Energy-saving control method and system for data center
By preprocessing and clustering analysis of the historical operation data of the data center, the energy consumption interval range is updated in real time, and energy consumption control is controlled using the thermal management system, the lag problem of energy saving control in the existing technology is solved and energy consumption is improved Control accuracy and responsiveness.
Patent Information
- Application Number
- CN202411072896.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, there is a lag in energy-saving control of the main equipment of the data center, which reduces the accuracy of energy-saving control.
By collecting historical operation data of the data center for preprocessing and clustering analysis, the energy-saving interval, regulation interval and alarm interval of the main equipment operating temperature are determined, and the real-time energy consumption data and historical energy consumption data are compared in real time, and the log data is updated to determine The interval range is used to perform corresponding energy consumption control operations using the thermal management system.
It improves the accuracy of energy consumption control in data centers, avoids the lag of energy-saving control, and enhances the ability to respond to the real-time state of data centers.
Smart Images

Figure CN118981618A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of data centers, and more specifically, to an energy-saving control method and system for data centers. Background Art
[0002] In recent years, with the continuous expansion of the application fields of big data technology, the number of data centers has also increased year by year. Traditional data centers, as large energy consumers with low energy utilization rates, face major challenges in achieving energy conservation and environmental protection. Under the influence of the current low-carbon development concept, how to make data centers more energy-efficient has become a hot research issue.
[0003] In the prior art, an overcooling method is usually used for cooling, that is, increasing the air supply volume and lowering the air supply temperature, and high-intensity air conditioning cooling is performed until the operating temperature of the main equipment in the data center reaches its most suitable operating temperature to achieve control of the operating temperature environment of the main equipment in the data center, so as to ensure that the main equipment in the data center maintains a stable and reliable working environment. In order to meet the indoor temperature requirements, the data center can adopt a full-day cooling method to cool the main equipment, but this method will undoubtedly consume huge energy and cause a lot of energy waste. In order to reduce energy consumption, the operating data of the data center can also be observed over a period of time. The various control parameters that achieve the lowest energy consumption state of the data center under different working conditions can be calculated, and the main equipment of the data center can be controlled by the control parameters to achieve energy-saving effects. However, there is a certain lag in the energy-saving control of the main equipment of the data center according to the control parameters, which reduces the accuracy of the energy-saving control of the data center. Summary of the invention
[0004] The embodiments of the present application provide a data center energy-saving control method and system to solve the technical problem in the prior art that energy-saving control of data center main equipment based on control parameters has a certain lag, thereby reducing the accuracy of data center energy-saving control.
[0005] In order to solve the above technical problems, this application adopts the following technical solutions:
[0006] In a first aspect, the present application provides a data center energy-saving control method, comprising the following steps:
[0007] Collect historical operation data of the data center, generate corresponding log data, perform noise reduction on the log data to obtain preprocessed data, perform clustering and clustering processing on the preprocessed data to obtain cluster analysis results, and determine the energy-saving interval, control interval and alarm interval of the operating temperature value of the main equipment of the data center according to the cluster analysis results;
[0008] Acquire the real-time operation data of the data center, compare the real-time energy consumption data of the data center with the maximum and minimum values of the historical energy consumption data of the data center in the log data, and when the real-time energy consumption is greater than the maximum value or less than the minimum value, transmit the real-time operation data of the data center to the log data for updating, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data;
[0009] The thermal management system compares the main equipment operating temperature data with the energy-saving interval, control interval and alarm interval, determines the interval range of the main equipment operating temperature and performs corresponding operations.
[0010] In some embodiments, a recursive filtering algorithm is used to perform noise reduction processing on the generated log data to remove noise, thereby obtaining preprocessed data, and a K-means clustering analysis algorithm is used to perform clustering processing on the preprocessed data.
[0011] In some embodiments, the operating temperature of the main equipment in the data center is detected in real time by a temperature sensor.
[0012] In some embodiments, the real-time energy consumption of the data center is detected by energy consumption meters.
[0013] In some embodiments, when the real-time energy consumption data of the data center is within the range of historical energy consumption data, the operating temperature data of the main equipment of the data center is directly compared with the energy-saving interval, the control interval and the alarm interval through the thermal management system.
