Impact-resistant polypropylene material for upper cover of battery pack of new energy automobile and preparation method of impact-resistant polypropylene material

By constructing the material formula score tree diagram and performance score curve, the optimal formula score of the battery pack upper cover was determined, which solved the problem of poor performance of the battery pack upper cover material, and achieved improvements in impact strength and lightweight.

CN118983030AInactive Publication Date: 2024-11-19广东亨嘉橡塑科技有限公司

Patent Information

Application Number
CN202411002234.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The current impact-resistant polypropylene material used for the upper cover of the battery pack has the problem of poor material performance. The existing research mainly tests the performance values ​​of different formula components through simple experiments, and has not conducted a systematic and comprehensive study of the formula components. .

Method used

By obtaining the quality score test sequence and tree level of the formula material, constructing a tree diagram of the material formula score, extracting performance indicators, performing performance tests, calculating index weights, drawing performance change curves, identifying dynamic formula scores, and using formula scoring formulas to calculate dynamics Formula score value, determine the optimal formula score to prepare impact-resistant polypropylene materials.

Benefits of technology

The system optimization of the material performance of the battery pack cover is achieved, the impact strength and lightweight properties of the material are improved, and the overall performance of the battery pack is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983030A_ABST
    Figure CN118983030A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of polypropylene material preparation, and discloses an impact-resistant polypropylene material for a new energy automobile battery pack upper cover and a preparation method thereof.The preparation method comprises the steps that a material formula score tree diagram is constructed according to multiple mass fraction test sequence sets, and a material formula score set of material leaf nodes is recognized; performing performance testing on the multiple groups of to-be-tested polypropylene materials according to the performance indexes to obtain a transverse index performance set, drawing a performance change curve set according to the transverse index performance set, calculating an index weight set according to a target index performance interval set, and identifying an index performance value interval and a performance change value curve corresponding to the maximum index weight. Identifying a formula score value interval according to the index performance value interval, identifying an optimal formula score, and preparing the impact-resistant polypropylene material for the cover according to the optimal formula score. The invention mainly aims to solve the problem that the currently prepared impact-resistant polypropylene material for the upper cover of the battery pack is poor in material performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method and a device thereof, belonging to the technical field of polypropylene material preparation. Background Art

[0002] Polypropylene (PP) has good stiffness, hardness and chemical resistance, and is widely used in a wide range of fields such as electrical appliances, automobiles, and civil construction. With the development of the automobile industry, the proportion of polypropylene used in the automotive field continues to grow.

[0003] With the rapid development of the new energy vehicle industry, power batteries, as one of the core components of electric vehicles, are directly related to the overall performance of electric vehicles in terms of performance and safety. As an important component for protecting power batteries, the impact-resistant polypropylene material used in the battery pack cover not only needs to have sufficient strength and rigidity to cope with impact and vibration under various working conditions, but also needs to be lightweight to increase the vehicle's range. Therefore, the formula component ratio of the impact-resistant polypropylene material used in the battery pack cover has become a hot topic in industry research.

[0004] At present, the research on the proportion of formula components in the impact-resistant polypropylene material for battery pack covers is mainly carried out through simple experiments to test the performance values ​​of different formula component proportions on various performance indicators, and then comprehensively determine the suitability of different formula component proportions based on the performance values ​​on various performance indicators. Since this method simply tests the performance values ​​of multiple formula component proportions and does not conduct a systematic and comprehensive study of the formula components, the currently prepared impact-resistant polypropylene material for battery pack covers has the problem of poor material performance. Summary of the invention

[0005] The present invention provides an impact-resistant polypropylene material for a new energy vehicle battery pack cover and a preparation method, a device and a computer-readable storage medium thereof, the main purpose of which is to solve the problem of poor material performance of the currently prepared impact-resistant polypropylene material for a battery pack cover.

[0006] To achieve the above-mentioned purpose, the present invention provides an impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method thereof, comprising:

[0007] Obtaining a mass score test sequence and a tree hierarchy of each formula material in a formula material set, performing sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and constructing a material formula score tree diagram according to the multiple sets of mass score test sequence sets;

[0008] Acquire a performance indicator set, extract performance indicators in sequence from the performance indicator set, extract material leaf nodes in sequence from the material formula score tree diagram, and identify the material formula score set of the material leaf node;

[0009] Prepare impact-resistant polypropylene materials for covers of new energy battery packs according to the material formula score set to obtain multiple groups of polypropylene materials to be tested, and perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set;

[0010] Draw a performance change curve according to the horizontal indicator performance set, summarize the performance change curves of each performance indicator, and obtain a performance change curve set;

[0011] A target indicator performance interval set is received, and according to the target indicator performance interval set, an indicator weight of each performance indicator is calculated using a pre-built indicator weight formula to obtain an indicator weight set, wherein the indicator weight formula is as follows:

[0012]

[0013] Among them, k i represents the indicator weight of the i-th performance indicator, t i represents the fluctuation range of the i-th performance indicator, b i represents the target indicator performance interval value of the i-th performance indicator, i represents the serial number of the performance indicator, n represents the total number of performance indicators, t1 represents the fluctuation interval value of the first performance indicator, b1 represents the target indicator performance interval value of the first performance indicator, t n Indicates the fluctuation range of the nth performance indicator, b n represents the target indicator performance interval value of the nth performance indicator;

[0014] Extracting the maximum indicator weight from the indicator weight set, and identifying the indicator performance value interval and performance change value curve corresponding to the maximum indicator weight;

[0015] According to the index performance value interval, intercept the index starting performance point and the index ending performance point in the performance change value curve, and identify the formula score value interval corresponding to the index starting performance point and the index ending performance point;

[0016] Sliding values ​​are taken within a formula score value interval to obtain a dynamic formula score, and a longitudinal indicator performance set corresponding to the dynamic formula score in the performance change curve set is identified;

[0017] According to the vertical indicator performance set, a dynamic recipe score value is calculated using a pre-built recipe score formula, wherein the recipe score formula is as follows:

[0018] p=k1×(y1-Y1)+k2×(y2-Y2)+…+k n ×(y n -Y n )

[0019] Wherein, p represents the dynamic formula score value, k1 represents the indicator weight of the first indicator performance, y1 represents the indicator performance of the first indicator performance in the vertical indicator performance set, Y1 represents the median of the target indicator performance interval of the first indicator performance, k2 represents the indicator weight of the second indicator performance, y2 represents the indicator performance of the second indicator performance in the vertical indicator performance set, Y2 represents the median of the target indicator performance interval of the second indicator performance, k n Indicates the indicator weight of the nth indicator performance, y n represents the performance of the nth indicator in the vertical indicator performance set, Y n The median of the target indicator performance interval representing the performance of the nth indicator;

[0020] A dynamic formula scoring curve is drawn according to the dynamic formula scoring value, an optimal formula score is extracted from the dynamic formula scoring curve, an optimal formula score corresponding to the optimal formula score is identified, and an impact-resistant polypropylene material for the lid is prepared according to the optimal formula score.

[0021] Optionally, the step of obtaining a mass fraction test sequence and a tree hierarchy of each formula material in a formula material set includes:

[0022] Obtain the material formula score value interval and material formula score gradient for each formula material, and calculate the formula score value number using the following formula according to the material formula score value interval and material formula score gradient:

[0023]

[0024] Among them, γ j Indicates the formula score value of the j-th formula material, Represents the material formula score value interval of the jth formula material, ∈ j represents the material recipe score gradient of the jth recipe material;

[0025] According to the formula score values, the formula materials are hierarchically sorted from small to large to obtain a tree hierarchy of the formula materials;

[0026] According to the material formula score value interval and the material formula score gradient, the mass score test sequence is calculated using a pre-constructed mass formula, wherein the mass formula is as follows:

[0027]

[0028] in, represents the mth quality test score of the jth recipe material, represents the starting mass fraction of the material formula score value interval of the j-th formula material, and m represents the serial number of the mass test score of the j-th formula material.

