Visual project construction cost measuring and calculating system and method
Through the project construction cost visual calculation system, the intelligent calculation language model is used to analyze the consumables consumption index of the construction project, solving the problems of lag in consumables management information and differential detection, realizing consumables abnormality analysis and early warning, and improving management efficiency.
Patent Information
- Application Number
- CN202411036655.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The consumables management methods of existing construction projects rely on manual records, resulting in delayed information updates, inability to promptly reflect actual usage, and inaccurately obtain and compare differences in consumables, making it difficult to detect and deal with potential abnormal losses.
The project construction cost visual calculation system is adopted to obtain consumables consumption index and construction production data, create an intelligent calculation language model, conduct intelligent calculation and visual display, and promptly discover abnormal usage of consumables.
It realizes timely comparison and analysis of the difference between the actual amount of consumables used and the required amount, timely discovers potential abnormal losses, and improves the data intuitiveness and decision-making efficiency of consumables management.
Smart Images

Figure CN119005897A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of construction management, relates to artificial intelligence language model technology, and specifically is a system and method for visually calculating project construction costs. Background Art
[0002] AI language models are software systems based on AI technology that can understand and generate human language text. These models learn the grammar, semantics, and context of language through large-scale data training, enabling them to automatically process and generate text content, including answering questions, writing articles, and conducting conversations. Their capabilities are constantly improving, and they can gradually understand and generate more complex and specialized language content, serving the application needs of various fields such as customer service, education, medical care, and law.
[0003] The existing consumables management methods for construction projects have the following defects:
[0004] 1. Consumables management often relies on manual records or periodic updates, resulting in delayed information updates and difficulty in reflecting actual usage in a timely manner;
[0005] 2. It is impossible to accurately obtain and compare the difference between the actual amount of consumables used and the actual amount of consumables required during construction, and it is impossible to timely discover and deal with potential abnormal consumable loss problems;
[0006] To this end, we propose a system and method for visually estimating project construction costs. Summary of the invention
[0007] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a system and method for visually calculating project construction costs. The present invention is based on obtaining the consumable consumption index corresponding to each construction consumable management cycle, obtaining consumable cycle consumption data, obtaining construction production data, and defining the consumable cycle consumption data and construction production data as project construction data, which is used to create an intelligent measurement language model according to the project construction data, and is used to perform intelligent measurement of the project construction data according to the intelligent measurement language model to obtain project intelligent measurement data, which is used to visualize the project intelligent measurement data and issue abnormal measurement result warnings.
[0008] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: A system and method for visually calculating project construction cost, and the specific working process of each module is as follows:
[0009] A data acquisition module is used to mark multiple construction consumables management cycles, respectively acquire the consumables consumption index corresponding to each construction consumables management cycle, obtain consumables cycle consumption data, acquire construction production data, and define the consumables cycle consumption data and construction production data as project construction data;
[0010] Model creation module, used to create intelligent measurement language model based on project building data;
[0011] An intelligent calculation module is used to perform intelligent calculation on the project building data according to the intelligent calculation language model to obtain the project intelligent calculation data;
[0012] The visualization module is used to visualize the project's intelligent measurement data and issue warnings on abnormal measurement results.
[0013] Furthermore, the data acquisition module acquires the project building data as follows:
[0014] During the construction of a construction project, p construction consumables management cycles are marked and named as the first to pth consumables management cycles;
[0015] Performing consumables detection on a first consumables management cycle to obtain a first consumables consumption index;
[0016] Repeat the process of obtaining the first consumable consumption index, and respectively calculate the consumable consumption indexes corresponding to the second to p-th consumable management periods to obtain the second to p-th consumable consumption indexes;
[0017] The first to pth consumable consumption indexes are defined as consumable cycle consumption data;
[0018] Obtain the construction type, process requirements and construction plan corresponding to the construction project, and obtain construction production data;
[0019] The consumables cycle consumption data and construction production data are defined as project construction data.
[0020] Furthermore, the data acquisition module acquires the first consumable consumption index as follows:
[0021] Obtaining a consumables purchase list corresponding to the first consumables management cycle;
[0022] Each day in the first consumables management cycle is respectively regarded as a consumables management sub-cycle, and they are respectively named as the first to the qth consumables management sub-cycles;
[0023] Performing a consumables fund analysis on the first consumables management sub-period to obtain a first consumables consumption fund value;
[0024] Acquire the consumable fund consumption values corresponding to the second to qth consumable management sub-periods respectively to obtain the second to qth consumable fund consumption values;
[0025] Accumulate the first to qth consumables fund consumption values to obtain the actual consumables fund usage corresponding to the first construction consumables management cycle, and name it the first cycle fund actual usage;
[0026] The number of construction workers on the construction site corresponding to the first to qth consumables management sub-periods is obtained respectively, and the first to qth construction worker number values are obtained. The first to qth construction worker number values are accumulated and calculated to obtain the number of construction workers corresponding to the first construction consumables management period, and it is named the first period construction worker number;
[0027] Acquire the actual construction area corresponding to the first consumables management cycle to obtain the actual construction area of the first cycle;
[0028] The first consumables consumption index is obtained by calculating the actual construction area of the first period, the number of construction personnel in the first period, and the actual use of funds in the first period;
[0029] The first consumable consumption index is calculated.
