Construction method for boosting and capacity increasing transformation of power transmission tower

By setting up temporary reinforcement devices and suspending in the head of the transmission tower to adjust the conductor height, the problems of long construction cycle, high cost and limited conductor capacity of the transmission tower boosting and capacity increase method are solved, and high efficiency is achieved The power transmission capacity is improved.

CN118979651APending Publication Date: 2024-11-19SHANGHAI SHEMAR POWER ENG CO LTD

Patent Information

Application Number
CN202411098241.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing transmission tower boosting and capacity increase methods have problems such as long construction cycle, high costs, tight land resources and limited increase in wire transmission capacity, which is difficult to effectively meet the needs of user load growth.

Method used

The temporary reinforcement device is used to set up the head of the transmission tower, remove the middle phase bridge structure, suspend and install the composite cross-bar, adjust the conductor height, connect the edge phase conductor through the hanging wire assembly to achieve the wire height increase and increase the voltage of the transmission tower Level and power transmission capacity.

Benefits of technology

Without removing the original main tower structure, the conductor height and voltage level of the transmission tower will be increased, the power transmission capacity will be increased, and the construction cycle and cost will be reduced. It will be suitable for areas with tight land resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979651A_ABST
    Figure CN118979651A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for boosting and capacity increasing transformation of a power transmission tower, which comprises the following steps of: arranging a temporary reinforcing device on a tower head of the power transmission tower to be transformed, fixedly supporting between a first crank arm and a second crank arm of the tower head by using the temporary reinforcing device, and dismantling a middle-phase bridge structure originally positioned between the first crank arm and the second crank arm; and the assembled middle-phase composite cross arm is suspended and installed between the first crank arm and the second crank arm of the tower head, and the temporary reinforcing device fixedly supported between the first crank arm and the second crank arm is dismounted. The tower head can be kept in an original structural state under the fixed support of the temporary reinforcing device, and unexpected change cannot occur before and after the middle-phase bridge structure is removed, so that an original cross arm structure can be replaced on a main tower structure of an original power transmission tower, the height of a wire can be adjusted, and the power transmission efficiency is improved. Without dismantling the original main tower structure, the lead is heightened, and the boosting and capacity-increasing transformation of the power transmission tower is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electric power transmission, and in particular to a construction method for voltage-boosting and capacity-increasing transformation of transmission towers. Background Art

[0002] Transmission towers are pole-shaped or tower-shaped structures that support overhead transmission line conductors and overhead ground wires, and keep a certain distance between the transmission line conductors and the ground wires, and between the transmission line conductors and the ground wires and the earth. With the development of the economy, the regional load has increased year by year, and the original traditional transmission lines can no longer meet the growing demand of existing user loads. To solve this problem, it is necessary to increase the transmission capacity of the transmission lines.

[0003] For conventional single-circuit wine glass towers, there are mainly two conventional methods that can be used to increase the transmission capacity of the transmission line. The first method can use the voltage boosting method, by increasing the voltage level of the original transmission line, increasing the voltage U, thereby achieving an increase in electric energy. The second method can use the capacity expansion method, by replacing the original transmission line conductor with a conductor with a larger transmission capacity, increasing the current I, thereby achieving an increase in electric energy.

[0004] At present, when carrying out the above-mentioned voltage-boosting method, it is usually necessary to dismantle the entire original transmission line and build a new transmission line with a higher voltage level on its basis. This method has the problems of long construction period and high cost. At the same time, as the voltage level of the transmission line increases, the width of the corridor becomes wider, and additional land acquisition is inevitable. For areas with limited land resources, it is difficult to implement and the land acquisition cost is high.

[0005] When carrying out the capacity increase method mentioned above, it is usually necessary to remove the original transmission line conductors of the entire line and install new large-capacity conductors on the original transmission towers. Since the transmission tower has not changed, in order to ensure that the force on the transmission tower does not exceed the design value after the conductor is replaced, some of the rods in the transmission tower can be strengthened, so that the transmission tower can withstand a greater load. However, this modification method of strengthening some rods usually results in the specification of the large-capacity conductors selected being smaller, and the capacity and current carrying capacity of the conductors are limited. Generally, the effect after the modification is not as good as the voltage boost method mentioned above. Summary of the invention

[0006] Based on this, it is necessary to provide a construction method for the voltage increase and capacity increase of transmission towers in response to the technical problems mentioned above.

[0007] The present application provides a construction method for voltage-boosting and capacity-increasing transformation of a transmission tower, and the construction method for voltage-boosting and capacity-increasing transformation of a transmission tower comprises the following steps:

[0008] A temporary reinforcement device is arranged on the tower head of the transmission tower to be transformed, and the temporary reinforcement device is used to fix and support between the first curved arm and the second curved arm of the tower head. In this state, the middle phase bridge structure originally located between the first curved arm and the second curved arm is removed;

[0009] The assembled middle phase composite cross arm is suspended and installed between the first curved arm and the second curved arm of the tower head. After the installation is completed, the temporary reinforcement device fixedly supported between the first curved arm and the second curved arm is removed.

[0010] In one of the embodiments, before a temporary reinforcement device is arranged on the tower head of the transmission tower to be modified, the transmission tower to be modified is placed in a state where a middle phase conductor and a ground wire are not hung.

[0011] In one embodiment, before a temporary reinforcement device is set on the tower head of the transmission tower to be modified, when the transmission tower to be modified is in a state of suspending a middle phase conductor and a ground wire, the construction method for voltage-increasing and capacity-increasing modification of the transmission tower includes the following steps:

[0012] The middle phase conductor and the ground wire of the transmission tower to be modified are hoisted to keep them away from the transmission tower to be modified and the ground, and then a temporary reinforcement device is set on the tower head of the transmission tower to be modified.

[0013] In one of the embodiments, before suspending the middle phase composite crossarm, a middle phase mounting hole is opened on the first curved arm and the second curved arm of the tower head, and then the assembled middle phase composite crossarm is suspended, and the middle phase composite crossarm is installed between the first curved arm and the second curved arm of the tower head using the middle phase mounting hole.

[0014] In one of the embodiments, before suspending the middle phase composite crossarm, a middle phase erection plate is set on the first curved arm and the second curved arm of the tower head, and then the assembled middle phase composite crossarm is suspended, and the middle phase composite crossarm is installed between the first curved arm and the second curved arm of the tower head using the middle phase erection plate.

[0015] In one embodiment, the first side phase angle steel structure originally located at the first crank arm and the second side phase angle steel structure originally located at the second crank arm are removed;

[0016] The assembled first side phase composite cross arm and the second side phase composite cross arm are suspended, the first side phase composite cross arm is installed on the outside of the first curved arm, and the second side phase composite cross arm is installed on the outside of the second curved arm.

[0017] In one embodiment, before dismantling the original first side phase angle steel structure and the second side phase angle steel structure, the transmission tower to be reconstructed is placed in a state where no side phase conductors are hung.

