Landslide disaster insurance per capita rate evaluation method and device based on landslide disaster event set, and storage medium
By constructing a landslide disaster event set and combining the physical and mechanical parameters of soil and rock with a rainfall-induced disaster model, the subjectivity problem in determining the average premium rate for geological disaster insurance in existing technologies has been solved, and the accurate assessment and risk quantification of the average premium rate for landslide disaster insurance have been achieved.
Patent Information
- Application Number
- CN202411043312.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-22
AI Technical Summary
Existing methods for determining the average premium rate for geological disaster insurance are highly subjective and cannot effectively reflect the number of casualties or economic losses that may be caused by geological disasters. They are difficult to quantify and accurately support the risk assessment and premium rate determination of insurance losses, and do not fully consider the actual frequency, scale and potential loss characteristics of geological disasters.
Based on the landslide disaster event set, a normal or log-normal distribution model is established by calculating the coefficient of variation and skewness coefficient of the physical and mechanical parameters of the soil and rock mass. Combined with the rainfall-induced disaster probability model, long-term time series simulation is carried out to obtain the landslide event set and calculate the total economic and property losses and the per capita cost rate.
It has enabled accurate assessment of the per capita premium rate for landslide disaster insurance, improved the quantification and accuracy of the assessment, and can scientifically quantify the economic and property losses and casualties that may be caused by geological disasters, supporting the accurate quantification of insurance risks and disaster prevention and mitigation work.
Smart Images

Figure CN119006179A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of geological disaster insurance, and in particular to a method, device and storage medium for evaluating per capita premium rate of landslide disaster insurance based on a landslide disaster event set. Background Art
[0002] my country is located in the eastern part of the Eurasian continent. Affected by the movement of the Pacific Plate, the Indian Plate and the Eurasian Plate, China has strong seismic activity, complex topography and geological conditions, and is prone to frequent and multiple geological disasters. According to incomplete statistics from the Ministry of Natural Resources, in the past 10 years, the economic and property losses caused by geological disasters each year account for about 27% of the losses caused by all types of natural disasters in the country, and the average annual direct economic losses caused by geological disasters are about 4 billion yuan, which poses a serious threat to my country's economic and social development, especially the safety of life and property in areas prone to geological disasters. The number of known landslide disasters in my country accounts for 80% of all known geological disaster hazards, and more than 90% of casualties and economic and property losses are caused by landslide disasters. However, due to the fact that the development of geological disaster insurance in my country is currently restricted by key technical issues such as the difficulty in accurately calculating insurance premiums, geological disaster insurance lacks continuous evaluation and simulation based on long-term series, and it is difficult to support the probability-based insurance loss risk assessment. The existing calculation methods mostly use the comprehensive risk index method to reflect the relative level of risk, but do not effectively reflect the number of casualties or economic losses that may be caused by geological disasters, and it is difficult to quantitatively and accurately support insurance loss risk assessment and insurance premium setting.
[0003] The implementation of geological disaster insurance is of great significance in reducing people's losses, giving full play to the post-disaster relief function of disaster insurance, and balancing government pressure. Its core lies in the scientific quantification of the economic and property losses that may be caused by geological disasters in a certain area and the precise determination of the per capita rate of personnel in areas threatened by geological disasters or high-risk areas on this basis. The present invention intends to construct a landslide disaster event set construction technology that can realize the determination of per capita landslide disaster insurance rates.
[0004] In the process of implementing the present invention, the inventors found that there are at least the following problems in the prior art:
[0005] At present, there is no relevant research that clearly proposes a technical method for determining the per capita premium rate of geological disaster insurance. The main methods used are comprehensive index methods or index-based methods, which are highly subjective and uncertain. They cannot effectively reflect the number of casualties or economic losses that may be caused by geological disasters, and it is difficult to quantitatively and accurately support the determination of the per capita premium rate of geological disaster insurance. The main reasons are:
[0006] 1. The triggering standard for geological disaster insurance is based on the measurement index of other disaster types. The existing technical methods do not effectively consider the actual frequency, scale, potential losses and other characteristics of geological disasters, so it is impossible to achieve quantitative and scientific calculation of the losses that may be caused;
[0007] Second, the determination of economic and property losses caused by geological disasters mostly adopts empirical models or statistical fitting models, which do not take into account the physical mechanism characteristics of disaster occurrence and the differential characteristics of spatial random distribution of physical strength of rock and soil bodies. In addition, this method is highly dependent on historical disaster data. In most cases, historical data is limited and has obvious regional characteristics. The calculation method and model are difficult to be promoted and applied, and the assessment error of the possible losses caused by geological disasters is large;
[0008] 3. The determination of per capita rate is mainly determined by the government finances of the year, the total number of households in the jurisdiction and the historical disaster loss statistics in the area. It does not fully take into account the triggering characteristics of geological disasters, and does not fully consider the economic and property losses that may be caused by geological disasters. The rate calculation results and methods have strong uncertainty.
[0009] Therefore, a method, device and storage medium for evaluating the per capita premium rate of landslide disaster insurance based on a landslide disaster event set are needed to at least partially solve the above technical problems. Summary of the invention
[0010] In view of this, an embodiment of the present invention provides a method, device and storage medium for evaluating per capita premium rate of landslide disaster insurance based on a landslide disaster event set, so as to solve at least one of the problems in the prior art.
[0011] The embodiment of the present invention provides a method for evaluating the per capita premium rate of landslide disaster insurance based on a landslide disaster event set, and the evaluation method comprises the following steps:
[0012] Based on the measured physical and mechanical data of a certain number of rock and soil units in the target study area, the coefficient of variation and skewness coefficient are calculated;
[0013] According to the results of the coefficient of variation and the coefficient of skewness, a probability model of the physical strength parameters of the rock and soil mass that conforms to the normal distribution function or the log-normal distribution function is established, and the physical and mechanical simulation data of the rock and soil mass of a preset number of groups of each grid unit are randomly obtained;
[0014] The safety factor is calculated for each grid unit multiple times based on the obtained physical and mechanical simulation data of the rock and soil body, and the instability probability of each grid unit is obtained according to the calculated safety factor result;
[0015] According to the instability probability of all grid cells, the instability probability of the corresponding slope cells is obtained;
[0016] The rainfall disaster probability model of the target study area was determined by logistic regression analysis based on historical landslide disaster events and historical daily rainfall data in the same period and region, and the rainfall disaster probability was obtained;
[0017] Based on the instability probability of slope units and the probability of rainfall disaster, the spatiotemporal coupled instability probability of the corresponding slope units is obtained;
[0018] The long-term simulation is performed based on the probability of spatiotemporal coupled instability meeting the preset conditions to obtain a set of landslide events of the corresponding slope unit in the future preset time period;
[0019] Based on the economic property distribution data of the slope units at the corresponding positions and corresponding times in the set of landslide events, the total amount of economic property losses caused by the landslide in a preset time period is obtained;
[0020] Based on the total economic property losses and the number of all potentially threatened persons covered by landslide disaster insurance, the quantitative results of the per capita premium assessment for landslide disaster insurance within the preset time period are calculated using the average apportionment method.