[0030] Furthermore, the data acquisition module acquires the actual usage of funds in the first cycle, as follows:
[0031] The consumables used in the first consumable management sub-cycle are named as first to j-th type consumables respectively, and the consumption of the first to j-th type consumables in the first management sub-cycle is obtained respectively to obtain the consumption of the first to j-th type consumables;
[0032] According to the consumables purchase list corresponding to the first consumables management cycle, the unit consumables price values corresponding to the first to j-th types of consumables are obtained to obtain the first to j-th consumables price values;
[0033] The first consumable capital consumption value corresponding to the first consumable management sub-period is obtained by calculating the first to j-th type consumable consumption amounts and the first to j-th consumable price values;
[0034] Acquire the consumable fund consumption values corresponding to the second to qth consumable management sub-periods respectively to obtain the second to qth consumable fund consumption values;
[0035] The first to qth consumables fund consumption values are accumulated to obtain the actual usage of consumables funds corresponding to the first construction consumables management cycle, and it is named the actual usage of funds in the first cycle.
[0036] Furthermore, the model creation module creates an intelligent estimation language model, as follows:
[0037] Obtain project construction data, and obtain construction production data based on the project construction data;
[0038] Using construction production data as a keyword, crawl multiple construction case data from the Internet and mark them as the first to a construction cases;
[0039] Perform text extraction on the first to ath construction cases, obtain the actual usage of consumables and the actual construction area corresponding to the first to ath construction cases, and obtain case construction text data;
[0040] Dividing the case construction text data into model training set data and model test set data according to a predetermined division ratio;
[0041] Create an AI model through the existing AI platform, and connect the model training set data and model test set data to the AI model through the API interface;
[0042] Use the model training set data to repeatedly train the AI model on question and answer until all model training set data has been trained at least once;
[0043] The artificial intelligence model is trained on question and answer using the model test set data, and the result text data of each training is obtained. The result text data is matched with the case construction text data corresponding to the test set until the matching result reaches the target matching rate. The artificial intelligence model whose matching result reaches the target matching rate is named the intelligent measurement language model.
[0044] Furthermore, the intelligent calculation module obtains the project intelligent calculation data as follows:
[0045] Obtain intelligent measurement language model;
[0046] Obtain project construction data, and obtain the actual construction area, number of construction workers, and duration of consumables management cycle corresponding to each consumables management cycle based on the project construction data;
[0047] Intelligently calculate the first consumables management cycle to obtain the first consumables consumption index calculation difference;
[0048] Repeat the process of obtaining the first consumable consumption index calculation difference, respectively obtain the consumable consumption index calculation differences corresponding to the second to p-th consumable consumption management periods, and obtain the second to p-th consumable consumption index calculation differences;
[0049] The difference between the first and pth consumable consumption indexes is defined as the project intelligent measurement data.
[0050] Furthermore, the intelligent calculation module obtains the calculated difference of the first consumable consumption index as follows:
[0051] Obtain the actual construction area, number of construction personnel, and duration of the consumables management cycle corresponding to the first consumables management cycle to obtain model input data;
[0052] Input the model input data into the intelligent calculation language model, obtain the content data output by the intelligent calculation language model, and obtain the calculated consumption of the first to b-th types of consumables;
[0053] Obtaining a first consumable consumption index;
[0054] The first consumable consumption index is obtained according to the project construction data, and the difference between the measured consumable consumption index and the first consumable consumption index is calculated to obtain the measured difference of the consumable consumption index corresponding to the first consumable management period, and it is named the first consumable consumption index measured difference.
[0055] Furthermore, the intelligent calculation module obtains the first consumable consumption index as follows:
[0056] According to the consumables purchase list corresponding to the first consumables management period, the consumables fund consumption values corresponding to the measured consumption of the first to b-th types of consumables are obtained to obtain the first to b-th types of consumables fund consumption values;
[0057] The calculated consumption of the first to b-th types of consumables, the capital consumption values of the first to b-th consumables, the actual construction area corresponding to the first consumable management period, and the number of construction personnel are calculated to obtain the calculated consumable consumption index corresponding to the first consumable management period;
[0058] Calculate the consumables consumption index.
