New energy cluster active control method and system based on section constraint security
By adopting a safe and active control method based on cross-section constraints in new energy stations, the complexity and responsiveness of new energy stations in the existing technology are solved by allocating and cycling power through layer by layer of multi-layer nested sections. The problem of this has achieved dynamic active control of the power grid and effective absorption of new energy.
Patent Information
- Application Number
- CN202411058004.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-19
AI Technical Summary
The active control method of existing new energy stations is complex when dealing with real-time power distribution at different levels of sections, the response process is complex and the security of the strategy is insufficient, and it is unable to effectively respond to the real-time changes and flexible power requirements of new energy stations, resulting in the power grid. The side AGC instructions cannot be effectively scheduled.
Adopt a secure new energy cluster active control method based on cross-section constraints, and allocate the power of new energy cluster layer by layer through multi-layer nested sections, and use virtual capacity differences and marking instructions to achieve dynamic active control to ensure the safety and responsiveness of power distribution. .
By allocating and cycling power, dynamic active control of the new energy cluster is achieved, the power scheduling efficiency of the power grid is improved, the safe operation of the power grid and the effective absorption of new energy are ensured, and the delay allocation of power regulation is reduced. .
Smart Images

Figure CN118983885A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power systems, and more specifically, to a new energy cluster active power control method and system based on section constraint safety. Background Art
[0002] A new energy station is a collection of all equipment below the grid connection point of a wind farm or solar power station that is centrally connected to the power system. It is usually composed of transformers, busbars, lines, converters, energy storage, wind turbines, photovoltaic power generation equipment, reactive power regulation equipment and auxiliary equipment. The grid-connected side of the new energy station is equipped with AGC (Automatic Generation Control) equipment, which ensures the stability of the power grid and the quality of power supply by monitoring and adjusting the output power and system voltage of the station when it is connected to the grid.
[0003] At present, there has been in-depth research on the active power control method of new energy stations, and it has been widely cited in power grid dispatching systems at all levels. For example, background technology document 1: Tang Yi, Wang Qi, Chen Ning, etc., Active power optimization control method of wind farms using power prediction information, Proceedings of the CSEE, Vol. 32, No. 34, 2012, pp. 1-7. The document proposes an optimization control method for active power control of wind farms based on ultra-short-term wind power prediction data to reduce the number of unit control actions. Background technology document 2: Xie Xu, Wu Jiping, Luo Yazhou, etc., Real-time coordinated control strategy for wind power dispatching in the same control area at two levels, Automation of Electric Power Systems, Vol. 41, No. 11, 2017, pp. 114-119. The document proposes a two-level dispatching coordinated control strategy for the same control area, thereby realizing the maximum consumption of wind power resources across the entire network. Background technology document 3: Wu Linlin, Sun Yamin, Liu Haitao, etc., Research on active power control technology of large-scale new energy clusters connected to the flexible DC grid, Global Energy Internet, Vol. 3, No. 2, 2020, pp. 125-131. The document mentions two active power control strategies, radical and conservative, and introduces ultra-short-term prediction as a clustering indicator to improve the accuracy of dynamic power generation index redistribution. Background technology document 4: Shi Guirong, Sun Rongfu, Xu Haixiang, etc., Active layered coordination control strategy for large-scale cluster renewable energy, Power System Technology, Vol. 5, 2018, pp. 9-16. The document ensures the safe operation of the power grid by evaluating the maximum absorption capacity of renewable energy in the entire network and even in each section; optimizes the active control instructions layer by layer in the order of the entire network layer, field group layer, and field station layer to expand the depth and breadth of renewable energy absorption; and configures reasonable active power distribution weight coefficients in a targeted manner to ensure the fairness of absorption between different renewable energy field station groups and wind and solar power generation in the same section.
[0004] However, some literatures do not consider the real-time power distribution problem under different levels of sections. Although some literatures consider the power distribution restrictions for sections, they also adopt a complex objective function calculation process, which leads to the need to collect a large number of system parameters in the technical implementation process, with a large amount of calculation and a complex response process. Once a slight change occurs on the new energy station side, the power allocation strategy may fail, so the security of the strategy also needs to be improved. In addition, the literature classifies the operating status of different new energy stations and station clusters at different levels, and provides different active power control strategies for different types. This multi-strategy control method is more suitable for long-term station cluster control, but it cannot ensure a good response to real-time changes in individual stations and real-time flexible power demand.