[0021] In a second aspect, an embodiment of the present invention further provides an electronic device, the electronic device comprising:
[0022] The coefficient calculation module is used to calculate the coefficient of variation and the coefficient of skewness based on the measured physical and mechanical data of a certain number of rock and soil bodies in the slope units of the target study area;
[0023] A simulation data acquisition module is used to establish a probability model of rock and soil physical strength parameters that conforms to the characteristics of a normal distribution function or a log-normal distribution function according to the results of the coefficient of variation and the coefficient of skewness, and randomly acquire a preset number of groups of rock and soil physical and mechanical simulation data for each divided grid unit;
[0024] A grid unit instability probability acquisition module is used to calculate the safety factor for each grid unit multiple times based on the acquired geotechnical physical and mechanical simulation data, and obtain the instability probability of each grid unit according to the calculated safety factor result;
[0025] A slope unit instability probability acquisition module is used to obtain the instability probability of the corresponding slope unit according to the instability probability of all grid units;
[0026] The rainfall disaster probability acquisition module is used to determine the rainfall disaster probability model of the target study area based on the logistic regression analysis of historical landslide disaster events and historical daily rainfall data in the same period and region, and obtain the rainfall disaster probability;
[0027] The slope unit landslide probability acquisition module is used to obtain the spatiotemporal coupled instability probability of the corresponding slope unit based on the instability probability of the slope unit and the probability of rainfall disaster;
[0028] A landslide event set acquisition module is used to perform long-term simulation based on the probability of spatiotemporal coupled instability satisfying preset conditions, and obtain a set of landslide events of the corresponding slope unit within a preset time period in the future;
[0029] An economic property loss acquisition module is used to obtain the total amount of economic property losses caused by landslides within a preset time period based on the economic property distribution data of slope units at corresponding positions and corresponding times in a set of landslide events;
[0030] The per capita rate assessment module is used to calculate the quantitative results of the per capita rate assessment of landslide disaster insurance within a preset time period based on the total economic property losses and the number of all potentially threatened persons covered by landslide disaster insurance, using the average allocation method.
[0031] In a third aspect, an embodiment of the present invention further provides a device for evaluating per capita premium rate of landslide disaster insurance based on a landslide disaster event set, the evaluation device comprising:
[0032] A memory for storing computer executable instructions;
[0033] The processor is used to implement the evaluation method described in the above technical solution when executing the computer executable instructions stored in the memory.
[0034] In a fourth aspect, an embodiment of the present invention further provides a storage medium storing computer instructions, wherein the computer instructions are used to enable the computer to execute the evaluation method according to the above technical solution.
[0035] In a fifth aspect, an embodiment of the present invention further provides a computer program product, comprising computer instructions, which, when executed by a processor, implement the steps of the evaluation method of the above technical solution.
[0036] According to the method for assessing the per capita premium rate of landslide disaster insurance based on a landslide disaster event set in an embodiment of the present invention, a method for constructing a landslide event set is proposed, which can achieve quantitative assessment of the spatial location and time of landslide disasters within a certain simulated preset time period, and combine the economic property status and population distribution characteristics of landslide-prone areas in the region to achieve accurate assessment of the per capita premium rate of landslide disaster insurance, which plays an important supporting role in achieving accurate quantification of landslide disaster risks in a certain area, assessing the spatial distribution and size of risks, and scientifically deploying disaster prevention and mitigation work.
[0037] Additional advantages, purposes, and features of the present invention will be described in part in the following description, and will become apparent to those skilled in the art after studying the following, or may be learned from the practice of the present invention. The purposes and other advantages of the present invention may be achieved and obtained by the structures specifically indicated in the specification and the accompanying drawings.
[0038] Those skilled in the art will appreciate that the objectives and advantages that can be achieved with the present invention are not limited to the above specific description, and the above and other objectives that can be achieved by the present invention will be more clearly understood from the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of this application, and do not constitute a limitation of the present invention. The components in the drawings are not drawn to scale, but are only for illustrating the principles of the present invention. In order to facilitate the illustration and description of some parts of the present invention, the corresponding parts in the drawings may be enlarged, that is, they may become larger relative to other components in the exemplary device actually manufactured according to the present invention. In the drawings:
[0040] Figure 1 is a flow chart of an evaluation method according to an embodiment of the present invention;
[0041] Figure 2 It is a schematic diagram of establishing a probability model of physical strength parameters of a first or second type of rock and soil mass in an evaluation method according to an embodiment of the present invention;
[0042] Figure 3 A schematic diagram of the conversion between the instability probability of a grid unit and the instability probability of a slope unit in an evaluation method according to an embodiment of the present invention;
[0043] Figure 4 A histogram of the instability probability density distribution of the slope unit and a corresponding probability density function fitting diagram in the evaluation method of one embodiment of the present invention;
[0044] Figure 5 A histogram of the probability density distribution of rainfall-induced disasters and a corresponding probability density function fitting diagram in an evaluation method according to an embodiment of the present invention;
[0045] Figure 6 A flow chart of a method for determining the spatiotemporal coupling instability probability of a slope unit in an evaluation method according to an embodiment of the present invention;
[0046] Figure 7 A schematic diagram of a framework of an electronic device according to an embodiment of the present invention;
[0047] Figure 8 FIG. 4 is a schematic diagram of an evaluation device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.
[0049] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the solutions according to the present invention are shown in the accompanying drawings, while other details that are not closely related to the present invention are omitted.
[0050] It should be emphasized that the term “include / comprises” when used herein refers to the presence of features, elements, steps or components, but does not exclude the presence or addition of one or more other features, elements, steps or components.