[0059] Furthermore, the visualization module visualizes the project intelligent measurement data and issues warnings of abnormal measurement results, as follows:
[0060] Acquire the project intelligent measurement data, and establish an intelligent measurement plane histogram based on the project intelligent measurement data, with the first to p-th consumable management cycles as the horizontal coordinates and the first to p-th consumable consumption index measurement differences as the vertical coordinates;
[0061] The measurement result warning line is marked in the intelligent measurement plane histogram. When the histogram corresponding to the consumables management cycle in the intelligent measurement plane histogram is higher than the measurement result warning line, an abnormal measurement result warning is issued.
[0062] The present invention also provides a method for visually calculating project construction costs, which is applicable to the above system and includes the following specific steps:
[0063] Step S1: Obtain project building data;
[0064] Step S2: Create a language model based on the project building data to obtain an intelligent measurement language model;
[0065] Step S3: intelligently calculate the project building data according to the intelligent calculation language model to obtain project intelligent calculation data;
[0066] Step S4: Visualize the project intelligent measurement data and issue warnings on abnormal measurement results.
[0067] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0068] 1. The present invention creates a language model based on project construction data, performs intelligent calculation on the project construction data based on the intelligent calculation language model, obtains the difference in the consumables consumption index, and performs abnormal analysis on consumables, so as to obtain and compare the difference between the actual amount of consumables used and the actual amount of consumables required, and timely discover and deal with potential abnormal consumables loss problems;
[0069] 2. The present invention can make the consumables management data more intuitive and easy to understand by visually displaying the project intelligent measurement data and publishing the measurement results for abnormal warnings, so as to facilitate decision makers to discover abnormal usage of consumables in a timely manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0071] Figure 1 is the overall system block diagram of the present invention;
[0072] Figure 2 It is a diagram of the implementation steps of the present invention;
[0073] Figure 3 This is the intelligent calculation plane histogram of the present invention. DETAILED DESCRIPTION
[0074] Embodiment 1
[0075] See also Figure 1 , the present invention provides a technical solution: a project construction cost visualization calculation system, including a data acquisition module, a model creation module, an intelligent calculation module, a visualization module and a server, wherein the data acquisition module, the model creation module, the intelligent calculation module and the visualization module are respectively connected to the server;
[0076] The data acquisition module acquires the project building data;
[0077] During the construction of a construction project, p construction consumables management cycles are marked and named as the first to pth consumables management cycles;
[0078] It should be noted here that:
[0079] In this application, p is the quantity value corresponding to the marked construction consumables management cycle, and in this application, p is an integer greater than 0;
[0080] In this application, the start time node of the construction consumables management cycle is the time point when the consumables arrive at the construction site, and the end time node is the time point when the consumables arrive at the construction site next time. A construction consumables management cycle is specifically the time range for two consecutive consumables to arrive at the construction site;
[0081] In this application, consumables may be building materials such as cement, sandstone, bricks, tiles, etc.;
[0082] The consumables are detected in the first consumables management cycle to obtain the first consumables consumption index, which is as follows:
[0083] Obtaining a consumables purchase list corresponding to the first consumables management cycle;
[0084] Each day in the first consumables management cycle is respectively regarded as a consumables management sub-cycle, and they are respectively named as the first to the qth consumables management sub-cycles;
[0085] Performing a consumables fund analysis on the first consumables management sub-period to obtain a first consumables consumption fund value;
[0086] The details are as follows:
[0087] The consumables used in the first consumable management sub-cycle are named as first to j-th type consumables respectively, and the consumption of the first to j-th type consumables in the first management sub-cycle is obtained respectively to obtain the consumption of the first to j-th type consumables;
[0088] It should be noted here that:
[0089] In the present application, j is the number of consumable types used in the first consumable management sub-cycle, and j is an integer greater than 0;
[0090] According to the consumables purchase list corresponding to the first consumables management cycle, the unit consumables price values corresponding to the first to j-th types of consumables are obtained to obtain the first to j-th consumables price values;
[0091] The first consumable capital consumption value corresponding to the first consumable management sub-period is obtained by calculating the first to j-th type consumable consumption amounts and the first to j-th consumable price values;
[0092] The first consumables capital consumption value is calculated as follows:
[0093] Hzx=Hj1×Hx1+Hj2×Hx2+·······+Hjj×Hxj;
[0094] Among them, Hzx is the first consumables capital consumption value, Hj1 to Hjj are the first to j-th type of consumables consumption, and Hx1 to Hxj are the first to j-th consumables capital consumption values;
[0095] Acquire the consumable fund consumption values corresponding to the second to qth consumable management sub-periods respectively to obtain the second to qth consumable fund consumption values;
[0096] Accumulate the first to qth consumables fund consumption values to obtain the actual consumables fund usage corresponding to the first construction consumables management cycle, and name it the first cycle fund actual usage;
