Community microgrid energy storage scheduling method

Through the analysis of the power consumption demand model of the community microgrid and the intelligent scheduling of energy storage facilities, the problem of mismatch between supply and demand of the community microgrid is solved, the stability and reliability of the power grid is improved, the cost of electricity is reduced, and the cost of electricity is promoted. Utilization of renewable energy.

CN119010039AActive Publication Date: 2024-11-22CHENGDU YUNDIAN LEXIANG TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411126407.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The existing community microgrid lacks intelligent regulation and emergency support capabilities and is unable to effectively meet diversified electricity demand, resulting in serious supply and demand problems, especially in terms of fluctuations in electricity loads and reliability.

Method used

Through the analysis of electricity demand mode, energy storage facility judgment, intelligent Internet of Things acquisition and unified access to the community microgrid platform, scheduling methods such as peak staggering and peak-cutting and flat valley scheduling are adopted to reasonably allocate electricity, increase energy storage facilities to cope with peak loads, and Use peak and valley electricity price spreads to obtain economic benefits.

Benefits of technology

It realizes effective management and control of different electricity consumption needs within the community, reduces electricity consumption fluctuations, improves grid stability and reliability, reduces grid failures and costs, improves user satisfaction, and promotes the utilization of renewable energy. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010039A_ABST
    Figure CN119010039A_ABST
Patent Text Reader

Abstract

The invention discloses a community micro-grid energy storage scheduling method, relates to the technical field of micro-grid energy storage, and effectively realizes effective management and control of different power demands in a community through demand investigation, data acquisition, butt joint of an energy storage system and a power utilization system, remote control of equipment and full-process management of micro-grid scheduling. Through peak shifting dispatching, emergency dispatching, peak clipping and flat valley dispatching, other intelligent dispatching and other methods, different electricity utilization requirements are met in a targeted mode, the overall electricity utilization fluctuation of a community power grid can be reduced, the risk of the community power grid is solved, certain economic benefits are obtained through peak and valley electricity price difference, reasonable electricity utilization dispatching and energy storage dispatching are achieved, and the energy utilization efficiency is improved. According to the method, the stability and reliability of the power grid can be improved, voltage fluctuation and power grid faults can be reduced, renewable energy sources can be better integrated, development and application of the renewable energy sources can be promoted, and energy transformation and sustainable development can be promoted through management and scheduling of the energy storage facilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of microgrid energy storage technology, and in particular to a community microgrid energy storage scheduling method. Background Art

[0002] With the diversification of community residents' lives, the demand for electricity has also diversified. In addition to basic electricity consumption for residents' lives, the community also extends to public areas, such as: greening, street lights, public lighting, such as parking lot lighting, new energy vehicle charging, community shops, important facilities, such as: elevators, power supply facilities, water supply facilities, fire protection facilities, etc., outdoor temporary electricity and other electricity needs. Therefore, a community microgrid energy storage scheduling method is needed.

[0003] Prior art, such as the invention patent application with announcement number CN117996797A, discloses a method for energy storage configuration and cooperative scheduling of a hydrogen-based community microgrid, which belongs to the field of comprehensive energy. This method is used to solve the mutual conversion of electricity and hydrogen, storage of electricity and hydrogen energy, and scheduling problems of cooperative sharing of electricity and hydrogen energy within hydrogen-based community microgrids including renewable energy, and the optimization configuration problems of electric energy storage systems and hydrogen energy storage systems. It can minimize social costs including infrastructure costs and operating costs, promote local consumption of renewable energy, and meet users' daily hydrogen needs. The heterogeneous energy storage and sharing cooperation framework and internal payment strategy based on optimal configuration obtained by the method provided by the present invention can ensure that all participants make profits, reduce total social costs, and improve user-friendliness of hydrogen filling.

[0004] With respect to the above scheme, the applicant of the present invention has found that the above technology has at least the following technical problems: 1. The above scheme lacks scheduling according to different electricity demands. Due to different requirements for electricity load, the requirements for electricity guarantee capabilities are also different. Most of the construction of community power supply and distribution facilities is built by developers, which only provide basic power supply and distribution facilities and do not have any intelligent regulation and emergency guarantee capabilities. The scheduling capacity of community power supply and distribution settings has indeed formed a more serious supply and demand problem with the increasing various electricity demands in the community, and it is also unable to further meet more community electricity demands.

