Power supply configuration method considering economy among different power supplies

By constructing the initial investment, operation, fuel and carbon emission cost functions of the power supply, combined with the 8760-hour production time simulation simulation program, the problem of insufficient detailed analysis of coal-fired power and gas-power consumption in the existing power supply configuration research is solved. A more economical power configuration solution is realized and power planning guidance for new power systems is provided.

CN118971210AActive Publication Date: 2024-11-15CEEC HUNAN ELECTRIC POWER DESIGN INST +1

Patent Information

Application Number
CN202411451822.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-11-15
Estimated Expiration
2044-10-17

AI Technical Summary

Technical Problem

The existing power supply configuration research fails to effectively consider the actual coal consumption and gas consumption of coal power and gas power of different power supplies, resulting in a rough economic analysis and failing to fully reflect the construction and operation and maintenance costs.

Method used

By obtaining the unit investment, operating years, operating costs, carbon emission factors, carbon emission unit costs, annual coal price and gas price of various power supplies, we build the annual value function of the initial investment cost, annual operating cost function, and annual fuel of various power supplies. The cost function and the social cost function of carbon emissions are combined with the 8760-hour production time simulation simulation program, and the power configuration scheme that eliminates the power supply gap is selected, and the lowest cost scheme is selected as the optimal power configuration scheme.

Benefits of technology

A refined cost model for different power supply configurations is realized, a more economical power supply configuration solution is provided, which is of guiding significance for the power planning of new power systems and can more accurately reflect the construction and operation and maintenance costs of various power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971210A_ABST
    Figure CN118971210A_ABST
Patent Text Reader

Abstract

The invention discloses a power supply configuration method considering economy among different power supplies. The method comprises the following steps: S1, acquiring unit investment and other data of various power supplies; s2, constructing a power supply construction operation total cost function; s3, carrying out electric power and electric quantity balance calculation to obtain a power supply configuration basic scheme meeting a supply guarantee demand, and forming a series of configuration schemes; s4, inputting the series configuration scheme as a discrete known quantity into a production time sequence analog simulation program for repeated iteration, and outputting two types of power supply fuel consumptions needing to be compared under different power supply configuration schemes; and S5, inputting the parameters obtained and calculated in the S1 and S4 into the power supply construction and operation total cost function in the S2, calculating the construction and operation total cost of different power supply configuration schemes, and selecting the scheme with the lowest cost as the optimal power supply configuration scheme. The power supply side refined cost function is constructed, the power supply configuration method considering the economical efficiency of different power supplies is provided, and the method has great guiding significance for novel power supply planning of the electric power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply configuration, and in particular to a power supply configuration method considering the economy between different power supplies. Background Art

[0002] Building a clean, low-carbon, safe and efficient energy system and a new power system with new energy as the main body are the basic guarantees for achieving the "dual carbon goals" and are also fundamental measures to achieve energy transformation.

[0003] Efficient power configuration is an important part of the research on new power systems. The existing power configuration research has a relatively rough consideration of the economic efficiency of various power sources, usually only considering the construction and operation and maintenance costs, and simply calculating the fuel cost, which fails to reflect the impact of different power configurations on the actual coal and gas consumption of coal-fired power and gas-fired power. Summary of the invention

[0004] The present invention provides a power supply configuration method taking into account the economy of different power supplies to solve the technical problem mentioned in the background technology.

