Method for uniformly mixing materials in stock ground
By preparing the trough distribution plan and optimizing the CFW cutting rate calculation, combining multi-dimensional three-dimensional data tracking and nonlinear multi-objective optimization model, the problem of lack of full-process monitoring and prediction in the existing technology is solved, and the stability of mixing ingredients in the material plant is achieved. and quality control.
Patent Information
- Application Number
- CN202410981243.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-26
AI Technical Summary
The existing technology lacks a control method that integrates the entire process monitoring and prediction of incoming materials-dumping and troughing, and cannot effectively predict the CFW cutting rate, ingredients type, equipment failure, mixed ingredients three-dimensional tracking, SiO2, TFe online Monitoring and other functions.
By preparing a slot distribution plan, optimizing the CFW cutting rate calculation, realizing multi-variety switching and rate adjustment in equipment failures, using multi-dimensional three-dimensional data tracking and data analysis, a nonlinear multi-objective optimization model is established to ensure the stability of SiO2 and TFe content. , and monitor and control the CFW cut-out rate in real time.
The prediction and control of mixed ingredients in the material plant is achieved, the stability and quality of mixed ore components are ensured, and the CFW cutting rate and material components of each tank can be predicted in advance, reducing the fluctuations in mixed ore quality caused by equipment failure.
Smart Images

Figure CN119015918A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of material batching in a material yard, and in particular relates to a method for achieving uniform mixing and batching in a material plant. Background Art
[0002] The incoming material storage, transfer processing, and unmanned stacking control of the material yard are all operated by a single functional system. Single functional operations can be performed or a large amount of data can be manually entered for prediction, but there is no integrated control method for monitoring and predicting the entire process from incoming materials-tank planning-tank loading-batching. Batching operations also do not achieve prediction and tracking of CFW cut-out rate, batching type, equipment failure, three-dimensional tracking of mixed batching, SiO2, TFe online monitoring and other functions. Summary of the invention
[0003] The object of the present invention is to provide a method for achieving uniform mixing of materials in a material factory, which can predict the CFW cutting rate and material composition of each slot in advance and effectively control the material loading and CFW cutting.
[0004] The technical solution adopted by the present invention to solve the technical problem is: a method for achieving mixing and batching in a material factory, comprising the following steps:
[0005] (1) Prepare the slot allocation plan: The bulk accumulation plan is a material ratio plan. The block material quantity, material type, batch, and ratio of each accumulation plan are changing. The slot allocation plan is prepared after the bulk accumulation plan is loaded and executed;
[0006] (2) Tank loading: Material tank loading is to transport materials to the mixing tank. The tank loading plan, the actual material inventory in the tank, and the remaining material loading quantity are combined to add the corresponding material transportation plan and issue it for execution. Tank loading operations are mainly divided into two types: one is to load block plan materials according to the tank distribution plan, and the other is to load unplanned materials that are not in the block plan;
[0007] (3) Batching operation:
[0008] 1) CFW cut-out rate optimization calculation: When all the materials in the BLOCK plan are loaded into the slots and participate in the batching, the CFW setting value of each slot is calculated according to the planned ratio; otherwise, the CFW setting value of each slot is calculated according to the optimization calculation model;
[0009] 2) Switching between multiple varieties of ingredients in batching tank:
[0010] The materials in the batching trough are tracked according to the loading batches. The variety switching is divided into the same variety switching or different variety switching. The same variety switching is completed automatically, and the different variety switching is divided into automatic or manual switching modes. After the different variety switching, the cutting rate of each batching trough is immediately optimized and calculated and sent to the control system for execution;
[0011] 3) Calculation and adjustment of accumulation rate when equipment fails:
[0012] When the mixing intelligent stacking model tracks the disc feeder fault signal, the disc feeder status bar on the screen will turn red to remind the operator, and immediately optimize the remaining trough cut-out rate calculation and send it to the control system for execution, reducing the fluctuation of mixed ore quality caused by long-term equipment failure.
