Information management method, device and equipment

By monitoring and synchronizing the acquisition and verification of equity data to the big data center in real time in the business system, adjusting the acquisition and verification strategies, the information asymmetry and separation between budget management and execution is solved, and the rapid budget usage strategy is achieved Improvement of adjustment and control.

CN119005894APending Publication Date: 2024-11-22CHINA CONSTRUCTION BANK +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411033146.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing technology cannot quickly and effectively realize information collaborative management, which leads to difficulties in adjusting budget usage strategies and leads to information asymmetry and separation between budget management and execution.

Method used

By monitoring the collection and verification of rights and interests in the business system in real time, synchronizing the data to the big data center, adjusting the collection and verification strategies based on real-time data updates, and realizing intelligent budget warning and control.

Benefits of technology

It improves the strictness and timeliness of budget management, realizes rapid adjustment of budget usage strategies, solves the problems of information asymmetry and separation, and improves the automation and refinement of budget management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005894A_ABST
    Figure CN119005894A_ABST
Patent Text Reader

Abstract

The invention provides an information management method, device and equipment. Relates to the technical field of information management. The method comprises the steps that after it is determined that an input activity takes effect, associated rights and interests of the input activity are displayed through a user interface, and the associated rights and interests comprise at least one kind of rights and interests; the receiving flow of each right ID is monitored in real time, and the right ID of the successfully received first right is synchronized to the big data center, so that the big data center updates the received number of the first right and is used for providing data about whether the receiving strategy of each right needs to be adjusted for a service system; and / or, monitoring the cancel-after-verification flow of each right ID in real time, and synchronizing the right ID of the second right successfully cancel-after-verification to the big data center, so that the big data center updates the cancel-after-verification quantity of the second right to provide data about whether each right needs to adjust the cancel-after-verification strategy for the business system. According to the method provided by the invention, the problem that information collaborative management cannot be quickly and effectively realized in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of information management technology, and in particular to an information management method, apparatus, and device. Background Art

[0002] With the continuous development of modern enterprise management, most companies have implemented online approval processes, which can improve the efficiency of activity budget management through information technology, overcome the inherent defects of traditional offline management models, and realize the digitization and automation of office processes.

[0003] However, at the overall level, there remains a significant disconnect between the budget approval process and actual production systems. Existing budget management solutions often treat budget approval as an administrative activity independent of production operations, primarily relying on office information systems. However, actual budget expenditure occurs within relatively separate production systems. This separation creates information asymmetry between budget management and execution, making it difficult for existing solutions to automatically track budget usage and rapidly adjust budget strategies.

[0004] Therefore, existing technologies cannot quickly and effectively achieve information collaborative management, and thus cannot quickly adjust budget utilization strategies. Summary of the Invention

[0005] The present application provides an information management method, apparatus and equipment to solve the problem that the existing technology cannot quickly and effectively realize information collaborative management, and thus cannot quickly adjust the budget usage strategy.

[0006] In a first aspect, the present application provides an information management method, applied to a business system, the method comprising:

[0007] After determining that the entered activity has taken effect, the associated rights and interests of the entered activity are displayed through the user interface, where the associated rights and interests include at least one right, and one right and interest corresponds to a right ID; the collection flow of each right and interest ID is monitored in real time, and the right ID of the first right that is successfully collected is synchronized to the big data center, so that the big data center updates the number of first rights collected, thereby providing the business system with data on whether the collection strategy of each right needs to be adjusted; and / or, the redemption flow of each right and interest ID is monitored in real time, and the right ID of the second right that is successfully redeemed is synchronized to the big data center, so that the big data center updates the number of second rights redeemed, thereby providing the business system with data on whether the redemption strategy of each right needs to be adjusted; wherein, the first right and the second right are both at least one right among the associated rights and interests.

[0008] In one possible design, the real-time monitoring of the claiming traffic of each equity ID and synchronizing the equity ID of the successfully claimed first equity to the big data center so that the big data center updates the number of first equity claimed includes:

[0009] For each benefit ID, in response to a first user's request to claim the benefit, a determination is made as to whether the first user has successfully claimed the benefit based on the benefit claim limit information obtained from the big data center or the first indication information received from the big data center. The benefit claim limit information is determined by the number of benefits claimed and the limit warning configuration information. The limit warning configuration information is pre-configured or dynamically updated based on the number of benefits claimed, the number of benefits written off, and the budget information of an effective activity for the benefit. The effective activity budget information matches the approved activity budget information recorded in the big data center. The approved activity budget information is synchronized to the big data center by the budget system. The activity budget information includes the total activity budget amount, sub-activity information, the contribution ratio, and the activity discount level. The activity discount level includes at least the associated benefits of the recorded activity. If the benefit is successfully claimed, the benefit ID of the benefit is sent to the big data center so that the big data center increments the number of the first benefit claimed by 1. The successfully claimed benefit is deemed the first benefit. If the benefit is not successfully claimed, a prompt message indicating that the benefit claim failed is displayed on the user interface.

[0010] In one possible design, determining whether the first user successfully claims the benefit based on the benefit claiming limit information obtained from the big data center or the first indication information received from the big data center includes:

[0011] Based on the flow-limit information on the collection of the rights and interests obtained from the big data center, it is predicted whether the rights and interests are subject to flow-limited collection. If it is predicted that the rights and interests are subject to flow-limited collection, it is determined whether the rights and interests are subject to flow-limited collection based on the number of rights and interests collected, the number of rights and interests written off, and the budget information of the rights and interests in the entered activities. If it is determined that the rights and interests are subject to flow-limited collection, the collection strategy of the rights and interests is adjusted, and it is determined that the rights and interests collection has failed, and a prompt of the failure of the rights and interests collection is provided through the user interface; if it is predicted that the rights and interests are not subject to flow-limited collection, it is determined that the rights and interests are not subject to flow-limited collection, and it is determined that the rights and interests collection has been successful, and a prompt of the success of the rights and interests collection is provided through the user interface; or, if the first indication information is used to indicate that the rights and interests are not subject to flow-limited collection, it is determined that the rights and interests collection has been successful, and a prompt of the success of the rights and interests collection is provided through the user interface; if the first indication information is used to indicate that the rights and interests are subject to flow-limited collection, it is determined that the rights and interests collection has failed, and a prompt of the success of the rights and interests collection is provided through the user interface.

[0012] In one possible design, the real-time monitoring of the redemption flow of each equity ID and synchronizing the equity IDs of successfully redeemed second equity to the big data center so that the big data center updates the number of redeemed second equity includes:

[0013] For each benefit ID, in response to the second user's request to apply for write-off of the benefit, it is determined whether the second user has successfully written off the benefit based on the write-off fuse information of the benefit obtained from the big data center or the second indication information sent by the big data center; wherein the write-off fuse information of the benefit is determined by the amount of the benefit written off and the fuse warning configuration information, and the fuse warning configuration information is pre-configured or dynamically updated based on the amount of the benefit written off and the budget information of the benefit in the effective activities; if the benefit is successfully written off, the benefit ID of the benefit is sent to the big data center so that the big data center adds 1 to the amount of the second benefit written off; wherein the benefit that has been successfully written off is used as the second benefit; if the benefit is not successfully written off, a prompt message indicating that the benefit write-off has failed is displayed through the user interface.

[0014] In one possible design, determining whether the second user successfully cancels the benefit based on the benefit cancellation fuse information obtained from the big data center or the second indication information received from the big data center includes:

[0015] Based on the information of the equity obtained from the big data center, it is predicted whether the equity is circuit-broken and written off. If it is predicted that the equity is circuit-broken and written off, it is determined whether the equity is circuit-broken and written off based on the amount of the equity written off and the budget information of the equity in the entered activity. If it is determined that the equity is circuit-broken and written off, the write-off strategy of the equity is adjusted, and it is determined that the equity write-off has failed and the failure of the equity write-off is prompted through the user interface; if it is predicted that the equity is not circuit-broken and written off, it is determined that the equity is not circuit-broken and written off, and it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; or, if the second indication information is used to indicate that the equity is not circuit-broken and written off, it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; if the second indication information is used to indicate that the equity is circuit-broken and written off, it is determined that the equity write-off has failed and the failure of the equity write-off is prompted through the user interface.

[0016] In one possible design, the method further includes:

[0017] In response to the event entry application of the event organizer, the available budget is queried from the big data center, and based on the available budget, it is determined whether the available budget matches the landing business budget information of the entered activity; if it matches, the entered activity is determined to be effective after the approval is passed; if it does not match, the event organizer is prompted to re-fill in the activity information through the budget system.

[0018] In a second aspect, the present application provides an information management method, applied to a big data center, the method comprising:

[0019] Obtain the right ID of the first right that has been successfully claimed from the business system in real time, and update the number of the first right that has been claimed; determine the claim flow limit information of the first right or determine the first indication information based on the number of the first right that has been claimed and the flow limit warning configuration information, and send the claim flow limit information or the first indication information to the business system so that the business system determines whether the first right has been claimed with flow limit; and / or, obtain the right ID of the second right that has been successfully cancelled from the business system in real time, and update the number of the second right that has been cancelled; determine the cancellation fuse information of the second right or determine the second indication information based on the number of the second right that has been cancelled and the circuit breaker warning configuration information, and send the cancellation fuse information or the second indication information to the business system so that the business system determines whether the second right has been cancelled.