[0029] Optionally, constructing a material recipe score dendrogram according to a plurality of sets of quality score test sequence sets comprises:

[0030] hierarchically locate the quality score test sequence set according to the tree hierarchy to obtain multiple groups of quality score hierarchical test sequences, extract a starting score test sequence set with a preset sequence replication number of 1 from the multiple groups of quality score test sequence sets, and construct an initial recipe score tree diagram according to the starting score test sequence set;

[0031] Extracting a leaf node level test sequence of the initial recipe score dendrogram from the multiple groups of quality score level test sequences;

[0032] Identifying an initial leaf node set of the initial recipe score dendrogram, and sequentially extracting quality score leaf nodes from the initial leaf node set of the initial recipe score dendrogram;

[0033] Performing node growth at the mass score leaf node according to the leaf node level test sequence to obtain an iterative formula score dendrogram;

[0034] Determining whether the mass score leaf nodes have been extracted;

[0035] If the mass score leaf nodes have not been completely extracted, returning to the above step of sequentially extracting mass score leaf nodes from the initial leaf node set in the initial recipe score dendrogram;

[0036] If the mass score leaf node is extracted, then the leaf node level of the iterative formula score dendrogram is identified to determine whether the leaf node level is equal to a preset level threshold;

[0037] If the leaf node level is not equal to the level threshold, the initial recipe score tree diagram is updated by using the iterative recipe score tree diagram, and the step of extracting the leaf node level test sequence of the initial recipe score tree diagram from the multiple groups of quality score level test sequences is returned to the above step;

[0038] If the leaf node level is equal to the level threshold, the original recipe score dendrogram is obtained;

[0039] The nodes of the original formula score dendrogram are reordered to obtain a material formula score dendrogram.

[0040] Optionally, drawing a performance change curve according to the horizontal indicator performance set includes:

[0041] Extracting lateral index performances in turn from the lateral index performance set, and identifying a set of associated formula scores of the lateral index performances;

[0042] According to the associated recipe score set and the lateral index performance, points are plotted in a pre-constructed recipe score-index performance coordinate system to obtain a recipe score-performance point set;

[0043] The formula score-performance point set is subjected to curve fitting to obtain a performance change curve.

[0044] Optionally, before calculating the indicator weight of each performance indicator using a pre-built indicator weight formula according to the target indicator performance interval set, the method further includes:

[0045] Extracting performance change curves in sequence from the performance change curve set, and identifying maximum performance values ​​and minimum performance values ​​of the performance change curves;

[0046] A fluctuation interval value is constructed according to the minimum performance value and the maximum performance value to obtain a fluctuation interval value set.

[0047] Optionally, intercepting an indicator starting performance point and an indicator ending performance point in the performance change value curve according to the indicator performance value interval includes:

[0048] Identify the interval starting performance value and the interval ending performance value of the indicator performance value interval;

[0049] Constructing an interval start horizontal section and an interval end horizontal section according to the interval start performance value, and using the interval start horizontal section and the interval end horizontal section to intercept a performance change value line segment in the performance change value curve;

[0050] Identify the index starting performance point and the index ending performance point of the performance change value segment.

[0051] Optionally, performing sliding value determination within a formula score value interval to obtain a dynamic formula score includes:

[0052] Obtaining the sliding value step and the starting formula score value point of the formula score value interval;

[0053] The sliding value is started at the starting formula score value point according to the sliding value step to obtain a dynamic formula score.

[0054] Optionally, the identifying the longitudinal indicator performance set corresponding to the dynamic recipe score in the performance change curve set includes:

[0055] Constructing a longitudinal performance value line according to the dynamic recipe score, and finding the intersection of the longitudinal performance value line and the performance change curve set to obtain a longitudinal performance intersection set;

[0056] The index performance of each longitudinal performance intersection point in the longitudinal performance intersection point set is identified to obtain a longitudinal index performance set.

[0057] Optionally, the step of reordering nodes of the original recipe score dendrogram to obtain a material recipe score dendrogram includes:

[0058] Identifying a node set at the same level in the original recipe score dendrogram, and extracting a plurality of sets of same-parent brother node sets from the node set at the same level, wherein the same-parent brother node set is a set of brother nodes with the same parent node;

[0059] Sorting the multiple groups of sibling node sets to obtain a sequence of sibling node sets;

[0060] Identifying a node set sequence number of each sibling node set in the sibling node set sequence;

[0061] Identifying a sequence parity of the node set sequence number;

[0062] Classifying the sibling node sets into odd and even groups according to the sequence number parity to obtain multiple groups of odd sibling node sets and multiple groups of even sibling node sets;

[0063] A starting brother node and an ending brother node are identified in the even-numbered brother node set, and the node positions of the starting brother node and the ending brother node are swapped to obtain the material formula score dendrogram.

[0064] Optionally, before drawing the performance change curve according to the horizontal indicator performance set, the method further includes:

[0065] Extracting a material leaf node sequence from the material formula score dendrogram, identifying a material formula score set of each material leaf node in the material leaf node set, and obtaining a material formula score set sequence;

[0066] A recipe score-indicator performance coordinate system is constructed according to the performance indicator set and the material recipe score set sequence, wherein the vertical axis of the recipe score-indicator performance coordinate system is the indicator performance, and the horizontal axis is the material recipe score.

[0067] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:

[0068] at least one processor; and,

[0069] a memory communicatively connected to the at least one processor; wherein,

[0070] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to realize the above-mentioned impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof.

[0071] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored. The at least one instruction is executed by a processor in an electronic device to realize the above-mentioned impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and its preparation method.

[0072] Compared with the problem described in the background technology, the embodiment of the present invention first obtains the mass score test sequence and tree hierarchy of each formula material in the formula material set. Since the number of mass score test sequences in each tree hierarchy in the material formula score tree diagram is different, it is necessary to perform sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and then construct a material formula score tree diagram based on the multiple sets of mass score test sequence sets. In order to prepare the impact-resistant polypropylene material for the cover of the new energy battery pack according to the material formula score set, multiple sets of polypropylene materials to be tested are obtained. First, it is necessary to obtain a performance indicator set, and then extract the performance indicators in the performance indicator set in sequence. , then extract material leaf nodes in the material formula score tree diagram in turn, so as to achieve the purpose of identifying the material formula score set of the material leaf node. After obtaining multiple groups of polypropylene materials to be tested, it is necessary to perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set, and then draw a performance change curve according to the transverse indicator performance set to obtain a performance change curve set. At this time, the target indicator performance interval set can be received. Since the size of each target indicator performance interval is different, the indicator weight of each performance indicator can be calculated according to the target indicator performance interval set using a pre-built indicator weight formula to obtain an indicator weight set, so that the indicator weight can be used in the indicator weight. The maximum indicator weight is extracted from the re-concentration, and the indicator performance value interval and the performance change value curve corresponding to the maximum indicator weight are identified. At this time, it is necessary to identify the recipe score value interval, and then slide the value within the recipe score value interval to obtain the dynamic recipe score. When obtaining the recipe score value interval, it is necessary to intercept the indicator starting performance point and the indicator ending performance point in the performance change value curve according to the indicator performance value interval, so as to identify the recipe score value interval corresponding to the indicator starting performance point and the indicator ending performance point. Since it is necessary to perform a comprehensive performance comparison on the longitudinal indicator performance set of the dynamic recipe score, it is necessary to identify the dynamic recipe score in the performance change curve set. The vertical indicator performance set corresponding to the vertical indicator performance set is then calculated using a pre-built formula scoring formula according to the vertical indicator performance set, and finally a dynamic formula scoring curve is drawn according to the dynamic formula scoring value, the optimal formula score is extracted from the dynamic formula scoring curve, and the optimal formula score corresponding to the optimal formula score is identified, and finally the impact-resistant polypropylene material for the cover is prepared according to the optimal formula score. Therefore, the impact-resistant polypropylene material for the upper cover of the battery pack of a new energy vehicle proposed in the present invention and the preparation method, device, electronic device and computer-readable storage medium thereof mainly aim to solve the problem of poor material performance of the currently prepared impact-resistant polypropylene material for the upper cover of the battery pack. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Figure 1A schematic diagram of an impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method thereof provided in one embodiment of the present invention;

