Method for establishing train positioning and electronic equipment
By using a dual-redundant onboard control system, the train positioning problem on complex rail lines is solved by sharing beacon information between the front and rear VOBCs. This enables rapid positioning in short track sections and reduces beacon installation requirements and system modification costs.
Patent Information
- Application Number
- CN202411184100.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-19
AI Technical Summary
In rail transit, especially in environments with many switches and short track sections, such as parking lots and storage lines, existing technologies struggle to quickly establish train positioning and cannot continuously read two beacons, leading to positioning difficulties.
The vehicle control system adopts a dual-redundant architecture, with two sets of vehicle controllers (VOBCs) installed at the front and rear of the train respectively. They share beacon information and only need to detect two beacons to establish train positioning. By combining the activation status of the train cab and the beacon markings, the train's direction of travel and reference position can be determined.
It enables rapid train positioning in complex track environments, reduces beacon installation costs, lowers system modification complexity and operating costs, and is applicable to scenarios such as parking lots and storage lines, enabling rapid train positioning in short track sections.
Smart Images

Figure CN118977754A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transportation, and in particular to a method for establishing train positioning and electronic equipment. Background Art
[0002] The vehicle on board controller (VOBC) that uses beacon or transponder (hereinafter collectively referred to as "beacon") devices for positioning is usually designed to locate the train by using a beacon reader to read the track beacon. The train positioning process requires first determining the train reference point, that is, the position of the beacon reader antenna on the track (hereinafter referred to as the "train reference position"), and then calculating the train envelope based on the train reference position to complete the train positioning process.
[0003] In the related art, VOBC needs to read two beacons continuously to determine the reference position of the train. However, if the two beacons are too far apart, or in more complex lines (such as parking lots), it is difficult to obtain the reference position of the train using this method, making it impossible to quickly establish the train positioning.
[0004] Therefore, in the above situation, how to quickly establish train positioning is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The embodiments of the present application provide a method and electronic equipment for establishing train positioning, which can quickly establish train positioning in a line environment with many switches and short track sections, such as a parking lot section and a storage line.
[0006] An embodiment of the present application provides a method for establishing train positioning, comprising the following steps: determining the train position based on a first beacon; obtaining the turnout status based on the train position, and establishing a connection relationship between track sections; updating the train position based on the connection relationship between the track sections and the distance traveled by the train after the first beacon, and obtaining a bidirectional train reference position; determining the train reference position based on the activation status of the train cab and the bidirectional train reference position; and establishing train positioning based on the train reference position.
[0007] In one embodiment, the method is applied to a vehicle-mounted control system, which includes two vehicle-mounted controllers VOBC, and the two VOBCs are respectively installed at the front and rear of the train.
[0008] In one embodiment, before determining the position of the train according to the first beacon, the method further includes: using an automatic train monitoring system ATS to set an approach route for the train so that the switch ahead of the train's moving direction is in a locked state.
[0009] In one embodiment, determining the train position based on the first beacon includes: when any VOBC detects the first beacon, obtaining the identifier of the track segment of the first beacon and the offset on the track segment of the first beacon from the on-board electronic map according to the beacon identifier of the first beacon; and using the identifier of the track segment of the first beacon and the offset on the track segment of the first beacon as the train position.
[0010] In one embodiment, the obtaining of the turnout status and establishing a connection relationship between track segments based on the train position includes: any VOBC obtaining the control area information of the train from the on-board electronic map based on the train position; the VOBC establishing communication with the trackside area controller ZC in the control area based on the control area information, and receiving the turnout status sent by the ZC; the VOBC establishing a connection relationship between track segments based on the turnout status.
[0011] In one embodiment, updating the train position and obtaining a bidirectional train reference position according to the connection relationship of the track sections and the distance traveled by the train after the first beacon includes:
[0012] When any VOBC detects the first beacon, it continues to detect the distance traveled by the train; the VOBC updates the track segment identification of the first beacon and the offset on the first beacon track segment from the forward and reverse directions of the track segment according to the connection relationship of the track segments and the distance traveled by the train, obtains the updated track segment identification and the offset on the updated track segment, and uses them as the updated train position; the VOBC obtains the forward train reference position and the reverse train reference position according to the updated train position.
[0013] In one embodiment, after obtaining the bidirectional train reference position, the method further includes: the VOBC determines whether the bidirectional train reference position is valid according to the state change of the train during driving; when the bidirectional train reference position is invalid, the VOBC resets the bidirectional train reference position.
[0014] In one embodiment, the two sets of VOBC include a local VOBC and a peer VOBC, and the activation state of the train cab is used to characterize the front position of the train; determining the train reference position based on the activation state of the train cab and the bidirectional train reference position includes: the local VOBC verifies whether the beacon detected by the peer VOBC is valid; when the beacon detected by the peer VOBC is valid, determining the train direction according to the activation state of the train cab; if the local cab is in an activated state, the direction from the beacon detected by the peer VOBC to the beacon detected by the local VOBC is used as the train direction; if the peer cab is in an activated state, the direction from the beacon detected by the local VOBC to the beacon detected by the peer VOBC is used as the train direction; determining the train reference position based on the train direction and the bidirectional train reference position; wherein the local cab is the cab where the local VOBC is located, and the peer cab is the cab where the peer VOBC is located.
[0015] In one embodiment, the local VOBC verifies whether the beacon detected by the opposite VOBC is valid, including: the local VOBC receives the beacon identifier of the beacon detected by the opposite VOBC and the distance traveled by the train after the beacon is detected; if the beacon identifier of the beacon detected by the local VOBC is consistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines that the beacon detected by the opposite VOBC is invalid; if the beacon identifier of the beacon detected by the local VOBC is inconsistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines that the beacon detected by the opposite VOBC is invalid according to the activation state of the train cab, the reference position of the bidirectional train, the distance traveled by the train after the opposite VOBC detects the beacon, and the distance traveled by the train after the beacon is detected. The calculated position of the train when the opposite-end VOBC detects the beacon is determined based on the distance traveled; the effective detection area of the beacon is determined according to the calculated position of the train when the opposite-end VOBC detects the beacon and the detection window size of the beacon; the local-end VOBC uses the beacon identifier of the beacon detected by the opposite-end VOBC to obtain the position of the beacon when the opposite-end VOBC detects it from the on-board electronic map; if the position of the beacon detected by the opposite-end VOBC is within the effective detection area of the beacon, the local-end VOBC determines that the beacon detected by the opposite-end VOBC is valid; if the position of the beacon detected by the opposite-end VOBC is not within the effective detection area of the beacon, the local-end VOBC determines that the beacon detected by the opposite-end VOBC is invalid.
