Concrete structure beam formwork construction method

By pre-testing the positioning line and lifting assembly methods, the problems of low construction efficiency and safety of concrete structure beam forms are solved, and a more efficient and safe beam form installation process is achieved.

CN118979635APending Publication Date: 2024-11-19CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411083833.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The construction efficiency and safety of existing concrete structure beam forms are low, and construction workers work on the formwork for a long time, which poses safety hazards.

Method used

By pre-checking the construction drawings, measuring and laying the positioning lines, setting up scaffolding, cutting and processing wooden boards and wooden beams, assembling and reinforcing the U-shaped grooves, lifting them to the scaffolding position using lifting equipment, and using wire hammers to cooperate with the positioning lines for accurate accuracy Adjust the positioning and finally complete the installation of the beam formwork.

Benefits of technology

It improves the efficiency of beam formwork installation and the safety of construction personnel, reduces the working time on the scaffolding, and ensures the accuracy and efficiency of beam formwork installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979635A_ABST
    Figure CN118979635A_ABST
Patent Text Reader

Abstract

The invention relates to a concrete structure beam formwork construction method which is based on an existing concrete structure beam formwork and comprises the following steps that S1, construction preparation is conducted, specifically, a construction drawing and a construction scheme are checked, and the size of the needed structure beam formwork is determined; s2, positioning and line snapping are conducted, specifically, a positioning line of a beam needing to be constructed is measured, placed and popped out on a floor of the next layer in the construction area; s3, scaffold installation is conducted, specifically, the scaffold is erected on the next floor of the construction area according to the construction requirement of the concrete structural beam; s4, wood processing is conducted, specifically, according to the determined size of the concrete structure beam formwork, the plates and the wood braces forming the concrete structure beam formwork are cut and processed; according to the method, the plate and the square wood are used for pre-assembling the beam formwork, the beam formwork is hoisted to the corresponding position on the scaffold used for supporting and construction assistance, and finally beam formwork installation is completed, so that the operation time of constructors on the scaffold is shortened, the influence of the scaffold on beam formwork installation is reduced, and the construction efficiency is improved. Therefore, the installation efficiency of the beam formwork and the operation safety of constructors are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a concrete structure beam formwork construction method. Background Art

[0002] During the construction of concrete structures in ordinary housing construction projects, commonly used formwork systems include the following types: 1. Wooden formwork system: Its construction process is complex, the number of turnovers is relatively high, the amount of manual labor is large, and the wood consumption is high. However, it has the advantages of low construction cost, strong flexibility, easy cutting and processing, and the ability to adapt to a variety of non-standard types of components. It is the most widely used formwork system in ordinary housing construction projects; 2. Aluminum formwork system: Compared with wooden formwork, it is light in weight and high in strength, which is conducive to the operation on the construction site, suitable for large-scale construction, can be used multiple times, and has good appearance quality. At the same time, it also reduces wood consumption and environmental pollution. Compared with traditional wooden formwork, the cost is slightly higher. Aluminum formwork is a standardized product and can be used in special-shaped components or non-standard The flexibility of the use of quasi-components is poor; 3. Combined steel formwork system: easy construction, flexible and convenient disassembly and assembly, saving time and labor, long service life, and many turnover times, but its one-time purchase investment is large, the cost recovery period is long, its volume is large, its flexibility is poor, its transportation cost is high, and its scope of use is limited; 4. Plastic formwork system: At present, many companies have developed various plastic formworks, such as hard reinforced plastic formworks, wood-plastic composite formworks, GMT plastic formworks, floor plastic formworks and large plastic formwork systems, etc., which are similar to aluminum formworks and combined steel formworks, and their application range is also relatively limited; 5. Other new formwork systems: such as silicon ink selenium disassembly-free formworks, 3D printing disassembly-free formworks, etc., are currently mostly limited in application due to technical or cost issues.

[0003] In order to save costs, existing beam molds generally adopt wooden molds. Construction workers need to carry materials and assemble beam molds on the mold frame, which undoubtedly leads to low construction efficiency. In addition, construction workers remain on the mold frame for a long time, which is prone to safety problems. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the prior art, provide a concrete structure beam formwork construction method, and solve the problems of low efficiency and safety of beam formwork construction in the prior art.