[0005] 2. Since large and medium-sized industrial projects themselves will take into account the issues of power load fluctuation and reliability at the beginning of construction, they will be equipped with relevant intelligent power supply and distribution equipment and facilities, adopt smart grid dispatching systems, and even cooperate with new energy supporting facilities such as photovoltaics and energy storage. However, when building community power grids, more complex application scenarios are usually not considered, and they are unwilling to invest in smart grid dispatching systems. However, the current community electricity demand is becoming more and more diversified, and residential electricity demand should be the first priority at all times. Summary of the invention

[0006] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a community microgrid energy storage scheduling method.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions: The present invention provides a community microgrid energy storage scheduling method, including: Step 1, analysis of electricity demand pattern types: through investigation, field visits and surveys, confirm the electricity demand patterns of the target community, and obtain the electricity load, urgency and stability corresponding to each electricity demand pattern, and then analyze the electricity demand pattern type corresponding to each electricity demand pattern.

[0008] Step 2: Determine whether to increase energy storage facilities: Obtain the peak load value, peak load duration and load fluctuation amplitude corresponding to each electricity demand pattern type in each time period in the historical cycle, analyze and obtain the electricity load assessment coefficient corresponding to each electricity demand pattern type in each time period in the historical cycle, and then determine whether energy storage facilities need to be added in the future cycle.

[0009] Step 3: Analysis of power dispatch: Use IoT intelligent collection to connect to the community main transformer, and connect the management systems of various power facilities to the community microgrid platform. If no energy storage facilities are added, when the power load of the target community is insufficient during a certain period of time, the power demand parameter dispatch values ​​of each power facility in the target community during that period are analyzed, and the power facilities in that period are dispatched according to the corresponding power demand parameter dispatch values.

[0010] Step 4: Analysis of peak shaving and valley flattening scheduling: If energy storage facilities are added and connected to the community microgrid platform, when the power load of the target community is insufficient during a certain period of time, the power demand parameter scheduling values ​​of each power facility in the target community during that period are analyzed according to the analysis of power scheduling in step 3, and the peak shaving and valley flattening scheduling of the energy storage facilities during that period is analyzed.

[0011] Preferably, the determination of whether it is necessary to add energy storage facilities in future cycles is specifically determined as follows: C1. Compare the electricity load assessment coefficient corresponding to each electricity demand pattern type in each time period in the historical cycle with the set standard electricity load assessment coefficient of the electricity demand pattern type in the corresponding time period. If the electricity load assessment coefficient corresponding to a certain electricity demand pattern type in a certain time period in the historical cycle is less than or equal to the set standard electricity load assessment coefficient of the electricity demand pattern type in the corresponding time period, it is determined that it is not necessary to add energy storage facilities in the future cycle.

[0012] C2. If the electricity load assessment coefficient corresponding to a certain electricity demand pattern type in a certain period of time in the historical cycle is greater than the set standard electricity load assessment coefficient of the electricity demand pattern type in the corresponding period of time, it is determined that energy storage facilities need to be added in the future period.

[0013] Preferably, the scheduling value of the power demand parameters of each power facility in the target community during the period is analyzed, and the specific analysis process is as follows: D1. When the power load of the target community is insufficient during a period of time, the power demand of each power facility is assigned a corresponding weight value according to the basic weight corresponding to the power demand of each power facility set by the system, and the reduction amplitude corresponding to the power demand of each power facility is calculated according to the reduction amplitude formula when the load is insufficient: reduction amplitude = 1-weight value 2.

[0014] D2. Compare the reduction in power demand of each power-consuming facility with the reduction in power demand parameter dispatch value in the database. If the reduction in power demand of a certain power facility is the same as the reduction in power demand parameter dispatch value in the database, the power demand parameter dispatch value in the database will be used as the power demand parameter dispatch value for each power facility during that period.

[0015] D3. Arrange the reduction ranges corresponding to the power demand of each power consuming facility in order from small to large, and then prioritize the power demand parameter scheduling values ​​of each power consuming facility in that period in the order of the reduction ranges.

