Station cable laying path addressing method and system based on source load vector
By using a source-load vector-based method in the power cable design of railway stations, the three-dimensional cable laying path is simplified into two-dimensional virtual path lines, which solves the problems of low efficiency and error-prone cable design in three-dimensional space, and achieves more efficient and Accurate cable path planning.
Patent Information
- Application Number
- CN202410993449.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-19
AI Technical Summary
In the design of power cables at railway stations, when the prior art performs relative position analysis and path planning of equipment and cable laying channels in three-dimensional space, there are problems such as low efficiency, time-consuming and error-prone, especially in medium and large stations. Cable engineering design.
Using the method based on the source load vector, the cable laying path in three-dimensional space is simplified into a virtual path line through two-dimensional projection, the source load vector is constructed and the intersection point with the cable laying channel is judged, and the cable laying path is planned according to different working conditions. Map the two-dimensional path information back to three-dimensional space.
It effectively improves the BIM design efficiency of power cables at railway stations, reduces the error rate and time-consuming of manual design, and improves the accuracy and design efficiency of cable path planning.
Smart Images

Figure CN118981817A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway station power cable design, and in particular to a station cable laying path addressing method and system based on source-load vector. Background Art
[0002] Railway station power cables mainly include power through-line cable lines, substation power lines and station feeder lines. They can be divided into high-voltage power cables and low-voltage power cables in terms of voltage level. The main laying methods of station power cables include direct burial underground, laying in cable trenches, laying in cable troughs and laying in drainage pipes. With the development of digital technology, the field of railway engineering design has also ushered in new developments. Based on traditional CAD design technology, BIM design technology has begun to become a key development direction. BIM design technology delivers BIM three-dimensional models, which is conducive to construction simulation and detailed design. It has technical advantages for design and construction scenarios such as cable laying that are prone to errors and omissions.
[0003] At present, when designing power cables in stations through BIM technology, designers need to first design the main channel for cable laying. The channel is the main carrier for cable laying, and the main types include cable trenches, cable troughs, and pipes. After the main cable laying channel is manually designed, the main electrical equipment is placed. Next, the designer determines the location of a certain electrical equipment and the power supply equipment for the equipment, and determines whether the power supply cable for the equipment can be laid using the main channel. Finally, the cable laying path is manually planned. In the above typical railway station power cable design scenario, compared with traditional two-dimensional design, the use of computers in three-dimensional space to compare and analyze the relative positions of equipment and the main cable laying channel, and to calculate the intersection of points, lines, surfaces, and entities in three-dimensional space is limited by the accuracy of computer data processing, which is more difficult and time-consuming, and there is no mature technical standard. This process still requires designers to make manual design based on their experience and judgment, which affects the improvement of the BIM design efficiency of railway station power cables, especially for the cable engineering design of medium and large stations, which is time-consuming and prone to errors. Summary of the invention
[0004] The present application provides a method and system for addressing a station cable laying path based on a source-load vector, so as to solve the problems of low efficiency, long time consumption and easy error in the existing railway station power cable design using computers in three-dimensional space.
[0005] According to the first aspect, an embodiment provides a method for addressing a cable laying path of a station based on a source-load vector, the method comprising:
[0006] The railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane using its cable access point or exit point as a key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, wherein the electrical equipment includes power loads and power supplies;
[0007] Connect the key base points of the power load and its power supply in sequence to construct a source-load vector, where the starting point of the source-load vector is the key base point of the power supply and the end point is the key base point of the power load, and obtain the intersection points and the number of intersection points of the source-load vector and the virtual path line;
[0008] According to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, a plurality of working conditions are obtained, and it is judged whether the power cable starting from the power supply source to the power load under different working conditions can be laid using the main cable laying channel;
[0009] Based on the judgment results, the cable laying path is planned and addressed for different working conditions to obtain two-dimensional path information, and the two-dimensional path information is mapped to three-dimensional space.
[0010] Furthermore, the railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including:
[0011] The three-dimensional BIM model of the station is projected onto a two-dimensional plane to obtain only a simplified two-dimensional projection outline graphic.