[0013] 4) Multi-dimensional tracking of the mixing process:
[0014] During the mixing and stacking process, the operating status, cut-out cumulative value, cut-out set value, and cut-out current value of each CFW are collected at regular intervals, the cut-out time and cut-out amount are calculated, and the mixing pile number, BLOCK number, cut-out start time, cut-out end time, and cut-out product name are tracked to form a detailed CFW cut-out data record; through multi-dimensional analysis, calculation, and organization of the recorded data, a data record with piles, BLOCKs, and varieties as the main body is formed, and by tracking the data in shifts, the difference between the ingredients in fixed intervals and the expected ingredients in the pile is controlled to form an effective responsibility management and control system.
[0015] 5) Online monitoring of SiO2 and TFe:
[0016] Multi-dimensional data tracking provides data support for online monitoring of SiO2 and TFe. Data analysis technology is used to monitor abnormal fluctuations in ingredients during the entire batching process. The system reserves a moisture detection interface for incoming materials from the mixing and batching trough, and incorporates it into the SiO2 and TFe calculation model.
[0017] Furthermore, the optimization calculation model in the step 1) is mainly to ensure that the contents of SiO2 and TFe remain relatively stable, especially during the stacking process, the content of SiO2 in the mixed component must be kept consistent with the target SiO2 of the mixed pile at any time, and the content of TFe in the mixed component must be kept basically consistent with the target TFe; taking the optimal combination of materials with different components as the overall goal, using stepwise regression analysis and complex tuning method, a nonlinear multi-objective optimization model for the material ratio of the trough ingredients is established.
[0018] Furthermore, the basic process principles for optimizing the calculation of the CFW cutting rate in step 1) are: first, ensuring that the cutting rate of each slot is within the rated upper and lower limits of the equipment CFW; second, ensuring that the stacking progress of each slot is basically synchronized; third, keeping the mixed component SiO2 cut out of each slot CFW consistent with the target SiO2, and the mixed component TFe basically consistent with the target TFe.
[0019] Furthermore, the basic method for optimizing the calculation of the CFW cut-out rate in step 1) is as follows:
[0020] a. Under the premise of meeting the process principles, determine the adjustable range of CFW cut-out rate, and calculate its initial cut-out rate Rate according to the ratio of each slot remaining amount and remaining time to ensure that the accumulation progress of each slot is basically synchronized: Rate = slot remaining amount / remaining time;
[0021] b. Calculate the instantaneous comprehensive SiO2 and TFe content based on the initial cut-out rate Rate:
[0022] Comprehensive SiO2 content = [SiO2 content of material 1 * Ratel / (Ratel + Rate2 + ... + Raten)] + [SiO2 content of material 2 * Rate2 / (Ratel + Rate2 + ... + Raten)] + ... + [SiO2 content of material n * Raten /
[0023] (Ratel+Rate2+……+Raten)];
[0024] Comprehensive TFe content = [TFe content of material 1*Ratel / (Ratel+Rate2+…+Raten)]+[TFe content of material 2*Rate2 / (Ratel+Rate2+…+Raten)]+…+[TFe content of material n*Raten /
[0025] (Ratel+Rate2+……+Raten)];
[0026] In this way, the comprehensive SiO2 and TFe contents at various rates can be obtained;
[0027] c. Optimization calculation of CFW cut-out rate: Based on the initial cut-out rate, by comparing the initial comprehensive SiO2 and TFe content with the bulk target SiO2 and TFe content, adjust the CFW cut-out rate of each slot to achieve the purpose of matching the bulk target SiO2 and TFe;
[0028] The optimization calculation is based on the segmented optimization of tightening first and then loosening, and gradually relaxing. In order to achieve the unchanged SiO2 and TFe of the material cut out, the computer technology is used to continuously perform optimization calculations during the entire cutting process, so that the SiO2 of the mixed material cut out by CFW at each moment is consistent with the target SiO2, and the TFe of the mixed material is basically consistent with the target TFe, ensuring the stable quality of the mixed ore;
[0029] d. Real-time equipment tracking and data collection, as well as real-time control of equipment, mastering the CFW cumulative cut-out volume and instantaneous flow data.