[0005] New energy stations are usually divided into different types such as photovoltaic stations and wind power stations. New energy stations of the same type are limited by the wind and light resources at the station location, and their operation mode is also greatly affected by environmental factors. In addition, with the different construction time and construction conditions of new energy stations, the grid connection mode and grid connection technology of new energy stations are also different. The response ability of new energy stations to active control instructions during the grid connection process is different.
[0006] At present, some new energy stations can follow the active power control instructions of the power grid to adjust the grid-connected power generation at any time, while some new energy stations have insufficient power generation adjustment capabilities due to various reasons, and the grid-connected adjustment amount cannot be adjusted in real time synchronously with the control instructions. The background technology has not yet considered the situation that the AGC instructions cannot actually dispatch the operating status of some new energy stations. This results in the AGC instructions issued by the power grid side not being able to get actual responses on the side of each new energy station.
[0007] To address this issue, under the premise of the already very complex AGC active power allocation strategy, the part of the control power that cannot follow the control instructions will be re-controlled within multiple subsequent scheduling cycles of the AGC, which greatly reduces the AGC's control efficiency of the active power of the new energy cluster and may cause the problem of electricity supply and demand.
[0008] In view of the above problems, a new active power control method and system of new energy clusters based on section constraint safety is urgently needed. Summary of the invention
[0009] In order to solve the deficiencies in the prior art, the present invention provides a new energy cluster active power control method and system based on section constraint safety, which implements dynamic active power control of the new energy cluster by cyclically allocating the power of the new energy cluster layer by layer in an environment of multi-layer nested sections.
[0010] The present invention adopts the following technical solution.
[0011] A first aspect of the present invention relates to a new energy cluster active power control method based on section constraint safety, the method comprising the following steps: collecting the initial new energy cluster power, and allocating the initial new energy cluster power layer by layer from the top section of the multi-layer nested section downwards according to the virtual capacity difference of the new energy stations under different sections, until the new energy stations under different sections; if the current section state changes to a jump or pause state, the new energy cluster power that cannot be sent to the current section is recorded as the first power and the first power is recovered; if the current station cannot respond to the allocation instruction of the new energy cluster power, and the number of unresponsive times exceeds a preset threshold, the power adjustment amount corresponding to multiple allocation instructions under the accumulated number of unresponsive times is recorded as the second power and the second power is recovered; the initial new energy cluster power is adjusted using the recovered first power and second power to obtain the circulating power of the new energy cluster; the circulating power of the new energy cluster is allocated layer by layer from the top section of the multi-layer nested section downwards, and the layer-by-layer allocation process is iterated to implement dynamic active power control for the new energy cluster.
[0012] Preferably, based on the difference in virtual capacity of new energy stations under different sections, it includes: summing up the virtual capacities of all new energy stations and sub-sections under the current section as the virtual capacity of the current section; the difference in virtual capacity of different sections is the percentage of the virtual capacity of the current section to the sum of the virtual capacities of all new energy stations to be adjusted.
[0013] Preferably, the initial new energy cluster power is allocated downward layer by layer starting from the top section of the multi-layer nested sections until the new energy stations under different sections, including: calculating the adjustable amount of the current section according to the section limit of the current section and the current active power; and feeding back the adjustable amount of the current section to the upper section as the control upper limit of the current section to ensure that the upper section controls the new energy cluster power allocated to the current section layer by layer within the adjustable amount.
[0014] Preferably, the initial new energy cluster power is allocated downward layer by layer starting from the top section of the multi-layer nested sections until the new energy stations under different sections, including: using the current active power of all new energy stations under the current section and the new energy cluster power of the current section to perform a sum calculation to obtain the total target power under the current section; eliminating the new energy stations or lower sections with marking instructions under the current section, and implementing the allocation of total target power for unmarked new energy stations or lower sections; the allocation includes disassembling the total target power based on the virtual capacity differences of unmarked new energy stations or lower sections.
[0015] Preferably, based on the virtual capacity difference of the unmarked new energy station or the lower section, the total target power is disassembled, including: if the disassembly power to any unmarked new energy station or the lower section causes the operating power to exceed the control upper limit of the feedback of the unmarked new energy station or the lower section, a marking instruction is added; the excess power is recorded and the current unmarked new energy station or the lower section is eliminated, and the excess power is reallocated according to the virtual capacity difference until the allocation is completed; if the excess power cannot be fully allocated in the current section, the unallocated part is recorded as the third power and the third power is recovered.
[0016] Preferably, the initial new energy cluster power is adjusted using the third power obtained through recycling to obtain the new energy cluster circulating power.
