Combined multi-channel large-diameter mixing pile construction device and method

By setting up a high-pressure gas chamber and a high-pressure grouting channel in the mixing pile drill rod, and using a high-pressure gas blade to cut the sand layer, the problem of reducing the depth of the mixing pile in the sand layer geology is solved, and the reinforcement effect and construction stability are improved.

CN118997127APending Publication Date: 2024-11-22CHINA CONSTR THIRD ENG BUREAU GRP SOUTH CHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410933856.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the geology of sand layer, existing mixing piles are easily affected by the resistance of the flowing sand layer during drilling, resulting in the slowdown of the drill bit sinking speed and the overflow of cement slurry, which cannot reach the design depth and the reinforcement effect is poor.

Method used

A combined multi-channel large-diameter mixing pile construction device is designed. By setting up a high-pressure gas chamber and a high-pressure grouting channel in the drill rod, a high-pressure gas blade is formed using the combined outlet of high-pressure gas and slurry, cutting the sand layer to reduce the flowing sand layer Resistance to the drill bit and high-pressure gas is provided through the air compressor, enhancing the cutting capacity of the slurry.

Benefits of technology

The problem of reducing the depth of mixing piles in the sand layer geology is effectively solved, the stability and reinforcement effect of the drilling inner wall is improved, and the construction depth and reinforcement range of mixing piles are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997127A_ABST
    Figure CN118997127A_ABST
Patent Text Reader

Abstract

The invention relates to the field of foundation pit supporting, in particular to a combined multi-channel large-diameter mixing pile construction device and method. Comprising a drill rod, a high-pressure gas channel and a high-pressure slurry channel, a high-pressure gas cavity is formed in the bottom in the drill rod, a slurry-gas combined outlet penetrating to the outer wall of the drill rod is formed in the inner wall of the high-pressure gas cavity, and a drill bit is installed at the bottom outside the drill rod. One end of the high-pressure gas channel extends to the top end of the drill rod, and the other end of the high-pressure gas channel communicates with the high-pressure gas cavity. Comprising a high-pressure grout main channel and two high-pressure grout branch channels, one end of the high-pressure grout main channel extends to the top end of the drill rod, the other end of the high-pressure grout main channel is connected with one ends of the two high-pressure grout branch channels, and the other ends of the two high-pressure grout branch channels are communicated with the two high-pressure gas cavities respectively. Under the influence of the high-pressure gas, the slurry can form a high-pressure gas blade to cut a sand layer while being sprayed out along with the high-pressure gas, and the situation that the flowing sand layer is accumulated on the periphery of a drill bit and a drill rod to generate large resistance, and consequently the construction process of a stirring pile is influenced is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of foundation pit support, and in particular to a combined multi-channel large-diameter mixing pile construction device and method. Background Art

[0002] The existing construction technology and machinery types of cement mixing piles are generally divided into three types: single-axis, double-axis and three-axis. Among them, single-axis mixing piles are widely used in foundation reinforcement due to their simple structure and flexible and convenient use.

[0003] Since the sand layer is loose and has a certain fluidity, the mixing pile will encounter great resistance when cutting the soil. During the on-site pile test, when drilling to about 1.2m in the sand layer, it was found that the sinking speed of the drill bit slowed down significantly. If the drill bit continues to drill down, it will eventually get stuck and unable to continue drilling, and cement slurry will overflow at the drilling position, resulting in the mixing pile treatment depth not meeting the design requirements.

[0004] Since the sand layer is highly fluid, when the drill bit is drilling towards the designed elevation, the flowing sand layer will refill the borehole and exert a gradually increasing friction resistance on the drill bit and drill rod, and at the same time absorb the cutting force of the high-pressure slurry impact cutting the soil, causing the diameter of the entire soil reinforcement range to gradually shrink as the elevation decreases until the drill bit stops rotating. At this time, the inner wall of the borehole almost overlaps with the drill bit, so the reinforcement effect cannot be achieved. Summary of the invention

[0005] Based on this, it is necessary to provide a combined multi-channel large-diameter mixing pile construction device and method to address the above-mentioned technical problems. Both slurry and high-pressure gas will flow out from the slurry combination channel, and under the influence of the high-pressure gas, the slurry will form a high-pressure gas blade to cut the sand layer while being ejected with the high-pressure gas, blocking the flow of sand layer and accumulating around the drill bit and drill rod to produce greater resistance, thereby affecting the mixing pile construction process. At the same time, it solves the problem that the radial diameter of the high-pressure rotary spraying of the mixing pile in general sand layer geology becomes smaller and smaller with the depth of driving.

