Curve stiffening chord steel truss girder bridge design method and steel truss girder bridge

By translating and rotating the upper chord system line of the stiffening string system line in the bridge design and setting the angle, a stiffening string structure is established, the substress problem during the assembly of the stiffening string of the bridge is solved, ensuring structural safety and landscape effect, and adapting to different longitudinal slopes , improves design efficiency.

CN118996979AActive Publication Date: 2024-11-22CHINA RAILWAY MAJOR BRIDGE RECONNAISSANCE & DESIGN INSTITUTE CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411256779.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-22
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

In bridge design, when there are longitudinal slopes on both sides of the bridge span, the stiffening string design in the prior art usually regards the main beam linear shape as a flat slope, resulting in splicing substresses when assembling the stiffening strings, threatening structural safety.

Method used

By shifting the upper chord system line corresponding to the stiffening string system line upwards in a vertical plane as the rotation axis of the stiffening string plane, and rotating the angle along the stiffening string plane, establish the stiffening string system line to make the stiffening string system line as The reference is to form a stiffening string structure to ensure that there is no horizontal deviation when splicing the stiffening string and the upper chord, and to adapt to the longitudinal slope of different proportions.

Benefits of technology

It solves the substress problem during assembling stiffener strings, ensures structural safety, and takes into account both landscape effect and stress requirements. It can be quickly adjusted to adapt to changes in longitudinal slopes, improving design efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118996979A_ABST
    Figure CN118996979A_ABST
Patent Text Reader

Abstract

The invention discloses a curve stiffening chord steel truss girder bridge design method and a steel truss girder bridge, and relates to the technical field of bridge design. The method comprises the steps that in a vertical plane, part of an upper chord system line corresponding to a stiffening chord system line is translated upwards by a set length to serve as a stiffening chord plane rotating shaft; the vertical plane is rotated by a set angle towards the bridge floor side along the stiffening chord plane rotating shaft to serve as a stiffening chord plane; and establishing a stiffening chord system line in the stiffening chord plane, and establishing a stiffening chord structure by taking the stiffening chord system line as a reference. When the built stiffening chord structure is spliced with the upper chord, no transverse deviation exists, no secondary stress exists, and the stiffening chord structure can adapt to longitudinal slopes with different proportions on the two sides of a circular curve. The problem that in the prior art, certain splicing secondary stress is brought to the structure when stiffening strings are spliced, and the safety of the structure is threatened is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge design, and in particular to a design method for a curved stiffening chord steel truss bridge and a steel truss bridge. Background Art

[0002] In order to simultaneously meet the requirements of large-span steel truss structure stress and landscape effect, more and more steel trusses adopt the structure with curved stiffening chords, and the stiffening chord plane is not in the same plane as the main beam chord rod to meet higher landscape requirements. In traditional steel truss bridges with stiffening chords, in order to meet the overall layout requirements of the line, the longitudinal slope and circular curve section are usually considered in the vertical curve line shape of the steel truss. In special cases, longitudinal slopes of different proportions are even arranged on both sides of the circular curve section to adapt to the overall layout.

[0003] In the prior art, when there are longitudinal slopes on both sides of the bridge span, the main beam line shape is still considered as a flat slope when designing the stiffening chords. When the stiffening chords are assembled, certain secondary splicing stresses will be brought to the structure, threatening the safety of the structure. Summary of the invention

[0004] In view of the defects existing in the prior art, the purpose of the present invention is to provide a design method for a curved stiffening chord steel truss bridge and a steel truss bridge, which can solve the problem in the prior art that when there are longitudinal slopes on both sides of the bridge span, the main beam line shape is still designed as a flat slope when designing the stiffening chords, and there is a certain splicing secondary stress in the structure when assembling the stiffening chords, which threatens the safety of the structure.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] On the one hand, this scheme provides a design method for a curved stiffened chord steel truss bridge, including:

[0007] In the vertical plane, part of the upper chord system line corresponding to the stiffening chord system line is translated upward by a set length to serve as the stiffening chord plane rotation axis;

[0008] The vertical plane is rotated along the rotation axis of the stiffening chord plane to the bridge deck side by a set angle as the stiffening chord plane;

[0009] A stiffening string system line is established in the stiffening string plane, and a stiffening string structure is established based on the stiffening string system line.