[0016] D4. When the power load of the target community is insufficient during a certain period of time and the charging load of new energy vehicles is large, the community microgrid connects with the new energy vehicle charging pile management system to regulate the peak power consumption of the charging piles and postpone most of the charging time to night and early morning.

[0017] Preferably, the peak shaving and valley flattening scheduling of the energy storage facilities in the time period is analyzed, and the specific analysis process is as follows: E1. When the power load of the target community is insufficient in a certain period of time, each energy storage facility needs to discharge, and each energy storage facility performs discharge scheduling for each power facility in the time period according to the power demand parameter scheduling value of each power facility.

[0018] E2. When the electricity load of the target community is normal during a certain period of time, each energy storage facility needs to be charged, and the charging costs corresponding to the normal electricity load in each period of the current cycle are obtained, and the charging cost cases corresponding to the normal electricity load in each period of the current cycle are arranged in order from small to large, so as to obtain the time periods with the lowest charging costs in the current cycle, and then charge each energy storage facility in the time periods with the lowest charging costs in the current cycle.

[0019] The beneficial effects of the present invention are as follows: 1. The present invention provides a community microgrid energy storage dispatching method, which effectively realizes the effective management and control of different electricity demands within the community through demand survey, data collection, energy storage system and power system docking, equipment remote control, and full-process management of microgrid dispatching. Through peak-shifting dispatching, emergency dispatching, peak-cutting and valley-flattening dispatching, and other intelligent dispatching methods, not only can different electricity demands be met in a targeted manner, but also the overall electricity fluctuation of the community power grid can be reduced, the risks of the community power grid can be resolved, and certain economic benefits can be obtained by using the peak-valley electricity price difference.

[0020] 2. The embodiments of the present invention can dispatch power facilities and energy storage facilities according to actual demand through analysis of different types of power demand patterns, reasonably distribute power, and improve the utilization efficiency of power. At the same time, the analysis of historical power load data can predict the fluctuation of future power demand, and timely determine whether it is necessary to increase energy storage facilities, thereby reducing the risk of power system operation. Reasonable power dispatching and energy storage dispatching can improve the stability and reliability of the power grid, reduce voltage fluctuations and the occurrence of power grid failures, and ensure the normal operation of the power grid. Through fine dispatching and management, the user's power experience can be improved, the power cost can be reduced, the stability and reliability of power consumption can be guaranteed, and the user satisfaction can be improved.

[0021] 3. The embodiments of the present invention can maximize the use of the energy of each facility, reasonably allocate electricity demand, improve the utilization efficiency of the facility, and facilitate peak-shaving and valley-flattening scheduling analysis by performing intelligent scheduling analysis on power facilities and energy storage facilities. When the power load is insufficient, the power of the energy storage facility can be released to avoid energy waste and improve energy utilization efficiency. Reasonable power scheduling and peak-shaving and valley-flattening scheduling can reduce the load on the power grid during peak hours and avoid electricity consumption during peak electricity price hours, thereby reducing the electricity cost of the community. Through the management and scheduling of energy storage facilities, renewable energy can be better integrated, its utilization rate can be improved, the development and application of renewable energy can be promoted, and energy transformation and sustainable development can be promoted. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 The present invention is a flowchart of the steps for implementing the method. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Embodiments of the present invention Figure 1 As shown, a community microgrid energy storage scheduling method includes: Step 1, analysis of electricity demand pattern types: through research, field visits and surveys, confirm the electricity demand patterns of the target community, and obtain the electricity load, urgency and stability corresponding to each electricity demand pattern, and then analyze the electricity demand pattern type corresponding to each electricity demand pattern.

[0026] In a specific embodiment, the power load, urgency and stability corresponding to each power demand mode are obtained, and the specific acquisition process is as follows: A1. Through real-time monitoring and data recording, each power demand mode is monitored using a smart meter, its power consumption is recorded, and the power consumption corresponding to each power demand mode is accumulated to obtain the power load of each power demand mode.