[0006] The present invention provides a combined multi-channel large-diameter mixing pile construction device, comprising:

[0007] A drill rod, wherein a high-pressure gas chamber is provided at the inner bottom of the drill rod, a slurry-gas combination outlet is provided on the inner wall of the high-pressure gas chamber and penetrates to the outer wall of the drill rod, and a drill bit is installed at the outer bottom of the drill rod;

[0008] A high-pressure gas channel, one end of which extends to the top of the drill pipe, and the other end of which is connected to the high-pressure gas chamber;

[0009] The high-pressure slurry channel includes a high-pressure slurry main channel and two high-pressure slurry branch channels. One end of the high-pressure slurry main channel extends to the top of the drill pipe, and the other end of the high-pressure slurry main channel is connected to one end of the two high-pressure slurry branch channels. The other ends of the two high-pressure slurry branch channels are respectively connected to the two high-pressure gas chambers.

[0010] In one embodiment, it also includes a pile mixing machine, an air compressor, a high-pressure slurry pump, a slurry storage tank, a mixer, a water tank and a cement silo;

[0011] The pile mixing machine is used to drive the drill rod to drill, the mixer is used to mix the water in the water tank and the cement in the cement silo and transport them to the slurry storage barrel, the air compressor is used to supply air to the high-pressure gas channel, and the high-pressure slurry pump is used to transport the slurry in the slurry storage barrel to the high-pressure slurry channel.

[0012] In one embodiment, the slurry-gas combination outlet is arranged at the bottom of the high-pressure gas chamber, and the slurry-gas combination outlet is connected to the high-pressure gas chamber through a first connecting channel, one end of the high-pressure slurry branch is connected to the slurry-gas combination outlet, and a nozzle is installed in the slurry-gas combination outlet.

[0013] In one embodiment, the nozzle is rotatably installed at the slurry-gas combination outlet, and a second connecting channel is also provided at the bottom of the drill pipe. The high-pressure gas chamber is connected to the second connecting channel, and the high-pressure gas entering the second connecting channel will flow through the slurry-gas combination outlet and return to the high-pressure gas chamber, and drive the nozzle to rotate when flowing through the slurry-gas combination outlet.

[0014] In one embodiment, the nozzle is embedded in the slurry-gas combination outlet, a third connecting channel connecting the slurry-gas combination outlet and the high-pressure gas chamber is provided above the nozzle, a fourth connecting channel connecting the slurry-gas combination outlet and the second connecting channel is provided below the nozzle, a one-way valve is provided at the third connecting channel, and the third connecting channel and the fourth connecting channel are connected to the slurry-gas combination outlet at the nozzle installation location.

[0015] In one embodiment, the spray head includes a guide plate and a plurality of wind shields;

[0016] The nozzle is rotatably installed in an annular groove in the slurry-gas combination outlet, the third connecting channel and the fourth connecting channel are both connected to the annular groove, a rectangular-structured spray hole is opened in the middle of the guide plate, and the multiple wind shields are arranged in an annular array on the outer circle of the guide plate. When the high-pressure gas in the fourth connecting channel flows through the annular groove, the wind shield is affected by the high-pressure gas and rotates.

[0017] In one embodiment, the ends of the third connecting channel and the fourth connecting channel connected to the annular groove are inclined toward the same side of the annular groove, and this side of the annular groove is connected to the third connecting channel and the fourth connecting channel to form a driving gas channel.

