Where: K i,s It represents the slope of each section of the coal consumption function after piecewise linearization; The power-on status of the unit, 1 for power-on and 0 for power-off; c 0,i Indicates that the unit is turned on and at minimum output P gen,i,min Coal consumption generated by operation; is the output of the unit in segment s, satisfying the following formula: In the formula, is the output of the unit in segment s; P gen,i,max and P gen,i,min are the maximum output and the minimum output of the unit respectively; a i , b i 、c i They are the three cost coefficients of the unit; For power flow constraints, the node power equation is linearized and approximated, the initial voltage v0 and initial phase angle θ0 are provided, and the node injection power equation is linearized successively using the first-order Taylor series expansion to obtain: Where P i and Q i are the active power and reactive power of node i respectively; G ij and B ij are the real and imaginary parts of the admittance matrix between node i and node j respectively; V i and V j are the voltages at node i and node j respectively; θ ij is the phase angle difference between node i and node j; N is the set of power system nodes; v i v j and v i v j θ ij It is still a nonlinear term, which is transformed as follows through Taylor expansion and mathematical transformation: Where N' is the set of all nodes connected to node i in the power system; and are the initial voltages at node i and node j respectively; is the initial phase angle difference between node i and node j; From the square sum formula, we can get 2 The term is considered as a whole υ, then will become a linear expression At the same time, in the transmission network, the voltage difference between nodes is very small, v ij is a relatively small value, so the linear expression The nonlinear term v can be represented with a smaller error i v j To improve the calculation accuracy, a Taylor expansion is used to Further linearization is performed by introducing a non-negative slack variable ε ij , the nonlinear terms are converted into linear terms as follows: Through the above method, the nonlinear terms in the objective function and power flow constraints are linearized, and finally solved using CPLEX and GUROBI solvers.
Citation Information
Patent Citations
Multi-source power system day-ahead optimization scheduling method considering frequency constraints
CN112994013A