[0010] In some optional schemes, a stiffening chord system line is established in the stiffening chord plane, and after the stiffening chord structure is established based on the stiffening chord system line, the relative position of the stiffening chord structure and the upper chord top plate is determined by precise lofting, and it is judged whether the structure meets the force requirements. If the structure does not meet the force requirements, the set length and the set angle are adjusted until the structure meets the force requirements.

[0011] In some optional solutions, the upper chord system line is translated upward by a set length in the vertical plane, before the axis of rotation of the stiffening chord plane:

[0012] Determine the longitudinal slopes on both sides of the bridge span according to the connection conditions on both sides of the bridge span;

[0013] According to the longitudinal slope on both sides of the bridge span, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

[0014] In some optional solutions, the method of determining the upper chord system line and the lower chord system line according to the longitudinal slopes on both sides of the bridge span and forming the main beam overall structure includes:

[0015] Determine the vertical curve of the main beam according to the longitudinal slope on both sides of the bridge span;

[0016] According to the vertical curve line shape of the main beam, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

[0017] In some optional schemes, after the upper chord system line and the lower chord system line are determined according to the vertical curve line shape of the main beam and the overall structure of the main beam is formed, the relative position of the stiffening chord system line and the upper chord system line is determined according to the upper chord system line.

[0018] In some optional solutions, the initially set length is half of the height of the upper chord.

[0019] In some optional schemes, a stiffening chord system line is established in the stiffening chord plane, and after the stiffening chord structure is established based on the stiffening chord system line, the stiffening vertical rod structure and the stiffening chord cross brace structure are designed based on the established stiffening chord structure.

[0020] On the other hand, the present solution also provides a steel truss bridge, which includes a stiffening chord, and the stiffening chord is designed by the above-mentioned curved stiffening chord steel truss bridge design method.

[0021] In some optional schemes, an upper chord is arranged at the bottom of the stiffening chord, a lower chord is arranged below the upper chord in parallel and at intervals, a plurality of web members are arranged between the upper chord and the lower chord along the longitudinal bridge direction, and both ends of the web members are respectively connected to the upper chord and the lower chord, and the plurality of web members are connected end to end in sequence, and a plurality of stiffening chord vertical rods are arranged between the stiffening chord and the upper chord in parallel and at intervals along the longitudinal bridge direction, and the connection points of the stiffening chord vertical rods and the upper chord coincide with the connection points of the upper chord and the web members.

[0022] In some optional schemes, an upper bridge deck is arranged between the upper chords on both sides of the bridge centerline, a lower bridge deck is arranged between the lower chords on both sides of the bridge centerline, and a plurality of stiffening chord cross braces are arranged between the stiffening chords on both sides of the bridge centerline along the longitudinal direction of the bridge.

[0023] Compared with the prior art, the advantages of the present invention are as follows: in the vertical plane, the present invention translates the part of the upper chord system line corresponding to the stiffening chord system line upward by a set length to serve as the rotation axis of the stiffening chord plane; the vertical plane is rotated by a set angle toward the bridge deck side along the rotation axis of the stiffening chord plane to serve as the stiffening chord plane; the stiffening chord system line is established in the stiffening chord plane, and the stiffening chord structure is established based on the stiffening chord system line. The established stiffening chord structure has no lateral deviation when spliced ​​with the upper chord, and there is no secondary stress, and it can adapt to longitudinal slopes of different proportions on both sides of the circular curve. The problem in the prior art that the stiffening chord assembly will bring certain splicing secondary stress to the structure, threatening the structural safety, is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 It is a schematic diagram of the flow of the design method of the curved stiffened chord steel truss bridge in an embodiment of the present invention;

[0026] Figure 2 is a schematic diagram of a stiffening chord plane in an embodiment of the present invention;

[0027] Figure 3 A schematic diagram of a vertical curve of a bridge in an embodiment of the present invention;

[0028] Figure 4 It is a structural schematic diagram of a curved stiffened chord steel truss bridge in an embodiment of the present invention;