[0014] In some embodiments, the thermal management system determines the range of the operating temperature of the main equipment of the data center based on the comparison results, and executes the energy consumption control operation corresponding to the range. When the operating temperature value of the data center is in the energy-saving range, the existing output temperature of the thermal management system is maintained. When the operating temperature value of the data center is in the regulation range, the output temperature is regulated by the thermal management system. When the operating temperature value of the data center is in the alarm range, the output temperature of the thermal management system is regulated and an alarm message is sent to the management personnel through the thermal management system while executing the regulation of the thermal management system's output temperature.
[0015] In some embodiments, when the operating temperature value of the main equipment of the data center is not in the energy-saving range, the output temperature is controlled by the thermal management system, and the temperature output value of the output regulated by the thermal management system is determined according to the following formula:
[0016]
[0017] Where p(t) is the temperature output value of the heat treatment system at time t, err(t) is the temperature error at time t, is the differential of the error err(t), which indicates the rate of change of the error, k p is the proportional gain, k i is the integral gain, k d is the differential gain.
[0018] In a second aspect, the present application provides a data center energy-saving control system, which includes:
[0019] A temperature range determination module is used to collect historical operating data of the data center, generate corresponding log data, perform noise reduction on the log data to obtain pre-processed data, perform clustering and clustering processing on the pre-processed data to obtain cluster analysis results, and determine the energy-saving range, control range and alarm range of the operating temperature value of the main equipment of the data center according to the cluster analysis results;
[0020] A log data update processing module is used to obtain the real-time energy consumption data of the data center, compare the real-time energy consumption data of the data center with the historical energy consumption data of the data center in the log data, and when the real-time energy consumption of the data center is not within the range of the historical energy consumption data, send the real-time energy consumption data of the data center to the log system to update the log data, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data;
[0021] The energy consumption control module is used to compare the operating temperature data of the main equipment of the data center with the energy-saving interval, the regulation interval and the alarm interval through the thermal management system, determine the interval range of the operating temperature of the main equipment of the data center, and execute the energy consumption control operation corresponding to the interval.
[0022] In a third aspect, the present application provides a computer device, comprising a memory and a processor, wherein the memory stores codes, and the processor is configured to obtain the codes and execute any of the above-described energy-saving control methods for a data center.
[0023] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, wherein the computer program, when executed by a processor, implements any of the above-mentioned energy-saving control methods for a data center.
[0024] The technical solution provided by the embodiments disclosed in this application has the following beneficial effects:
[0025] In the data center energy-saving control method and system disclosed in the present application, first, historical operation data of the data center is collected to obtain log data. In order to improve the reliability and availability of the data, the log data is preprocessed, and different operation intervals of the data center are determined by classifying the preprocessed data. When the data center is working, the real-time operation data of the data center is detected, and the transmission object of the data is determined after comparing the real-time energy consumption data of the data center with the log data, and then it is determined whether the real-time operation data is fed back to the log data for updating or directly processed by the thermal management system. If the data is fed back to the log data for updating, the updated preprocessing is classified to obtain new different operation intervals of the data center. If it is processed by the thermal management system, the interval range of the operating temperature of the main equipment is determined and the corresponding operation is performed. In the above scheme, the real-time operation data of the data center is compared with the historical operation data, and the log data is continuously updated, so that the interval division calculated according to the new log data can more accurately reflect the real-time status of the existing equipment, which can avoid the problem that there is a certain lag in the energy-saving control of the main equipment of the data center according to the control parameters, which affects the final energy-saving control effect, and can improve the accuracy of the energy consumption control of the data center. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is an exemplary flow chart of an energy-saving control method for a data center according to some embodiments of the present application;
[0027] Figure 2 is a schematic diagram of exemplary hardware and / or software of an energy-saving control system for a data center according to some embodiments of the present application;
[0028] Figure 3 It is an exemplary structural diagram of a computer device for implementing an energy-saving control method for a data center according to some embodiments of the present application. DETAILED DESCRIPTION
[0029] The present application provides a data center energy-saving control method and system, the core of which is to collect historical operation data of the data center, generate corresponding log data, perform noise reduction on the log data to obtain pre-processed data, perform clustering and clustering processing on the pre-processed data to obtain clustering analysis results, determine the energy-saving interval, control interval and alarm interval of the operating temperature value of the main equipment of the data center according to the clustering analysis results, obtain the real-time operation data of the data center, compare the real-time energy consumption data of the data center with the maximum value and minimum value of the historical energy consumption data of the data center in the log data, when the real-time energy consumption is greater than the maximum value or less than the minimum value, transmit the real-time operation data of the data center to the log data for updating, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data, and compare the main equipment operating temperature data with the above-mentioned energy-saving interval, control interval and alarm interval by the thermal management system, judge the interval range of the main equipment operating temperature and perform corresponding operations.