[0018] In one embodiment, before dismantling the original first side phase angle steel structure and the second side phase angle steel structure, when the transmission tower to be transformed is in a state of hanging side phase conductors, the construction method for voltage-increasing and capacity-increasing transformation of the transmission tower includes the following steps:

[0019] The side phase conductor of the transmission tower to be modified is hoisted away from the transmission tower to be modified and the ground, and then a first side phase composite cross arm is installed on the outside of the first curved arm, and a second side phase composite cross arm is installed on the outside of the second curved arm.

[0020] In one embodiment, before suspending the first side phase composite cross arm, a first side phase mounting hole is opened on the first curved arm of the tower head, and then the assembled first side phase composite cross arm is suspended, and the first side phase composite cross arm is installed on the first curved arm of the tower head by using the first side phase mounting hole; and / or,

[0021] Before suspending the second side phase composite cross arm, a second side phase mounting hole is opened on the second curved arm of the tower head, and then the assembled second side phase composite cross arm is suspended, and the second side phase composite cross arm is installed on the second curved arm of the tower head using the second side phase mounting hole.

[0022] In one embodiment, before suspending the first side phase composite cross arm, a first side phase erection plate is arranged on the first curved arm of the tower head, and then the assembled first side phase composite cross arm is suspended, and the first side phase composite cross arm is installed on the first curved arm of the tower head by using the first side phase erection plate; and / or,

[0023] Before suspending the second side phase composite cross arm, a second side phase erection plate is arranged on the second curved arm of the tower head, and then the assembled second side phase composite cross arm is suspended, and the second side phase composite cross arm is installed on the second curved arm of the tower head using the second side phase erection plate.

[0024] In one of the embodiments, the middle phase composite crossarm, the first side phase composite crossarm and the second side phase composite crossarm are suspended to a preset position by a suspension mechanism, and the suspension mechanism includes a drone, a crane, a helicopter or a pulley block.

[0025] In the above-mentioned construction method for the voltage-increasing and capacity-increasing transformation of the transmission tower, the temporary reinforcement device can adjust the lateral length according to the lateral distance between the first curved arm and the second curved arm of the tower head, so that the first curved arm and the second curved arm of the tower head can be maintained in the original structural state under the fixed support of the temporary reinforcement device, and no unexpected changes will occur before and after the removal of the middle-phase bridge structure. Therefore, based on the above-mentioned construction method, the original cross-arm structure can be replaced on the main tower structure of the original transmission tower, and the height of the middle-phase conductor can be adjusted by using the modified middle-phase composite cross-arm, so that the conductor can be increased without dismantling the original main tower structure. For the same reason, the conductor of the side phase can also be connected to the side phase node through the hanging wire assembly to lift the conductor of the side phase, thereby realizing the voltage-increasing and capacity-increasing transformation of the transmission tower. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of the plan structure of a transmission tower provided in one embodiment of the present application.

[0027] Figure 2 A schematic diagram of the three-dimensional structure of a transmission tower provided in one embodiment of the present application.

[0028] Figure 3 A schematic diagram of the structure of a tower head and a ground wire bracket provided in one embodiment of the present application.

[0029] Figure 4 A schematic diagram of the partial assembly structure of a first oblique-stayed insulating rod, a first support insulating rod and a middle-phase connecting assembly provided for one embodiment of the present application.

[0030] Figure 5 A schematic diagram of the partial assembly structure of a second oblique-stayed insulating rod, a second support insulating rod and an edge-connecting component located on one side provided for one embodiment of the present application.

[0031] Figure 6 A schematic diagram of the partial assembly structure of a second oblique-stayed insulating rod, a second support insulating rod and an edge-phase connecting component located on the other side provided for one embodiment of the present application.

[0032] Figure 7 A schematic structural diagram of a transmission tower with a shielding ring provided in one embodiment of the present application.

[0033] Figure 8 For Figure 7 Schematic diagram of the three-dimensional structure of the transmission tower shown.

[0034] Fig. 9 A schematic structural diagram of a transmission tower with a shielding ring provided in accordance with another embodiment of the present application.

[0035] Fig.10 For Fig. 9Schematic diagram of the three-dimensional structure of the transmission tower shown.

[0036] Fig.11 It is a schematic diagram of the planar structure of a wine glass tower in the prior art.

[0037] Fig.12 This is a schematic diagram of the usage status of a temporary reinforcement device provided in one embodiment of the present application.

[0038] Fig.13 This is a schematic diagram of the first direction structure of a temporary reinforcement device provided in one embodiment of the present application.

[0039] Fig.14 This is a schematic diagram of the second direction structure of a temporary reinforcement device provided in one embodiment of the present application.

[0040] Fig.15 For Fig.14 Left side view of the temporary reinforcement device shown.

[0041] Fig.16 For Fig.14 Right side view of the temporary reinforcement device shown.

[0042] Figure Number:

[0043] 10. Middle phase bridge structure; 20. First side phase angle steel structure; 30. Second side phase angle steel structure;

[0044] 100. Conductor; 200. Temporary reinforcement device;

[0045] 210. Reinforcement rod; 220. Adjustment assembly;

[0046] 221, adjusting main body; 222, first connecting part; 223, second connecting part; 211, third connecting part; 212, fourth connecting part;

[0047] 1000, main tower structure; 2000, composite cross arm assembly; 3000, hanging wire assembly; 4000, ground wire bracket; 5000, shielding ring;

[0048] 1000a, reference horizontal plane; 1000b, middle phase assembly space; 1000c, top space opening;

[0049] 1100, tower body; 1200, tower head;

[0050] 1210, first curved arm; 1220, second curved arm;

[0051] 2100, middle phase composite cross arm; 2200, side phase composite cross arm;

[0052] 2110, first inclined insulating rod; 2120, first supporting insulating rod; 2130, middle phase connecting assembly;

[0053] 2111, end fittings of the first inclined tie rod; 2121, end fittings of the first support rod; 2131, middle phase node fittings;

[0054] 2210, second inclined insulating rod; 2220, second supporting insulating rod; 2230, side phase connection assembly;

[0055] 2211, the end fittings of the second inclined tie rod; 2221, the end fittings of the second support rod; 2231, the edge node fittings;

[0056] 3100, connection fittings; 3200, wire support; 3200a, support inner cavity; 3210, bending part; 3300, suspension element; 3400, unit hanger;

[0057] 4100, a first ground wire bracket; 4200, a second ground wire bracket. DETAILED DESCRIPTION

[0058] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below. If these terms "first" and "second" appear, these terms are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features.

[0059] The present application provides a construction method for the voltage-increasing and capacity-increasing transformation of a transmission tower, the purpose of which is to transform, for example, Fig.11 The existing transmission tower voltage increase and capacity increase is shown as follows Figures 1 to 6 The transmission tower shown, therefore, this application first introduces in detail the structure and design of the modified transmission tower.