[0027] A2. Through communication with community residents, shops and relevant government departments, and through the formation of questionnaires, community residents, shops and relevant government departments are asked to fill in the questionnaires. The content of the questionnaires includes the urgency score and stability score corresponding to each electricity demand mode. The urgency score and stability score of each electricity demand mode corresponding to each questionnaire are averaged to obtain the average urgency score and stability score corresponding to each electricity demand mode. The average urgency score and stability score corresponding to each electricity demand mode are compared with the average values ​​of each urgency degree and each stability degree in the database, so as to obtain the urgency degree and stability degree corresponding to each electricity demand mode.

[0028] In another specific embodiment, the analysis of the electricity demand pattern type corresponding to each electricity demand pattern is as follows: the power load, urgency and stability corresponding to each electricity demand pattern are compared with the power load, urgency and stability corresponding to each electricity demand pattern type in the database; if the power load, urgency and stability corresponding to a certain electricity demand pattern are the same as the power load, urgency and stability corresponding to a certain electricity demand pattern type in the database, then the power demand pattern type in the database is recorded as the power demand pattern type corresponding to the power demand pattern.

[0029] It should be noted that the types of electricity demand patterns include stability-priority electricity demand pattern, heavy-load electricity demand pattern and smooth electricity demand pattern.

[0030] Step 2: Determine whether to increase energy storage facilities: Obtain the peak load value, peak load duration and load fluctuation amplitude corresponding to each electricity demand pattern type in each time period in the historical cycle, analyze and obtain the electricity load assessment coefficient corresponding to each electricity demand pattern type in each time period in the historical cycle, and then determine whether energy storage facilities need to be added in the future cycle.

[0031] In a specific embodiment, the peak load value, peak load duration and load fluctuation amplitude corresponding to each type of electricity demand pattern in each time period in the historical period are obtained. The specific acquisition process is as follows: B1. Obtain electricity consumption data in the historical period through the power company and the smart meter, and then draw the electricity load distribution and fluctuation diagram of the community based on the electricity consumption data in the historical period. By displaying the electricity load value on the time axis, a curve or bar chart is formed to represent the electricity load situation in different time periods.

[0032] B2. Through the power load distribution diagram, we can observe the peak power load values ​​that appear in each time period for each power demand pattern type in the historical cycle. The peak power load value is the peak load value, and then we can obtain the peak load values ​​corresponding to each power demand pattern type in each time period in the historical cycle.

[0033] B3. Determine the duration of each peak load by observing the duration of the time period corresponding to the peak load value of each electricity demand pattern type in each time period diagram in the historical cycle, and then obtain the peak load duration corresponding to each electricity demand pattern type in each time period in the historical cycle.

[0034] B4. Based on the electricity load fluctuation chart, the fluctuation of load values ​​in different time periods for each electricity demand pattern type in the historical period is observed, and the load fluctuation amplitude is calculated. The load fluctuation amplitude is the maximum difference in electricity load values ​​within a period of time to determine the load fluctuation amplitude, and then the load fluctuation amplitude corresponding to each electricity demand pattern type in each time period in the historical period is obtained.

[0035] In another specific embodiment, the analysis obtains the power load evaluation coefficient corresponding to each power demand pattern type in each time period in the historical period. The specific analysis process is as follows: the peak load value, peak load duration and load fluctuation amplitude corresponding to each power demand pattern type in each time period in the historical period are recorded as Z ig , X ig and V ig, where i represents the number corresponding to each power demand mode type, i=1,2...n, n is any integer greater than 2, g represents the number corresponding to each time period, g=1,2...u, u is any integer greater than 2, substitute into the calculation formula

[0036] The power load evaluation coefficient δ corresponding to each power demand pattern type in each period in the historical cycle is obtained. ig , where Z′, X′, and V′ are the standard peak load value, standard peak load duration, and standard load fluctuation range corresponding to the set power demand pattern type, respectively; η1, η2, and η3 are the weight factors corresponding to the peak load value, peak load duration, and load fluctuation range of the set power demand pattern type, respectively.

[0037] It should be noted that η1, η2, and η3 are greater than 0 and less than 1.

