LISP protocol-based air-ground data link switching time delay test method for aviation telecommunication network

By building a test platform in a laboratory environment, using LISP protocol and channel simulator, efficient testing of ground-to-air data link handover delay in aeronautics and telecommunications networks is achieved, and the problem of time-consuming and cost-effective testing in the existing technology is solved. It provides low-cost testing solutions to support the digital construction in the civil aviation field.

CN118972287AInactive Publication Date: 2024-11-15THE SECOND RES INST OF CIVIL AVIATION ADMINISTRATION OF CHINA
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411233395.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the time-delay test method for ground-to-air data link switching of aeronautics and telecommunications networks is time-consuming, complex and expensive, and it is difficult to meet the relevant requirements of the ICAO.

Method used

Using the LISP protocol-based aviation and telecommunications network ground-to-air data link switching delay test method, a test platform is built in a laboratory environment, and using computers, routers and channel simulators to simulate signals during flight by configuring LISP and OSPF protocols. Transmission environment, automatically switches ground-to-air communication links, and calculates the switching delay.

Benefits of technology

It has realized efficient and low-cost delay testing of ground-to-air data link switching, saving human resources, reducing time waste, providing sufficient test data support, and promoting the construction of digital and intelligent air traffic control in the civil aviation field.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118972287A_ABST
    Figure CN118972287A_ABST
Patent Text Reader

Abstract

The invention provides an LISP protocol-based aviation telecommunication network ground-air data link switching time delay test method, relates to the field of civil aviation communication, and solves the problems of long time consumption, complex equipment and high cost of a traditional actual flight method. The method comprises the following steps: building a test platform which comprises corresponding equipment of at least two sets of air-ground communication systems for realizing link switching operation; the method comprises the following steps: configuring an LISP protocol for multiple types of routers in a test platform, and determining a preferred ground-air communication link; configuring a channel simulator, simulating a signal transmission environment in a flight process and connecting equipment; a preferred ground-air communication link is started, and sending of test data is simulated through a computer; the first-choice ground-air communication link is closed, the first-choice ground-air communication link is automatically switched to the alternative ground-air communication link, a corresponding data packet is captured in a router packet capturing mode, and ground-air data link switching time delay is calculated; according to the invention, the test can be completed in a laboratory environment, so that the test process has the characteristics of high efficiency and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of civil aviation communications and is applied in a laboratory test environment, specifically to a method for testing the handover delay of a ground-to-air data link of an aviation telecommunication network based on a LISP protocol. Background Art

[0002] In the future concept of air traffic management (ATM), in order to improve safety, airspace capacity and flight efficiency, the exchange of data between the ground and aircraft will increase significantly, mainly including air traffic services (ATS) and airline operational communications (AOC). IP-based aviation telecommunications network (ATN / IPS) will become the new standard for future ATM infrastructure, realizing Figure 1 The IP "end-to-end" communication shown will gradually replace the current civil aviation communication network based on ACARS and aeronautical telecommunications network open system interconnection (ATN / OSI) protocols. This future communication infrastructure (FCI) can realize the digital transmission of flight-critical data and voice communications between the aircraft and ground-end ATM in a resilient, secure and timely manner, and achieve higher communication capacity and rate by building a multi-link environment using the proposed future data links such as airports, ground, air and satellites.

[0003] Multilink operation is a concept of data link usage, which refers to the simultaneous use of at least two independent ground-to-air data links (A / G) to meet the requirements of flight ATS services in terms of mobility, safety and quality of service (QoS). The scope of multilink operation applies to all airspaces except the Oceanic Extreme Remote (ORP) area. Multilink operation also involves selecting the most appropriate radio link for a given data service and seamlessly switching between available data links based on the quality of the A / G data link currently in use or user preference settings.

[0004] LISP (Locator / ID Separation Protocol) provides a new type of network architecture, which divides IP addresses into RLOC (Routing Locator) addresses that indicate location and EID (Endpoint Identifier) ​​addresses that indicate identity. RLOC addresses are used for forwarding in the core network, and when reaching the edge of the customer network, the outer IP address is stripped and the EID address is used for forwarding. The ground-based LISP civil aviation communication network provides a solution for multi-link operations, which can minimize the complexity of aircraft and the overhead of ground-to-air data links, achieve seamless switching between available data links, and maintain continuous communication during high-speed movement of aircraft.