[0005] To achieve the above object, the technical solution of the present invention is achieved as follows: The present invention provides a power supply configuration method considering the economic efficiency of different power supplies, comprising the following steps: S1. Obtain the unit investment, operating years, operating cost, carbon emission factor, unit cost of carbon emission, annual coal price, and annual gas price of various power sources; S2. Construct the annual value function of the total initial investment cost of each type of power source, the annual operating cost function of each type of power source, the annual fuel cost function of each type of power source, and the social cost function of carbon emissions, and use the above functions to construct the total cost function of power source construction and operation; S3. Based on the resource endowment, load and power source development in the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand, select the two types of power sources to be compared, and form a series of configuration plans; S4. Input the series of configuration schemes as discrete known quantities into the 8760-hour production timing simulation program for repeated iterations, eliminate the power configuration schemes with power supply gaps, and output the fuel consumption of the two types of power sources to be compared under different power configuration schemes; S5. Input the parameters obtained and calculated by S1 and S4 into the total cost function of power supply construction and operation in S2, calculate the total construction and operation costs of different power supply configuration schemes, and select the scheme with the lowest cost as the optimal power supply configuration scheme.

[0006] Furthermore, the S2 specifically includes the following steps: S21. Calculate the total initial investment of various power sources, convert the initial investment present value into annual cost value according to the operating years of various power sources, and construct the annual cost value function of the total initial investment cost of various power sources , S22. Based on the installed capacity and total installed cost of each type of power source, construct the annual operating cost function of each type of power source ; S23. Considering the coal consumption cost of coal-fired power generation and the gas consumption cost of gas turbines, and based on the real-time data of coal consumption, natural gas consumption, coal price and gas price, establish the annual fuel cost function of various power sources. ; S24. Construct a social cost function for carbon emissions based on the unit social cost of carbon emissions and the real-time data of coal consumption and natural gas consumption. ; S25. Annual value function of total initial investment cost using various power sources , Annual operating cost function of various power sources 、Annual fuel cost function of various power sources And the social cost function of carbon emissions Constructing the total cost function of power supply construction and operation .

[0007] Furthermore, the annual value function of the total initial investment cost of various power sources in S21 is The calculation formula is as follows: ; In the formula, For the The unit kilowatt cost of the power source; For the The installed capacity of each power source; For the The operating life of the power source; is the benchmark rate of return.

[0008] Furthermore, the annual operating cost function of each type of power supply in S22 is The details are as follows: ; in, For the The coefficients related to the installed capacity of various power sources include unit installation staff wages, water consumption fees, desulfurization and denitrification fees, material costs and other cost coefficients; For the The coefficient related to the product of installed capacity of each power source and unit investment, including repair costs and insurance costs; Indicates The unit installation cost of the power supply; In addition, and The following relationship is satisfied: ; in, For the The number of installed capacity per unit of each power source; is the average salary of the personnel; is the welfare cost coefficient; For the Water consumption per unit installed capacity of each power source; For water price; , They are the consumption of desulfurization agent and denitrification agent per installed unit of coal-fired power plant; , are the unit prices of desulfurizer and denitrifier respectively; For the Unit installation material cost of each power source; For the Other costs of the power supply; For the Power supply repair cost factor; For the The proportion of fixed assets formed by various power sources; For the Power supply insurance rates.

[0009] Furthermore, the annual fuel cost function of each type of power source in S23 is The details are as follows: ; ; in, D Indicates the total number of days; H Indicates the total number of hours; , Respectively represent Tiandi Hourly coal consumption and natural gas consumption; , Respectively represent Tiandi Hourly coal and gas prices.

[0010] Furthermore, the social cost function of carbon emissions in S24 is , as follows: ; in, , They are coal carbon emission factor and natural gas carbon emission factor respectively; is the unit social cost of carbon emissions.

[0011] Furthermore, the total cost function of power supply construction and operation in S25 is , as follows: .

[0012] Furthermore, the S3 specifically includes the following steps: S31. Based on the resource endowment, load and power development of the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand. ; S32. Select two types of power sources to be compared, collect the total amount data of the two types of power sources, and then define the solution step size ,form Group comparison plan , that is, a series configuration scheme.

[0013] Furthermore, the power supply configuration basic scheme in S31 The formula is as follows: ; in, is the installed capacity of hydropower, For thermal power and biomass installed capacity, is the wind power installed capacity, is the photovoltaic installed capacity, is the scale of coal-fired power generation capacity, is the installed capacity of gas-fired power plants, is the installed capacity of electrochemical energy storage, is the installed capacity of pumped storage. The scale of power transmission for external electricity.