[0018] In one embodiment, a limiting plate is provided on the other side of the annular groove, and the limiting plate is provided in an arc-shaped structure, one side of the limiting plate is fixedly fitted with the annular groove, and the other side of the limiting plate is movably fitted with the end of the windshield plate.

[0019] In one embodiment, the width of the openings at both ends of the spray hole is greater than the width of the middle section of the spray hole.

[0020] The present invention also provides a combined multi-channel large-diameter mixing pile construction method, which is applied to a combined multi-channel large-diameter mixing pile construction device described in any one of the above embodiments, and the method comprises:

[0021] The drill rod rotates and moves downward into the pit of the mixing pile;

[0022] The high-pressure slurry channel conveys the slurry to the high-pressure gas chamber;

[0023] The high-pressure gas channel injects high-pressure gas into the high-pressure gas chamber at the bottom end of the drill pipe;

[0024] Affected by the high-pressure gas, the slurry will be ejected through the slurry-gas combination outlet along with the high-pressure gas, and at the same time, a high-pressure gas blade will be formed to cut the sand layer, blocking the flowing sand layer from accumulating around the drill bit and drill rod.

[0025] The above-mentioned combined multi-channel large-diameter mixing pile construction device and method, by adding a high-pressure slurry channel above the drill bit, then using an air compressor to integrate high-pressure gas on the drill bit, and driving the drill rod to rotate and move downward in the pit of the mixing pile, and then transporting the slurry to the high-pressure gas chamber through the high-pressure slurry channel, and injecting high-pressure gas into the high-pressure gas chamber at the bottom end of the drill rod through the high-pressure gas channel. Since the high-pressure gas channel is connected to the slurry combination outlet, the slurry and the high-pressure gas will both flow out from the slurry combination channel, and under the influence of the high-pressure gas, the slurry will form a high-pressure gas blade to cut the sand layer while being ejected with the high-pressure gas, blocking the flowing sand layer from accumulating around the drill bit and drill rod to generate greater resistance, thereby affecting the mixing pile construction process, and at the same time solving the problem that the grouting radiation diameter of the high-pressure rotary spraying of the mixing pile in general sand layer geology becomes smaller and smaller with the depth of driving. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 This is one of the overall structural schematic diagrams of the mixing pile construction device provided by the present invention;

[0028] Figure 2 A schematic diagram of the partial structure of the mixing pile construction device provided by the present invention;

[0029] Figure 3 A schematic diagram of the local structure inside the drill pipe provided by the present invention;

[0030] Figure 4 A schematic diagram of the planar structure inside the drill rod provided by the present invention;

[0031] Figure 5 A schematic diagram of the structure of the slurry-gas combination outlet provided by the present invention;

[0032] Figure 6 The second schematic diagram of the overall structure of the mixing pile construction device provided by the present invention.

[0033] Reference numerals:

[0034] 100, drill rod; 110, high-pressure gas chamber; 120, slurry-gas combined outlet; 121, driving gas channel; 130, first connecting channel; 140, second connecting channel; 150, third connecting channel; 160, fourth connecting channel; 210, high-pressure slurry main channel; 220, high-pressure slurry branch channel; 300, high-pressure gas channel; 400, nozzle; 410, guide plate; 411, spray hole; 420, wind shield; 430, limit plate; 500, drill bit; 600, one-way valve; 710, pile mixing machine; 720, air compressor; 730, high-pressure slurry pump; 740, slurry storage barrel; 750, mixer; 760, water tank; 770, cement silo. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Combine the following Figures 1 to 6 The invention describes a combined multi-channel large-diameter mixing pile construction device and method.

[0037] like Figure 2 As shown, in one embodiment, a combined multi-channel large-diameter mixing pile construction device includes a drill rod 100, a high-pressure gas channel 300 and a high-pressure slurry channel; a high-pressure gas chamber 110 is provided at the inner bottom of the drill rod 100, and a slurry-gas combination outlet 120 penetrating to the outer wall of the drill rod 100 is opened on the inner wall of the high-pressure gas chamber 110, and a drill bit 500 is installed at the outer bottom of the drill rod 100; one end of the high-pressure gas channel 300 extends to the top of the drill rod 100, and the other end of the high-pressure gas channel 300 is connected to the high-pressure gas chamber 110; it includes a high-pressure slurry main channel 210 and two high-pressure slurry branch channels 220, one end of the high-pressure slurry main channel 210 extends to the top of the drill rod 100, and the other end of the high-pressure slurry main channel 210 is connected to one end of the two high-pressure slurry branch channels 220, and the other ends of the two high-pressure slurry branch channels 220 are respectively connected to the two high-pressure gas chambers 110.

