Multi-dimensional dynamic risk early warning method and system

Through multi-dimensional dynamic risk warning methods and systems, the current value and evaluation value of risk indicators are analyzed, the risk status is determined and corresponding operations are performed, and the problems of low evaluation accuracy and efficiency in the existing technology are solved, achieving more accurate and efficient Risk warning.

CN118982231AInactive Publication Date: 2024-11-19ANHUI TRANSPORTATION HLDG GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410981023.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing risk assessment and early warning methods lack support from information systems, resulting in low evaluation accuracy and efficiency and are susceptible to human factors.

Method used

Using multi-dimensional dynamic risk warning methods and systems, by determining the relevant information of the risk indicators of the object to be evaluated, analyzing the current risk value and judgment value, and then determining the risk status and performing corresponding response operations, including high-risk, moderate risk and low-risk status. Comprehensive assessments are conducted in combination with historical and current risk conditions.

Benefits of technology

It improves the rationality and comprehensiveness of risk status determination, improves the accuracy and efficiency of risk warning, and ensures the timeliness and accuracy of risk response.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982231A_ABST
    Figure CN118982231A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of risk early warning, and discloses a multi-dimensional dynamic risk early warning method and system, and the method comprises the steps: determining a to-be-evaluated object which needs risk early warning evaluation, and determining the index related information of at least one risk early warning index; according to the index related information of each risk early warning index, analyzing a risk current value corresponding to each risk early warning index, and determining a risk evaluation value of each risk early warning index; and determining the risk state of the to-be-evaluated object according to the risk evaluation value and the risk current value corresponding to each risk early warning index, and executing corresponding risk response operation according to the risk state. Therefore, the accuracy and the reliability of the risk state can be improved, the risk assessment efficiency and the risk assessment accuracy of the to-be-assessed object are also improved, so that the execution reasonability and the execution accuracy of the risk response operation are improved, and the risk early warning response timeliness, the risk early warning response efficiency and the risk early warning response accuracy of the to-be-assessed object are also improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of risk warning technology, and in particular to a multi-dimensional dynamic risk warning method and system. Background Art

[0002] Risk early warning for enterprises can enhance their immunity, resilience and competitiveness, eliminate crises before they form or in their infancy, ensure that enterprises remain calm and take precautions before they occur, and thus enable enterprises to achieve sustainable development. Therefore, risk assessment and early warning are crucial to enterprise development.

[0003] At present, most of the risk assessment and early warning methods require that staff members collect relevant data offline every time they conduct risk assessment and early warning operations, and independently refer to the pre-set assessment rules to conduct a subjective risk assessment of the relevant data to obtain the risk assessment results of the enterprise. The human evaluation operation is easily affected by many factors such as mental state, environmental atmosphere, subjective consciousness, and the existing risk assessment and early warning methods lack information system support. The above situations will affect risk assessment and risk early warning to a certain extent. Therefore, the existing risk assessment and early warning methods have the problems of low assessment and early warning accuracy and low assessment and early warning efficiency. It can be seen that it is particularly important to provide a risk assessment and early warning method that can improve the accuracy of assessment and early warning and the low efficiency of assessment and early warning. Summary of the invention

[0004] The present invention provides a multi-dimensional dynamic risk early warning method and system, which can improve the early warning accuracy and evaluation and early warning efficiency of risks.

[0005] In order to solve the above technical problems, the first aspect of the present invention discloses a multi-dimensional dynamic risk early warning method, the method comprising:

[0006] Determine an object to be evaluated that needs to be evaluated for risk warning, and determine indicator-related information of the object to be evaluated for at least one preset risk warning indicator;

[0007] According to the indicator-related information of each of the risk warning indicators, the current risk value corresponding to each of the risk warning indicators is analyzed, and the risk evaluation value of each of the risk warning indicators is determined, wherein the risk evaluation value at least includes a risk red light value, a risk green light value and a risk benchmark value;

[0008] According to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, the risk status of the object to be assessed is determined, and according to the risk status, corresponding risk response operations are performed.

[0009] As an optional implementation, in the first aspect of the present invention, the risk status of the object to be evaluated is determined according to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, and corresponding risk response operations are performed according to the risk status, including:

[0010] For each of the risk warning indicators, when the current risk value corresponding to the risk warning indicator is greater than or equal to the corresponding risk red light value, the risk state of the object to be assessed for the risk warning indicator is determined to be a high risk state, and a corresponding high risk warning operation is performed;

[0011] When the current risk value corresponding to the risk warning indicator is less than or equal to the corresponding risk green light value, it is determined that the risk state of the object to be evaluated for the risk warning indicator is a low risk state;

[0012] When the current risk value corresponding to the risk warning indicator is between the corresponding risk green light value and the corresponding risk benchmark value, it is determined that the risk state of the object to be assessed for the risk warning indicator is a moderate risk state, and a corresponding moderate warning operation is performed;

[0013] and / or,

[0014] According to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, determine the current risk status corresponding to each of the risk warning indicators, and determine the historical risk status of the object to be assessed corresponding to each of the risk warning indicators;

[0015] Analyze the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator;

[0016] According to the overall risk accumulation and the overall risk change, the comprehensive risk result of the object to be assessed is determined, and according to the comprehensive risk result, corresponding early warning response operations are performed.

[0017] As an optional implementation, in the first aspect of the present invention, all of the risk warning indicators include a first risk indicator at the company level and a second risk indicator at the department level; all of the second risk indicators at the department level include a third risk indicator at the result level and a fourth risk indicator at the process level;

[0018] And, the method further comprises:

[0019] Determine the field information involved in each of the risk warning indicators;

[0020] For each of the risk warning indicators, determine the project information and application information of each involved field according to the involved field information of the risk warning indicator;

[0021] Analyze the execution importance of the risk warning indicator based on the project information, and analyze the impact of the risk warning indicator based on the project information and application information;

[0022] Determine the assessment weight of the risk warning indicator based on the execution importance and the impact degree;

[0023] And, determining the comprehensive risk result of the object to be assessed based on the overall risk accumulation and the overall risk change, including:

[0024] The comprehensive risk result of the object to be evaluated is determined based on the assessment weight of each risk warning indicator, the risk accumulation situation of each risk warning indicator included in the overall risk accumulation situation, and the risk change situation of each risk warning indicator included in the overall risk change situation.

[0025] As an optional implementation, in the first aspect of the present invention, analyzing the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator includes:

[0026] For each of the risk warning indicators, one or more historical risk events and the processing status of each of the historical risk events are determined according to the historical risk status of the risk warning indicator, and the processing status includes a processed status or a pending status; based on the event information, processing status and interval time with the current time corresponding to each of the historical risk events, the risk accumulation situation corresponding to the risk warning indicator is determined;

[0027] For each of the risk warning indicators, determine the risk change of the risk warning indicator based on the current risk status and historical risk status of the risk warning indicator;

[0028] According to the risk change of each of the risk warning indicators, the overall risk change of the object to be evaluated is determined, and according to the risk accumulation of each of the risk warning indicators, the overall risk accumulation of the object to be evaluated is determined.

[0029] As an optional implementation manner, in the first aspect of the present invention, determining the risk assessment value of each of the risk warning indicators includes:

[0030] For each of the risk warning indicators, obtain the historical behavior data of the risk warning indicator; determine one or more risk precursor phenomena and the frequency of occurrence of each of the risk precursor phenomena based on the historical behavior data; determine one or more historical risk phenomena and the hazard information of each of the historical risk phenomena based on the historical behavior data; analyze the first risk assessment result of the risk warning indicator based on the phenomenon information of each of the risk precursor phenomena and its frequency of occurrence, the phenomenon information of each of the historical risk phenomena and its hazard information;

[0031] Obtaining industry standard information of the risk warning indicator; determining one or more designated risk phenomena for different hazard levels and phenomenon information of each designated risk phenomenon according to the industry standard information; determining a response plan for each designated risk phenomenon according to the industry standard information; analyzing the second risk assessment result of the risk warning indicator according to the phenomenon information of each designated risk phenomenon and its response plan;

[0032] Obtaining expert opinion information of the risk warning indicator; analyzing the third risk assessment result of the risk warning indicator according to the expert opinion information;

[0033] A risk assessment value of the risk warning indicator is determined according to the first risk assessment result, the second risk assessment result and the third risk assessment result.

[0034] As an optional implementation, in the first aspect of the present invention, after determining the risk assessment value of each risk warning indicator, the method further includes:

[0035] Determine the risk assessment and warning results of all the risk warning indicators, wherein the risk assessment and warning results include the predicted risk status determined by the risk assessment value and the current risk value and the treatment plan for the predicted risk status;

[0036] Determine the existing risk status corresponding to the object to be assessed, wherein the existing risk status includes the risk status that still exists after the corresponding risk response operation is performed;

[0037] According to the existing risk conditions, the predicted risk conditions and the treatment plan, determining whether the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy conditions;

[0038] When it is determined that the risk assessment values ​​of not all of the risk warning indicators meet the assessment accuracy condition, a risk assessment value calibration operation is performed on all of the risk warning indicators.