[0030] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 , which is an exemplary flow chart of a data center energy-saving control method according to some embodiments of the present application. The data center energy-saving control method 100 mainly includes the following steps:
[0031] In step 101, historical operating data of the data center is collected to generate corresponding log data, the log data is denoised using a filtering algorithm to obtain preprocessed data, the preprocessed data is clustered, and the energy-saving interval, control interval and alarm interval of the operating temperature value of the main equipment of the data center are determined based on the analysis results after clustering.
[0032] In some embodiments, a recursive filtering algorithm is used to perform noise reduction processing on the generated log data to remove noise, thereby obtaining preprocessed data, and a K-means clustering analysis algorithm is used to perform clustering processing on the preprocessed data.
[0033] In specific implementation, when establishing log data, the historical operation data collected includes the operating temperature value of the main equipment and the real-time data center energy consumption value under the operating temperature value of the main equipment. Since the historical operation data collected in some extreme cases is relatively abnormal and does not have the value of finally determining different working intervals, the log data should be processed by filtering algorithm for noise reduction. In this application, the noise reduction process is divided into a prediction stage and a correction stage. In the prediction stage, the measurement equation and the state equation are used for calculation. When filtering the linear system, the measurement equation and the state equation are:
[0034] X k+1 =α kX k +A k
[0035] Z k =β k X k +B k
[0036] Among them, X k represents the state vector of the m×1-dimensional system, X k+1 is the state vector of the system at time k+1, α k It represents the state transfer matrix of m×m dimensions, A k is the noise of the state prediction quantity that conforms to the normal distribution N(0,Q), Z k is the measurement value of the n×1-dimensional system, β k is the measurement matrix of the n×n dimensional measurement function, B k is the noise of the measurement value of the system that conforms to the normal distribution N(0,R).
[0037] Expand and simplify the above measurement equation and state equation to obtain the prediction equation:
[0038]
[0039]
[0040] in, is the predicted value of the system state, α k It represents the state transfer matrix of m×m dimensions, T represents the transpose of the matrix, is the estimated value of the system state, P k is the covariance matrix of the estimate errors, is the covariance matrix of the estimated value error at time k+1, Q k is the noise covariance matrix of the process at time k.
[0041] The correction equation can be transformed into:
[0042]
[0043]
[0044]
[0045] in, is the predicted value of the system state at time k+1, is the predicted value of the covariance matrix of the estimated value error at time k+1, is the estimated value of the system state at time k+1, P k+1is the covariance matrix of the estimated value error at time k+1, I is the identity matrix, R k+1 is the k+1 time prediction noise covariance matrix, Z k+1 is the predicted value of the n×1-dimensional system at time k+1, β k+1 is the prediction matrix of the n×n-dimensional prediction function at time k+1, T represents the transpose of the matrix, K k+1 represents the Kalman gain of the system at time k+1.
[0046] Through the dynamic characteristics of the system and the update of measurement data, the prediction phase and correction phase processes are repeated to obtain a continuous estimate of the system state and complete the preprocessing of historical operation data.
[0047] It should be noted that after the preprocessing of the historical operation data is completed, the data is clustered using a cluster analysis method based on the preprocessed data. Based on the clustering results of the clustering analysis, the analysis results after clustering of the data center can divide different clusters into three intervals.
[0048] In specific implementation, the pre-processed data of the log system can be clustered according to the K-means clustering algorithm to obtain different temperature value clusters, and the energy-saving interval, control interval and alarm interval of the main equipment operating temperature value can be divided according to different temperature value clusters.
[0049] In some embodiments, the preprocessed data is divided into K classes, and the value of K is set to 3. Three cluster centers are randomly selected, and the Euclidean distances between the data point and all the cluster centers are calculated. Each data point is classified into the cluster to which the cluster center with the closest Euclidean distance belongs. The calculation formula of the Euclidean distance in this embodiment is:
[0050]
[0051] Wherein, d(x, y) is the Euclidean distance between two data objects x and y, and in this embodiment, x i is the i-th data object, y i is the cluster center of the cluster, and n is the dimension of the data object.
[0052] After clustering is completed, the mean of the data of each cluster is calculated and the mean is defined as the new cluster center. The formula of the new cluster center is as follows:
[0053]
[0054] Among them, y represents the new cluster center, S represents the number of data points assigned to the cluster center y, and sum(x) represents the sum of the feature vectors x of all data points assigned to the cluster center y.