[0012] Furthermore, the railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including:
[0013] The cable entry or exit points of the main electrical equipment arranged in the three-dimensional BIM model of the station are used as the key base points of the electrical equipment, and the key base points of the electrical equipment are projected into the two-dimensional projection contour graphic according to their relative positions in the three-dimensional model of the station.
[0014] Furthermore, the railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including:
[0015] The main cable laying channel designed in the three-dimensional model of the station is simplified from a three-dimensional solid model to a virtual path line, and is projected into a two-dimensional projection contour graphic according to the relative position of the virtual path line in the three-dimensional model of the station, wherein the portion exceeding the two-dimensional projection contour of the station is not stored. The virtual path line is the center line of the projection graphic of the main cable laying channel on the two-dimensional plane.
[0016] Furthermore, according to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, a plurality of working conditions are obtained, and it is judged whether the power cable starting from the power supply source to the power load under different working conditions can be laid using the main cable laying channel, specifically including:
[0017] Case 1: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main cable laying channel;
[0018] Case 2: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N=2, the power cable starting from the power supply source i and ending at the power load j can be laid using the main channel;
[0019] Case 3: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main channel;
[0020] Case 4: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=2, the power cable starting from the power supply source i and ending at the power load j can be laid using the main channel;
[0021] Case 5: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main channel;
[0022] Case 6: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections N with the virtual path P is 0, if the distance K1 from point i to P or the distance K2 from point j to P is greater than the preset value K, the power cable from power supply source i to power load j cannot be laid using the main channel. If the distance K1 from point i to P or the distance K2 from point j to P is less than the preset value K, the power cable from power supply source i to power load j can be laid using the main channel.
[0023] Furthermore, based on the judgment result, the cable laying path is planned and addressed according to different working conditions to obtain two-dimensional path information, specifically including:
[0024] For working condition 1, the cable is laid from power source i to power load j by direct burial;
[0025] For working condition 2, the part from power source i to the main cable laying channel P is directly buried by the shortest path; the shortest path is selected between two intersections and the main cable laying channel is used for laying; the part from the main cable laying channel P to the power load j is directly buried by the shortest path;
[0026] For working condition 3, the cable is laid from power supply i to power load j by direct burial;
[0027] For working condition 4, the part from power source i to the main cable laying channel P is directly buried by the shortest path; the shortest path is selected between two intersections and the main cable laying channel is used for laying; the part from the main cable laying channel P to the power load j is directly buried by the shortest path;
[0028] For working condition 5, the cable is laid directly underground from power supply i to power load j;
[0029] For working condition 6, if the distance K1 from point i to P or the distance K2 from point j to P is greater than the preset value K, the cable is laid from the power supply i to the power load j by direct burial; if the distance K1 from point i to P or the distance K2 from point j to P is less than the preset value K, the part from the power supply i to the main cable laying channel P is directly buried by the shortest path, the shortest path is selected between the two intersections and the main cable laying channel is used for laying, and the part from the main cable laying channel P to the power load j is directly buried by the shortest path.
[0030] Furthermore, the two-dimensional path information is mapped to the three-dimensional space, specifically including:
[0031] In the three-dimensional model of the station, the virtual path line of the main cable laying channel is mapped into a solid model, and then the key base points of the main electrical equipment are mapped into the equipment model in the three-dimensional space. Finally, the two-dimensional path is mapped to the three-dimensional space. The cable laying path can be determined in the three-dimensional space based on the electrical equipment points and the key points of the cables entering and exiting the main cable laying channel on the two-dimensional path.
[0032] According to the second aspect, in one embodiment, a station cable laying path addressing system based on source load vector is provided, the system comprising:
[0033] A two-dimensional projection module is used to project the railway yard, main electrical equipment and main cable laying channels in three-dimensional space in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane using its cable access point or exit point as a key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, wherein the electrical equipment includes power loads and power sources;
[0034] A source-load vector construction module is used to sequentially connect the key base points of the power load and its power supply to construct a source-load vector, where the starting point of the source-load vector is the key base point of the power supply and the end point is the key base point of the power load, and obtain the intersection point and number of intersection points of the source-load vector and the virtual path line;
[0035] A main channel judgment module is used to obtain multiple working conditions according to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, and judge whether the power cable starting from the power supply to the power load under different working conditions can be laid using the main cable laying channel;
[0036] The path addressing module is used to plan and address the cable laying path for different working conditions based on the judgment results to obtain two-dimensional path information, and map the two-dimensional path information to three-dimensional space.
