Structure for enhancing connection between concrete filled steel tube pier and steel box girder by adopting convex steel diaphragm plate and construction method thereof
By setting up precast concrete columns and convex cross-dividing plate units on the bridge pier steel pipes, combined with the use of cast-in-place concrete blocks, the problem of insufficient horizontal fixing strength of the connection between the bridge pier and the box girder in the prior art is solved, and the bridge pier and box girder are realized High strength, stable connection, suitable for long-term use.
Patent Information
- Application Number
- CN202411127226.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The connecting structure of the existing steel box girder and the steel pipe concrete piers is insufficient in the lateral fixing strength, resulting in insufficient overall stability and difficult to use for a long time.
The connecting structure between the concrete piers and the steel box girder is reinforced by convex steel steel cross-dividing plates. By setting precast concrete columns, box girder bottom plates, partitions, box girder top plates, installation holes, plug grooves, and convex cross-dividing on the bridge pier steel pipes The partition unit and cast-in-place concrete block realize the connection between plugging and concrete casting, and enhance the connection strength and stability.
The overall structural stability and connection strength of the bridge piers and box girders are improved, so that the bridge has high installation stability in both vertical and horizontal directions, and is suitable for long-term use.
Smart Images

Figure CN118996983A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge structures, and in particular relates to a structure using a convex steel diaphragm to reinforce the connection between a steel tube concrete bridge pier and a steel box beam, and a construction method thereof. Background Art
[0002] The concrete-filled steel tube bridge pier has a specific structure consisting of an outer steel tube and inner concrete. Therefore, the functional characteristics of the bridge pier can combine the tensile strength of steel structures with the compressive strength of concrete structures.
[0003] The steel box girder has a box-like structure and is generally in the shape of a cuboid. The stable connection between the bridge piers and the steel box girder is one of the necessary conditions for the long-term stability of the overall bridge structure.
[0004] Generally, the above connection methods mainly include: screw connection, welding, and concrete pouring connection.
[0005] For example, a Chinese utility model patent with authorization announcement number CN216474576U and authorization announcement date 2022.05.10 discloses a consolidation structure of a steel box girder of a rotating rigid frame bridge and a concrete pier, including a turntable, a concrete pier and a consolidation device. The concrete pier is rotatably connected to the surface of the turntable, a bridge is provided on the surface of the concrete pier, and the consolidation device is provided at the connection between the concrete pier and the bridge. The consolidation device includes a limit frame, the limit frame is fixedly connected to the surface of the concrete pier, the surface of the limit frame is fixedly connected to a back plate, the surface of the back plate is provided with a socket, the inner wall of the socket is threadedly connected with a fixed bolt, the surface of the concrete pier is sleeved with a support ring, the inner wall of the support ring is fixedly connected with a connecting bolt, the surface of the support ring is provided with a constraint groove, and the inner wall of the constraint groove is rotatably connected with a load-bearing frame.
[0006] The consolidation structure in this utility model patent has the following advantages: by setting up a consolidation device, the stability of the bridge body is increased, thereby reducing the consolidation difficulty of the bridge body, improving the assembly efficiency of the bridge body, and improving the firmness of the bridge body.
[0007] However, in actual use, the consolidation structure still has at least the following disadvantages, which are also the technical problems to be solved by the present invention, namely: The direct connection between the fixing device and the bridge is only a number of fixing bolts, so the lateral fixing strength is insufficient and the stability of the entire connection structure is insufficient, making it difficult to use for a long time.
[0008] Therefore, in summary, there is an urgent need for an overall stable structure that can connect the piers and the bridge with high strength, so that the bridge has both vertical and lateral installation stability on the piers. Summary of the invention
[0009] The present invention provides a structure for connecting a steel tube concrete bridge pier and a steel box girder by using a convex steel diaphragm. By arranging precast concrete columns, a box girder bottom plate, a diaphragm, a box girder top plate, mounting holes, plug-in slots, a protruding diaphragm unit, and cast-in-place concrete blocks on the pier steel tube, the structure can ensure that the steel tube concrete bridge pier and the steel box girder have at least three connection relationships, namely, plug-in connection, concrete pouring connection, and the protruding diaphragm unit strengthening the concrete pouring connection effect. This makes the above-mentioned overall structure have greater structural stability and can be used stably for a long time.