[0038] It should also be noted that through the summary of a large amount of research data and experimental data, professional institutions and research institutions set the standard peak load value, standard peak load duration, and standard load fluctuation range corresponding to the power demand pattern type. At the same time, based on the professional knowledge and research basis of experts in the field, they discuss and confirm with industry organizations or professional institutions. Experts set the weight factors corresponding to the peak load value of the power demand pattern type, the weight factors corresponding to the peak load duration, and the weight factors corresponding to the load fluctuation range based on their own experience and knowledge.

[0039] In another specific embodiment, the determination of whether it is necessary to add energy storage facilities in future cycles is carried out as follows: C1. Compare the power load assessment coefficient corresponding to each power demand pattern type in each time period in the historical cycle with the set standard power load assessment coefficient of the power demand pattern type in the corresponding time period. If the power load assessment coefficient corresponding to a certain power demand pattern type in a certain time period in the historical cycle is less than or equal to the set standard power load assessment coefficient of the power demand pattern type in the corresponding time period, it is determined that it is not necessary to add energy storage facilities in the future cycle.

[0040] C2. If the electricity load assessment coefficient corresponding to a certain electricity demand pattern type in a certain period of time in the historical cycle is greater than the set standard electricity load assessment coefficient of the electricity demand pattern type in the corresponding period of time, it is determined that energy storage facilities need to be added in the future period.

[0041] The embodiments of the present invention can dispatch power facilities and energy storage facilities according to actual demand through analysis of different types of power demand patterns, reasonably distribute power, and improve the utilization efficiency of power. At the same time, the analysis of historical power load data can predict the fluctuation of future power demand, and timely determine whether it is necessary to increase energy storage facilities, thereby reducing the risk of power system operation. Reasonable power dispatching and energy storage dispatching can improve the stability and reliability of the power grid, reduce the occurrence of voltage fluctuations and power grid failures, and ensure the normal operation of the power grid. Through fine dispatching and management, the user's power experience can be improved, the power cost can be reduced, the stability and reliability of power consumption can be guaranteed, and the user satisfaction can be improved.

[0042] Step 3: Analysis of power dispatch: Use IoT intelligent collection to connect to the community main transformer, and connect the management systems of various power facilities to the community microgrid platform. If no energy storage facilities are added, when the power load of the target community is insufficient during a certain period of time, the power demand parameter dispatch values ​​of each power facility in the target community during that period are analyzed, and the power facilities in that period are dispatched according to the corresponding power demand parameter dispatch values.

[0043] In a specific embodiment, the scheduling value of the power demand parameter of each power facility in the target community during the period is analyzed, and the specific analysis process is as follows: D1. When the power load of the target community is insufficient during a period of time, the power demand of each power facility is assigned a corresponding weight value according to the basic weight corresponding to the power demand of each power facility set by the system, and the reduction range corresponding to the power demand of each power facility is calculated according to the reduction range formula when the load is insufficient: reduction range = 1-weight value 2.

[0044] D2. Compare the reduction in power demand of each power-consuming facility with the reduction in power demand parameter dispatch value in the database. If the reduction in power demand of a certain power facility is the same as the reduction in power demand parameter dispatch value in the database, the power demand parameter dispatch value in the database will be used as the power demand parameter dispatch value for each power facility during that period.

[0045] D3. Arrange the reduction ranges corresponding to the power demand of each power consuming facility in order from small to large, and then prioritize the power demand parameter scheduling values ​​of each power consuming facility in that period in the order of the reduction ranges.

[0046] D4. When the power load of the target community is insufficient during a certain period of time and the charging load of new energy vehicles is large, the community microgrid connects with the new energy vehicle charging pile management system to regulate the peak power consumption of the charging piles and postpone most of the charging time to night and early morning.

[0047] It should be noted that when the load is insufficient, the system's reduction in the demand for electricity for this item = 1-weight value 2. The system's default basic weights are: residential electricity consumption: 0.85, electricity consumption for important facilities: 0.9, electricity consumption for charging new energy vehicles: 0.7, electricity consumption in public areas: 0.7, electricity consumption for public lighting: 0.65, electricity consumption for community shops: 0.45, and temporary outdoor electricity consumption: 0.3.