[0037] According to the third aspect, an embodiment provides an electronic device, the device comprising: a processor and a memory;
[0038] The memory is used to store one or more program instructions;
[0039] The processor is used to run one or more program instructions to execute the steps of a site cable laying path addressing method based on source load vector as described in any of the above items.
[0040] According to the fourth aspect, an embodiment provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of a site cable laying path addressing method based on source load vector as described in any one of the above items are implemented.
[0041] The present application provides a method and system for addressing the cable laying path in a station based on a source-load vector, which projects a three-dimensional BIM model, draws power supply points and power loads in a two-dimensional projection, and constructs connection vectors between electrical equipment, transforms the main channel for cable laying from a physical model into a virtual path line, and determines the intersection of the source-load vector and the virtual path line of the main channel for cable laying by judging the intersection of the source-load vector and the virtual path line of the main channel for cable laying, determines the relative position of each device and the virtual path line through two-dimensional point and line data, determines whether the cable can be laid using the main channel, and addresses the cable laying path, which can effectively improve the BIM design efficiency of power cables in railway stations and can be applied to the field of railway power engineering design. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A flow chart of a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0043] Figure 2A specific implementation flow chart of a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0044] Figure 3 A schematic diagram of a two-dimensional projection of a three-dimensional solid model in a method for addressing a cable laying path in a station based on a source-charge vector provided by an embodiment of the present invention;
[0045] Figure 4 A schematic diagram of working condition 1 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0046] Figure 5 A schematic diagram of working condition 2 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0047] Figure 6 A schematic diagram of working condition 3 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0048] Figure 7 A schematic diagram of working condition 4 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0049] Figure 8 A schematic diagram of working condition 5 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0050] Fig. 9 A schematic diagram of working condition 6 in a method for addressing a cable laying path in a station based on a source-load vector provided by an embodiment of the present invention;
[0051] Fig.10 A schematic diagram of the logical structure of a site cable laying path addressing system based on source-load vectors is provided for one embodiment of the present invention. DETAILED DESCRIPTION
[0052] The present invention is further described in detail below by specific embodiments in conjunction with the accompanying drawings. Wherein similar elements in different embodiments adopt associated similar element numbers. In the following embodiments, many detailed descriptions are for making the present application better understood. However, those skilled in the art can easily recognize that some features can be omitted in different situations, or can be replaced by other elements, materials, methods. In some cases, some operations related to the present application are not shown or described in the specification, this is to avoid the core part of the present application being overwhelmed by too much description, and for those skilled in the art, it is not necessary to describe these related operations in detail, and they can fully understand the related operations according to the description in the specification and the general technical knowledge in the art.
[0053] In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementations. At the same time, the steps or actions in the method description can also be interchanged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the various sequences in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a required sequence, unless otherwise specified that a certain sequence must be followed.
[0054] The first embodiment of the present invention provides a method for addressing a cable laying path in a station based on a source-load vector. Figure 1 and Figure 2 Provide detailed explanation.
[0055] like Figure 1 As shown, in step S100, the railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane with its cable entry point or exit point as the key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, and the electrical equipment includes power loads and power supplies.
[0056] Railway station power cables are composed of high-voltage cables and low-voltage cables, which can be laid in the main cable channels or directly buried underground. The engineering design of station power cables is mainly carried out by the power major. As a post-station major, the power major needs to provide the power major with an information-based three-dimensional model of the railway station when carrying out BIM engineering design, and the power major carries out the design on this basis.
[0057] In this embodiment, step S110 projects the three-dimensional professional model of the station into a two-dimensional graphic, simplifies the attributes in the physical model, and only obtains the model projection outline of the station. At the same time, the power supply, power load and other equipment models arranged by the power profession in the three-dimensional professional model of the station are used as key base points, and the cable connection points of each electrical equipment are retained, and they are projected into the two-dimensional projection graphic of the station according to their relative positions in the three-dimensional model of the station.