[0005] Whether the switching delay of the ground-to-air data link in ATN / IPS can meet the relevant requirements of the International Civil Aviation Organization (ICAO) requires long-term testing and verification. The traditional testing method is to install ground base stations of various communication systems on the flight route and conduct flight tests and verifications by carrying airborne terminals on the aircraft. A flight test takes a long time, and the equipment installation is complicated and expensive, so huge human and material resources are spent. Therefore, how to design a more efficient and low-cost ground-to-air data link switching delay test method has become a focus of technicians in this field. Summary of the invention

[0006] Based on the current status of the background technology, the purpose of the present invention is to solve the problems of long time consumption, complex equipment and high cost in the existing aviation telecommunication network ground-to-air data link switching delay test based on actual flight mode, and therefore proposes an aviation telecommunication network ground-to-air data link switching delay test method based on the LISP protocol. The present invention can complete the test in a laboratory environment, and combines communication equipment with network equipment to make the test process efficient and low-cost, thereby providing sufficient test data support for the construction of a new generation of civil aviation communication networks, saving human resources, avoiding time waste, and promoting the construction of digital and intelligent air traffic control in the civil aviation field.

[0007] The present invention adopts the following technical solutions to achieve the purpose:

[0008] A method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol, the method comprising the following steps:

[0009] S1. Building a test platform based on computers, routers and channel simulators; the test platform includes corresponding equipment and subnets of at least two sets of ground-to-air communication systems for implementing link switching operations;

[0010] S2. For multiple types of routers in the test platform, configure the LISP protocol and the OSPF protocol accordingly to determine the preferred ground-to-air communication link and the alternative ground-to-air communication link;

[0011] S3. Configure a channel simulator to simulate the signal transmission environment during flight; connect the corresponding equipment of each ground-to-air communication system to the channel simulator;

[0012] S4, start the ground-to-air communication system corresponding to the preferred ground-to-air communication link, and simulate the process of the ground station sending test data to the aircraft through computer simulation;

[0013] S5. The ground-to-air communication system corresponding to the preferred ground-to-air communication link is turned off, and the ground-to-air communication system corresponding to the alternative ground-to-air communication link is automatically switched and generates test data;

[0014] S6. By means of router packet capture, the corresponding data packets when the preferred ground-to-air communication link is closed and when the alternative ground-to-air communication link is switched successfully are captured, and the ground-to-air data link switching delay is calculated.

[0015] Furthermore, the test platform built in step S1 includes an aircraft end, at least two ground-to-air communication systems, an ATN / IPS main network and an AOS / ATS server end; each ground-to-air communication system includes an airborne end and a ground station end connected through a channel simulator; the aircraft end and the AOS / ATS server end are both configured with corresponding computers and routers, and the ATN / IPS main network is configured with a router network; the aircraft end is connected to each ground-to-air communication system, each ground-to-air communication system is connected to the ATN / IPS main network, and the ATN / IPS main network is connected to the AOS / ATS server end.

[0016] Specifically, in each ground-to-air communication system, RF cables are used to connect the airborne end and the channel simulator, as well as the channel simulator and the ground station end; on the aircraft end, ATN / IPS main network and AOS / ATS server end, network cables are used to connect the corresponding computers and routers.

[0017] Specifically, the aircraft end is constructed by a first computer and a correspondingly configured airborne router, and the airborne router is connected to the airborne end of each set of ground-to-air communication system.

[0018] Specifically, each ground-to-air communication system has a ground subnet composed of a subnet router and a boundary router. The ground station end of each ground-to-air communication system is connected to at least one subnet router of the corresponding ground subnet; each ground-to-air communication system is connected to the ATN / IPS main network through the boundary router in the corresponding ground subnet.

[0019] Specifically, the ATN / IPS main network is constructed by multiple main network routers and at least one MS / MR router; the MS / MR router is used as a LISP mapping server; the ATN / IPS main network is connected to the AOS / ATS server through the main network router.

[0020] Specifically, the AOS / ATS server is constructed by a second computer and a correspondingly configured border router, and the border router is connected to a main network router in the ATN / IPS main network.

[0021] Furthermore, in step S2, the LISP protocol is first configured for the border router of the ground subnet in each ground-to-air communication system and the border router in the AOS / ATS server, and then the LISP protocol is configured for the MS / MR router in the ATN / IPS main network; after the configuration is completed, the EID addresses of the aircraft end and the AOS / ATS server are set respectively, and the preferred ground-to-air communication link and the alternative ground-to-air communication link are determined and set; at the same time, the OSPF protocol is configured in the subnet router and the main network router.