[0038] The above-mentioned combined multi-channel large-diameter mixing pile construction device adds a high-pressure slurry channel above the drill bit 500, and then uses the air compressor 720 to integrate high-pressure gas (20 times the atmospheric pressure applied on site) on the drill bit 500, and then drives the drill rod 100 to rotate and move downward in the pit of the mixing pile, and then transports the slurry to the high-pressure gas chamber 110 through the high-pressure slurry channel, and injects high-pressure gas into the high-pressure gas chamber 110 at the bottom end of the drill rod 100 through the high-pressure gas channel 300. Since the high-pressure gas channel 300 is connected to the slurry combination outlet, the slurry and the high-pressure gas will both flow out from the slurry combination channel, and under the influence of the high-pressure gas, the slurry will form a high-pressure gas blade to cut the sand layer while being ejected with the high-pressure gas, blocking the flowing sand layer from accumulating around the drill bit 500 and the drill rod 100 to generate greater resistance, thereby affecting the mixing pile construction process, and at the same time solving the problem that the grouting radiation diameter of the high-pressure rotary spraying of the mixing pile in general sand layer geology becomes smaller and smaller with the depth of the driving.

[0039] It should be noted that if Figure 6 As shown, the high-pressure slurry branch 220, the high-pressure gas chamber 110 and the slurry combination outlet of the combined multi-channel large-diameter mixing pile construction device in this embodiment can be arranged in a circular array in plurality, and are opposite to each other in pairs and used one by one, so as to avoid uneven spraying of the two relative slurry combination outlets when a problem occurs in one of the slurry combination outlets, thereby affecting the construction effect of the device.

[0040] like Figure 1As shown, in one embodiment, it also includes a pile mixing machine 710, an air compressor 720, a high-pressure slurry pump 730, a slurry storage barrel 740, a mixer 750, a water tank 760 and a cement silo 770; the pile mixing machine 710 is used to drive the drill rod 100 to drill, the mixer 750 is used to mix the water in the water tank 760 and the cement in the cement silo 770 and transport them to the slurry storage barrel 740, the air compressor 720 is used to supply air to the high-pressure gas channel 300, and the high-pressure slurry pump 730 is used to transport the slurry in the slurry storage barrel 740 to the high-pressure slurry channel.

[0041] like Figure 3 and Figure 4 As shown, in one embodiment, the slurry-gas combination outlet 120 is arranged at the bottom of the high-pressure gas chamber 110, and the slurry-gas combination outlet 120 is connected to the high-pressure gas chamber 110 through a first connecting channel 130, one end of the high-pressure slurry branch channel 220 is connected to the slurry-gas combination outlet 120, and a nozzle 400 is installed in the slurry-gas combination outlet 120.

[0042] Specifically, by adopting the first connecting channel 130 to connect the slurry-gas combination outlet 120 with the high-pressure gas chamber 110, it can be seen that except for the first connecting channel 130 at the upper end of the slurry combination outlet, the slurry combination channel is disconnected from the high-pressure gas chamber 110, and the high-pressure slurry branch channel 220 is directly connected to the slurry combination outlet, which can effectively avoid splashing during the slurry transportation process, thereby limiting the slurry at the slurry combination outlet.

[0043] In one embodiment, the nozzle 400 is rotatably installed at the slurry-gas combination outlet 120, and a second connecting channel 140 is also provided at the bottom of the drill pipe 100. The high-pressure gas chamber 110 is connected to the second connecting channel 140, and the high-pressure gas entering the second connecting channel 140 will flow through the slurry-gas combination outlet 120 and return to the high-pressure gas chamber 110, and drive the nozzle 400 to rotate when flowing through the slurry-gas combination outlet 120.