[0010] In addition, the present invention also provides a construction method for the above structure, which comprises the following steps: precast concrete columns are prefabricated in a factory, and then threaded steel bars are fixed in the pier steel pipes, thereby appropriately shortening the construction period of the above overall structure.
[0011] The technical solution adopted by the present invention to solve the above-mentioned problem is: a structure of strengthening the connection between a steel tube concrete pier and a steel box girder by using a convex steel diaphragm, comprising a pier steel tube, a precast concrete column, a box girder bottom plate, a diaphragm, and a box girder top plate, and also comprising a mounting hole arranged on the box girder bottom plate and plugged into the pier steel tube, a plug-in groove opened downward from the upper end surface of the pier steel tube, a protruding diaphragm unit arranged on the upper surface of the box girder bottom plate and engaged with the plug-in groove, and a cast-in-place concrete block arranged in the pier steel tube and on the box girder bottom plate and covering the protruding diaphragm unit.
[0012] A further preferred technical solution is that: the number of the plug-in grooves is 2; the protruding transverse partition unit includes an end protruding transverse plate arranged on the upper surface of the box girder bottom plate and engaged with the two plug-in grooves, and an end groove arranged on the end protruding transverse plate and used for cast-in-place concrete in the pier steel pipe.
[0013] A further preferred technical solution is that the protruding transverse partition unit also includes a vertical plate arranged on the end protruding transverse plate and used for engaging with the side surface of the plug-in slot.
[0014] A further preferred technical solution is that: the precast concrete column is provided with a threaded steel bar for inserting the cast-in-place concrete block; the protruding transverse partition unit also includes a middle opening arranged on the end protruding transverse plate and used to pass through the threaded steel bar; the threaded steel bar is also provided with a fastening nut for pressing down the end protruding transverse plate.
[0015] A further preferred technical solution is that the protruding transverse partition unit also includes an extension pipe which is arranged on the lower surface of the end protruding transverse plate and is sleeved on the threaded steel bar.
[0016] A further preferred technical solution is that: a stiffening plate unit for welding the outer annular surface of the pier steel pipe and the lower surface of the box beam bottom plate is also provided on the plug-in groove.
[0017] A further preferred technical solution is that the stiffening plate unit includes a rectangular cross plate which is inserted into the insertion groove and supports the box beam bottom plate, and a right-angled triangular plate which is arranged on the rectangular cross plate and is used for welding the outer annular surface of the pier steel pipe and the lower surface of the box beam bottom plate.
[0018] A further preferred technical solution is that the protruding transverse partition unit also includes a reinforcement slot opened upward from the lower end surface of the extension tube and used for engaging the rectangular transverse plate.
[0019] A further preferred technical solution is that a radial plate for connecting the threaded steel bars is also provided on the inner annular surface of the pier steel pipe.
[0020] The invention discloses a construction method for a structure using a convex steel diaphragm to strengthen the connection between a steel tube concrete pier and a steel box beam, the steps of which include: prefabricating the precast concrete column in a factory, and then fixing the threaded steel bar in the pier steel tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the position structure of the present invention.
[0022] Figure 2 It is a schematic diagram of the position of the mounting holes in the present invention.
[0023] Figure 3 It is a schematic diagram of the position of the plug slot in the present invention.
[0024] Figure 4 It is a schematic diagram of the position of the threaded steel bars in the present invention.
[0025] Figure 5 It is a schematic diagram of the position of the protruding diaphragm unit in the present invention.
[0026] Figure 6 It is a schematic structural diagram of the protruding transverse partition unit in the present invention.
[0027] Figure 7 It is a schematic diagram of the position and shape of the radial plate in the present invention.
[0028] Figure 8 It is a schematic diagram of the position structure of the stiffening plate unit in the present invention.