[0022] Preferably, in step S3, the flight trajectory coordinate data of the aircraft used for the simulation test is generated by computer software used in conjunction with the channel simulator and imported into the channel simulator; the configuration parameters of the channel simulator are modified according to the ground-to-air signal transmission environment characteristics required for the simulation test, and then the channel simulator is connected to each ground-to-air communication system at the same time.

[0023] Further, in step S4, test data is generated by a second computer configured in the AOS / ATS server, and the test data is transmitted through the ground-to-air communication system corresponding to the preferred ground-to-air communication link, simulating the process of the AOS / ATS server sending data to the aircraft; then step S5 is performed, and the ground-to-air communication system corresponding to the alternative ground-to-air communication link performs an automatic switching operation when the preferred ground-to-air communication link is closed;

[0024] In step S6, the time t1 when the ground-to-air communication system corresponding to the preferred ground-to-air communication link is closed is recorded, and at the same time, the MS / MR router in the ATN / IPS main network is captured, and the corresponding data packet time t2 when the preferred ground-to-air communication link is closed is recorded, and the closing delay T1=t2-t1 is obtained; then, when the alternative ground-to-air communication link is switched successfully, the MS / MR router in the ATN / IPS main network is captured, and the corresponding data packet time t3 when the switching is successful is recorded, and the first switching delay T2=t3-t2 is obtained; then, when the AOS / ATS server receives data after the switching is successful, the border router in the AOS / ATS server is captured, and the corresponding data packet time t4 when the data is received is recorded, and the second switching delay T4=t4-t3 is obtained; thereby, the switching delay T=T1+T2+T3 of the preferred ground-to-air communication link to the alternative ground-to-air communication link is calculated.

[0025] In summary, due to the adoption of this technical solution, the beneficial effects of the present invention are as follows:

[0026] The test method of the present invention is highly flexible and can dynamically adjust the number of network nodes according to test requirements. In addition, with the help of a channel simulator, the real environment of ground-to-air data transmission can be accurately simulated, and simulation of different propagation environments can be achieved by simply changing relevant parameters. This method allows testers to select different systems under test according to actual needs and quickly build a test network that meets the requirements, thereby efficiently and accurately testing the switching delay of the ground-to-air data link in a variety of environments.

[0027] Compared with traditional testing methods, the present invention greatly reduces the testing cost and time required. Traditional methods usually require the deployment of ground base stations of various communication systems on the ground, and the testing is carried out by actual flight with airborne terminals. Each test costs up to hundreds of thousands of yuan and takes a long time. After adopting the method of the present invention, all necessary testing work can be completed in a laboratory environment, which not only avoids the high cost of flight testing, but also saves a lot of time and resources.

[0028] The computers, communications and network equipment used in the present invention are all standard products that can be directly purchased on the market, and their reliability has been widely verified. At the same time, the various parameters required for flight trajectory modeling and transmission channel simulation are supported by a solid theoretical basis, ensuring the effectiveness and feasibility of the entire test process. The configuration of the network protocol also follows the general standard, making the test process easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A schematic diagram of the future ATN / IPS aviation telecommunication network;

[0030] Figure 2 The overall process diagram of the testing method of the present invention is briefly described;

[0031] Figure 3 A schematic diagram of the structure of the test platform built for the present invention;

[0032] Figure 4 A schematic diagram of switching of a data link in the method of the present invention;

[0033] Figure 5 A schematic diagram of a Map-Register drop IP data packet in an embodiment of the present invention;

[0034] Figure 6 Schematic diagram of a Map-Register IP data packet in an embodiment of the present invention;

[0035] Figure 7 Schematic diagram of a Map-Reply IP data packet in an embodiment of the present invention. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0037] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] Example

[0039] A method for testing the time delay of ground-to-air data link switching in aviation telecommunication networks based on the LISP protocol. Figure 2 The overall process of the method is briefly described, and its steps can be summarized as follows:

[0040] S1. Building a test platform based on computers, routers and channel simulators; the test platform includes corresponding equipment and subnets of at least two sets of ground-to-air communication systems for implementing link switching operations;

[0041] S2. For multiple types of routers in the test platform, configure the LISP protocol and the OSPF protocol accordingly to determine the preferred ground-to-air communication link and the alternative ground-to-air communication link;

[0042] S3. Configure a channel simulator to simulate the signal transmission environment during flight; connect the corresponding equipment of each ground-to-air communication system to the channel simulator;

[0043] S4, start the ground-to-air communication system corresponding to the preferred ground-to-air communication link, and simulate the process of the ground station sending test data to the aircraft through computer simulation;

[0044] S5. The ground-to-air communication system corresponding to the preferred ground-to-air communication link is turned off, and the ground-to-air communication system corresponding to the alternative ground-to-air communication link is automatically switched and generates test data;

[0045] S6. By means of router packet capture, the corresponding data packets when the preferred ground-to-air communication link is closed and when the alternative ground-to-air communication link is switched successfully are captured, and the ground-to-air data link switching delay is calculated.

