Power grid control optimization system and method based on continuous optimization iteration

By adopting a continuous optimization and iteration method in the grid control system, combining topological models and real-time data monitoring, and dynamically adjusting the optimization strategy, the stability problem of the power grid in the rapidly changing scenarios is solved, and higher reliability and cost-effectiveness are achieved.

CN119010187AActive Publication Date: 2024-11-22BAZHOU POWER SUPPLY CO OF STATE GRID XINJIANG ELECTRIC POWER CO LTD

Patent Information

Application Number
CN202411159690.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-22
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

When the power grid faces rapidly changing electricity usage scenarios and diversified energy access scenarios, it is difficult to ensure the safety and quality of power supply, resulting in the impact of the stability and reliability of the control system.

Method used

Adopt a grid control system based on continuous optimization iteration, including the grid topology model module, node information database module, grid imbalance model library module, grid real-time operation data monitoring module, grid optimization strategy model module and stability evaluation model module, through real-time Monitor and simulate, dynamically adjust optimization strategies to ensure grid stability.

Benefits of technology

The stability evaluation value in the case of rapid expansion and update of the power grid is achieved to meet the requirements, reduce costs, increase the reliability and flexibility of the power grid, and ensure a smooth transition of power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010187A_ABST
    Figure CN119010187A_ABST
Patent Text Reader

Abstract

The invention relates to the field of electric power, and provides a power grid control optimization system and method based on continuous optimization iteration. The system comprises a power grid topology model module, a node information database module, a power grid unbalance degree model library module, a power grid real-time operation data monitoring module, a power grid optimization strategy model module, a power grid stability evaluation model module and a power grid optimization strategy decision support module. The power grid optimization strategy decision support module comprises a power grid operation support sub-module and a power grid line change optimization simulation sub-module, and the power grid line change optimization simulation sub-module is used for optimizing the power grid line change when the power grid line needs to be newly added or changed. And establishing a simulation model, recommending an optimization strategy of a newly added line or a period of time after the line is changed, taking the optimization strategy as an optimization strategy in a related period of time, iterating the optimization strategy to the power grid operation support sub-module, taking the optimization strategy as a supplement of a power grid operation optimization strategy, and supporting final optimization control of operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power grid optimization, and in particular to a power grid control optimization method based on continuous optimization iteration. Background Art

[0003] The power supply requires diversification and needs to meet the requirements of green, high-level, fast and stable supply. Combined with the uneven distribution of regions, people flow, energy, etc., as well as the rapid emergence of various grid-connected main body access scenarios during the development process, sudden concentrated and unstable power consumption scenarios, and possible rapid changes in scenarios, all have a huge impact on power supply security and quality. Therefore, high requirements are placed on the stability of the overall power grid and the flexibility and reliability of the control system. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a power grid control optimization system and method based on continuous optimization iteration to solve the current technical problems.

[0005] Technical Solution

[0006] The power grid control optimization system based on continuous optimization iteration is characterized by: including a power grid topology model module, a node information database module, a power grid imbalance model library module, a power grid real-time operation data monitoring module, a power grid optimization strategy model module, a power grid stability evaluation model module, and a power grid optimization strategy decision support module, wherein:

[0007] The power grid topology model module is a node-based power grid model established based on data and network topology, including network topology parameters, node location parameters, node capacity parameters, node control equipment, load parameters, and line node connection relationships of the power grid, as basic data of the power grid model, for the power grid to perform reactive and active switching control based on nodes, and the nodes are transformer nodes or load nodes of transmission or distribution lines such as substations or transformer boxes;

[0008] The node information database module is used to record and update the relevant information data of the node, including the node operation equipment details and node operation parameters, and the operation relationship information of the node and the adjacent nodes;

[0009] The power grid imbalance model library module includes voltage, current or three-phase imbalance calculation models;

[0010] The real-time operation data monitoring module of the power grid is used to monitor and record the real-time operation data of the power grid, monitor the stability of the power grid operation, and once an imbalance occurs, optimize the power grid according to the optimization strategy recommended by the power grid operation optimization strategy decision support module;