[0029] Fig. 9 It is a schematic diagram of the position of the fastening nut in the present invention from a top view.
[0030] Fig.10 It is a schematic diagram of the structure of the steel tube concrete pier in the present invention.
[0031] In the figure, the meanings of the symbols are as follows: Pier steel pipe 11, precast concrete column 12, box beam bottom plate 13, diaphragm 14, box beam top plate 15; Mounting hole 1, plug-in slot 2, protruding diaphragm unit 3, cast-in-place concrete block 4, threaded steel bar 5, fastening nut 6, stiffening plate unit 7, radial plate 8; The end protruding horizontal plate 301, the end slot 302, the vertical plate 303, the middle opening 304, the extension tube 305, the reinforcement slot 306, the rectangular horizontal plate 701, and the right-angled triangle plate 702. DETAILED DESCRIPTION
[0032] The following descriptions are merely preferred embodiments of the present invention and are not intended to limit the scope of the present invention.
[0033] As attached Figure 1-10 As shown, a structure for connecting a steel tube concrete pier and a steel box girder using a convex steel diaphragm, comprising a pier steel tube 11, a precast concrete column 12, a box girder bottom plate 13, a diaphragm 14, and a box girder top plate 15, and also comprising a mounting hole 1 arranged on the box girder bottom plate 13 and plugged into the pier steel tube 11, a plug-in groove 2 opened downward from the upper end surface of the pier steel tube 11, a protruding diaphragm unit 3 arranged on the upper surface of the box girder bottom plate 13 and engaged with the plug-in groove 2, and a cast-in-place concrete block 4 arranged in the pier steel tube 11 and on the box girder bottom plate 13 and covering the protruding diaphragm unit 3.
[0034] In this embodiment, the main structure of the steel tube concrete pier includes: pier steel tube 11 and precast concrete column 12, and the main structure of the steel box girder includes: box girder bottom plate 13, diaphragm 14, and box girder top plate 15. The connection structure of the above two mainly includes: the protruding transverse diaphragm unit 3 and the cast-in-place concrete block 4.
[0035] At this point, the steel tube concrete pier, steel box girder, and connection structure constitute a relatively complete structure. Among them, the high-strength connection and stable installation characteristics of this structure are mainly reflected in the following three aspects: First, the pier steel pipe 11 is inserted upwardly and installed at the installation hole 1; Second, the cast-in-place concrete block 4 connects the steel tube concrete pier and the steel box girder into a whole; Thirdly, the protruding diaphragm unit 3 further increases the plug-in size and effective plug-in degree of the steel tube concrete pier and the cast-in-place concrete block 4, so that the above-mentioned concrete connection strength is further improved.
[0036] The shape of the mounting hole 1 is circular. When viewed from a top view, the symmetry line of the plug slot 2 passes through the central axis of the pier steel pipe 11 .
[0037] In addition, the protruding transverse diaphragm unit 3 and the upper surface of the box beam bottom plate 13 are at least abutted against each other, and can be welded and fixed. The outline shape of the cast-in-place concrete block 4 is "upper rectangular parallelepiped, lower cylindrical", which covers the entire protruding transverse diaphragm unit 3 and the upper end of the pier steel pipe 11, thereby achieving the effect of pouring concrete to connect the pier and the steel box beam.
[0038] Finally, the concrete pouring starting point of the cast-in-place concrete block 4 is: the upper end surface of the precast concrete column 12 and the upper surface of the box beam bottom plate 13, its transverse pouring boundary is: the partition 14, and its pouring end point is: the lower surface of the box beam top plate 15. Among them, the box beam top plate 15 can be welded and fixed after the cast-in-place concrete block 4 is solidified, or it is welded and fixed with the partition 14 when leaving the factory, but a concrete pouring port is reserved on it.
[0039] The number of the plug-in slots 2 is 2; the protruding transverse diaphragm unit 3 includes an end protruding transverse plate 301 arranged on the upper surface of the box girder bottom plate 13 and engaged with the two plug-in slots 2, and an end slot 302 arranged on the end protruding transverse plate 301 and used for pouring concrete into the pier steel pipe 11.