[0074] Figure 2 A schematic structural diagram of an electronic device that implements the impact-resistant polypropylene material for the upper cover of a new energy vehicle battery pack and a preparation method thereof, provided in one embodiment of the present invention.

[0075] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments. DETAILED DESCRIPTION

[0076] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0077] The embodiment of the present application provides an impact-resistant polypropylene material for the upper cover of a new energy vehicle battery pack and a preparation method thereof. The execution subject of the impact-resistant polypropylene material for the upper cover of a new energy vehicle battery pack and the preparation method thereof includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided in the embodiment of the present application. In other words, the impact-resistant polypropylene material for the upper cover of a new energy vehicle battery pack and the preparation method thereof can be executed by software or hardware installed on a terminal device or a server device. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.

[0078] Embodiment 1:

[0079] Reference Figure 1 The figure is a schematic diagram of a process of an impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method thereof provided by an embodiment of the present invention. In this embodiment, the impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method thereof include:

[0080] S1. Obtain a mass score test sequence and a tree hierarchy for each formula material in a formula material set, perform sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and construct a material formula score tree diagram according to the multiple sets of mass score test sequence sets.

[0081] It can be explained that the formula material set refers to the preparation material set of impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack, such as: PP powder, POE toughening agent, talcum powder, nano calcium carbonate, sericite powder, anti-aging agent and masterbatch and other materials. The talcum powder can also be further subdivided into 5000 mesh talcum powder, 3000 mesh talcum powder and 1250 mesh talcum powder. The mass fraction test sequence refers to the mass fraction sequence of each formula material, for example: when the formula material is talcum powder, the mass fraction test sequence can be 15%, 18%, 21%, 24%, 27%, 30% and so on. The tree hierarchy refers to the number of levels of the mass fraction test sequence in the material formula score tree diagram. The sequence replication refers to replicating the mass fraction test sequence according to the tree hierarchy. The material formula score dendrogram refers to a dendrogram constructed based on multiple sets of mass fraction test sequence sets of various formula materials. For example, when the mass fraction test sequence of the PP powder is 42%, 42.5%, 43%, 43.5%, 44%, 44.5%, the mass fraction test sequence of the POE toughening agent is 4%, 4.2%, 4.4%, 4.6%.

[0082] When the mass fraction test sequence of the talc powder is 15%, 18%, 21%, 24%, 27%, then 4%, 4.2%,

[0083] The tree level of 4.4% and 4.6% can be 1, the tree level of 15%, 18%, 21%, 24%, and 27% can be 2, and the tree level of 42%, 42.5%, 43%, 43.5%, 44%, and 44.5% can be 3. Then 4% can be connected to 15%, 18%, 21%, 24%, and 27% by tree nodes; 4.2% can be connected to 15%, 18%, 21%, 24%, and 27% by tree nodes. Node connection; 4.4% can be connected with 15%, 18%, 21%, 24%, and 27% respectively through tree node connection; 4.6% can be connected with 15%, 18%, 21%, 24%, and 27% respectively through tree node connection; at this time, a two-level material formula score tree diagram is constructed, and further, 15% in the two-level material formula score tree diagram can be connected with the mass fraction test sequence of PP powder through tree node connection, and so on.

[0084] In the embodiment of the present invention, the method of obtaining the mass fraction test sequence and tree hierarchy of each formula material in the formula material set includes:

[0085] Obtain the material formula score value interval and material formula score gradient for each formula material, and calculate the formula score value number using the following formula according to the material formula score value interval and material formula score gradient:

[0086]

[0087] Among them, γ j Indicates the formula score value of the j-th formula material, Represents the material formula score value interval of the jth formula material, ∈ j represents the material recipe score gradient of the jth recipe material;

[0088] According to the formula score values, the formula materials are hierarchically sorted from small to large to obtain a tree hierarchy of the formula materials;

[0089] According to the material formula score value interval and the material formula score gradient, the mass score test sequence is calculated using a pre-constructed mass formula, wherein the mass formula is as follows:

[0090]

[0091] in, represents the mth quality test score of the jth recipe material, represents the starting mass fraction of the material formula score value interval of the j-th formula material, and m represents the serial number of the mass test score of the j-th formula material.

[0092] It can be understood that the material formula score value interval value refers to the value interval value of the material formula, and the material formula score gradient refers to the interval value of the material formula score. For example, when the mass fraction test sequence of PP powder is 42%, 42.5%, 43%, 43.5%, 44%, 44.5%, the material formula score value interval of the PP powder can be [42%, 44.5%], and the material formula score value interval value is 2.5%. The material formula score gradient is 0.5%. The formula score value number refers to the number of optional mass fractions of the formula material, for example, the formula score value number of the PP powder is 6. The tree level of the formula material is equal to its formula score value number.

[0093] In an embodiment of the present invention, the step of constructing a material formula score dendrogram according to a plurality of sets of quality score test sequence sets includes:

[0094] hierarchically locate the quality score test sequence set according to the tree hierarchy to obtain multiple groups of quality score hierarchical test sequences, extract a starting score test sequence set with a preset sequence replication number of 1 from the multiple groups of quality score test sequence sets, and construct an initial recipe score tree diagram according to the starting score test sequence set;

[0095] Extracting a leaf node level test sequence of the initial recipe score dendrogram from the multiple groups of quality score level test sequences;

[0096] Identifying an initial leaf node set of the initial recipe score dendrogram, and sequentially extracting quality score leaf nodes from the initial leaf node set of the initial recipe score dendrogram;

[0097] Performing node growth at the mass score leaf node according to the leaf node level test sequence to obtain an iterative formula score dendrogram;

[0098] Determining whether the mass score leaf nodes have been extracted;

[0099] If the mass score leaf nodes have not been completely extracted, returning to the above step of sequentially extracting mass score leaf nodes from the initial leaf node set in the initial recipe score dendrogram;

[0100] If the mass score leaf node is extracted, then the leaf node level of the iterative formula score dendrogram is identified to determine whether the leaf node level is equal to a preset level threshold;

[0101] If the leaf node level is not equal to the level threshold, the initial recipe score tree diagram is updated by using the iterative recipe score tree diagram, and the step of extracting the leaf node level test sequence of the initial recipe score tree diagram from the multiple groups of quality score level test sequences is returned to the above step;

[0102] If the leaf node level is equal to the level threshold, the original recipe score dendrogram is obtained;

[0103] The nodes of the original formula score dendrogram are reordered to obtain a material formula score dendrogram.