[0020] In one possible design, the current limiting warning configuration information is pre-configured, or dynamically updated based on the number of the rights claimed, the number of the rights cancelled, and the budget information of the rights in the effective activities; and / or, the circuit breaker warning configuration information is pre-configured, or dynamically updated based on the number of the rights cancelled and the budget information of the rights in the effective activities.

[0021] In one possible design, the method further includes:

[0022] Obtain the approved activity budget information sent by the budget system;

[0023] Among them, the activity budget information includes the total activity budget amount, sub-activity information, investment ratio, and activity preferential strength; among them, the activity preferential strength at least includes the associated rights and interests of the entered activity, and the associated rights and interests include at least one right and one right corresponds to one right ID.

[0024] In a third aspect, the present application provides an information management method, which is applied to a budget system, and the method comprises:

[0025] In response to an event organizer's request for an event budget, obtain the entered event budget information, the event budget information including the total event budget amount, sub-event information, contribution ratio, and event discount strength; wherein the event discount strength includes at least the associated benefits of the entered event, the associated benefits including at least one benefit, each benefit corresponding to a benefit ID;

[0026] Determining whether the activity budget information corresponding to the entered activity is reasonable based on the entered activity budget information;

[0027] If reasonable, the entered activity is determined to be approved, and the entered activity budget information is synchronized to the big data center, so that the big data center can monitor the activity budget information in real time to determine whether to adjust the related benefit claiming strategy or the related benefit write-off strategy;

[0028] If it is unreasonable, the review node will be returned to the node of the activity organizer to prompt the activity organizer that the activity budget review has failed, or to instruct the activity organizer to modify the activity budget information and resubmit it.

[0029] In a fourth aspect, the present application provides an information management device, applied to a business system, comprising:

[0030] An activity rights visibility module is used to display the associated rights of the entered activity through a user interface after determining that the entered activity has taken effect, wherein the associated rights include at least one right, and one right corresponds to one right ID; a rights collection monitoring module is used to monitor the collection flow of each right ID in real time, and synchronize the right ID of the first right successfully collected to the big data center, so that the big data center updates the number of first rights collected, and provides the business system with data on whether the collection strategy of each right needs to be adjusted; and / or, a rights cancellation monitoring module is used to monitor the cancellation flow of each right ID in real time, and synchronize the right ID of the second right successfully cancelled to the big data center, so that the big data center updates the number of second rights cancelled, and provides the business system with data on whether the cancellation strategy of each right needs to be adjusted; wherein, the first right and the second right are both at least one right among the associated rights.

[0031] In a fifth aspect, the present application provides an information management device, applied to a big data center, comprising:

[0032] The first processing module is configured to obtain, in real time, the entitlement ID of the first entitlement that has been successfully claimed from the business system and update the number of the first entitlement that has been claimed; determine the claim flow limit information or first indication information for the first entitlement based on the number of the first entitlement that has been claimed and the flow limit warning configuration information, and send the claim flow limit information or the first indication information to the business system so that the business system determines whether the first entitlement has been claimed with flow limit; and / or, the second processing module is configured to obtain, in real time, the entitlement ID of the second entitlement that has been successfully cancelled from the business system and update the number of the second entitlement that has been cancelled; determine the cancellation fuse information or second indication information for the second entitlement based on the number of the second entitlement that has been cancelled and the circuit breaker warning configuration information, and send the cancellation fuse information or the second indication information to the business system so that the business system determines whether the second entitlement has been cancelled with circuit breaker.

[0033] In a sixth aspect, the present application provides an information management device, applied to a budget system, comprising:

[0034] An activity budget acquisition module is used to respond to an activity organizer's request for an activity budget and obtain the entered activity budget information, wherein the activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength; wherein the activity preferential strength at least includes the associated rights and interests of the entered activity, and the associated rights and interests include at least one right, and one right and interest corresponds to a right ID; an activity review module is used to determine whether the activity budget information corresponding to the entered activity is reasonable based on the entered activity budget information; if reasonable, it is determined that the entered activity has been reviewed and passed, and the entered activity budget information is synchronized to the big data center, so that the big data center monitors the activity budget information in real time to determine whether to adjust the associated rights and interests collection strategy or the associated rights and interests write-off strategy; if unreasonable, the review node is returned to the activity organizer's node to prompt the activity organizer that the activity budget review has failed, or to instruct the activity organizer to resubmit it by modifying the activity budget information.

[0035] In a seventh aspect, an embodiment of the present application provides an information management system, comprising: a business system, a big data center, and a budget system, wherein the business system and the budget system are respectively communicatively connected to the big data center;

[0036] The business system is used to execute the method according to any one of the first aspects;

[0037] The big data center is used to execute the method according to any one of the second aspects;

[0038] The budget system is used to execute the method as described in any one of the third aspects.

[0039] The business system and the budget system are respectively connected to the big data center for communication.

[0040] In an eighth aspect, an embodiment of the present application provides an electronic device comprising: at least one processor and a memory; the memory stores computer-executable instructions; the at least one processor executes the computer-executable instructions stored in the memory, so that the at least one processor executes the information management method as described in any one of the above aspects and various possible designs of any one of the aspects.

[0041] In the ninth aspect, an embodiment of the present application provides a computer-readable storage medium, which stores computer execution instructions. When the computer execution instructions are executed by a processor, they are used to implement the information management method described in any of the above aspects and various possible designs of any aspect.

[0042] In a tenth aspect, an embodiment of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the information management method as described in any of the above aspects and various possible designs of any of the above aspects.

[0043] The information management method, apparatus, and device provided in the present application display the associated rights and interests of the recorded activity through a user interface after determining that the recorded activity has taken effect, wherein the associated rights and interests include at least one right, and one right corresponds to a right ID; monitor the collection flow of each right ID in real time, and synchronize the right ID of the first right successfully collected to the big data center, so that the big data center updates the number of first rights collected, thereby providing the business system with data on whether the collection strategy of each right needs to be adjusted; and / or monitor the redemption flow of each right ID in real time, and synchronize the right ID of the second right successfully redeemed to the big data center, so that the big data center updates the number of second rights redeemed, thereby providing the business system with data on whether the redemption strategy of each right needs to be adjusted; wherein the first right and the second right are both at least one right among the associated rights and interests. This application monitors the collection and / or write-off status of each benefit ID in real time, and synchronizes the collection and / or write-off status to the big data center. Based on the updated collection and / or write-off status of the big data center, it determines whether the collection and / or write-off strategy of the benefit needs to be adjusted, thereby achieving the effect of intelligent budget warning and improving the rigor and timeliness of budget control. Therefore, through the interaction between the business system and the big data center, it is possible to quickly and effectively achieve information collaborative management, thereby achieving rapid adjustment of budget usage strategies. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0045] Figure 1 This is an application scenario diagram of the information management method applicable to the embodiment of the present application;

[0046] Figure 2 A flowchart of the information management method provided in an embodiment of the present application;

[0047] Figure 3 An interactive diagram of the information management method provided in an embodiment of the present application;

[0048] Figure 4 A schematic diagram of the structure of the information management device provided in an embodiment of the present application;

[0049] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0050] The above drawings illustrate specific embodiments of the present application, which will be described in more detail below. These drawings and the textual description are not intended to limit the scope of the present application in any way, but rather to illustrate the concepts of the present application to those skilled in the art by reference to specific embodiments. DETAILED DESCRIPTION

[0051] Exemplary embodiments will be described in detail herein, with examples illustrated in the accompanying drawings. In the following description, when referring to the drawings, identical numerals in different figures represent identical or similar elements, unless otherwise indicated. The embodiments described in the following exemplary embodiments are not intended to represent all embodiments consistent with the present application. Rather, they are merely examples of apparatus and methods consistent with certain aspects of the present application, as detailed in the appended claims.

[0052] In the technical solution of this application, the collection, storage, use, processing, transmission, provision and disclosure of information such as financial data or user data involved comply with the provisions of relevant laws and regulations and do not violate public order and good morals.

[0053] It should be noted that in the embodiments of the present application, certain software, components, models and other existing solutions in the industry may be mentioned. They should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of the present application, but it does not mean that the applicant has or will necessarily use the solution.

[0054] In existing technologies, there's still a significant disconnect between the budget approval process and actual production systems. Existing budget management solutions often treat budget approval as an administrative activity independent of production operations, primarily conducted through office information systems. However, actual budget expenditure occurs within relatively separate production systems. This separation creates information asymmetry between budget management and execution, making it difficult for existing solutions to automatically track budget usage and rapidly adjust budget strategies.

[0055] Therefore, existing technologies cannot quickly and effectively achieve information collaborative management, and thus cannot quickly adjust budget utilization strategies.

[0056] In response to the above technical problems, this application proposes the following technical concept: a solution is proposed to deeply integrate the budget (management) system and the (production) business system, making full use of big data technology to achieve real-time monitoring and intelligent early warning of budget usage, fundamentally improving the rigor and effectiveness of budget control, and through the interaction between business systems and big data centers, it can quickly and effectively realize information collaborative management, thereby realizing rapid adjustment of budget usage strategies.