[0044] Specifically, the nozzle 400 is embedded in the slurry-gas combination outlet 120, and a third connecting channel 150 connecting the slurry-gas combination outlet 120 and the high-pressure gas chamber 110 is provided above the nozzle 400, and a fourth connecting channel 160 connecting the slurry-gas combination outlet 120 and the second connecting channel 140 is provided below the nozzle 400. A one-way valve 600 is provided at the third connecting channel 150, and the third connecting channel 150 and the fourth connecting channel 160 are connected to the slurry-gas combination outlet 120 at the installation location of the nozzle 400.

[0045] The high-pressure gas transported by the high-pressure gas channel 300 first enters the high-pressure gas chamber 110, then enters the slurry gas combination outlet 120 through the first connecting channel 130 and flows to the outside, and enters the installation position of the nozzle 400 in the combination outlet through the second connecting channel 140 and the fourth connecting channel 160 in turn, and then flows through the nozzle 400 and re-enters the high-pressure gas chamber 110 through the third connecting channel 150, and in this process, pushes the nozzle 400 to rotate, thereby preventing external objects from clogging the nozzle 400, and the two paths are not connected and do not affect each other.

[0046] like Figure 5 As shown, in one embodiment, the nozzle 400 includes a guide plate 410 and a plurality of wind shields 420; the nozzle 400 is rotatably installed in an annular groove in the slurry-gas combination outlet 120, the third connecting channel 150 and the fourth connecting channel 160 are both connected to the annular groove, a rectangular spray hole 411 is opened in the middle of the guide plate 410, and a plurality of wind shields 420 are arranged in an annular array on the outer ring of the guide plate 410, and when the high-pressure gas in the fourth connecting channel 160 flows through the annular groove, the wind shield 420 is affected by the high-pressure gas and rotates.

[0047] Specifically, the opening widths of both ends of the spray hole 411 are greater than the width of the middle section of the spray hole 411. The ends of the third connecting channel 150 and the fourth connecting channel 160 connected to the annular groove are inclined toward the same side of the annular groove, and the side of the annular groove is connected to the third connecting channel 150 and the fourth connecting channel 160 to form the driving gas channel 121.

[0048] Preferably, a limit plate 430 is provided on the other side of the annular groove. The limit plate 430 is arranged in an arc-shaped structure. One side of the limit plate 430 is fixedly fitted with the annular groove, and the other side of the limit plate 430 is movably fitted with the end of the windshield plate 420.

[0049] In the above-mentioned combined multi-channel large-diameter mixing pile construction device, when the high-pressure gas reaches the slurry combination outlet, it will impact and cut the soil at a very high speed, and the air knife will enter the slurry gas combination outlet 120 through the high-pressure gas chamber 110. At this time, the airflow passes through the narrow, thin nozzle 411 to form a balanced airflow sheet in a specific direction. Specifically, because the high-pressure gas chamber 110 has a high compression ratio for the high-pressure airflow, the airflow velocity loss is minimized, while the pressure is maximized, thereby generating an airflow sheet with strong impact force.

[0050] As the drill bit 500 performs the reinforcement operation, the high-pressure gas blade cooperates with the high-pressure slurry to stir the soil layer, which can generate greater impact energy than simply using the high-pressure slurry, achieving a larger consolidation range between the slurry and the soil layer and a denser and more uniform stirring effect.

[0051] The device has low modification difficulty and strong operability. A multi-channel drill rod 100 is used for drilling. When the high-pressure slurry pipeline is drilled into the predetermined depth of the soil layer along with the drill bit 500, at least one pair of nozzles 400 are coaxially arranged at the bottom of the pipe to simultaneously eject a jet flow of two media, high-pressure slurry and high-pressure air, to impact and destroy the soil. That is, a high-pressure generating device such as a high-pressure slurry pump 730 ejects a slurry of about 20KPa and a high-pressure gas of 0.9Mpa-1.2Mpa pressure, which are ejected at high speed from the inner nozzle. Under the combined action of the high-pressure slurry and its outer ring airflow, the energy for destroying the soil is significantly increased, and finally a larger consolidation body is formed in the soil. Overcome the greater resistance caused by the sand layer to the lifting process of the drill bit 500 to avoid drill jamming.