[0039] As an optional implementation, in the first aspect of the present invention, judging whether the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy conditions according to the existing risk conditions, the predicted risk conditions and the treatment plan includes:

[0040] Determine one or more risk events that have occurred based on the risk conditions that have occurred, and determine one or more predicted risk events based on the predicted risk conditions;

[0041] According to all the predicted risk events and all the occurred risk events, determining whether all the predicted risk events meet a preset prediction completeness condition;

[0042] When it is determined that all the predicted risk events do not satisfy the prediction completeness condition, based on all the predicted risk events and all the occurred risk events, unpredicted target risk events are screened out from all the occurred risk events;

[0043] According to the predicted risk status and the processing plan, judging whether the target risk event meets the preset external cause generation condition;

[0044] When it is determined that the target risk event meets the external cause generation condition, it is determined that the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy condition;

[0045] When it is determined that the target risk event does not satisfy the external cause generation condition, determining that the risk assessment values ​​of all the risk warning indicators do not all satisfy the preset assessment accuracy condition;

[0046] When it is determined that all of the predicted risk events satisfy the prediction completeness condition, it is determined that the risk assessment values ​​of all of the risk warning indicators satisfy the preset assessment accuracy condition.

[0047] The second aspect of the present invention discloses a multi-dimensional dynamic risk early warning system, characterized in that the system comprises:

[0048] A determination module is used to determine an object to be evaluated that needs to be evaluated for risk warning, and to determine the indicator-related information of the object to be evaluated for at least one preset risk warning indicator;

[0049] A current value determination module, used to analyze the current risk value corresponding to each risk warning indicator according to the indicator-related information of each risk warning indicator;

[0050] An evaluation value determination module is used to determine the risk evaluation value of each of the risk warning indicators, wherein the risk evaluation value at least includes a risk red light value, a risk green light value and a risk benchmark value;

[0051] The risk warning module is used to determine the risk status of the object to be evaluated according to the risk assessment value and the current risk value corresponding to each risk warning indicator, and perform corresponding risk response operations according to the risk status.

[0052] As an optional implementation, in the second aspect of the present invention, the risk warning module determines the risk status of the object to be evaluated according to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, and performs corresponding risk response operations according to the risk status, specifically including:

[0053] For each of the risk warning indicators, when the current risk value corresponding to the risk warning indicator is greater than or equal to the corresponding risk red light value, the risk state of the object to be assessed for the risk warning indicator is determined to be a high risk state, and a corresponding high risk warning operation is performed;

[0054] When the current risk value corresponding to the risk warning indicator is less than or equal to the corresponding risk green light value, it is determined that the risk state of the object to be evaluated for the risk warning indicator is a low risk state;

[0055] When the current risk value corresponding to the risk warning indicator is between the corresponding risk green light value and the corresponding risk benchmark value, it is determined that the risk state of the object to be assessed for the risk warning indicator is a moderate risk state, and a corresponding moderate warning operation is performed;

[0056] and / or,

[0057] According to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, determine the current risk status corresponding to each of the risk warning indicators, and determine the historical risk status of the object to be assessed corresponding to each of the risk warning indicators;

[0058] Analyze the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator;

[0059] According to the overall risk accumulation and the overall risk change, the comprehensive risk result of the object to be assessed is determined, and according to the comprehensive risk result, corresponding early warning response operations are performed.

[0060] As an optional implementation, in the second aspect of the present invention, all of the risk warning indicators include a first risk indicator at the company level and a second risk indicator at the department level; all of the second risk indicators at the department level include a third risk indicator at the result level and a fourth risk indicator at the process level;

[0061] And, the system further comprises:

[0062] A weight determination module is used to determine the field information involved in each of the risk warning indicators; for each of the risk warning indicators, determine the project information and application information of each involved field according to the field information involved in the risk warning indicator; analyze the execution importance corresponding to the risk warning indicator according to the project information, and analyze the impact degree corresponding to the risk warning indicator according to the project information and application information; determine the assessment weight of the risk warning indicator according to the execution importance and the impact degree;

[0063] Furthermore, the risk warning module determines the comprehensive risk result of the object to be assessed according to the overall risk accumulation and the overall risk change, specifically including:

[0064] The comprehensive risk result of the object to be evaluated is determined based on the assessment weight of each risk warning indicator, the risk accumulation situation of each risk warning indicator included in the overall risk accumulation situation, and the risk change situation of each risk warning indicator included in the overall risk change situation.

[0065] As an optional implementation, in the second aspect of the present invention, the risk warning module analyzes the overall risk accumulation and overall risk change of the object to be evaluated according to the current risk status and historical risk status of each risk warning indicator, specifically including:

[0066] For each of the risk warning indicators, one or more historical risk events and the processing status of each of the historical risk events are determined according to the historical risk status of the risk warning indicator, and the processing status includes a processed status or a pending status; based on the event information, processing status and interval time with the current time corresponding to each of the historical risk events, the risk accumulation situation corresponding to the risk warning indicator is determined;

[0067] For each of the risk warning indicators, determine the risk change of the risk warning indicator based on the current risk status and historical risk status of the risk warning indicator;

[0068] According to the risk change of each of the risk warning indicators, the overall risk change of the object to be evaluated is determined, and according to the risk accumulation of each of the risk warning indicators, the overall risk accumulation of the object to be evaluated is determined.

[0069] As an optional implementation, in the second aspect of the present invention, the way in which the evaluation value determination module determines the risk evaluation value of each of the risk warning indicators specifically includes:

[0070] For each of the risk warning indicators, obtain the historical behavior data of the risk warning indicator; determine one or more risk precursor phenomena and the frequency of occurrence of each of the risk precursor phenomena based on the historical behavior data; determine one or more historical risk phenomena and the hazard information of each of the historical risk phenomena based on the historical behavior data; analyze the first risk assessment result of the risk warning indicator based on the phenomenon information of each of the risk precursor phenomena and its frequency of occurrence, the phenomenon information of each of the historical risk phenomena and its hazard information;

[0071] Obtaining industry standard information of the risk warning indicator; determining one or more designated risk phenomena for different hazard levels and phenomenon information of each designated risk phenomenon according to the industry standard information; determining a response plan for each designated risk phenomenon according to the industry standard information; analyzing the second risk assessment result of the risk warning indicator according to the phenomenon information of each designated risk phenomenon and its response plan;

[0072] Obtaining expert opinion information of the risk warning indicator; analyzing the third risk assessment result of the risk warning indicator according to the expert opinion information;

[0073] A risk assessment value of the risk warning indicator is determined according to the first risk assessment result, the second risk assessment result and the third risk assessment result.

[0074] As an optional implementation, in the second aspect of the present invention, the determination module is further used to determine the risk assessment warning results of all the risk warning indicators after determining the risk judgment value of each risk warning indicator, the risk assessment warning results including the predicted risk status determined by the risk judgment value and the current risk value and the processing plan for the predicted risk status; determine the existing risk status corresponding to the object to be evaluated, the existing risk status including the risk status that still exists after executing the corresponding risk response operation;

[0075] The system further comprises:

[0076] A judgment module, used to judge whether the risk evaluation values ​​of all the risk warning indicators meet the preset evaluation accuracy conditions according to the existing risk conditions, the predicted risk conditions and the processing solutions;

[0077] The evaluation value determination module is further used to perform a risk evaluation value calibration operation on all the risk warning indicators when the judgment module determines that the risk evaluation values ​​of not all the risk warning indicators meet the assessment accuracy condition.

[0078] As an optional implementation, in the second aspect of the present invention, the judgment module determines whether the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy conditions according to the existing risk conditions, the predicted risk conditions and the treatment plan, specifically including:

[0079] Determine one or more risk events that have occurred based on the risk conditions that have occurred, and determine one or more predicted risk events based on the predicted risk conditions;

[0080] According to all the predicted risk events and all the occurred risk events, determining whether all the predicted risk events meet a preset prediction completeness condition;

[0081] When it is determined that all the predicted risk events do not satisfy the prediction completeness condition, based on all the predicted risk events and all the occurred risk events, unpredicted target risk events are screened out from all the occurred risk events;

[0082] According to the predicted risk status and the processing plan, judging whether the target risk event meets the preset external cause generation condition;

[0083] When it is determined that the target risk event meets the external cause generation condition, it is determined that the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy condition;

[0084] When it is determined that the target risk event does not satisfy the external cause generation condition, determining that the risk assessment values ​​of all the risk warning indicators do not all satisfy the preset assessment accuracy condition;

[0085] When it is determined that all of the predicted risk events satisfy the prediction completeness condition, it is determined that the risk assessment values ​​of all of the risk warning indicators satisfy the preset assessment accuracy condition.

[0086] The third aspect of the present invention discloses another multi-dimensional dynamic risk early warning system, the system comprising:

[0087] A memory storing executable program code;

[0088] a processor coupled to the memory;

[0089] The processor calls the executable program code stored in the memory to execute a multi-dimensional dynamic risk warning method disclosed in the first aspect of the present invention.

[0090] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute a multi-dimensional dynamic risk warning method disclosed in the first aspect of the present invention.