[0014] Beneficial effects of the present invention: Compared with traditional methods, the present invention constructs a refined cost model on the power supply side and proposes a power supply configuration method that considers the economy between different power sources, which has great guiding significance for the power supply planning of new power systems. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a flow chart of the present invention; Figure 2 It is a line graph of the total construction and operation cost under each configuration scheme in the embodiment of the present invention. DETAILED DESCRIPTION

[0016] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Preferred embodiments of the present invention are provided in the drawings. However, the present invention can be implemented in many other different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.

[0017] Reference Figure 1 The embodiment of the present application provides a power supply configuration method considering the economy between different power supplies, including the following steps: S1. Obtain relevant parameters such as unit investment, operating years, operating cost, carbon emission factor, unit cost of carbon emission, coal price for 8760 hours throughout the year, and gas price for 8760 hours throughout the year for various types of power sources; S2. Construct the annual value function of the total initial investment cost of each type of power source, the annual operating cost function of each type of power source, the annual fuel cost function of each type of power source, and the social cost function of carbon emissions, and use the above functions to construct the total cost function of power source construction and operation; S3. Based on the resource endowment, load and power source development in the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand, select the two types of power sources to be compared, and form a series of configuration plans; S4. Input the series configuration schemes as discrete known quantities into the 8760-hour production sequence simulation program for repeated iterations, exclude the power configuration schemes with power supply gaps, and output the 8760-hour consumption of two types of power raw materials to be compared under different power configuration schemes; the 8760-hour production sequence simulation program is an existing industry-wide simulation method; S5. Input the parameters obtained and calculated by S1 and S4 into the total cost function of power supply construction and operation in S2, calculate the total construction and operation costs of different power supply configuration schemes, and select the scheme with the lowest cost as the optimal power supply configuration scheme.

[0018] In some embodiments, S2 specifically includes the following steps: S21. Calculate the total initial investment of various power sources, convert the initial investment present value into annual cost value according to the operating years of various power sources, and construct the annual cost value function of the total initial investment cost of various power sources , S22. Based on the installed capacity and total installed cost of each type of power source, construct the annual operating cost function of each type of power source ; S23. Considering the coal consumption cost of coal-fired power generation and the gas consumption cost of gas turbines, and based on the real-time data of coal consumption, natural gas consumption, coal price and gas price, establish the annual fuel cost function of various power sources. ; S24. Construct a social cost function for carbon emissions based on the unit social cost of carbon emissions and the real-time data of coal consumption and natural gas consumption. ; S25. Annual value function of total initial investment cost using various power sources , Annual operating cost function of various power sources 、Annual fuel cost function of various power sources And the social cost function of carbon emissions Constructing the total cost function of power supply construction and operation .

[0019] In some embodiments, the annual value function of the total initial investment cost of each type of power source in S21 is The calculation formula is as follows: ; In the formula, For the The unit kilowatt cost of the power source (unit: yuan / kilowatt); For the The installed capacity of each power source (unit: 10,000 kilowatts); For the The operating life of the power source (unit: year); The benchmark rate of return is usually 6% or 7%.