[0104] It is understandable that the multiple groups of mass fraction hierarchical test sequences refer to a set of mass fraction test sequences whose tree hierarchy has been determined and positioned according to the tree hierarchy. The starting score test sequence set refers to multiple groups of mass fraction hierarchical test sequences with a tree hierarchy of 1 (the number of sequence replications is 1), and the number of sequence replications refers to the number of replications of the mass fraction test sequence. The initial formula score dendrogram refers to a tree node sequence constructed according to the starting score test sequence set. For example, when the starting score test sequence set is a mass fraction test sequence of POE toughening agent of 4%, 4.2%, 4.4%, and 4.6%, the initial formula score dendrogram consists of four nodes, namely 4%, 4.2%, 4.4%, and 4.6%, respectively.

[0105] Further, the leaf node level test sequence refers to the next mass fraction test sequence set of the initial formula score tree diagram that needs to be tree-connected. For example, when the initial formula score tree diagram is composed of four nodes of 4%, 4.2%, 4.4%, and 4.6%, the leaf node level test sequence can be the mass fraction test sequence of talcum powder 15%, 18%, 21%, 24%, and 27%. The initial leaf node set refers to the leaf node set of the initial formula score tree diagram, and the leaf node refers to the node of the last tree level of the initial formula score tree diagram. The mass fraction leaf node refers to the leaf node in the initial leaf node set. The node growth refers to the tree node connection of the leaf node level test sequence with the mass fraction leaf node. The level threshold refers to the total number of tree levels of the material formula score tree diagram. The node reordering refers to the process of reordering the leaf nodes in the original formula score tree diagram. The reasons for the node reordering are described in detail below.

[0106] In the embodiment of the present invention, the step of reordering the nodes of the original recipe score dendrogram to obtain the material recipe score dendrogram includes:

[0107] Identifying a node set at the same level in the original recipe score dendrogram, and extracting a plurality of sets of same-parent brother node sets from the node set at the same level, wherein the same-parent brother node set is a set of brother nodes with the same parent node;

[0108] Sorting the multiple groups of sibling node sets to obtain a sequence of sibling node sets;

[0109] Identifying a node set sequence number of each sibling node set in the sibling node set sequence;

[0110] Identifying a sequence parity of the node set sequence number;

[0111] Classifying the sibling node sets into odd and even groups according to the sequence number parity to obtain multiple groups of odd sibling node sets and multiple groups of even sibling node sets;

[0112] A starting brother node and an ending brother node are identified in the even-numbered brother node set, and the node positions of the starting brother node and the ending brother node are swapped to obtain the material formula score dendrogram.

[0113] Furthermore, the node set of the same level refers to the set of nodes belonging to the same tree level. The node set of the same father and brother refers to the set of brother nodes belonging to the same parent node. For example, when 4% is connected to 15%, 18%, 21%, 24%, and 27% respectively in tree nodes, 4% is the parent node of 15%, 18%, 21%, 24%, and 27%, and 15%, 18%, 21%, 24%, and 27% are each other's brother nodes. Since the quality score test sequence needs to be replicated, there may be multiple sets of node sets of the same father and brother.

[0114] For example, when the tree level of 4%, 4.2%, 4.4%, and 4.6% is 1, the tree level of 15%, 18%, 21%, 24%, and 27% can be 2, and the tree level of 42%, 42.5%, 43%, 43.5%, 44%, and 44.5% can be 3, then 4% can be connected to 15%, 18%, 21%, 24%, and 27% respectively by tree nodes; 4.2% can be connected to 15%, 18%, 21%, 24%, and 27% respectively by tree nodes. ; 4.4% can be connected to 15%, 18%, 21%, 24%, and 27% in a tree-like node connection respectively; 4.6% can be connected to 15%, 18%, 21%, 24%, and 27% in a tree-like node connection respectively. At this time, the node set sequence number of the sibling node set connected to 4% is 1; the node set sequence number of the sibling node set connected to 4.2% is 2; the node set sequence number of the sibling node set connected to 4.4% is 3; the node set sequence number of the sibling node set connected to 4.6% is 4. The multiple sets of odd-numbered sibling nodes are 15%, 18%, 21%, 24%, and 27% of the node set sequence numbers 1 and 3, and the same is true for the multiple sets of even-numbered sibling nodes. The starting sibling node and the ending sibling node refer to the first node and the last node in the quality score test sequence. When the quality score test sequence is 15%, 18%, 21%, 24%, and 27%, the quality scores corresponding to the starting sibling node and the ending sibling node are 15% and 27%, respectively. The node position swapping refers to swapping the positions of the starting sibling node and the ending sibling node.

[0115] S2. Acquire a performance indicator set, extract performance indicators in the performance indicator set in sequence, extract material leaf nodes in the material formula score tree diagram in sequence, and identify the material formula score set of the material leaf node.

[0116] Explainably, the performance indicator set refers to a preset performance indicator set, such as room temperature impact strength, tensile strength, elongation, flexural strength, flexural modulus, etc. The material leaf node refers to a leaf node of the material formula score tree diagram. The material formula score set refers to the material formula score set corresponding to the material leaf node in the material formula score tree diagram. For example: 4% POE toughening agent, 18% talcum powder, 43% PP powder, etc.

[0117] S3. Prepare impact-resistant polypropylene material for the cover of a new energy battery pack according to the material formula score set to obtain multiple groups of polypropylene materials to be tested, and perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set.

[0118] It is understandable that the transverse index performance set refers to the index performance set obtained after the performance test of the multiple groups of polypropylene materials to be tested under the performance index. For example, the elongation can be 130%, 132%, 135%, 138%, 140% and 143%, etc.

[0119] S4. Draw a performance change curve according to the horizontal indicator performance set, summarize the performance change curves of each performance indicator, and obtain a performance change curve set.

[0120] It can be understood that the performance change curve refers to a curve that characterizes the corresponding relationship between each transverse index performance and the material formula score in the transverse index performance set. Since there are multiple performance indicators, there is a performance change curve set.

[0121] Furthermore, since the mass score test sequences in the original formula score tree diagram are arranged in order, the tail and head mass scores of two adjacent mass score test sequences in the same tree level are different. When drawing the performance change curve, the difference in material formula scores between two adjacent points on the performance change curve should be minimized as much as possible. Therefore, it is necessary to reorder the nodes of the original formula score tree diagram.

[0122] For example, the tree level of 4%, 4.2%, 4.4%, and 4.6% can be 1; the tree level of 15%, 18%, 21%, 24%, and 27% can be 2; the tree level of 42%, 42.5%, 43%, 43.5%, 44%, and 44.5% can be 3, and 4% can be connected to 15%, 18%, 21%, 24%, and 27% respectively through tree nodes; 4.2% can be connected to 15%, 18%, 21%, 24%, and 27% respectively through tree nodes. At this time, the tail quality score of the quality score test sequence connected to the 4% tree node is 27%, while the head quality score of the quality score test sequence connected to the 4.2% tree node is 15%. At this time, the tail and head quality scores are different, so the node positions of the starting brother node 15% and the ending brother node 27% in the quality score test sequence connected to the 4.2% tree node can be swapped. The same goes for reordering nodes in other tree levels.