[0058] The cable laying channel is the main carrier for cable laying. According to its different types, in the field of railway power engineering, there are mainly: cable trench, cable trough, cable conduit. Cable trench, cable trough, cable conduit have many entity attributes, such as: size information, model specification information, location coordinates and other information. The entity structure is also relatively complex, consisting of basic elements such as points, lines, and surfaces. The number of basic elements is huge and intertwined. It is difficult to judge whether the cable can be laid through the main channel according to the position of electrical equipment in three-dimensional space, and it is also difficult to further address the cable path.
[0059] In this embodiment, step S120 simplifies the main cable laying channel from a three-dimensional solid model to a virtual path line, denoted as P. The virtual path line is a straight line or a multi-segment line in a two-dimensional plane, which is the midline of the projection figure of the main cable channel in the two-dimensional plane. The path direction of the main cable channel can be represented by the virtual path line. The virtual path line of the main cable channel in the two-dimensional plane does not distinguish between the types of main cable channels, and all types of main cable channels are represented by virtual path lines in the two-dimensional plane. At the same time, because the cable engineering design of the power station is based on the professional model of the station, the three-dimensional professional model of the station has been simplified to a projection outline in the previous step S110, which includes the key base points of various electrical equipment of the power profession. The virtual path line of the main cable channel is placed in the station projection figure according to its relative position in the three-dimensional model, and the part exceeding the station projection outline is not stored for the next step.
[0060] The two-dimensional projection result of the three-dimensional solid model is as follows Figure 3 As shown, among them, 1: station professional model; 2: cable laying main channel model; 3: power load model; 4: power supply model; 5: station model projection; 6: virtual path line; 7: key base points of power load; 8: key base points of power supply.
[0061] like Figure 1 As shown, in step S200, the key base points of the power load and its power supply are sequentially connected to construct a source-load vector, the starting point of the source-load vector is the key base point of the power supply, and the end point is the key base point of the power load, and the intersection points and the number of intersection points of the source-load vector and the virtual path line are obtained.
[0062] Specifically, the key points of each electrical equipment in step S110 are connected into a vector in the order of power load and its power supply, and a source-load vector is constructed, which is recorded as L ij, The source load vector starts from the power supply i and ends at the power load j. The vector L ij Located in plane S, find the vector L ij The intersection point P with the virtual path line P of the main cable channel i And the number of intersection points N.
[0063] like Figure 1 As shown, in step S300, a variety of working conditions are obtained according to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, and it is determined whether the power cable starting from the power supply and ending with the power load under different working conditions can be laid using the main cable laying channel.
[0064] Specifically, according to the construction type of the virtual path line P and the vector L ijThe number of intersections N determines the relative positions of the power supply i and the power load j relative to the main cable laying channel, and determines whether the power cable starting from the power supply i and ending with the power load j can be laid using the main cable channel. The main working conditions are as follows:
[0065] Case 1: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N = 1, as shown in the attached Figure 4 As shown, the power cable from power supply source i to power load j cannot be laid using the main cable laying channel; Figure 4 In, L ij is the source load vector, P is the virtual path line; i is the key base point of the power source; j is the key base point of the power load; P1 is the intersection of the source load vector and the virtual path line; L is the cable laying path;
[0066] Case 2: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N = 2, as shown in the attached Figure 5 As shown, the power cable from power supply source i to power load j can be laid using the main channel; Figure 5 In, L ij is the source load vector, P is the virtual path line; i is the key base point of the power supply; j is the key base point of the power load; P1 and P2 are the intersection points of the source load vector and the virtual path line; L is the cable laying path;
[0067] Case 3: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N = 1, as shown in the attached Figure 6 As shown, the power cable from power supply source i to power load j cannot be laid using the main channel; Figure 6 In, L ij is the source load vector, P is the virtual path line; i is the key base point of the power source; j is the key base point of the power load; P1 is the intersection of the source load vector and the virtual path line; L is the cable laying path;
[0068] Case 4: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N = 2, as shown in the attached Figure 7 As shown, the power cable from power supply source i to power load j can be laid using the main channel; Figure 7 In, L ij is the source load vector, P is the virtual path line; i is the key base point of the power supply; j is the key base point of the power load; P1 and P2 are the intersection points of the source load vector and the virtual path line; L is the cable laying path;
[0069] Case 5: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections with the virtual path P is N = 1, as shown in the attached Figure 8 As shown, the power cable from power supply source i to power load j cannot be laid using the main channel; Figure 8 In, L ij is the source load vector, P is the virtual path line; i is the key base point of the power source; j is the key base point of the power load; P1 is the intersection of the source load vector and the virtual path line; L is the cable laying path;
[0070] Case 6: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections N with the virtual path P is 0, if the distance K1 or K2 from point i or point j to P is greater than the preset value K (as long as one of the distance K1 from point i to P and the distance K2 from point j to P is greater than K), the power cable from the power supply source i to the power load j cannot be laid using the main channel. If the distance K1 or K2 from point i or point j to P is less than the preset value K, the power cable from the power supply source i to the power load j can be laid using the main channel. Fig. 9 As shown; Fig. 9 In, L ij is the source load vector, P is the virtual path line, i is the key base point of the power source, j is the key base point of the power load, L is the cable laying path, K1 and K2 are the distances between the key base points and the virtual path line.