[0020] In some embodiments, the annual operating cost function of each type of power supply in S22 is The details are as follows: ; in, For the The coefficients related to the installed capacity of various power sources include unit installation staff wages, water consumption fees, desulfurization and denitrification fees, material costs and other cost coefficients; For the The coefficient related to the product of installed capacity of each power source and unit investment, including repair costs and insurance costs; Indicates The unit installation cost of the power supply; In addition, and The following relationship is satisfied: ; in, For the The number of personnel per unit installed capacity of each power source (unit: person); is the average salary of employees (unit: 10,000 yuan / person); is the welfare cost coefficient; For the The water consumption per installed capacity of the power source (unit: ton / kW) is obtained by dividing the annual water consumption described in the economic calculation boundary of the typical power source by the installed capacity of the power source; is the water price (unit: yuan / ton); , They are the consumption of desulfurization agent (i.e. limestone) and denitrification agent (i.e. urea) per installed unit of coal-fired power (unit: ton / kilowatt); , are the unit prices of desulfurizer and denitrifier respectively (unit: yuan / ton). The desulfurization and denitrification costs are the expenses specific to coal-fired power generation, and the other power sources are zero. For the Unit installation material cost of each power source (unit: yuan / kilowatt); For the Other costs of this type of power supply, such as unit installed sewage treatment fees, etc.; For the Power supply repair cost factor; For the The proportion of fixed assets formed by various power sources; For the Power supply insurance rates.

[0021] In some embodiments, the annual fuel cost function of each type of power source in S23 is The details are as follows: ; ; in, D Indicates the total number of days. D =1,2,……,365; H Indicates the total number of hours, H =1,2,……,24; , Respectively represent Tiandi Hourly coal consumption (in tons) and natural gas consumption (in cubic meters); , Respectively represent Tiandi Hourly coal price (unit: yuan / ton) and gas price (unit: yuan / cubic meter).

[0022] In some embodiments, the carbon emission social cost function in S24 , as follows: ; in, , They are respectively the carbon emission factor of coal (unit: tonnes of carbon dioxide / ton) and the carbon emission factor of natural gas (unit: tonnes of carbon dioxide / cubic meter); is the unit social cost of carbon emissions (unit: yuan / ton).

[0023] In some embodiments, the total cost function of power supply construction and operation in S25 is , as follows: .

[0024] In some embodiments, S3 specifically includes the following steps: S31. Based on the resource endowment, load and power development of the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand. ; S32. Select two types of power sources to be compared, collect the total amount data of the two types of power sources, and then define the solution step size (Unit: 10,000 kilowatts), forming Group comparison plan , that is, a series configuration scheme.

[0025] Specifically, taking large-scale coal-fired power and gas-fired power as examples: First, we select large-scale coal-fired power and gas-fired power as the two types of power sources to be compared, and collect the total amount data of large-scale coal-fired power and gas-fired power. Here, the total amount of the two is defined as (Unit: 10,000 kilowatts), the step length of the scheme is ,form Group comparison plan , as follows: ; in, , Respectively Large-scale coal-fired power and gas-fired power generation capacity in the group plan.

[0026] In some embodiments, the power configuration basic scheme in S31 The formula is as follows: ; in, is the installed capacity of hydropower, For thermal power and biomass installed capacity, is the wind power installed capacity, is the photovoltaic installed capacity, is the scale of coal-fired power generation capacity, is the installed capacity of gas-fired power plants, is the installed capacity of electrochemical energy storage, is the installed capacity of pumped storage. The scale of power transmission for external electricity.

[0027] In order to further understand the working principle and technical effect of the present invention, the following simulation is carried out by taking the economic comparison of large-scale coal-fired power and gas-fired power as an example. In the example, the data of a province in central China is selected as the research scope, and 2030 is selected as the planning level year. Considering that the newly built power sources in the province from 2024 to 2030 are mainly large-scale coal-fired power, wind power, photovoltaic power, gas-fired power, and electrochemical energy storage, only large-scale coal-fired power, wind power, photovoltaic power, gas-fired power, and electrochemical energy storage are analyzed and explained.

[0028] 1. Obtain the relevant parameters required for calculation according to S1, see Tables 1 to 3.

[0029] Table 1: Unit cost of various power supplies; .

[0030] Table 2: Economic calculation parameters of various power sources; .

[0031] Table 3: Carbon emission related parameters; .

[0032] 2. Construct the annual value function of the total initial investment cost of various power sources according to the steps described in S21 .

[0033] .