[0040] In this embodiment, the protruding cross plate 301 at the end is in the shape of a rectangle, and the axis of symmetry parallel to its long side passes through the vertical center axis of the pier steel pipe 11, so that the protruding cross plate 301 at the end can relatively evenly and symmetrically resist tension and reinforce the pier steel pipe 11 in the cast-in-place concrete block 4.
[0041] The width of the end protruding horizontal plate 301 is equal to the width of the plug-in slot 2. The end slots 302 are rectangular in shape and are 2 in number. The transverse opening depth is at least enough to fully expose the inner area of the pier steel pipe 11, otherwise the cast-in-place concrete block 4 cannot fill the pier steel pipe 11, and there will be no cast-in-place concrete part in the shape of the "lower cylinder", which will greatly reduce the structural strength of the structure.
[0042] Of course, the lateral depth of the end slot 302 cannot be too large, otherwise the structural strength of the protruding transverse partition unit 3 will be reduced, which is not conducive to the stability of the structure.
[0043] At this time, the shape of the protruding diaphragm unit 3 is "H-shaped".
[0044] The protruding transverse partition unit 3 further includes a vertical plate 303 which is arranged on the end protruding transverse plate 301 and is used for engaging with the side surface of the plug-in slot 2 .
[0045] In this embodiment, the two vertical plates 303 and the one end protruding horizontal plate 301 are integrally formed, and the vertical cross-section of the whole is "U-shaped". Compared with the method of using the end protruding horizontal plate 301 alone, this combination has the advantages that the strength of the plug-in slot 2 and the strength of the cast-in-place concrete block 4 can be significantly improved.
[0046] The precast concrete column 12 is provided with a threaded steel bar 5 for inserting the cast-in-place concrete block 4; the protruding transverse partition unit 3 also includes a middle opening 304 arranged on the end protruding horizontal plate 301 and used to pass the threaded steel bar 5; the threaded steel bar 5 is also provided with a fastening nut 6 for pressing down the end protruding horizontal plate 301.
[0047] In this embodiment, for the precast concrete column 12, the function of the threaded steel bar 5 is to fully reinforce the precast concrete and ultimately improve the structural strength of the entire steel tube concrete pier.
[0048] On the other hand, the precast concrete column 12 can also be reinforced with steel mesh according to the existing technology, which can also strengthen the structure of the steel tube concrete pier itself, as long as the position of the steel mesh does not affect the installation of the protruding diaphragm unit 3.
[0049] In addition, for the protruding diaphragm unit 3, the function of the threaded steel bar 5 is: First, it is inserted into the middle opening 304, thereby transversely reinforcing the entire protruding transverse partition unit 3; Second, after engaging the fastening nut 6 , the end protruding transverse plate 301 is pressed down, thereby vertically reinforcing the entire protruding transverse partition unit 3 .
[0050] Finally, it should be noted that: When the protruding diaphragm unit 3 is installed, the threaded steel bar 5 is completely fixed on the precast concrete column 12; The upper end of the threaded steel bar 5 may protrude outside the pier steel pipe 11 , but may not affect the installation of the box girder top plate 15 .
[0051] The protruding transverse partition unit 3 also includes an extension pipe 305 which is arranged on the lower surface of the end protruding transverse plate 301 and is sleeved with the threaded steel bar 5.
[0052] In this embodiment, there is no need to set threads on the middle opening 304 and the extension tube 305. The direct function of the extension tube 305 is to sleeve the threaded steel bar 5 together with the middle opening 304, increase the sleeve size between the protruding transverse partition unit 3 and the threaded steel bar 5, and make the above-mentioned transverse reinforcement effect better.
[0053] The inserting groove 2 is also provided with a stiffening plate unit 7 for welding the outer annular surface of the pier steel pipe 11 and the lower surface of the box beam bottom plate 13.
[0054] In this embodiment, the main function of the stiffening plate unit 7 is to reinforce the connection between the steel tube concrete pier and the steel box girder together with the protruding transverse diaphragm unit 3 and the cast-in-place concrete block 4. That is, the stiffening plate unit 7 also belongs to the above-mentioned connection structure.