[0123] In the embodiment of the present invention, before drawing the performance change curve according to the horizontal indicator performance set, the method further includes:

[0124] Extracting a material leaf node sequence from the material formula score dendrogram, identifying a material formula score set of each material leaf node in the material leaf node set, and obtaining a material formula score set sequence;

[0125] A recipe score-indicator performance coordinate system is constructed according to the performance indicator set and the material recipe score set sequence, wherein the vertical axis of the recipe score-indicator performance coordinate system is the indicator performance, and the horizontal axis is the material recipe score.

[0126] It can be understood that the material leaf node sequence refers to the leaf node sequence of the material formula score dendrogram.

[0127] In the embodiment of the present invention, the step of drawing a performance change curve according to the horizontal indicator performance set includes:

[0128] Extracting lateral index performances in turn from the lateral index performance set, and identifying a set of associated formula scores of the lateral index performances;

[0129] According to the associated recipe score set and the lateral index performance, points are plotted in a pre-constructed recipe score-index performance coordinate system to obtain a recipe score-performance point set;

[0130] The formula score-performance point set is subjected to curve fitting to obtain a performance change curve.

[0131] It can be understood that the associated formula score set refers to the material formula score set corresponding to the transverse index performance. For example, when the transverse index performance is elongation 140%, the corresponding material formula score set can be 4% POE toughening agent, 22% talcum powder, 44% PP powder, 20% nano calcium carbonate, and 10% sericite powder.

[0132] S5. Receive a target indicator performance interval set, and calculate the indicator weight of each performance indicator using a pre-built indicator weight formula according to the target indicator performance interval set to obtain an indicator weight set.

[0133] It can be understood that the target index performance interval set refers to the set of various index performance intervals input by the user, for example: the room temperature impact strength is [40KJ / m 2 ,42KJ / m 2 ], tensile strength is [10MPa, 13MPa], elongation is [120%, 140%], flexural strength is [20MPa, 24MPa], flexural modulus is [800MPa, 900MPa]. The indicator weight refers to the weight value of the performance indicator.

[0134] In detail, the indicator weight formula is as follows:

[0135]

[0136] Among them, k i represents the indicator weight of the i-th performance indicator, t i represents the fluctuation range of the i-th performance indicator, b i represents the target indicator performance interval value of the i-th performance indicator, i represents the serial number of the performance indicator, n represents the total number of performance indicators, t1 represents the fluctuation interval value of the first performance indicator, b1 represents the target indicator performance interval value of the first performance indicator, t n Indicates the fluctuation range of the nth performance indicator, b n Indicates the target indicator performance interval value of the nth performance indicator.

[0137] In the embodiment of the present invention, before calculating the indicator weight of each performance indicator using a pre-constructed indicator weight formula according to the target indicator performance interval set, the method further includes:

[0138] Extracting performance change curves in sequence from the performance change curve set, and identifying maximum performance values ​​and minimum performance values ​​of the performance change curves;

[0139] A fluctuation interval value is constructed according to the minimum performance value and the maximum performance value to obtain a fluctuation interval value set.

[0140] S6. Extract the maximum indicator weight from the indicator weight set, and identify the indicator performance value range and performance change value curve corresponding to the maximum indicator weight.

[0141] In the embodiment of the present invention, the indicator performance value interval corresponding to the maximum indicator weight refers to the target indicator performance interval of the performance indicator corresponding to the maximum indicator weight.

[0142] S7. According to the index performance value range, intercept the index starting performance point and the index ending performance point in the performance change value curve, and identify the recipe score value range corresponding to the index starting performance point and the index ending performance point.

[0143] It can be understood that the indicator starting performance point and the indicator ending performance point refer to the coordinate points where the indicator performance value range is intercepted in the performance change value curve.

[0144] In the embodiment of the present invention, the step of intercepting the indicator starting performance point and the indicator ending performance point in the performance change value curve according to the indicator performance value interval includes:

[0145] Identify the interval starting performance value and the interval ending performance value of the indicator performance value interval;

[0146] Constructing an interval start horizontal section and an interval end horizontal section according to the interval start performance value, and using the interval start horizontal section and the interval end horizontal section to intercept a performance change value line segment in the performance change value curve;

[0147] Identify the index starting performance point and the index ending performance point of the performance change value segment.

[0148] It is understandable that the interval start performance value and the interval end performance value refer to the start value and the end value of the index performance value interval respectively. The interval start horizontal section and the interval end horizontal section refer to the straight lines passing through the interval start performance value and the interval end performance value and perpendicular to the horizontal coordinate axis respectively. The performance change value line segment refers to the curve segment in the performance change value curve that belongs to the interval start horizontal section and the interval end horizontal section. The index start performance point and the index end performance point refer to the starting point and the end point of the performance change value line segment respectively.

[0149] S8. Slide and take values ​​within the recipe score value range to obtain a dynamic recipe score, and identify the longitudinal indicator performance set corresponding to the dynamic recipe score in the performance change curve set.

[0150] It can be understood that the sliding value refers to selecting a recipe score within the recipe score value interval according to a preset sliding value step. The longitudinal index performance set refers to the index performance set corresponding to the dynamic recipe score in the performance change curve set.

[0151] In the embodiment of the present invention, the sliding value is performed within the formula score value interval to obtain a dynamic formula score, including:

[0152] Obtaining the sliding value step and the starting formula score value point of the formula score value interval;

[0153] The sliding value is started at the starting formula score value point according to the sliding value step to obtain a dynamic formula score.

[0154] For example, when the recipe score value range is from the 5th material leaf node to the 8th material leaf node in the material recipe score tree diagram, the sliding value step size can be 0.2 unit length, and each unit length is the interval distance between two adjacent material recipe scores in the recipe score-indicator performance coordinate system, which can be 1 cm.

[0155] In the embodiment of the present invention, the step of identifying the longitudinal indicator performance set corresponding to the dynamic recipe score in the performance change curve set includes:

[0156] Constructing a longitudinal performance value line according to the dynamic recipe score, and finding the intersection of the longitudinal performance value line and the performance change curve set to obtain a longitudinal performance intersection set;

[0157] The index performance of each longitudinal performance intersection point in the longitudinal performance intersection point set is identified to obtain a longitudinal index performance set.

[0158] It can be explained that the longitudinal performance value line refers to a straight line passing through the dynamic formula score and perpendicular to the transverse axis.

[0159] S9. Calculate the dynamic recipe score value using the pre-built recipe score formula based on the longitudinal indicator performance set.

[0160] It can be understood that the dynamic recipe score value refers to the score of the longitudinal indicator performance set according to the target indicator performance interval set.

[0161] In detail, the formula scoring formula is as follows:

[0162] p=k1×(y1-Y1)+k2×(y2-Y2)+…+k n ×(y n -Y n )

[0163] Wherein, p represents the dynamic formula score value, k1 represents the indicator weight of the first indicator performance, y1 represents the indicator performance of the first indicator performance in the vertical indicator performance set, Y1 represents the median of the target indicator performance interval of the first indicator performance, k2 represents the indicator weight of the second indicator performance, y2 represents the indicator performance of the second indicator performance in the vertical indicator performance set, Y2 represents the median of the target indicator performance interval of the second indicator performance, k n Indicates the indicator weight of the nth indicator performance, y n represents the performance of the nth indicator in the vertical indicator performance set, Y n The median of the target indicator performance interval representing the performance of the nth indicator.

[0164] S10, drawing a dynamic formula scoring curve according to the dynamic formula scoring value, extracting the optimal formula score from the dynamic formula scoring curve, identifying the optimal formula score corresponding to the optimal formula score, and preparing the impact-resistant polypropylene material for the cover according to the optimal formula score.