[0097] The number of construction workers on the construction site corresponding to the first to qth consumables management sub-periods is obtained respectively, and the first to qth construction worker number values are obtained. The first to qth construction worker number values are accumulated and calculated to obtain the number of construction workers corresponding to the first construction consumables management period, and it is named the first period construction worker number;
[0098] Acquire the actual construction area corresponding to the first consumables management cycle to obtain the actual construction area of the first cycle;
[0099] The first consumables consumption index is obtained by calculating the actual construction area of the first period, the number of construction personnel in the first period, and the actual use of funds in the first period;
[0100] Calculate the first consumable consumption index, the specific formula configuration is as follows:
[0101]
[0102] Among them, Xhz1 is the first consumables consumption index, Zjs1 is the actual use of funds in the first period, Ry1 is the number of construction personnel in the first period, Sm1 is the actual construction area in the first period, a1 and a2 are respectively the set proportional coefficients and a1 and a2 are both greater than 0;
[0103] Repeat the process of obtaining the first consumable consumption index, and respectively calculate the consumable consumption indexes corresponding to the second to p-th consumable management periods to obtain the second to p-th consumable consumption indexes;
[0104] The first to pth consumable consumption indexes are defined as consumable cycle consumption data;
[0105] Obtain the construction type, process requirements and construction plan corresponding to the construction project, and obtain construction production data;
[0106] Define the consumables cycle consumption data and construction production data as project construction data;
[0107] The data acquisition module acquires the project building data and transmits it to the model creation module and the intelligent measurement module;
[0108] The model creation module creates a language model based on the project building data to obtain an intelligent measurement language model;
[0109] Obtain project construction data, and obtain construction production data based on the project construction data;
[0110] Using construction production data as a keyword, crawl multiple construction case data from the Internet and mark them as the first to a construction cases;
[0111] Perform text extraction on the first to ath construction cases, obtain the actual usage of consumables and the actual construction area corresponding to the first to ath construction cases, and obtain case construction text data;
[0112] Dividing the case construction text data into model training set data and model test set data according to a predetermined division ratio;
[0113] It should be noted here that:
[0114] In the present application, the predetermined division ratio of the model training set data and the model test set data is three to seven;
[0115] It should be noted here that:
[0116] In this application, the construction case data involved here are the same as the project types involved in the construction consumables management cycle;
[0117] Create an AI model through the existing AI platform, and connect the model training set data and model test set data to the AI model through the API interface;
[0118] Use the model training set data to repeatedly train the AI model on question and answer until all model training set data has been trained at least once;
[0119] Use the model test set data to conduct question-answering training on the artificial intelligence model, obtain the result text data of each training, and perform text matching between the result text data and the case construction text data corresponding to the test set until the matching result reaches the target matching rate. The artificial intelligence model whose matching result reaches the target matching rate is named the intelligent measurement language model;
[0120] It should be noted here that:
[0121] The existing artificial intelligence platform involved here may be Chat GPT3.5;
[0122] The model creation module acquires the intelligent calculation language model and transmits it to the intelligent calculation module;
[0123] The intelligent calculation module performs intelligent calculation on the project building data according to the intelligent calculation language model to obtain the project intelligent calculation data;
[0124] Obtain intelligent measurement language model;
[0125] Obtain project construction data, and obtain the actual construction area, number of construction workers, and duration of consumables management cycle corresponding to each consumables management cycle based on the project construction data;
[0126] Intelligently calculate the first consumables management cycle to obtain the first consumables consumption index calculation difference;
[0127] The details are as follows:
[0128] Obtain the actual construction area, number of construction personnel, and duration of the consumables management cycle corresponding to the first consumables management cycle to obtain model input data;
[0129] Input the model input data into the intelligent calculation language model, obtain the content data output by the intelligent calculation language model, and obtain the calculated consumption of the first to b-th types of consumables;
[0130] According to the consumables purchase list corresponding to the first consumables management period, the consumables fund consumption values corresponding to the measured consumption of the first to b-th types of consumables are obtained to obtain the first to b-th types of consumables fund consumption values;
[0131] It should be noted here that:
[0132] In the present application, b is the number of consumable types calculated for the first consumable management cycle, and b is an integer greater than 0;
[0133] The calculated consumption of the first to b-th types of consumables, the capital consumption values of the first to b-th consumables, the actual construction area corresponding to the first consumable management period, and the number of construction personnel are calculated to obtain the calculated consumable consumption index corresponding to the first consumable management period;
[0134] Calculate the consumables consumption index. The specific formula is as follows:
[0135]