[0016] An embodiment of the present application also provides an electronic device, comprising: a processor; a memory for storing processor executable instructions; wherein the processor is configured to execute the above-mentioned method for establishing train positioning.
[0017] The solution provided by the above-mentioned embodiments of the present application can quickly establish train positioning in line environments with many switches and short track sections, such as parking sections and storage lines, thereby solving the problem that train positioning can only be established on the same track section. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solution of the embodiments of the present application, the drawings required for use in the embodiments of the present application are briefly introduced below.
[0019] Figure 1 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application;
[0020] Figure 2 is a schematic diagram of a vehicle control system based on a dual redundant architecture provided in an embodiment of the present application;
[0021] Figure 3 is a schematic diagram of a track section provided in an embodiment of the present application;
[0022] Figure 4 It is a flow chart of a method for establishing train positioning provided by an embodiment of the present application;
[0023] Figure 5 It is a flowchart of another method for establishing train positioning provided by an embodiment of the present application;
[0024] Figure 6 It is a schematic diagram of updating the reference position of a train when a single beacon is detected by VOBC provided in an embodiment of the present application;
[0025] 7 is a schematic diagram of calculating the effective detection area of the peer VOBC beacon detection provided by an embodiment of the present application;
[0026] FIG. 8 is a schematic diagram of the beneficial effects provided by the embodiment of the application. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.
[0028] Similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0029] Rail transit lines are composed of several track sections divided by turnouts. The position of any point on the track section is represented by a triple, whose structure is: (train direction, track section identifier, offset on the track section). The train direction refers to the direction of movement of the train on the track section. There are two cases, one is the direction of movement of the train from small mileage to large mileage (hereinafter referred to as "track section positive direction" or "GD0 direction"), and the other is the direction of movement of the train from large mileage to small mileage (hereinafter referred to as "track section reverse direction" or "GD1 direction"). The track section identifier refers to the mark used to distinguish different track sections, which can be represented by numbers, letters and other characters. The offset on the track section refers to the distance of the point's position from the starting point of the track section.
[0030] VOBC needs to read two beacons in succession to determine the train reference position. When reading the first beacon, VOBC determines the identification of the track section and the initial value of the offset on the track section based on the on-board electronic map, that is, the base position of the train reference position (hereinafter referred to as "train position"); after reading the second beacon, VOBC corrects the train position and determines the train's travel direction, that is, the direction from the first beacon to the second beacon is the train's travel direction on the track, and then determines the train reference position. Then, according to the distance the train travels after the second beacon, the offset on the track section is updated to obtain the real-time train reference position.
[0031] Because the train position includes the identification of the track section and the offset on the track section, the train position can be determined by detecting one beacon, but the direction information needs to be determined by continuously detecting two beacons. For example, three beacons, beacon 1, beacon 2, and beacon 3, are installed on the track from left to right. When the first beacon is detected as beacon 2, the position of the train on the track can be determined, but the direction of the train cannot be determined, that is, the train may move towards beacon 1 or beacon 3. Only when beacon 1 or beacon 3 is detected can the direction of the train be determined. If beacon 1 is detected, it means that the train moves from right to left on the track (from large mileage to small mileage, GD1 direction). If beacon 3 is detected, it means that the train moves from left to right on the track (from small mileage to large mileage, GD0 direction). Only by determining the position and direction information of the train on the track section can the train reference position be determined.
[0032] After reading the second beacon, the train direction can be determined, and then the position of the second beacon is used as the train reference position. Subsequently, based on the current train reference position, the train travel distance is added or subtracted to update the train reference position and obtain the real-time train reference position.
[0033] After VOBC determines the real-time train reference position, the train positioning process can be completed by calculating the train envelope based on the train reference position. The train envelope mainly includes the positions of the front and rear of the train. The train envelope is obtained by adding (GD0 direction) or subtracting (GD1 direction) the distance from the train reference position to the front of the train, and the train rear position is obtained by subtracting (GD0 direction) or adding (GD1 direction) the distance from the train reference point to the rear of the train. It should be noted that the distance from the train reference position to the front of the train plus or minus the distance from the train reference position to the front of the train here specifically refers to the offset on the track section in the train reference position triple plus or minus the distance from the train reference position to the front of the train. If it is in the GD0 direction and the offset on the track section is positive, the distance from the train reference position to the front of the train is added; if it is in the GD1 direction and the offset on the track section is negative, the distance from the train reference position to the front of the train is subtracted. In the above calculation, if the added or subtracted distance is within the length range of the track section where the train reference position is located, the identification of the track section remains unchanged; otherwise, VOBC needs to extend the distance to the track section connected to the track section where the train reference position is located for calculation based on the connection relationship of the track sections, and the identification of the track section is also updated to the identification of the connected track section accordingly. If the connection relationship of the track sections cannot be determined, the front or rear position of the train cannot be determined. Then, the train travel direction in the triplet remains unchanged, and the new triplet is used as the front position or parking position of the train, and finally the train positioning is established.
[0034] In the related technology, VOBC will communicate with the regional controller to obtain the status of the switches between track sections only after establishing the train envelope. Therefore, during the train positioning process, VOBC has not established communication with the regional controller, and VOBC cannot know the status of the switches between the track sections, and cannot determine the connection relationship between the two track sections. As a result, if the train establishes positioning in the switch area, it is impossible to determine the track section where the front or rear of the train is located and the train envelope cannot be calculated. Therefore, the above-mentioned train positioning establishment process requires that the train is on the same track section.