[0046] This embodiment will introduce the details of each part of the above method in detail, and the method is applicable to various civil aviation communication systems. In this embodiment, a very high frequency (VHF) radio station and an L-band digital aviation communication system (L-DACS) are used as examples for introduction. Figure 3 The test platform shown in the figure shows the ground-to-air communication system 1, and the L-DACS system corresponds to the ground-to-air communication system 2. In the test, the VHF radio will be selected as the preferred ground-to-air communication link, and the computer will simulate the AOS / ATS server to send data to the aircraft. The link corresponding to the VHF radio is used as the preferred ground-to-air communication link. After being manually disconnected, it will automatically switch to the ground-to-air communication link of the L-DACS system, and then calculate the time from the link disconnection error to the corresponding router to update the EID-to-RLOC path and cache it in the LISP mapping server, so as to realize the test of the ground-to-air data link switching delay. For details, please refer to Figure 4 's hint.

[0047] like Figure 3 As shown, this embodiment uses the following equipment and configuration information as examples.

[0048] The aircraft end is simulated by computer LIVM1, and its IP address is set to 10.1.1.5; R1 is the onboard router, and its IP address is set to 10.1.1.1.

[0049] The ground-to-air data link consists of two sets of airborne and ground station equipment of the ground-to-air communication system, as well as a channel simulator, thereby simulating the actual propagation of civil aviation ground-to-air data.

[0050] In the ground subnet of the ground-to-air communication system 1, the specific composition of multiple routers is as follows: R2 is an access router, and its IP address is set to 192.168.22.1; R3 and R4 are border routers (xTR), and their IP addresses are set to 192.168.23.1 and 192.168.24.1 respectively.

[0051] In the ground subnet of the ground-to-air communication system 2, the specific composition of multiple routers is as follows: R5 is an access router, and its IP address is set to 192.168.11.1; R6 is a border router (xTR), and its IP address is set to 192.168.12.1.

[0052] The multiple main network routers in the ATN / IPS main network include: Figure 3The IP addresses of R7 to R13 are set to 10.0.100.1, 10.0.101.1, 10.0.102.1, 10.0.103.1, 10.0.104.1, 10.0.105.1, and 10.0.106.1 respectively; there is also an additional MS / MR router as a LISP mapping server, and its IP address is set to 10.0.20.1.

[0053] The AOS / ATS server is simulated by computer LIVM2, and its IP address is set to 10.2.1.4; R14 is the border router (xTR), and its IP address is set to 10.2.1.1.

[0054] In this embodiment, the computer may be a personal computer, which is a general-purpose shelf product; the specific model of each router may be H3C MSR2630; and the channel simulator may be a channel simulator product of the Spirent Vertex series produced by Spirent Communications.

[0055] according to Figure 3 Connect each device in a way and set the corresponding IP addresses to build a test platform; in each ground-to-air communication system, use RF cables to connect the airborne end and the channel simulator, as well as the channel simulator and the ground station end; on the aircraft end, ATN / IPS main network and AOS / ATS server end, use network cables to connect the corresponding computers and router networks.

[0056] Configure the LISP protocol for routers R3, R4, R6, and R14 that serve as border routers (xTR). The main configuration commands are as follows:

[0057] Router(config)#system-view

[0058] Router(config)#lisp

[0059] Router(config-lisp)#itr

[0060] Router(config-lisp)#itr map-resolver 10.0.20.1

[0061] Router(config-lisp)#etr

[0062] Router(config-lisp)#database-mapping XXXX XXXX priority Xweight X

[0063] (R3 enters 192.168.23.1 10.0.100.5 priority 30 weight 30;

[0064] R4 enters 192.168.24.1 10.0.101.5 priority 20 weight 20;

[0065] R6 enters 192.168.12.1 10.0.102.5 priority 10 weight 10;

[0066] R14 enters 10.2.1.1 10.0.105.5 priority 10 weight 10)

[0067] Router(config-lisp)#etr map-server 10.0.20.1 authentication-mode sha-1 authentication-key plaintext 123456