[0091] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0092] In an embodiment of the present invention, an object to be evaluated that needs to undergo a risk warning evaluation is determined, and indicator-related information of the object to be evaluated for at least one preset risk warning indicator is determined; based on the indicator-related information of each risk warning indicator, the risk current value corresponding to each risk warning indicator is analyzed, and a risk judgment value for each risk warning indicator is determined, the risk judgment value including at least a risk red light value, a risk green light value, and a risk benchmark value; based on the risk judgment value and the risk current value corresponding to each risk warning indicator, the risk status of the object to be evaluated is determined, and corresponding risk response operations are performed based on the risk status. It can be seen that the present invention can determine the current risk value and risk judgment value of the risk warning indicator of the object to be evaluated, and determine the risk status of the object to be evaluated according to the risk judgment value and the current risk value and then perform corresponding risk response operations, which is beneficial to improving the rationality and comprehensiveness of the risk status determination method of the object to be evaluated, and is also beneficial to improving the rationality and comprehensiveness of the risk warning response method of the object to be evaluated, and is further beneficial to improving the accuracy and reliability of the determined risk status, and is also beneficial to improving the risk assessment efficiency and risk assessment accuracy of the object to be evaluated, thereby helping to improve the execution rationality and execution accuracy of risk response operations based on the risk status, and is also beneficial to improving the timeliness, efficiency and accuracy of the risk warning response of the object to be evaluated. BRIEF DESCRIPTION OF THE DRAWINGS

[0093] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0094] Figure 1 It is a flow chart of a multi-dimensional dynamic risk early warning method disclosed in an embodiment of the present invention;

[0095] Figure 2 It is a flow chart of another multi-dimensional dynamic risk early warning method disclosed in an embodiment of the present invention;

[0096] Figure 3 It is a structural schematic diagram of a multi-dimensional dynamic risk early warning system disclosed in an embodiment of the present invention;

[0097] Figure 4 It is a structural schematic diagram of another multi-dimensional dynamic risk early warning system disclosed in an embodiment of the present invention;

[0098] Figure 5 It is a structural schematic diagram of another multi-dimensional dynamic risk early warning system disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0099] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0100] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.

[0101] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0102] The present invention discloses a multi-dimensional dynamic risk warning method and system, which can determine the current risk value and risk judgment value of the object to be evaluated for the risk warning indicator, and determine the risk state of the object to be evaluated according to the risk judgment value and the current risk value, and then perform the corresponding risk response operation, which is conducive to improving the rationality and comprehensiveness of the risk state determination method of the object to be evaluated, and is also conducive to improving the rationality and comprehensiveness of the risk warning response method of the object to be evaluated, and is further conducive to improving the accuracy and reliability of the determined risk state, and is also conducive to improving the risk assessment efficiency and risk assessment accuracy of the object to be evaluated, so as to improve the execution rationality and execution accuracy of the risk response operation based on the risk state, and is also conducive to improving the timeliness, efficiency and accuracy of the risk warning response of the object to be evaluated. The following are detailed descriptions.

[0103] Embodiment 1

[0104] See also Figure 1 , Figure 1 : is a flow chart of a multi-dimensional dynamic risk warning method disclosed in an embodiment of the present invention. Figure 1 The described method may be applied to a multi-dimensional dynamic risk early warning system, wherein the system may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiments of the present invention. Figure 1 As shown, the multi-dimensional dynamic risk early warning method includes the following operations:

[0105] 101. Determine the object to be evaluated that needs to be evaluated for risk warning, and determine the indicator-related information of the object to be evaluated for at least one preset risk warning indicator.

[0106] Optionally, the object to be evaluated may be an enterprise, equipment, project, or any other object that requires risk warning evaluation, and the embodiment of the present invention does not limit this.

[0107] Optionally, the indicator-related information can be obtained through multi-source information fusion, such as data fusion, information fusion, etc., to effectively integrate information from different channels and sources, establish an information fusion evaluation system, and ensure that the fused information can comprehensively and accurately reflect the actual situation of the risk, which is not limited in the embodiments of the present invention.

[0108] Optionally, the indicator-related information can be obtained by connecting with an internal information system. Specifically, the risk warning information platform is connected with the internal information system of the enterprise to achieve data sharing and interaction, and improve the efficiency and accuracy of submitting risk warnings. In addition, the indicator-related information can also be obtained using external information, which is not limited in the embodiments of the present invention.

[0109] Optionally, all risk warning indicators may include strategic risk types; further, strategic risk types may include strategic management risk types and scientific and technological innovation risk types; further, strategic management risk types may include strategic planning annual plan completion rate (operating income) indicator types, strategic planning annual plan completion rate (total profit) indicator types, state-owned assets value preservation and appreciation rate indicator types and income target completion rate indicator types, etc.; scientific and technological innovation risk types may include R&D funding investment intensity indicator types, etc., which are not limited in the embodiments of the present invention.

[0110] Optionally, the specific construction method of risk warning indicators is illustrated by the following examples: (1) Questionnaire design and special meeting convening: Design a sample questionnaire for risk warning indicators, and hold a special meeting on risk control to unify ideas and clarify the direction and requirements of indicator design; (2) Reporting and sorting of indicators of directly affiliated units: Each directly affiliated unit completes the design and reporting of its own risk warning indicators according to the requirements of the questionnaire; the group risk control department sorts and integrates the reported indicators to form a preliminary risk warning indicator system; (3) Indicator screening and determination: Based on the reported indicators, the final risk warning indicators are screened and determined through conference communication, expert review, etc. to form a complete risk warning indicator system, which is not limited to the embodiments of the present invention.

[0111] Optionally, a digital monitoring cockpit is constructed, and modern information technologies such as big data and cloud computing are used to construct a digital risk warning monitoring cockpit to achieve real-time monitoring of risks, automatic warning and data analysis functions; advanced data processing and analysis technologies are used to update indicator-related information of risk warning indicators in real time, which is not limited to the embodiments of the present invention.

[0112] 102. Based on the indicator-related information of each risk warning indicator, analyze the current risk value corresponding to each risk warning indicator, and determine the risk judgment value of each risk warning indicator. The risk judgment value at least includes the risk red light value, risk green light value and risk benchmark value.

[0113] Optionally, the information used to determine the risk assessment value can be obtained by connecting with the internal information system, connecting the risk warning information platform with the internal information system of the enterprise to achieve data sharing and interaction, and improve the efficiency and accuracy of risk warning; it can also be obtained by using external information, actively exploring the use of external information sources, such as industry reports, policy changes, etc., to dynamically adjust and optimize the risk warning indicator system to adapt to changes in the external environment, which is not limited to the embodiments of the present invention.

[0114] Optionally, by using advanced data processing and analysis technology, the risk assessment value of the risk warning indicator can be updated in real time, and the risk assessment value of the risk warning indicator can be dynamically adjusted according to actual conditions, which is not limited in the embodiments of the present invention.

[0115] Optionally, the current risk value and risk assessment value of the risk warning indicator are provided as follows: the current risk value refers to the current risk level value, danger level value, etc. of the object to be assessed for the risk warning indicator; the risk assessment value refers to the set risk level value, set danger level value, etc. used to assess the current risk status of the object to be assessed for the risk warning indicator, which is not limited in the embodiments of the present invention.

[0116] 103. Determine the risk status of the object to be assessed based on the risk assessment value and current risk value corresponding to each risk warning indicator, and perform corresponding risk response operations based on the risk status.

[0117] Optionally, this solution supports rapid reuse in application scenarios. Specifically, the system is customized and developed according to the needs of different companies' different main businesses and fields, for example, transportation, investment, real estate, etc.; and can be quickly reused in other different fields: in the medical field, the technical solution of the present invention can be used to realize the rapid entry and intelligent analysis of early warning indicators in the medical field; in the financial field, the technology can be used to realize the automated processing of risk assessment and credit rating; the expansion of these application scenarios makes the technical solution of the present invention have a wider application value and market prospects, which is not limited to the embodiments of the present invention.

[0118] Optionally, this solution establishes a real-time feedback mechanism for the early warning system, continuously adjusts and optimizes the system according to the accuracy of the early warning results, and utilizes online learning, transfer learning and other technologies to enable the early warning system to automatically adapt to changes in the risk environment and continuously improve the accuracy and reliability of the early warning. This is not limited to the embodiments of the present invention.

[0119] Optionally, the optimization of user experience is also emphasized, and the user's learning cost and usage difficulty are reduced through concise and clear interface design and intelligent operation prompts, which is not limited in the embodiments of the present invention.

[0120] It can be seen that the implementation of a multi-dimensional dynamic risk warning method described in the embodiment of the present invention can determine the current risk value and risk judgment value of the object to be evaluated for the risk warning indicator, and determine the risk status of the object to be evaluated based on the risk judgment value and the current risk value, and then perform corresponding risk response operations, which is conducive to improving the rationality and comprehensiveness of the risk status determination method of the object to be evaluated, and is also conducive to improving the rationality and comprehensiveness of the risk warning response method of the object to be evaluated, and is further conducive to improving the accuracy and reliability of the determined risk status, and is also conducive to improving the risk assessment efficiency and risk assessment accuracy of the object to be evaluated, thereby facilitating improving the execution rationality and execution accuracy of risk response operations based on risk status, and is also conducive to improving the timeliness, efficiency and accuracy of risk warning response of the object to be evaluated.