[0035] The method of continuously reading two beacons on the same track section to establish train positioning has the following problems: if the two beacons are far apart, the train needs to travel a long distance to complete the train positioning process; in parking lots, storage lines and other locations, the lines are complex, there are many switches, and the track sections are short, making it difficult to ensure that the train can continuously read two beacons on the same track section. With the increasing demand for signal system upgrades, the original parking lots and storage lines need to be upgraded from interlocking mode to Automatic Train Protection (ATP) mode, which requires the train to establish train positioning as soon as possible in the parking lot and storage line.
[0036] Therefore, in order to solve the above technical problems, this application proposes a VOBC based on a dual redundant architecture, which realizes the function of rapid train positioning by sharing the detected signal beacon information of each VOBC. The original requirement that each VOBC needs to detect two consecutive beacons to establish train positioning has been upgraded to two VOBCs only needing to detect two beacons to meet the requirement of each VOBC to establish train positioning. Compared with related technologies, establishing train positioning under a VOBC with a dual redundant architecture can quickly establish train positioning in line environments with many switches and short track sections, such as parking lots and storage lines.
[0037] Figure 1 1 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device 100 may be a vehicle-mounted control system with a dual redundant architecture, and is used to execute the method for establishing train positioning provided in an embodiment of the present application. Figure 1 As shown, the electronic device 100 includes: one or more processors 102, and one or more memories 104 storing processor executable instructions. The processor 102 is configured to execute the method for establishing train positioning provided in the following embodiment of the present application.
[0038] It is important to note that Figure 1 The electronic device in is only one possible device structure, and there are other possible device structures, which are not limited in this application.
[0039] The processor 102 can be a gateway, a smart terminal, or a device including a central processing unit (CPU), a graphics processing unit (GPU), or other forms of processing units with data processing capabilities and / or instruction execution capabilities. It can process data of other components in the electronic device 100 and control other components in the electronic device 100 to perform desired functions.
[0040] The memory 104 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 102 may run the program instructions to implement the method for establishing train positioning described below. Various applications and various data, such as various data used and / or generated by the application, may also be stored in the computer-readable storage medium.
[0041] In one embodiment, Figure 1 The electronic device 100 shown may also include an input device 106, an output device 108, and a data acquisition device 110, which are interconnected via a bus system 112 and / or other forms of connection mechanisms (not shown). Figure 1 The components and structures of the electronic device 100 shown are merely exemplary and non-limiting. The electronic device 100 may also have other components and structures as required.
[0042] The input device 106 may be a device for a user to input instructions, and may include one or more of a keyboard, a mouse, a microphone, a touch screen, etc. The output device 108 may output various information (e.g., images or sounds) to the outside (e.g., a user), and may include one or more of a display, a speaker, etc. The data acquisition device 110 may collect the first beacon. Exemplarily, the data acquisition device 110 may be a camera, a signal sensor, etc.
[0043] In one embodiment, the various components in the example electronic device 100 for implementing the method for establishing train positioning of the embodiment of the present application can be integrated or dispersed, such as integrating the processor 102, memory 104, input device 106 and output device 108 into one, while separating the data acquisition device 110.
[0044] In one embodiment, the example electronic device 100 for implementing the method for establishing train positioning of the embodiment of the present application can be implemented as an intelligent terminal such as a smart phone, a tablet computer, a desktop computer, a server, a vehicle-mounted device, etc.
[0045] This application is based on a dual redundant architecture vehicle control system, the architecture of which is as follows Figure 2 As shown, two VOBCs are installed at the front (VOBC A) and rear (VOBC B) of the train respectively. The two VOBCs communicate through the network. Each VOBC is equipped with a beacon reader (TI). VOBC A is equipped with TIA, and VOBC B is equipped with TIB. The two VOBCs are distinguished by the local VOBC and the opposite VOBC. Each VOBC can obtain the activation status of the train's cab through the train line. If the cab of the train at the same end as the VOBC is activated, it is called the local cab activation. If the cab of the train at a different end from the VOBC is activated, it is called the remote cab activation, also known as the opposite cab activation. It should be noted that there is a cab at the front and rear of the train. The cab with activated cab is located at the front of the train. VOBC can determine the front of the train in the direction of travel through the cab activation. VOBC determines the position of the front, rear and opposite beacons through the relative position of the activated cab and VOBC.
[0046] Figure 3 It is a schematic diagram of a track section. Each track section has a corresponding identification and length. The direction of the track section is from left to right (from small mileage to large mileage) as the positive direction of the track section (GD0 direction), and from right to left (from large mileage to small mileage) as the reverse direction of the track section (GD1 direction). Every two track sections are divided by a turnout. Only by knowing the state of the turnout can the connection relationship between the two track sections be determined. The position of any point on the track section of the train is represented by a triple, and its structure is: (direction of the track section, identification of the track section, offset on the track section). A point on the track section moves a certain distance along a certain direction of the track section, which is to calculate the position of the point on the track section that is reached after moving the distance along the track section in the predetermined direction from the starting point according to the connection relationship of the track section.
[0047] Figure 4 1 is a flow chart of a method for establishing train positioning according to an embodiment of the present application. The method for establishing train positioning can be applied to the above-mentioned vehicle control system based on a dual redundant architecture. Figure 4 As shown, the method includes the following steps 410-450, and steps 410-450 can be performed by any of the two VOBCs mentioned above. For example, steps 410-450 are performed by VOBC A, and can also be performed by VOBC B. When VOBC A is the local VOBC, then VOBC B is the opposite VOBC, and when VOBC B is the local VOBC, then VOBC A is the opposite VOBC. The following is a possible embodiment, in which steps 410-450 are performed by VOBC A, VOBC A is the local VOBC, and VOBC B is the opposite VOBC.