[0052] Due to the high porosity of sandy formations, the mud consumption is large and the mud leakage phenomenon is serious. Therefore, when constructing large-diameter mixing piles in sandy geology, the viscosity and concentration of the mud are required to be higher to ensure that the sand can be effectively emulsified and suspended to prevent the sand from flowing and carrying. However, the friction resistance of sandy formations is large, and the drilling torque and pull-back force will increase, which may cause the drill bit 500 and the drill rod 100 to wear easily. The combination of high-pressure gas and high-pressure slurry in this embodiment can greatly reduce the resistance of the sand layer.

[0053] The sandy strata have strong adsorption capacity and abundant groundwater, which may cause the mud to thin out and increase the risk of buried drill pipes. In addition, gravel sand and coarse sand in the mud are easy to form blockages in the borehole due to fluidity, squeezing and burying the pipes. In this embodiment, the soil is cut and destroyed by high-pressure gas, which can avoid the buried pipe phenomenon caused by the fluidity of the sand layer.

[0054] In one embodiment, a combined multi-channel large-diameter mixing pile construction method is applied to a combined multi-channel large-diameter mixing pile construction device of any of the above embodiments, comprising the following steps:

[0055] The drill rod rotates and moves downward into the pit of the mixing pile.

[0056] The high-pressure slurry channel conveys the slurry to the high-pressure gas chamber.

[0057] The high-pressure gas passage injects high-pressure gas into the high-pressure gas chamber at the bottom end of the drill pipe.

[0058] Affected by the high-pressure gas, the slurry will be ejected through the slurry-gas combination outlet along with the high-pressure gas, and at the same time, a high-pressure gas blade will be formed to cut the sand layer, blocking the flowing sand layer from accumulating around the drill bit and drill rod.

[0059] The above-mentioned combined multi-channel large-diameter mixing pile construction method adds a high-pressure slurry channel above the drill bit, and then uses an air compressor to integrate high-pressure gas (20 times the atmospheric pressure applied on site) on the drill bit, and then drives the drill rod to rotate and move downward in the pit of the mixing pile, and then transports the slurry to the high-pressure gas chamber through the high-pressure slurry channel, and injects high-pressure gas into the high-pressure gas chamber at the bottom end of the drill rod through the high-pressure gas channel. Since the high-pressure gas channel is connected to the slurry combination outlet, the slurry and the high-pressure gas will both flow out from the slurry combination channel, and under the influence of the high-pressure gas, the slurry will form a high-pressure gas blade to cut the sand layer while being ejected with the high-pressure gas, blocking the flowing sand layer from accumulating around the drill bit and drill rod to produce a large resistance, thereby affecting the mixing pile construction process, and at the same time solving the problem that the grouting radiation diameter of the high-pressure rotary spraying of the mixing pile in general sand layer geology becomes smaller and smaller with the depth of driving.

[0060] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0061] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A combined multi-channel large-diameter mixing pile construction device, characterized in that: include: A drill rod, wherein a high-pressure gas chamber is provided at the inner bottom of the drill rod, a slurry-gas combination outlet is provided on the inner wall of the high-pressure gas chamber and penetrates to the outer wall of the drill rod, and a drill bit is installed at the outer bottom of the drill rod; A high-pressure gas channel, one end of which extends to the top of the drill pipe, and the other end of which is connected to the high-pressure gas chamber; The high-pressure slurry channel includes a high-pressure slurry main channel and two high-pressure slurry branch channels. One end of the high-pressure slurry main channel extends to the top of the drill pipe, and the other end of the high-pressure slurry main channel is connected to one end of the two high-pressure slurry branch channels. The other ends of the two high-pressure slurry branch channels are respectively connected to the two high-pressure gas chambers.