[0030] Furthermore, the data in step 4) based on bulk, BLOCK, and variety are recorded as follows:
[0031] Block accumulation amount = ∑ (accumulation amount of each type of Block);
[0032] Large pile accumulation = ∑ (accumulation of each block);
[0033] Block remaining quantity = Block planned quantity - Block accumulated quantity;
[0034] Large pile remaining quantity = large pile planned quantity - large pile accumulation quantity;
[0035] Block accumulation time = actual system operation time when Block batching;
[0036] Large pile accumulation time = ∑ (the actual system operation time when each block is batched);
[0037] Block remaining time = Block remaining amount / set target rate.
[0038] The present invention has the following beneficial effects: the present invention predicts and calculates the target composition of the mixed ore by reading the mixing and batching plan and the raw material inspection and testing composition data, so as to achieve automatic distribution of the raw materials to the troughs, and then sets the stacking rate according to the transmission rate of the belt conveyor under the batching trough to automatically calculate the cutting rate, predict the stacking composition of the mixed ore, stabilize the composition of the mixed ore and ensure the quality of the mixed ore through effective control of the material troughing and CFW cutting, realize the advance prediction of the CFW cutting rate and material composition of each trough, and effectively control the material troughing and CFW cutting. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a flow chart of slot allocation plan preparation of the present invention.
[0040] Figure 2 It is a flow chart of the slot loading operation of the present invention.
[0041] Figure 3 It is a batching operation flow chart of the present invention. DETAILED DESCRIPTION
[0042] The following are specific embodiments of the present invention, which further describe the technical solution of the present invention, but the protection scope of the present invention is not limited to these embodiments. Any changes or equivalent substitutions that do not deviate from the concept of the present invention are included in the protection scope of the present invention.
[0043] 1. Prepare slot allocation plan
[0044] The bulk accumulation plan is a material ratio plan. The BLOCK material quantity, material type, batch, and ratio of each accumulation plan are changing. After the bulk accumulation plan is loaded and executed, the slot allocation plan is compiled. The compilation process is as follows: Figure 1 shown.
[0045] 2. Slotting operation
[0046] Material loading is the operation of the belt process to transport materials to the mixing and batching tank. Combine the batching plan, the actual material inventory in the tank and the remaining material loading quantity to add the corresponding material transportation plan and issue it for execution. There are two main types of loading operations: one is to load the Block plan materials according to the slot plan, and the other is to load the end materials or miscellaneous materials that are not in the BLOCK plan. Figure 2 shown.
[0047] 3. Batching operation
[0048] The batching process is as follows: Figure 3 As shown, the details are as follows:
[0049] 1) CFW cut-out rate optimization calculation
[0050] When all BLOCK planned materials are loaded into slots for batching, the CFW set value of each slot is calculated according to the planned ratio; otherwise, the CFW set value of each slot is calculated according to the optimized calculation model.
[0051] The optimization calculation model is mainly to ensure that the content of SiO2 and TFe remains relatively stable, especially during the stacking process, the content of SiO2 in the mixed component must be consistent with the target SiO2 of the mixed pile at any time, and the content of TFe in the mixed component must be basically consistent with the target TFe; the optimal combination of different component materials is taken as the overall goal, and the stepwise regression analysis and complex tuning method are used to establish a nonlinear multi-objective optimization model for the proportion of trough batching materials. Through the high-order variables and the flexibility of the target and constraint system, the selection of batching material optimization targets is more convenient and flexible.
[0052] The basic process principles for optimizing the CFW cutting rate are: first, ensure that the cutting rate of each slot is within the rated upper and lower limits of the equipment CFW; second, ensure that the stacking progress of each slot is basically synchronized; third, keep the mixed component SiO2 cut out of each slot CFW consistent with the target SiO2, and the mixed component TFe basically consistent with the target TFe.