[0055] After determining the new cluster center, the present application continues to calculate the Euclidean distance between the data point and the new cluster center, re-clustering and calculating the mean of the data of each new cluster, and repeats the process until the cluster center of each cluster no longer changes significantly, and finally obtains the clustering result of the preprocessed data. The clustering result divides the energy consumption mode of the data center into three intervals according to the operating temperature value of the main equipment, namely: energy-saving interval, control interval and alarm interval.
[0056] In some embodiments, for example, the clustering results of the operating temperature of the main equipment in the data center are mode one: 20 degrees to 40 degrees, and the corresponding clustering center of the energy consumption data is 50kw; mode two: 40 degrees to 60 degrees, and the corresponding clustering center of the energy consumption data is 70kw; mode three: 60 degrees to 80 degrees, and the corresponding clustering center of the energy consumption data is 100kw; thus, it can be determined that the energy-saving interval is 20 degrees to 40 degrees, the control interval is 40 degrees to 60 degrees, and the alarm interval is 60 degrees to 80 degrees, which will not be repeated here.
[0057] In step 102, the real-time energy consumption data of the data center is obtained, and the real-time energy consumption data of the data center is compared with the historical energy consumption data of the data center in the log data. When the real-time energy consumption of the data center is not within the range of the historical energy consumption data, the real-time energy consumption data of the data center is sent to the log system to update the log data, and the energy-saving interval, control interval and alarm interval range of the main equipment operating temperature value of the data center are re-determined based on the updated log data.
[0058] In the specific implementation, it is necessary to collect real-time operation data of the data center, compare the real-time energy consumption data in the real-time operation data with the range of historical energy consumption data of the data center in the log system, determine whether the data is lower than or exceeds the range of historical energy consumption data in the log system, and decide the next processing steps for the real-time operation data of the data center based on the judgment result.
[0059] In some embodiments, the real-time energy consumption of the data center is detected by energy consumption meters.
[0060] In some embodiments, a maximum value WMAX or a minimum value WMIN of historical energy consumption data in the log system may be used to compare with the real-time energy consumption data, where W represents the real-time energy consumption data of the data center at a certain moment.
[0061] If W > WMAX or W < WMIN, the judgment result is yes. Transmit the real-time operation data back to the log data, and repeat the processing procedures of step 101 and step 102 after updating the log data. Finally, obtain a new energy-saving range, regulation range, and alarm range, and then compare the real-time main device operation temperature value with the new energy-saving range, regulation range, and alarm range to determine the corresponding range, and transmit the result to the thermal management system for processing.
[0062] If WMIN < W < WMAX, the judgment result is no. Compare the real-time main device operation temperature value with the existing energy-saving range, regulation range, and alarm range to determine the corresponding range, and transmit the result to the thermal management system for processing.
[0063] In some embodiments, for example, the real-time energy consumption data W of the data center at a certain moment is 48 kw, and the minimum value WMIN of the historical energy consumption data in the log system is 50 kw. Since W < WMIN, the judgment result is yes, and the real-time data at this time is transmitted to the log data for updating.
[0064] In step 103, compare the main device operation temperature data of the data center with the energy-saving range, regulation range, and alarm range through the thermal management system to judge the range where the main device operation temperature of the data center is located, and execute the energy consumption control operation corresponding to this range.
[0065] In some embodiments, the operation temperature of the main device of the data center is detected in real time through a temperature sensor.
[0066] When specifically implemented, when the real-time energy consumption data of the data center is within the range of the historical energy consumption data, directly compare the main device operation temperature data of the data center with the energy-saving range, regulation range, and alarm range through the thermal management system.
[0067] In some embodiments, when the operation temperature value of the main device of the data center is not within the energy-saving range, control the output temperature through the thermal management system, and the temperature output value regulated by the thermal management system is determined according to the following formula.
[0068]
[0069] Where p(t) is the temperature output value of the heat treatment system at time t, err(t) is the temperature error at time t, is the differential of the error err(t), representing the change rate of the error, k p is the proportional gain, k i is the integral gain, k d is the differential gain.