[0051] It should also be noted that, unless otherwise specified, the term “connection” herein may refer not only to a direct connection but also to an indirect connection involving an intermediate.
[0052] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the accompanying drawings, the same reference numerals represent the same or similar components, or the same or similar steps.
[0053] First, refer to Figure 1 The following describes a method 100 for evaluating the per capita premium rate of landslide disaster insurance based on a landslide disaster event set according to an embodiment of the present application. Figure 1 As shown, the landslide disaster insurance per capita rate assessment method 100 based on the landslide disaster event set may include the following steps:
[0054] In step S110, the coefficient of variation and the coefficient of skewness are calculated based on a certain number of measured physical and mechanical data of rock and soil masses of slope units in the target study area.
[0055] In step S120, a probability model of rock and soil physical strength parameters conforming to a normal distribution function or a log-normal distribution function is established according to the results of the coefficient of variation and the coefficient of skewness, and the physical and mechanical simulation data of the rock and soil of a preset number of groups of each divided grid unit are randomly obtained.
[0056] In step S130, the safety factor is calculated for each grid unit multiple times based on the acquired physical and mechanical simulation data of the rock and soil mass, and the instability probability of each grid unit is obtained according to the calculated safety factor.
[0057] In step S140, the instability probability of the corresponding slope unit is obtained according to the instability probability of all grid units.
[0058] In step S150, a rainfall disaster probability model for the target study area is determined based on logistic regression analysis of historical landslide disaster events and historical daily rainfall data for the same period and region to obtain the rainfall disaster probability.
[0059] In step S160, based on the instability probability of the slope unit and the probability of rainfall disaster, the spatiotemporal coupled instability probability of the corresponding slope unit is obtained.
[0060] In step S170, a long-term simulation is performed based on the spatiotemporal coupled instability probability of the slope unit satisfying a preset condition, to obtain a set of landslide events of the corresponding slope unit within a preset time period in the future.
[0061] In step S180, based on the economic property distribution data of the slope units at the corresponding positions and corresponding times in the set of landslide events, the total amount of economic property losses caused by the landslide within a preset time period is obtained.
[0062] In step S190, based on the total economic property losses and the number of all potentially threatened persons covered by landslide disaster insurance, a quantitative result of the per capita landslide disaster insurance rate assessment within a preset time period is calculated by an average allocation method.
[0063] In the embodiments of the present application, firstly, by carrying out the instability calculation of the landslide unit based on the coefficient of variation model and the skewness coefficient model, the spatial probability information of the landslide instability damage is obtained, and the long-term simulated rainfall data and the historical data of rainfall-induced landslide disasters in the area are combined to obtain the time probability information of rainfall-induced landslides, thereby completing the construction of the landslide disaster event set, and further superimposing the regional economic property distribution data to refine the economic property losses caused by the landslide during the simulated rainfall time; by calculating the number of people in the landslide-prone area, the quantitative calculation result of the per capita landslide disaster insurance rate without considering the insurance company's operating cost assumption is obtained according to the average allocation method.
[0064] From the description of the above process, it can be seen that the evaluation method 100 according to the embodiment of the present application, compared with the traditional method, effectively solves the problems of the existing comprehensive index-based method, such as insufficient consideration of the temporal and spatial information of landslide occurrence, insufficient consideration of the size of economic losses caused by landslides within a certain area, and insufficient consideration of the number of potential threatened people in the area, resulting in the calculation results of per capita insurance premiums being highly subjective, with large errors, poor quantification, and weak technical theoretical foundation. Therefore, this method has high universality and accuracy.
[0065] The contents of the above steps of the landslide disaster insurance per capita rate assessment method 100 based on a landslide disaster event set according to an embodiment of the present application will be described in detail below.
[0066] In an embodiment of the present application, in step S110, the coefficient of variation and the coefficient of skewness are calculated based on a certain number of measured physical and mechanical data of rock and soil masses of slope units in the target study area.
[0067] Slope units generally refer to: spatial units formed by ridge lines and valley bottom lines, with consistent topographic and geological conditions (slope aspect, slope gradient, slope surface, flow direction, etc.), and with significantly different topographic and geological characteristics from adjacent slopes. Usually, slope units are the basic units in landslide stability assessment at a regional scale. They are obtained using the technical path of "indoor manual preliminary division + field investigation and revision". The target study area refers to the area to be assessed.
[0068] Generally speaking, a target study area can include multiple slope units. Take one of the slope units as an example, and the other slope units are treated in the same way. A certain number of measured data on the physical and mechanical properties of rock and soil are collected at different locations of the slope unit. For example, the number of collected data can be appropriately adjusted according to the size of the slope unit area, such as not less than 15 or 20 groups, such as 15 or 20 groups. Focus on collecting measured data on the physical and mechanical properties of different types of rock and soil bodies in typical disaster-prone strata and loose weathered layers overlying bedrock. Among them, each location or each group of measured data on the physical and mechanical properties of rock and soil bodies can include cohesion and internal friction angle.
[0069] Then, based on the measured physical and mechanical data of rock and soil, the coefficient of variation and skewness coefficient are calculated to evaluate the data quality and credibility.
[0070] Specifically, the coefficient of variation
[0071] Among them, σ is the standard deviation of the measured data of the physical mechanics of the rock and soil mass, and μ is the mean of the measured data of the physical mechanics of the rock and soil mass. The standard deviation and mean generally refer to the standard deviation and mean of the same type of data, such as the standard deviation and mean of the cohesion data, and the standard deviation and mean of the internal friction angle data.
[0072] Skewness coefficient
[0073] Where n is the number of measured data on the physical mechanics of the rock and soil mass, such as the 15 or 20 groups mentioned above. i is the corresponding measured data value of the physical mechanics of rock and soil.
[0074] Of course, before performing step S110, it is necessary to collect a corresponding amount of physical and mechanical data of the rock and soil body by actual measurement. The actual measurement and collection of data can be carried out using existing technical methods, which will not be described in detail here.
[0075] In an embodiment of the present application, in step S120, a first type (conforming to the normal distribution function) probability model of rock and soil physical strength parameters or a second type (conforming to the log-normal distribution function) probability model of rock and soil physical strength parameters is established according to the results of the coefficient of variation and the coefficient of skewness, and physical and mechanical simulation data of a preset number of groups of rock and soil for each divided grid unit are randomly obtained.