[0029] Figure 5 It is a schematic diagram of the cross-sectional structure of a curved stiffened chord steel truss bridge according to an embodiment of the present invention;

[0030] In the figure: 1. upper chord system line; 2. stiffening chord; 3. stiffening chord vertical rod; 4. upper chord; 5. web member; 6. lower chord; 7. stiffening chord cross brace; 8. stiffening chord node plate; 9. stiffening chord vertical rod node plate; 10. upper bridge deck; 11. lower bridge deck; 12. stiffening chord plane rotation axis; 13. stiffening chord plane; 14. vertical plane; 15. stiffening chord system line. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0032] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0033] like Figure 1 As shown, on the one hand, the present invention provides a design method for a curved stiffened chord steel truss bridge, comprising:

[0034] S1: In the vertical plane, the part of the upper chord system line corresponding to the stiffening chord system line is translated upward by a set length as the rotation axis of the stiffening chord plane.

[0035] S2: Rotate the vertical plane along the stiffening chord plane rotation axis toward the bridge deck side by a set angle to serve as the stiffening chord plane.

[0036] S3: Establish a stiffening string system line in the stiffening string plane, and establish a stiffening string structure based on the stiffening string system line.

[0037] like Figure 2 As shown, in this embodiment, the bridge structure design and layout are based on BIM (Building Information Modeling) technology. The stiffening chord system line is the axis of the stiffening chord design layout, the upper chord rod system line is the axis of the upper chord rod design layout, and the other system lines are analogous. The upper chord rod system line 1 corresponding to the stiffening chord system line 15 is translated upward by a set length to obtain the stiffening chord plane rotation axis 12. The vertical plane 14 is rotated toward the bridge deck side along the stiffening chord plane rotation axis 12 by a set angle to obtain the stiffening chord plane 13. The stiffening chord system line 15 is established in the stiffening chord plane 13, and the stiffening chord structure is established based on the stiffening chord system line 15. The established stiffening chord structure has no lateral deviation when spliced ​​with the upper chord rod, and there is no secondary stress, which can adapt to the longitudinal slopes of different proportions on both sides of the circular curve. The problem in the prior art that the stiffening chord assembly will bring certain splicing secondary stress to the structure and threaten the structural safety is solved. During the bridge design process, when the longitudinal slope is adjusted, this solution can quickly adjust the structure to adapt to the impact of the longitudinal slope adjustment on the structural changes.

[0038] In some optional embodiments, a stiffening chord system line is established in the stiffening chord plane, and after the stiffening chord structure is established based on the stiffening chord system line, the relative position of the stiffening chord structure and the upper chord top plate is determined by precise lofting, and it is determined whether the structure meets the force requirements. If the structure does not meet the force requirements, the set length and the set angle are adjusted until the structure meets the force requirements.

[0039] In this embodiment, the selection of the initial setting angle is determined by the landscape design effect. The initial setting length is half of the height of the upper chord. After the relative position of the stiffening chord structure and the upper chord top plate is determined by precise lofting, if the structure does not meet the force requirements, the setting angle is adjusted first. The setting angle is adjusted while ensuring the landscape effect. If the setting angle still cannot meet the structural force requirements, the setting length is adjusted so that the structure meets the force requirements.

[0040] In some optional embodiments, in the vertical plane, the upper chord system line is translated upward by a set length, as before the stiffening chord plane rotation axis:

[0041] Determine the longitudinal slopes on both sides of the bridge span according to the connection conditions on both sides of the bridge span;

[0042] According to the longitudinal slope on both sides of the bridge span, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

[0043] In this embodiment, the connection condition means that after the bridge crosses the river, it needs to be connected to the road and railway network on both sides. Since the road and railway network on both sides are generally planned earlier than the bridge, the longitudinal slope should be determined according to the connection conditions on both sides in the early stage of bridge research. For example, if the bridge needs to be connected to the nearby road network as soon as possible after crossing, the longitudinal slope of the bridge should be increased to ensure that the route is implemented as soon as possible.