[0048] Step 410: Determine the train position according to the first beacon.
[0049] The first beacon may be the first beacon detected by VOBC A, or may be other beacons. For example, after the train reference position fails, a new beacon detected by VOBC A may also be the first beacon.
[0050] The train position, that is, the position of the train when the VOBC detects the beacon, refers to the reference position of the train reference position, which includes the identification of the track section and the offset on the track section. When the VOBC detects only one beacon, since the direction of the train cannot be determined, only the train position can be determined, but the train reference position cannot be determined. Therefore, in order to determine the train reference position, the train direction must be determined. As mentioned above, the related technology usually uses VOBC A to detect a beacon that is continuous with the first beacon, and then determine the direction of the train, and then determine the train reference position. The present application uses two VOBCs, and only needs VOBC B to detect a valid beacon to determine the direction of the train, thereby determining the train reference position.
[0051] When VOBC A detects the first beacon, the identifier of the track segment of the first beacon and the offset on the track segment of the first beacon are obtained from the on-board electronic map according to the beacon identifier of the first beacon; the identifier of the track segment of the first beacon and the offset on the track segment of the first beacon are used as the train position.
[0052] Before step 410, the method further includes: using the ATS to set an approach route for the train so that the switch ahead of the train's moving direction is in a locked state.
[0053] Step 420: According to the train position, the turnout status is obtained and the connection relationship of the track sections is established.
[0054] VOBC A obtains the control zone information of the train from the onboard electronic map according to the train position. VOBC A establishes communication with the ZC in the control zone according to the control zone information and receives the turnout status sent by the ZC. VOBC A establishes the connection relationship of the track segment according to the turnout status. As mentioned above, the turnout has been locked by ATS before step 410, so the ZC knows the turnout status, such as Figure 3 In the example, if sections 1 and 3 of switch 1 are locked through ATS, and sections 2 and 3 are not locked, ZC will send the situation that sections 1 and 3 of switch 1 are locked, and sections 2 and 3 are not locked to VOBC A, and VOBC A will establish a connection between sections 2 and 3 based on these situations.
[0055] Step 430: Update the train position and obtain a bidirectional train reference position based on the connection relationship of the track sections and the distance the train travels after the first beacon.
[0056] After VOBC A detects the first beacon, it continues to detect the distance traveled by the train. VOBC A updates the track segment identifier of the first beacon and the offset on the track segment of the first beacon from the forward and reverse directions of the track segment according to the connection relationship of the track segments and the distance traveled by the train, obtains the updated track segment identifier and the offset on the updated track segment, and uses them as the updated train position. VOBC A obtains the forward train reference position and the reverse train reference position according to the updated train position.
[0057] Since VOBC A only detects one beacon, VOBC A cannot determine the direction of the train. Therefore, VOBC A simultaneously maintains the train reference position in both the positive direction of the track section (from small mileage to large mileage) and the reverse direction of the track section (from large mileage to small mileage).
[0058] After step 430, the method further includes: VOBC A determines whether the bidirectional train reference position is valid according to the state change of the train during the running process. When the bidirectional train reference position is invalid, the VOBC A resets the bidirectional train reference position.
[0059] VOBC A determines whether the bidirectional train reference position is valid according to the state change of the train during travel, mainly in the following three situations:
[0060] The first case: after VOBC A detects the first beacon, VOBC A checks whether there is a beacon loss situation, that is, whether there is an expected beacon that cannot be detected.
[0061] The second case: When the train starts to move, VOBC A will monitor whether the active cab of the train has changed. If the cab changes, the train position will not be affected, but it will affect the subsequent determination of the train's direction of travel. Therefore, if the active cab changes, the bidirectional train reference position cannot be used, and a new beacon needs to be re-detected to determine the reference position.
[0062] The third case: When the train starts to move, VOBC determines whether the rotation direction of the train wheels has changed. The change in the rotation direction of the train wheels indicates that the train has reversed, which will affect the calculation of the train's travel distance. Generally, during the train positioning process, the calculation requirements for the train's travel distance are high, so this restriction is added.
[0063] Once the expected beacon is not detected, the train activates a cab change, or the wheel rotation direction changes, VOBC A will reset the bidirectional train reference position and the detected beacon data. VOBC A needs to detect a new beacon to start the train positioning process again.
[0064] Step 440: Determine the train reference position according to the activation state of the train cab and the bidirectional train reference position.
[0065] Step 404 specifically includes: the local VOBC (VOBC A) verifies whether the beacon detected by the opposite VOBC (VOBC B) is valid. When the beacon detected by the opposite VOBC is valid, the train direction is determined according to the activation state of the train cab. If the local cab is in an activated state, the direction from the beacon detected by the opposite VOBC to the beacon detected by the local VOBC is used as the train direction. If the opposite cab is in an activated state, the direction from the beacon detected by the local VOBC to the beacon detected by the opposite VOBC is used as the train direction. According to the train direction and the bidirectional train reference position, the train reference position is determined; wherein the local cab is the cab where the local VOBC is located, and the opposite cab is the cab where the opposite VOBC is located.
[0066] The local VOBC (VOBC A) verifies whether the beacon detected by the opposite VOBC (VOBC B) is valid, specifically including: the local VOBC receives the beacon identifier of the beacon detected by the opposite VOBC and the distance traveled by the train after the beacon is detected. If the beacon identifier of the beacon detected by the local VOBC is consistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines that the beacon detected by the opposite VOBC is invalid. If the beacon identifier of the beacon detected by the local VOBC is inconsistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines the calculated train position when the opposite VOBC detects the beacon according to the activation state of the train cab, the bidirectional train reference position, and the distance traveled by the train after the opposite VOBC detects the beacon. According to the calculated train position when the opposite VOBC detects the beacon and the detection window size of the beacon, the effective detection area of the beacon is determined. The local VOBC uses the beacon identifier of the beacon detected by the opposite VOBC to obtain the position of the beacon detected by the opposite VOBC from the vehicle electronic map. If the position of the beacon detected by the opposite VOBC is within the effective detection area of the beacon, the local VOBC determines that the beacon detected by the opposite VOBC is valid. If the position of the beacon detected by the opposite VOBC is not within the effective detection area of the beacon, the local VOBC determines that the beacon detected by the opposite VOBC is invalid.