[0053] The basic method for optimizing the CFW cut-out rate is as follows:
[0054] a. Under the premise of meeting the process principles, determine the adjustable range of the CFW cut-out rate, and calculate its initial cut-out rate Rate according to the ratio of the remaining amount and the remaining time of each slot to ensure that the accumulation progress of each slot is basically synchronized: Rate = slot remaining amount / remaining time.
[0055] b. Calculate the instantaneous comprehensive SiO2 and TFe content based on the initial cut-out rate Rate:
[0056] Comprehensive SiO2 content = [SiO2 content of material 1 * Ratel / (Ratel + Rate2 + ... + Raten)] + [SiO2 content of material 2 * Rate2 / (Ratel + Rate2 + ... + Raten)] + ... + [SiO2 content of material n * Raten /
[0057] (Ratel+Rate2+……+Raten)];
[0058] Comprehensive TFe content = [TFe content of material 1*Ratel / (Ratel+Rate2+…+Raten)]+[TFe content of material 2*Rate2 / (Ratel+Rate2+…+Raten)]+…+[TFe content of material n*Raten /
[0059] (Ratel+Rate2+……+Raten)];
[0060] In this way, the comprehensive SiO2 and TFe contents at various rates can be obtained.
[0061] c. Optimization calculation of CFW cut-out rate: Based on the initial cut-out rate, by comparing the initial comprehensive SiO2 and TFe content with the bulk target SiO2 and TFe content, adjust the CFW cut-out rate of each slot to achieve the purpose of matching the bulk target SiO2 and TFe.
[0062] Since the varieties and components of the materials in each stage of accumulation vary greatly, the optimization calculation is based on segmented optimization of tightening first and then loosening, and gradually relaxing. In order to achieve the unchanged SiO2 and TFe of the materials cut out, computer technology is used to continuously perform optimization calculations during the entire cutting process, so that the SiO2 of the mixed material cut out by CFW at each moment is consistent with the target SiO2, and the TFe of the mixed material is basically consistent with the target TFe, ensuring the stable quality of the mixed ore.
[0063] d. Real-time equipment tracking and data collection, as well as real-time control of equipment, mastering the CFW cumulative cut-out volume and instantaneous flow data.
[0064] Physical analysis shows that this method can be used to design a uniform ore accumulation calculation control model that meets the requirements and is easy to calculate and closed-loop control.
[0065] 2) Switch between multiple varieties of ingredients in the batching tank
[0066] The materials in the batching trough are tracked according to the loading batches. The variety switching is divided into the same variety switching or different variety switching. The same variety switching is completed automatically, and the different variety switching is divided into automatic or manual switching modes. After the different variety switching, the cut-out rate of each batching trough is immediately optimized and calculated and sent to the control system for execution.
[0067] 3) Calculation and adjustment of accumulation rate when equipment fails
[0068] When the mixing intelligent stacking model tracks the disc feeder fault signal, the disc feeder status bar on the screen will turn red to alert the operator, and immediately optimize the remaining trough cut-out rate calculation and send it to the control system for execution, reducing the fluctuation in the quality of the mixed ore caused by long-term equipment failure.
[0069] 4) Multi-dimensional tracking of the mixing process
[0070] During the mixing and stacking process, the operating status, cut-out cumulative value, cut-out set value, and cut-out current value of each CFW are collected at regular intervals, the cut-out time and cut-out amount are calculated, and the mixing pile number, BLOCK number, cut-out start time, cut-out end time, cut-out product name, etc. are tracked to form a detailed CFW cut-out data record; through multi-dimensional analysis, calculation, and collation of the recorded data, a data record with piles, BLOCKs, and varieties as the main body is formed, and by tracking the data in shifts, the difference between the ingredients in fixed intervals and the expected ingredients in the pile is controlled to form an effective responsibility management and control system.