[0070] Specifically, it can be seen that the temperature output value of the thermal management system can be obtained by the deviation value of the current system and the input value deviation of the previous two moments, which can be expressed as:
[0071] p(t)=p(t-1)+Δp(t)
[0072] Among them, k p is the proportional gain, k i is the integral gain, k d is the differential gain, err(t-1) is the error of the previous sampling at the t-th sampling, err(t-2) is the error of the previous sampling at the t-1-th sampling, T is the sampling period, p(t) is the temperature output value of the thermal management system at the t-th sampling, p(t-1) is the temperature output value of the thermal management system at the previous sampling at the t-th sampling, and Δp(t) is the difference between the temperature output value of the thermal management system at the t-th sampling and the temperature output value of the thermal management system at the previous sampling.
[0073] In some embodiments, the thermal management system determines the range of the operating temperature of the main equipment of the data center based on the comparison results, and executes the energy consumption control operation corresponding to the range. When the operating temperature value of the data center is in the energy-saving range, the existing output temperature of the thermal management system is maintained. When the operating temperature value of the data center is in the regulation range, the output temperature is regulated by the thermal management system. When the operating temperature value of the data center is in the alarm range, the output temperature of the thermal management system is regulated and an alarm message is sent to the management personnel through the thermal management system while executing the regulation of the thermal management system's output temperature.
[0074] In some embodiments, for example, when the operating temperature value of the main device is in the alarm range, while using the above-mentioned control method to adjust the output temperature value of the thermal management system, a high energy consumption alarm signal is sent to the data center manager, who will investigate the cause of the high energy consumption of the data center.
[0075] In addition, in some embodiments, reference Figure 2 , which is a schematic diagram of exemplary hardware or software of an energy-saving control system for a data center according to some embodiments of the present application. The energy-saving control system 200 for a data center in this embodiment may include: a temperature range determination module 201, a log data update processing module 202 and an energy consumption control module 203, which are described as follows:
[0076] The temperature range determination module 201 in the present application is mainly used to collect historical operation data of the data center, generate corresponding log data, perform noise reduction on the log data to obtain pre-processed data, perform clustering and clustering processing on the pre-processed data to obtain clustering analysis results, and determine the energy-saving interval, control interval and alarm interval of the operating temperature value of the main equipment of the data center according to the clustering analysis results;
[0077] The log data update processing module 202 in the present application is mainly used to obtain the real-time energy consumption data of the data center, compare the real-time energy consumption data of the data center with the historical energy consumption data of the data center in the log data, and when the real-time energy consumption of the data center is not within the range of the historical energy consumption data, send the real-time energy consumption data of the data center to the log system to update the log data, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data;
[0078] Energy consumption control module 203. In the present application, energy consumption control module 203 is mainly used to compare the operating temperature data of the main equipment of the data center with the energy-saving interval, regulation interval and alarm interval through the thermal management system, determine the interval range of the operating temperature of the main equipment of the data center, and execute the energy consumption control operation corresponding to the interval.
[0079] In some embodiments, the present application also provides a computer device, which includes a memory and a processor, wherein the memory stores codes, and the processor is configured to obtain the codes and execute the above-mentioned energy-saving control method for the data center.
[0080] In some embodiments, reference Figure 3 , which is a schematic diagram of the structure of a computer device for implementing the energy-saving control method of a data center according to some embodiments of the present application. The energy-saving control method of the data center in the above embodiment can be achieved by Figure 3 The computer device 300 shown in the figure is implemented, and the computer device 300 includes at least one processor 301, a communication bus 302, a memory 303 and at least one communication interface 304.
[0081] The processor 301 may be a general-purpose central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more processors for controlling the execution of the data center energy-saving control method in the present application.
[0082] Communication bus 302 may include a pathway for transmitting information between the above-mentioned components.
[0083] The memory 303 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a disk or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory 303 may exist independently and be connected to the processor 301 via the communication bus 302. The memory 303 may also be integrated with the processor 301.
[0084] The memory 303 is used to store the program code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the program code stored in the memory 303. The program code may include one or more software modules. The energy-saving control method of the data center in the above embodiment can be implemented by the processor 301 and one or more software modules in the program code in the memory 303.
[0085] The communication interface 304 uses any transceiver or other device for communicating with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area networks (WLAN), etc.
[0086] In a specific implementation, as an embodiment, a computer device may include multiple processors, each of which may be a single-CPU processor or a multi-CPU processor. The processor here may refer to one or more devices, circuits, and / or processing cores for processing data (e.g., computer program instructions).