[0067] Step 405: Establish train positioning according to the train reference position.
[0068] After determining the train reference position, VOBC A calculates the train front position by adding the distance from the train reference point to the train front according to the connection relationship of the track sections, and calculates the train rear position by subtracting the distance from the train reference point to the train rear from the train reference position, thereby establishing the train positioning envelope and thus the train positioning.
[0069] The solution provided by the above-mentioned embodiments of the present application can quickly establish train positioning in line environments with many switches and short track sections, such as parking sections and storage lines, thereby solving the problem that train positioning can only be established on the same track section.
[0070] Figure 5 It is a flowchart of a method for establishing train positioning according to another embodiment of the present application, and the method includes the following steps 510-570.
[0071] Step 510: Before the train moves, set a route for the train on the ATS.
[0072] When a train without established positioning is to move, a route is set for the train on the ATS, and the switch in front of the train's running direction is locked by setting the route. After the route allocation is completed, the signal system indicates the train movement through signal lights and other means.
[0073] Step 520: When the first beacon is detected, the train reference position is initialized to obtain the train position.
[0074] During the movement of the train, when VOBC detects the first beacon, it obtains the track segment identifier and the offset on the track segment of the beacon from the on-board electronic map according to the beacon identifier, uses this information as the starting position of the train reference position, completes the train reference position initialization, and obtains the train position.
[0075] Step 530: VOBC obtains the turnout status and establishes the track section connection relationship.
[0076] When VOBC detects the first beacon, VOBC will initiate communication with the trackside area controller. The trackside area controller will establish communication with the VOBC that does not provide train location information. After the trackside area controller establishes communication with the VOBC that does not provide train location information, the trackside area controller will send the status of all turnouts within the route range of this area to VOBC. For those turnouts that are not within the route range, the trackside area controller will not send their status to VOBC. When VOBC receives the turnout status information sent by the trackside area controller, VOBC uses this turnout status information to establish the connection relationship between track sections without establishing train positioning.
[0077] When the train has not established positioning, VOBC obtains the control area information of the current train from the on-board electronic map according to the train position, and establishes communication with the trackside regional controller of the control area. The communication message indicates to obtain the turnout status of the area, and the message does not contain the train's location information. After receiving the message from VOBC, the regional controller checks the route status of the area and sends all the turnout status contained in the route to VOBC. VOBC uses the received turnout status to establish the connection relationship between the track sections. The rail transit line will be divided into several regional controllers. The on-board electronic map will define the track sections where these regional control areas are located. According to the track section and offset of the train position, the track section and offset of the reference position can be determined. The regional controller to which it belongs can be found from the on-board electronic map, thereby obtaining the regional controller information to be communicated.
[0078] In the related art, establishing the connection relationship between track sections depends on the turnout status sent by the regional controller. When VOBC is establishing communication with the regional controller, because the regional controller needs to verify the envelope of the train to establish the mobile authorization protection area, it will only establish communication with the trackside regional controller after the envelope of the train is established. As a result, in the process of establishing the train positioning, it is impossible to establish communication with the regional controller, and it is also impossible to obtain the turnout status to establish the section connection relationship. The method of this embodiment has been improved. By obtaining the first beacon position, the regional controller where the current train is located is obtained, and communication is established with the regional controller to obtain the turnout position. In the method of this embodiment, the regional controller also needs to be improved, that is, when a train communication message that does not contain the train envelope position is received, the turnout status can be sent to VOBC. In the related art, train communication messages that do not contain the train envelope position are generally discarded directly.
[0079] exist Figure 3 In the example, assuming that the switch status information received by VOBC is that the status of switch 1 is positive locked and the status of switch 2 is negative locked, the track section connection relationship is:
[0080]
[0081] That is, in the positive direction of the track segments, the next track segment of track segment 1 is track segment 3, and the next track segment of track segment 3 is track segment 5; in the negative direction of the track segments, the next track segment of track segment 5 is track segment 3, and the next track segment of track segment 3 is track segment 1; track segment 2 and track segment 4 have no track segments connected to them in the positive and negative directions of the track segments.
[0082] Through the connection relationship of the track segments, the position after adding or subtracting a specified distance can be calculated from the position of any point on the track segment. The position of a point on the track segment plus the distance is the position of the point on the track segment after moving the distance from the point along the direction of the track segment indicated by the position of the point and the connected track segment; the position of a point on the track segment minus the distance is the position of the point on the track segment after moving the distance from the point along the opposite direction of the direction of the track segment indicated by the position of the point and the connected track segment.
[0083] Step 540: Train position update and monitoring.
[0084] VOBC monitors the train's direction of travel and beacon detection. When VOBC detects the first beacon, the train's direction of travel is not allowed to change, and the beacon is not allowed to be lost. VOBC updates the track segment's identification and position offset based on the track segment's connection and the train's travel distance. Since only one beacon is detected, VOBC cannot determine the train's direction of travel, so VOBC simultaneously maintains the position information of the train reference points in both the positive direction of the track segment (from small mileage to large mileage) and the reverse direction of the track segment (from large mileage to small mileage).
[0085] Figure 6 It is a schematic diagram of the train reference position update when VOBC detects a single beacon. After VOBC detects a beacon, VOBC adds and subtracts the total travel distance of the train after the beacon is detected according to the position of the beacon to obtain the train reference position in the positive and negative directions of the track section.
[0086] VOBC ensures the validity of the train reference position by monitoring the train status changes during travel. It mainly monitors the following conditions:
[0087] ① After VOBC detects the first beacon, VOBC checks whether there is any beacon loss, that is, whether there is any expected beacon that has not been detected;
[0088] ②When the train starts moving, VOBC will monitor whether the train's active cab has changed;
[0089] ③When the train starts moving, VOBC determines whether the rotation direction of the train wheels has changed.