[0071] Block accumulation amount = ∑ (accumulation amount of each type of Block);
[0072] Large pile accumulation = ∑ (accumulation of each block);
[0073] Block remaining quantity = Block planned quantity - Block accumulated quantity;
[0074] Large pile remaining quantity = large pile planned quantity - large pile accumulation quantity;
[0075] Block stacking time = actual system running time when Block batching;
[0076] Large pile accumulation time = ∑ (the actual system operation time when each block is batched);
[0077] Block remaining time = Block remaining amount / set target rate.
[0078] 5) Online monitoring of SiO2 and TFe
[0079] Multi-dimensional data tracking provides data support for online monitoring of SiO2 and TFe, and uses data analysis technology to monitor abnormal fluctuations in components during the entire batching process.
[0080] The sintering process is most concerned about the fluctuation value of SiO2 in the mixed ore composition, followed by the fluctuation value of TFe. The fluctuation of SiO2 affects the basicity, the main quality indicator of sintered ore, and the fluctuation of TFe affects the stability of iron content in sintered ore. The main goal of the mixed intelligent stacking model is to control the fluctuation of SiO2 and TFe within a reasonable range.
[0081] The system reserves a moisture detection interface for the incoming materials from the mixing and batching tank, and incorporates it into the SiO2 and TFe calculation model.
[0082] The present invention is not limited to the above-mentioned implementation modes, and anyone should be aware of the structural changes made under the enlightenment of the present invention, and all those having the same or similar technical solutions as the present invention fall within the protection scope of the present invention.
[0083] The techniques, shapes, and structural parts not described in detail in the present invention are all well-known techniques.
Claims
1. A method for achieving mixing and batching in a material factory, characterized in that: The following steps are involved: (1) Prepare the slot allocation plan: The bulk accumulation plan is a material ratio plan. The block material quantity, material type, batch, and ratio of each accumulation plan are changing. The slot allocation plan is prepared after the bulk accumulation plan is loaded and executed; (2) Tank loading: Material tank loading is to transport materials to the mixing tank. The tank loading plan, the actual material inventory in the tank, and the remaining material loading quantity are combined to add the corresponding material transportation plan and issue it for execution. Tank loading operations are mainly divided into two types: one is to load block plan materials according to the tank distribution plan, and the other is to load unplanned materials that are not in the block plan; (3) Batching operation: 1) CFW cut-out rate optimization calculation: When all the materials in the BLOCK plan are loaded into the slots and participate in the batching, the CFW setting value of each slot is calculated according to the planned ratio; otherwise, the CFW setting value of each slot is calculated according to the optimization calculation model; 2) Switching between multiple varieties of ingredients in batching tank: The materials in the batching trough are tracked according to the loading batches. The variety switching is divided into the same variety switching or different variety switching. The same variety switching is completed automatically, and the different variety switching is divided into automatic or manual switching modes. After the different variety switching, the cutting rate of each batching trough is immediately optimized and calculated and sent to the control system for execution; 3) Calculation and adjustment of accumulation rate when equipment fails: When the mixing intelligent stacking model tracks the disc feeder fault signal, the disc feeder status bar on the screen will turn red to remind the operator, and immediately optimize the remaining trough cut-out rate calculation and send it to the control system for execution, reducing the fluctuation of mixed ore quality caused by long-term equipment failure. 4) Multi-dimensional tracking of the mixing process: During the mixing and stacking process, the operating status, cut-out cumulative value, cut-out set value, and cut-out current value of each CFW are collected regularly, the cut-out time and cut-out amount are calculated, and the mixing pile number, BLOCK number, cut-out start time, cut-out end time, and cut-out product name are tracked to form a detailed CFW cut-out data record; through multi-dimensional analysis, calculation, and sorting of recorded data, a data record based on piles, BLOCKs, and varieties is formed. By tracking the data by shift cut-off quantity, the difference between the fixed interval ingredients and the expected ingredients of the pile is controlled to form an effective responsibility management and control system; 5) Online monitoring of SiO2 and TFe: Multi-dimensional data tracking provides data support for online monitoring of SiO2 and TFe. Data analysis technology is used to monitor abnormal fluctuations in ingredients during the entire batching process. The system reserves a moisture detection interface for incoming materials from the mixing and batching trough, and incorporates it into the SiO2 and TFe calculation model.