[0136] Among them, Xhzc is the calculated consumables consumption index corresponding to the first consumables management cycle, Lc1 to Lcb are the calculated consumption of the first to b-th types of consumables, Zx1 to Zxb are the capital consumption values of the first to b-th consumables, Ryc is the number of construction personnel corresponding to the first consumables management cycle, Smc is the actual construction area corresponding to the first consumables management cycle, and a1 and a2 are the set proportional coefficients;
[0137] Obtaining the first consumables consumption index according to the project construction data, calculating the difference between the measured consumables consumption index and the first consumables consumption index, obtaining the consumables consumption index measured difference corresponding to the first consumables management period, and naming it the first consumables consumption index measured difference;
[0138] Repeat the process of obtaining the first consumable consumption index calculation difference, respectively obtain the consumable consumption index calculation differences corresponding to the second to p-th consumable consumption management periods, and obtain the second to p-th consumable consumption index calculation differences;
[0139] The difference between the consumption index of the first to the pth consumables is defined as the project intelligent calculation data;
[0140] The intelligent measurement module acquires the project intelligent measurement data and transmits it to the visualization module;
[0141] The visualization module visualizes the project's intelligent measurement data and issues warnings on abnormal measurement results;
[0142] See also Figure 3 , obtain the project intelligent measurement data, and establish an intelligent measurement plane histogram based on the project intelligent measurement data, with the first to p-th consumable management cycles as the horizontal coordinates and the first to p-th consumable consumption index measurement differences as the vertical coordinates;
[0143] The measurement result warning line is marked in the intelligent measurement plane histogram. When the histogram corresponding to the consumables management cycle in the intelligent measurement plane histogram is higher than the measurement result warning line, an abnormal measurement result warning is issued.
[0144] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.
[0145] Embodiment 2
[0146] See also Figure 2 Based on another concept of the same invention, a method for visually calculating project construction costs is now proposed, including the following specific steps:
[0147] Step S1: Obtain project building data;
[0148] Step S11: During the construction of the construction project, p construction consumables management cycles are marked respectively and named as the first to pth construction consumables management cycles;
[0149] Step S12: performing consumables detection on the first consumables management cycle to obtain a first consumables consumption index;
[0150] The details are as follows:
[0151] Step S121: obtaining a consumables purchase list corresponding to the first consumables management cycle;
[0152] Step S122: each day in the first consumables management cycle is respectively regarded as a consumables management sub-cycle, and they are respectively named as the first to the qth consumables management sub-cycles;
[0153] Step S123: performing consumables fund analysis on the first consumables management sub-period to obtain a first consumables consumption fund value;
[0154] The details are as follows:
[0155] Step S1231: naming the consumables used in the first consumables management sub-cycle as first to j-th type consumables respectively, obtaining the consumption of the first to j-th type consumables in the first management sub-cycle respectively, and obtaining the consumption of the first to j-th type consumables;
[0156] Step S1232: acquiring the unit consumable price values corresponding to the first to j-th types of consumables respectively according to the consumable purchase list corresponding to the first consumable management period, and obtaining the first to j-th consumable price values;
[0157] Step S1233: Calculating the consumption of the first to j-th types of consumables and the first to j-th consumable price values to obtain a first consumable capital consumption value corresponding to the first consumable management sub-period;
[0158] The first consumables capital consumption value is calculated as follows:
[0159] Hzx=Hj1×Hx1+Hj2×Hx2+·······+Hjj×Hxj;
[0160] Among them, Hzx is the first consumables capital consumption value, Hj1 to Hjj are the first to j-th type of consumables consumption, and Hx1 to Hxj are the first to j-th consumables capital consumption values;
[0161] Step S124: acquiring the consumables fund consumption values corresponding to the second to qth consumables management sub-periods respectively, to obtain the second to qth consumables fund consumption values;
[0162] Step S125: Accumulate the first to qth consumables fund consumption values to obtain the actual usage of consumables funds corresponding to the first construction consumables management period, and name it as the first period fund actual usage;
[0163] Step S126: respectively obtain the number of construction workers on the construction site corresponding to the first to qth consumables management sub-periods, obtain the first to qth construction worker number values, accumulate the first to qth construction worker number values, obtain the number of construction workers corresponding to the first construction consumables management period, and name it the number of construction workers in the first period;
[0164] Step S127: Acquire the actual construction area corresponding to the first consumables management period to obtain the actual construction area of the first period;
[0165] Step S128: obtaining a first consumables consumption index by calculating the actual construction area in the first period, the number of construction personnel in the first period, and the actual amount of funds used in the first period;
[0166] Calculate the first consumable consumption index, the specific formula configuration is as follows:
[0167]
[0168] Among them, Xhz1 is the first consumables consumption index, Zjs1 is the actual use of funds in the first period, Ry1 is the number of construction personnel in the first period, Sm1 is the actual construction area in the first period, a1 and a2 are respectively the set proportional coefficients and a1 and a2 are both greater than 0;
[0169] Step S13: Repeat the process of obtaining the first consumable consumption index, and respectively calculate the consumable consumption indexes corresponding to the second to p-th consumable management cycles to obtain the second to p-th consumable consumption indexes;