[0057] The following specific embodiments describe in detail the technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0058] The information management method of the embodiment of the present application can be applied to Figure 1 The scene shown, Figure 1 This is an application scenario diagram of the information management method applicable to the embodiment of the present application. The scenario includes: an event organizer, a budget system (which can be a budget declaration system or a budget management system, which will not be described in detail below), a business system, a big data platform (i.e., a big data center), and a user terminal (the user terminal can be an APP, or a small program or a web page terminal, and the user terminal is not specifically limited here; the user terminal is taken as an APP as an example below); wherein, the business system is configured with a rights and interests middle platform (here refers to the rights and interests module, which is used to distribute rights and interests and other activity preferential content), and the business system can be multiple, or it can be a business system integrated by multiple businesses or multiple business categories. The composition of the business system and the specific business functions included are not specifically limited here. Among them, the budget system, the business system, and the big data center can constitute an information management system. The event organizer can declare the budget through the budget system, and can also configure the activity through the business system. The business system can also interact with the user terminal and the big data platform respectively.

[0059] This scenario builds a highly integrated and feature-rich business ecosystem encompassing multiple key system components (e.g., budgeting systems, business systems, and a big data center). This ecosystem aims to optimize business operations, enhance user experience, and enable refined management and decision-making through data-driven processes. The core of this ecosystem includes the budgeting system, business systems, a big data platform, and the user interface—a mobile application (APP). These systems interact closely and systematically, forming an efficient closed-loop data flow, as follows:

[0060] Budget System: As an independent module, this system is designed specifically for enterprise budget planning and approval processes. It allows departments or project teams to develop detailed expenditure budgets based on business needs and market forecasts, submit them for approval, and track budget execution in real time. The budget system features a rigorous permissions management mechanism to ensure the security and accuracy of budget data. It also supports multi-dimensional budget analysis and report generation, facilitating management's monitoring and decision-making regarding overall financial performance.

[0061] The business system, operating in parallel with the budgeting system, covers all areas of daily business operations, such as equity management, order management, and customer relationships. It automates and digitizes business processes, ensuring smooth operations and real-time data updates. While independent, the business and budgeting systems interact through a big data platform, ensuring a close connection between budget execution and actual business activities, fostering dual oversight of finance and operations.

[0062] Big Data Platform: As the information hub of the entire ecosystem, the Big Data Platform plays a crucial role. It not only receives real-time data streams from budget and business systems but also integrates other internal and external data sources to build a comprehensive, multi-layered data warehouse. Leveraging advanced data processing and analysis technologies, the Big Data Platform performs real-time calculations and deep mining on massive amounts of data, providing strong support for benefit collection and write-offs.

[0063] Specifically, the big data platform can track and accurately calculate user benefit redemption behavior in real time, including but not limited to the entire process of coupon issuance and redemption. It also records detailed information about benefit redemption, including coupon usage time, consumption scenarios, and discount amounts. This real-time computing capability ensures that companies have complete control over marketing funds and their spending progress, enabling them to quickly respond to market changes, precisely adjust marketing strategies, optimize resource allocation, and improve user satisfaction.

[0064] APP user interface: As a bridge for direct interaction between users and business systems, the mobile application (APP) is designed to be simple and easy to use, providing users with a one-stop business processing and rights management experience. Through the APP, users can not only conveniently access various business functions, such as product browsing, order submission, after-sales service, etc., but also easily view, receive and manage various rights information, such as coupons, points, member privileges, etc. When a user receives a benefit (such as a coupon) on the APP, this operation information will be immediately synchronized to the big data platform for calculation and recording. Similarly, when a user uses a coupon for redemption in a subsequent transaction, the big data platform will also count the usage of the benefits in real time and feed back the relevant information to the business system. Based on these feedbacks, the business system controls whether to restrict the collection of coupons or to trigger a redemption fuse.

[0065] Specifically, the core mechanism of this application is:

[0066] 1. Data Interoperability: Through system integration and interface development, we break down information silos between budget systems and business systems, ensuring real-time synchronization of budget approval results with production data. Once a budget is approved, its amount and usage rules are directly embedded into the underlying logic of the business system, ensuring that every budget-related business operation can be accurately recorded and traced.

[0067] 2. Real-time Cost Collection and Statistics: Leveraging the powerful data ingestion, cleansing, and integration capabilities of big data technology, the system captures and meticulously processes the massive amounts of cost data generated by production and business systems in real time. The system automatically tracks the cost of each business activity, including direct, indirect, variable, and fixed costs, and updates budget balances and usage progress in real time.

[0068] 3. Intelligent Early Warning and Dynamic Adjustment: Based on real-time cost data, the system incorporates advanced algorithms and models to monitor budget usage in real time. If the budget is about to exceed set thresholds or exhibit unusual consumption patterns, an early warning mechanism is triggered. This warning information includes detailed overspending forecasts, analysis of possible causes, and recommended adjustments. Event organizers can flexibly adjust budget plans based on actual business development, such as reallocating budgets, optimizing resource allocation, or adjusting business strategies, to ensure effective budget utilization.

[0069] 4. Automated Business Control: In response to budget warnings, the system has the ability to proactively intervene in business processes. When the warning conditions are met, the system can automatically implement control measures on relevant business systems, such as business throttling (for example, limiting the frequency of operations for certain non-core or low-priority businesses to reduce unnecessary costs) and business circuit breakers (for example, suspending certain budget-consuming business functions in special circumstances to prevent budgetary overruns). These automated control measures can quickly intervene when budget overruns are imminent, effectively preventing overspending.

[0070] 5. Full-Process Budget Control: This application covers the entire lifecycle of event budgets, from planning, approval, execution, and adjustment, ensuring a tight coupling between budget management and business execution. Through comprehensive budget tracking, real-time analysis, and intelligent intervention, closed-loop management of event budgets is achieved, ensuring that all event expenditures are compliant and within budget constraints.

[0071] 6. Improved Efficiency and Compliance: Through these innovations, companies have significantly improved the overall efficiency of their events while strictly enforcing budget control requirements. The seamless integration of budget management and business execution reduces manual intervention and communication costs, accelerates decision-making and response, and enables companies to quickly adapt to market changes and flexibly adjust strategies. Furthermore, systematic budget control ensures transparency and compliance of event expenses, facilitates internal audits and external oversight, and strengthens the standardization of the company's financial management.

[0072] Therefore, this application successfully addresses the many drawbacks of traditional budget management solutions in cost control by deeply integrating the budget system with the production business system and leveraging big data technology to achieve real-time cost monitoring, intelligent early warning, and automatic business control. It not only strengthens the company's refined management of event budgets and ensures effective cost control, but also significantly improves the efficiency of event organization, achieving both compliance and economic benefits, and providing strong technical support for modern enterprises to cope with cost challenges in complex market environments.

[0073] The embodiment of the present application also provides an information management method. Figure 2 This is a flow chart of the information management method provided in the embodiment of the present application. Figure 2 As shown, the information management method includes:

[0074] S201. After determining that a recorded activity is effective, displaying the associated rights and interests of the recorded activity through a user interface, wherein the associated rights and interests include at least one right and interest, and each right and interest corresponds to a right and interest ID.

[0075] S202: Monitor the claim flow of each benefit ID in real time, and synchronize the benefit ID of the first benefit that has been successfully claimed to the big data center, so that the big data center updates the number of first benefits claimed, and provides the business system with data on whether the claim strategy of each benefit needs to be adjusted; and / or

[0076] S203. Monitor the write-off flow of each equity ID in real time, and synchronize the equity ID of the successfully written-off second equity to the big data center, so that the big data center updates the number of written-off second equity, and provides the business system with data on whether the write-off strategy of each equity needs to be adjusted.

[0077] The first interest and the second interest are both at least one of the associated interests.

[0078] In this embodiment, the execution subject of the information management method is a business system, which can be a diversified business system, or there can be at least one business system. Taking multiple business systems as an example, multiple business systems cover all aspects of enterprise operations, such as sales management, supply chain management, customer service, marketing, etc. Each business system has independent business logic and data processing capabilities to meet the needs of specific business scenarios. These business systems not only support the smooth operation of daily business processes, but also generate a large amount of transaction data and behavior records related to budget costs, which are synchronized to the big data center and managed in collaboration with the big data center.

[0079] The information management method provided in this embodiment displays the associated rights and interests of the recorded activity through a user interface after determining that the recorded activity has taken effect, wherein the associated rights and interests include at least one right, and one right corresponds to one right ID; monitors the claim flow of each right ID in real time, and synchronizes the right ID of the first right that has been successfully claimed to the big data center, so that the big data center updates the number of the first right claimed, and provides the business system with data on whether the claim strategy of each right needs to be adjusted; and / or monitors the redemption flow of each right ID in real time, and synchronizes the right ID of the second right that has been successfully redeemed to the big data center, so that the big data center updates the number of the second right redeemed, and provides the business system with data on whether the redemption strategy of each right needs to be adjusted; wherein the first right and the second right are both at least one of the associated rights and interests. This application monitors the claim and / or redemption status of each right ID in real time, synchronizes the claim and / or redemption status of the right to the big data center, and then determines whether the claim strategy and / or redemption strategy of the right needs to be adjusted based on the claim and / or redemption status updated by the big data center, thereby achieving the effect of intelligent budget warning and improving the rigor and timeliness of budget control. Therefore, through the interaction between business systems and big data centers, information collaborative management can be achieved quickly and effectively, thereby enabling rapid adjustment of budget utilization strategies.