[0165] It is understandable that the optimal formula score can be the maximum formula score in the dynamic formula score curve. The horizontal axis index of the dynamic formula score curve can be constructed by the formula score value range. When the optimal formula score is obtained, the corresponding optimal formula score can be extracted. The optimal material formula score may not be the horizontal axis marking point in the formula score-index performance coordinate system (the material leaf node sequence number of the material formula score tree diagram), but two adjacent horizontal axis marking points can be extracted according to the optimal material formula score, and then the optimal material formula score is obtained according to the positional relationship between the leaf node of the optimal material formula score in the formula score-index performance coordinate system and the two adjacent horizontal axis marking points (because the node sequence has been adjusted, there is only one different formula component corresponding to the material formula components of the two adjacent horizontal axis marking points), thereby realizing the preparation of impact-resistant polypropylene material for the lid according to the optimal formula score.

[0166] For example, when the formula score values ​​of the horizontal axis marked point that is closer to the horizontal axis position of the optimal material formula score in the formula score-index performance coordinate system are 4% POE toughening agent, 22% talcum powder, 44% PP powder, 20% nano calcium carbonate, and 30% sericite, and the formula score values ​​of another horizontal axis marked point (farther away) are 4% POE toughening agent, 22% talcum powder, 44% PP powder, 20% nano calcium carbonate, and 28% sericite (not normalized), the horizontal axis marked point that is closer to the horizontal axis position of the optimal material formula score in the formula score-index performance coordinate system is the 7th material leaf node (distance 0.3 unit length), and the horizontal axis marked point that is farther away from the horizontal axis position of the optimal material formula score in the formula score-index performance coordinate system is the 8th material leaf node (distance 0.7 unit length), at this time the mass fraction of the sericite can be The proportions of other ingredients remain unchanged. Finally, normalization is performed to obtain the optimal formula score.

[0167] Compared with the problem described in the background technology, the embodiment of the present invention first obtains the mass score test sequence and tree hierarchy of each formula material in the formula material set. Since the number of mass score test sequences in each tree hierarchy in the material formula score tree diagram is different, it is necessary to perform sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and then construct a material formula score tree diagram based on the multiple sets of mass score test sequence sets. In order to prepare the impact-resistant polypropylene material for the cover of the new energy battery pack according to the material formula score set, multiple sets of polypropylene materials to be tested are obtained. First, it is necessary to obtain a performance indicator set, and then extract the performance indicators in the performance indicator set in sequence. , then extract material leaf nodes in the material formula score tree diagram in turn, so as to achieve the purpose of identifying the material formula score set of the material leaf node. After obtaining multiple groups of polypropylene materials to be tested, it is necessary to perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set, and then draw a performance change curve according to the transverse indicator performance set to obtain a performance change curve set. At this time, the target indicator performance interval set can be received. Since the size of each target indicator performance interval is different, the indicator weight of each performance indicator can be calculated according to the target indicator performance interval set using a pre-built indicator weight formula to obtain an indicator weight set, so that the indicator weight can be used in the indicator weight. The maximum indicator weight is extracted from the re-concentration, and the indicator performance value interval and the performance change value curve corresponding to the maximum indicator weight are identified. At this time, it is necessary to identify the recipe score value interval, and then slide the value within the recipe score value interval to obtain the dynamic recipe score. When obtaining the recipe score value interval, it is necessary to intercept the indicator starting performance point and the indicator ending performance point in the performance change value curve according to the indicator performance value interval, so as to identify the recipe score value interval corresponding to the indicator starting performance point and the indicator ending performance point. Since it is necessary to perform a comprehensive performance comparison on the longitudinal indicator performance set of the dynamic recipe score, it is necessary to identify the dynamic recipe score in the performance change curve set. The vertical indicator performance set corresponding to the vertical indicator performance set is then calculated using a pre-built formula scoring formula according to the vertical indicator performance set, and finally a dynamic formula scoring curve is drawn according to the dynamic formula scoring value, the optimal formula score is extracted from the dynamic formula scoring curve, and the optimal formula score corresponding to the optimal formula score is identified, and finally the impact-resistant polypropylene material for the cover is prepared according to the optimal formula score. Therefore, the impact-resistant polypropylene material for the upper cover of the battery pack of a new energy vehicle proposed in the present invention and the preparation method, device, electronic device and computer-readable storage medium thereof mainly aim to solve the problem of poor material performance of the currently prepared impact-resistant polypropylene material for the upper cover of the battery pack.

[0168] Embodiment 2:

[0169] like Figure 2, which is a schematic diagram of the structure of an electronic device that realizes the impact-resistant polypropylene material for the upper cover of a new energy vehicle battery pack and its preparation method provided by one embodiment of the present invention.

[0170] The electronic device 1 may include a processor 10, a memory 11, a bus 12 and a communication interface 13, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as an impact-resistant polypropylene material for a new energy vehicle battery pack cover and a preparation procedure thereof.

[0171] Among them, the memory 11 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, mobile hard disk, multimedia card, card-type memory (for example: SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. The memory 11 may be an internal storage unit of the electronic device 1 in some embodiments, such as a mobile hard disk of the electronic device 1. The memory 11 may also be an external storage device of the electronic device 1 in other embodiments, such as a plug-in mobile hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), etc. equipped on the electronic device 1. Further, the memory 11 may also include both an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the impact-resistant polypropylene material and its preparation program for the upper cover of the battery pack of a new energy vehicle, but also can be used to temporarily store data that has been output or is to be output.

[0172] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect the various components of the entire electronic device, and executes or executes the programs or modules stored in the memory 11 (such as the impact-resistant polypropylene material for the upper cover of the battery pack of new energy vehicles and its preparation program, etc.), and calls the data stored in the memory 11 to execute various functions of the electronic device 1 and process data.

[0173] The bus may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The bus is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.

[0174] Figure 2 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 2 The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.

[0175] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to each component. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include any components such as one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, etc. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.

[0176] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.

[0177] Optionally, the electronic device 1 may further include a user interface, which may be a display (Display), an input unit (such as a keyboard (Keyboard)), and optionally, the user interface may also be a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device, etc. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.

[0178] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.

[0179] The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation program thereof stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When running in the processor 10, the following can be achieved:

[0180] Obtaining a mass score test sequence and a tree hierarchy of each formula material in a formula material set, performing sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and constructing a material formula score tree diagram according to the multiple sets of mass score test sequence sets;

[0181] Acquire a performance indicator set, extract performance indicators in sequence from the performance indicator set, extract material leaf nodes in sequence from the material formula score tree diagram, and identify the material formula score set of the material leaf node;

[0182] Prepare impact-resistant polypropylene materials for covers of new energy battery packs according to the material formula score set to obtain multiple groups of polypropylene materials to be tested, and perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set;

[0183] Draw a performance change curve according to the horizontal indicator performance set, summarize the performance change curves of each performance indicator, and obtain a performance change curve set;

[0184] A target indicator performance interval set is received, and according to the target indicator performance interval set, an indicator weight of each performance indicator is calculated using a pre-built indicator weight formula to obtain an indicator weight set, wherein the indicator weight formula is as follows:

[0185]

[0186] Among them, k i represents the indicator weight of the i-th performance indicator, t i represents the fluctuation range of the i-th performance indicator, b i represents the target indicator performance interval value of the i-th performance indicator, i represents the serial number of the performance indicator, n represents the total number of performance indicators, t1 represents the fluctuation interval value of the first performance indicator, b1 represents the target indicator performance interval value of the first performance indicator, t n Indicates the fluctuation range of the nth performance indicator, b n represents the target indicator performance interval value of the nth performance indicator;