[0044] In some optional embodiments, the method of determining the upper chord system line and the lower chord system line and forming the main beam overall structure according to the longitudinal slopes on both sides of the bridge span includes:

[0045] Determine the vertical curve of the main beam according to the longitudinal slope on both sides of the bridge span;

[0046] According to the vertical curve line shape of the main beam, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

[0047] like Figure 3 As shown, in this embodiment, the upper chord system line 1 is determined based on the vertical curve of the main beam, and the upper chord system line 1 includes straight line segments on both sides of the longitudinal slope and a circular curve segment at the longitudinal slope.

[0048] In some optional embodiments, after the upper chord system line and the lower chord system line are determined according to the vertical curve line shape of the main beam and the overall structure of the main beam is formed, the relative positions of the stiffening chord system line and the upper chord system line are determined according to the upper chord system line.

[0049] In some optional embodiments, a stiffening chord system line is established in the stiffening chord plane, and after the stiffening chord structure is established based on the stiffening chord system line, a stiffening vertical rod structure and a stiffening chord cross brace structure are designed based on the established stiffening chord structure.

[0050] like Figure 4 As shown, on the other hand, the present invention also provides a steel truss bridge, which includes a stiffening chord 2, and the stiffening chord 2 is designed by the above-mentioned curved stiffening chord steel truss bridge design method.

[0051] In some optional embodiments, an upper chord rod 4 is arranged at the bottom of the stiffening chord 2, a lower chord rod 6 is arranged parallel and spaced below the upper chord rod 4, a plurality of web rods 5 are arranged between the upper chord rod 4 and the lower chord rod 6 along the longitudinal bridge direction, and both ends of the web rods 5 are respectively connected to the upper chord rod 4 and the lower chord rod 6, and the plurality of web rods 5 are connected end to end in sequence, and a plurality of stiffening chord vertical rods 3 are arranged parallel and spaced between the stiffening chord 2 and the upper chord rod 4 along the longitudinal bridge direction, and the connection points of the stiffening chord vertical rods 3 and the upper chord rod 4 coincide with the connection points of the upper chord rod 4 and the web rod 5.

[0052] In this embodiment, a chord vertical rod node plate 9 is provided at one end where the chord vertical rod 3 is connected to the upper chord rod 4, and a chord vertical rod node plate 8 is provided at one end where the chord vertical rod 3 is connected to the chord 2. The overall stiffness of the chord 2 is improved by providing the chord vertical rod 3.

[0053] like Figure 5 As shown, in some optional embodiments, an upper bridge deck 10 is arranged between the upper chords 4 on both sides of the central axis of the bridge, a lower bridge deck 11 is arranged between the lower chords 6 on both sides of the central axis of the bridge, and a plurality of stiffening chord cross braces 7 are arranged between the stiffening chords 2 on both sides of the central axis of the bridge along the longitudinal direction of the bridge.

[0054] In summary, in the vertical plane, the present invention translates the part of the upper chord system line corresponding to the stiffening chord system line upward by a set length as the rotation axis of the stiffening chord plane; rotates the vertical plane along the rotation axis of the stiffening chord plane to the bridge deck side by a set angle as the stiffening chord plane; establishes the stiffening chord system line in the stiffening chord plane, and establishes the stiffening chord structure based on the stiffening chord system line. The established stiffening chord structure has no lateral deviation when spliced ​​with the upper chord, and there is no secondary stress, which can adapt to the longitudinal slopes of different proportions on both sides of the circular curve. It takes into account both the structural force and the landscape effect. It solves the problem in the prior art that when the stiffening chord is assembled, it will bring certain splicing secondary stress to the structure, threatening the safety of the structure. This scheme can quickly locate the complex stiffening chord structure in space, and can adapt to the situation of asymmetric longitudinal slopes in the center of the bridge span. At the same time, in the early stage of the scheme determination, it can quickly adapt to the influence of the adjustment of the longitudinal slopes on both sides on the spatial relationship of the structure. The design efficiency of the structural size and shape in the early stage of the scheme determination is greatly increased.