[0080] In some embodiments, real-time monitoring of the claim flow of each equity ID and synchronizing the equity ID of the successfully claimed first equity to the big data center so that the big data center updates the number of first equity claimed includes:

[0081] For each benefit ID, in response to a request from a first user to claim the benefit, determining whether the first user has successfully claimed the benefit based on the claim limit information for the benefit obtained from the big data center or the first instruction information received from the big data center;

[0082] If the claim is successful, the claim ID of the claim is sent to the big data center, so that the big data center increases the number of the first claim by 1; the claim successfully taken is regarded as the first claim;

[0083] If the rights and interests are not successfully collected, a prompt message indicating that the rights and interests have failed to be collected will be displayed through the user interface.

[0084] Among them, the flow limit information for the collection of the rights and interests is determined by the number of the rights and interests collected and the flow limit warning configuration information. The flow limit warning configuration information is pre-configured, or dynamically updated based on the number of the rights and interests collected, the number of the rights and interests written off and the budget information of the rights and interests in the effective activities; the budget information of the effective activities matches the approved activity budget information recorded in the big data center, and the approved activity budget information is synchronized to the big data center by the budget system. The activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength. The activity preferential strength at least includes the associated rights and interests of the entered activity.

[0085] In this embodiment, the claim flow-limiting threshold (i.e., flow-limiting threshold or flow-limiting threshold configuration) can be fixed or dynamically adjusted. If a user applies to the business system through the user interface to claim one or more benefits, the business system needs to determine whether to allow the benefit to be claimed. First, it checks the compliance of the user's claim of the benefit, and second, it determines whether the benefit has reached the upper limit for the current time period or the activity. Among them, the business system can determine whether the benefit has been successfully claimed based on the claim flow-limiting information or based on the judgment result sent by the big data center.

[0086] Specifically, for any benefit ID, the following process is performed: a user sends a request to the business system through the user interface to claim the benefit. The business system obtains the claim limit information for the benefit from the big data center or receives a first indication message from the big data center. Based on this claim limit information or first indication message, the business system determines whether the benefit claim is successful, that is, whether to allow the benefit to be claimed. If the benefit claim is successful, the benefit ID of the benefit is sent to the big data center, and the big data center increments the number of the first benefit claimed by 1.

[0087] In some embodiments, determining whether the first user successfully claims the benefit based on the benefit claiming flow limiting information obtained from the big data center or the first indication information received from the big data center includes:

[0088] Based on the flow-limit information on the collection of the rights and interests obtained from the big data center, it is predicted whether the rights and interests are subject to flow-limit collection. If it is predicted that the rights and interests are subject to flow-limit collection, it is determined whether the rights and interests are subject to flow-limit collection based on the number of rights and interests collected, the number of rights and interests written off, and the budget information of the rights and interests in the entered activities. If it is determined that the rights and interests are subject to flow-limit collection, the collection strategy of the rights and interests is adjusted, and it is determined that the rights and interests collection has failed and a prompt is given on the user interface that the rights and interests collection has failed; if it is predicted that the rights and interests are not subject to flow-limit collection, it is determined that the rights and interests are not subject to flow-limit collection, and it is determined that the rights and interests collection has been successful and a prompt is given on the user interface that the rights and interests collection has been successful; or,

[0089] If the first indication information is used to indicate that the rights and interests are not subject to flow restriction, it is determined that the rights and interests are successfully collected and a prompt is given through the user interface that the rights and interests are successfully collected; if the first indication information is used to indicate that the rights and interests are subject to flow restriction, it is determined that the rights and interests are failed to be collected and a prompt is given through the user interface that the rights and interests are failed to be collected.

[0090] The claim flow restriction information of the equity can also be used to indicate whether the equity is subject to flow restriction. For example, if the claim flow restriction information includes key = equity ID (for example, equity ID, which will not be repeated below), value = yes, it means that the equity corresponding to the equity ID is subject to flow restriction. If the claim flow restriction information includes key = equity ID, value = no, it means that the equity corresponding to the equity ID is not subject to flow restriction.

[0091] In this embodiment, if the benefit obtained from the big data center is initially determined to be subject to flow control, the business system needs to re-determine whether it is subject to flow control based on the actual number of benefits received in combination with the budget. If it is determined to be subject to flow control, it is determined that the current benefit has failed to be received, and the benefit issuance strategy is adjusted. For example, the data on the subsequent cancellation of the benefit is checked. If the number of cancellations does not reach the threshold, the benefit continues to be issued.

[0092] In some embodiments, real-time monitoring of the redemption flow of each equity ID and synchronizing the equity ID of the successfully redeemed second equity to the big data center so that the big data center updates the number of second equity redeemed includes:

[0093] For each benefit ID, in response to a request from a second user to cancel the benefit, determining whether the second user has successfully canceled the benefit based on the cancellation fuse information of the benefit obtained from the big data center or the second indication information received from the big data center;

[0094] If the equity is successfully written off, the equity ID of the equity is sent to the big data center, so that the big data center increases the number of the second equity written off by 1; wherein the equity that is successfully written off serves as the second equity;

[0095] If the equity is not successfully written off, a prompt message indicating that the equity write-off has failed is displayed through the user interface.

[0096] Among them, the write-off fuse information of the rights and interests is determined by the amount of the rights and interests written off and the fuse warning configuration information. The fuse warning configuration information is pre-configured, or dynamically updated based on the amount of the rights and interests written off and the budget information of the rights and interests in the effective activities; the budget information of the effective activities matches the approved activity budget information recorded in the big data center. The approved activity budget information is synchronized to the big data center by the budget system. The activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength. The activity preferential strength at least includes the associated rights and interests of the entered activities.

[0097] In this embodiment, the write-off circuit breaker threshold (i.e., the circuit breaker threshold or circuit breaker threshold configuration) can be fixed or dynamically adjusted. If a user applies to the business system through the user interface to write off one or more benefits, the business system needs to determine whether to allow the write-off of the benefit. First, it checks the compliance of the user's write-off of the benefit and second, it determines whether the benefit has reached the write-off limit for the current time period or the activity. The business system can determine whether the benefit write-off is successful based on the write-off circuit breaker information or based on the judgment result sent by the big data center.

[0098] Specifically, for any benefit ID, the following process is performed: a user sends a request to the business system through the user interface to request the write-off of the benefit. The business system then obtains the write-off fuse information for the benefit from the big data center or receives a second indication from the big data center. Based on the write-off fuse information or second indication, the business system determines whether the write-off of the benefit is successful, that is, whether to allow the write-off of the benefit. If the write-off of the benefit is successful, the benefit ID of the benefit is sent to the big data center, which then increments the number of the second benefit written off by one.

[0099] It should be noted that the first interest and the second interest can be the same type of interest or different types of interest. There is no specific limitation here and it needs to be determined based on the specific scenario.

[0100] In some embodiments, determining whether the second user successfully cancels the benefit based on the benefit cancellation fuse information obtained from the big data center or the second indication information received from the big data center includes:

[0101] Based on the information of the equity obtained from the big data center, it is predicted whether the equity is circuit-broken and written off; if it is predicted that the equity is circuit-broken and written off, it is determined whether the equity is circuit-broken and written off based on the amount of the equity written off and the budget information of the equity in the entered activity; if it is determined that the equity is circuit-broken and written off, the write-off strategy of the equity is adjusted, and it is determined that the equity write-off fails and the failure of the equity write-off is prompted through the user interface; if it is predicted that the equity is not circuit-broken and written off, it is determined that the equity is not circuit-broken and written off, and it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; or,

[0102] If the second indication information is used to indicate that the equity has not been circuit-broken and written off, the equity write-off is determined to be successful and a prompt indicating the success of the equity write-off is provided through the user interface; if the second indication information is used to indicate that the equity has been circuit-broken and written off, the equity write-off is determined to have failed and a prompt indicating the failure of the equity write-off is provided through the user interface.

[0103] The write-off information for a claim can also indicate whether the claim has been written off. For example, if the write-off information includes key = claim number and value = yes, it indicates that the claim corresponding to the claim ID has been written off. If the write-off information includes key = claim number and value = no, it indicates that the claim corresponding to the claim ID has not been written off.

[0104] In this embodiment, if the business system obtains from the big data center a preliminary determination that the benefit is subject to flow restriction, the business system needs to re-determine whether it is subject to flow restriction based on the actual number of benefits received and the budget. If it is determined to be subject to flow restriction, it is determined that the current benefit has failed to be received and the benefit issuance strategy is adjusted. For example, the data on subsequent cancellations of the benefit is checked. If the number of cancellations does not reach the threshold, the benefit is continued to be issued. In some embodiments, the method further includes:

[0105] In response to an event entry application from an event organizer, querying an available budget from a big data center, and determining, based on the available budget, whether the available budget matches the entered event landing business budget information;

[0106] If there is a match, the entered activity will be made effective after the approval is confirmed;

[0107] If there is a mismatch, the event organizer will be prompted to re-fill in the event information through the budget system.