[0055] The number of the stiffening plate units 7 is 2-4, and they are evenly spaced in the circumferential direction of the pier steel pipe 11 .
[0056] The stiffening plate unit 7 includes a rectangular transverse plate 701 inserted in the insertion groove 2 and supporting the box beam bottom plate 13, and a right-angled triangular plate 702 arranged on the rectangular transverse plate 701 and used for welding the outer annular surface of the pier steel pipe 11 and the lower surface of the box beam bottom plate 13.
[0057] In this embodiment, another method of using the plug-in slot 2 is: the rectangular cross plate 701 is pressed on the bottom surface of the plug-in slot 2, the box beam bottom plate 13 is pressed on the rectangular cross plate 701, and the end protruding cross plate 301 is pressed on the box beam bottom plate 13.
[0058] So far, the above combined structure has at least the following advantages: First, although the depth of the insertion groove 2 exceeds the bottom plate 13 of the box beam, it is blocked by the rectangular horizontal plate 701 to ensure that concrete will not leak from the insertion groove 2; Second, the stiffening plate unit 7 can not only be welded to the outer annular surface of the pier steel pipe 11 and the lower surface of the box beam bottom plate 13, but also can be plugged into the cast-in-place concrete block 4, thereby reinforcing and installing the stiffening plate unit 7 to enhance the structural strength of the entire structure.
[0059] In addition, the two right-angled sides of the right-angled triangle plate 702 can be welded to the outer annular surface of the pier steel pipe 11 and the lower surface of the box beam bottom plate 13 respectively.
[0060] The protruding transverse partition unit 3 further includes a reinforcement slot 306 which is opened upward from the lower end surface of the extension tube 305 and is used to engage with the rectangular transverse plate 701 .
[0061] In this embodiment, the stiffening plate unit 7 has the above three fixing installation methods: First, the rectangular horizontal plate 701 is inserted into the cast-in-place concrete block 4, which is connected as a whole after solidification; Second, the rectangular horizontal plate 701 is plugged into the plug-in slot 2; Third, the right-angled triangle plate 702 is welded to the pier steel pipe 11 and the box beam bottom plate 13 .
[0062] At this point, the stiffening plate unit 7 has been able to achieve its own stable installation and strengthen the connection position between the steel tube concrete pier and the steel box girder.
[0063] The setting of the reinforcement slot 306 has the direct function of engaging the rectangular horizontal plate 701, and the ultimate function is: First, the protruding transverse diaphragm unit 3 is fixed in an annular direction so that the length direction of the protruding transverse diaphragm unit 3 can be set as needed. For example, when the length direction is in the transverse bridge direction, the reinforcement effect is best, and the connection direction of the two stiffening plate units 7 can be set as the transverse bridge direction; Second, as the fourth fixing and installation method of the stiffening plate unit 7, its fixing and installation stability is further improved.
[0064] Of course, the rectangular cross plate 701 is appropriately inserted laterally into the reinforcement slot 306 and will not block the threaded steel bar 5.
[0065] The inner annular surface of the pier steel pipe 11 is also provided with a radial plate 8 for connecting the threaded steel bars 5 .
[0066] In this embodiment, before the precast concrete column 12 is cast, the pier steel pipe 11, the radial plate 8, and the threaded steel bar 5 are first welded, so that the "steel pipe" part of the steel tube concrete pier has greater structural strength.
[0067] Moreover, the radial plate 8 can also prevent the threaded steel bar 5 from being harmfully shifted laterally when pouring concrete, thereby ensuring that the fixed position of the threaded steel bar 5 is the central axis position of the pier steel pipe 11 .
[0068] The construction method of the structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm includes the following steps: the precast concrete column 12 is prefabricated in a factory, and then the threaded steel bar 5 is fixed in the pier steel tube 11.
[0069] In this embodiment, the height of the upper end surface of the precast concrete column 12 is lower than the bottom surface height of the insertion groove 2 , ensuring that the protruding diaphragm unit 3 is completely cast and fixed in the cast-in-place concrete block 4 .