[0011] The power grid optimization strategy model module includes various optimization strategy models that have been historically verified or newly recommended;

[0012] The power grid stability evaluation model module includes power grid flow calculation and various stability evaluation models;

[0013] The power grid optimization strategy decision support module includes a power grid operation support submodule and a power grid line change optimization simulation submodule. The power grid operation support submodule is used to monitor and calculate the stability of the power grid during operation according to the real-time power grid operation data of the power grid real-time operation data monitoring module. The calculation is performed using the relevant models in the power grid imbalance model library module, and then the model with the highest stability evaluation is selected after simulation according to the relevant optimization strategy models in the power grid optimization strategy model module. The optimization control strategy in operation is executed according to the network topology, node location and node capacity information of the power grid line in the power grid topology model module and the node control device;

[0014] The power grid line change optimization simulation submodule is used to establish a simulation model and recommend an optimization strategy for a period of time after the addition of new lines or line changes when the power grid lines need to be added or the lines need to be changed, and iterate the optimization strategy as the optimization strategy for the relevant time period to the power grid operation support submodule as a supplement to the power grid operation optimization strategy to support the final optimization control of the operation.

[0015] Furthermore, when a new line is needed or a line is changed in the power grid line, the power grid line change optimization simulation submodule can first establish a first imbalance model of the line change part according to the changed line, configure a first optimization strategy, and run the power grid stability evaluation model according to the first optimization strategy to obtain a stability evaluation value I, and then combine the changed line and the corresponding node information with the existing power grid topology simulation, establish a second imbalance model of the extended node of the line change according to the simulated updated power grid topology, configure a second optimization strategy, and perform stability evaluation of the line change part and stability evaluation of the line range of the extended node to obtain stability evaluation value II and stability evaluation value Ш, respectively.

[0016] Further, if the stability evaluation value II and the stability evaluation value Ш meet the requirements, the second optimization strategy is adopted, and if the stability evaluation value I and the stability evaluation value Ш meet the requirements, the first optimization strategy is adopted.

[0017] Furthermore, the method for selecting the extended nodes of the line change adopts all adjacent nodes of the connection node of the changed line and the power grid, and in the power grid topology after simulation and update, compares the voltage change or current change or three-phase imbalance change of each node after simulation with the corresponding historical data after sample distribution, determines the affected nodes whose difference data reaches a certain range through an algorithm, and selects all affected nodes as the extended nodes of the line change.

[0018] A histogram or Markov chain algorithm is used to determine the affected nodes whose difference data reaches a certain range.

[0019] Furthermore, when establishing a second imbalance model of the extended node of the line change and configuring the second optimization strategy, based on the different models and expert systems of the power grid optimization strategy model module, the stability evaluation value II is taken as the first objective function to meet the requirements, and the stability evaluation value Ш is taken as the second objective function to meet the requirements. The second optimization strategy is continuously optimized and the second optimization strategy that finally meets the requirements is adopted.

[0020] Furthermore, within a period of time after the line change is completed and the grid is connected, the scope of the line change itself and the scope of the extended node are optimized as a group for grid control, and iterated to the grid operation support submodule as a supplement to the grid operation optimization strategy to support the final optimization control of the grid operation.

[0021] An optimization method using the above-mentioned power grid control optimization system is characterized by comprising the following steps:

[0022] Step 1: Obtain the grid topology model and real-time grid operation data, monitor the grid operation stability, and once an imbalance is found, optimize the grid according to the optimization strategy recommended by the grid operation optimization strategy decision support module;

[0023] Step 2: When a new line is needed or a line change is required, the power grid line change optimization simulation submodule of the power grid operation optimization strategy decision support module is run to select a control optimization strategy by building two models of the line change range and the extended node range;

[0024] Step 3: After the line change is completed, the grid topology model and the newly added or changed node information database are updated, and within a period of time after the line change is connected to the grid, the control optimization strategy selected in step 2 is used to control the extended node range;

[0025] Step 4: Update the control optimization strategy and extended node range selected in step 2 to the grid operation support submodule of the grid optimization strategy decision support module, and optimize all other grid lines outside the extended node range according to a unified optimization strategy, or use a group control model for control optimization after reallocation.