[0071] like Figure 1 As shown, in step S400, based on the judgment result, the laying path of the cable is planned and addressed for different working conditions to obtain two-dimensional path information, and the two-dimensional path information is mapped to three-dimensional space.
[0072] After determining in step S300 whether the power cable starting from power supply source i and ending at power load j can be laid using the main cable laying channel, this step plans and addresses the cable laying path according to the shortest route principle based on the different working conditions in step S300. Different planning strategies can be adopted for the different working conditions in step S300. The specific strategies are as follows:
[0073] For working condition 1, the cable is laid directly underground from the power supply source i to the power load j. Figure 4 As shown;
[0074] For working condition 2, the part from power source i to main cable laying channel P is directly buried by the shortest path; the shortest path is selected between two intersections and the main cable laying channel is used for laying; the part from main cable laying channel P to power load j is directly buried by the shortest path; as shown in the attached figure, Figure 5 As shown;
[0075] For working condition 3, the cable is laid directly underground from the power supply source i to the power load j. Figure 6 As shown;
[0076] For working condition 4, the part from the power supply source i to the main cable laying channel P is directly buried by the shortest path; the shortest path is selected between the two intersections and the main cable laying channel is used for laying; the part from the main cable laying channel P to the power load j is directly buried by the shortest path; as shown in the attached Figure 7 As shown;
[0077] For working condition 5, the cable is laid directly underground from power supply i to power load j. Figure 8 As shown;
[0078] For working condition 6, when the distance K1 or K2 from point i or point j to P is greater than the preset value K, the cable is laid directly underground from the power supply i to the power load j; when the distance K1 or K2 from point i or point j to P is less than the preset value K, the part from the power supply i to the main cable laying channel P is directly buried underground using the shortest path, the shortest path is selected between the two intersections and the main cable laying channel is used for laying, and the part from the main cable laying channel P to the power load j is directly buried underground using the shortest path, as shown in the attached figure. Fig. 9 shown.
[0079] After determining the cable laying path, the two-dimensional path information is mapped to the three-dimensional solid model according to the two-dimensional and three-dimensional projection relationship. First, in the professional three-dimensional model of the station, the virtual path line of the main cable laying channel is mapped to a solid model, that is, a cable trench, cable trough or cable conduit model. Then, the key base points of electrical equipment such as power loads or power sources of the power industry are mapped to the two-dimensional base points as equipment models in three-dimensional space. Finally, the cable laying path of step S400 is mapped to three-dimensional space. The cable laying path can be determined in three-dimensional space based on the electrical equipment points and the key points of the cables entering and exiting the main cable laying channel on the two-dimensional path.
[0080] After completing the above steps, the path of the cable path in three-dimensional space is determined. The above steps can be automatically implemented through computer programs, which can improve the efficiency of site power cable engineering design, improve the accuracy of cable path planning, realize standardized software drawing, improve engineering design efficiency and solution decision-making quality, and reduce engineering design manpower consumption.