[0076] Specifically, it can be seen from step S110 that at least the coefficient of variation and skewness of cohesion, and the coefficient of variation and skewness of the internal friction angle can be obtained, so the first type of rock and soil physical strength parameter probability model or the second type of rock and soil physical strength parameter probability model corresponding to cohesion, and the first type of rock and soil physical strength parameter probability model or the second type of rock and soil physical strength parameter probability model corresponding to the internal friction angle can be obtained respectively.
[0077] Therefore, reference Figure 2 When the coefficient of variation of cohesion is less than 30% and the skewness coefficient is less than 0.025, the normal distribution is selected to construct the first type of rock and soil physical strength parameter probability model corresponding to cohesion. When the coefficient of variation of internal friction angle is ≥30% or the skewness coefficient is ≥0.025, the log-normal distribution is selected to construct the second type of rock and soil physical strength parameter probability model corresponding to internal friction angle.
[0078] Then, a 1:10,000 digital elevation model (DEM) can be generated based on the actual conditions of the slope units (or the target study area), and the slope units can be gridded in the DEM model into grid units of equal or unequal areas. The generation of a 1:10,000 digital elevation model (DEM) based on the actual conditions of the slope units (or the target study area) adopts the existing technology in the field and is not described here.
[0079] Among them, regarding the extraction of slope units in the DEM model, the extraction method based on the analysis of the hydrological process of the forward and reverse DEM is the method currently adopted in most studies. This method uses commercial software such as ArcGIS to analyze the surface hydrological process of DEM. The main steps include generating a depression-free DEM, extracting flow direction and runoff accumulation, generating a river network, extracting the forward and reverse catchment basins, and merging catchment basins.
[0080] Then, using the probability models of soil physical strength parameters established for cohesion and internal friction angle respectively, Monte Carlo sampling is used to randomly extract data for each grid unit to obtain a preset number of groups of rock and soil physical and mechanical simulation data (cohesion and internal friction angle), for example, 10,000 groups or other numbers of cohesion and internal friction angle simulation data are obtained for each grid unit.
[0081] The evaluation method of this embodiment uses uncertainty theory methods such as Monte Carlo sampling models in combination with coefficient of variation and skewness coefficient through this step and step S110, and is used for regional scale landslide disaster risk assessment, which is of great significance for reducing the spatial variability of soil strength characteristics, the result errors caused by insufficient total amount, density and spatial coverage of measured data, improving the reliability of evaluation calculations, and improving the prediction ability of the method. Therefore, based on the collection of measured data on the physical mechanics of rock and soil, statistical analysis of typical disaster-prone soil strength parameters (cohesion, internal friction angle) data is carried out to obtain statistical analysis results (mean value, variance) based on normal distribution or lognormal distribution, and further obtain the frequency of occurrence of different values of rock and soil strength parameters, providing data support for subsequent probability-based safety factor calculations.
[0082] In an embodiment of the present application, in step S130, the safety factor is calculated for each grid unit multiple times based on the acquired physical and mechanical simulation data of the rock and soil body, and the instability probability of each grid unit is obtained according to the calculated safety factor.
[0083] Continuing from the above, assuming that each grid unit obtains 10,000 sets of cohesion and internal friction angle simulation data, and each set of cohesion and internal friction angle simulation data is used to perform a safety factor calculation on the corresponding grid unit, that is, 10,000 safety factor calculations are performed on each grid unit, and 10,000 safety factor results can be obtained.
[0084] Specifically, the infinite slope model, which is relatively mature in theory, clear in physical meaning, widely recognized and widely used at the regional scale, is used to calculate the safety factor F based on the physical mechanics mechanism to characterize the slope stability without considering the influence of groundwater level changes on the model parameters. The calculation method is as follows:
[0085]
[0086] Among them, c' is effective cohesion, γ is soil weight, z is potential sliding surface depth, β is slope gradient, and φ' is effective internal friction angle. c' and φ' are simulated data of the preset number group obtained randomly as mentioned above, and other data can be obtained by existing technical means such as survey and investigation data.
[0087] When F≤1, the slope is considered unstable, i.e., landslide may occur. When F>1, the slope is considered stable.
[0088] According to the results of multiple calculations of the safety factor, the number of occurrences of F≤1 and F>1 corresponding to each grid unit is counted to obtain the instability probability of each grid unit = the number of occurrences of F≤1 / the number of calculations of the safety factor.
[0089] In an embodiment of the present application, in step S140 , the instability probability of the corresponding slope unit is obtained according to the instability probability of all grid units.
[0090] refer to Figure 3 On the basis of the calculation results of the instability probability of the grid unit, the area-weighted summation method can be used to calculate and assign the instability probability based on the grid unit to the corresponding slope unit according to a weight ratio of 1:1, and the instability probability based on the grid unit can be converted into the instability probability result based on the slope unit, and the instability probability result of the corresponding slope unit in the target study area can be calculated.
[0091] By adopting the method in this step, the calculated instability probability results of the slope units in the target study area are more accurate.
[0092] In an embodiment of the present application, in step S150, a rainfall disaster probability model for the target study area is determined based on logistic regression analysis of historical landslide disaster events and historical daily rainfall data for the same period and region to obtain the rainfall disaster probability.
[0093] In addition to the rainfall on the day, the rainfall factor that induces landslides should also consider the precipitation data from the 1st day to the kth day before the landslide occurs. Assume that under the influence of the rainfall factor, the probability of a landslide occurring is 1, and the probability of no landslide occurring is 0.
[0094] First, before performing this step S150, it is necessary to obtain a rainfall disaster probability model for the target study area. Generally, the target study area is collected and statistically analyzed by collecting historical landslide disaster events and historical rainfall data, and performing a logistic regression analysis based on historical landslide disaster events and historical daily rainfall data in the same period and region, thereby obtaining a rainfall disaster probability model for the target study area. The logistic regression analysis can adopt existing technology and will not be described in detail here.
[0095] Based on the rainfall disaster probability model of the target study area, the rainfall disaster probability p2 is obtained as follows:
[0096] The probability of rainfall causing disasters on a certain day, p2, is obtained based on the rainfall causing disasters probability model determined by logistic regression analysis;
[0097]
[0098] Where k is the number of days of precipitation data before the landslide occurs, j = 0, 1, 2, ..., k, β j is the effective rainfall coefficient on the jth day before the landslide occurs, x j is the rainfall on the jth day before the landslide occurs, and x0=1.