[0108] In this embodiment, the user interacts with the business system through the user interface, fills in the activity information, and determines whether the filled-in activity information matches the approved budget. Specifically, the event organizer initiates an activity entry application to the business system, and the business system queries the available budget from the big data center, verifies the available budget with the on-site business budget information of the activity entered by the event organizer, and determines whether the available budget matches the on-site business budget information of the entered activity; if it matches, it continues to judge the compliance of the on-site business of the entered activity, etc. If it meets the predetermined conditions, the review is passed; if it does not meet the predetermined conditions, the review is rejected. The business system will send a prompt message of whether the review is passed or not to the event organizer. If it does not match, the review node of the business system will be returned to the event organizer, and the event organizer will be prompted to re-fill in the activity information through the budget system.

[0109] For example, combined Figure 3 As shown, Figure 3 This is an interactive diagram of the information management method provided by the embodiment of the present application. Taking an event as an example, in the process of preparing and executing an event, the information management process (for example, the budget management process) is combined with Figure 3 As shown, this can be achieved by following the steps below:

[0110] 1. Budget Development and Approval: The event organizer (here, referring to the event organizer, and not further detailed below) first submits a complete budget application in the budget system, including details such as the total budget, cost allocation ratio, event location, and ancillary benefits. Once approved, the budget becomes available for use, providing funding for subsequent event preparations. If the application is rejected, the organizer must adjust the budget proposal or terminate the budget application as appropriate to ensure the rational and economical allocation of resources.

[0111] 2. Budget data synchronization: After the budget approval is successfully completed, the detailed data of the activity budget will be instantly synchronized to the big data platform, building a comprehensive budget view so that each department can obtain budget dynamics in real time and provide solid data support for decision-making.

[0112] 3. Event Information Completion and Verification: The organizer then completes the event information in the business system, including details of the approved budget, event theme, time, target audience, and other specific information. During this process, the discount offered by the coupon must be consistent with the discount level specified during the budget application; otherwise, the system will reject the verification, ensuring that the event is strictly executed within the budget plan.

[0113] 4. Event Release and Display: After event information review and approval, the carefully curated event page will be displayed on the app for target users to browse and participate. This is designed to maximize event exposure, stimulate user interest, and accelerate the effectiveness of the event.

[0114] 5. Rights collection and risk control: When users collect rights on the APP, the business system will monitor the collection flow of the rights ID in real time. If the flow limit threshold and / or the fuse threshold are reached, the system will immediately prompt the user that the collection has failed, effectively preventing the pressure on the information management system and the risk of budget overruns caused by excessive concentrated collection. On the contrary, if the collection behavior is within the safety threshold, the system will smoothly execute the collection operation, and feed back the successful collection data to the big data platform in real time, and simultaneously update the collection count of the rights. At the same time, when the amount of rights collected reaches the warning threshold (here refers to the flow limit warning threshold), the system will update the business system flow limit configuration in the form of a key-value pair (key: equity ID, value: flow limit ratio), and the warning will also send a text message to notify the organizer to adjust the strategy in time to ensure the smooth progress of the event.

[0115] 6. Equity cancellation and monitoring: After the user successfully receives the equity, the business system will conduct a strict check on the cancellation circuit breaker configuration during the cancellation process. The cancellation operation can only be successfully carried out if the equity instance has not yet reached the cancellation circuit breaker standard. The data of successful cancellation will also be synchronized to the big data platform in real time to update the cancellation count of the equity. If the number of cancellations reaches the preset circuit breaker threshold (here refers to the cancellation circuit breaker threshold), the system will notify the business system to update the cancellation circuit breaker configuration (here refers to the cancellation circuit breaker threshold) in the form of a key-value pair (key: equity ID, value: true), and send an early warning SMS to prompt the organizer to take corresponding actions, such as adjusting the rhythm of equity issuance, adding remedial measures, etc., to ensure that the event is carried out efficiently within the budget control range.

[0116] Therefore, this application builds a highly efficient, collaborative, and data-driven business ecosystem by integrating the budget system, business system, big data platform, and user end. The system design fully considers core aspects such as precise budget control, efficient flow of activity information, and user benefit collection and verification. Relying on the big data platform to achieve real-time data synchronization and intelligent analysis, coupled with a flexible current limiting and circuit breaker mechanism, it ensures that the entire activity process is carried out in an orderly manner within budget constraints. This not only ensures effective cost control for the enterprise, but also greatly improves the efficiency of activity organization and execution, as well as the user experience.

[0117] Another embodiment of the present application provides an information management method, applied to a big data center, comprising:

[0118] Obtaining the ID of the first benefit that has been successfully claimed from the business system in real time, and updating the number of the first benefit that has been claimed; determining the claim flow limit information or first indication information for the first benefit based on the number of the first benefit that has been claimed and the flow limit warning configuration information, and sending the claim flow limit information or the first indication information to the business system so that the business system determines whether the first benefit is subject to flow limit claiming; and / or,

[0119] The right ID of the second right that has been successfully written off is obtained from the business system in real time, and the amount of the second right written off is updated; based on the amount of the second right written off and the circuit breaker warning configuration information, the write-off circuit breaker information or the second indication information of the second right is determined, and the write-off circuit breaker information or the second indication information is sent to the business system, so that the business system determines whether the second right has been written off by the circuit breaker.

[0120] All data generated by both business and budget systems can be seamlessly synchronized to the big data platform. The big data platform boasts powerful data aggregation, cleansing, integration, and analysis capabilities, transforming data from diverse sources and formats into unified, standardized data assets. This highly integrated data environment breaks down system silos and ensures that critical information required for budget management is collected without omission or delay.

[0121] Big Data Platform: Calculates benefit redemption and redemption status in real time. "Benefits" here typically refer to various corporate incentives, such as coupons, points, and gift cards. Users access the business system through the company's official app or other front-end channels to redeem and use their benefits. Whenever a benefit redemption or redemption occurs, this operational data is rapidly transmitted to the big data platform.

[0122] The big data platform utilizes an advanced real-time computing engine to process and deeply mine massive amounts of data on benefit redemption and redemption, accurately analyzing key metrics such as the total amount of benefits issued, remaining quantity, utilization rate, expiration rate, and user data. These real-time statistics not only reveal the effectiveness of benefit campaigns but also provide powerful data support for evaluating budget input-output ratios and optimizing marketing strategies.

[0123] The big data platform provides real-time feedback to the business system on the calculated equity status and trend analysis results. Based on this information, the business system can dynamically adjust equity issuance strategies, such as limiting issuance speed, adjusting validity periods, and initiating additional issuances, to effectively control budget costs. Furthermore, the information management system can provide timely warnings of potential budget overruns based on equity write-offs, triggering appropriate approval processes or automated adjustment mechanisms to ensure strict adherence to pre-determined targets and thresholds.

[0124] The information management method provided in this embodiment obtains and synchronizes information from the business system, monitoring the claim and / or write-off status of each benefit ID in real time. The big data center updates the claim and / or write-off status and synchronizes it with the business system, allowing the business system to determine whether to adjust the claim and / or write-off strategy for the benefit, thereby achieving intelligent budget early warning and improving the rigor and timeliness of budget management. Therefore, through the interaction between the business system and the big data center, information collaborative management can be quickly and effectively achieved, thereby enabling the rapid adjustment of budget utilization strategies.

[0125] In some embodiments, the current limiting warning configuration information is pre-configured, or dynamically updated based on the number of benefits claimed, the number of benefits written off, and the budget information of the benefits in the effective activities; and / or,

[0126] The fuse warning configuration information is pre-configured or dynamically updated based on the amount of the equity written off and the budget information of the equity in the effective activities.

[0127] In this embodiment, the claim current limit threshold can be fixed or dynamically adjusted; the write-off fuse threshold can be fixed or dynamically adjusted.

[0128] In some embodiments, the method further comprises:

[0129] Obtain the approved activity budget information sent by the budget system;

[0130] Among them, the activity budget information includes the total activity budget amount, sub-activity information, investment ratio, and activity preferential strength; among them, the activity preferential strength at least includes the associated rights and interests of the entered activity, and the associated rights and interests include at least one right and one right corresponds to one right ID.

[0131] In this example, event organizers interact with the budget system to submit budget applications. By integrating multiple business systems, the budget system, and a big data platform, a data-driven, real-time, and intelligently regulated budget and cost management system has been constructed. This information management approach enables precise control over the entire budget lifecycle, from budget preparation to execution monitoring, significantly improving the efficiency and cost-effectiveness of a company's financial management.

[0132] Yet another embodiment of the present application provides an information management method, which is applied to a budget system. The method includes:

[0133] In response to an event organizer's request for an event budget, obtain the entered event budget information, the event budget information including the total event budget amount, sub-event information, contribution ratio, and event discount strength; wherein the event discount strength includes at least the associated benefits of the entered event, the associated benefits including at least one benefit, each benefit corresponding to a benefit ID;

[0134] Determining whether the activity budget information corresponding to the entered activity is reasonable based on the entered activity budget information;

[0135] If reasonable, the entered activity is determined to be approved, and the entered activity budget information is synchronized to the big data center, so that the big data center can monitor the activity budget information in real time to determine whether to adjust the related benefit claiming strategy or the related benefit write-off strategy;

[0136] If it is unreasonable, the review node will be returned to the node of the activity organizer to prompt the activity organizer that the activity budget review has failed, or to instruct the activity organizer to modify the activity budget information and resubmit it.