[0005] To achieve the above object, the present invention provides a concrete structure beam formwork construction method, comprising the following steps:

[0006] S1. Construction preparation: Check the construction drawings and construction plan to determine the size of the required structural beam formwork;

[0007] S2. Positioning and popping lines: measure and place the positioning lines of the required construction beams on the floor slab of the next floor in the construction area;

[0008] S3, Scaffolding installation: Scaffolding is set up on the floor slab below the construction area according to the needs of concrete structural beam construction;

[0009] S4. Wood processing: according to the determined size of concrete structure beam formwork, cut and process the plates and wood beams that make up the concrete structure beam formwork;

[0010] S5, pre-assembly of beam formwork: assemble the cut plates into a U-shaped groove and reinforce it with wooden beams;

[0011] S6, beam formwork hoisting: Use hoisting equipment to hoist the assembled and reinforced U-shaped trough to the corresponding position of the scaffolding;

[0012] S7, beam formwork positioning: use plumb bob and the positioning line on the floor slab below the construction area to adjust and position the U-shaped groove after reinforcement;

[0013] S8, beam node processing: reinforce the end nodes of the beam formwork formed by the reinforced U-shaped groove, and finally complete the installation of the beam formwork.

[0014] Furthermore, the dimensions of the structural beam formwork required in step S1 include the length of the plate, the width of the plate, the length of the wooden beam, the number of wooden beams, and the binding spacing of the wooden beams.

[0015] Furthermore, step S3 also includes lifting the scaffolding materials onto the next floor slab in the construction area using lifting equipment.

[0016] Furthermore, step S4 also includes setting up a wood processing area at a vacant position of a floor slab below the construction area to facilitate the processing of wood constituting the beam formwork.

[0017] Furthermore, in step S5, the assembly and reinforcement of the U-shaped groove are completed in the wood processing area.

[0018] Furthermore, step S7 specifically includes hanging the body of the plumb bob on the side of the reinforced U-shaped groove, allowing the hammer head of the plumb bob to naturally hang down to the next floor slab in the construction area, and adjusting the position of the reinforced U-shaped groove so that the hammer head falls on the positioning line, thereby completing the precise adjustment and positioning of the reinforced U-shaped groove.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. Use plates and wooden beams to pre-assemble the beam formwork, and hoist it to the corresponding position on the scaffolding used for support and construction assistance, and finally complete the installation of the beam formwork, thereby reducing the working time of construction workers on the scaffolding, and then reducing the impact of the scaffolding on the installation of the beam formwork, thereby increasing the installation efficiency of the beam formwork and the safety of construction workers' operations.

[0021] 2. Pop up the positioning line in advance on the floor slab of the next floor in the construction area, and use the plumb line to quickly position the beam formwork, which increases the overall work efficiency while ensuring the accuracy of the beam formwork installation position. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A construction flow chart of a concrete structure beam formwork construction method of the present invention;

[0023] Figure 2 A schematic diagram of pre-assembly of a beam form in a concrete structure beam form construction method of the present invention;

[0024] Figure 3 It is a schematic diagram of installing a beam formwork in a concrete structure beam formwork construction method of the present invention. DETAILED DESCRIPTION

[0025] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0026] Please refer to the attached Figure 1 The present invention provides a concrete structure beam formwork construction method, based on the existing concrete structure beam formwork, comprising the following steps:

[0027] S1. Construction preparation: Check the construction drawings and construction plan to determine the required size of the structural beam formwork, which includes the length of the plate, the width of the plate, the length of the wooden beam, the number of wooden beams, and the binding spacing of the wooden beams;

[0028] S2. Positioning and popping lines: measure and place the positioning lines of the required construction beams on the floor slab of the next floor in the construction area;

[0029] S3. Scaffolding installation: Use lifting equipment to hoist the scaffolding materials to the floor slab below the construction area. Set up the scaffolding on the floor slab below the construction area according to the construction needs of the concrete structure beams. The scaffolding should not interfere with the positioning line in the longitudinal direction.