[0087] The above-mentioned computer device can be a general-purpose computer device or a special-purpose computer device. In a specific implementation, the computer device can be a desktop computer, a portable computer, a network server, a personal digital assistant (PDA), a mobile phone, a tablet computer, a wireless terminal device, a communication device or an embedded device. The embodiment of the present application does not limit the type of computer device.
[0088] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0089] For example, in some embodiments, the present application also provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the energy-saving control method of the data center described above is implemented.
[0090] The present application is described by flowcharts and / or block diagrams of the methods, devices (systems), and computer program products of the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0091] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0092] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0093] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0094] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A data center energy saving control method, characterized in that: The steps include: Collecting historical operation data of the data center to generate corresponding log data, performing noise reduction on the log data to obtain preprocessed data, performing clustering and clustering processing on the preprocessed data to obtain cluster analysis results, and determining energy-saving intervals, control intervals, and alarm intervals of operating temperature values of main equipment of the data center according to the cluster analysis results; Acquire the real-time energy consumption data of the data center, compare the real-time energy consumption data of the data center with the historical energy consumption data of the data center in the log data, and when the real-time energy consumption of the data center is not within the range of the historical energy consumption data, send the real-time energy consumption data of the data center to the log system to update the log data, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data; The thermal management system compares the operating temperature data of the main equipment of the data center with the energy-saving interval, the control interval and the alarm interval to determine the interval range of the operating temperature of the main equipment of the data center and execute the energy consumption control operation corresponding to the interval.
2. The method according to claim 1, characterized in that The generated log data is subjected to denoising processing using a recursive filtering algorithm to remove noise, thereby obtaining preprocessed data, and the preprocessed data is subjected to clustering processing using a K-means clustering analysis algorithm.
3. The method according to claim 1, characterized in that The temperature sensor is used to detect the operating temperature of the main equipment in the data center in real time.
4. The method according to claim 1, characterized in that The real-time energy consumption of the data center is detected through energy consumption meters.
5. The method according to claim 1, characterized in that When the real-time energy consumption data of the data center is within the range of historical energy consumption data, the operating temperature data of the main equipment of the data center is directly compared with the energy-saving interval, the control interval and the alarm interval through the thermal management system.
6. The method according to claim 5, characterized in that The thermal management system determines the range of the operating temperature of the main equipment of the data center based on the comparison result, and executes the energy consumption control operation corresponding to the range. When the operating temperature value of the data center is in the energy-saving range, the existing output temperature of the thermal management system is maintained. When the operating temperature value of the data center is in the regulation range, the output temperature is regulated by the thermal management system. When the operating temperature value of the data center is in the alarm range, the output temperature of the thermal management system is regulated and an alarm message is sent to the management personnel through the thermal management system while executing the regulation of the output temperature of the thermal management system.
7. The method according to claim 6, characterized in that When the operating temperature value of the main equipment of the data center is not in the energy-saving range, the output temperature is controlled by the thermal management system, and the temperature output value of the thermal management system is determined according to the following formula: Where p(t) is the temperature output value of the heat treatment system at time t, err(t) is the temperature error at time t, is the differential of the error err(t), which indicates the rate of change of the error, k p is the proportional gain, k i is the integral gain, k d is the differential gain.
8. A data center energy-saving control system, characterized in that: include; A temperature range determination module is used to collect historical operating data of the data center, generate corresponding log data, perform noise reduction on the log data to obtain pre-processed data, perform clustering and clustering processing on the pre-processed data to obtain cluster analysis results, and determine the energy-saving range, control range and alarm range of the operating temperature value of the main equipment of the data center according to the cluster analysis results; A log data update processing module is used to obtain the real-time energy consumption data of the data center, compare the real-time energy consumption data of the data center with the historical energy consumption data of the data center in the log data, and when the real-time energy consumption of the data center is not within the range of the historical energy consumption data, send the real-time energy consumption data of the data center to the log system to update the log data, and re-determine the energy-saving interval, control interval and alarm interval range of the operating temperature value of the main equipment of the data center according to the updated log data; The energy consumption control module is used to compare the operating temperature data of the main equipment of the data center with the energy-saving interval, the regulation interval and the alarm interval through the thermal management system, determine the interval range of the operating temperature of the main equipment of the data center, and execute the energy consumption control operation corresponding to the interval.
9. A computer device, characterized in that: The computer device includes a memory and a processor, the memory stores codes, and the processor is configured to obtain the codes and execute the energy-saving control method for a data center according to any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the energy-saving control method for a data center as described in any one of claims 1 to 7 is implemented.