[0187] Extracting the maximum indicator weight from the indicator weight set, and identifying the indicator performance value interval and performance change value curve corresponding to the maximum indicator weight;

[0188] According to the index performance value interval, intercept the index starting performance point and the index ending performance point in the performance change value curve, and identify the formula score value interval corresponding to the index starting performance point and the index ending performance point;

[0189] Sliding values ​​are taken within a formula score value interval to obtain a dynamic formula score, and a longitudinal indicator performance set corresponding to the dynamic formula score in the performance change curve set is identified;

[0190] According to the vertical indicator performance set, a dynamic recipe score value is calculated using a pre-built recipe score formula, wherein the recipe score formula is as follows:

[0191] p=k1×(y1-Y1)+k2×(y2-Y2)+…+k n ×(y n -Y n )

[0192] Wherein, p represents the dynamic formula score value, k1 represents the indicator weight of the first indicator performance, y1 represents the indicator performance of the first indicator performance in the vertical indicator performance set, Y1 represents the median of the target indicator performance interval of the first indicator performance, k2 represents the indicator weight of the second indicator performance, y2 represents the indicator performance of the second indicator performance in the vertical indicator performance set, Y2 represents the median of the target indicator performance interval of the second indicator performance, k n Indicates the indicator weight of the nth indicator performance, y n represents the performance of the nth indicator in the vertical indicator performance set, Y n The median of the target indicator performance interval representing the performance of the nth indicator;

[0193] A dynamic formula scoring curve is drawn according to the dynamic formula scoring value, an optimal formula score is extracted from the dynamic formula scoring curve, an optimal formula score corresponding to the optimal formula score is identified, and an impact-resistant polypropylene material for the lid is prepared according to the optimal formula score.

[0194] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figure 1 to Figure 2 The description of the relevant steps in the corresponding embodiments will not be repeated here.

[0195] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).

[0196] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:

[0197] Obtaining a mass score test sequence and a tree hierarchy of each formula material in a formula material set, performing sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and constructing a material formula score tree diagram according to the multiple sets of mass score test sequence sets;

[0198] Acquire a performance indicator set, extract performance indicators in sequence from the performance indicator set, extract material leaf nodes in sequence from the material formula score tree diagram, and identify the material formula score set of the material leaf node;

[0199] Prepare impact-resistant polypropylene materials for covers of new energy battery packs according to the material formula score set to obtain multiple groups of polypropylene materials to be tested, and perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set;

[0200] Draw a performance change curve according to the horizontal indicator performance set, summarize the performance change curves of each performance indicator, and obtain a performance change curve set;

[0201] A target indicator performance interval set is received, and according to the target indicator performance interval set, an indicator weight of each performance indicator is calculated using a pre-built indicator weight formula to obtain an indicator weight set, wherein the indicator weight formula is as follows:

[0202]

[0203] Among them, k i represents the indicator weight of the i-th performance indicator, t i represents the fluctuation range of the i-th performance indicator, b i represents the target indicator performance interval value of the i-th performance indicator, i represents the serial number of the performance indicator, n represents the total number of performance indicators, t1 represents the fluctuation interval value of the first performance indicator, b1 represents the target indicator performance interval value of the first performance indicator, t nIndicates the fluctuation range of the nth performance indicator, b n represents the target indicator performance interval value of the nth performance indicator;

[0204] Extracting the maximum indicator weight from the indicator weight set, and identifying the indicator performance value interval and performance change value curve corresponding to the maximum indicator weight;

[0205] According to the index performance value interval, intercept the index starting performance point and the index ending performance point in the performance change value curve, and identify the formula score value interval corresponding to the index starting performance point and the index ending performance point;

[0206] Sliding values ​​are taken within a formula score value interval to obtain a dynamic formula score, and a longitudinal indicator performance set corresponding to the dynamic formula score in the performance change curve set is identified;

[0207] According to the vertical indicator performance set, a dynamic recipe score value is calculated using a pre-built recipe score formula, wherein the recipe score formula is as follows:

[0208] p=k1×(y1-Y1)+k2×(y2-Y2)+…+k n ×(y n -Y n )

[0209] Wherein, p represents the dynamic formula score value, k1 represents the indicator weight of the first indicator performance, y1 represents the indicator performance of the first indicator performance in the vertical indicator performance set, Y1 represents the median of the target indicator performance interval of the first indicator performance, k2 represents the indicator weight of the second indicator performance, y2 represents the indicator performance of the second indicator performance in the vertical indicator performance set, Y2 represents the median of the target indicator performance interval of the second indicator performance, k n Indicates the indicator weight of the nth indicator performance, y n represents the performance of the nth indicator in the vertical indicator performance set, Y n The median of the target indicator performance interval representing the performance of the nth indicator;

[0210] A dynamic formula scoring curve is drawn according to the dynamic formula scoring value, an optimal formula score is extracted from the dynamic formula scoring curve, an optimal formula score corresponding to the optimal formula score is identified, and an impact-resistant polypropylene material for the lid is prepared according to the optimal formula score.

[0211] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0212] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0213] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0214] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. An impact-resistant polypropylene material for a new energy vehicle battery pack upper cover and a preparation method thereof, characterized in that: The method comprises: Obtaining a mass score test sequence and a tree hierarchy of each formula material in a formula material set, performing sequence replication on the mass score test sequence according to the tree hierarchy to obtain multiple sets of mass score test sequence sets, and constructing a material formula score tree diagram according to the multiple sets of mass score test sequence sets; Acquire a performance indicator set, extract performance indicators in sequence from the performance indicator set, extract material leaf nodes in sequence from the material formula score tree diagram, and identify the material formula score set of the material leaf node; Prepare impact-resistant polypropylene materials for covers of new energy battery packs according to the material formula score set to obtain multiple groups of polypropylene materials to be tested, and perform performance tests on the multiple groups of polypropylene materials to be tested according to the performance indicators to obtain a transverse indicator performance set; Draw a performance change curve according to the horizontal indicator performance set, summarize the performance change curves of each performance indicator, and obtain a performance change curve set; A target indicator performance interval set is received, and according to the target indicator performance interval set, an indicator weight of each performance indicator is calculated using a pre-built indicator weight formula to obtain an indicator weight set, wherein the indicator weight formula is as follows: Among them, k i represents the indicator weight of the i-th performance indicator, t i represents the fluctuation range of the i-th performance indicator, b i represents the target indicator performance interval value of the i-th performance indicator, i represents the serial number of the performance indicator, n represents the total number of performance indicators, t1 represents the fluctuation interval value of the first performance indicator, b1 represents the target indicator performance interval value of the first performance indicator, t n Indicates the fluctuation range of the nth performance indicator, b n represents the target indicator performance interval value of the nth performance indicator; Extracting the maximum indicator weight from the indicator weight set, and identifying the indicator performance value interval and performance change value curve corresponding to the maximum indicator weight; According to the index performance value interval, intercept the index starting performance point and the index ending performance point in the performance change value curve, and identify the formula score value interval corresponding to the index starting performance point and the index ending performance point; Sliding values ​​are taken within a formula score value interval to obtain a dynamic formula score, and a longitudinal indicator performance set corresponding to the dynamic formula score in the performance change curve set is identified; According to the vertical indicator performance set, a dynamic recipe score value is calculated using a pre-built recipe score formula, wherein the recipe score formula is as follows: p=k1×(y1-Y1)+k2×(y2-Y2)+…+k n ×(y n -Y n ) Wherein, p represents the dynamic formula score value, k1 represents the indicator weight of the first indicator performance, y1 represents the indicator performance of the first indicator performance in the vertical indicator performance set, Y1 represents the median of the target indicator performance interval of the first indicator performance, k2 represents the indicator weight of the second indicator performance, y2 represents the indicator performance of the second indicator performance in the vertical indicator performance set, Y2 represents the median of the target indicator performance interval of the second indicator performance, k n Indicates the indicator weight of the nth indicator performance, y n represents the performance of the nth indicator in the vertical indicator performance set, Y n The median of the target indicator performance interval representing the performance of the nth indicator; A dynamic formula scoring curve is drawn according to the dynamic formula scoring value, an optimal formula score is extracted from the dynamic formula scoring curve, an optimal formula score corresponding to the optimal formula score is identified, and an impact-resistant polypropylene material for the lid is prepared according to the optimal formula score.

2. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: The method of obtaining the mass fraction test sequence and tree hierarchy of each formula material in the formula material set includes: Obtain the material formula score value interval and material formula score gradient for each formula material, and calculate the formula score value number using the following formula according to the material formula score value interval and material formula score gradient: Among them, γ j Indicates the formula score value of the j-th formula material, Represents the material formula score value interval of the jth formula material, ∈ j represents the material recipe score gradient of the jth recipe material; According to the formula score values, the formula materials are hierarchically sorted from small to large to obtain a tree hierarchy of the formula materials; According to the material formula score value interval and the material formula score gradient, the mass score test sequence is calculated using a pre-constructed mass formula, wherein the mass formula is as follows: in, represents the mth quality test score of the jth recipe material, represents the starting mass fraction of the material formula score value interval of the j-th formula material, and m represents the serial number of the mass test score of the j-th formula material.

3. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: The method of constructing a material formula score dendrogram according to a plurality of sets of quality score test sequence sets comprises: hierarchically locate the quality score test sequence set according to the tree hierarchy to obtain multiple groups of quality score hierarchical test sequences, extract a starting score test sequence set with a preset sequence replication number of 1 from the multiple groups of quality score test sequence sets, and construct an initial recipe score tree diagram according to the starting score test sequence set; Extracting a leaf node level test sequence of the initial recipe score dendrogram from the multiple groups of quality score level test sequences; Identifying an initial leaf node set of the initial recipe score dendrogram, and sequentially extracting quality score leaf nodes from the initial leaf node set of the initial recipe score dendrogram; Performing node growth at the mass score leaf node according to the leaf node level test sequence to obtain an iterative formula score dendrogram; Determining whether the mass score leaf nodes have been extracted; If the mass score leaf nodes have not been completely extracted, returning to the above step of sequentially extracting mass score leaf nodes from the initial leaf node set in the initial recipe score dendrogram; If the mass score leaf node is extracted, then the leaf node level of the iterative formula score dendrogram is identified to determine whether the leaf node level is equal to a preset level threshold; If the leaf node level is not equal to the level threshold, the initial recipe score tree diagram is updated by using the iterative recipe score tree diagram, and the step of extracting the leaf node level test sequence of the initial recipe score tree diagram from the multiple groups of quality score level test sequences is returned to the above step; If the leaf node level is equal to the level threshold, the original recipe score dendrogram is obtained; The nodes of the original formula score dendrogram are reordered to obtain a material formula score dendrogram.

4. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: Drawing a performance change curve according to the horizontal indicator performance set includes: Extracting lateral index performances in turn from the lateral index performance set, and identifying a set of associated formula scores of the lateral index performances; According to the associated recipe score set and the lateral index performance, points are plotted in a pre-constructed recipe score-index performance coordinate system to obtain a recipe score-performance point set; The formula score-performance point set is subjected to curve fitting to obtain a performance change curve.

5. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: Before calculating the indicator weight of each performance indicator using a pre-built indicator weight formula according to the target indicator performance interval set, the method further includes: Extracting performance change curves in sequence from the performance change curve set, and identifying maximum performance values ​​and minimum performance values ​​of the performance change curves; A fluctuation interval value is constructed according to the minimum performance value and the maximum performance value to obtain a fluctuation interval value set.

6. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: The method of intercepting the indicator starting performance point and the indicator ending performance point in the performance change value curve according to the indicator performance value interval includes: Identify the interval starting performance value and the interval ending performance value of the indicator performance value interval; Constructing an interval start horizontal section and an interval end horizontal section according to the interval start performance value, and using the interval start horizontal section and the interval end horizontal section to intercept a performance change value line segment in the performance change value curve; Identify the index starting performance point and the index ending performance point of the performance change value segment.

7. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 1, characterized in that: The sliding value is obtained within the formula score value range to obtain a dynamic formula score, including: Obtaining the sliding value step and the starting formula score value point of the formula score value interval; The sliding value is started at the starting formula score value point according to the sliding value step to obtain a dynamic formula score.

8. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 7, characterized in that: The step of identifying the longitudinal indicator performance set corresponding to the dynamic recipe score in the performance change curve set includes: Constructing a longitudinal performance value line according to the dynamic recipe score, and finding the intersection of the longitudinal performance value line and the performance change curve set to obtain a longitudinal performance intersection set; The index performance of each longitudinal performance intersection point in the longitudinal performance intersection point set is identified to obtain a longitudinal index performance set.

9. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 3, characterized in that: The step of reordering the nodes of the original formula score dendrogram to obtain the material formula score dendrogram includes: Identifying a node set at the same level in the original recipe score dendrogram, and extracting a plurality of sets of same-parent brother node sets from the node set at the same level, wherein the same-parent brother node set is a set of brother nodes with the same parent node; Sorting the multiple groups of sibling node sets to obtain a sequence of sibling node sets; Identifying a node set sequence number of each sibling node set in the sibling node set sequence; Identifying a sequence parity of the node set sequence number; Classifying the sibling node sets into odd and even groups according to the sequence number parity to obtain multiple groups of odd sibling node sets and multiple groups of even sibling node sets; A starting brother node and an ending brother node are identified in the even-numbered brother node set, and the node positions of the starting brother node and the ending brother node are swapped to obtain the material formula score dendrogram.

10. The impact-resistant polypropylene material for the upper cover of the new energy vehicle battery pack and the preparation method thereof as claimed in claim 9, characterized in that: Before drawing the performance change curve according to the horizontal indicator performance set, the method further includes: Extracting a material leaf node sequence from the material formula score dendrogram, identifying a material formula score set of each material leaf node in the material leaf node set, and obtaining a material formula score set sequence; A recipe score-indicator performance coordinate system is constructed according to the performance indicator set and the material recipe score set sequence, wherein the vertical axis of the recipe score-indicator performance coordinate system is the indicator performance, and the horizontal axis is the material recipe score.

Citation Information

Patent Citations

  • Hyperledger Fabric longitudinal extensible method and system

    CN113342888A

  • Business evaluation method and device based on intelligent modeling, electronic equipment and medium

    CN113516417A

  • Data display method based on index tree and terminal equipment

    CN113934894A

  • Polypropylene cable production process optimization method and system

    CN116312882A

  • Rubber shaping strength optimization method and device based on chemical surface treatment

    CN118335267A

Cited By

  • Method and system for improving activity and uniformly modifying injected magnetic powder

    CN120767117A

  • A method and system for injection of magnetic powder for activity enhancement and uniformity modification

    CN120767117B