[0121] In an optional embodiment, the above-mentioned determining the risk status of the object to be assessed according to the risk assessment value and the current risk value corresponding to each risk warning indicator, and performing corresponding risk response operations according to the risk status, may include:

[0122] For each risk warning indicator, when the current risk value corresponding to the risk warning indicator is greater than or equal to the corresponding risk red light value, the risk status of the object to be assessed for the risk warning indicator is determined to be a high risk status, and the corresponding high risk warning operation is performed;

[0123] When the current risk value corresponding to the risk warning indicator is less than or equal to the corresponding risk green light value, the risk status of the object to be assessed for the risk warning indicator is determined to be a low risk status;

[0124] When the current risk value corresponding to the risk warning indicator is between the corresponding risk green light value and the corresponding risk benchmark value, the risk status of the object to be assessed for the risk warning indicator is determined to be a moderate risk status, and the corresponding moderate warning operation is performed;

[0125] and / or,

[0126] According to the risk assessment value and current risk value corresponding to each risk warning indicator, determine the current risk status corresponding to each risk warning indicator, and determine the historical risk status of the object to be assessed corresponding to each risk warning indicator;

[0127] Analyze the overall risk accumulation and overall risk changes of the object to be assessed based on the current and historical risk status of each risk warning indicator;

[0128] Based on the overall risk accumulation and overall risk changes, determine the comprehensive risk results of the object to be assessed, and perform corresponding early warning response operations based on the comprehensive risk results.

[0129] Optionally, the above-mentioned execution of corresponding high-risk warning operations, such as issuing high-risk warning instructions, issuing high-risk warning signals, and performing problem risk resolution operations based on the real-time operating conditions of the object to be evaluated, etc., is not limited in the embodiments of the present invention.

[0130] Optionally, the above-mentioned execution of corresponding appropriate warning operations, such as appropriate warning according to specific circumstances, is not limited in the embodiments of the present invention.

[0131] Optionally, the severity proportional relationship between the risk red light value, the risk green light value and the risk benchmark value is specifically: the risk red light value is more serious than the risk benchmark value, and the risk benchmark value is more serious than the risk green light value; further, using a numerical comparison method, the risk red light value may be higher than the risk benchmark value, and the risk benchmark value may be higher than the risk green light value, which is not limited in the embodiments of the present invention.

[0132] Optionally, the current risk status of the risk warning indicator may be the risk level, specific risk type, specific risk detail information, specific impact degree, specific affected object, specific response method, etc. of the object to be evaluated for the risk warning indicator in the current scenario, and the embodiments of the present invention are not limited thereto.

[0133] Optionally, the historical risk status of the risk warning indicator may be the risk level, specific risk type, specific risk detail information, specific impact degree, specific impact object, specific response method, etc. of the object to be evaluated for the risk warning indicator in historical scenarios, and the embodiments of the present invention are not limited thereto.

[0134] Optionally, the risk status, overall risk accumulation and overall risk change of each risk warning indicator can be understood as establishing a dual warning mechanism based on a single indicator and an overall risk dimension, which pays attention to both the abnormal fluctuations of a single indicator and the accumulation and change of the overall risk of the object to be evaluated (such as a company); it not only realizes real-time monitoring of a single risk indicator, but also can grasp the overall risk status of the enterprise from a macro perspective, thereby ensuring the comprehensiveness and timeliness of risk warnings, which is not limited to the embodiments of the present invention.

[0135] It can be seen that this optional embodiment can provide risk status assessment and risk response methods for a single risk warning indicator, and assessment and risk response methods for the overall risk of the object to be assessed, which is conducive to improving the pertinence, flexibility and comprehensiveness of risk assessment and response methods, and thus is conducive to improving the accuracy and reliability of risk assessment and response results. The dual warning mechanism is adopted, which is conducive to improving the timeliness of risk response and operational safety and stability of the object to be assessed.

[0136] In another optional embodiment, all risk warning indicators include a first risk indicator at the company level and a second risk indicator at the department level; all second risk indicators at the department level include a third risk indicator at the result level and a fourth risk indicator at the process level.

[0137] Optionally, multi-level risk warning indicators are set, specifically: (1) This solution sets risk warning indicators at the company level and department level (i.e., the first risk indicator at the company level and the second risk indicator at the department level). This multi-level and multi-dimensional design makes risk warning more comprehensive and accurate. Through the company-level indicators, the overall risk status of the enterprise can be grasped at a macro level; while the department-level indicators can go deep into each business department to timely discover and warn of potential risks; the company-level indicators and the process-level indicators are closely linked to each other, comprehensively reflecting the overall risk status; (2) At the department level, this solution further sets result indicators and process indicators (i.e., the third risk indicator at the result level and the fourth risk indicator at the process level); the result indicators reflect the final effect of the department's work, while the process indicators focus on the execution process of the department's work; by paying attention to both the results and the process, it can more comprehensively reflect the rationality of risk warning customization and timely adjust key data such as weights and thresholds, which are not limited in the embodiments of the present invention.

[0138] It can be seen that this optional implementation example can divide all risk warning indicators into multiple levels and dimensions, which is conducive to improving the comprehensiveness, diversity and flexibility of risk warning indicators, and further conducive to improving the comprehensiveness of reflecting the risk status of risk warning indicators and the accuracy of warning, thereby facilitating improving the timeliness of risk discovery and problem solving for risk warning indicators.

[0139] In yet another optional embodiment, the method may further include the following operations:

[0140] Determine the field information involved in each risk warning indicator;

[0141] For each risk warning indicator, determine the project information and application information of each involved field based on the field information of the risk warning indicator;

[0142] Analyze the execution importance of the risk warning indicator based on the project information, and analyze the impact of the risk warning indicator based on the project information and application information;

[0143] The assessment weight of the risk warning indicator shall be determined based on the importance of execution and the degree of impact.

[0144] Optionally, according to the importance and impact of the risk warning indicators, a scientific method is used to determine the weight of each indicator to ensure the objectivity and accuracy of the warning result, which is not limited in the embodiment of the present invention.

[0145] Optionally, the field information involved in the risk warning indicator can be understood as the information on the field involved in the risk warning indicator that needs to be analyzed and evaluated, which can specifically include: field type, field impact, field project, field application, field evaluation, field personnel, etc., which is not limited in the embodiments of the present invention.

[0146] Optionally, the project information related to the field may be project type, project impact, project evaluation, project personnel, project authority, project content, etc., which is not limited in the embodiment of the present invention.

[0147] Optionally, the application information related to the field may be application type, application impact, application evaluation, application scope, application personnel, application requirements, application permissions, application content, etc., which is not limited in the embodiment of the present invention.

[0148] Optionally, the above-mentioned analysis of the execution importance corresponding to the risk warning indicator is based on the project information. For example: when the project information is used to indicate that the project references more funds, has more project-related personnel, has a higher project level, has more project authorities, etc., it is determined that the execution importance corresponding to the risk warning indicator is higher; when the project information is used to indicate that the project references less funds, has fewer project-related personnel, has a lower project level, has fewer project authorities, etc., it is determined that the execution importance corresponding to the risk warning indicator is lower. The same applies to other situations, and the embodiments of the present invention are not limited thereto.

[0149] Optionally, the above-mentioned analysis of the impact degree corresponding to the risk warning indicator is based on the project information and application information. For example: when the project information is used to indicate that there are fewer project-related personnel, the level of project-related personnel is lower, the project referenced funds are less, the project authority is less, etc., and the application information is used to indicate that the application scope is smaller, the application requirements are fewer, the application authority is lower, etc., then the impact degree corresponding to the risk warning indicator is determined to be smaller; when the project information is used to indicate that there are more project-related personnel, the level of project-related personnel is higher, the project referenced funds are more, the project authority is more, etc., and the application information is used to indicate that the application scope is larger, the application requirements are more, the application authority is higher, etc., then the impact degree corresponding to the risk warning indicator is determined to be higher. The same applies to other situations, and the embodiments of the present invention are not limited.

[0150] Optionally, the above-mentioned evaluation weight of the risk warning indicator is determined according to the execution importance and the degree of impact. For example: when the execution importance is higher and the degree of impact is greater, the evaluation weight of the risk warning indicator is greater; when the execution importance is lower and the degree of impact is smaller, the evaluation weight of the risk warning indicator is smaller. The same applies to other situations, and the embodiments of the present invention are not limited thereto.

[0151] It can be seen that this optional embodiment can determine the assessment weights of risk warning indicators based on the execution importance and impact of the risk warning indicators, which is conducive to improving the comprehensiveness and rationality of the method for determining the assessment weights, and further conducive to improving the accuracy and reliability of the determined assessment weights, thereby facilitating improving the accuracy and objectivity of the risk assessment results and risk warning results determined based on the assessment weights.