[0081] The embodiment of the present invention provides a method for addressing the cable laying path in a station based on a source charge vector, which uses a simplified projection of a three-dimensional solid model to create key base points of electrical equipment, construct a source charge vector and a virtual path line of the main channel for cable laying, and formulates a corresponding processing strategy according to the intersection between the source charge vector and the virtual path line to plan and address the cable laying path. The present invention has the following advantages:
[0082] 1) A simplified projection method of three-dimensional solid models is provided in the field of railway station cable engineering design. By retaining key information, the station professional three-dimensional model is simplified and projected into a two-dimensional graphic containing only two-dimensional contour information, and the power professional electrical equipment model is simplified and projected into a two-dimensional key point, retaining only the cable lead-in and lead-out key point information. Through the simplified processing method of the above three-dimensional model, the three-dimensional model complexly constructed by points, lines and surfaces is processed into a two-dimensional graphic composed of simple points and lines, which reduces the difficulty of data processing, is more conducive to judging the relative positions of electrical equipment and main cable laying channels, is more conducive to judging whether the power cable is laid using the main cable laying channel, and is conducive to the programmatic realization of automatic path addressing for station cable engineering design.
[0083] 2) A method for constructing a source-charge vector is provided. In a two-dimensional projection plane, the key base points of electrical equipment are used, with the power supply as the starting point and the power load as the end point, and their connecting line is used as the source-charge vector. The source-charge vector not only contains the starting and ending point information of the cable from the power supply to the power load, but also provides the starting and ending point information for mapping the cable model from a two-dimensional to a three-dimensional model, which is conducive to programmatic judgment of whether there is an intersection relationship between the power cable from the power supply to the power load and the main cable laying channel, and provides technical feasibility for programmatic automatic planning of cable paths.
[0084] 3) A method for constructing a virtual path line for the main cable laying channel is provided. The center line of the two-dimensional projection of the physical models such as cable trenches, cable troughs, and cable ducts in three-dimensional space is used as the virtual path line, and the complex physical models are represented by polylines, which reduces the complexity of data processing, facilitates the programmatic storage of the path information of the main cable laying channels, and facilitates the programmatic automatic planning of cable paths.
[0085] 4) A method for calculating and determining the relative position of equipment by projecting point and line data on a two-dimensional plane using a three-dimensional model is provided. Point, line, surface, and entity data that are difficult to calculate and process in three-dimensional space due to the limitations of computer data processing accuracy are converted into two-dimensional, easy-to-process point and line data, and the relative position and relative distance of the equipment within and outside the channel are determined, thereby improving the reliability and convenience of data processing.
[0086] 5) A method for determining whether the main cable laying channel can be used for cable laying and further performing cable path planning and addressing is provided based on the intersection of the virtual path line and the source load vector, and the construction type of the virtual path line P and the vector L ij The number of intersections N is used as the judgment condition, and 6 different working conditions are provided to judge whether the cable can be laid using the main cable laying channel. Further, for each working condition, relevant methods for cable path planning and site selection are provided, which provides a technical method for computer-implemented programmed field cable engineering design, is more conducive to the software implementation of field cable engineering design, improves engineering design efficiency, scheme decision-making quality, and reduces engineering design manpower consumption. .
[0087] Corresponding to the above-disclosed method for cable laying path addressing based on source charge vector, the embodiment of the present invention further discloses a cable laying path addressing system based on source charge vector, such as Fig.10 As shown, it specifically includes:
[0088] A two-dimensional projection module is used to project the railway yard, main electrical equipment and main cable laying channels in three-dimensional space in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane using its cable access point or exit point as a key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, wherein the electrical equipment includes power loads and power sources;
[0089] A source-load vector construction module is used to sequentially connect the key base points of the power load and its power supply to construct a source-load vector, where the starting point of the source-load vector is the key base point of the power supply and the end point is the key base point of the power load, and obtain the intersection point and number of intersection points of the source-load vector and the virtual path line;
[0090] A main channel judgment module is used to obtain multiple working conditions according to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, and judge whether the power cable starting from the power supply to the power load under different working conditions can be laid using the main cable laying channel;
[0091] The path addressing module is used to plan and address the cable laying path for different working conditions based on the judgment results to obtain two-dimensional path information, and map the two-dimensional path information to three-dimensional space.
[0092] It should be noted that for the detailed description of a site cable laying path addressing system based on source load vector provided in an embodiment of the present invention, reference can be made to the relevant description of a site cable laying path addressing method based on source load vector provided in an embodiment of the present application, which will not be repeated here.