[0060] See also Figures 1 to 6As shown, the modified transmission tower includes a main tower structure 1000, a composite cross arm assembly 2000 and a hanging wire assembly 3000. The main tower structure 1000 may be limited to a reference horizontal plane 1000a, which is a constructed virtual plane and does not actually exist. It is only used as an auxiliary reference when describing the relationship between the main tower structure 1000 and the ground. For example, when the transmission tower is installed on the ground, the reference horizontal plane 1000a of the main tower structure 1000 is ensured to be parallel to the earth's horizontal plane, so that the transmission tower is installed vertically relative to the ground. In addition, the reference horizontal plane 1000a is also used to determine the angle and direction of the composite cross arm assembly 2000 set on the main tower structure 1000, which can be seen below.

[0061] like Figure 1 As shown, the main tower structure 1000 includes a tower body 1100 and a tower head 1200. The tower body 1100 is the basic structure of the entire transmission tower and is used for installation in direct contact with the ground, serving as the installation foundation of the entire transmission tower. The tower head 1200 is arranged on the tower body 1100 and is mainly used to set the composite cross arm assembly 2000, the ground wire bracket 4000, the conductor 100 and the ground wire, etc. Figures 1 to 3 As shown, the tower head 1200 includes a first curved arm 1210 and a second curved arm 1220, and the first curved arm 1210 and the second curved arm 1220 are arranged at the top of the tower body 1100, and the first curved arm 1210 and the second curved arm 1220 are arranged in a left-right symmetrical manner. At this time, the space enclosed between the first curved arm 1210 and the second curved arm 1220 can be used to form a middle phase assembly space 1000b.

[0062] Since the bottoms of the first curved arm 1210 and the second curved arm 1220 are connected to the tower body 1100, and the tops of the first curved arm 1210 and the second curved arm 1220 are not connected to each other, the middle phase assembly space 1000b formed between the first curved arm 1210 and the second curved arm 1220 has a top space opening 1000c facing upward, so that the first curved arm 1210 and the second curved arm 1220 form a structure similar to a "U" shape with the tower body 1100. Moreover, the first curved arm 1210 and the second curved arm 1220 can both include an upper curved arm and a lower curved arm connected up and down. Taking the first curved arm 1210 as an example, the lower curved arm is used to be arranged at the top of the tower body 1100 and connected to the tower body 1100, while the upper curved arm is located at the top of the lower curved arm and is used to be connected to the ground wire bracket 4000. The second curved arm 1220 is similarly not described in detail.

[0063] Continue reading Figure 3As shown, the composite cross-arm assembly 2000 is arranged at the tower head 1200, and the composite cross-arm assembly 2000 is used to connect the conductor 100 at the tower head 1200, and the conductor 100 includes the conductor 100 of the middle phase and the conductor 100 of the side phase. Therefore, the composite cross-arm assembly 2000 may include a middle phase composite cross-arm 2100 and two side phase composite cross-arms 2200, wherein the middle phase composite cross-arm 2100 is arranged in the middle phase assembly space 1000b of the main tower structure 1000, so that the middle phase composite cross-arm 2100 can be used to connect the conductor 100 of the middle phase in the middle phase assembly space 1000b, and the two side phase composite cross-arms 2200 can be arranged on the left and right sides of the tower head 1200, and are used to connect the conductor 100 of the side phase on the left and right sides of the tower head 1200 (i.e., the first curved arm 1210 and the second curved arm 1220 are away from the outer side of the middle phase composite cross-arm 2100).

[0064] like Figure 3 As shown, the middle phase composite cross arm 2100 includes a plurality of first inclined insulating rods 2110 and a plurality of first support insulating rods 2120, one end of all the first inclined insulating rods 2110 are respectively connected to different positions of the first curved arm 1210 and the second curved arm 1220, and all the first inclined insulating rods 2110 have an angle with the reference horizontal plane 1000a, for example, Figure 3 In the embodiment, one end of all first inclined insulating rods 2110 facing the left and right sides is symmetrically connected to the first curved arm 1210 and the second curved arm 1220, and the connection positions of all first inclined insulating rods 2110 on the first curved arm 1210 or the second curved arm 1220 are also symmetrically arranged. Similarly, one end of all first supporting insulating rods 2120 is respectively connected to different positions of the first curved arm 1210 and the second curved arm 1220, and all first supporting insulating rods 2120 have an angle with the reference horizontal plane 1000a, for example, Figure 3 In the figure, one end of all first pillar insulating rods 2120 facing the left and right sides is symmetrically connected to the first curved arm 1210 and the second curved arm 1220, and the connection positions of all first pillar insulating rods 2120 on the first curved arm 1210 or the second curved arm 1220 are also symmetrically arranged on the left and right sides.

[0065] Moreover, after one end of all the first inclined insulating rods 2110 and all the first pillar insulating rods 2120 are connected at the first curved arm 1210 and the second curved arm 1220, the other ends of all the first inclined insulating rods 2110 and the other ends of all the first pillar insulating rods 2120 are also connected to form a middle phase node in the middle phase assembly space 1000b. In one embodiment, in the direction from the middle phase node to the first curved arm 1210 or the second curved arm 1220, the height of the plurality of first inclined insulating rods 2110 gradually increases, and in the direction from the middle phase node to the first curved arm 1210 or the second curved arm 1220, the height of the plurality of first pillar insulating rods 2120 gradually decreases, thereby forming a structure as shown in FIG. Figure 3 The mid-phase composite crossarm 2100 is shown in FIG.

[0066] like Figure 3 As shown, in one embodiment, the middle phase composite cross arm 2100 includes a middle phase connecting component 2130, and the middle phase connecting component 2130 is used to form a middle phase node. Figure 4 As shown, the middle phase connection assembly 2130 includes a middle phase node hardware 2131, a plurality of first inclined rod end hardware 2111 and a plurality of first pillar rod end hardware 2121, one end of the first inclined rod end hardware 2111 is detachably connected to the middle phase node hardware 2131, the other end of each first inclined rod end hardware 2111 is connected to the end of a first inclined insulating rod 2110, one end of the first pillar rod end hardware 2121 is detachably connected to the middle phase node hardware 2131, and the other end of each first pillar rod end hardware 2121 is connected to the end of a first pillar insulating rod 2120. In addition, those skilled in the art can also realize the connection between the middle phase connection assembly 2130 and the first inclined insulating rod 2110 and the first pillar insulating rod 2120 through other detachable methods according to actual needs, which is not limited here.

[0067] The number of hanging wire assemblies 3000 is configured to be at least three, and the hanging wire assemblies 3000 are used to connect the conductor 100. At this time, the middle phase node of the middle phase composite cross arm 2100 is provided with at least one hanging wire assembly 3000, and after the middle phase conductor 100 is connected to the hanging wire assembly 3000 on the middle phase composite cross arm 2100, the hanging wire assembly 3000 has a lower droop height relative to the middle phase node, and the conductor 100 is also lower than the middle phase node.