[0017] Preferably, if the current station cannot respond to the allocation instruction of the power of the new energy cluster, and the number of unresponsive times exceeds a preset threshold, the power adjustment amounts corresponding to multiple allocation instructions under the accumulated number of unresponsive times are recorded as the second power and the second power is recovered, and it also includes: if the number of unresponsive times does not exceed the preset threshold, the accumulated power adjustment amounts corresponding to one or more allocation instructions that cannot be responded to are superimposed on the power adjustment amount corresponding to the current instruction received by the current station; if the superimposed result is less than or equal to the adjustment step of the current station, the current station is actively controlled based on the superimposed result; if the superimposed result is greater than the adjustment step of the current station, the current station is actively controlled based on the adjustment step, the power exceeding the step is recorded as the second power, and a marking instruction is added for the current station.
[0018] The second aspect of the present invention relates to a new energy cluster active power control system based on section constraint safety, the system includes an allocation module, a first recovery module, a second recovery module, a regulation module, and a circulation control module; wherein the allocation module is used to collect the initial new energy cluster power, and according to the virtual capacity difference of the new energy sites under different sections, the initial new energy cluster power is allocated layer by layer from the top section of the multi-layer nested sections downward to the new energy sites under different sections; the first recovery module is used to record the new energy cluster power that cannot be sent to the current section as the first power and recover the first power if the current section state changes to a jump or pause state. Power; a second recovery module, which is used to, if the current site cannot respond to the allocation instruction of the new energy cluster power, and the number of unresponsive times exceeds a preset threshold, then the power adjustment amount corresponding to multiple allocation instructions under the accumulated number of unresponsive times is recorded as the second power and the second power is recovered; an adjustment module, which is used to adjust the initial new energy cluster power using the recovered first power and second power to obtain the circulating power of the new energy cluster; a circulation control module, which is used to allocate the circulating power of the new energy cluster layer by layer starting from the top section of the multi-layer nested sections, and iterate the layer-by-layer allocation process to implement dynamic active power control for the new energy cluster.
[0019] A third aspect of the present invention relates to a terminal, comprising a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the method in the first aspect of the present invention.
[0020] A fourth aspect of the present invention relates to a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method in the first aspect of the present invention.
[0021] The beneficial effect of the present invention is that, compared with the prior art, the active power control method and system of a new energy cluster based on section constraint safety in the present invention implements dynamic active power control of the new energy cluster by cyclically allocating the power of the new energy cluster layer by layer in a multi-layer nested section environment. The present invention integrates different new energy stations with different wind and solar resources, operating status, and grid-connected conditions, and implements fast and slow compatible comprehensive response and comprehensive control for stations with different characteristics.
[0022] The beneficial effects of the present invention also include:
[0023] 1. The present invention comprehensively considers the power generation mode and characteristics of the new energy station, takes the virtual capacity of the new energy station as the basis, comprehensively considers the section constraints, section status, response speed and response capability of a single station, and gradually adjusts the power distribution process of the new energy in a cyclic iterative manner. The effective distribution and adjustment of the power of the new energy cluster is implemented through the "gradual decomposition and multiple allocation" method, ensuring the real and effective allocation of all adjustment quantities within a cluster scheduling time, and fully avoiding the problem of delayed allocation of power adjustment quantities.
[0024] 2. The present invention fairly distributes power to the entire network's renewable energy according to a multi-layer section strategy on the grid side, while the station side maximizes the use of section margins through power generation capacity detection and transfer strategies, enabling the grid to accept renewable energy output at its maximum capacity while ensuring grid safety.
[0025] 3. In the process of implementing the method of the present invention, there is no need to classify different types of stations. Instead, the power generation capacity and grid-connected power regulation capacity of the station are automatically and flexibly judged according to the station's own response speed and response step. According to the difference in power generation capacity of different stations, new energy stations with temporarily strong power generation capacity or excellent regulation performance are allowed to occupy the transmission space first, and the space will be vacated when the new energy stations with inferior power generation capacity or regulation performance have the ability, so as to give full play to the power generation capacity of each new energy station, take fairness into consideration, and realize the smooth consumption of new energy active power.
[0026] 4. Within a cluster scheduling cycle, the method of the present invention first implements the average distribution of the total target power according to the virtual capacity of the section or station, ensuring that after the active power regulation distribution is completed, the consistency requirements of the power generation environment conditions of each station are met under ideal conditions. In addition, considering the actual regulation limits of the section and station, the remaining amount is reasonably transferred according to the actual conditions of the section and station, thereby ensuring the integration between the ideal power distribution method and the actual distribution constraints. In this way, the present invention minimizes the probability of the station being unable to respond in advance, ensures the degree of participation of the new energy station in the cluster active power control process, and ensures the feasibility and reliability of the cluster active power control.