[0090] Once the expected beacon is not detected, the train activates a cab change, or the wheel rotation direction changes, VOBC will reset the train's reference position information and the detected beacon data. VOBC needs to detect a new beacon to start the train positioning process again.
[0091] Step 550: The VOBC verifies the validity of the peer VOBC detection beacon.
[0092] By combining the beacons detected by the two VOBCs and the distance traveled by the train after detecting the beacons, the effective detection area of the other-end beacon is calculated. The validity of the beacon detected by the other-end VOBC is verified through this effective detection area, and the validity of the train position at this end is verified through the validity of the beacon detected by the other-end VOBC.
[0093] When the train has not established positioning, the VOBC will periodically receive the beacon identifier and the distance the train has traveled since the beacon was detected from the other VOBC through communication messages.
[0094] When the local VOBC detects the first beacon, the local VOBC verifies the validity of the beacon detected by the other VOBC based on the train reference position information. The verification method is as follows:
[0095] If the beacon detected by the local VOBC is the same as the beacon detected by the peer VOBC, the local VOBC will consider the beacon verification invalid. If the beacons are inconsistent, the local VOBC will take the following verification steps:
[0096] Step 1: The local VOBC uses its own calculated train position and the activated train cab to determine the calculated train position when the other VOBC detects the beacon, that is, the position of the other train beacon reader when the beacon is detected, and calculates the position in both directions of the track section. The specific calculation method is as follows:
[0097] If the train cab where the local VOBC is located is activated, then:
[0098] For the positive direction of the track section, the method for calculating the train reference position when the VOBC at the other end detects the beacon is: starting from the train reference position of the VOBC at this end, move the distance between the two beacon readers installed on the train in the opposite direction of the track section, and then move the distance the train travels after the VOBC at the other end detects the beacon, which is the calculated train position when the VOBC at the other end detects the beacon.
[0099] For the reverse direction of the track section, the method for calculating the train reference position when the VOBC at the other end detects the beacon is: starting from the train reference position of the VOBC at this end, move the distance between the two beacon readers installed on the train in the positive direction of the track section, and then move the distance the train travels after the VOBC at the other end detects the beacon, which is the calculated train position of the VOBC at the other end.
[0100] If the train cab where the peer VOBC is located is activated, then:
[0101] For the positive direction of the track section, the method for calculating the train reference position when the VOBC at the other end detects the beacon is: starting from the train reference position of the VOBC at this end, move the distance between the two beacon readers installed on the train in the positive direction of the track section, and then move the distance traveled by the train after the VOBC at the other end detects the beacon in the reverse direction of the track section, which is the calculated train position when the VOBC at the other end detects the beacon.
[0102] For the reverse direction of the track section, the method for calculating the train reference position when the VOBC at the other end detects the beacon is: starting from the train reference position of the VOBC at this end, move the distance between the two beacon readers installed on the train in the reverse direction of the track section, and then move the distance traveled by the train after the VOBC at the other end detects the beacon in the positive direction of the track section, which is the calculated train position when the VOBC at the other end detects the beacon.
[0103] Among them, the distance between the two beacon readers installed on the train is a system predefined parameter, and the distance traveled by the train after the opposite VOBC detects the beacon is sent by the opposite VOBC through a communication message.
[0104] Step 2: Calculate the effective detection area of the beacon based on the calculated position of the opposite train and the detection window size of the beacon. The detection window size of the beacon is related to the installation error of the beacon, the speed of the train, the uncertainty of the train position, the transmission delay of the two VOBCs, and other factors. The effective detection area of the beacon is within the range of the beacon detection window size before and after the calculated position of the train when the opposite VOBC detects the beacon.
[0105] Step 3: The local VOBC uses the beacon identifier detected by the other VOBC to obtain the location information of the beacon from the vehicle electronic map. If the location of the beacon detected by the other VOBC is within the effective detection area, the local VOBC will determine that the beacon detected by the other VOBC is valid, otherwise the local VOBC will determine that the beacon detected by the other VOBC is invalid.
[0106] FIG7 shows a schematic diagram of calculating the effective detection area of the above-mentioned opposite-end VOBC beacon detection, FIG7(a1) is the train cab where VOBCA is located activated, VOBC A calculates the effective detection area of beacon 1 detected by VOBC B in the positive direction of the track section. FIG7(a2) is the train cab where VOBC A is located activated, VOBC A calculates the effective detection area of beacon 1 detected by VOBC B in the reverse direction of the track section. FIG7(b1) is the train cab where VOBC A is located activated, VOBC B calculates the effective detection area of beacon 2 detected by VOBC A in the positive direction of the track section. FIG7(b2) is the train cab where VOBC A is located activated, VOBC B calculates the effective detection area of beacon 2 detected by VOBC A in the reverse direction of the track section.
[0107] Step 560: VOBC establishes train location.
[0108] The VOBC determines the train's direction of travel and thus the train's reference position based on the relative position relationship between the activated train cab and the beacons detected by the two VOBCs, thereby establishing the train's positioning.
[0109] When the train has not established positioning, if the local VOBC determines that the beacon information sent by the opposite VOBC is valid, the VOBC determines the train travel direction information in the train reference position and further determines the train reference position according to the relative position relationship between the activated cab of the train and the beacons detected by the local VOBC and the opposite VOBC, as follows:
[0110] ① If the local cab is in the activated state, the direction from the beacon detected by the remote VOBC to the beacon detected by the local VOBC is the train travel direction;
[0111] ② If the remote cab is in an activated state, the direction from the beacon detected by the local VOBC to the beacon detected by the remote VOBC is the train travel direction;
[0112] ③ According to the determined train travel direction, select the train reference position corresponding to the train travel direction as the actual train reference position.