[0068] Therefore, compared to Fig.11In the transmission tower of the present application, the hanging wire assembly 3000 can be designed to be shorter according to the requirements. The shorter hanging wire assembly 3000 can make the middle phase conductor 100 closer to the middle phase node, increase the distance between the middle phase conductor 100 and the ground, and meet the requirement of increasing the clearance value of the conductor 100 after boosting. Moreover, the windage has a small effect on the length of the middle phase composite cross arm 2100, so that the clearance between the conductor 100 and the main tower structure 100 after boosting still meets the requirements.

[0069] A plurality of first inclined insulating rods 2110 and a plurality of first supporting insulating rods 2120 are connected as a middle phase node, which can meet the electrical clearance after voltage boosting. The conductor 100 is connected to the middle phase node through a hanging wire assembly 3000, which also lifts the conductor 100 of the middle phase, and can also meet the requirement for increased ground clearance of the conductor 100 after voltage boosting.

[0070] Therefore, in the structural design of the above-mentioned middle-phase composite crossarm 2100 of the transmission tower, the middle-phase composite crossarm 2100 can adjust and control the height of the middle-phase node formed in the middle-phase composite crossarm 2100 relative to the ground by adjusting the connection positions of all the first inclined insulating rods 2110 and all the first pillar insulating rods 2120 on the first curved arm 1210 and the second curved arm 1220, and at the same time adaptively adjusting the angles of all the first inclined insulating rods 2110 and all the first pillar insulating rods 2120 relative to the reference horizontal plane 1000a, and adaptively adjusting the hanging length of the hanging wire assembly 3000 to adjust the height of the middle-phase conductor 100 relative to the ground.

[0071] Based on the structural design of the above-mentioned mid-phase composite cross arm 2100, the original cross arm structure can be replaced on the original wine glass tower, and the original cross arm structure can be replaced by the following method: Figures 1 to 3 The modified middle-phase composite cross arm 2100 shown in the figure adjusts the height of the middle-phase conductor 100, so that the conductor 100 can be increased without dismantling the original main tower structure 1000, thereby realizing the transmission tower modification of increasing voltage and capacity. Fig.11 As shown, the main tower structure of the original wine glass tower is the same as the main tower structure 1000 of the transmission tower in the prior art, including the slight differences in the height and size of the tower body 1100, the tower head 1200 and the ground wire support 4000, which are all considered to be the same structure as the main tower structure 1000.

[0072] Continue reading Figure 3As shown, two side phase composite cross arms 2200 are respectively arranged on the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, and the two side phase composite cross arms 2200 are both located outside the middle phase assembly space 1000b. Each side phase composite cross arm 2200 includes a plurality of second inclined insulating rods 2210 and a plurality of second supporting insulating rods 2220, one end of all the second inclined insulating rods 2210 in each side phase composite cross arm 2200 is respectively connected to different positions of the tower head 1200, and all the second inclined insulating rods 2210 in each side phase composite cross arm 2200 have an angle with the reference horizontal plane 1000a. At the same time, one end of all the second supporting insulating rods 2220 in each side phase composite cross arm 2200 is respectively connected to different positions of the tower head 1200, and all the second supporting insulating rods 2220 in each side phase composite cross arm 2200 have an angle with the reference horizontal plane 1000a.

[0073] The other ends of all the second inclined insulating rods 2210 and the other ends of all the second supporting insulating rods 2220 in each side phase composite cross arm 2200 are connected to form a side phase node outside the middle phase assembly space 1000b, for example Figure 3 As shown, the two side-phase composite crossarms 2200 located on the left and right sides of the tower head 1200 each construct a side-phase node on the left and right sides of the tower head 1200, and a hanging wire assembly 3000 is provided at the side-phase nodes of the two side-phase composite crossarms 2200. The hanging wire assembly 3000 is consistent with the hanging wire assembly 3000 provided on the middle-phase composite crossarm 2100. After the side-phase conductor 100 is connected to the hanging wire assembly 3000 on the side-phase composite crossarm 2200, the conductor 100 can be made lower than the side-phase node due to the lower drooping height of the hanging wire assembly 3000 relative to the side-phase node.

[0074] In one embodiment, in the direction from the edge phase node to the first curved arm 1210 or the second curved arm 1220, the height of the plurality of second inclined insulating rods 2210 gradually increases, and in the direction from the edge phase node to the first curved arm 1210 or the second curved arm 1220, the height of the plurality of second supporting insulating rods 2220 gradually decreases, thereby forming a Figure 3 The two side composite cross arms 2200 shown in FIG.

[0075] like Figure 3 As shown, in one embodiment, the side phase composite cross arm 2200 includes a side phase connection component 2230, and the side phase connection component 2230 is used to form a side phase node. Figure 5As shown, the side phase connection assembly 2230 includes a side phase node hardware 2231, a plurality of second inclined tie rod end hardware 2211 and a plurality of second support rod end hardware 2221, one end of the second inclined tie rod end hardware 2211 is detachably connected to the side phase node hardware 2231, the other end of each second inclined tie rod end hardware 2211 is connected to the end of a second inclined insulating rod 2210, one end of the second support rod end hardware 2221 is detachably connected to the side phase node hardware 2231, and the other end of each second support rod end hardware 2221 is connected to the end of a second support insulating rod 2220. In addition, those skilled in the art can also realize the connection between the side phase connection assembly 2230 and the second inclined insulating rod 2210 and the second support insulating rod 2220 through other detachable methods according to actual needs, which is not limited here.

[0076] For the same reason, the hanging wire assembly 3000 set on the side phase composite cross arm 2200 can also be designed to be shorter according to the requirements. The shorter hanging wire assembly 3000 can make the relative distance between the side phase conductor 100 and the side phase node closer, increase the distance between the side phase conductor 100 and the ground, and meet the requirement of increasing the ground clearance of the conductor 100 after boosting. Moreover, the smaller influence of the wind deviation on the length of the side phase composite cross arm 2200 makes the clearance between the conductor 100 and the main tower structure 100 after boosting still meet the requirements. Multiple second inclined insulating rods 2210 and multiple second support insulating rods 2220 are used to connect as the side phase node, which can meet the electrical clearance after boosting. The conductor 100 is connected to the side phase node through the hanging wire assembly 3000, which also raises the side phase conductor 100, and can also meet the requirement of increasing the ground clearance of the conductor 100 after boosting.

[0077] Therefore, in the structural design of the above-mentioned side-phase composite crossarm 2200 of the transmission tower, the side-phase composite crossarm 2200 can adjust and control the height of the side-phase node formed in the side-phase composite crossarm 2200 relative to the ground by adjusting the connection positions of all the second inclined insulating rods 2210 and all the second supporting insulating rods 2220 on the first curved arm 1210 and the second curved arm 1220, and at the same time adaptively adjusting the angles of all the second inclined insulating rods 2210 and all the second supporting insulating rods 2220 relative to the reference horizontal plane 1000a, and adaptively adjusting the hanging length of the hanging wire assembly 3000 to adjust the height of the side phase conductor 100 relative to the ground.