[0026] Furthermore, in the step 2, the optimization strategies are configured respectively by constructing two models of the line change range and the extended node range, and one of the optimization strategies is selected as the final optimization strategy, or an optimization algorithm is established with the stability evaluation value of the newly added part of the line and the extended node part within the range of the extended node as the objective function, so as to continuously optimize the optimization strategy of the final control.

[0027] A storage medium stores a program, characterized in that the program implements the above-mentioned optimization method when executed by a processor.

[0028] Beneficial Effects

[0029] The present invention proposes a power grid control optimization system and method based on continuous optimization iteration, which establishes a topological model and a database for power grid basic data and node information, and also establishes a database for monitoring models and control optimization models. By continuously updating the database, it is possible to continuously iterate the optimization model and select better optimization strategies in power grid monitoring. Especially in the case of rapid expansion and continuous updating of the power grid, the present invention proposes to establish two line update models and optimize the control strategy, which can not only determine the stability of the line update part, but also achieve a smooth transition, and can fully utilize the advantages of multi-point node control of the power grid, reduce costs, and increase power grid reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 Schematic diagram of the system architecture of the present invention.

[0031] Figure 2 Schematic diagram of the working process of the system of the present invention.

[0032] Figure 3 The figure is a schematic diagram of the process of selecting a control scheme for adding a new circuit in the prior art.

[0033] Figure 4 The figure is a schematic diagram of the process of selecting a control scheme for a newly added line in the system of the present invention; since modeling and simulation have been performed within the scope of the extended node when the scheme for the newly added line is selected, subsequent operation can also be continuously supported. DETAILED DESCRIPTION

[0034] The present invention is further described below in conjunction with specific embodiments and drawings.

[0035] In order to support the rapid and continuous expansion of the power grid, the present application proposes a power grid control optimization system based on continuous optimization iteration, which can be continuously updated and iterated on the existing system. The system includes a power grid topology model module, a node information database module, a power grid imbalance model library module, a power grid real-time operation data monitoring module, a power grid optimization strategy model module, a power grid stability evaluation model module, and a power grid optimization strategy decision support module. The power grid topology model module is a node-based power grid model established based on data and network topology, including network topology parameters, node location parameters, node capacity parameters, node control equipment, load parameters, and line node connection relationships of the power grid, as basic data of the power grid model, which is used for the power grid to perform reactive and active switching control based on nodes. The nodes are transmission or distribution line transformer nodes or load nodes such as substations or transformer boxes;

[0036] The node information database module is used to record and update the relevant information data of the node, including the node operation equipment details and node operation parameters, as well as the operation relationship information between the node and the adjacent nodes. The nodes are marked and distinguished according to the type and level, which is used for the subsequent related group control according to the node;

[0037] The power grid imbalance model library module includes voltage, current or three-phase imbalance calculation models, which can be selected according to different types of monitoring points or control objects;

[0038] The real-time operation data monitoring module of the power grid is used to monitor and record the real-time operation data of the power grid, monitor the stability of the power grid operation, and once an imbalance occurs, optimize the power grid according to the optimization strategy recommended by the power grid operation optimization strategy decision support module;

[0039] The power grid optimization strategy model module includes various optimization strategy models that have been verified historically or newly recommended, so as to continuously optimize and iterate; the power grid stability evaluation model module includes power grid flow calculation and various stability evaluation models;

[0040] The power grid optimization strategy decision support module includes a power grid operation support submodule and a power grid line change optimization simulation submodule. The power grid operation support submodule is used to monitor and calculate the stability of the power grid during operation according to the real-time power grid operation data of the power grid real-time operation data monitoring module. The calculation is performed using the relevant models in the power grid imbalance model library module, and then the model with the highest stability evaluation is selected after simulation according to the relevant optimization strategy models in the power grid optimization strategy model module. The optimization control strategy in operation is executed according to the network topology, node location and node capacity information of the power grid line in the power grid topology model module and the node control device;

[0041] The power grid line change optimization simulation submodule is used to establish a simulation model and recommend an optimization strategy for a period of time after the addition of new lines or line changes when the power grid lines need to be added or the lines need to be changed, and iterate the optimization strategy as the optimization strategy for the relevant time period to the power grid operation support submodule as a supplement to the power grid operation optimization strategy to support the final optimization control of the operation.