[0048] Step 4: Analysis of peak shaving and valley flattening scheduling: If energy storage facilities are added and connected to the community microgrid platform, when the power load of the target community is insufficient during a certain period of time, the power demand parameter scheduling values ​​of each power facility in the target community during that period are analyzed according to the analysis of power scheduling in step 3, and the peak shaving and valley flattening scheduling of the energy storage facilities during that period is analyzed.

[0049] In a specific embodiment, the peak shaving and valley flattening scheduling of the energy storage facilities in the time period is analyzed, and the specific analysis process is as follows: E1. When the power load of the target community is insufficient in a certain period of time, each energy storage facility needs to discharge, and each energy storage facility performs discharge scheduling for each power facility in the time period according to the power demand parameter scheduling value of each power facility.

[0050] E2. When the electricity load of the target community is normal during a certain period of time, each energy storage facility needs to be charged, and the charging costs corresponding to the normal electricity load in each period of the current cycle are obtained, and the charging cost cases corresponding to the normal electricity load in each period of the current cycle are arranged in order from small to large, so as to obtain the time periods with the lowest charging costs in the current cycle, and then charge each energy storage facility in the time periods with the lowest charging costs in the current cycle.

[0051] It should be noted that investment: energy storage battery purchase or leasing, energy storage system purchase or leasing; use: energy storage facilities are charged at low electricity prices during the low electricity consumption period of the community; discharge during the peak electricity consumption period or temporary important guarantee period of the community, such as: sudden power outage of important facilities; economic benefits: community peak-valley electricity price difference: taking a certain city as an example, it is currently about 0.6 yuan / kWh, and if it is sold to commercial businesses around the community, it is about 1.0 to 1.5 yuan / kWh; social benefits: for temporary emergency electricity needs, energy storage facilities can seamlessly provide emergency power supply for 2-8 hours; distributed energy storage: using new energy vehicle charging piles that support V2G technology in the community, with the authorization and consent of the owner, part of the electricity in the current idle new energy vehicles is reversely output to the community microgrid to achieve distributed energy storage. The advantage of distributed energy storage is that owners can enjoy a certain share of economic rights and interests during the discharge process.

[0052] The embodiments of the present invention can maximize the use of the energy of each facility, reasonably allocate electricity demand, improve the utilization efficiency of the facility, and facilitate peak-shaving and valley-flattening scheduling analysis by performing intelligent scheduling analysis on power facilities and energy storage facilities. When the power load is insufficient, the electric energy of the energy storage facility can be released to avoid energy waste and improve energy utilization efficiency. Reasonable power scheduling and peak-shaving and valley-flattening scheduling can reduce the load on the power grid during peak hours and avoid electricity consumption during peak electricity price hours, thereby reducing the electricity cost of the community. Through the management and scheduling of energy storage facilities, renewable energy can be better integrated, its utilization rate can be improved, the development and application of renewable energy can be promoted, and energy transformation and sustainable development can be promoted.

[0053] The present invention provides a community microgrid energy storage dispatching method, which effectively realizes the effective management and control of different electricity demands within the community through demand survey, data collection, energy storage system and power system docking, equipment remote control, and full process management of microgrid dispatching. Through peak-shifting dispatching, emergency dispatching, peak-cutting and valley-flattening dispatching, and other intelligent dispatching methods, not only can different electricity demands be met in a targeted manner, but also the overall electricity fluctuation of the community power grid can be reduced, the risks of the community power grid can be resolved, and certain economic benefits can be obtained by using the peak-valley electricity price difference.

[0054] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.