[0078] Based on the structural design of the side phase composite cross arm 2200, the original cross arm structure can be replaced on the main tower structure 1000 of the original transmission tower, and the cross arm structure can be replaced by the side phase composite cross arm 2200. Figures 1 to 3The modified side-phase composite cross arm 2200 shown in the figure adjusts the height of the side-phase conductor 100, so that the conductor 100 of the side phase can be raised without dismantling the original main tower structure 1000, thereby realizing the transmission tower modification of increasing voltage and capacity.

[0079] Continue reading Figure 4 In one embodiment, the hanging wire assembly 3000 includes a connecting fitting 3100 and a wire support 3200, one end of the connecting fitting 3100 is connected to the middle phase node fitting 2131, and the wire support 3200 is connected to the other end of the connecting fitting 3100, wherein the connecting fitting 3100 can be a connecting plate of fixed length, or can also be formed by a plurality of connecting plates fixedly connected in sequence. The connecting plate can be a PT adjustment plate, a parallel hanging plate, etc., and different connecting plates can be selected according to actual working conditions to be hinged into the connecting fitting 3100, so that it has different lengths to meet different wire height requirements to the ground. The wire support 3200 has a supporting inner cavity 3200a inside, and the supporting inner cavity 3200a is used to pass the wire 100. For example, the wire support 3200 can be a wire clamp having a supporting wire 100 and other similar structures that can support the wire 100, which are not limited here. Therefore, in order to stably pass the wire 100, the wire support 3200 can be designed to be straight and have a certain length. Therefore, the supporting inner cavity 3200a of the wire support 3200 is also adaptively presented as a straight inner cavity. The straight inner cavity has a straight trajectory. The wire 100 is movably passed through the supporting inner cavity 3200a along the straight trajectory of the supporting inner cavity 3200a, so that the wire 100 can be passed through the supporting inner cavity 3200a of the wire support 3200 along the length direction of the wire support 3200, and a stable package is formed based on the length design of the wire support 3200.

[0080] Moreover, if Figure 4 As shown, a curved portion 3210 is provided on at least one end of the wire support 3200 along the straight track. For example, curved portions 3210 are designed at both ends of the wire support 3200, wherein the curved portion 3210 gradually expands outward in a direction perpendicular to the straight track from the central position of the wire support 3200 to at least one end thereof. Figure 4 In the up and down direction shown in , the curved portion 3210 is in a gradually sagging state. Therefore, as the curved portion 3210 gradually sags, the conductor 100 can form a natural sag between the two transmission towers as the curved portion 3210 gradually sags, ensuring that the conductor 100 is not tight.

[0081] It can be understood that if there is no structural design of the curved portion 3210, the supporting inner cavity 3200a inside the conductor support 3200 is straight in the horizontal direction, and the conductor 100 will form a horizontally horizontal tight (straight) state between the two transmission towers. If the conductor 100 bends downward due to gravity, it will be damaged. Based on the structural design of the curved portion 3210, the conductor 100 will form an arc-shaped state with a droop in the middle between the two transmission towers, avoiding the conductor 100 from being damaged. Moreover, as the conductor 100 extends to the two ends of the conductor support 3200, the curved portions 3210 at the two ends of the conductor support 3200 can also avoid the conductor 100 to prevent the sharp ends from cutting the surface of the conductor 100.

[0082] Continue reading Figure 4 As shown, in one embodiment, the hanging wire assembly 3000 further includes a hanging element 3300 and a unit hanger 3400, the hanging element 3300 is connected to the other end of the connecting hardware 3100, the number of the unit hangers 3400 is configured to be at least two, and the plurality of unit hangers 3400 are respectively hinged to different positions of the hanging element 3300, such as Figure 4 As shown, the suspension element 3300 can adopt a structure such as a triangular connecting plate that can centrally connect several unit hangers 3400, which is not limited here. The number of wire supports 3200 is configured to be at least two, so each wire support 3200 can be connected to a unit hanger 3400, and then connected to the other end of the connecting hardware 3100 through the unit hanger 3400 and the suspension element 3300. At this time, multiple unit hangers 3400 can be set at the same time through the suspension element 3300, and multiple wire supports 3200 can be connected using multiple unit hangers 3400, so as to achieve multiple wires 100 hanging on the same hanging wire assembly 3000.

[0083] The middle phase node and the side phase node of the composite cross arm assembly 2000 are directly hung with the metal hanging wire assembly 3000, which bears the nominal voltage of the line. The protruding part is very likely to have electric field distortion, and there is a high probability of corona discharge, which affects the life of the hanging wire assembly 3000 and the quality of people's living environment. Figures 7 to 10 In the embodiment, a runway-shaped, semicircular, and other equalizing shielding rings are arranged on the outside of the hanging wire assembly 3000. The shielding rings have a large radius of curvature and a smooth metal surface, so that no extreme electric field distortion will be generated. Therefore, placing the shielding rings on the middle phase node and the side phase node can well cover the protruding metal surface underneath, making the electric field area around the middle phase node and the side phase node uniform, solving the above-mentioned problem. Among them, the shielding ring can be parallel to the cross arm direction or perpendicular to the cross arm direction, playing the same role, that is, preventing the metal fittings from generating corona and making the surrounding electric field area uniform.

[0084] Continue reading Figure 3As shown, in one embodiment, the main tower structure 1000 also includes a ground wire support 4000, and the ground wire support 4000 includes a first ground wire support 4100 and a second ground wire support 4200. The first ground wire support 4100 is arranged at the top of the first curved arm 1210, and the second ground wire support 4200 is arranged at the top of the second curved arm 1220. The top of the first ground wire support 4100 and the top of the second ground wire support 4200 are used to connect the ground wire. For the case of a higher boost voltage, the ground wire support 4000 can be raised, and the middle phase composite cross arm 2100 is appropriately moved up a certain height on the tower head 1200, and the space of the middle phase assembly space 1000b becomes larger, which can meet the requirements of a larger gap after boosting. At the same time, the side phase composite cross arm 2200 is moved up at the same time, and the three-phase conductors 100 are located on the same horizontal plane. The distance between the conductor 100 and the ground is increased to meet the distance requirement of the conductor 100 to the ground, and a higher voltage level boost is achieved.

[0085] Continue reading Fig.11 As shown, the construction method of the present application can be modified in the original main tower structure 1000 of the transmission tower. Therefore, the main tower structure 1000 provided by the present application is the same structure as the main tower structure 1000 of the transmission tower in the prior art, including the height, size and other minor differences of the tower body 1100, the tower head 1200 and the ground wire bracket 4000, which are all deemed to be the same structure as the main tower structure 1000.