[0068] Router(config-lisp)#quit

[0069] Next, configure the LISP protocol for the MS / MR router that serves as the LISP mapping server, set the EID of the aircraft end to AIR, set the EID of the AOS / ATS server end to ATS, and set the preferred ground-to-air communication link EID-to-RLOC to the data link corresponding to the VHF radio (i.e., through the subnet router R3). The main configuration commands are as follows:

[0070] Router(config)#system-view

[0071] Router(config)#lisp

[0072] Router(config-lisp)#map-resolver

[0073] Router(config-lisp)#map-server

[0074] Router(config-lisp)#site A

[0075] Router(config-lisp-site-A)#authentication-mode sha-1authentication-key plaintext 123456

[0076] Router(config-lisp-site-A)#eid-prefix 10.1.1.5AIR

[0077] Router(config-lisp-site-A)#eid-prefix 10.2.1.4ATS

[0078] Router(config-lisp-site-A)#database-mapping AIR 192.168.23.1priority30

[0079] Router(config-lisp-site-A)#quit

[0080] Router(config)#quit

[0081] Next, configure the OSPF (Open Shortest Path First) protocol for the ground subnet of the ground-to-air communication system and the routers in the ATN / IPS main network. The main configuration commands are:

[0082] Router(config)#router ospf[process-id]

[0083] The above process completes steps S1 and S2 in the method, and then proceeds to step S3.

[0084] Use the dedicated tool software provided by the channel simulator Spirent Vertex to generate the aircraft's flight trajectory coordinate data and import it via the USB-RS232 / RJ45 cable.

[0085] According to the ground-to-air signal transmission environment characteristics required for the simulation test, parameters such as path loss, multipath effect, and Doppler frequency shift are set to ensure that the signal transmission during the flight can be accurately simulated.

[0086] The transceiver of the VHF radio and the airborne and ground station ends of the L-DACS system are connected to the two bidirectional channels of the channel simulator respectively.

[0087] The following is a detailed description of steps S4 to S6 in the method.

[0088] Data transmission: Through computer LIVM2, simulate the AOS / ATS server to send test data to the aircraft AIR.

[0089] Link switching: Close the data link corresponding to the VHF radio and record the closing time t1.

[0090] Calculate the time taken for the data link "Map-Register drop" corresponding to the VHF radio: Capture the received data at the MS / MR router and confirm that the MS / MR router receives the register drop IP data packet sent by router R3 or R4 (such as Figure 5 As shown in FIG. 1 , the time t2 is recorded. Then the data link "Map-Register drop" corresponding to the VHF radio station takes time T1 = t2-t1.

[0091] Calculate the time consumption of the data link "Map-Register" corresponding to the L-DACS system: Capture the received data at the MS / MR router and confirm that the MS / MR router receives the register IP data packet sent by router R6 (such as Figure 6 As shown), the time t3 is recorded. Then the data link "Map-Register" corresponding to the L-DACS system takes time T2 = t3-t2.

[0092] Calculate the time consumption of the data link "Map-Reply" corresponding to the L-DACS system: Capture the received data at router R14 and confirm that router R14 receives the Map-Reply IP data packet sent by router R6 (such as Figure 7 As shown), the time t4 is recorded. Then the time consumed by the data link corresponding to the L-DACS system when updating the EID-to-RLOC path is T3=t4-t3.

[0093] Through the above calculation process, the complete switching delay from the data link corresponding to the VHF radio station to the data link corresponding to the L-DACS system is T=T1+T2+T3, thereby realizing the ground-to-air data link switching delay test of the aviation telecommunication network based on the LISP protocol.

Claims

1. A method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol, characterized in that: The method comprises the following steps: S1. Building a test platform based on computers, routers and channel simulators; the test platform includes corresponding equipment and subnets of at least two sets of ground-to-air communication systems for implementing link switching operations; S2. For multiple types of routers in the test platform, configure the LISP protocol and the OSPF protocol accordingly to determine the preferred ground-to-air communication link and the alternative ground-to-air communication link; S3. Configure a channel simulator to simulate the signal transmission environment during flight; connect the corresponding equipment of each ground-to-air communication system to the channel simulator; S4, start the ground-to-air communication system corresponding to the preferred ground-to-air communication link, and simulate the process of the ground station sending test data to the aircraft through computer simulation; S5. The ground-to-air communication system corresponding to the preferred ground-to-air communication link is turned off, and the ground-to-air communication system corresponding to the alternative ground-to-air communication link is automatically switched and generates test data; S6. By means of router packet capture, the corresponding data packets when the preferred ground-to-air communication link is closed and when the alternative ground-to-air communication link is switched successfully are captured, and the ground-to-air data link switching delay is calculated.

2. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 1 is characterized in that: The test platform built in step S1 includes an aircraft end, at least two ground-to-air communication systems, an ATN / IPS main network and an AOS / ATS server end; each ground-to-air communication system includes an airborne end and a ground station end connected through a channel simulator; the aircraft end and the AOS / ATS server end are both equipped with corresponding computers and routers, and the ATN / IPS main network is equipped with a router network; the aircraft end is connected to each ground-to-air communication system, each ground-to-air communication system is connected to the ATN / IPS main network, and the ATN / IPS main network is connected to the AOS / ATS server end.

3. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 2, characterized in that: In each ground-to-air communication system, RF cables are used to connect the airborne end and the channel simulator, as well as the channel simulator and the ground station end. On the aircraft end, ATN / IPS main network and AOS / ATS server end, network cables are used to connect the corresponding computers and router networks.

4. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 2, characterized in that: The aircraft end is constructed by a first computer and a correspondingly configured airborne router, and the airborne router is connected to the airborne end of each ground-to-air communication system.

5. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 2, characterized in that: Each ground-to-air communication system has a ground subnet composed of subnet routers and boundary routers. The ground station end of each ground-to-air communication system is connected to at least one subnet router of the corresponding ground subnet; each ground-to-air communication system is connected to the ATN / IPS main network through the boundary router in the corresponding ground subnet.

6. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 5 is characterized in that: The ATN / IPS main network is constructed by multiple main network routers and at least one MS / MR router; the MS / MR router is used as a LISP mapping server; the ATN / IPS main network is connected to the AOS / ATS server through the main network router.

7. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 2, characterized in that: The AOS / ATS server is constructed by a second computer and a correspondingly configured border router, and the border router is connected to a main network router in the ATN / IPS main network.

8. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 6, characterized in that: In step S2, first configure the LISP protocol for the border router of the ground subnet and the border router in the AOS / ATS server in each ground-to-air communication system, and then configure the LISP protocol for the MS / MR router in the ATN / IPS main network; after the configuration is completed, set the EID addresses of the aircraft end and the AOS / ATS server respectively, determine and set the preferred ground-to-air communication link and the alternative ground-to-air communication link; at the same time, configure the OSPF protocol in the subnet router and the main network router.

9. The method for testing the time delay of ground-to-air data link switching in an aviation telecommunication network based on the LISP protocol according to claim 1, characterized in that: In step S3, the flight trajectory coordinate data of the aircraft used for the simulation test is generated by computer software used in conjunction with the channel simulator and imported into the channel simulator; the configuration parameters of the channel simulator are modified according to the ground-to-air signal transmission environment characteristics required for the simulation test, and then the channel simulator is connected to each ground-to-air communication system at the same time.

10. The method for testing the time delay of ground-to-air data link switching in aviation telecommunication network based on LISP protocol according to claim 2, characterized in that: In step S4, the test data is generated by the second computer configured in the AOS / ATS server, and the test data is transmitted through the ground-to-air communication system corresponding to the preferred ground-to-air communication link, so as to simulate the process of the AOS / ATS server sending data to the aircraft. Then, step S5 is performed, in which the ground-to-air communication system corresponding to the alternative ground-to-air communication link performs an automatic switching operation when the primary ground-to-air communication link is closed; In step S6, the time t1 of closing the ground-to-air communication system corresponding to the preferred ground-to-air communication link is recorded, and at the same time, the MS / MR router in the ATN / IPS main network is captured to record the time t2 of the data packet corresponding to the closing of the preferred ground-to-air communication link, and the closing delay T1=t2-t1 is obtained; Then, when the alternative ground-to-air communication link is switched successfully, the MS / MR router in the ATN / IPS main network is captured, and the corresponding data packet time t3 when the switching is successful is recorded, and the first switching delay T2=t3-t2 is obtained; then, when the AOS / ATS server receives data after the switching is successful, the border router in the AOS / ATS server is captured, and the corresponding data packet time t4 when the data is received is recorded, and the second switching delay T4=t4-t3 is obtained; Thus, the switching delay T=T1+T2+T3 of the preferred ground-to-air communication link switching to the alternative ground-to-air communication link is calculated.

Citation Information

Cited By

  • Airport ground-air data multi-domain multi-link transmission method

    CN119277468A

  • Universal unmanned aerial vehicle data link simulation system

    CN119781516A