[0027] 5. The present invention implements the status marking of the sections and stations that have been fully connected to the grid by means of marking instructions, preventing the power distribution process from exceeding the actual adjustable capacity of the sections and stations, ensuring the real-time degree of communication monitoring between the power distribution side and the sections and stations, and overcoming the problem that power distribution cannot be actually implemented.
[0028] 6. The power distribution method of the present invention fully takes into account the limitations of some new energy stations on the adjustable speed and adjustable capacity of the grid-connected active power, and redirects the active power allocated to the station through three different methods such as full transfer, partial transfer and delayed adjustment, ensuring the reasonable consumption of the allocated active power and rapid response to the adjustment instructions. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of a power distribution mode of a new energy cluster in a new energy cluster active power control method based on section constraint safety in the present invention;
[0030] Figure 2 It is a schematic diagram of a power transfer strategy for a certain new energy station in a new energy cluster active power control method based on section constraint safety in the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in the present invention are only embodiments of a part of the present invention, not all embodiments. Based on the spirit of the present invention, all other embodiments not recorded in the present invention obtained by ordinary technicians in this field according to the embodiments recorded in the present invention without making creative work should belong to the protection scope of the present invention.
[0032] A first aspect of the present invention relates to a new energy cluster active power control method based on section constraint safety, the method comprising steps 1 to 5.
[0033] Step 1: Collect the initial power of the new energy cluster, and allocate the initial power of the new energy cluster layer by layer from the top section of the multi-layer nested sections downward to the new energy stations under different sections according to the virtual capacity differences of the new energy stations under different sections.
[0034] The power of the new energy cluster is obtained according to the demand on the grid side. For example, according to the regional dispatching system, the penetration rate of new energy in the region is analyzed, and it is calculated based on a comprehensive analysis of the real-time regional electricity demand and the shortage of traditional thermal power units. The power of the new energy cluster is usually a regional reference quantity obtained by taking into account the scale of new energy in the region and the grid connection capacity of new energy, and fully considering the environmental support capacity of new energy power generation. In the present invention, it is necessary to gradually disassemble the power of the new energy cluster and distribute it to the new energy stations in each region through an iterative cycle. Therefore, the present invention refers to this reference quantity calculated by the regional dispatching system as the initial new energy cluster power.
[0035] The power of the new energy cluster can usually be collected by the AGC device responsible for normal control, and decomposed calculation and power instruction allocation are implemented. In an embodiment of the present invention, the most fundamental principle of power allocation is obtained based on the virtual capacity difference between new energy sites.
[0036] The present invention takes into account the complexity of section setting and analyzes the situation of multi-layer nested sections in the region. The topmost section in the region is called the top section, and the lower sections are the parent section and the child section respectively. Each upper section may include multiple lower sections and new energy stations. The "include" here can be understood as for a current power consumption area, if the transmission line through which a new energy station is connected to the grid and supplies energy to the power consumption area is located in a certain section, then the section includes the new energy station. Therefore, when the regional AGC issues a power control instruction, it is necessary not only to perform regulation on the new energy station, but also to consider the regulation capacity limitation of the section.
[0037] Preferably, based on the difference in virtual capacity of new energy stations under different sections, it includes: summing up the virtual capacities of all new energy stations and sub-sections under the current section as the virtual capacity of the current section; the difference in virtual capacity of different sections is the percentage of the virtual capacity of the current section to the sum of the virtual capacities of all new energy stations to be adjusted.
[0038] Through the multi-layer nested section method, each top-level section includes multiple parent sections in turn, each parent section includes multiple sub-sections in turn, and the sub-section includes multiple new energy stations. Therefore, when calculating the virtual capacity difference of the section, the sum of the virtual capacity of all lower sections and all new energy stations of the section can be considered. If the sum of the virtual capacity of all new energy stations related to the current area is 1, the virtual capacity of each section can be expressed as a percentage.
[0039] In addition, since a universal conversion can be implemented between the virtual capacity and the actual capacity of the traditional generator, the active power control method for the new energy cluster in the present invention can also be further flexibly involved in the dispatching and control process of the active power of the entire network.
[0040] Without considering the section restrictions and power generation restrictions of new energy sites, the ideal initial power allocation method of the new energy cluster is to implement it in proportion to the virtual capacity difference. In actual situations, however, the restrictions of sections and sites also need to be considered.