[0030] S4, wood processing: select the vacant position of the floor slab below the construction area as the wood processing area, and cut and process the plates and wood beams that make up the concrete structure beam mold according to the determined size of the concrete structure beam mold;

[0031] S5, pre-assembly of beam molds: assemble the cut panels into U-shaped grooves in the wood processing area and reinforce them with wooden beams;

[0032] S6, beam formwork hoisting: Use hoisting equipment to hoist the assembled and reinforced U-shaped trough as a whole to the corresponding position of the scaffolding;

[0033] S7, beam formwork positioning: hang the line body of the line hammer on the side of the reinforced U-shaped groove, let the hammer head of the line hammer naturally hang down to the floor slab of the next layer in the construction area, and at the same time adjust the position of the reinforced U-shaped groove so that the hammer head falls on the positioning line, so as to complete the precise adjustment and positioning of the reinforced U-shaped groove;

[0034] S8. Beam node processing: After the U-shaped groove after reinforcement is positioned, the U-shaped groove after reinforcement is fixed by setting up supports between the U-shaped groove after reinforcement and the scaffolding, and the adjacent U-shaped groove end nodes are connected and fixed through the existing connecting parts, and finally the beam formwork installation is completed.

[0035] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A concrete structure beam formwork construction method, based on an existing concrete structure beam formwork, characterized in that: The steps include: S1. Construction preparation: Check the construction drawings and construction plan to determine the size of the required structural beam formwork; S2. Positioning and popping lines: measure and place the positioning lines of the required construction beams on the floor slab of the next floor in the construction area; S3, Scaffolding installation: Scaffolding is set up on the floor slab below the construction area according to the needs of concrete structural beam construction; S4. Wood processing: according to the determined size of concrete structure beam formwork, cut and process the plates and wood beams that make up the concrete structure beam formwork; S5, pre-assembly of beam formwork: assemble the cut plates into a U-shaped groove and reinforce it with wooden beams; S6, beam formwork hoisting: Use hoisting equipment to hoist the assembled and reinforced U-shaped trough to the corresponding position of the scaffolding; S7, beam formwork positioning: use plumb bob and the positioning line on the floor slab below the construction area to adjust and position the U-shaped groove after reinforcement; S8, beam node processing: reinforce the end nodes of the beam formwork formed by the reinforced U-shaped groove, and finally complete the installation of the beam formwork.

2. A concrete structure beam form construction method according to claim 1, characterized in that: The dimensions of the structural beam formwork required in step S1 include the length of the plate, the width of the plate, the length of the wooden beam, the number of wooden beams, and the binding spacing of the wooden beams.

3. A concrete structure beam form construction method according to claim 1, characterized in that: Step S3 also includes lifting the scaffolding materials onto the next floor slab in the construction area using lifting equipment.

4. A concrete structure beam form construction method according to claim 1, characterized in that: Step S4 also includes setting up a wood processing area at a vacant position of the floor slab below the construction area to facilitate the processing of wood constituting the beam mold.

5. A concrete structure beam form construction method according to claim 4, characterized in that: In step S5, the assembly and reinforcement of the U-shaped groove are completed in the wood processing area.

6. A concrete structure beam form construction method according to claim 1, characterized in that: Step S7 specifically includes hanging the body of the plumb bob on the side of the reinforced U-shaped groove, allowing the hammer head of the plumb bob to naturally hang down to the next floor slab in the construction area, and adjusting the position of the reinforced U-shaped groove so that the hammer head falls on the positioning line, thereby completing the precise adjustment and positioning of the reinforced U-shaped groove.

Citation Information

Patent Citations

  • Construction method for formwork of beam, plate and column structure

    CN110259114A

  • Whole-support whole-disassembly combined type shaping beam formwork, supporting system and construction method thereof

    CN112096061A

  • Beam-slab formwork structure and mounting process

    CN113685021A

  • Small beam and column assembly type formwork

    CN219431385U

  • Method for constructing foundation beam

    JP1997088348A