[0170] Step S14: defining the first to pth consumable consumption indexes as consumable cycle consumption data;
[0171] Step S15: Obtain the construction type, process requirements and construction plan corresponding to the construction project to obtain construction production data;
[0172] Step S16: defining the consumables cycle consumption data and construction production data as project construction data;
[0173] Step S2: Create a language model based on the project building data to obtain an intelligent measurement language model;
[0174] Step S21: Acquire project building data, and acquire construction production data according to the project building data;
[0175] Step S22: crawling multiple construction case data from the Internet using construction production data as keywords, and marking them as first to a construction cases;
[0176] Step S23: extracting text from the first to the ath construction cases, obtaining the actual usage of consumables and the actual construction area corresponding to the first to the ath construction cases, and obtaining case construction text data;
[0177] Step S24: dividing the case construction text data into model training set data and model test set data according to a predetermined division ratio;
[0178] Step S25: Create an intelligent estimation language model, as follows:
[0179] Step S251: Create an artificial intelligence model through the existing artificial intelligence platform, and connect the model training set data and the model test set data to the artificial intelligence model through the API interface;
[0180] Step S252: repeatedly performing question-answering training on the artificial intelligence model using the model training set data until all model training set data have been trained at least once;
[0181] Step S253: Use the model test set data to conduct question-answering training on the artificial intelligence model, obtain the result text data of each training, and perform text matching on the result text data with the case construction text data corresponding to the test set until the matching result reaches the target matching rate, and name the artificial intelligence model whose matching result reaches the target matching rate as an intelligent measurement language model;
[0182] Step S3: intelligently calculate the project building data according to the intelligent calculation language model to obtain project intelligent calculation data;
[0183] Step S31: Obtaining an intelligent estimation language model;
[0184] Step S32: Acquire project construction data, and acquire the actual construction area, number of construction personnel, and duration of the consumables management cycle corresponding to each consumables management cycle according to the project construction data;
[0185] Step S33: intelligently calculate the first consumables management cycle to obtain a first consumables consumption index calculation difference;
[0186] The details are as follows:
[0187] Step S331: Acquire the actual construction area, number of construction personnel, and duration of the consumables management cycle corresponding to the first consumables management cycle to obtain model input data;
[0188] Step S332: inputting the model input data into the intelligent calculation language model, obtaining the content data output by the intelligent calculation language model, and obtaining the calculated consumption of the first to b-th types of consumables;
[0189] Step S333: acquiring the consumable capital consumption values corresponding to the measured consumption amounts of the first to b-th types of consumables respectively according to the consumable procurement list corresponding to the first consumable management period, and obtaining the first to b-th types of consumable capital consumption values;
[0190] Step S334: Calculate the calculated consumption of the first to b-th types of consumables, the capital consumption values of the first to b-th consumables, the actual construction area corresponding to the first consumable management period, and the number of construction personnel to obtain a calculated consumable consumption index corresponding to the first consumable management period;
[0191] Calculate the consumables consumption index. The specific formula is as follows:
[0192]
[0193] Among them, Xhzc is the calculated consumables consumption index corresponding to the first consumables management cycle, Lc1 to Lcb are the calculated consumption of the first to b-th types of consumables, Zx1 to Zxb are the capital consumption values of the first to b-th consumables, Ryc is the number of construction personnel corresponding to the first consumables management cycle, Smc is the actual construction area corresponding to the first consumables management cycle, and a1 and a2 are the set proportional coefficients;
[0194] Step S335: obtaining the first consumable consumption index according to the project building data, calculating the difference between the measured consumable consumption index and the first consumable consumption index, obtaining the consumable consumption index measured difference corresponding to the first consumable management period, and naming it the first consumable consumption index measured difference;
[0195] Step S34: Repeat the process of obtaining the first consumable consumption index calculation difference, respectively obtain the consumable consumption index calculation differences corresponding to the second to p-th consumable consumption index calculation differences of the second to p-th consumable consumption index calculation differences;
[0196] Step S35: defining the calculated difference of the first to pth consumable consumption index as project intelligent calculation data;
[0197] Step S4: The visualization module visualizes the project intelligent measurement data and issues an abnormal warning of the measurement results;
[0198] Step S41: Acquire project intelligent measurement data, and establish an intelligent measurement plane histogram with the first to p-th consumable management cycles as the horizontal coordinates and the first to p-th consumable consumption index measurement differences as the vertical coordinates according to the project intelligent measurement data;
[0199] Step S42: Mark the warning line of the measurement result in the intelligent measurement plane histogram. When the histogram corresponding to the consumables management cycle in the intelligent measurement plane histogram is higher than the warning line of the measurement result, an abnormal warning of the measurement result is issued.