[0041] Preferably, the initial new energy cluster power is allocated downward layer by layer starting from the top section of the multi-layer nested sections until the new energy stations under different sections, including: calculating the adjustable amount of the current section according to the section limit of the current section and the current active power; and feeding back the adjustable amount of the current section to the upper section as the control upper limit of the current section to ensure that the upper section controls the new energy cluster power allocated to the current section layer by layer within the adjustable amount.
[0042] Figure 1 FIG. 1 is a schematic diagram of a power distribution method of a new energy cluster in a new energy cluster active power control method based on section constraint safety in the present invention. Figure 1 As shown, the section is scanned layer by layer from top to bottom, and proportional power allocation is first implemented with virtual capacity. On this basis, if the allocation process causes a section or station to exceed the limit, the power originally allocated to this part will be transferred nearby.
[0043] Therefore, the present invention supports the lower section or the lower station to inform the upper section of the real-time active power situation and the rated power situation in advance, so as to ensure that the upper section obtains the adjustable amount of a certain section or a certain station in the lower layer in advance, and implements the scheduling within the range of the adjustable amount. If the target power calculated in proportion exceeds the virtual capacity of the station, it should be judged that the power instruction to be issued exceeds the limit and needs to be transferred to other stations or sections.
[0044] Preferably, the initial new energy cluster power is allocated downward layer by layer starting from the top section of the multi-layer nested sections until the new energy stations under different sections, including: using the current active power of all new energy stations under the current section and the new energy cluster power of the current section to perform a sum calculation to obtain the total target power under the current section; eliminating the new energy stations or lower sections with marking instructions under the current section, and implementing the allocation of total target power for unmarked new energy stations or lower sections; the allocation includes disassembling the total target power based on the virtual capacity differences of unmarked new energy stations or lower sections.
[0045] The allocation process is not to allocate the adjustment amount in proportion to the virtual capacity difference, but to expect that no matter what the power situation of each station is before the adjustment, the ideal situation after the adjustment should be to achieve relatively uniform power distribution under the virtual capacity. Therefore, the amount allocated according to the virtual capacity is actually the total target power, that is, the sum of the adjustment amount of all stations in the upper section and the real-time power of all stations.
[0046] At a certain time to be adjusted, some stations and sub-sections under the upper section are already full and cannot be adjusted. Therefore, the adjustment amount should no longer be allocated to these stations. To this end, the real-time power of these full lower sections and stations should be removed from the total target power, and these lower sections and stations should be eliminated from this allocation process. This elimination process is implemented by marking instructions.
[0047] On this basis, for the sections and stations that are not marked with instructions, the remaining total target power is proportionally disassembled according to the virtual capacity. Then, the total target power allocated to each section and station is subtracted from the current real active power of the section and station to obtain the amount to be adjusted for each section and station.
[0048] Preferably, the total target power is disassembled based on the virtual capacity difference of the unmarked new energy station or the lower section, including: if the disassembly power to any unmarked new energy station or the lower section causes the operating power to exceed the control upper limit of the feedback of the unmarked new energy station or the lower section, then a marking instruction is added; the excess power is recorded and the current unmarked new energy station or the lower section is eliminated, and the excess power is reallocated according to the virtual capacity difference until the allocation is completed; if the excess power cannot be fully allocated in the current section, the unallocated part is recorded as the third power and the third power is recovered.
[0049] In the process of disassembling and allocating the amount to be adjusted in each section and station, the allocated amount will cause the total active power of the section and station to exceed the limit. Therefore, it is also necessary to adjust the amount to be allocated to ensure that it will not exceed the limit after allocation.
[0050] In the present invention, the limit value of the section is usually obtained and set based on the dispatching experience in the power grid dispatching system. This parameter takes into account various factors of the regional power grid and is obtained by analyzing a large amount of historical data. The upper control limit of the new energy station can usually be obtained according to the own situation of the new energy station, for example, it is comprehensively related to the installed capacity, environmental factors, season, climate and other factors of the new energy station. This parameter can also be set artificially. In one embodiment of the present invention, the upper control limit of the station is obtained according to the virtual capacity of the station, and the virtual capacity is the product of the maximum installed capacity of the station and the reward and punishment coefficient. The reward and punishment coefficient is flexibly adjusted according to factors such as season, climate, commissioning scale, operation and maintenance events. But in general, for the short-term active power control process of the new energy cluster in the present invention, the reward and punishment coefficient does not change within a single adjustment or a continuous multiple adjustment event.