2. The method for achieving mixing and batching in a material factory as claimed in claim 1, characterized in that: The optimization calculation model in the step 1) is mainly to ensure that the contents of SiO2 and TFe remain relatively stable, especially during the stacking process, the content of SiO2 in the mixed component must be kept consistent with the target SiO2 of the mixed pile at any time, and the content of TFe in the mixed component must be kept basically consistent with the target TFe; the optimal combination of materials with different components is taken as the overall goal, and a nonlinear multi-objective optimization model for the material ratio of the trough is established by using stepwise regression analysis and complex tuning method.
3. The method for achieving mixing and batching in a material factory as claimed in claim 1, characterized in that: The basic process principles for optimizing the calculation of the CFW cutting rate in step 1) are: first, ensuring that the cutting rate of each slot is within the rated upper and lower limits of the equipment CFW; second, ensuring that the stacking progress of each slot is basically synchronized; third, keeping the mixed component SiO2 cut out of each slot CFW consistent with the target SiO2, and the mixed component TFe basically consistent with the target TFe.
4. The method for achieving mixing and batching in a material factory as claimed in claim 1, characterized in that: The basic method for optimizing the calculation of the CFW cut-out rate in step 1) is as follows: a. Under the premise of meeting the process principles, determine the adjustable range of CFW cut-out rate, and calculate its initial cut-out rate Rate according to the ratio of each slot remaining amount and remaining time to ensure that the accumulation progress of each slot is basically synchronized: Rate = slot remaining amount / remaining time; b. Calculate the instantaneous comprehensive SiO2 and TFe content based on the initial cut-out rate Rate: Comprehensive SiO2 content = [SiO2 content of material 1 * Ratel / (Ratel + Rate2 + ... + Raten)] + [SiO2 content of material 2 * Rate2 / (Ratel + Rate2 + ... + Raten)] + ... + [SiO2 content of material n * Raten / (Ratel+Rate2+……+Raten)]; Comprehensive TFe content = [TFe content of material 1*Ratel / (Ratel+Rate2+…+Raten)]+[TFe content of material 2*Rate2 / (Ratel+Rate2+…+Raten)]+…+[TFe content of material n*Raten / (Ratel+Rate2+……+Raten)]; In this way, the comprehensive SiO2 and TFe contents at various rates can be obtained; c. Optimization calculation of CFW cut-out rate: Based on the initial cut-out rate, by comparing the initial comprehensive SiO2 and TFe content with the bulk target SiO2 and TFe content, adjust the CFW cut-out rate of each slot to achieve the purpose of matching the bulk target SiO2 and TFe; The optimization calculation is based on the segmented optimization of tightening first and then loosening, and gradually relaxing. In order to achieve the unchanged SiO2 and TFe of the material cut out, the computer technology is used to continuously perform optimization calculations during the entire cutting process, so that the SiO2 of the mixed material cut out by CFW at each moment is consistent with the target SiO2, and the TFe of the mixed material is basically consistent with the target TFe, ensuring the stable quality of the mixed ore; d. Real-time equipment tracking and data collection, as well as real-time control of equipment, mastering the CFW cumulative cut-out volume and instantaneous flow data.
5. The method for achieving mixing and batching in a material factory as claimed in claim 1, characterized in that: The data records in step 4) based on bulk, BLOCK and variety are as follows: Block accumulation amount = ∑ (accumulation amount of each type of Block); Large pile accumulation = ∑ (accumulation of each block); Block remaining quantity = Block planned quantity - Block accumulated quantity; Large pile remaining quantity = large pile planned quantity - large pile accumulated quantity; Block stacking time = actual system running time when Block batching; Large pile accumulation time = ∑ (the actual system operation time when each block is batched); Block remaining time = Block remaining amount / set target rate.