[0099] By fitting the model and inputting different k values, the precipitation 6 days before the landslide was finally measured as input, which is most relevant to the probability of rainfall-induced landslide. Precipitation exceeding 6 days has little effect on the model, so k is generally taken as 6.
[0100] Among them, the values of effective rainfall coefficients 6 days before the landslide occurred are as follows:
[0101] Table 1 Effective rainfall coefficient
[0102] coefficient Numeric <![CDATA[β0]]> -0.2773453095 <![CDATA[β1]]> -0.0041925177 <![CDATA[β2]]> 0.0118063341 <![CDATA[β3]]> 0.0040427760 <![CDATA[β4]]> -0.0015853220 <![CDATA[β5]]> 0.0060062115 <![CDATA[β6]]> 0.0008037461
[0103] Therefore, based on the above rainfall disaster probability model, we can predict the probability of rainfall disasters p2 every day within a preset time period in the future, such as the probability of rainfall disasters every day for half a year, a year or many years.
[0104] In an embodiment of the present application, in step S160, the spatiotemporal coupled instability probability of the corresponding slope unit is obtained based on the instability probability of the slope unit and the probability of rainfall disaster.
[0105] Specifically, refer to Figure 6 , considering the correlation between the instability probability of slope units and the probability of rainfall disasters, the Copula function model can be used to establish the joint distribution function relationship. The specific process is as follows:
[0106] 1) Fitting the probability density function of the instability probability of the slope unit
[0107] The density distribution of the instability probability of the slope unit can be fitted using Python's scipy.stats, and it can be concluded that the instability probability conforms to the exponential distribution, and its probability density function (i.e., the first probability density function) is:
[0108]
[0109] Where λ = 0.21. Figure 4 , which is the instability probability density distribution histogram of the slope unit and the corresponding probability density function fitting diagram.
[0110] 2) Fitting the probability density function of rainfall-induced disaster probability
[0111] We can use Python's scipy.stats to fit the density distribution of the probability of rainfall-induced disasters, and find that the probability of rainfall-induced disasters conforms to the normal distribution, and its probability density function (i.e., the second probability density function) is:
[0112]
[0113] Among them, μ′=0.481, σ′ 2 =0.055. refer to Figure 5, which is the probability density distribution histogram of rainfall-induced disasters and the corresponding probability density function fitting diagram.
[0114] 3) Select the Copula function by comparing the significance
[0115] The Archimedean Copula function does not require marginal distribution, can better fit the correlation between indicators and is easy to calculate, so it is often widely used. This paper selects three common types of Copula functions: Clayton Copula, Gumbel Copula and Frank Copula, establishes the joint distribution function of instability probability and rainfall disaster probability, and uses the maximum likelihood estimation method to obtain the relevant parameter values; calculates its KS statistic and root mean square error value as follows:
[0116]
[0117] As shown in the table above, all three Copula functions can pass the KS test. According to the minimum mean square error (RSME) criterion, Clayton Copula is selected as the link function to fit the joint distribution of the instability probability of the slope unit and the probability of rainfall disaster.
[0118] 4) Integrate the first probability density function and the second probability density function respectively to obtain the corresponding first cumulative distribution function u(p1) and second cumulative distribution function v(p2).
[0119] The first cumulative distribution function u(p1) and the second cumulative distribution function v(p2) are respectively the integrals of the first probability density function and the second probability density function, which are common calculations in the field of mathematics and will not be elaborated here.
[0120] 5) Calculate the spatiotemporal coupled instability probability P(p1, p2) of each slope unit under the influence of rainfall
[0121] Based on the above steps, this paper adopts the Clayton Coupla function, and the landslide probability can be expressed as:
[0122]
[0123]
[0124] It can be seen that the spatiotemporal coupled instability probability P(p1, p2) of each slope unit, or the landslide probability P(p1, p2) of the slope unit, takes into account both the instability probability of the slope unit, that is, determines the specific location information of the landslide, and the probability of rainfall disasters, that is, determines the specific time information of the possible landslide.
[0125] In the embodiment of the present application, in step S170, a long time series simulation is performed based on the probability of spatiotemporal coupling instability satisfying a preset condition to obtain a set of landslide events of the corresponding slope unit within a preset time period in the future.
[0126] Setting P(p1, p2)>0.5 indicates that this time corresponds to a landslide event. When P(p1, p2)>0.5, a long-term simulation is performed, such as 100 years or other time, to obtain each landslide event in the preset time period in the future, forming a set of landslide events in the preset time period. Of course, the value of 0.5 can also be adjusted appropriately according to the situation.
[0127] In an embodiment of the present application, in step S180, based on the economic property distribution data of the slope units at the corresponding positions and corresponding times in the set of landslide events, the total amount of economic property losses caused by the landslide within a preset time period is obtained.
[0128] Specifically, as can be seen from the above, the slope unit landslide probability P(p1, p2) not only takes into account the instability probability of the slope unit, that is, determines the specific location information of the landslide, but also combines the probability of rainfall disasters, that is, determines the specific time information of the possible occurrence of landslides.
[0129] Based on the aggregate results of landslide events within the preset time period, the specific slope unit location information and time information of the landslide were obtained. Furthermore, by spatially superimposing the economic property distribution data at the corresponding time in the target study area, according to the basic principle that the economic property within the scope of landslide damage is regarded as all losses, the total amount of economic property losses that may be caused by landslides within the preset time period of the simulation was quantitatively calculated.
[0130] In an embodiment of the present application, in step S190, based on the total economic property losses and the number of all potentially threatened persons covered by landslide disaster insurance, a quantitative result of the per capita landslide disaster insurance rate assessment within a preset time period is calculated by an average apportionment method.
[0131] Based on the above calculation results of economic property losses, in accordance with the basic coverage principle of landslide disaster insurance for all potential threatened persons (it is considered that within a specific administrative area, people distributed in areas with high landslide disaster risk are the main covered persons of landslide disaster insurance, and people living in plain areas or areas with low landslide risk are not considered as potential persons covered by landslide disaster insurance), by calculating the number of people in areas with high landslide risk, the quantitative calculation result of the per capita landslide disaster rate is obtained by using the average allocation method (the total potential economic property loss value divided by the number of all potential threatened persons) without considering the assumption of insurance company operating costs.