[0042] When a new line or line change is needed in the power grid, the power grid line change optimization simulation submodule can first establish a first imbalance model of the line change part according to the changed line, configure the first optimization strategy, and run the power grid stability evaluation model according to the first optimization strategy to obtain a stability evaluation value I. Then, the changed line and the corresponding node information are combined with the existing power grid topology simulation, and according to the updated power grid topology after the simulation, a second imbalance model of the extended node of the line change is established, the second optimization strategy is configured, and the stability evaluation of the line change part and the stability evaluation of the line range of the extended node are performed to obtain the stability evaluation value II and the stability evaluation value Ш respectively.

[0043] If the stability evaluation value II and the stability evaluation value Ш meet the requirements, the second optimization strategy is adopted; if the stability evaluation value I and the stability evaluation value Ш meet the requirements, the first optimization strategy is adopted.

[0044] Alternatively, when establishing a second imbalance model of the extended node of the line change and configuring a second optimization strategy, based on the different models and expert systems of the power grid optimization strategy model module, the stability evaluation value II meets the requirements as the first objective function, and the stability evaluation value Ш meets the requirements as the second objective function, the second optimization strategy is continuously optimized, and the second optimization strategy that finally meets the requirements is adopted.

[0045] The system of the present application establishes an operation model with existing power grid data. By establishing different databases, control models and evaluation models, it can not only realize the selection of operation control strategies, but also continuously optimize the control strategies through iterative databases. When the line is updated or a new line is added, a zero-order model is established through simulation, so that the control strategy is selected twice when it is established. Not only can the cost of the control equipment that may be increased be reduced by optimizing the control strategy before the line is changed, and a more optimized reactive or active control architecture can be selected, but also the grid connection process can be made more flexible. After the control strategy is selected in advance, the reliability and stability of the power grid are higher.

[0046] The method for selecting the extended nodes of the line change adopts all adjacent nodes of the connection node of the changed line and the power grid. In the power grid topology after simulation and update, the distribution of difference data after sample comparison between the voltage change or current change or three-phase imbalance change after simulation of each node and the corresponding historical data is performed, and the affected nodes whose difference data reaches a certain range are determined through an algorithm, and all affected nodes are selected as the extended nodes of the line change.

[0047] For data that conforms to the normal distribution, a histogram can be used to determine the affected nodes whose difference data reaches a certain range. For data that is nonlinear or has unclear relationships, a Markov chain algorithm can be used to determine the affected nodes within a certain range.

[0048] After the line change is completed and the grid is connected for a period of time, the scope of the line change itself and the scope of the extended node are optimized as a group for grid control, and iterated to the grid operation support submodule as a supplement to the grid operation optimization strategy to support the final optimization control of the grid operation.

[0049] The optimization method of the above power grid control optimization system comprises the following steps:

[0050] Step 1: Obtain the grid topology model and real-time grid operation data, monitor the grid operation stability, and once an imbalance is found, optimize the grid according to the optimization strategy recommended by the grid operation optimization strategy decision support module;

[0051] Step 2: When a new line is needed or a line change is required, the power grid line change optimization simulation submodule of the power grid operation optimization strategy decision support module is run to select a control optimization strategy by building two models of the line change range and the extended node range;

[0052] Step 3: After the line change is completed, the grid topology model and the newly added or changed node information database are updated, and within a period of time after the line change is connected to the grid, the control optimization strategy selected in step 2 is used to control the extended node range;

[0053] Step 4: Update the control optimization strategy and extended node range selected in step 2 to the grid operation support submodule of the grid optimization strategy decision support module, and optimize all other grid lines outside the extended node range according to a unified optimization strategy, or use a group control model for control optimization after reallocation.