[0093] In addition, an embodiment of the present invention also provides an electronic device, comprising: a processor and a memory; the memory is used to store one or more program instructions; the processor is used to run one or more program instructions to execute the steps of a site cable laying path addressing method based on source load vector as described in any of the above items.
[0094] It should be noted that, for the detailed description of an electronic device provided in an embodiment of the present invention, reference can be made to the relevant description of a site cable laying path addressing method based on source-load vector provided in an embodiment of the present application, which will not be repeated here.
[0095] In addition, an embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of a method for addressing a site cable laying path based on a source load vector as described in any of the above items are implemented.
[0096] It should be noted that, for a detailed description of a computer-readable storage medium provided in an embodiment of the present invention, reference can be made to the relevant description of a site cable laying path addressing method based on source load vector provided in an embodiment of the present application, which will not be repeated here.
[0097] Those skilled in the art will appreciate that all or part of the functions of the various methods in the above-mentioned embodiments can be implemented by hardware or by computer programs. When all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can be stored in a computer-readable storage medium, and the storage medium can include: read-only memory, random access memory, disk, optical disk, hard disk, etc., and the program is executed by a computer to implement the above-mentioned functions. For example, the program is stored in the memory of the device, and when the program in the memory is executed by the processor, all or part of the above-mentioned functions can be implemented. In addition, when all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can also be stored in a storage medium such as a server, another computer, disk, optical disk, flash disk or mobile hard disk, and can be downloaded or copied and saved in the memory of the local device, or the system of the local device is updated, and when the program in the memory is executed by the processor, all or part of the functions in the above-mentioned embodiments can be implemented.
[0098] The above specific examples are used to illustrate the present invention, which are only used to help understand the present invention and are not used to limit the present invention. For those skilled in the art to which the present invention belongs, some simple deductions, modifications or substitutions can be made according to the idea of the present invention.
Claims
1. A method for addressing the cable laying path of a station based on source-load vectors. It is characterized in that The method comprises: The railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane using its cable access point or exit point as a key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, wherein the electrical equipment includes power loads and power supplies; Connect the key base points of the power load and its power supply in sequence to construct a source-load vector, where the starting point of the source-load vector is the key base point of the power supply and the end point is the key base point of the power load, and obtain the intersection points and the number of intersection points of the source-load vector and the virtual path line; According to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, a plurality of working conditions are obtained, and it is judged whether the power cable starting from the power supply source to the power load under different working conditions can be laid using the main cable laying channel; Based on the judgment results, the cable laying path is planned and addressed for different working conditions to obtain two-dimensional path information, and the two-dimensional path information is mapped to three-dimensional space.
2. A method for addressing a cable laying path based on a source-load vector according to claim 1, It is characterized in that The railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including: The three-dimensional BIM model of the station is projected into a two-dimensional plane to obtain only a simplified two-dimensional projection outline graphic.
3. A method for addressing a cable laying path based on a source-load vector according to claim 2, It is characterized in that The railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including: The cable entry or exit points of the main electrical equipment arranged in the three-dimensional BIM model of the station are used as the key base points of the electrical equipment, and the key base points of the electrical equipment are projected into the two-dimensional projection contour graphic according to their relative positions in the three-dimensional model of the station.
4. A method for addressing a cable laying path based on a source-load vector according to claim 2, It is characterized in that The railway yard, main electrical equipment and main cable laying channels in three-dimensional space are projected in two dimensions, including: The main cable laying channel designed in the three-dimensional model of the station is simplified from a three-dimensional solid model to a virtual path line, and is projected into a two-dimensional projection contour graphic according to the relative position of the virtual path line in the three-dimensional model of the station, wherein the portion exceeding the two-dimensional projection contour of the station is not stored. The virtual path line is the center line of the projection graphic of the main cable laying channel on the two-dimensional plane.