[0132] Based on the above description, the evaluation method according to the embodiment of the present application effectively solves the problem of insufficient quantification and refinement of the per capita premium rate of landslide disaster insurance, and solves the problems of insufficient consideration of the temporal and spatial information of landslide occurrence, insufficient consideration of the size of economic losses caused by landslides within a certain area, and insufficient consideration of the number of potential threatened people in the area (the population to be covered by landslide disaster insurance) in the existing comprehensive index-based method, resulting in strong subjectivity, large errors, poor quantification and weak technical theoretical foundation in the calculation results of the per capita insurance premium rate.
[0133] The above exemplary illustrates the evaluation method 100 according to the embodiment of the present application. Figure 7 Another aspect of the present application provides an electronic device 200 .
[0134] Reference Figure 2 An example electronic device 200 for implementing the evaluation method of the embodiment of the present application is described. The electronic device 200 may include a coefficient calculation module 210, a simulation data acquisition module 220, a grid unit instability probability acquisition module 230, a slope unit instability probability acquisition module 240, a rainfall disaster probability acquisition module 250, a slope unit landslide probability acquisition module 260, a landslide event set acquisition module 270, an economic property loss acquisition module 280, and a per capita rate evaluation module 290, wherein:
[0135] The coefficient calculation module is used to calculate the coefficient of variation and the coefficient of skewness based on the measured physical and mechanical data of a certain number of rock and soil bodies in the slope units of the target study area;
[0136] A simulation data acquisition module is used to randomly acquire a preset number of groups of rock and soil physical mechanics simulation data for each divided grid unit according to the first type of rock and soil physical strength parameter probability model or the second type of rock and soil physical strength parameter probability model established according to the results of the coefficient of variation and the coefficient of skewness;
[0137] A grid unit instability probability acquisition module is used to calculate the safety factor for each grid unit multiple times based on the acquired geotechnical physical and mechanical simulation data, and obtain the instability probability of each grid unit according to the calculated safety factor result;
[0138] A slope unit instability probability acquisition module is used to obtain the instability probability of the corresponding slope unit according to the instability probability of all grid units;
[0139] The rainfall disaster probability acquisition module is used to determine the rainfall disaster probability model of the target study area based on the logistic regression analysis of historical landslide disaster events and historical daily rainfall data in the same period and region, and obtain the rainfall disaster probability;
[0140] The slope unit landslide probability acquisition module is used to obtain the spatiotemporal coupled instability probability of the corresponding slope unit based on the instability probability of the slope unit and the probability of rainfall disaster;
[0141] A landslide event set acquisition module is used to perform long-term simulation based on the slope unit landslide probability meeting the preset conditions, and obtain a set of landslide events within a preset time period in the future;
[0142] An economic property loss acquisition module is used to obtain the total amount of economic property losses caused by landslides within a preset time period based on the economic property distribution data of slope units at corresponding positions and corresponding times in a set of landslide events;
[0143] The per capita premium rate assessment module is used to calculate the per capita premium rate assessment result of landslide disaster insurance within a preset time period based on the total economic property losses and the number of all potentially threatened persons under landslide disaster insurance, using the average allocation method.
[0144] The electronic device 200 proposed in the present application avoids the inaccuracy and large error of single indicator evaluation, and can achieve rapid and efficient evaluation of the per capita premium rate of landslide disaster insurance.
[0145] refer to Figure 8 , the evaluation device 300 for implementing the evaluation method according to the embodiment of the present application includes a processor 310 and a memory 320. The evaluation device 300 may include one or more processors 310 and one or more memories 320. The memory 320 stores an executable program run by the processor 310, and when the executable program is run by the processor 310, the processor 310 executes the evaluation method 100 according to the embodiment of the present application described above.
[0146] The processor 310 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the evaluation device 300 to perform desired functions.
[0147] The memory 320 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 310 may run the program instructions to implement the client functions (implemented by the processor) in the embodiments of the present application described herein and / or other desired functions. Various applications and various data may also be stored in the computer-readable storage medium, such as various data used and / or generated by the application, etc.
[0148] The evaluation device 300 may also include an input device (not shown) and an output device (not shown), and these components are interconnected via a bus system (not shown) and / or other forms of connection mechanisms. Figure 3 The components and structures of the evaluation device 300 shown are merely exemplary and not restrictive. The evaluation device 300 may also have other components and structures as required.
[0149] The input device may be a device used by a user to input instructions, and may include one or more of a keyboard, a mouse, a microphone, a touch screen, etc. In addition, the input device may also be any interface for receiving information.
[0150] The output device may output various information (eg, images or sounds) to the outside (eg, a user), and may include one or more of a display, a speaker, etc. In addition, the output device may also be any other device with an output function.
[0151] Exemplarily, the example evaluation device 300 for implementing the evaluation method 100 according to the embodiment of the present application can be applied to terminal devices (such as mobile phones), tablet computers, laptops, ultra-mobile personal computers (ultra-mobile personal computers, UMPCs), handheld computers, netbooks, personal digital assistants (personal digital assistants, PDAs), wearable devices (such as smart watches, smart glasses or smart helmets, etc.), augmented reality (augmented reality, AR), virtual reality (virtual reality, VR) devices, smart home devices, car computers and other electronic devices, and the embodiments of the present application do not impose any restrictions on this.
[0152] Those skilled in the art can understand the specific operation of the evaluation device 300 for implementing the evaluation method according to the embodiment of the present application in combination with the contents described above. For the sake of brevity, the specific details are not repeated here, and only some main operations of the processor 310 are described.