[0051] When the dismantled power is added to the real-time operating power of a section or station, the operating power may exceed the upper control limit. At this time, a marking instruction should be added to the section or station to ensure that the power will not be increased for the section or station during the next dispatch. The marking instruction can include the amount of operating power added to the station when the last dispatch was full, and can also include the amount of partial dismantled power that cannot be increased.
[0052] In one embodiment, the marking instructions are divided into two different types. One is the section or station that has exceeded the limit. The other is the section or station that is about to exceed the limit. For such a section or station that is about to exceed the limit, the upper section can be informed by recording the remaining adjustable power amount, so that when the power is allocated in equal proportion next time, it is ensured in advance that it will not cause the limit to be exceeded again, thereby effectively reducing the number of allocations.
[0053] Excess power is the amount of power that cannot be increased. This part will be recorded. For the current power allocation, at the current section level, according to the proportional allocation, there are some other stations or sections that are not full. Therefore, for this part of the excess power, it is still allocated in a proportional manner and flexibly allocated to other sections or stations that have not exceeded the limit.
[0054] At this time, if all sub-sections and stations under a section cannot be transferred in real time, the remaining power will be recorded as the third power. This may happen because the section transmission capacity is higher than the station generation capacity, resulting in the station exceeding the limit but the section is still within the control upper limit.
[0055] Preferably, the initial new energy cluster power is adjusted using the third power obtained through recycling to obtain the new energy cluster circulating power.
[0056] The third power obtained here can be used to cyclically modify the initial new energy cluster power, so as to adjust the instruction for issuing the new energy cluster power, re-circulate and scan the upper or top section, and implement power cyclic allocation. This part is similar to the recovery and redistribution process of the first power and the second power mentioned later.
[0057] In the above method, scan downward layer by layer starting from the top section, and if the power that cannot be allocated is scanned, it will be returned to the previous layer. After performing multiple cyclic scans, all power is accurately allocated according to the conditions of the new energy station and the conditions of each section. During the cyclic scanning process, the power is disassembled many times and disassembled into power blocks of different sizes. Usually, larger power blocks will be smoothly allocated to multiple different sections and stations to implement regulation of sections and stations. Only a small number of smaller power blocks need to be fully allocated and further disassembled. Therefore, this method overcomes the irreconcilable contradiction between accurate power distribution and rapid power distribution, and ensures real-time, accurate and flexible power distribution.
[0058] Step 2: If the current section state is changed to a jump or pause state, the power of the new energy cluster that cannot be delivered to the current section is recorded as the first power and the first power is recovered.
[0059] In the process of power distribution, although the response limits of sections and stations are fully considered, there may still be situations where the state of sections changes during power distribution. This situation may not only be caused by the section exceeding the limit due to power adjustment, but may also be caused by other human factors or other dispatching, control, and maintenance factors of the power grid.
[0060] Therefore, if the state of a section changes, it may be an active jump of the section or a manual pause. In this case, the power already allocated to the section needs to be adjusted or reallocated. At this time, according to the state of the section, if the section cannot change the power state, the adjustment amount needs to be transferred to other sections or stations, and the adjustment amount is recorded as the first power and recovered. If the section is caused by a transmission line fault, the adjustment amount and the original active power need to be recorded as the first power and recovered.
[0061] Similar to the third power, the recovered power will be redistributed through the next cycle cross-sectional scanning.
[0062] Step 3: If the current site cannot respond to the allocation instruction of the new energy cluster power, and the number of unresponsive times exceeds the preset threshold, the power adjustment amount corresponding to multiple allocation instructions under the accumulated number of unresponsive times is recorded as the second power and the second power is recovered.
[0063] Similarly, if a single station is unable to respond to a power allocation instruction, this power needs to be quickly recovered and allocated to other stations.
[0064] Preferably, if the current station cannot respond to the allocation instruction of the power of the new energy cluster, and the number of unresponsive times exceeds a preset threshold, the power adjustment amounts corresponding to multiple allocation instructions under the accumulated number of unresponsive times are recorded as the second power and the second power is recovered, and it also includes: if the number of unresponsive times does not exceed the preset threshold, the accumulated power adjustment amounts corresponding to one or more allocation instructions that cannot be responded to are superimposed on the power adjustment amount corresponding to the current instruction received by the current station; if the superimposed result is less than or equal to the adjustment step of the current station, the current station is actively controlled based on the superimposed result; if the superimposed result is greater than the adjustment step of the current station, the current station is actively controlled based on the adjustment step, the power exceeding the step is recorded as the second power, and a marking instruction is added for the current station.