[0054] In step 2, two models of line change range and extended node range are constructed, and optimization strategies are configured respectively. One of the optimization strategies is selected as the final optimization strategy, or an optimization algorithm is established with the stability evaluation value of the newly added part of the line and the extended node part within the extended node range as the objective function, so as to continuously optimize the optimization strategy of the final control. Specific embodiment 1

[0056] For the continuous iterative reactive power optimization method of the newly added lines, the following steps are adopted:

[0057] 1. Power grid analysis and modeling

[0058] Collect grid data (including parameters of lines, substations, reactive power compensation devices, etc.), establish grid power flow models and transient simulation models as the basis for analyzing power quality issues and compensation methods. This is the modeling of new lines or line changes.

[0059] 2. Analysis of voltage imbalance along the line

[0060] Based on the line parameters of the power supply system, the actual single-phase high-power impact load data on the newly added or changed lines is analyzed and used for calculation and simulation. A voltage imbalance analysis model along the line is established. Based on the model, the steady-state and transient power quality problems of the system are analyzed, and SVG control strategies and control parameters are proposed.

[0061] 3. Simulation analysis of SVG negative sequence compensation capability under weak power grid

[0062] Establish a regional power grid SVG control system model for newly added or changed lines, and update the newly added or changed lines to the upper power grid or the overall power grid for analysis, analyze the line impact part, and add it to the regional power grid, establish a secondary regional power grid SVG control system model, analyze the coupling relationship of each control loop in the SVG control system under weak power grid, analyze the dynamic interaction characteristics of SVG and power grid, optimize SVG control strategy and control parameters, and improve negative sequence compensation performance under weak power grid.

[0063] 4. Continuously monitor and optimize SVG’s optimal compensation control of random load fluctuations

[0064] Establish a regional power grid flow model for newly added or changed lines and the affected part of the line, that is, the expanded area. Based on the SVG dynamic random load compensation current accurate extraction and control method, dynamically adjust and compensate reactive power, and conduct real-time tracking and compensation according to the changes in load reactive power to suppress voltage fluctuations, negative sequence and harmonics caused by impact reactive power. Establish a monitoring mechanism for newly added or changed lines and regional power grids, and conduct continuous optimization control based on the regional power grid flow model.

[0065] Among them, based on the existing historical data and network topology, a node-based power grid model is established, and the network topology parameters, node location parameters, node capacity parameters, node equipment details, power supply side load parameters, demand side load parameters, line node connection relationships, etc. in the power grid model data are extracted as the basic data of the power grid model, and data is collected together with the monitored line bus voltage real-time data, load active power real-time data, reactive compensation real-time data, and distributed power source real-time location and data, which are analyzed as model operation data. The node can be a transmission or distribution line transformer node or load node such as a substation or transformer box. Each node is hierarchically labeled as Tn, where n is from the 1st level with the highest voltage to the nth level in the network topology, and nodes with the same transformer voltage are nodes of the same level.

[0066] The relevant information of each node is classified and recorded, including the information of the adjacent nodes of the node, the distance to the adjacent nodes and the information of the connection relationship, and an information table of each node is established, and a power grid flow model and a transient simulation model are established.

[0067] When a new line is added or a line is changed, for the new line nodes or the new nodes generated by the line change, based on the requirements of the power grid model, the relevant information of the new or changed nodes is updated to the above-mentioned power grid model, and according to the actual operation of the new line part or the changed line part, a simulation and establishment of an imbalance analysis model along the new line or the changed line is carried out, and the first simulated SVG control system model of the new line or the changed line is established accordingly.

[0068] Taking the connection node between the newly added line and the regional power grid topology or the connection node between the line change and the original line as the initial node, the node information of the intermediate adjacent nodes with the nodes one or two layers higher as the terminal nodes is browsed to establish the second simulation SVG control system model of the regional power grid after the node expansion.

[0069] By comparing the two simulated SVG control system models, a more economical and stable SVG control system model is recommended. Based on this SVG control system model, a power flow model of the regional power grid after expanding the node is established to evaluate the operation status of the distribution system, obtain the system network loss, and determine the optimal implementation of the solution after evaluation.

[0070] The area after the node is expanded uses the Histogram method to determine the relevant adjacent nodes, that is, all adjacent nodes of the connected node are simulated in the power grid model of the newly added line or line change, and the difference data after comparing the simulated voltage change or current change or three-phase imbalance change with the historical data is used to determine the relevant influencing nodes through the Histogram algorithm.