[0086] Therefore, if Fig.11 As shown, the main modified parts of the transmission tower in the prior art are the middle phase bridge structure 10, the first side phase angle steel structure 20 and the second side phase angle steel structure 30 on the main tower structure 1000, wherein the middle phase bridge structure 10 is a cross arm structure for hanging the conductor 100 of the middle phase in the original transmission tower, and the middle phase bridge structure 10 needs to be modified and replaced with the middle phase composite cross arm 2100 of the transmission tower in the present application, the first side phase angle steel structure 20 and the second side phase angle steel structure 30 are cross arm structures for hanging the conductor 100 of the side phase in the original transmission tower, and the first side phase angle steel structure 2 0 and the second side phase angle steel structure 30 are respectively located on the left and right sides of the tower head 1200, so the first side phase angle steel structure 20 and the second side phase angle steel structure 30 need to be transformed and replaced with two side phase composite cross arms 2200 in this application which are also located on the left and right sides of the transmission tower. The two side phase composite cross arms 2200 can be respectively referred to as the first side phase composite cross arm 2200 and the second side phase composite cross arm 2200. The first side phase composite cross arm 2200 is used to replace the first side phase angle steel structure 20, and the second side phase composite cross arm 2200 is used to replace the second side phase angle steel structure 30.

[0087] Moreover, the modification process of the above transmission tower may involve the possibility of modifying the ground wire support. For example, when the lightning protection angle of the transmission tower changes and reinforcement is required on the basis of the original ground wire support, the ground wire support needs to be modified in a targeted manner. Those skilled in the art can modify according to actual needs, which is not limited here.

[0088] Based on the above transmission tower, the construction method for voltage-increasing and capacity-increasing transformation of the transmission tower provided in this application includes the following steps:

[0089] A temporary reinforcement device 200 is provided on the tower head 1200 of the transmission tower to be transformed, such as Fig.12 As shown, a temporary reinforcement device 200 is used to fix and support between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200. In this state, the middle phase bridge structure 10 originally located between the first curved arm 1210 and the second curved arm 1220 is removed. The function of the temporary reinforcement device 200 is to form a temporary support between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, replacing the original middle phase bridge structure 10, so that the overall structure before and after the transformation remains consistent and the stability of the overall structure is maintained.

[0090] Because the bottoms of the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 are connected to the tower body 1100, and the middle phase assembly space 1000b formed between the first curved arm 1210 and the second curved arm 1220 has a top space opening 1000c facing upward, so that the first curved arm 1210 and the second curved arm 1220 and the tower body 1100 form a structure similar to a "U" shape. Therefore, in order to ensure that the structure of the tower head 1200 is still stable after the middle phase bridge structure 10 is dismantled, the temporary reinforcement device 200 needs to be fixed and supported between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 before the middle phase bridge structure 10 is dismantled.

[0091] The temporary reinforcement device 200 can adopt various structures and adopt various connection methods to form a fixed support connection with the first curved arm 1210 and the second curved arm 1220 of the tower head 1200. For example, see Fig.12 As shown, the temporary reinforcement device 200 can be adopted as a crossbar structure, and the two ends of the crossbar structure can be threadedly connected to the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 respectively by means of threaded connection, or various connection methods such as strap connection, flange connection, cross plug plate connection, etc. can also be adopted. The crossbar structure adjusts the lateral length according to the lateral distance between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, so that the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 can be maintained in the original structural state under the fixed support of the crossbar structure, and no unexpected changes will occur before and after the demolition of the middle phase bridge structure 10.

[0092] In one embodiment, if Figures 13 to 16 As shown, the temporary reinforcement device 200 includes a reinforcement rod and an adjustment component. The reinforcement rod is a rod of fixed length. The adjustment component is arranged at one end of the reinforcement rod. The adjustment component can be used to adjust the length. Then, on the basis of the fixed length of the reinforcement rod, the overall length of the temporary reinforcement device 200 can be adjusted by adjusting the length of the adjustment component itself. The adjustment component may include an adjustment body, a first connection part, and a second connection part. The adjustment body may adopt a variety of retractable structures such as a hydraulic cylinder and a telescopic rod. Those skilled in the art may select a suitable retractable structure based on various factors such as actual pressure requirements and installation convenience, which are not limited here.

[0093] The first connection part and the second connection part are respectively arranged at the two ends of the adjustment body, and the adjustment body is connected to the end of the reinforcement rod through the first connection part, so that the adjustment body can be connected to the reinforcement rod, and the overall length of the temporary reinforcement device 200 can be increased on the fixed length of the reinforcement rod. The adjustment body is used to be connected to the tower head 1200 of the transmission tower through the second connection part. In addition, the reinforcement rod can be provided with a third connection part and a fourth connection part, and the reinforcement rod can be connected to the first connection part through the third connection part, and the reinforcement rod is used to be connected to the tower head 1200 of the transmission tower through the fourth connection part. For example, the adjustment body is connected to the first curved arm 1210 of the tower head 1200 through the second connection part, and the reinforcement rod is connected to the second curved arm 1220 of the tower head 1200 through the fourth connection part. The first connection part and the third connection part can adopt structures such as connection flanges, and the second connection part and the fourth connection part can adopt structures such as connection ears, which are not limited here.

[0094] Among them, the reinforcement rod and the adjustment component are detachably connected, and the cross-sectional shape of the reinforcement rod can be circular, or can be triangular, quadrilateral or other shapes, which are not limited here; according to different working conditions, a certain size of reinforcement rod can be selected to be connected with a certain type of adjustment component to form a temporary reinforcement device 200 that can meet load requirements, tower head size requirements and other requirements, thereby expanding the scope of application of the temporary reinforcement device 200.

[0095] In addition, the temporary reinforcement device 200 can also be constructed in various ways, such as force-bearing wires, oblique support rods, etc. When various forms are adopted, they all need to meet the force requirements, so that the overall structure of the transmission tower is stable and does not affect the installation of the middle-phase composite crossarm at the back. Those skilled in the art can set the structure of the temporary reinforcement device 200 according to actual needs, and no limitation is made here.

[0096] The temporary reinforcement device 200 is fixedly supported between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, and the middle phase bridge structure 10 originally located between the first curved arm 1210 and the second curved arm 1220 is removed. At this time, the transmission tower is in a state as shown in FIG. Fig.12 In this state, the assembled middle phase composite cross arm 2100 can be suspended and installed between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200. After the installation is completed, the temporary reinforcement device 200 fixedly supported between the first curved arm 1210 and the second curved arm 1220 is removed.