[0200] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention; the preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods; obviously, many modifications and changes can be made according to the contents of this specification; this specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can well understand and use the present invention.
Claims
1. A visual calculation system for project construction cost, characterized in that: include: A data acquisition module is used to mark multiple construction consumables management cycles, respectively acquire the consumables consumption index corresponding to each construction consumables management cycle, obtain consumables cycle consumption data, acquire construction production data, and define the consumables cycle consumption data and construction production data as project construction data; Model creation module, used to create intelligent measurement language model based on project building data; An intelligent calculation module is used to perform intelligent calculation on the project building data according to the intelligent calculation language model to obtain the project intelligent calculation data; The visualization module is used to visualize the project's intelligent measurement data and issue warnings on abnormal measurement results.
2. A project construction cost visualization calculation system according to claim 1, characterized in that: The data acquisition module acquires the project building data, specifically as follows: During the construction of a construction project, p construction consumables management cycles are marked and named as the first to pth consumables management cycles; Performing consumables detection on a first consumables management cycle to obtain a first consumables consumption index; Repeat the process of obtaining the first consumable consumption index, and respectively calculate the consumable consumption indexes corresponding to the second to p-th consumable management cycles to obtain the second to p-th consumable consumption indexes; The first to pth consumable consumption indexes are defined as consumable cycle consumption data; Obtain the construction type, process requirements and construction plan corresponding to the construction project, and obtain construction production data; The consumables cycle consumption data and construction production data are defined as project construction data.
3. A project construction cost visualization calculation system according to claim 2, characterized in that: The data acquisition module acquires the first consumable consumption index as follows: Obtaining a consumables purchase list corresponding to the first consumables management cycle; Each day in the first consumables management cycle is regarded as a consumables management sub-cycle, and they are named as the first to the qth consumables management sub-cycles respectively; Performing a consumables fund analysis on the first consumables management sub-period to obtain a first consumables consumption fund value; The consumables fund consumption values corresponding to the second to qth consumables management sub-periods are respectively acquired to obtain the second to qth consumables fund consumption values; Accumulate the first to qth consumables fund consumption values to obtain the actual consumables fund usage corresponding to the first construction consumables management cycle, and name it the first cycle fund actual usage; The number of construction workers on the construction site corresponding to the first to qth consumables management sub-periods is obtained respectively, and the first to qth construction worker number values are obtained. The first to qth construction worker number values are accumulated and calculated to obtain the number of construction workers corresponding to the first construction consumables management period, and it is named the number of construction workers in the first period; Acquire the actual construction area corresponding to the first consumables management cycle to obtain the actual construction area of the first cycle; The first consumables consumption index is obtained by calculating the actual construction area of the first period, the number of construction personnel in the first period, and the actual use of funds in the first period; The first consumable consumption index is calculated.
4. A project construction cost visualization calculation system according to claim 3, characterized in that: The data acquisition module acquires the actual amount of funds used in the first cycle, as follows: The consumables used in the first consumables management sub-cycle are named as first to j-th type consumables respectively, and the consumption of the first to j-th type consumables in the first management sub-cycle is obtained respectively to obtain the consumption of the first to j-th type consumables; According to the consumables purchase list corresponding to the first consumables management cycle, the unit consumables price values corresponding to the first to j-th types of consumables are obtained to obtain the first to j-th consumables price values; The first consumable capital consumption value corresponding to the first consumable management sub-period is obtained by calculating the first to j-th type consumable consumption amounts and the first to j-th consumable price values; The consumables fund consumption values corresponding to the second to qth consumables management sub-periods are respectively acquired to obtain the second to qth consumables fund consumption values; The first to qth consumables fund consumption values are accumulated to obtain the actual usage of consumables funds corresponding to the first construction consumables management cycle, and it is named the actual usage of funds in the first cycle.