[0071] First, count the histogram and range of the input data; then define the left pointer and the right pointer to point to the left and right boundaries of the histogram respectively; calculate the histogram coverage between the current two pointers, if it is less than or equal to the set coverage threshold, return the histogram value pointed to by the left pointer at this moment, if not, adjust the value of the two pointers to move closer to the middle; if the histogram value pointed to by the current left pointer is greater than the histogram value pointed to by the right pointer, then move the right pointer to the left, otherwise move the left pointer to the right; loop until the area covered by the two pointers meets the requirements.

[0072] The specific node information whose difference data value is within the range obtained by the above algorithm is extracted, and the nodes connected to the connected nodes are selected with the line information of the power grid model, and then the nodes with the newly added lines and line changes form the regional power grid after the nodes are expanded. A regional simulation power grid model is established with the regional power grid, and a power grid flow model of the regional power grid is established to evaluate the operation status of the distribution system, obtain the system network loss, and determine the optimal implementation of the plan after evaluation.

[0073] If it is a load-type node, the active output change is monitored and Markov chain algorithm or ant colony algorithm can also be used to determine the regional power grid after the node is expanded. Then, based on the different models and expert systems of the power grid optimization strategy model module, the stability of the newly added lines after the node is expanded is used as the first objective function, and the stability of the regional power grid after the node is expanded is used as the second objective function. As the iterative convergence condition, the scope of the expanded node is continuously optimized, and then the control strategy is optimized. The control strategy that ultimately meets the requirements is adopted, thereby meeting the stability requirements and maximizing the use of existing control equipment to reduce costs.

[0074] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A power grid control optimization system based on continuous optimization iteration, characterized by: It includes power grid topology model module, node information database module, power grid imbalance model library module, power grid real-time operation data monitoring module, power grid optimization strategy model module, power grid stability evaluation model module, and power grid optimization strategy decision support module. The power grid topology model module is a node-based power grid model established based on data and network topology, including network topology parameters, node location parameters, node capacity parameters, node control equipment, load parameters, and line node connection relationships of the power grid, as basic data of the power grid model, for the power grid to perform reactive and active switching control based on nodes, and the nodes are transformer nodes or load nodes of transmission or distribution lines such as substations or transformer boxes; The node information database module is used to record and update the relevant information data of the node, including the node operation equipment details and node operation parameters, and the operation relationship information of the node and the adjacent nodes; The power grid imbalance model library module includes voltage, current or three-phase imbalance calculation models; The real-time operation data monitoring module of the power grid is used to monitor and record the real-time operation data of the power grid, monitor the stability of the power grid operation, and once an imbalance occurs, optimize the power grid according to the optimization strategy recommended by the power grid operation optimization strategy decision support module; The power grid optimization strategy model module includes various optimization strategy models that have been historically verified or newly recommended; The power grid stability evaluation model module includes power grid flow calculation and various stability evaluation models; the power grid optimization strategy decision support module includes a power grid operation support submodule and a power grid line change optimization simulation submodule, the power grid operation support submodule is used to monitor and calculate the stability of the power grid during operation according to the real-time power grid operation data of the power grid real-time operation data monitoring module, and the calculation is performed using the relevant models in the power grid imbalance model library module, and then after simulation according to the relevant optimization strategy models in the power grid optimization strategy model module, the model with the highest stability evaluation is selected, and the optimization control strategy in operation is executed according to the network topology, node location and node capacity information of the power grid line in the power grid topology model module and the node control device; The power grid line change optimization simulation submodule is used to establish a simulation model and recommend an optimization strategy for a period of time after the addition of new lines or line changes when the power grid lines need to be added or the lines need to be changed, and iterate the optimization strategy as the optimization strategy for the relevant time period to the power grid operation support submodule as a supplement to the power grid operation optimization strategy to support the final optimization control of the operation.