[0097] Among them, the assembly of the middle phase composite cross arm 2100 can be completed on the ground. Regarding the installation of the temporary reinforcement device 200, the temporary reinforcement device 200 can be installed first and then the middle phase bridge structure 10 can be dismantled. At this time, it is necessary to ensure that the installation of the temporary reinforcement device 200 does not interfere with the position of the dismantling of the middle phase bridge structure 10, or the middle phase bridge structure 10 can be dismantled first, and the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 can be hoisted by two cranes, and then the temporary reinforcement device 200 can be installed. At this time, the temporary reinforcement device 200 is installed at the original position of the middle phase bridge structure 10. Technical personnel in this field can choose the installation method according to actual needs, as long as it is ensured that before the middle phase composite cross arm 2100 is suspended, the transmission tower is in the following position: Fig.12 The state shown in the figure is sufficient, at which time the conditions for modifying and installing the middle phase composite crossarm 2100 can be met, thereby realizing the priority modification of the middle phase composite crossarm 2100.

[0098] During the installation and modification of the middle-phase composite crossarm 2100, a power outage is required. In one embodiment, before setting the temporary reinforcement device 200 on the tower head 1200 of the transmission tower to be modified, first ensure that the transmission tower to be modified has been powered off, and then remove the original middle-phase conductor and ground wire suspended from the transmission tower to be modified. This method is suitable for full-line modification. In another embodiment, before setting the temporary reinforcement device 200 on the tower head 1200 of the transmission tower to be modified, first ensure that the transmission tower to be modified has been powered off, and then lift the middle-phase conductor 100 and ground wire suspended from the transmission tower to be modified, so that the middle-phase conductor 100 and the ground wire are away from the transmission tower to be modified and the ground, and then set the temporary reinforcement device 200 on the tower head 1200 of the transmission tower to be modified. This method of suspension does not require the conductor 100 and the ground wire to be completely removed, and is therefore suitable for modifying a specific transmission tower or a transmission tower of a certain line.

[0099] During the process of installing the middle phase composite crossarm 2100 between the first curved arm 1210 and the second curved arm 1220, before suspending the middle phase composite crossarm 2100, a middle phase installation hole can be opened on the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, and then the assembled middle phase composite crossarm 2100 is suspended, and the middle phase composite crossarm 2100 is installed between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 by using the middle phase installation hole. For example, the middle phase composite crossarm 2100 is connected to the middle phase composite crossarm 2100 by connecting components such as threaded components and clamping components that can be inserted into the middle phase installation hole, so that the middle phase composite crossarm 2100 can be quickly installed between the first curved arm 1210 and the second curved arm 1220 with the help of the middle phase installation hole.

[0100] Alternatively, in one of the embodiments, before suspending the middle phase composite crossarm 2100, a middle phase erection plate may be provided on the first curved arm 1210 and the second curved arm 1220 of the tower head 1200, and then the assembled middle phase composite crossarm 2100 may be suspended, and the middle phase composite crossarm 2100 may be installed between the first curved arm 1210 and the second curved arm 1220 of the tower head 1200 using the middle phase erection plate. For example, the middle phase erection plate may be set to an adaptive shape, size, etc. according to the installation requirements of the middle phase composite crossarm 2100, and then the middle phase erection plate may be installed on the first curved arm 1210 and the second curved arm 1220, and an installation structure foundation suitable for installing the middle phase composite crossarm 2100 may be constructed on the first curved arm 1210 and the second curved arm 1220, so that the middle phase composite crossarm 2100 may be quickly installed between the first curved arm 1210 and the second curved arm 1220 with the aid of the middle phase erection plate.

[0101] The middle phase composite cross arm 2100 is suspended to a preset position by a suspension mechanism, and the suspension mechanism includes a drone or a crane or a helicopter or a pulley block. The suspension mechanism can be selected from one of the drones or cranes or helicopters or a pulley block, or several of them can be selected to achieve a stable suspension of the middle phase composite cross arm 2100. Of course, the suspension mechanism can also be other tools besides the above tools, which is not limited here. During the entire suspension process, since the middle phase composite cross arm 2100 has been assembled, the overall size is large, and the preset position is located between the first crank arm 1210 and the second crank arm 1220, the entire structure can be fixed with a windproof rope to prevent it from shaking during the suspension process, and then colliding with other structures on the tower head 1200 to cause damage.

[0102] After the middle phase composite cross arm 2100 is installed, the side phase composite cross arm 2200, i.e., the first side phase composite cross arm 2200 and the second side phase composite cross arm 2200 located on the left and right sides of the tower head 1200, can be installed. For example, in one embodiment, the first side phase angle steel structure 20 originally located at the first crank arm 1210 and the second side phase angle steel structure 30 originally located at the second crank arm 1220 need to be removed first, and the assembled first side phase composite cross arm 2200 and the second side phase composite cross arm 2200 are suspended, and the first side phase composite cross arm 2200 is installed on the outside of the first crank arm 1210, and the second side phase composite cross arm 2200 is installed on the outside of the second crank arm 1220. Among them, the assembly of the first side phase composite crossarm 2200 and the second side phase composite crossarm 2200 can be completed on the ground, and the assembly of the first side phase composite crossarm 2200 and the second side phase composite crossarm 2200, as well as the disassembly of the first side phase angle steel structure 20 and the second side phase angle steel structure 30 can all be carried out simultaneously, as long as the first side phase angle steel structure 20 and the second side phase angle steel structure 30 are in a state of being dismantled before the first side phase composite crossarm 2200 and the second side phase composite crossarm 2200 are suspended, the conditions for modifying and installing the side phase composite crossarm 2200 can be met at this time, and the modification and installation of the side phase composite crossarm 2200 can be realized.

[0103] During the installation and modification of the first side phase composite cross arm 2200 and the second side phase composite cross arm 2200, a power outage operation is required. In one embodiment, before dismantling the original first side phase angle steel structure 20 and the second side phase angle steel structure 30, first ensure that the power supply of the transmission tower to be modified has been cut off, and then remove the original side phase conductor suspended by the transmission tower to be modified. This method is suitable for the modification of the entire line. In another embodiment, before dismantling the original first side phase angle steel structure 20 and the second side phase angle steel structure 30, first ensure that the power supply of the transmission tower to be modified has been cut off, and then the side phase conductor 100 suspended by the transmission tower to be modified can be lifted away from the transmission tower to be modified and the ground, and then the first side phase composite cross arm 2200 is installed on the outside of the first curved arm 1210, and the second side phase composite cross arm 2200 is installed on the outside of the second curved arm 1220. This method of suspension does not require the conductor 100 and the ground wire to be completely removed, and is therefore suitable for modifying a specific transmission tower or a transmission tower of a certain line.

[0104] During the process of installing the first side phase composite crossarm 2200 and the second side phase composite crossarm 2200 on the first curved arm 1210 and the second curved arm 1220, before suspending the first side phase composite crossarm 2200 or the second side phase composite crossarm 2200, a first side phase mounting hole or a second side phase mounting hole can be respectively opened on the first curved arm 1210 or the second curved arm 1220 of the tower head 1200, and then the assembled first side phase composite crossarm 2200 is suspended, and the first side phase composite crossarm 2200 or the second side phase composite crossarm 2200 is respectively installed on the first curved arm 1210 or the second curved arm 1220 of the tower head 1200 by using the first side phase mounting hole or the second side phase mounting hole, for example, by connecting the first side phase composite crossarm 2200 or the second side phase composite crossarm 2200 to the first side phase composite crossarm 2200 or the second side phase composite crossarm 2200 through a threaded component, a clamping component or the like that can be inserted into the first side phase mounting hole or the second side phase mounting hole to achieve installation.