[0152] In yet another optional embodiment, the above-mentioned determination of the comprehensive risk result of the object to be assessed based on the overall risk accumulation and the overall risk change may include:

[0153] The comprehensive risk result of the object to be assessed is determined based on the assessment weight of each risk warning indicator, the risk accumulation of each risk warning indicator included in the overall risk accumulation, and the risk change of each risk warning indicator included in the overall risk change.

[0154] It can be seen that this optional embodiment can determine the comprehensive risk result of the object to be evaluated in combination with the assessment weight of each risk warning indicator, which is conducive to improving the rationality and comprehensiveness of the method for determining the comprehensive risk result, and then is conducive to improving the accuracy and reliability of the determined comprehensive risk result, thereby helping to improve the focus, objectivity and accuracy of risk warnings for different risk warning indicators.

[0155] In another optional embodiment, the above analysis of the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator may include:

[0156] For each risk warning indicator, one or more historical risk events and the processing status of each historical risk event are determined based on the historical risk status of the risk warning indicator, and the processing status includes a processed status or a pending status; based on the event information, processing status and interval time with the current time corresponding to each historical risk event, the risk accumulation situation corresponding to the risk warning indicator is determined;

[0157] For each risk warning indicator, determine the risk change of the risk warning indicator based on the current risk status and historical risk status of the risk warning indicator;

[0158] According to the risk changes of each risk warning indicator, the overall risk changes of the object to be evaluated are determined, and according to the risk accumulation of each risk warning indicator, the overall risk accumulation of the object to be evaluated is determined.

[0159] Further optionally, for each risk warning indicator, determining the risk change of the risk warning indicator according to the current risk status and historical risk status of the risk warning indicator may include:

[0160] For each risk warning indicator, the status difference content of the risk warning indicator is determined based on the current risk status and historical risk status of the risk warning indicator, and the risk change of the risk warning indicator is determined based on the status difference content.

[0161] Further optionally, the above-mentioned determination of the overall risk change of the object to be assessed according to the risk change of each risk warning indicator may include:

[0162] Based on the preset change weight of each risk warning indicator, the risk change situation of all risk warning indicators is determined as the overall risk change situation of the object to be evaluated.

[0163] Further optionally, the above-mentioned determination of the overall risk accumulation situation of the object to be assessed according to the risk accumulation situation of each risk warning indicator may include:

[0164] Based on the preset cumulative weight of each risk warning indicator, the cumulative risk situation of all risk warning indicators is determined as the overall cumulative risk situation of the object to be evaluated.

[0165] It can be seen that this optional embodiment can provide a method for determining the risk accumulation situation and the risk change situation of the risk warning indicators, determine the risk accumulation situation and the risk change situation of each risk warning indicator, and then determine the overall risk change situation and the overall risk accumulation situation, which is conducive to improving the comprehensiveness and rationality of the method for determining the risk accumulation situation, and then help improve the accuracy and reliability of the determined risk accumulation situation, and thus help improve the accuracy and reliability of the determined overall risk accumulation situation. In addition, it is also conducive to improving the comprehensiveness and rationality of the method for determining the risk change situation, and then help improve the accuracy and reliability of the determined risk change situation, and thus help improve the accuracy and reliability of the determined overall risk change situation.

[0166] In yet another optional embodiment, the above-mentioned determination of the risk assessment value of each risk warning indicator may include:

[0167] For each risk warning indicator, obtain the historical behavior data of the risk warning indicator; determine one or more risk foreshadowing phenomena and the frequency of occurrence of each risk foreshadowing phenomenon based on the historical behavior data; determine one or more historical risk phenomena and the hazard information of each historical risk phenomenon based on the historical behavior data; analyze the first risk assessment result of the risk warning indicator based on the phenomenon information of each risk foreshadowing phenomenon and its frequency of occurrence, the phenomenon information of each historical risk phenomenon and its hazard information;

[0168] Obtaining industry standard information of the risk warning indicator; determining one or more designated risk phenomena for different hazard levels and phenomenon information of each designated risk phenomenon based on the industry standard information; determining a response plan for each designated risk phenomenon based on the industry standard information; analyzing the second risk assessment result of the risk warning indicator based on the phenomenon information of each designated risk phenomenon and its response plan;

[0169] Obtain expert opinion information on the risk warning indicator; and analyze the third risk assessment result of the risk warning indicator based on the expert opinion information;

[0170] The risk assessment value of the risk warning indicator is determined based on the first risk assessment result, the second risk assessment result and the third risk assessment result.

[0171] Optionally, the risk assessment value of the risk warning indicator is calibrated in combination with historical data, industry standards and expert opinions to ensure the timeliness and effectiveness of the warning signal, which is not limited in the embodiment of the present invention.

[0172] Optionally, the first risk assessment result of analyzing the risk warning indicator according to the phenomenon information and occurrence frequency of each risk precursor phenomenon, the phenomenon information and hazard information of each historical risk phenomenon, may include:

[0173] According to the phenomenon information and occurrence frequency of each risk omen phenomenon, a first risk level classification result for each risk omen phenomenon is determined, and the first risk level classification result is used to represent the first risk level corresponding to different omen phenomenon contents and occurrence frequency values;

[0174] According to the phenomenon information and hazard information of each historical risk phenomenon, the second risk level classification result for each historical risk phenomenon is determined, and the second risk level classification result is used to represent the second risk level corresponding to different risk phenomenon contents and hazard levels;

[0175] According to the first risk level division result and the second risk level division result, the first risk assessment result of the risk warning indicator is determined.

[0176] Further optionally, the risk level can be used to reflect a risk red light value, a risk green light value, and a risk benchmark value, which is not limited in the embodiment of the present invention.

[0177] Optionally, the above-mentioned analyzing the second risk assessment result of the risk warning indicator according to the phenomenon information of each designated risk phenomenon and its response plan may include:

[0178] According to the phenomenon information of each specified risk phenomenon and its response plan, determine the third-level classification result for each specified risk phenomenon. The third-level classification result is used to indicate the third risk level corresponding to different risk phenomenon contents and response difficulties;

[0179] According to the results of the third-level classification, the second risk assessment result of the risk warning indicator is determined.

[0180] Optionally, the third risk assessment result of analyzing the risk warning indicator based on the expert opinion information may include:

[0181] Based on the expert opinion information, the fourth-level division results are determined, and based on the fourth-level division results, the third risk assessment results of the risk warning indicator are determined.

[0182] Optionally, the first risk assessment result, the second risk assessment result and the third risk assessment result of the risk warning indicator all include a single-level risk red light value, a single-level risk green light value and a single-level risk benchmark value corresponding to the risk warning indicator, which is not limited in the embodiment of the present invention.

[0183] It can be seen that this optional embodiment can provide corresponding risk assessment result determination methods for historical behavior data, behavior standard information and expert opinion information respectively, and determine the risk assessment value of the risk warning indicator at three levels: historical behavior data, behavior standard information and expert opinion information. This is conducive to improving the diversity, flexibility, pertinence and rationality of the risk assessment result determination method, and thus is conducive to improving the accuracy and reliability of the determined risk assessment results, thereby helping to improve the accuracy and reliability of the risk assessment value of the determined risk warning indicator. In addition, it is also conducive to improving the diversity and comprehensiveness of the risk assessment value determination parameter levels (i.e., historical data level, industry standard level and expert opinion level).

[0184] Embodiment 2

[0185] See also Figure 2 , Figure 2 : is a flow chart of another multi-dimensional dynamic risk warning method disclosed in an embodiment of the present invention. Figure 2 The described method may be applied to a multi-dimensional dynamic risk early warning system, wherein the system may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiments of the present invention. Figure 2 As shown, the multi-dimensional dynamic risk early warning method includes the following operations:

[0186] 201. Determine an object to be evaluated that needs to undergo risk warning evaluation, and determine indicator-related information of the object to be evaluated for at least one preset risk warning indicator.

[0187] 202. Based on the indicator-related information of each risk warning indicator, analyze the current risk value corresponding to each risk warning indicator, and determine the risk judgment value of each risk warning indicator. The risk judgment value at least includes the risk red light value, the risk green light value and the risk benchmark value.

[0188] 203. Determine the risk status of the object to be assessed based on the risk assessment value and current risk value corresponding to each risk warning indicator, and perform corresponding risk response operations based on the risk status.

[0189] 204. Determine the risk assessment and warning results of all risk warning indicators. The risk assessment and warning results include the predicted risk status determined by the risk assessment value and the current risk value, as well as the treatment plan for the predicted risk status.

[0190] Optionally, the predicted risk situation and the treatment plan for the predicted risk situation can be understood as the risk status, risk events, specific risk response operations performed for the risk status and risk events, and the risk treatment effect corresponding to the risk response operations determined by step 203, and the embodiments of the present invention are not limited thereto.

[0191] 205. Determine the existing risk conditions corresponding to the object to be assessed. Existing risk conditions include risk conditions that still exist after the corresponding risk response operations are performed.

[0192] 206. Based on the existing risk conditions, predicted risk conditions and treatment plans, determine whether the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy conditions.

[0193] Further optionally, when it is determined that the risk assessment values ​​of all risk warning indicators meet the assessment accuracy conditions, the above-mentioned operations of determining the object to be assessed that needs to undergo risk warning assessment, and determining the indicator-related information of the object to be assessed for at least one preset risk warning indicator are performed, and the embodiments of the present invention are not limited thereto.