2. The power grid control optimization system based on continuous optimization iteration according to claim 1, characterized in that: The power grid line change optimization simulation submodule can, when a new line is needed or a line change occurs in the power grid line, first establish a first imbalance model of the line change part according to the changed line, configure a first optimization strategy, and run the power grid stability evaluation model according to the first optimization strategy to obtain a stability evaluation value I, then combine the changed line and the corresponding node information with the existing power grid topology simulation, establish a second imbalance model of the extended node of the line change according to the power grid topology updated by the simulation, configure a second optimization strategy, and perform stability evaluation of the line change part and stability evaluation of the line range of the extended node to obtain stability evaluation value II and stability evaluation value Ш, respectively.

3. The power grid control optimization system based on continuous optimization iteration according to claim 2, characterized in that: If the stability evaluation value II and the stability evaluation value Ш meet the requirements, the second optimization strategy is adopted; if the stability evaluation value I and the stability evaluation value Ш meet the requirements, the first optimization strategy is adopted.

4. The power grid control optimization system based on continuous optimization iteration according to claim 2, characterized in that: The method for selecting the extended nodes of the line change adopts all adjacent nodes of the connection node of the changed line and the power grid. In the power grid topology after simulation and update, the distribution of difference data after sample comparison between the voltage change or current change or three-phase imbalance change after simulation of each node and the corresponding historical data is performed, and the affected nodes whose difference data reaches a certain range are determined through an algorithm, and all affected nodes are selected as the extended nodes of the line change.

5. The power grid control optimization system based on continuous optimization iteration according to claim 4, characterized in that: A histogram or Markov chain algorithm is used to determine the affected nodes whose difference data reaches a certain range.

6. The power grid control optimization system based on continuous optimization iteration according to claim 2, characterized in that: When establishing a second imbalance model of the extended node of the line change and configuring the second optimization strategy, based on the different models and expert systems of the power grid optimization strategy model module, the stability evaluation value II meets the requirements as the first objective function, and the stability evaluation value Ш meets the requirements as the second objective function, the second optimization strategy is continuously optimized, and the second optimization strategy that finally meets the requirements is adopted.

7. The power grid control optimization system based on continuous optimization iteration according to claim 3 or 6, characterized in that: After the line change is completed and the grid is connected for a period of time, the scope of the line change itself and the scope of the extended node are optimized as a group for grid control, and iterated to the grid operation support submodule as a supplement to the grid operation optimization strategy to support the final optimization control of the grid operation.

8. An optimization method for a power grid control optimization system based on continuous optimization iteration according to claim 1, characterized in that: The steps include: Step 1: Obtain the grid topology model and real-time grid operation data, monitor the grid operation stability, and once an imbalance is found, optimize the grid according to the optimization strategy recommended by the grid operation optimization strategy decision support module; Step 2: When a new line is needed or a line change is required, the power grid line change optimization simulation submodule of the power grid operation optimization strategy decision support module is run to select a control optimization strategy by building two models of the line change range and the extended node range; Step 3: After the line change is completed, the grid topology model and the newly added or changed node information database are updated, and within a period of time after the line change is connected to the grid, the control optimization strategy selected in step 2 is used to control the extended node range; Step 4: Update the control optimization strategy and extended node range selected in step 2 to the grid operation support submodule of the grid optimization strategy decision support module, and optimize all other grid lines outside the extended node range according to a unified optimization strategy, or use a group control model for control optimization after reallocation.

9. The optimization method according to claim 8, characterized in that: The second step is to respectively configure the optimization strategies by building two models of the line change range and the extended node range, and select one of the optimization strategies as the final optimization strategy, or to establish an optimization algorithm with the stability evaluation value of the newly added part of the line and the extended node part within the extended node range as the objective function, so as to continuously optimize the optimization strategy of the final control.

10. A storage medium storing a program, characterized in that: When the program is executed by a processor, the optimization method as claimed in claims 8 to 9 is implemented.

Citation Information

Patent Citations

  • Alternating current and direct current interconnected power grid wind and fire coordination dynamic economy scheduling optimization method

    CN105846456A

  • Multiple input three-phase inverter with independent MPPT and high efficiency

    US20160372926A1

Cited By

  • Power equipment measurement and control system and method based on artificial intelligence

    CN119651925A