Claims

1. A community microgrid energy storage scheduling method, characterized in that: include: Step 1: Analysis of electricity demand pattern types: Through research, field visits and surveys, confirm the electricity demand patterns of the target community, and obtain the electricity load, urgency and stability corresponding to each electricity demand pattern, and then analyze the electricity demand pattern type corresponding to each electricity demand pattern; Step 2: Determine whether to increase energy storage facilities: Obtain the peak load value, peak load duration, and load fluctuation amplitude corresponding to each power demand pattern type in each period in the historical cycle, analyze and obtain the power load assessment coefficient corresponding to each power demand pattern type in each period in the historical cycle, and then determine whether energy storage facilities need to be added in the future cycle; Step 3: Analysis of power dispatch: Use the Internet of Things to intelligently collect and connect to the community main transformer, and connect the management systems of various power facilities to the community microgrid platform. If no energy storage facilities are added, when the power load of the target community is insufficient during a certain period of time, the power demand parameter dispatch values ​​of each power facility in the target community during that period are analyzed, and the power facilities of the power facility during that period are dispatched according to the corresponding power demand parameter dispatch values; Step 4: Analysis of peak shaving and valley flattening scheduling: If energy storage facilities are added and connected to the community microgrid platform, when the power load of the target community is insufficient during a certain period of time, the power demand parameter scheduling values ​​of each power facility in the target community during that period are analyzed according to the analysis of power scheduling in step 3, and the peak shaving and valley flattening scheduling of the energy storage facilities during that period is analyzed.

2. A community microgrid energy storage dispatching method as claimed in claim 1, characterized in that: The specific acquisition process of obtaining the power load, urgency and stability corresponding to each power demand mode is as follows: A1. Through real-time monitoring and data recording, use smart meters to monitor each power demand mode, record its power consumption, and accumulate the power consumption corresponding to each power demand mode to obtain the power load of each power demand mode; A2. Through communication with community residents, shops and relevant government departments, and through the formation of questionnaires, community residents, shops and relevant government departments are asked to fill in the questionnaires. The content of the questionnaires includes the urgency score and stability score corresponding to each electricity demand mode. The urgency score and stability score of each electricity demand mode corresponding to each questionnaire are averaged to obtain the average urgency score and stability score corresponding to each electricity demand mode. The average urgency score and stability score corresponding to each electricity demand mode are compared with the average values ​​of each urgency degree and each stability degree in the database, so as to obtain the urgency degree and stability degree corresponding to each electricity demand mode.

3. A community microgrid energy storage dispatching method as claimed in claim 2, characterized in that: The specific analysis process of analyzing the power demand pattern type corresponding to each power demand pattern is as follows: The power load, urgency and stability corresponding to each power demand pattern are compared with the power load, urgency and stability corresponding to each power demand pattern type in the database. If the power load, urgency and stability corresponding to a power demand pattern are the same as those corresponding to a power demand pattern type in the database, the power demand pattern type in the database is recorded as the power demand pattern type corresponding to the power demand pattern.

4. A community microgrid energy storage dispatching method as claimed in claim 3, characterized in that: The specific acquisition process of obtaining the peak load value, peak load duration and load fluctuation amplitude corresponding to each power demand mode type in each time period in the historical cycle is as follows: B1. Obtain electricity consumption data in the historical period through power companies and smart meters, and then draw the electricity load distribution and fluctuation diagram of the community based on the electricity consumption data in the historical period. By displaying the electricity load value on the time axis, a curve or bar chart is formed to represent the electricity load situation in different periods; B2. Through the power load distribution diagram, the peak power load value of each power demand pattern type in each time period in the historical cycle is observed. The peak power load value is the peak load value, and then the peak load value corresponding to each power demand pattern type in each time period in the historical cycle is obtained; B3. Determine the duration of each peak load by observing the duration of the time period corresponding to the peak load value of each power demand pattern type in each time period diagram in the historical cycle, and then obtain the peak load duration corresponding to each power demand pattern type in each time period in the historical cycle; B4. Based on the electricity load fluctuation chart, the fluctuation of load values ​​in different time periods for each electricity demand pattern type in the historical period is observed, and the load fluctuation amplitude is calculated. The load fluctuation amplitude is the maximum difference in electricity load values ​​within a period of time to determine the load fluctuation amplitude, and then the load fluctuation amplitude corresponding to each electricity demand pattern type in each time period in the historical period is obtained.