[0194] 207. When it is determined that the risk assessment values ​​of not all risk warning indicators meet the assessment accuracy conditions, a risk assessment value calibration operation is performed on all risk warning indicators.

[0195] Optionally, the above-mentioned risk assessment value calibration operation is performed on all risk warning indicators. For example, the risk assessment value of the risk warning indicator is calibrated in combination with historical data, industry standards, expert opinions, actual application cases, actual warning deviation conditions, etc., which is not limited to the embodiments of the present invention.

[0196] In the embodiment of the present invention, for other descriptions of step 201 to step 207, please refer to other detailed descriptions of step 101 to step 103 in embodiment 1, and the embodiment of the present invention will not be repeated here.

[0197] It can be seen that the embodiment of the present invention can determine the current risk value and risk judgment value of the risk warning indicator of the object to be evaluated, and determine the risk status of the object to be evaluated according to the risk judgment value and the current risk value, and then perform the corresponding risk response operation, which is conducive to improving the rationality and comprehensiveness of the risk status determination method of the object to be evaluated, and is also conducive to improving the rationality and comprehensiveness of the risk warning response method of the object to be evaluated, and is further conducive to improving the accuracy and reliability of the determined risk status, and is also conducive to improving the risk assessment efficiency and risk assessment accuracy of the object to be evaluated, so as to improve the execution rationality and execution accuracy of the risk response operation based on the risk status, and is also conducive to improving the timeliness, efficiency and accuracy of the risk warning response of the object to be evaluated; and, it can also determine whether the risk judgment value meets the assessment accuracy condition. If not, a risk judgment value calibration operation is performed, which is conducive to improving the comprehensiveness and integrity of the risk judgment value determination method, and is further conducive to improving the execution rationality and execution timeliness of the risk judgment value calibration operation, so as to improve the accuracy and reliability of the determined risk judgment value, and further conducive to improving the rationality, accuracy and reliability of the risk assessment warning based on the risk judgment value.

[0198] In an optional embodiment, judging whether the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy conditions based on the existing risk conditions, predicted risk conditions and treatment plans may include:

[0199] Based on the risk conditions that have occurred, determine one or more risk events that have occurred, and based on the predicted risk conditions, determine one or more predicted risk events;

[0200] Based on all predicted risk events and all existing risk events, determine whether all predicted risk events meet the preset prediction completeness conditions;

[0201] When it is determined that all predicted risk events do not meet the prediction completeness condition, based on all predicted risk events and all existing risk events, unpredicted target risk events are screened out from all existing risk events;

[0202] Based on the predicted risk status and treatment plan, determine whether the target risk event meets the preset external cause generation conditions;

[0203] When it is determined that the target risk event meets the external cause generation conditions, it is determined that the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy conditions;

[0204] When it is determined that the target risk event does not meet the external cause generation condition, it is determined that the risk assessment values ​​of all risk warning indicators do not all meet the preset assessment accuracy condition;

[0205] When it is determined that all predicted risk events meet the prediction completeness condition, it is determined that the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy condition.

[0206] Optionally, there are risk events that have occurred and risk events that have been predicted. For example: an occurred risk event refers to a risk event that still exists after the corresponding risk response operation is performed, and a predicted risk event refers to a risk event predicted before the corresponding risk response operation is performed; further, when the occurred risk events include events other than predicted risk events, it may be caused by the staff’s failure to handle the early warning prompts (subjectivity) or by inaccurate system predictions (objectivity), and the embodiments of the present invention do not limit this.

[0207] Further optionally, judging whether all predicted risk events meet a preset prediction completeness condition based on all predicted risk events and all occurred risk events may include:

[0208] Determine whether all predicted risk events include predicted risk events;

[0209] When the judgment result is yes, it is determined that all predicted risk events meet the preset prediction completeness condition; when the judgment result is no, it is determined that all predicted risk events do not meet the preset prediction completeness condition.

[0210] Optionally, the above-mentioned judgment of whether the target risk event meets the preset external cause generation condition based on the predicted risk status and the processing plan is given as an example: judging whether the existence of the target risk event is due to the fact that the staff did not artificially execute a certain processing plan, resulting in an additional risk event. If the staff performs risk processing according to the processing plan given by the system, the target risk event will not occur, and it is determined that the target risk event meets the preset external cause generation condition; if the target risk event is caused by inaccurate system risk prediction, then the target risk event does not meet the preset external cause generation condition, and the embodiments of the present invention are not limited to this.

[0211] It can be seen that this optional embodiment can determine the results of satisfaction of the evaluation accuracy conditions through the satisfaction of the prediction completeness conditions of all predicted risk events and the satisfaction of the external cause generation conditions of all target risk events, which is conducive to improving the rationality, progressiveness and comprehensiveness of the method for determining the results of satisfaction of the evaluation accuracy conditions, and further helps to improve the accuracy and reliability of the determined results of satisfaction of the evaluation accuracy conditions, thereby helping to improve the rationality, accuracy and timeliness of the execution of operations triggered by the evaluation accuracy satisfaction results.

[0212] Embodiment 3

[0213] See also Figure 3 , Figure 3 Schematic diagram of a multi-dimensional dynamic risk early warning system disclosed in an embodiment of the present invention. Figure 3 The described system may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiment of the present invention. Figure 3 As shown, the multi-dimensional dynamic risk early warning system may include:

[0214] The determination module 301 is used to determine an object to be evaluated that needs to be evaluated for risk warning, and to determine indicator-related information of the object to be evaluated for at least one preset risk warning indicator.

[0215] The current value determination module 302 is used to analyze the risk current value corresponding to each risk warning indicator according to the indicator-related information of each risk warning indicator.

[0216] The assessment value determination module 303 is used to determine the risk assessment value of each risk warning indicator. The risk assessment value at least includes a risk red light value, a risk green light value and a risk benchmark value.

[0217] The risk warning module 304 is used to determine the risk status of the object to be evaluated according to the risk assessment value and the current risk value corresponding to each risk warning indicator, and perform corresponding risk response operations according to the risk status.

[0218] It can be seen that the implementation Figure 3The described multi-dimensional dynamic risk warning system can determine the current risk value and risk judgment value of the risk warning indicator of the object to be evaluated, and determine the risk status of the object to be evaluated based on the risk judgment value and the current risk value, and then perform corresponding risk response operations, which is conducive to improving the rationality and comprehensiveness of the risk status determination method of the object to be evaluated, and is also conducive to improving the rationality and comprehensiveness of the risk warning response method of the object to be evaluated, and is thereby conducive to improving the accuracy and reliability of the determined risk status, and is also conducive to improving the risk assessment efficiency and risk assessment accuracy of the object to be evaluated, thereby facilitating improving the execution rationality and execution accuracy of risk response operations based on the risk status, and is also conducive to improving the timeliness, efficiency and accuracy of the risk warning response of the object to be evaluated.

[0219] In an optional embodiment, the risk warning module 304 determines the risk status of the object to be evaluated according to the risk assessment value and the current risk value corresponding to each risk warning indicator, and performs corresponding risk response operations according to the risk status, specifically including:

[0220] For each risk warning indicator, when the current risk value corresponding to the risk warning indicator is greater than or equal to the corresponding risk red light value, the risk status of the object to be assessed for the risk warning indicator is determined to be a high risk status, and the corresponding high risk warning operation is performed;

[0221] When the current risk value corresponding to the risk warning indicator is less than or equal to the corresponding risk green light value, the risk status of the object to be assessed for the risk warning indicator is determined to be a low risk status;

[0222] When the current risk value corresponding to the risk warning indicator is between the corresponding risk green light value and the corresponding risk benchmark value, the risk status of the object to be assessed for the risk warning indicator is determined to be a moderate risk status, and the corresponding moderate warning operation is performed;

[0223] and / or,

[0224] According to the risk assessment value and current risk value corresponding to each risk warning indicator, determine the current risk status corresponding to each risk warning indicator, and determine the historical risk status of the object to be assessed corresponding to each risk warning indicator;

[0225] Analyze the overall risk accumulation and overall risk changes of the object to be assessed based on the current and historical risk status of each risk warning indicator;

[0226] Based on the overall risk accumulation and overall risk changes, determine the comprehensive risk results of the object to be assessed, and perform corresponding early warning response operations based on the comprehensive risk results.

[0227] It can be seen that the implementation Figure 4 The described system can provide risk status assessment and risk response methods for a single risk warning indicator, and assessment and risk response methods for the overall risk of the object to be assessed, which is conducive to improving the pertinence, flexibility and comprehensiveness of risk assessment and response methods, and thus to improving the accuracy and reliability of risk assessment and response results. The dual warning mechanism is adopted, which is conducive to improving the timeliness of risk response and operational safety and stability of the object to be assessed.

[0228] In another optional embodiment, all risk warning indicators include a first risk indicator at the company level and a second risk indicator at the department level; all second risk indicators at the department level include a third risk indicator at the result level and a fourth risk indicator at the process level.