[0153] In one embodiment of the present application, when the executable program is executed by the processor 310, the processor 310 executes the following steps: based on a certain number of measured physical and mechanical data of rock and soil bodies in the slope units of the target study area, the coefficient of variation and the coefficient of skewness are calculated; based on the results of the coefficient of variation and the coefficient of skewness, a probability model of the physical strength parameters of the rock and soil bodies that conforms to the normal distribution function or the log-normal distribution function is established, and the physical and mechanical simulation data of the rock and soil bodies of a preset number of groups for each divided grid unit are randomly obtained; based on the obtained physical and mechanical simulation data of the rock and soil bodies, the safety factor is calculated for each grid unit multiple times, and the instability probability of each grid unit is obtained according to the result of the calculated safety factor; the instability probability of the corresponding slope unit is obtained according to the instability probability of all grid units; based on The rainfall disaster probability model of the target study area was determined by logistic regression analysis of historical landslide disaster events and historical daily rainfall data in the same period and region, and the rainfall disaster probability was obtained; the spatiotemporal coupled instability probability of the corresponding slope unit was obtained based on the instability probability of the slope unit and the rainfall disaster probability; a long-term simulation was performed with the landslide probability of the slope unit meeting the preset conditions, and a set of landslide events within a preset time period in the future was obtained; the total economic property loss caused by the landslide within the preset time period was obtained based on the economic property distribution data of the slope units at each corresponding position and corresponding time in the set of landslide events; based on the total economic property loss and the number of all potentially threatened persons under landslide disaster insurance, the quantitative result of the per capita premium assessment of landslide disaster insurance within the preset time period was calculated by the average allocation method.
[0154] In one embodiment of the present application, when the executable program is executed by the processor 310, the processor 310 executes the following steps:
[0155] Establish a probability model of the physical strength parameters of the first type of rock and soil mass or a probability model of the physical strength parameters of the second type of rock and soil mass, and the specific contents include:
[0156] When the coefficient of variation is less than 30% and the skewness coefficient is less than 0.025, the normal distribution function is selected to construct the probability model of the physical strength parameters of the first type of rock and soil mass. When the coefficient of variation is ≥30% or the skewness coefficient is ≥0.025, the log-normal distribution function is selected to construct the probability model of the physical strength parameters of the second type of rock and soil mass.
[0157] In one embodiment of the present application, when the executable program is executed by the processor 310, the processor 310 executes the following steps:
[0158] The area-weighted summation method is used to calculate the instability probability based on the grid unit and assign it to the corresponding slope unit according to a weight ratio of 1:1, so that the instability probability of the grid unit is converted into the instability probability of the corresponding slope unit.
[0159] In addition, according to an embodiment of the present application, the present application further provides a storage medium, on which a computer program is stored, and when the computer program is run by a processor, it is used to perform the corresponding steps of the evaluation method of the embodiment of the present application. The storage medium may include, for example, a memory card of a smart phone, a storage component of a tablet computer, a hard disk of a personal computer, a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a portable compact disk read-only memory (CD-ROM), a USB memory, or any combination of the above storage media. The computer-readable storage medium may be any combination of one or more computer-readable storage media.
[0160] In addition, according to an embodiment of the present application, the present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement the steps of the evaluation method of the embodiment of the present application.
[0161] In addition, an embodiment of the present invention also provides a landslide disaster event prediction method, comprising the following steps:
[0162] Based on the measured physical and mechanical data of a certain number of rock and soil masses in the slope units of the target study area, the coefficient of variation and the coefficient of skewness are calculated.
[0163] According to the results of the coefficient of variation and the coefficient of skewness, a first type of rock and soil physical strength parameter probability model that conforms to the normal distribution function or a second type of rock and soil physical strength parameter probability model that conforms to the log-normal distribution function is established, and the physical and mechanical simulation data of the rock and soil of a preset number of groups of each divided grid unit are randomly obtained.
[0164] The safety factor of each grid unit is calculated multiple times based on the acquired physical and mechanical simulation data of the rock and soil mass, and the instability probability of each grid unit is obtained according to the result of the calculated safety factor.
[0165] The instability probability of the corresponding slope unit is obtained according to the instability probability of all grid units.
[0166] The rainfall disaster probability model of the target study area was determined by logistic regression analysis based on historical landslide disaster events and historical daily rainfall data in the same period and region, and the rainfall disaster probability was obtained.
[0167] Based on the instability probability of the slope unit and the probability of rainfall disaster, the spatiotemporal coupled instability probability of the corresponding slope unit is obtained.
[0168] The landslide disaster event is determined when the spatiotemporal coupled instability probability of the slope unit meets the preset conditions.
[0169] In addition, a landslide event set can be constructed based on all landslide hazard events.
[0170] The specific contents of the above steps are the same as some steps in the evaluation method provided in the embodiment of the present invention, and will not be repeated here.
[0171] Although example embodiments have been described herein with reference to the accompanying drawings, it should be understood that the above example embodiments are merely exemplary and are not intended to limit the scope of the present application to this. Those of ordinary skill in the art may make various changes and modifications therein without departing from the scope and spirit of the present application. All these changes and modifications are intended to be included within the scope of the present application as required by the appended claims.
[0172] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0173] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed.
[0174] In the description provided herein, a large number of specific details are described. However, it is understood that the embodiments of the present application can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.
[0175] Similarly, it should be understood that in order to streamline the present application and help understand one or more of the various application aspects, in the description of the exemplary embodiments of the present application, the various features of the present application are sometimes grouped together into a single embodiment, figure, or description thereof. However, the method of the present application should not be interpreted as reflecting the following intention: the claimed application requires more features than the features clearly stated in each claim. More specifically, as reflected in the corresponding claims, the inventive point is that the corresponding technical problem can be solved with features less than all the features of a single disclosed embodiment. Therefore, the claims following the specific embodiment are hereby explicitly incorporated into the specific embodiment, wherein each claim itself serves as a separate embodiment of the present application.
[0176] It will be understood by those skilled in the art that, except for mutually exclusive features, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this specification may be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature that provides the same, equivalent or similar purpose.
[0177] In addition, those skilled in the art will appreciate that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present application and form different embodiments. For example, in the claims, any one of the claimed embodiments can be used in any combination.
[0178] The various component embodiments of the present application can be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It should be understood by those skilled in the art that a microprocessor or digital signal processor (DSP) can be used in practice to implement some or all functions of some modules according to the embodiments of the present application. The application can also be implemented as a device program (e.g., computer program and computer program product) for executing a part or all of the methods described herein. Such a program implementing the present application can be stored on a computer-readable medium, or can have the form of one or more signals. Such a signal can be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.
[0179] It should be noted that the above embodiments illustrate the present application rather than limit the present application, and that those skilled in the art may design alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets should not be constructed as a limitation to the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "one" or "an" preceding an element does not exclude the presence of multiple such elements. The present application may be implemented by means of hardware including several different elements and by means of a suitably programmed computer. In a unit claim that lists several devices, several of these devices may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names.