[0113] As shown in FIG7 , the train cab where VOBC A is located is activated. For VOBC A, the effective detection area of beacon 1 detected by VOBC B can only be in the positive direction of the track segment (FIG7(a1)). For VOBC B, the effective detection area of beacon 2 detected by VOBC A can also only be in the positive direction of the track segment (FIG7(b1)). If the positions of beacon 1 and beacon 2 are within the effective detection area calculated by VOBC, VOBC A and VOBC B can determine that the train travel direction is the positive direction of the track segment, and select the train reference position in the positive direction of the track segment as the actual train reference position.
[0114] After determining the train reference position, based on the connection relationship of the track sections, the train front position is obtained by adding the distance from the train reference point to the front of the train, and the train rear position is obtained by subtracting the distance from the train reference point to the rear of the train from the train reference position. The train positioning envelope is established to establish the train positioning.
[0115] Step 570: VOBC verifies train positioning.
[0116] When VOBC uses a single beacon to recover the train position, VOBC obtains the first beacon in front of the train and uses it as a verification beacon for train positioning.
[0117] During the train movement, VOBC determines whether the verification beacon is detected. If the verification beacon is detected within the valid position range of the beacon, VOBC determines that the train positioning verification is successful; if the verification beacon is not detected within the valid position range of the train or VOBC detects other beacons, VOBC determines that the train positioning verification has failed.
[0118] When VOBC determines that the train verification train positioning has failed, VOBC resets the train positioning and needs to re-detect the beacon to establish the train positioning.
[0119] The advantages of the above embodiments of the present application are as follows:
[0120] 1) When VOBC detects the first beacon, it will establish communication with the regional controller, obtain the status of the switch in front of the train before the train establishes its position, and establish the connection relationship between the track sections. It can establish train positioning in line environments with many switches and short track sections such as parking lots and storage lines, solving the problem that trains must be on the same track section to establish train positioning.
[0121] 2) Through the relative position relationship between the beacon readers and the beacons they detect under the dual redundant architecture, the system can establish train positioning when two VOBCs each detect a beacon, which helps to quickly establish train positioning.
[0122] 3) The essence of this application is to establish the positioning of the train through two different beacons in the train route, and to ensure the relative position relationship of the beacons detected by the two VOBCs through conditions such as locking the switch in the train route, a single movement direction, the beacon cannot be lost, and the train cab cannot be changed (that is, the train direction cannot be changed). The relative position relationship of the two beacons can be used to correctly determine the train's direction of travel. Each VOBC can establish the train positioning based on a single beacon, taking into account the safety and efficiency of the train operation.
[0123] 4) The method provided in this application is particularly suitable for scenarios where VOBC is started and enters operation in parking lots, parking lines and other environments. The method of restoring positioning through a single beacon can reduce the number of beacons in parking locations such as parking lots and parking lines, save beacon costs, reduce design restrictions on the transformation of signal systems such as parking lots, and make system designs such as beacon installation and layout more flexible, compared to the original method that requires two beacons to be detected to establish positioning.
[0124] 5) The implementation of the method provided in this application does not require any hardware modification, and only requires software upgrades of the trackside area controller and the on-board controller. The method can be implemented on the original system at a relatively low cost.
[0125] The beneficial effects of the embodiment of the present application will be further described in detail with reference to FIG. 8 .
[0126] As shown in FIG8(a), when the train is moving without positioning, if there is a beacon between the two beacon readers of the train, for the traditional method that requires continuous detection of two beacons to establish train positioning, VOBC A needs to detect beacons 2 and 3, and VOBC B needs to detect beacons 1 and 2, and beacons 1 and 2, and beacons 2 and 3 must be located in the same track section. In addition, when VOBC A detects beacon 3, the entire train must also be located in the same track section; similarly, when VOBC B detects beacon 2, the train should also be in the same track section, and the two VOBCs can establish train positioning. In the method of the embodiment of the present application, when VOBC A detects beacon 2 and VOBC B detects beacon 1, the two VOBCs can achieve train positioning, and beacons 1 and 2 do not need to be located in the same track section, and the train does not need to be located in the same track section. That is, in this scenario, both VOBCs can quickly establish train positioning by detecting only one beacon.
[0127] As shown in FIG8(b), when the train is moving without positioning, if there is no beacon between the two beacon readers of the train, for the traditional method that requires continuous detection of two beacons to establish train positioning, VOBC A needs to detect beacon 1 and beacon 2, and VOBC B also needs to detect beacon 1 and beacon 2, and beacon 1 and beacon 2 must be located in the same track section. In addition, when VOBC A and VOBC B detect beacon 2, the entire train must also be located in the same track section, and the two VOBCs can establish train positioning. In the method of the embodiment of the present application, when VOBC A detects beacon 2 and VOBC B detects beacon 1, the two VOBCs can achieve train positioning, and beacon 1 and beacon 2 do not need to be located in the same track section, and the train does not need to be located in the same track section. That is, in this scenario, VOBC B can also quickly establish train positioning by detecting only one beacon, realizing the redundancy of two sets of VOBCs.
[0128] As shown in Figure 8(c), when the train stops in a parking lot or storage line, for methods that require continuous detection of two beacons to establish train positioning, if the track section where the train stops is short and two beacons cannot be detected continuously in one track section, then special position recovery beacons need to be installed, such as beacons 1 and 2 shown in the figure, to support the train to establish positioning in a stationary state. However, in some extreme cases, these beacons may interfere with other devices, such as proximity sensors, making the installation of beacons infeasible. In addition, even if the track section where the train stops meets the requirement of continuous detection of two beacons, each VOBC needs to be designed and installed with two beacons to meet the requirements of train positioning, such as beacons 3, 4, 5 and 6 shown in the figure. When installing these beacons in the parking lot, it is necessary to consider the mutual interference between them and solve the problems of beacon misreading, which puts higher requirements on system design and operation. However, the method of the embodiment of the present application only needs to install one beacon between the two beacon readers of the train to achieve the rapid positioning requirement as shown in Figure 8(a). Only one beacon 3 and beacon 4 can be retained, and only one beacon 5 and beacon 6 can be retained. For non-unmanned lines, the positioning recovery beacons (beacons 1 and beacon 2) can be omitted, thereby reducing the complexity of the design and reducing the cost of design and operation. It can meet the needs of supporting trains to quickly establish train positioning in parking lots, storage lines, etc. with minimal modification and cost.