[0229] It can be seen that the implementation Figure 4 The described system can also divide all risk warning indicators into multiple levels and dimensions, which is conducive to improving the comprehensiveness, diversity and flexibility of risk warning indicators, and further to improving the comprehensiveness of reflecting the risk status of risk warning indicators and the accuracy of warning, thereby helping to improve the timeliness of risk discovery and problem solving for risk warning indicators.

[0230] In yet another optional embodiment, Figure 4 As shown, the system may also include:

[0231] The weight determination module 305 is used to determine the field information involved in each risk warning indicator; for each risk warning indicator, determine the project information and application information of each involved field based on the field information involved in the risk warning indicator; analyze the execution importance corresponding to the risk warning indicator based on the project information, and analyze the impact degree corresponding to the risk warning indicator based on the project information and application information; determine the assessment weight of the risk warning indicator based on the execution importance and the impact degree.

[0232] It can be seen that the implementation Figure 4 The described system can also determine the assessment weights of risk warning indicators based on the execution importance and impact of the risk warning indicators, which is conducive to improving the comprehensiveness and rationality of the method of determining the assessment weights, and then to improving the accuracy and reliability of the determined assessment weights, thereby helping to improve the accuracy and objectivity of the risk assessment results and risk warning results determined based on the assessment weights.

[0233] In another optional embodiment, the risk warning module 304 determines the comprehensive risk result of the object to be assessed according to the overall risk accumulation and overall risk change, specifically including:

[0234] The comprehensive risk result of the object to be assessed is determined based on the assessment weight of each risk warning indicator, the risk accumulation of each risk warning indicator included in the overall risk accumulation, and the risk change of each risk warning indicator included in the overall risk change.

[0235] It can be seen that the implementation Figure 4 The described system can also determine the comprehensive risk result of the object to be evaluated in combination with the evaluation weight of each risk warning indicator, which is conducive to improving the rationality and comprehensiveness of the method of determining the comprehensive risk result, and then to improving the accuracy and reliability of the determined comprehensive risk result, thereby helping to improve the focus, objectivity and accuracy of risk warnings for different risk warning indicators.

[0236] In another optional embodiment, the risk warning module 304 analyzes the overall risk accumulation and overall risk change of the object to be evaluated according to the current risk status and historical risk status of each risk warning indicator in the following manner:

[0237] For each risk warning indicator, one or more historical risk events and the processing status of each historical risk event are determined based on the historical risk status of the risk warning indicator, and the processing status includes a processed status or a pending status; based on the event information, processing status and interval time with the current time corresponding to each historical risk event, the risk accumulation situation corresponding to the risk warning indicator is determined;

[0238] For each risk warning indicator, determine the risk change of the risk warning indicator based on the current risk status and historical risk status of the risk warning indicator;

[0239] According to the risk changes of each risk warning indicator, the overall risk changes of the object to be evaluated are determined, and according to the risk accumulation of each risk warning indicator, the overall risk accumulation of the object to be evaluated is determined.

[0240] It can be seen that the implementation Figure 4 The described system can also provide a method for determining the risk accumulation situation and the risk change situation of the risk warning indicators, determine the risk accumulation situation and the risk change situation of each risk warning indicator, and then determine the overall risk change situation and the overall risk accumulation situation, which is conducive to improving the comprehensiveness and rationality of the method for determining the risk accumulation situation, and then help improve the accuracy and reliability of the determined risk accumulation situation, and then help improve the accuracy and reliability of the determined overall risk accumulation situation. In addition, it is also conducive to improving the comprehensiveness and rationality of the method for determining the risk change situation, and then help improve the accuracy and reliability of the determined risk change situation, and then help improve the accuracy and reliability of the determined overall risk change situation.

[0241] In yet another optional embodiment, the method in which the risk assessment value determining module 303 determines the risk assessment value of each risk warning indicator specifically includes:

[0242] For each risk warning indicator, obtain the historical behavior data of the risk warning indicator; determine one or more risk foreshadowing phenomena and the frequency of occurrence of each risk foreshadowing phenomenon based on the historical behavior data; determine one or more historical risk phenomena and the hazard information of each historical risk phenomenon based on the historical behavior data; analyze the first risk assessment result of the risk warning indicator based on the phenomenon information of each risk foreshadowing phenomenon and its frequency of occurrence, the phenomenon information of each historical risk phenomenon and its hazard information;

[0243] Obtaining industry standard information of the risk warning indicator; determining one or more designated risk phenomena for different hazard levels and phenomenon information of each designated risk phenomenon based on the industry standard information; determining a response plan for each designated risk phenomenon based on the industry standard information; analyzing the second risk assessment result of the risk warning indicator based on the phenomenon information of each designated risk phenomenon and its response plan;

[0244] Obtain expert opinion information on the risk warning indicator; and analyze the third risk assessment result of the risk warning indicator based on the expert opinion information;

[0245] The risk assessment value of the risk warning indicator is determined based on the first risk assessment result, the second risk assessment result and the third risk assessment result.

[0246] It can be seen that the implementation Figure 4 The described system can also provide corresponding risk assessment result determination methods for historical behavior data, behavior standard information and expert opinion information respectively, and determine the risk assessment value of the risk warning indicator through the three levels of historical behavior data, behavior standard information and expert opinion information, which is conducive to improving the diversity, flexibility, pertinence and rationality of the risk assessment result determination method, and thus is conducive to improving the accuracy and reliability of the determined risk assessment results, thereby helping to improve the accuracy and reliability of the risk assessment value of the determined risk warning indicator. In addition, it is also conducive to improving the diversity and comprehensiveness of the risk assessment value determination parameter levels (i.e., historical data level, industry standard level and expert opinion level).

[0247] In another optional embodiment, the determination module 301 is also used to determine the risk assessment and warning results of all risk warning indicators after determining the risk judgment value of each risk warning indicator, the risk assessment and warning results include the predicted risk status determined by the risk judgment value and the current risk value and the treatment plan for the predicted risk status; determine the existing risk status corresponding to the object to be evaluated, and the existing risk status includes the risk status that still exists after executing the corresponding risk response operation.

[0248] like Figure 4 As shown, the system may also include:

[0249] The judgment module 306 is used to judge whether the risk evaluation values ​​of all risk warning indicators meet the preset evaluation accuracy conditions according to the existing risk conditions, predicted risk conditions and treatment plans.

[0250] The evaluation value determination module 303 is also used to perform a risk evaluation value calibration operation on all risk warning indicators when the judgment module 306 determines that the risk evaluation values ​​of not all risk warning indicators meet the evaluation accuracy condition.

[0251] It can be seen that the implementation Figure 4 The described system can also determine whether the risk assessment value meets the assessment accuracy conditions. If not, a risk assessment value calibration operation is performed, which is conducive to improving the comprehensiveness and integrity of the risk assessment value determination method, and further conducive to improving the rationality and timeliness of the execution of the risk assessment value calibration operation, thereby helping to improve the accuracy and reliability of the determined risk assessment value, and further conducive to improving the rationality, accuracy and reliability of risk assessment warnings based on risk assessment values.

[0252] In another optional embodiment, the judgment module 306 judges whether the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy conditions according to the existing risk conditions, the predicted risk conditions and the treatment plan, specifically including:

[0253] Based on the risk conditions that have occurred, determine one or more risk events that have occurred, and based on the predicted risk conditions, determine one or more predicted risk events;

[0254] Based on all predicted risk events and all existing risk events, determine whether all predicted risk events meet the preset prediction completeness conditions;

[0255] When it is determined that all predicted risk events do not meet the prediction completeness condition, based on all predicted risk events and all existing risk events, unpredicted target risk events are screened out from all existing risk events;

[0256] Based on the predicted risk status and treatment plan, determine whether the target risk event meets the preset external cause generation conditions;

[0257] When it is determined that the target risk event meets the external cause generation conditions, it is determined that the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy conditions;

[0258] When it is determined that the target risk event does not meet the external cause generation condition, it is determined that the risk assessment values ​​of all risk warning indicators do not all meet the preset assessment accuracy condition;

[0259] When it is determined that all predicted risk events meet the prediction completeness condition, it is determined that the risk assessment values ​​of all risk warning indicators meet the preset assessment accuracy condition.

[0260] It can be seen that the implementation Figure 4 The described system can also determine the results of satisfaction of the evaluation accuracy conditions through the satisfaction of the prediction completeness conditions of all predicted risk events and the satisfaction of the external cause generation conditions of all target risk events, which is conducive to improving the rationality, progressiveness and comprehensiveness of the method of determining the results of satisfaction of the evaluation accuracy conditions, and further helps to improve the accuracy and reliability of the determined results of satisfaction of the evaluation accuracy conditions, thereby helping to improve the rationality, accuracy and timeliness of the execution of operations triggered by the evaluation accuracy satisfaction results.

[0261] Embodiment 4

[0262] See also Figure 5 , Figure 5 It is a structural diagram of another multi-dimensional dynamic risk early warning system disclosed in an embodiment of the present invention. Figure 5 The described system may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiment of the present invention. Figure 5 As shown, the system may include:

[0263] A memory 401 storing executable program codes;

[0264] a processor 402 coupled to the memory 401;

[0265] Furthermore, it may also include an input interface 403 and an output interface 404 coupled to the processor 402;

[0266] The processor 402 calls the executable program code stored in the memory 401 to execute the steps in the multi-dimensional dynamic risk warning method described in the first or second embodiment.