[0055] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0056] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0057] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A design method for a curved stiffened chord steel truss bridge. It is characterized in that include: In the vertical plane, part of the upper chord system line corresponding to the stiffening chord system line is translated upward by a set length to serve as the rotation axis of the stiffening chord plane; The vertical plane is rotated along the rotation axis of the stiffening chord plane to the bridge deck side by a set angle as the stiffening chord plane; A stiffening string system line is established in the stiffening string plane, and a stiffening string structure is established based on the stiffening string system line.

2. The design method of the curved stiffened chord steel truss bridge according to claim 1, It is characterized in that A stiffening chord system line is established in the stiffening chord plane. After the stiffening chord structure is established based on the stiffening chord system line, the relative position of the stiffening chord structure and the upper chord top plate is determined by precise lofting, and it is judged whether the structure meets the force requirements. If the structure does not meet the force requirements, the set length and set angle are adjusted until the structure meets the force requirements.

3. The design method of the curved stiffened chord steel truss bridge according to claim 1, It is characterized in that In the vertical plane, translate the upper chord system line upward by the set length, before the rotation axis of the stiffening chord plane: Determine the longitudinal slopes on both sides of the bridge span according to the connection conditions on both sides of the bridge span; According to the longitudinal slope on both sides of the bridge span, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

4. The design method of the curved stiffened chord steel truss bridge according to claim 3, It is characterized in that The method of determining the upper chord system line and the lower chord system line according to the longitudinal slopes on both sides of the bridge span and forming the overall structure of the main beam includes: Determine the vertical curve of the main beam according to the longitudinal slope on both sides of the bridge span; According to the vertical curve line shape of the main beam, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam.

5. The design method of the curved stiffened chord steel truss bridge according to claim 4, It is characterized in that According to the vertical curve line of the main beam, the upper chord system line and the lower chord system line are determined to form the overall structure of the main beam, and then the relative position of the stiffening chord system line and the upper chord system line is determined according to the upper chord system line.

6. The design method of the curved stiffened chord steel truss bridge according to claim 1, It is characterized in that Initially, the set length is half of the height of the upper chord.

7. The design method of the curved stiffened chord steel truss bridge according to claim 1, It is characterized in that A stiffening chord system line is established in the stiffening chord plane, and after the stiffening chord structure is established based on the stiffening chord system line, a stiffening vertical rod structure and a stiffening chord cross brace structure are designed based on the established stiffening chord structure.

8. A steel truss bridge, It is characterized in that It comprises a stiffening chord (2), and the stiffening chord (2) is designed by the design method of a curved stiffening chord steel truss bridge as claimed in claim 1.

9. The steel truss bridge according to claim 8, It is characterized in that An upper chord (4) is arranged at the bottom of the stiffening chord (2), a lower chord (6) is arranged at intervals in parallel below the upper chord (4), a plurality of web members (5) are arranged between the upper chord (4) and the lower chord (6) along the longitudinal bridge direction, the two ends of which are respectively connected to the upper chord (4) and the lower chord (6), the plurality of web members (5) are connected end to end in sequence, a plurality of stiffening chord vertical rods (3) are arranged at intervals in parallel between the stiffening chord (2) and the upper chord (4) along the longitudinal bridge direction, and the connection point between the stiffening chord vertical rod (3) and the upper chord (4) coincides with the connection point between the upper chord (4) and the web member (5).

10. The steel truss bridge according to claim 9, It is characterized in that An upper bridge deck (10) is arranged between upper chords (4) on both sides of the central axis of the bridge, a lower bridge deck (11) is arranged between lower chords (6) on both sides of the central axis of the bridge, and a plurality of stiffening chord cross braces (7) are arranged between stiffening chords (2) on both sides of the central axis of the bridge along the longitudinal direction of the bridge.

Citation Information

Patent Citations

  • Composite RCC deck and prestressed parabolic bottom chord underslung open web steel girder bridge superstructure

    CA3205909A1

  • Erection method of large-span continuous steel truss arch

    CN101117792A

  • Stiffening chord member and expanding steel truss combined continuous beam bridge and construction method

    CN111455812A

  • Composite truss bridge and its construction method

    JP2003193424A

  • Composite truss segment and truss bridge for simultaneously using suspension cable by using this truss segment and its construction method

    JP2004027516A