2. A combined multi-channel large-diameter mixing pile construction device according to claim 1, characterized in that: It also includes a pile mixer, an air compressor, a high-pressure slurry pump, a slurry storage tank, a mixer, a water tank and a cement silo; The pile mixing machine is used to drive the drill rod to drill, the mixer is used to mix the water in the water tank and the cement in the cement silo and transport them to the slurry storage barrel, the air compressor is used to supply air to the high-pressure gas channel, and the high-pressure slurry pump is used to transport the slurry in the slurry storage barrel to the high-pressure slurry channel.

3. A combined multi-channel large-diameter mixing pile construction device according to claim 2, characterized in that: The slurry-gas combination outlet is arranged at the bottom of the high-pressure gas chamber, and the slurry-gas combination outlet is connected to the high-pressure gas chamber through a first connecting channel, one end of the high-pressure slurry branch channel is connected to the slurry-gas combination outlet, and a nozzle is installed in the slurry-gas combination outlet.

4. A combined multi-channel large-diameter mixing pile construction device according to claim 3, characterized in that: The nozzle is rotatably mounted on the slurry-gas combination outlet, and a second connecting channel is also provided at the bottom of the drill pipe. The high-pressure gas chamber is communicated with the second connecting channel, and the high-pressure gas entering the second connecting channel will flow through the slurry-gas combination outlet and return to the high-pressure gas chamber, and drive the nozzle to rotate when flowing through the slurry-gas combination outlet.

5. A combined multi-channel large-diameter mixing pile construction device according to claim 4, characterized in that: The nozzle is embedded in the slurry-gas combination outlet, a third connecting channel connecting the slurry-gas combination outlet and the high-pressure gas chamber is provided above the nozzle, a fourth connecting channel connecting the slurry-gas combination outlet and the second connecting channel is provided below the nozzle, a one-way valve is provided at the third connecting channel, and the third connecting channel and the fourth connecting channel are connected to the slurry-gas combination outlet at the nozzle installation location.

6. A combined multi-channel large-diameter mixing pile construction device according to claim 5, characterized in that: The nozzle includes a guide plate and a plurality of wind shields; The nozzle is rotatably installed in an annular groove in the slurry-gas combination outlet, the third connecting channel and the fourth connecting channel are both connected to the annular groove, a rectangular-structured spray hole is opened in the middle of the guide plate, and the multiple wind shields are arranged in an annular array on the outer circle of the guide plate. When the high-pressure gas in the fourth connecting channel flows through the annular groove, the wind shield is affected by the high-pressure gas and rotates.

7. A combined multi-channel large-diameter mixing pile construction device according to claim 6, characterized in that: One end of the third connecting channel and the fourth connecting channel connected to the annular groove is inclined toward the same side of the annular groove, and the side of the annular groove is connected with the third connecting channel and the fourth connecting channel to form a driving gas channel.

8. The combined multi-channel large-diameter mixing pile construction device according to claim 7, characterized in that: A limiting plate is arranged on the other side of the annular groove, and the limiting plate is arranged in an arc-shaped structure. One side of the limiting plate is fixedly fitted with the annular groove, and the other side of the limiting plate is movably fitted with the end of the windshield plate.

9. A combined multi-channel large-diameter mixing pile construction device according to claim 8, characterized in that: The opening widths at both ends of the spray hole are greater than the width of the middle section of the spray hole.

10. A combined multi-channel large-diameter mixing pile construction method, applied to a combined multi-channel large-diameter mixing pile construction device as claimed in any one of claims 1 to 9, characterized in that: The method comprises: The drill rod rotates and moves downward into the pit of the mixing pile; The high-pressure slurry channel conveys the slurry to the high-pressure gas chamber; The high-pressure gas channel injects high-pressure gas into the high-pressure gas chamber at the bottom end of the drill pipe; Affected by the high-pressure gas, the slurry will be ejected through the slurry-gas combination outlet along with the high-pressure gas, and at the same time, a high-pressure gas blade will be formed to cut the sand layer, blocking the flowing sand layer from accumulating around the drill bit and drill rod.