[0034] 3. Calculate various power supplies according to the steps described in S22 and The calculated values ​​are shown in Table 4. After substituting the unit cost in Table 1 into the calculation, the annual operating cost function of each type of power supply can be obtained: .

[0035] .

[0036] Table 4: Parameters of annual operating cost function for various power sources; .

[0037] 4. Calculate the annual fuel cost function of each type of power source according to the steps described in S23 , in this example, the fuel price is calculated as a fixed value.

[0038] .

[0039] 5. Since the country has not yet issued relevant policies on the social cost of carbon emissions, the social cost of carbon emissions described in step S24 in this example is zero.

[0040] 6. According to step S25, the total cost function of construction and operation of various types of power sources is calculated.

[0041] .

[0042] 7. As described in step S3, a basic power supply configuration plan that meets the supply demand is formed through power balance calculation, and gas power and coal power are selected as the two types of power sources to be compared to form a series of configuration plans as shown in Table 5.

[0043] Table 5: Power supply series configuration plan (the following installed capacity is the increase compared with the base year); .

[0044] 8. According to steps S4 to S5, calculate the coal consumption and natural gas consumption for 8760 hours under different power configurations (i.e., the raw material consumption of the two types of power sources to be compared in S4), and calculate the total construction and operation costs of different power configurations, such as Figure 2 As shown in Table 6. From the calculation results, it can be seen that Scheme 6 has the lowest cost, so Scheme 6 is the optimal configuration scheme.

[0045] Table 6: Total cost of system construction and operation under each scheme; unit: 100 million yuan; .

[0046] In the specific operation of the present invention, firstly, a total cost function of power supply construction and operation is constructed, wherein the construction cost and operation cost are converted into a function of power supply installed capacity and unit investment through segmented cost analysis, and coal consumption and gas consumption data are generated through the 8760 timing simulation model (i.e., 8760-hour production timing simulation program) as a reference for fuel cost calculation; secondly, the total cost under different power supply configuration schemes is compared to obtain the optimal power supply configuration scheme. Compared with the traditional method, the present invention constructs a refined cost model on the power supply side (i.e., all functions obtained by S2), and proposes a power supply configuration method that considers the economy between different power supplies, which has great guiding significance for the power supply planning of new power systems.

[0047] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered within the protection scope of the present invention. In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A power supply configuration method considering the economic efficiency between different power supplies, characterized in that: The steps include: S1. Obtain the unit investment, operating years, operating cost, carbon emission factor, unit cost of carbon emission, annual coal price, and annual gas price of various power sources; S2. Construct the annual value function of the total initial investment cost of each type of power source, the annual operating cost function of each type of power source, the annual fuel cost function of each type of power source, and the social cost function of carbon emissions, and use the above functions to construct the total cost function of power source construction and operation; S3. Based on the resource endowment, load and power source development in the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand, select the two types of power sources to be compared, and form a series of configuration plans; S4. Input the series of configuration schemes as discrete known quantities into the 8760-hour production timing simulation program for repeated iterations, eliminate the power configuration schemes with power supply gaps, and output the fuel consumption of the two types of power sources to be compared under different power configuration schemes; S5. Input the parameters obtained and calculated by S1 and S4 into the total cost function of power supply construction and operation in S2, calculate the total construction and operation costs of different power supply configuration schemes, and select the scheme with the lowest cost as the optimal power supply configuration scheme.

2. The power configuration method according to claim 1, characterized in that: The S2 specifically includes the following steps: S21. Calculate the total initial investment of various power sources, convert the initial investment present value into annual cost value according to the operating years of various power sources, and construct the annual cost value function of the total initial investment cost of various power sources , S22. Based on the installed capacity and total installed cost of each type of power source, construct the annual operating cost function of each type of power source ; S23. Considering the coal consumption cost of coal-fired power generation and the gas consumption cost of gas turbines, and based on the real-time data of coal consumption, natural gas consumption, coal price and gas price, establish the annual fuel cost function of various power sources. ; S24. Construct a social cost function for carbon emissions based on the unit social cost of carbon emissions and the real-time data of coal consumption and natural gas consumption. ; S25. Annual value function of total initial investment cost using various power sources , Annual operating cost function of various power sources 、Annual fuel cost function of various power sources And the social cost function of carbon emissions Constructing the total cost function of power supply construction and operation .