[0065] Figure 2 Schematic diagram of a power transfer strategy for a certain new energy station in a new energy cluster active power control method based on cross-section constraint safety in the present invention. Figure 2 As shown, when the power of the top section is disassembled layer by layer, the new energy station will receive a power adjustment instruction issued by the AGC, including the power adjustment amount that the station needs to execute. In reality, due to various factors, although the new energy station did not provide a marking instruction upward, it still could not respond to these power adjustment amounts. For this reason, the present invention records the number of times the new energy station fails to respond. In one embodiment, the response number threshold is 3 times. If the response threshold is not exceeded, the new energy station can postpone the response, and these power adjustment amounts are still digested by the station itself. If the response number threshold is exceeded, the new energy station needs to transfer out the power adjustment amounts that have not responded for many times. In the present invention, the transferred adjustment amount is the second power.
[0066] It should be noted that in the delayed response process, in order to ensure that the delayed response speed can keep up with the regulation demand, the regulation step of the new energy station will also be taken into account. If the sum of the delayed response amount and the current response amount exceeds the regulation step of the new energy station, the excess will also be recorded in the second power.
[0067] The adjustment step size is usually calculated based on the equipment type and scale of the new energy station. For example, for a photovoltaic station, the number of photovoltaic panels that can be put into or cut off in batches at one time and the real-time power generation of each photovoltaic panel determine the size of the adjustment step size.
[0068] Step 4: Use the first power and the second power obtained by recycling to adjust the initial new energy cluster power to obtain the new energy cluster circulating power.
[0069] The recovered first power, second power and the third power mentioned above can be used to iteratively adjust the initial new energy cluster power. By summing these powers with the initial new energy cluster power, the real cluster power that needs to be iteratively allocated can be obtained. On this basis, the new energy cluster power is modified and the next new energy cluster power allocation is performed from the beginning.
[0070] Step 5, starting from the top section of the multi-layer nested sections, the circulating power of the new energy cluster is allocated layer by layer downward, and the layer-by-layer allocation process is iterated to implement dynamic active power control for the new energy cluster.
[0071] The execution process of step 5 is to disassemble and allocate the energy cluster cycle power obtained after recalculation. The allocation process is the same as the principle of step 1.
[0072] The second aspect of the present invention relates to a new energy cluster active power control system based on section constraint safety, the system includes an allocation module, a first recovery module, a second recovery module, a regulation module, and a circulation control module; wherein the allocation module is used to collect the initial new energy cluster power, and according to the virtual capacity difference of the new energy sites under different sections, the initial new energy cluster power is allocated layer by layer from the top section of the multi-layer nested sections downward to the new energy sites under different sections; the first recovery module is used to record the new energy cluster power that cannot be sent to the current section as the first power and recover the first power if the current section state changes to a jump or pause state. Power; a second recovery module, which is used to, if the current site cannot respond to the allocation instruction of the new energy cluster power, and the number of unresponsive times exceeds a preset threshold, then the power adjustment amount corresponding to multiple allocation instructions under the accumulated number of unresponsive times is recorded as the second power and the second power is recovered; an adjustment module, which is used to adjust the initial new energy cluster power using the recovered first power and second power to obtain the circulating power of the new energy cluster; a circulation control module, which is used to allocate the circulating power of the new energy cluster layer by layer starting from the top section of the multi-layer nested sections, and iterate the layer-by-layer allocation process to implement dynamic active power control for the new energy cluster.
[0073] A third aspect of the present invention relates to a terminal, comprising a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the method in the first aspect of the present invention.
[0074] A fourth aspect of the present invention relates to a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in the first aspect of the present invention.
[0075] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A new energy cluster active power control method based on section constraint safety, characterized in that: The method comprises the following steps: Collect the initial power of the new energy cluster, and distribute the initial power of the new energy cluster layer by layer from the top section of the multi-layer nested sections downwards according to the virtual capacity difference of the new energy stations under different sections, until the new energy stations under the different sections; If the current section state is changed to a jump or pause state, the power of the new energy cluster that cannot be delivered to the current section is recorded as the first power and the first power is recovered; If the current station cannot respond to the allocation instruction of the new energy cluster power, and the number of unresponsive times exceeds the preset threshold, the power adjustment amounts corresponding to the multiple allocation instructions under the number of unresponsive times are accumulated, recorded as the second power, and the second power is recovered; Using the first power and the second power obtained by recycling to adjust the initial new energy cluster power, so as to obtain the new energy cluster circulating power; The circulating power of the new energy cluster is allocated layer by layer starting from the top section of the multi-layer nested sections and the layer-by-layer allocation process is iteratively cycled to implement dynamic active power control for the new energy cluster.