5. A method for addressing a cable laying path based on a source-load vector according to claim 1, It is characterized in that According to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, a plurality of working conditions are obtained, and it is judged whether the power cable starting from the power supply source to the power load under different working conditions can be laid using the main cable laying channel, specifically including: Case 1: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main cable laying channel; Case 2: If the virtual path P is a closed curve, when the source load vector L ij When the number of intersections with the virtual path P is N=2, the power cable starting from the power supply source i and ending at the power load j can be laid using the main channel; Case 3: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main channel; Case 4: If the virtual path P is a non-closed polyline and a non-straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=2, the power cable starting from the power supply source i and ending at the power load j can be laid using the main channel; Case 5: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections with the virtual path P is N=1, the power cable starting from the power supply source i and ending at the power load j cannot be laid using the main channel; Case 6: If the virtual path P is a straight line, when the source load vector L ij When the number of intersections N with the virtual path P is 0, if the distance K1 from point i to P or the distance K2 from point j to P is greater than the preset value K, the power cable from power supply source i to power load j cannot be laid using the main channel. If the distance K1 from point i to P or the distance K2 from point j to P is less than the preset value K, the power cable from power supply source i to power load j can be laid using the main channel.
6. A method for addressing a cable laying path based on a source-load vector according to claim 3, It is characterized in that Based on the judgment results, the cable laying path is planned and addressed according to different working conditions to obtain two-dimensional path information, including: For working condition 1, the cable is laid from power source i to power load j by direct burial; For working condition 2, the part from power source i to the main cable laying channel P is directly buried by the shortest path; the shortest path is selected between two intersections and the main cable laying channel is used for laying; the part from the main cable laying channel P to the power load j is directly buried by the shortest path; For working condition 3, the cable is laid from power source i to power load j by direct burial; For working condition 4, the part from power source i to the main cable laying channel P is directly buried by the shortest path; the shortest path is selected between two intersections and the main cable laying channel is used for laying; the part from the main cable laying channel P to the power load j is directly buried by the shortest path; For working condition 5, the cable is laid from power supply i to power load j by direct burial; For working condition 6, if the distance K1 from point i to P or the distance K2 from point j to P is greater than the preset value K, the cable is laid from the power supply i to the power load j by direct burial; if the distance K1 from point i to P or the distance K2 from point j to P is less than the preset value K, the part from the power supply i to the main cable laying channel P is directly buried by the shortest path, the shortest path is selected between the two intersections and the main cable laying channel is used for laying, and the part from the main cable laying channel P to the power load j is directly buried by the shortest path.
7. A method for addressing a cable laying path based on a source-load vector according to claim 1, It is characterized in that Mapping two-dimensional path information to three-dimensional space includes: In the three-dimensional model of the station, the virtual path line of the main cable laying channel is mapped into a solid model, and then the key base points of the main electrical equipment are mapped into the equipment model in the three-dimensional space. Finally, the two-dimensional path is mapped to the three-dimensional space. The cable laying path can be determined in the three-dimensional space based on the electrical equipment points and the key points of the cables entering and exiting the main cable laying channel on the two-dimensional path.
8. A station cable laying path addressing system based on source load vector, It is characterized in that The system comprises: A two-dimensional projection module is used to project the railway yard, main electrical equipment and main cable laying channels in three-dimensional space in two dimensions, wherein the electrical equipment is projected onto the two-dimensional plane using its cable access point or exit point as a key base point, and the main cable laying channel is simplified into a virtual path line and projected onto the two-dimensional plane, wherein the electrical equipment includes power loads and power sources; A source-load vector construction module is used to sequentially connect the key base points of the power load and its power supply to construct a source-load vector, where the starting point of the source-load vector is the key base point of the power supply and the end point is the key base point of the power load, and obtain the intersection point and number of intersection points of the source-load vector and the virtual path line; A main channel judgment module is used to obtain multiple working conditions according to the construction type of the virtual path line and the number of intersections between the source load vector and the virtual path line, and judge whether the power cable starting from the power supply to the power load under different working conditions can be laid using the main cable laying channel; The path addressing module is used to plan and address the cable laying path for different working conditions based on the judgment results to obtain two-dimensional path information, and map the two-dimensional path information to three-dimensional space.
9. An electronic device, It is characterized in that The device comprises: a processor and a memory; The memory is used to store one or more program instructions; The processor is used to run one or more program instructions to execute the steps of a site cable laying path addressing method based on source load vector as described in any one of claims 1 to 7.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of a site cable laying path addressing method based on source load vectors as described in any one of claims 1 to 7 are implemented.