3. The power configuration method according to claim 2, characterized in that: The annual value function of the total initial investment cost of various power sources in S21 The calculation formula is as follows: ; In the formula, For the The unit kilowatt cost of the power source; For the The installed capacity of each power source; For the The operating life of the power source; is the benchmark rate of return.

4. The power configuration method according to claim 3, characterized in that: The annual operating cost function of each type of power supply in S22 The details are as follows: ; in, For the The coefficients related to the installed capacity of various power sources include unit installation staff wages, water consumption fees, desulfurization and denitrification fees, material costs and other cost coefficients; For the The coefficient related to the product of installed capacity of each power source and unit investment, including repair costs and insurance costs; Indicates The unit installation cost of the power supply; In addition, and The following relationship is satisfied: ; in, For the The number of installed capacity per unit of each power source; is the average salary of the staff; is the welfare cost coefficient; For the Water consumption per unit installed capacity of each power source; For water price; , They are the consumption of desulfurization agent and denitrification agent per installed unit of coal-fired power plant; , are the unit prices of desulfurizer and denitrifier respectively; For the Unit installation material cost of each power source; For the Other costs of the power supply; For the Power supply repair cost factor; For the The proportion of fixed assets formed by various power sources; For the Power supply insurance rates.

5. The power configuration method according to claim 4, characterized in that: The annual fuel cost function of each type of power source in S23 The details are as follows: ; ; in, D Indicates the total number of days; H Indicates the total number of hours; , Respectively represent Tiandi Hourly coal consumption and natural gas consumption; , Respectively represent Tiandi Hourly coal and gas prices.

6. The power configuration method according to claim 5, characterized in that: The social cost function of carbon emissions in S24 , as follows: ; in, , They are coal carbon emission factor and natural gas carbon emission factor respectively; is the unit social cost of carbon emissions.

7. The power configuration method according to claim 6, characterized in that: The total cost function of power supply construction and operation in S25 , as follows: 。 8. The power configuration method according to claim 7, characterized in that: The S3 specifically includes the following steps: S31. Based on the resource endowment, load and power development of the planning area, carry out power balance calculation to obtain the basic power configuration plan that meets the supply demand. ; S32. Select two types of power sources to be compared, collect the total amount data of the two types of power sources, and then define the solution step size ,form Group comparison plan , that is, a series configuration scheme.

9. The power configuration method according to claim 8, characterized in that: The basic scheme of power supply configuration in S31 The formula is as follows: ; in, is the installed capacity of hydropower, For thermal power and biomass installed capacity, is the installed capacity of wind power, is the photovoltaic installed capacity, is the scale of coal-fired power generation capacity, is the installed capacity of gas-fired power plants, is the installed capacity of electrochemical energy storage, is the installed capacity of pumped storage. The scale of power transmission for external electricity.

Citation Information

Patent Citations

  • Method suitable for multi-energy complementary linkage economy evaluation

    CN111585305A

  • Capacity ratio optimization method for power supply system containing high-permeability wind-solar power generation

    CN112085276A

  • Wind-solar-thermal storage capacity optimal configuration method in power grid planning

    CN112564183A

  • Wind-solar-water-fire-storage multi-source economic-low-carbon cooperative scheduling method

    CN115459349A

  • Power plan supporting apparatus

    EP3570224A1

Cited By

  • Thermal power type optimization method and system suitable for novel electric power system

    CN120914920A

  • Electric power and electric quantity balancing method and device considering photovoltaic output uncertainty

    CN121461389A