5. A community microgrid energy storage dispatching method as claimed in claim 4, characterized in that: The analysis obtains the power load assessment coefficient corresponding to each power demand pattern type in each time period in the historical cycle. The specific analysis process is as follows: The peak load value, peak load duration and load fluctuation amplitude corresponding to each type of electricity demand pattern in each period in the historical cycle are recorded as Z ig , X ig and V ig , where i represents the number corresponding to each power demand mode type, i=1,2...n, n is any integer greater than 2, g represents the number corresponding to each time period, g=1,2...u, u is any integer greater than 2, substitute into the calculation formula The power load evaluation coefficient δ corresponding to each power demand pattern type in each period in the historical cycle is obtained. ig , where Z′, X′, and V′ are the standard peak load value, standard peak load duration, and standard load fluctuation range corresponding to the set power demand pattern type, respectively; η1, η2, and η3 are the weight factors corresponding to the peak load value, peak load duration, and load fluctuation range of the set power demand pattern type, respectively.

6. A community microgrid energy storage dispatching method as claimed in claim 5, characterized in that: The specific process of judging whether to add energy storage facilities in the future cycle is as follows: C1. Compare the power load assessment coefficients corresponding to each power demand pattern type in each time period in the historical cycle with the set standard power load assessment coefficients of the power demand pattern type in the corresponding time period. If the power load assessment coefficients corresponding to a certain power demand pattern type in a certain time period in the historical cycle are all less than or equal to the set standard power load assessment coefficients of the power demand pattern type in the corresponding time period, it is determined that no energy storage facilities need to be added in the future cycle; C2. If the electricity load assessment coefficient corresponding to a certain electricity demand pattern type in a certain period of time in the historical cycle is greater than the set standard electricity load assessment coefficient of the electricity demand pattern type in the corresponding period of time, it is determined that energy storage facilities need to be added in the future period.

7. A community microgrid energy storage dispatching method as claimed in claim 6, characterized in that: The power demand parameter dispatching values ​​of each power facility in the target community during this period are analyzed, and the specific analysis process is as follows: D1. When the target community has insufficient electricity load during a certain period of time, the power demand of each power facility is assigned a corresponding weight value according to the basic weight corresponding to the power demand of each power facility set by the system, and the reduction range corresponding to the power demand of each power facility is calculated according to the reduction range formula when the load is insufficient: reduction range = 1-weight value 2; D2, and compare the reduction range of the power demand of each power facility with the reduction range of the power demand parameter dispatch value in the database. If the reduction range of the power demand of a certain power facility is the same as the reduction range of the power demand parameter dispatch value in the database, then the power demand parameter dispatch value in the database is used as the power demand parameter dispatch value of each power facility in the period; D3. Arrange the reduction ranges corresponding to the power demand of each power-consuming facility in order from small to large, and then prioritize the power demand parameter scheduling values ​​of each power-consuming facility in the period according to the order of the reduction ranges; D4. When the power load of the target community is insufficient during a certain period of time and the charging load of new energy vehicles is large, the community microgrid connects with the new energy vehicle charging pile management system to regulate the peak power consumption of the charging piles and postpone most of the charging time to night and early morning.

8. A community microgrid energy storage dispatching method as claimed in claim 7, characterized in that: The peak shaving and valley leveling scheduling of energy storage facilities during this period is analyzed, and the specific analysis process is as follows: E1. When the power load of the target community is insufficient during a certain period of time, each energy storage facility needs to discharge. Each energy storage facility will perform discharge scheduling for each power facility during that period according to the power demand parameter scheduling value of each power facility. E2. When the electricity load of the target community is normal during a certain period of time, each energy storage facility needs to be charged, and the charging costs corresponding to the normal electricity load in each period of the current cycle are obtained, and the charging cost cases corresponding to the normal electricity load in each period of the current cycle are arranged in order from small to large, so as to obtain the time periods with the lowest charging costs in the current cycle, and then charge each energy storage facility in the time periods with the lowest charging costs in the current cycle.

Citation Information

Patent Citations

  • Urban energy internet planning method adapting to electric energy substitution development strategy

    CN113052450A

  • Power dispatching method and device based on peak clipping potential

    CN114336651A

  • Power grid planning capacity analysis method considering schedulable flexible resource operation characteristics

    CN116402307A

  • Distribution area distributed energy storage resource interaction system

    CN117639034A

  • Multi-port input-output hybrid energy storage system and method

    CN118432152A

Cited By

  • Industrial and commercial energy storage system and energy storage scheduling method thereof

    CN120297710A

  • Industrial and commercial energy storage system and energy storage scheduling method thereof

    CN120297710B