[0105] Alternatively, in one of the embodiments, before suspending the first side phase composite cross arm 2200 or the second side phase composite cross arm 2200, a first side phase mounting plate or a second side phase mounting plate may be arranged on the first curved arm 1210 or the second curved arm 1220 of the tower head 1200, and then the assembled first side phase composite cross arm 2200 or the second side phase composite cross arm 2200 is suspended, and the first side phase mounting plate or the second side phase mounting plate is used to install the first side phase composite cross arm 2200 or the second side phase composite cross arm 2200 on the first curved arm 1210 or the second curved arm 1220 of the tower head 1200. For example, the first side phase mounting plate or the second side phase mounting plate may be set to an adaptive shape, size, etc. according to the installation requirements of the first side phase composite cross arm 2200 or the second side phase composite cross arm 2200, thereby constructing an installation structure foundation suitable for installation, which is not limited here.

[0106] The first side composite cross arm 2200 or the second side composite cross arm 2200 is suspended to a preset position by a suspension mechanism, and the suspension mechanism includes a drone, a crane, a helicopter, or a pulley block. The suspension mechanism can be selected from one of the drone, the crane, the helicopter, or the pulley block, or can be selected from a plurality of combinations to achieve a stable suspension of the first side composite cross arm 2200 or the second side composite cross arm 2200. Of course, the suspension mechanism can also be other tools besides the above tools, which is not limited here.

[0107] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0108] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A construction method for voltage-boosting and capacity-increasing transformation of a transmission tower, characterized in that: The construction method for the voltage-boosting and capacity-increasing transformation of the transmission tower comprises the following steps: A temporary reinforcement device is arranged on the tower head of the transmission tower to be modified, and the temporary reinforcement device is used to fix and support between the first curved arm and the second curved arm of the tower head. In this state, the middle phase bridge structure originally located between the first curved arm and the second curved arm is removed; The assembled middle phase composite cross arm is suspended and installed between the first curved arm and the second curved arm of the tower head. After the installation is completed, the temporary reinforcement device fixedly supported between the first curved arm and the second curved arm is removed.

2. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 1 is characterized in that: Before the temporary reinforcement device is arranged on the tower head of the transmission tower to be modified, the transmission tower to be modified is placed in a state where a middle phase conductor and a ground wire are not hung.

3. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 1, characterized in that: Before the temporary reinforcement device is arranged on the tower head of the transmission tower to be modified, when the transmission tower to be modified is in a state of suspending a middle phase conductor and a ground wire, the construction method for voltage-increasing and capacity-increasing modification of the transmission tower comprises the following steps: The middle phase conductor and the ground wire of the transmission tower to be modified are suspended so that the middle phase conductor and the ground wire are away from the transmission tower to be modified and the ground, and then the temporary reinforcement device is arranged on the tower head of the transmission tower to be modified.

4. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 1 is characterized in that: Before suspending the middle phase composite crossarm, a middle phase mounting hole is opened on the first curved arm and the second curved arm of the tower head, and then the assembled middle phase composite crossarm is suspended, and the middle phase composite crossarm is installed between the first curved arm and the second curved arm of the tower head using the middle phase mounting hole.

5. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 1 is characterized in that: Before suspending the middle phase composite crossarm, a middle phase erection plate is arranged on the first curved arm and the second curved arm of the tower head, and then the assembled middle phase composite crossarm is suspended, and the middle phase composite crossarm is installed between the first curved arm and the second curved arm of the tower head using the middle phase erection plate.

6. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 1 is characterized in that: Dismantle the first side phase angle steel structure originally located at the first crank arm and the second side phase angle steel structure originally located at the second crank arm; The assembled first side phase composite cross arm and the second side phase composite cross arm are suspended, wherein the first side phase composite cross arm is installed on the outer side of the first curved arm, and the second side phase composite cross arm is installed on the outer side of the second curved arm.

7. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 6 is characterized in that: Before dismantling the original first side phase angle steel structure and the second side phase angle steel structure, the transmission tower to be transformed is placed in a state where no side phase conductors are hung.

8. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 6 is characterized in that: Before dismantling the original first side phase angle steel structure and the second side phase angle steel structure, when the transmission tower to be transformed is in a state of hanging side phase conductors, the construction method for voltage-increasing and capacity-increasing transformation of the transmission tower includes the following steps: The side phase conductor of the transmission tower to be modified is suspended away from the transmission tower to be modified and the ground, and then the first side phase composite cross arm is installed on the outer side of the first curved arm, and the second side phase composite cross arm is installed on the outer side of the second curved arm.

9. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 6, characterized in that: Before suspending the first side phase composite cross arm, a first side phase mounting hole is opened on the first curved arm of the tower head, and then the assembled first side phase composite cross arm is suspended, and the first side phase composite cross arm is installed on the first curved arm of the tower head by using the first side phase mounting hole; and / or, Before suspending the second side phase composite cross arm, a second side phase mounting hole is opened on the second curved arm of the tower head, and then the assembled second side phase composite cross arm is suspended, and the second side phase composite cross arm is installed on the second curved arm of the tower head using the second side phase mounting hole.

10. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 6, characterized in that: Before suspending the first side phase composite cross arm, a first side phase erection plate is arranged on the first curved arm of the tower head, and then the assembled first side phase composite cross arm is suspended, and the first side phase composite cross arm is installed on the first curved arm of the tower head by using the first side phase erection plate; and / or, Before suspending the second side phase composite cross arm, a second side phase erection plate is arranged on the second curved arm of the tower head, and then the assembled second side phase composite cross arm is suspended, and the second side phase composite cross arm is installed on the second curved arm of the tower head by using the second side phase erection plate.

11. The construction method for voltage-boosting and capacity-increasing transformation of a transmission tower according to claim 6, characterized in that: The middle phase composite cross arm, the first side phase composite cross arm and the second side phase composite cross arm are suspended to a preset position by a suspension mechanism, and the suspension mechanism includes a drone, a crane, a helicopter or a pulley block.

Citation Information

Patent Citations

  • Ice-resisting and strengthening reconstruction method of existing power transmission tower

    CN101781937A

  • Wind resistance and reinforcement transformation method of high-voltage and superhigh-voltage power transmission line iron tower

    CN102535874A

  • Novel wine glass composite material tower

    CN103122723A

  • Tower head of power transmission tower, and power transmission tower

    WO2018059190A1

Cited By

  • Voltage uprating and capacity expansion method and transmission tower

    WO2026032401A1