5. A project construction cost visualization calculation system according to claim 1, characterized in that: The model creation module creates an intelligent estimation language model, as follows: Obtain project construction data, and obtain construction production data based on the project construction data; Using construction production data as a keyword, crawl multiple construction case data from the Internet and mark them as the first to a construction cases; Perform text extraction on the first to ath construction cases, obtain the actual usage of consumables and the actual construction area corresponding to the first to ath construction cases, and obtain case construction text data; Dividing the case construction text data into model training set data and model test set data according to a predetermined division ratio; Create an AI model through the existing AI platform, and connect the model training set data and model test set data to the AI model through the API interface; Use the model training set data to repeatedly train the AI model on question and answer until all model training set data has been trained at least once; The artificial intelligence model is trained on question and answer using the model test set data, and the result text data of each training is obtained. The result text data is matched with the case construction text data corresponding to the test set until the matching result reaches the target matching rate. The artificial intelligence model whose matching result reaches the target matching rate is named the intelligent measurement language model.
6. A project construction cost visualization calculation system according to claim 1, characterized in that: The intelligent calculation module obtains the project intelligent calculation data, as follows: Obtain intelligent measurement language model; Obtain project construction data, and obtain the actual construction area, number of construction workers, and duration of consumables management cycle corresponding to each consumables management cycle based on the project construction data; Intelligently calculate the first consumables management cycle to obtain the first consumables consumption index calculation difference; Repeat the process of obtaining the first consumable consumption index calculation difference, respectively obtain the consumable consumption index calculation differences corresponding to the second to p-th consumable consumption management periods, and obtain the second to p-th consumable consumption index calculation differences; The difference between the first and pth consumable consumption indexes is defined as the project intelligent measurement data.
7. A project construction cost visualization calculation system according to claim 6, characterized in that: The intelligent calculation module obtains the calculated difference of the first consumable consumption index as follows: Obtain the actual construction area, number of construction personnel, and duration of the consumables management cycle corresponding to the first consumables management cycle to obtain model input data; Input the model input data into the intelligent calculation language model, obtain the content data output by the intelligent calculation language model, and obtain the calculated consumption of the first to b-th types of consumables; Obtaining a first consumable consumption index; The first consumable consumption index is obtained according to the project construction data, and the difference between the measured consumable consumption index and the first consumable consumption index is calculated to obtain the measured difference of the consumable consumption index corresponding to the first consumable management period, and it is named the first consumable consumption index measured difference.
8. A project construction cost visualization calculation system according to claim 7, characterized in that: The intelligent calculation module obtains the first consumable consumption index as follows: According to the consumables purchase list corresponding to the first consumables management period, the consumables fund consumption values corresponding to the measured consumption of the first to b-th types of consumables are obtained to obtain the first to b-th types of consumables fund consumption values; The calculated consumption of the first to b-th types of consumables, the capital consumption values of the first to b-th consumables, the actual construction area corresponding to the first consumable management period, and the number of construction personnel are calculated to obtain the calculated consumable consumption index corresponding to the first consumable management period; Calculate the consumables consumption index.
9. A project construction cost visualization calculation system according to claim 1, characterized in that: The visualization module visualizes the project intelligent measurement data and issues abnormal warnings of measurement results, as follows: Acquire the project intelligent measurement data, and establish an intelligent measurement plane histogram based on the project intelligent measurement data, with the first to p-th consumable management cycles as the horizontal coordinates and the first to p-th consumable consumption index measurement differences as the vertical coordinates; The measurement result warning line is marked in the intelligent measurement plane histogram. When the histogram corresponding to the consumables management cycle in the intelligent measurement plane histogram is higher than the measurement result warning line, an abnormal measurement result warning is issued.
10. A method for visually calculating project construction costs, applicable to a system for visually calculating project construction costs as claimed in any one of claims 1 to 9, characterized in that: The calculation method comprises the following specific steps: Step S1: Obtain project building data; Step S2: Create a language model based on the project building data to obtain an intelligent measurement language model; Step S3: intelligently calculate the project building data according to the intelligent calculation language model to obtain project intelligent calculation data; Step S4: Visualize the project intelligent measurement data and issue warnings on abnormal measurement results.
Citation Information
Patent Citations
Building design material consumption evaluation system based on cloud computing
CN115062919A
House building construction material prediction method and system
CN116821859A
Construction progress and cost prediction method and device, equipment and storage medium
CN116976700A
Large-screen report rapid building and displaying method based on data warehouse
CN117575475A
Building material consumption monitoring management system and management method thereof
CN117910923A