[0137] The budget system maintains logical independence from the aforementioned business systems, ensuring that financial management activities such as budget preparation, approval, and adjustments are not directly impacted by business operations, thus safeguarding the integrity of financial resources. The budget system allows departments or project teams at all levels to submit budget applications according to pre-set rules. After the approval process, formal budgets are generated. The system also dynamically tracks budget execution progress, providing management with a real-time view of budget status.

[0138] The information management method provided in this embodiment is that the budget system receives the request for the event budget from the event organizer, obtains the entered event budget information, and then reviews the event budget information. If the review is passed, the entered event budget information is synchronized to the big data center, so that the big data center or the big data center can monitor the collection and / or cancellation of each benefit ID in real time through the business system, and then determine or determine through the business system whether it is necessary to adjust the benefit collection strategy and / or cancellation strategy, thereby achieving the effect of intelligent budget early warning, which can improve the rigor and timeliness of budget control. Therefore, through the interaction between the event organizer, the budget system, the business system and the big data center, it is possible to quickly and effectively realize information collaborative management, and then quickly adjust the budget usage strategy.

[0139] The present application provides an information management system or information management system, comprising: a business system, a big data center, and a budget system, wherein the business system and the budget system are respectively connected to the big data center in communication;

[0140] The business system is used to execute the method according to any one of the first aspects;

[0141] The big data center is used to execute the method according to any one of the second aspects;

[0142] The budget system is used to execute the method as described in any one of the third aspects.

[0143] In this embodiment, a comprehensive system architecture has been constructed that integrates multi-dimensional business functions (provided by diversified business systems) with data analysis capabilities. This architecture aims to enable refined management and effective monitoring of budget costs through precise data synchronization and real-time calculation mechanisms. This business system may include, but is not limited to, diversified business systems, a budget management system, and a big data platform. These systems work together to form an efficient information flow and decision support system.

[0144] Figure 4 This is a schematic diagram of the structure of the information management device provided in the embodiment of the present application. Figure 4 As shown, the information management device is applied to the business system. The information management device 40 includes: an activity rights visibility module 401, a rights collection monitoring module 402 and a rights write-off monitoring module 403;

[0145] The activity benefit visibility module 401 is used to display the associated benefits of the entered activity through a user interface after confirming that the entered activity is effective. The associated benefits include at least one benefit, and each benefit corresponds to a benefit ID.

[0146] The benefit claim monitoring module 402 is used to monitor the claim flow of each benefit ID in real time and synchronize the benefit ID of the first benefit that has been successfully claimed to the big data center so that the big data center can update the number of first benefits claimed and provide the business system with data on whether the claim strategy of each benefit needs to be adjusted; and / or,

[0147] The equity write-off monitoring module 403 is used to monitor the write-off flow of each equity ID in real time and synchronize the equity ID of the successfully written-off second equity to the big data center, so that the big data center can update the number of written-off second equity and provide the business system with data on whether the write-off strategy of each equity needs to be adjusted. The first equity and the second equity are both at least one of the associated equity.

[0148] In some embodiments, the benefit claim monitoring module 402 is specifically configured to:

[0149] For each benefit ID, in response to a first user's request to claim the benefit, a determination is made as to whether the first user has successfully claimed the benefit based on the benefit claim limit information obtained from the big data center or the first indication information received from the big data center. The benefit claim limit information is determined by the number of benefits claimed and the limit warning configuration information. The limit warning configuration information is pre-configured or dynamically updated based on the number of benefits claimed, the number of benefits written off, and the budget information of an effective activity for the benefit. The effective activity budget information matches the approved activity budget information recorded in the big data center. The approved activity budget information is synchronized to the big data center by the budget system. The activity budget information includes the total activity budget amount, sub-activity information, the contribution ratio, and the activity discount level. The activity discount level includes at least the associated benefits of the recorded activity. If the benefit is successfully claimed, the benefit ID of the benefit is sent to the big data center so that the big data center increments the number of the first benefit claimed by 1. The successfully claimed benefit is deemed the first benefit. If the benefit is not successfully claimed, a prompt message indicating that the benefit claim failed is displayed on the user interface. The current limiting warning configuration information is pre-configured, or dynamically updated based on the number of benefits claimed, the number of benefits cancelled, and the budget information of the benefits in the effective activities; and / or, the circuit breaker warning configuration information is pre-configured, or dynamically updated based on the number of benefits cancelled and the budget information of the benefits in the effective activities.

[0150] In some embodiments, the benefit claim monitoring module 402 is specifically configured to:

[0151] Based on the flow-limit information on the collection of the rights and interests obtained from the big data center, it is predicted whether the rights and interests are subject to flow-limited collection. If it is predicted that the rights and interests are subject to flow-limited collection, it is determined whether the rights and interests are subject to flow-limited collection based on the number of rights and interests collected, the number of rights and interests written off, and the budget information of the rights and interests in the entered activities. If it is determined that the rights and interests are subject to flow-limited collection, the collection strategy of the rights and interests is adjusted, and it is determined that the rights and interests collection has failed, and a prompt of the failure of the rights and interests collection is provided through the user interface; if it is predicted that the rights and interests are not subject to flow-limited collection, it is determined that the rights and interests are not subject to flow-limited collection, and it is determined that the rights and interests collection has been successful, and a prompt of the success of the rights and interests collection is provided through the user interface; or, if the first indication information is used to indicate that the rights and interests are not subject to flow-limited collection, it is determined that the rights and interests collection has been successful, and a prompt of the success of the rights and interests collection is provided through the user interface; if the first indication information is used to indicate that the rights and interests are subject to flow-limited collection, it is determined that the rights and interests collection has failed, and a prompt of the success of the rights and interests collection is provided through the user interface.

[0152] In some embodiments, the equity write-off monitoring module 403 is specifically configured to:

[0153] For each benefit ID, in response to the second user's request to apply for write-off of the benefit, it is determined whether the second user has successfully written off the benefit based on the write-off fuse information of the benefit obtained from the big data center or the second indication information sent by the big data center; wherein the write-off fuse information of the benefit is determined by the amount of the benefit written off and the fuse warning configuration information, and the fuse warning configuration information is pre-configured or dynamically updated based on the amount of the benefit written off and the budget information of the benefit in the effective activities; if the benefit is successfully written off, the benefit ID of the benefit is sent to the big data center so that the big data center adds 1 to the amount of the second benefit written off; wherein the benefit that has been successfully written off is used as the second benefit; if the benefit is not successfully written off, a prompt message indicating that the benefit write-off has failed is displayed through the user interface.

[0154] In some embodiments, the equity write-off monitoring module 403 is specifically configured to:

[0155] Based on the information of the equity obtained from the big data center, it is predicted whether the equity is circuit-broken and written off. If it is predicted that the equity is circuit-broken and written off, it is determined whether the equity is circuit-broken and written off based on the amount of the equity written off and the budget information of the equity in the entered activity. If it is determined that the equity is circuit-broken and written off, the write-off strategy of the equity is adjusted, and it is determined that the equity write-off has failed and the failure of the equity write-off is prompted through the user interface; if it is predicted that the equity is not circuit-broken and written off, it is determined that the equity is not circuit-broken and written off, and it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; or, if the second indication information is used to indicate that the equity is not circuit-broken and written off, it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; if the second indication information is used to indicate that the equity is circuit-broken and written off, it is determined that the equity write-off has failed and the failure of the equity write-off is prompted through the user interface.

[0156] In some embodiments, the apparatus further comprises: a processing module; the processing module is configured to:

[0157] In response to the event entry application of the event organizer, the available budget is queried from the big data center, and based on the available budget, it is determined whether the available budget matches the landing business budget information of the entered activity; if it matches, the entered activity is determined to be effective after the approval is passed; if it does not match, the event organizer is prompted to re-fill in the activity information through the budget system.

[0158] The information management device provided in the embodiment of the present application can be used to execute the technical solution of the information management method in the embodiment shown in the first aspect above. Its implementation principle and technical effects are similar and will not be repeated here.

[0159] Another embodiment of the present application provides an information management device, which is applied to a big data center. The device includes:

[0160] The first processing module is configured to obtain, in real time, the entitlement ID of the first entitlement that has been successfully claimed from the business system and update the number of the first entitlement that has been claimed; determine the claim flow limit information or first indication information for the first entitlement based on the number of the first entitlement that has been claimed and the flow limit warning configuration information, and send the claim flow limit information or the first indication information to the business system so that the business system determines whether the first entitlement has been claimed with flow limit; and / or, the second processing module is configured to obtain, in real time, the entitlement ID of the second entitlement that has been successfully cancelled from the business system and update the number of the second entitlement that has been cancelled; determine the cancellation fuse information or second indication information for the second entitlement based on the number of the second entitlement that has been cancelled and the circuit breaker warning configuration information, and send the cancellation fuse information or the second indication information to the business system so that the business system determines whether the second entitlement has been cancelled with circuit breaker.