[0129] In several embodiments provided in the present application, the disclosed devices and methods can also be implemented in other ways. The device and method embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and a part of a module, a program segment or a code contains one or more executable instructions for implementing a specified logical function. In some alternative implementations, the functions marked in the box can also occur in an order different from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or the flowchart, and the combination of boxes in the block diagram and / or the flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.
[0130] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
[0131] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
Claims
1. A method for establishing train positioning, characterized in that: The following steps are involved: determining the train position according to the first beacon; According to the train position, the turnout status is obtained, and the connection relationship of the track sections is established; According to the connection relationship of the track sections and the distance traveled by the train after the first beacon, the train position is updated, and a bidirectional train reference position is obtained; Determining a train reference position according to an activation state of the train cab and the bidirectional train reference position; The train positioning is established according to the train reference position.
2. The method for establishing train positioning according to claim 1, characterized in that: The method is applied to a vehicle-mounted control system, which includes two sets of vehicle-mounted controllers VOBC, and the two sets of VOBC are respectively installed at the front and rear of the train.
3. The method for establishing train positioning according to claim 1, characterized in that: Before determining the train position according to the first beacon, the method further includes: An automatic train monitoring system ATS is used to set an approach route for the train so that the switch ahead of the train's moving direction is in a locked state.
4. The method for establishing train positioning according to claim 2, characterized in that: Determining the train position according to the first beacon includes: When any VOBC detects the first beacon, the identifier of the track segment of the first beacon and the offset on the track segment of the first beacon are obtained from the on-board electronic map according to the beacon identifier of the first beacon; The identifier of the track section of the first beacon and the offset on the track section of the first beacon are used as the train position.
5. The method for establishing train positioning according to claim 2, characterized in that: The step of obtaining the turnout state according to the train position and establishing the connection relationship between track sections includes: Any VOBC obtains the control area information of the train from the on-board electronic map according to the position of the train; The VOBC establishes communication with the trackside area controller ZC in the control area according to the control area information, and receives the turnout status sent by the ZC; The VOBC establishes the connection relationship between the track sections according to the switch status.
6. The method for establishing train positioning according to claim 4, characterized in that: The updating of the train position and obtaining the bidirectional train reference position according to the connection relationship of the track sections and the distance traveled by the train after the first beacon comprises: When any VOBC detects the first beacon, it continues to detect the distance traveled by the train; The VOBC updates the track segment identifier of the first beacon and the offset on the track segment of the first beacon from the forward and reverse directions of the track segment according to the connection relationship of the track segments and the distance traveled by the train, obtains the updated track segment identifier and the offset on the updated track segment, and uses them as the updated train position; The VOBC obtains the forward train reference position and the reverse train reference position according to the updated train position.
7. The method for establishing train positioning according to claim 1, characterized in that: After obtaining the bidirectional train reference position, the method further includes: The VOBC determines whether the bidirectional train reference position is valid according to the state change of the train during the running process; When the bidirectional train reference position is invalid, the VOBC resets the bidirectional train reference position.
8. The method for establishing train positioning according to claim 2, characterized in that: The two sets of VOBCs include a local VOBC and a peer VOBC, and the activation state of the train cab is used to represent the locomotive position of the train; Determining the train reference position according to the activation state of the train cab and the bidirectional train reference position comprises: The local VOBC verifies whether the beacon detected by the peer VOBC is valid; When the beacon detected by the peer VOBC is valid, the train direction is determined based on the activation status of the train cab; If the local cab is in the activated state, the direction from the beacon detected by the other end VOBC to the beacon detected by the local VOBC is taken as the train travel direction; If the opposite cab is in an activated state, the direction from the beacon detected by the local VOBC to the beacon detected by the opposite VOBC is taken as the train travel direction; Determining a train reference position according to the train travel direction and the bidirectional train reference position; The local cab is the cab where the local VOBC is located, and the opposite cab is the cab where the opposite VOBC is located.
9. The method for establishing train positioning according to claim 8, characterized in that: The local VOBC verifies whether the beacon detected by the peer VOBC is valid, including: The local VOBC receives the beacon identifier of the beacon detected by the opposite VOBC and the distance traveled by the train after the beacon is detected; If the beacon identifier of the beacon detected by the local VOBC is consistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines that the beacon detected by the opposite VOBC is invalid; If the beacon identifier of the beacon detected by the local VOBC is inconsistent with the beacon identifier of the beacon detected by the opposite VOBC, the local VOBC determines the calculated train position when the opposite VOBC detects the beacon based on the activation state of the train cab, the bidirectional train reference position, and the distance traveled by the train after the opposite VOBC detects the beacon; Determine the effective detection area of the beacon according to the calculated position of the train when the opposite VOBC detects the beacon and the detection window size of the beacon; The local VOBC uses the beacon identifier of the beacon detected by the opposite VOBC to obtain the position of the beacon detected by the opposite VOBC from the vehicle electronic map; If the location of the beacon detected by the peer VOBC is within the valid detection area of the beacon, the local VOBC determines that the beacon detected by the peer VOBC is valid; If the location of the beacon detected by the opposite-end VOBC is not within the effective detection area of the beacon, the local-end VOBC determines that the beacon detected by the opposite-end VOBC is invalid.
10. An electronic device, characterized in that: The electronic device comprises: processor; a memory for storing processor-executable instructions; Wherein, the processor is configured to execute the method for establishing train positioning as described in any one of claims 1-9.
Citation Information
Cited By
Method for quickly establishing and positioning subway train in complex bifurcation area
CN119682811A
A method for quickly establishing positioning of a subway train in a complex turnout area
CN119682811B
Safe storage method and device for train memory positioning and medium
CN121650727A