[0070] At this point, the above factory prefabrication steps can not only relatively fix the threaded steel bars 5 and the pier steel pipes 11, but also greatly shorten the overall construction period of the structure.
[0071] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various modifications can be made within the knowledge of ordinary technicians in the technical field without departing from the purpose of the present invention. These are all non-creative modifications and are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A structure for connecting a steel tube concrete bridge pier and a steel box girder using a convex steel diaphragm, comprising a pier steel tube (11), a precast concrete column (12), a box girder bottom plate (13), a diaphragm (14), and a box girder top plate (15), characterized in that: It also includes a mounting hole (1) arranged on the box beam bottom plate (13) and plugged into the pier steel pipe (11), a plug-in groove (2) opened downward from the upper end surface of the pier steel pipe (11), a protruding diaphragm unit (3) arranged on the upper surface of the box beam bottom plate (13) and engaged with the plug-in groove (2), and a cast-in-place concrete block (4) arranged in the pier steel pipe (11) and on the box beam bottom plate (13) and covering the protruding diaphragm unit (3).
2. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 1 is characterized by: The number of the plug-in slots (2) is two; the protruding transverse diaphragm unit (3) comprises an end protruding transverse plate (301) arranged on the upper surface of the box girder bottom plate (13) and engaged with the two plug-in slots (2), and an end slot (302) arranged on the end protruding transverse plate (301) and used for pouring in-situ concrete into the pier steel pipe (11).
3. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 2 is characterized by: The protruding transverse partition unit (3) further comprises a vertical plate (303) arranged on the end protruding transverse plate (301) and used for engaging with the side surface of the plug-in slot (2).
4. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 2 is characterized by: The precast concrete column (12) is provided with a threaded steel bar (5) for inserting the cast-in-place concrete block (4); the protruding transverse partition unit (3) further comprises a middle opening (304) provided on the end protruding transverse plate (301) and for passing the threaded steel bar (5); the threaded steel bar (5) is also provided with a fastening nut (6) for pressing down the end protruding transverse plate (301).
5. The structure of connecting the steel tube concrete pier and the steel box girder by using a convex steel diaphragm to strengthen the connection according to claim 4 is characterized in that: The protruding transverse partition unit (3) further comprises an extension pipe (305) which is arranged on the lower surface of the end protruding transverse plate (301) and sleeved with the threaded steel bar (5).
6. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 5 is characterized by: The inserting groove (2) is also provided with a stiffening plate unit (7) for welding the outer annular surface of the pier steel pipe (11) and the lower surface of the box beam bottom plate (13).
7. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 6 is characterized by: The stiffening plate unit (7) comprises a rectangular transverse plate (701) inserted in the insertion groove (2) and supporting the box beam bottom plate (13), and a right-angled triangular plate (702) arranged on the rectangular transverse plate (701) and used for welding the outer annular surface of the pier steel pipe (11) and the lower surface of the box beam bottom plate (13).
8. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 7 is characterized by: The protruding transverse partition unit (3) further comprises a reinforcement slot (306) which is opened upward from the lower end surface of the extension tube (305) and is used to engage with the rectangular transverse plate (701).
9. The structure of connecting the steel tube concrete pier and the steel box girder using a convex steel diaphragm as claimed in claim 4 is characterized by: A radial plate (8) for connecting the threaded steel bars (5) is also provided on the inner annular surface of the pier steel pipe (11).
10. The construction method of the structure of using convex steel diaphragms to reinforce the connection between steel tube concrete bridge piers and steel box beams as claimed in claim 4, characterized in that: The precast concrete column (12) is prefabricated in a factory, and then the threaded steel bar (5) is fixed inside the pier steel pipe (11).
Citation Information
Patent Citations
Small-radius curved rigid frame system bridge
CN104790287A
Connecting structure for consolidation of steel box girder pedestrian bridge pier beam
CN216615467U
Pier beam consolidation structure of steel box beam and concrete pier
CN220598128U
Beam-column joint structural body
JP2004263501A