[0161] In some embodiments, the current limiting warning configuration information is pre-configured, or dynamically updated based on the number of the rights claimed, the number of the rights cancelled, and the budget information of the rights in the effective activities; and / or, the circuit breaker warning configuration information is pre-configured, or dynamically updated based on the number of the rights cancelled and the budget information of the rights in the effective activities.

[0162] In some embodiments, the apparatus further comprises: a third processing module; the third processing module is configured to:

[0163] Obtain the approved activity budget information sent by the budget system;

[0164] Among them, the activity budget information includes the total activity budget amount, sub-activity information, investment ratio, and activity preferential strength; among them, the activity preferential strength at least includes the associated rights and interests of the entered activity, and the associated rights and interests include at least one right and one right corresponds to one right ID.

[0165] The information management device provided in the embodiment of the present application can be used to execute the technical solution of the information management method in the embodiment shown in the second aspect above. Its implementation principle and technical effects are similar and will not be repeated here.

[0166] Another embodiment of the present application provides an information management device, which is applied to a budget system. The device includes:

[0167] An activity budget acquisition module is configured to respond to an activity organizer's request for an activity budget and acquire the entered activity budget information, wherein the activity budget information includes the total activity budget amount, sub-activity information, contribution ratio, and activity discount strength; wherein the activity discount strength includes at least the associated benefits of the entered activity, wherein the associated benefits include at least one benefit, and each benefit corresponds to a benefit ID;

[0168] The activity audit module is used to determine whether the activity budget information corresponding to the entered activity is reasonable based on the entered activity budget information; if it is reasonable, it is determined that the entered activity has passed the audit, and the entered activity budget information is synchronized to the big data center, so that the big data center can monitor the activity budget information in real time to determine whether to adjust the associated rights and interests collection strategy or the associated rights and interests write-off strategy; if it is unreasonable, the audit node is returned to the node of the activity organizer to prompt the activity organizer that the activity budget audit has failed, or to instruct the activity organizer to resubmit it by modifying the activity budget information.

[0169] The information management device provided in the embodiment of the present application can be used to execute the technical solution of the information management method in the embodiment shown in the third aspect above. Its implementation principle and technical effects are similar and will not be repeated here.

[0170] It should be noted that the division of the various modules of the above device is merely a division of logical functions. In actual implementation, they can be fully or partially integrated into a single physical entity or physically separated. Furthermore, these modules can be implemented entirely in software called by a processing element, or entirely in hardware. Alternatively, some modules can be implemented in software called by a processing element, while others can be implemented in hardware. For example, the order number generation module 704 can be a separate processing element, or it can be integrated into a chip of the above device. Furthermore, it can be stored in the memory of the above device in the form of program code, which can be called by a processing element of the above device to perform the functions of the order number generation module 704. The implementation of other modules is similar. Furthermore, these modules can be fully or partially integrated or implemented independently. The processing element here can be an integrated circuit with signal processing capabilities. During implementation, the steps of the above method or the above modules can be completed by hardware integrated logic circuits in the processor element or by software instructions.

[0171] Figure 5 This is a schematic diagram of the structure of the electronic device provided in the embodiment of the present application. Figure 5 As shown, the electronic device 50 may include: a transceiver 51 , a processor 52 , and a memory 53 .

[0172] The processor 52 executes the computer-executable instructions stored in the memory, so that the processor 52 implements the solutions in the above embodiments. The processor 52 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components.

[0173] The memory 53 is connected to the processor 52 via a system bus and communicates with the processor 52. The memory 53 is used to store computer program instructions.

[0174] The transceiver 51 may be used to obtain tasks to be executed and configuration information of the tasks to be executed.

[0175] The system bus can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, among others. The system bus can be divided into an address bus, a data bus, a control bus, and so on. For ease of illustration, the figure shows only one thick line, but this does not imply that there is only one bus or only one type of bus. Transceivers are used to enable communication between the database access device and other computers (e.g., clients, read-write libraries, and read-only libraries). Memory may include random access memory (RAM) and non-volatile memory.

[0176] The electronic device provided in the embodiment of the present application may be the terminal device of the above embodiment.

[0177] An embodiment of the present application also provides a chip for executing instructions, which is used to execute the technical solution of the information management method in the above embodiment.

[0178] An embodiment of the present application further provides a computer-readable storage medium, in which computer instructions are stored. When the computer instructions are executed on a computer, the computer executes the technical solution of the information management method of the above embodiment.

[0179] An embodiment of the present application also provides a computer program product, which includes a computer program stored in a computer-readable storage medium. At least one processor can read the computer program from the computer-readable storage medium, and when at least one processor executes the computer program, it can implement the technical solution of the information management method in the above embodiment.

[0180] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are merely illustrative. For example, the division of modules is only a logical function division. In actual implementation, there may be other division methods, such as multiple modules can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interface, device or module, which can be electrical, mechanical or other forms.

[0181] Modules described as separate components may or may not be physically separate, and components shown as modules may or may not be physical units, that is, they may be located in one place or distributed across multiple network elements. Some or all of these modules may be selected to implement the solution of this embodiment based on actual needs.

[0182] In addition, the functional modules in the various embodiments of the present application may be integrated into a single processing unit, or each module may exist physically separately, or two or more modules may be integrated into a single unit. The above-mentioned modules may be implemented in the form of hardware or hardware plus software functional units.

[0183] The above-mentioned integrated module implemented in the form of a software functional module can be stored in a computer-readable storage medium. The above-mentioned software functional module is stored in a storage medium and includes a number of instructions for causing a computer device (which can be a personal computer, server, or network device, etc.) or a processor to perform some steps of the methods of various embodiments of the present application.

[0184] It should be understood that the processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), or application-specific integrated circuits (ASICs). A general-purpose processor may be a microprocessor or any conventional processor. The steps of the method disclosed in the present invention may be directly implemented by a hardware processor or implemented by a combination of hardware and software modules in the processor.

[0185] The memory may include a high-speed RAM memory, and may also include non-volatile storage NVM, such as at least one disk memory, and may also be a USB flash drive, a mobile hard disk, a read-only memory, a magnetic disk or an optical disk.

[0186] The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus. Buses can be categorized as address buses, data buses, and control buses. For ease of illustration, the buses in the drawings of this application are not limited to just one bus or just one type of bus.

[0187] The storage medium may be implemented by any type of volatile or non-volatile memory device, or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. The storage medium may be any available medium that can be accessed by a general-purpose or special-purpose computer.

[0188] An exemplary storage medium is coupled to a processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be an integral part of the processor. The processor and the storage medium can be located in an application specific integrated circuit (ASIC). Of course, the processor and the storage medium can also exist as discrete components in an electronic control unit or a main control device.

[0189] Those skilled in the art will appreciate that all or part of the steps in the above-described method embodiments can be implemented using hardware associated with program instructions. The aforementioned program can be stored in a computer-readable storage medium. When executed, the program performs the steps of the above-described method embodiments. The aforementioned storage medium includes various media capable of storing program code, such as ROM, RAM, magnetic disks, or optical disks.

[0190] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some or all of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.

Claims

1. An information management method, characterized in that: Applied to a business system, the method comprises: After determining that the entered activity is effective, displaying the associated rights and interests of the entered activity through a user interface, wherein the associated rights and interests include at least one right and interest, and one right and interest corresponds to one right and interest ID; Monitor the claim flow of each benefit ID in real time, and synchronize the benefit ID of the first benefit that has been successfully claimed to the big data center, so that the big data center updates the number of first benefits claimed, so as to provide the business system with data on whether the claim strategy of each benefit needs to be adjusted; and / or, Monitor the write-off flow of each equity ID in real time, and synchronize the equity ID of the second equity that has been successfully written off to the big data center, so that the big data center updates the number of second equity written off, so as to provide the business system with data on whether the write-off strategy of each equity needs to be adjusted; The first interest and the second interest are both at least one of the associated interests.

2. The method according to claim 1, characterized in that: The real-time monitoring of the claiming flow of each equity ID and synchronizing the equity ID of the first equity that has been successfully claimed to the big data center so that the big data center updates the number of the first equity that has been claimed, includes: For each equity ID, in response to a request from a first user to apply for the equity, whether the first user successfully obtains the equity is determined based on the equity collection flow limit information obtained from the big data center or the first indication information sent by the big data center; wherein the equity collection flow limit information is determined by the number of the equity collected and the flow limit warning configuration information, and the flow limit warning configuration information is pre-configured or dynamically updated based on the number of the equity collected, the number of the equity written off, and the budget information of the equity in the effective activities; the budget information of the effective activities matches the approved activity budget information recorded in the big data center, and the approved activity budget information is synchronized from the budget system to the big data center, and the activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength, and the activity preferential strength at least includes the associated equity of the entered activity; If the claim of the rights is successful, the rights ID of the rights is sent to the big data center, so that the big data center increases the number of the first rights claimed by 1; wherein the rights successfully claimed are taken as the first rights; If the rights and interests are not successfully collected, a prompt message indicating that the rights and interests have not been collected will be displayed through the user interface.