[0180] The above is only a specific implementation or description of a specific implementation of the present application, and the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. The protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A landslide disaster insurance per capita rate assessment method based on a landslide disaster event set, characterized in that: The evaluation method comprises the following steps: Based on the measured physical and mechanical data of a certain number of rock and soil units in the target study area, the coefficient of variation and skewness coefficient are calculated; According to the results of the coefficient of variation and the coefficient of skewness, a probability model of the physical strength parameters of the rock and soil mass that conforms to the normal distribution function or the log-normal distribution function is established, and the physical and mechanical simulation data of the rock and soil mass of a preset number of groups of each grid unit are randomly obtained; The safety factor is calculated for each grid unit multiple times based on the obtained physical and mechanical simulation data of the rock and soil body, and the instability probability of each grid unit is obtained according to the calculated safety factor result; According to the instability probability of all grid cells, the instability probability of the corresponding slope cells is obtained; The rainfall disaster probability model of the target study area was determined by logistic regression analysis based on historical landslide disaster events and historical daily rainfall data in the same period and region, and the rainfall disaster probability was obtained; Based on the instability probability of slope units and the probability of rainfall disaster, the spatiotemporal coupled instability probability of the corresponding slope units is obtained; The long-term simulation is performed based on the probability of spatiotemporal coupled instability meeting the preset conditions to obtain a set of landslide events of the corresponding slope unit in the future preset time period; Based on the economic property distribution data of the slope units at the corresponding positions and corresponding times in the set of landslide events, the total amount of economic property losses caused by the landslide in a preset time period is obtained; Based on the total economic property losses and the number of all potentially threatened persons covered by landslide disaster insurance, the quantitative results of the per capita premium assessment for landslide disaster insurance within the preset time period are calculated using the average apportionment method.
2. The evaluation method according to claim 1, characterized in that: The calculation of the coefficient of variation and the coefficient of skewness specifically includes: Coefficient of variation Among them, σ is the standard deviation of the measured data of the physical mechanics of the rock and soil mass, and μ is the mean of the measured data of the physical mechanics of the rock and soil mass; Skewness coefficient Where n is the number of measured data on the physical mechanics of rock and soil, X i is the corresponding measured data value of the physical mechanics of rock and soil.
3. The evaluation method according to claim 1, characterized in that: Also includes: Establish a probability model of the physical strength parameters of the first type of rock and soil mass or a probability model of the physical strength parameters of the second type of rock and soil mass, and the specific contents include: When the coefficient of variation is less than 30% and the skewness coefficient is less than 0.025, the normal distribution function is selected to construct the probability model of the physical strength parameters of the first type of rock and soil mass. When the coefficient of variation is ≥30% or the skewness coefficient is ≥0.025, the log-normal distribution function is selected to construct the probability model of the physical strength parameters of the second type of rock and soil mass.
4. The evaluation method according to claim 1, characterized in that: The safety factor of each grid unit is calculated multiple times based on the obtained physical and mechanical simulation data of the rock and soil body, and the instability probability of each grid unit is obtained according to the calculated safety factor. The specific contents include: Calculating safety factor Where c′ is the effective cohesion, γ is the weight of the soil, z is the depth of the potential sliding surface, β is the slope gradient, and φ′ is the effective internal friction angle. When F≤1, the slope is considered unstable, that is, a landslide may occur. When F>1, the slope is considered stable. According to the results of multiple calculations of the safety factor, the number of occurrences of F≤1 and F>1 is counted to obtain the instability probability of each grid unit = the number of occurrences of F≤1 / the number of calculations of the safety factor.
5. The evaluation method according to claim 1, characterized in that: The instability probability of all grid cells in a slope cell is the instability probability of the corresponding slope cell, which specifically refers to: The area-weighted summation method is used to calculate the instability probability based on the grid unit and assign it to the corresponding slope unit according to a weight ratio of 1:1, so that the instability probability of the grid unit is converted into the instability probability of the slope unit.
6. The evaluation method according to claim 1, characterized in that: The rainfall disaster probability model for the target study area determined by logistic regression analysis based on historical landslide disaster events and historical daily rainfall data in the same period and region, and obtaining the rainfall disaster probability, specifically refers to: Based on the following rainfall disaster probability model, the probability of rainfall disaster on a certain day p2 is obtained; Where k is the number of days of precipitation data before the landslide occurs, j = 0, 1, 2, ..., k, β j is the effective rainfall coefficient on the jth day before the landslide occurs, x j is the rainfall on the jth day before the landslide occurs, and x0=1.
7. The evaluation method according to claim 1, characterized in that: The method of obtaining the landslide probability of the slope unit based on the instability probability of the slope unit and the probability of rainfall disaster includes: Fit the density distribution of the instability probability p1 of the slope unit to obtain the first probability density function Where, λ = 0.21; Fit the density distribution of rainfall disaster probability p2 to obtain the second probability density function Where, μ′=0.481, σ′ 2 =0.055; Integrate the first probability density function and the second probability density function respectively to obtain the corresponding first cumulative distribution function u(p1) and second cumulative distribution function v(p2); Obtaining the landslide probability of slope units P(p1,p2)={u(p1) -1.0473 +v(p2) -1.0473 -1} -0.9548 。 8. The evaluation method according to claim 1, characterized in that: Also includes: Based on the historical landslide disaster events and the historical daily rainfall data of the same period and the same region, the logistic regression analysis method was used to establish the rainfall disaster probability model of the target study area. and / or Obtain a certain number of measured physical and mechanical data of rock and soil masses in the slope units of the target study area.
9. A device for evaluating per capita landslide disaster insurance premium rate based on a landslide disaster event set, characterized in that: The evaluation device comprises: A memory for storing computer executable instructions; A processor, configured to implement the evaluation method according to any one of claims 1 to 8 when executing the computer executable instructions stored in the memory.
10. A storage medium storing computer instructions, wherein: The computer instructions are used to cause the computer to execute the evaluation method according to any one of claims 1 to 8.
Citation Information
Cited By
Landslide monitoring and early warning method and system based on digital twinborn technology
CN119920061A
Personnel evacuation risk-avoiding path planning method and device based on rainfall-induced landslide dynamic early warning, and storage medium
CN120252714A
Construction method and system of geological disaster early warning model and storage medium
CN120494217A