2. According to claim 1, a new energy cluster active power control method based on cross-section constraint safety is characterized by: The virtual capacity differences of new energy stations under different sections include: Sum the virtual capacities of all new energy stations and sub-sections under the current section to serve as the virtual capacity of the current section; The virtual capacity difference of different sections is the percentage of the virtual capacity of the current section to the sum of the virtual capacities of all new energy stations to be adjusted.
3. The active power control method of a new energy cluster based on cross-section constraint safety according to claim 2 is characterized by: The initial new energy cluster power is distributed layer by layer starting from the top section of the multi-layer nested sections downwards until the new energy stations under the different sections include: Calculating the adjustable amount of the current section according to the section limit value of the current section and the current active power; The adjustable amount of the current section is fed back to the upper section as the control upper limit of the current section to ensure that the upper section controls the power of the new energy cluster allocated to the current section layer by layer within the adjustable amount.
4. The active power control method of a new energy cluster based on section constraint safety according to claim 3 is characterized by: The initial new energy cluster power is distributed layer by layer starting from the top section of the multi-layer nested sections downwards until the new energy stations under the different sections include: The current active power of all new energy stations in the current section and the power of the new energy cluster in the current section are summed up to obtain the total target power in the current section; Eliminate the new energy stations or lower sections with marked instructions under the current section, and implement the allocation of the total target power for the new energy stations or lower sections without marks; The allocation includes disassembling the total target power based on the virtual capacity difference of the unmarked new energy station or the lower section.
5. The active power control method of a new energy cluster based on section constraint safety according to claim 4 is characterized in that: The total target power is decomposed based on the virtual capacity difference of the unmarked new energy station or the lower section, including: If the disassembly power to any unmarked new energy station or lower section causes the operating power to exceed the upper control limit of the feedback of the unmarked new energy station or lower section, a marking instruction is added; Record the excess power and remove the currently unmarked new energy station or lower section, and reallocate the excess power according to the virtual capacity difference until the allocation is completed; If the excess power cannot be fully allocated within the current section, the unallocated portion is recorded as the third power and the third power is recovered.
6. The active power control method of a new energy cluster based on cross-section constraint safety according to claim 5 is characterized by: The initial new energy cluster power is adjusted by utilizing the third power obtained through recycling to obtain the new energy cluster circulating power.
7. The active power control method of a new energy cluster based on cross-section constraint safety according to claim 1 is characterized by: If the current station cannot respond to the allocation instruction of the new energy cluster power, and the number of failures to respond exceeds a preset threshold, the power adjustment amounts corresponding to the multiple allocation instructions under the number of failures to respond are accumulated, recorded as the second power, and the second power is recovered, and further comprising: If the number of unresponsive times does not exceed the preset threshold, the accumulated power adjustment amount corresponding to the one or more allocation instructions that cannot be responded to is added to the power adjustment amount corresponding to the current instruction received by the current station; If the superposition result is less than or equal to the adjustment step size of the current station, performing active power control on the current station based on the superposition result; If the superposition result is greater than the adjustment step of the current station, active power control is performed on the current station based on the adjustment step, the power exceeding the step is recorded as the second power, and a marking instruction is added for the current station.
8. A new energy cluster active power control system based on cross-section constraint safety, characterized by: The system includes a distribution module, a first recovery module, a second recovery module, a regulation module, and a circulation control module; wherein, The allocation module is used to collect the initial new energy cluster power, and allocate the initial new energy cluster power layer by layer from the top section of the multi-layer nested sections downwards according to the virtual capacity difference of the new energy stations under different sections, until the new energy stations under the different sections; The first recovery module is used to record the new energy cluster power that cannot be delivered to the current section as the first power and recover the first power if the current section state is changed to a jump or pause state; The second recovery module is used for accumulating the power adjustment amounts corresponding to the multiple allocation instructions under the number of unresponsive times, recording them as the second power and recovering the second power if the current station cannot respond to the allocation instruction of the new energy cluster power and the number of unresponsive times exceeds a preset threshold; The regulating module is used to regulate the initial new energy cluster power by using the first power and the second power obtained by recycling, so as to obtain the new energy cluster circulating power; The circulation control module is used to distribute the circulation power of the new energy cluster layer by layer starting from the top section of the multi-layer nested sections, and iterate the layer-by-layer distribution process to implement dynamic active power control for the new energy cluster.
9. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
New energy nested section control method and system
CN121618623A