3. The method according to claim 2, characterized in that The determining whether the first user successfully obtains the rights and interests according to the current limiting information of obtaining the rights and interests from the big data center or the first indication information sent by the big data center includes: Based on the flow-limit information on the collection of the rights and interests obtained from the big data center, it is predicted whether the rights and interests are subject to flow-limit collection; if it is predicted that the rights and interests are subject to flow-limit collection, it is determined whether the rights and interests are subject to flow-limit collection based on the number of the rights and interests collected, the number of the rights and interests written off, and the budget information of the rights and interests in the entered activities; if it is determined that the rights and interests are subject to flow-limit collection, the collection strategy of the rights and interests is adjusted, and it is determined that the rights and interests collection fails and the failure of the rights and interests collection is prompted through the user interface; if it is predicted that the rights and interests are not subject to flow-limit collection, it is determined that the rights and interests are not subject to flow-limit collection, and it is determined that the rights and interests are successfully collected and the success of the rights and interests collection is prompted through the user interface; or, If the first indication information is used to indicate that the rights and interests are not subject to flow restriction, it is determined that the rights and interests are successfully collected and the user interface prompts that the rights and interests are successfully collected; if the first indication information is used to indicate that the rights and interests are subject to flow restriction, it is determined that the rights and interests are failed to be collected and the user interface prompts that the rights and interests are failed to be collected.

4. The method according to any one of claims 1 to 3, characterized in that: The real-time monitoring of the cancellation flow of each equity ID and synchronizing the equity ID of the successfully cancelled second equity to the big data center so that the big data center updates the number of the second equity cancelled, includes: For each benefit ID, in response to a request from a second user to apply for cancellation of the benefit, determine whether the second user has successfully cancelled the benefit according to the cancellation fuse information of the benefit obtained from the big data center or the second indication information received and sent by the big data center; wherein the cancellation fuse information of the benefit is determined by the amount of the benefit cancelled and the fuse warning configuration information, and the fuse warning configuration information is pre-configured or dynamically updated based on the amount of the benefit cancelled and the budget information of the benefit in the effective activity; If the equity is successfully written off, the equity ID of the equity is sent to the big data center, so that the big data center increases the number of the second equity written off by 1; wherein the equity that is successfully written off is used as the second equity; If the equity is not successfully written off, a prompt message indicating that the equity is not successfully written off is displayed through the user interface.

5. The method according to claim 4, characterized in that The determining whether the second user successfully cancels the rights and interests according to the cancellation fuse information of the rights and interests obtained from the big data center or the second indication information sent by the received big data center includes: Based on the information of the equity obtained from the big data center, it is predicted whether the equity is melted and written off; if it is predicted that the equity is melted and written off, it is determined whether the equity is melted and written off according to the amount of the equity being melted and written off and the budget information of the equity in the entered activity; if it is determined that the equity is melted and written off, the write-off strategy of the equity is adjusted, and it is determined that the equity write-off fails and the equity write-off failure is prompted through the user interface; if it is predicted that the equity is not melted and written off, it is determined that the equity is not melted and written off, and it is determined that the equity write-off is successful and the equity write-off is successful and prompted through the user interface; or, If the second indication information is used to indicate that the equity has not been written off by the circuit breaker, it is determined that the equity write-off is successful and the success of the equity write-off is prompted through the user interface; if the second indication information is used to indicate that the equity has been written off by the circuit breaker, it is determined that the equity write-off has failed and the failure of the equity write-off is prompted through the user interface.

6. The method according to any one of claims 1 to 3, characterized in that: The method further comprises: In response to an activity entry application from an activity organizer, query an available budget from a big data center, and determine, based on the available budget, whether the available budget matches the entry activity landing business budget information; If there is a match, then after the approval is confirmed, the entered activity will be effective; If there is a mismatch, the event organizer will be prompted to re-fill in the event information through the budget system.

7. An information management method, characterized in that: Applied to a big data center, the method includes: Obtaining the equity ID of the first equity that has been successfully received from the business system in real time, and updating the number of the first equity that has been received; determining the flow limit information for receiving the first equity or determining the first indication information according to the number of the first equity that has been received and the flow limit warning configuration information, and sending the flow limit information or the first indication information to the business system, so that the business system determines whether the first equity is received with flow limit; and / or, Obtain the equity ID of the second equity that has been successfully written off from the business system in real time, and update the amount of the second equity that has been written off; determine the write-off fuse information of the second equity or determine the second indication information according to the amount of the second equity that has been written off and the fuse warning configuration information, and send the write-off fuse information or the second indication information to the business system, so that the business system determines whether the second equity has been written off by the fuse.

8. The method according to claim 7, characterized in that The flow limiting warning configuration information is pre-configured, or dynamically updated based on the number of the rights claimed, the number of the rights written off, and the budget information of the rights in the effective activities; and / or, The fuse warning configuration information is pre-configured or dynamically updated based on the amount of the equity written off and the budget information of the equity in the effective activities.

9. The method according to claim 7 or 8, characterized in that: The method further comprises: Obtain the approved activity budget information sent by the budget system; Among them, the activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength; wherein the activity preferential strength at least includes the associated rights and interests of the entered activity, and the associated rights and interests include at least one right, and one right corresponds to one right ID.

10. An information management method, characterized in that: Applied to a budget system, the method comprises: In response to a request from an event organizer to apply for an event budget, the entered event budget information is obtained, wherein the event budget information includes a total event budget amount, sub-event information, a funding ratio, and event preferential strength; wherein the event preferential strength includes at least associated rights and interests of the entered event, wherein the associated rights and interests include at least one right and interest, and one right and interest corresponds to one right and interest ID; Determining whether the activity budget information corresponding to the entered activity is reasonable according to the entered activity budget information; If it is reasonable, it is determined that the entered activity has been approved, and the entered activity budget information is synchronized to the big data center, so that the big data center monitors the activity budget information in real time to determine whether to adjust the associated equity collection strategy or the associated equity write-off strategy; If it is unreasonable, the review node will be returned to the node of the activity organizer to prompt the activity organizer that the activity budget review has failed, or to instruct the activity organizer to resubmit by modifying the activity budget information.

11. An information management device, characterized in that: Applied to business systems, including: An activity rights and interests visibility module is used to display the associated rights and interests of the entered activity through a user interface after determining that the entered activity is effective, wherein the associated rights and interests include at least one right and interests, and one right and interests corresponds to one right and interests ID; A rights collection monitoring module is used to monitor the collection flow of each rights ID in real time, and synchronize the rights ID of the first rights that have been successfully collected to the big data center, so that the big data center updates the number of first rights that have been collected, so as to provide the business system with data on whether the collection strategy of each right needs to be adjusted; and / or, The equity write-off monitoring module is used to monitor the write-off flow of each equity ID in real time, and synchronize the equity ID of the second equity that has been successfully written off to the big data center, so that the big data center updates the number of second equity written off, and provides the business system with data on whether the write-off strategy of each equity needs to be adjusted; The first interest and the second interest are both at least one of the associated interests.

12. An information management device, characterized in that: Applied to big data centers, including: The first processing module is used to obtain the equity ID of the first equity that has been successfully received from the business system in real time, and update the number of the first equity that has been received; determine the flow limit information for receiving the first equity or determine the first indication information according to the number of the first equity that has been received and the flow limit warning configuration information, and send the flow limit information or the first indication information to the business system, so that the business system determines whether the first equity is received with flow limit; and / or, The second processing module is used to obtain the equity ID of the second equity that has been successfully written off from the business system in real time, and update the amount of the second equity that has been written off; determine the write-off fuse information of the second equity or determine the second indication information according to the amount of the second equity that has been written off and the fuse warning configuration information, and send the write-off fuse information or the second indication information to the business system, so that the business system determines whether the second equity has been written off by the fuse.

13. An information management device, characterized in that: Applied to budget systems, including: An activity budget acquisition module is used to respond to an activity organizer's request for an activity budget and acquire the entered activity budget information, wherein the activity budget information includes the total amount of the activity budget, sub-activity information, investment ratio, and activity preferential strength; wherein the activity preferential strength at least includes the associated rights and interests of the entered activity, wherein the associated rights and interests include at least one right and interest, and one right and interest corresponds to one right and interest ID; The activity review module is used to determine whether the activity budget information corresponding to the entered activity is reasonable based on the entered activity budget information; if it is reasonable, it is determined that the entered activity has been reviewed and passed, and the entered activity budget information is synchronized to the big data center, so that the big data center can monitor the activity budget information in real time to determine whether to adjust the associated rights and interests collection strategy or the associated rights and interests write-off strategy; if it is unreasonable, the review node is returned to the node of the activity organizer to prompt the activity organizer that the activity budget review has failed, or to instruct the activity organizer to resubmit it by modifying the activity budget information.

14. An information management system, characterized in that: include: A business system, a big data center and a budget system, wherein the business system and the budget system are respectively connected to the big data center in communication; The business system is used to execute the method according to any one of claims 1 to 6; The big data center is used to execute the method according to any one of claims 7 to 9; The budget system is used to execute the method according to claim 10.

15. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 10.

16. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 10 when executed by a processor.

17. A computer program product, characterized in that The invention comprises a computer program, which implements the method according to any one of claims 1 to 10 when being executed by a processor.