[0267] Embodiment 5

[0268] An embodiment of the present invention discloses a computer storage medium storing a computer program for electronic data exchange, wherein the computer program enables a computer to execute the steps of a multi-dimensional dynamic risk warning method described in Embodiment 1 or Embodiment 2.

[0269] Embodiment 6

[0270] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in a multi-dimensional dynamic risk warning method described in Embodiment 1 or Embodiment 2.

[0271] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0272] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, a magnetic disk storage, a magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0273] Finally, it should be noted that the multi-dimensional dynamic risk warning method and system disclosed in the embodiment of the present invention discloses only the preferred embodiments of the present invention, which are only used to illustrate the technical scheme of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical schemes described in the aforementioned embodiments can still be modified, or some of the technical features therein can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical schemes from the spirit and scope of the technical schemes of the embodiments of the present invention.

Claims

1. A multi-dimensional dynamic risk early warning method, characterized in that: The method comprises: Determine an object to be evaluated that needs to be evaluated for risk warning, and determine indicator-related information of the object to be evaluated for at least one preset risk warning indicator; According to the indicator-related information of each of the risk warning indicators, the current risk value corresponding to each of the risk warning indicators is analyzed, and the risk evaluation value of each of the risk warning indicators is determined, wherein the risk evaluation value at least includes a risk red light value, a risk green light value and a risk benchmark value; According to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, the risk status of the object to be assessed is determined, and according to the risk status, corresponding risk response operations are performed.

2. A multi-dimensional dynamic risk early warning method according to claim 1, characterized in that: Determining the risk status of the object to be assessed according to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, and performing corresponding risk response operations according to the risk status, includes: For each of the risk warning indicators, when the current risk value corresponding to the risk warning indicator is greater than or equal to the corresponding risk red light value, the risk state of the object to be assessed for the risk warning indicator is determined to be a high risk state, and a corresponding high risk warning operation is performed; When the current risk value corresponding to the risk warning indicator is less than or equal to the corresponding risk green light value, it is determined that the risk state of the object to be evaluated for the risk warning indicator is a low risk state; When the current risk value corresponding to the risk warning indicator is between the corresponding risk green light value and the corresponding risk benchmark value, it is determined that the risk state of the object to be assessed for the risk warning indicator is a moderate risk state, and a corresponding moderate warning operation is performed; and / or, According to the risk assessment value and the current risk value corresponding to each of the risk warning indicators, determine the current risk status corresponding to each of the risk warning indicators, and determine the historical risk status of the object to be assessed corresponding to each of the risk warning indicators; Analyze the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator; According to the overall risk accumulation and the overall risk change, the comprehensive risk result of the object to be assessed is determined, and according to the comprehensive risk result, corresponding early warning response operations are performed.

3. A multi-dimensional dynamic risk early warning method according to claim 2, characterized in that: All of the risk warning indicators include the first risk indicator at the company level and the second risk indicator at the department level; All the second risk indicators at the department level include the third risk indicator for the result level and the fourth risk indicator for the process level; And, the method further comprises: Determine the field information involved in each of the risk warning indicators; For each of the risk warning indicators, determine the project information and application information of each involved field according to the involved field information of the risk warning indicator; Analyze the execution importance of the risk warning indicator based on the project information, and analyze the impact of the risk warning indicator based on the project information and application information; Determine the assessment weight of the risk warning indicator based on the execution importance and the impact degree; And, determining the comprehensive risk result of the object to be assessed based on the overall risk accumulation and the overall risk change, including: The comprehensive risk result of the object to be evaluated is determined based on the assessment weight of each risk warning indicator, the risk accumulation situation of each risk warning indicator included in the overall risk accumulation situation, and the risk change situation of each risk warning indicator included in the overall risk change situation.

4. A multi-dimensional dynamic risk early warning method according to claim 2, characterized in that: The analysis of the overall risk accumulation and overall risk change of the object to be assessed based on the current risk status and historical risk status of each risk warning indicator includes: For each of the risk warning indicators, one or more historical risk events and the processing status of each of the historical risk events are determined according to the historical risk status of the risk warning indicator, and the processing status includes a processed status or a pending status; based on the event information, processing status and interval time with the current time corresponding to each of the historical risk events, the risk accumulation situation corresponding to the risk warning indicator is determined; For each of the risk warning indicators, determine the risk change of the risk warning indicator based on the current risk status and historical risk status of the risk warning indicator; According to the risk change of each of the risk warning indicators, the overall risk change of the object to be evaluated is determined, and according to the risk accumulation of each of the risk warning indicators, the overall risk accumulation of the object to be evaluated is determined.

5. A multi-dimensional dynamic risk early warning method according to any one of claims 1 to 4, characterized in that: Determining the risk assessment value of each risk warning indicator includes: For each of the risk warning indicators, obtain the historical behavior data of the risk warning indicator; determine one or more risk precursor phenomena and the frequency of occurrence of each of the risk precursor phenomena based on the historical behavior data; determine one or more historical risk phenomena and the hazard information of each of the historical risk phenomena based on the historical behavior data; analyze the first risk assessment result of the risk warning indicator based on the phenomenon information of each of the risk precursor phenomena and its frequency of occurrence, the phenomenon information of each of the historical risk phenomena and its hazard information; Obtaining industry standard information of the risk warning indicator; determining one or more designated risk phenomena for different hazard levels and phenomenon information of each designated risk phenomenon according to the industry standard information; determining a response plan for each designated risk phenomenon according to the industry standard information; analyzing the second risk assessment result of the risk warning indicator according to the phenomenon information of each designated risk phenomenon and its response plan; Obtaining expert opinion information of the risk warning indicator; analyzing the third risk assessment result of the risk warning indicator according to the expert opinion information; A risk assessment value of the risk warning indicator is determined according to the first risk assessment result, the second risk assessment result and the third risk assessment result.

6. A multi-dimensional dynamic risk early warning method according to any one of claims 1 to 4, characterized in that: After determining the risk assessment value of each risk warning indicator, the method further includes: Determine the risk assessment and warning results of all the risk warning indicators, wherein the risk assessment and warning results include the predicted risk status determined by the risk assessment value and the current risk value and the treatment plan for the predicted risk status; Determine the existing risk status corresponding to the object to be assessed, wherein the existing risk status includes the risk status that still exists after the corresponding risk response operation is performed; According to the existing risk conditions, the predicted risk conditions and the treatment plan, determining whether the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy conditions; When it is determined that the risk assessment values ​​of not all of the risk warning indicators meet the assessment accuracy condition, a risk assessment value calibration operation is performed on all of the risk warning indicators.

7. A multi-dimensional dynamic risk early warning method according to claim 6, characterized in that: The step of judging whether the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy conditions according to the existing risk conditions, the predicted risk conditions and the treatment plan includes: Determine one or more risk events that have occurred based on the risk conditions that have occurred, and determine one or more predicted risk events based on the predicted risk conditions; According to all the predicted risk events and all the occurred risk events, determining whether all the predicted risk events meet a preset prediction completeness condition; When it is determined that all the predicted risk events do not satisfy the prediction completeness condition, based on all the predicted risk events and all the occurred risk events, unpredicted target risk events are screened out from all the occurred risk events; According to the predicted risk status and the processing plan, judging whether the target risk event meets the preset external cause generation condition; When it is determined that the target risk event meets the external cause generation condition, it is determined that the risk assessment values ​​of all the risk warning indicators meet the preset assessment accuracy condition; When it is determined that the target risk event does not satisfy the external cause generation condition, determining that the risk assessment values ​​of all the risk warning indicators do not all satisfy the preset assessment accuracy condition; When it is determined that all of the predicted risk events satisfy the prediction completeness condition, it is determined that the risk assessment values ​​of all of the risk warning indicators satisfy the preset assessment accuracy condition.

8. A multi-dimensional dynamic risk early warning system, characterized in that: The system comprises: A determination module is used to determine an object to be evaluated that needs to be evaluated for risk warning, and to determine the indicator-related information of the object to be evaluated for at least one preset risk warning indicator; A current value determination module, used to analyze the current risk value corresponding to each risk warning indicator according to the indicator-related information of each risk warning indicator; An evaluation value determination module is used to determine the risk evaluation value of each of the risk warning indicators, wherein the risk evaluation value at least includes a risk red light value, a risk green light value and a risk benchmark value; The risk warning module is used to determine the risk status of the object to be evaluated according to the risk assessment value and the current risk value corresponding to each risk warning indicator, and perform corresponding risk response operations according to the risk status.

9. A multi-dimensional dynamic risk early warning system, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the multi-dimensional dynamic risk warning method as described in any one of claims 1-7.

10. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, which, when called, are used to execute a multi-dimensional dynamic risk warning method as described in any one of claims 1-7.

Citation Information

Cited By

  • Calculation method and system for multi-region risk

    CN122046031A