Warehousing system and order processing method
By setting up fixed high-position shelves and mobile shelves in the storage system, and using handling robots to transfer material boxes and shelves, the problem of small storage capacity in the existing technology is solved, and more efficient storage and out-of-warehousing processing is achieved.
Patent Information
- Application Number
- CN202411268337.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-26
AI Technical Summary
Due to the limited load-bearing capacity of the automatic guide and handling robot and the limited floor height of the movable shelves, the storage capacity is small, which cannot effectively improve the storage efficiency of the warehousing system.
Fixed high-level shelves are set up in the storage area, and the material box is transferred to the mobile shelves through the first handling robot. The second handling robot is further carrying the mobile shelves to the sorting area, and the warehouse capacity is increased by using the higher level height of the fixed high-level shelves. .
By increasing the floor height of fixed high-position shelves, the storage capacity of the warehousing system is improved, and it can accommodate more quantity of material boxes, which improves outbound efficiency and picking efficiency.
Smart Images

Figure CN119018535A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of warehousing and logistics, and in particular to a warehousing system and an order processing method. Background Art
[0002] With the development of the logistics industry, goods-to-person picking is an automated picking method, which usually uses a handling robot to transport the goods to the picking workstation, and the pickers pick and ship out of the warehouse. This picking method reduces the workload of the pickers and improves the efficiency of picking and shipping. Therefore, it has been widely used in industries such as retail and e-commerce.
[0003] For example, the current storage system includes movable shelves and automated guided vehicles (AGVs). The AGVs carry the movable shelves and transfer them to the picking station, where they are picked by the picking personnel. However, the current storage system has a small storage capacity due to the limited carrying capacity of the automated guided vehicles and the height of the movable shelves. Summary of the invention
[0004] In view of the above problems, an embodiment of the present application provides a warehousing system and an order processing method, which can increase the storage capacity of the warehousing system.
[0005] In order to achieve the above objectives, the embodiments of the present application provide the following technical solutions:
[0006] A first aspect of an embodiment of the present application provides a warehousing system comprising: a storage area, which is provided with at least one fixed high-level shelf; a sorting area, which is provided with at least one mobile shelf, and the mobile shelf and the corresponding fixed high-level shelf are arranged along the extension direction of the working channel; a first handling robot and a guide rail adapted therefor, wherein the extension direction of the guide rail is consistent with the extension direction of the working channel; the guide rail is provided on the fixed high-level shelf and extends to the working surface of the mobile shelf; the first handling robot is slidably installed on the guide rail and moves along the extension direction of the guide rail; the first handling robot is configured to transfer the material box between the storage area and the sorting area; a second handling robot is used to transfer the mobile shelf between the sorting area, and / or between the sorting area and the sorting area; the sorting area is provided with a sorting workbench, and the sorting workbench is used to sort the goods in the material box.
[0007] Compared with the related art, the storage system provided by the embodiment of the present application has the following advantages:
[0008] The warehousing system provided by the embodiment of the present application is provided with a fixed high shelf in the storage area and a mobile shelf in the sorting area; and the first handling robot transfers the material boxes between the fixed high shelf and the mobile shelf to realize sorting of the stock material boxes, and the material boxes to be sorted can be transferred to the mobile shelf. The second handling robot further carries the mobile shelf and transfers the mobile shelf to the sorting area; and the material boxes to be sorted are further sorted and shipped out through the sorting workbench.
[0009] In the related art, the storage system includes movable shelves and automatic guided transport robots. The movable shelves are used to store material boxes. When sorting out of the warehouse, the automatic guided transport robot carries the movable shelves to the sorting area, and the sorting material boxes are further sorted and shipped out through the sorting workbench. However, due to the limited carrying capacity of the automatic guided transport robot and the limited height of the movable shelves, the storage capacity of the current storage system is relatively small.
[0010] The storage system provided by the embodiment of the present application has fixed high-level shelves in the storage area, mobile shelves in the sorting area, and the first handling robot transfers the material boxes from the fixed high-level shelves to the mobile shelves, and the second handling robot carries the mobile shelves to the sorting area. Since the fixed high-level shelves have a higher layer height and a larger storage capacity than the mobile shelves, they can accommodate more material boxes, thereby increasing the storage capacity of the storage system.
[0011] In an optional embodiment, along the extension direction of the guide rail, the mobile shelf is arranged on one side of the fixed high-level shelf to form the working channel; along the extension direction of the guide rail, a first traffic channel is provided on the side of the mobile shelf away from the fixed high-level shelf, and the extension direction of the first traffic channel is perpendicular to the extension direction of the guide rail, and the first traffic channel is connected to the working channel.
[0012] In an optional embodiment, the guide rail includes a first part and a second part that are connected to each other; the storage system also includes a load-bearing frame, which is arranged on one side of the fixed high-level shelf along the extension direction of the working channel; in the same working channel, the first part is installed on the fixed high-level shelf, the second part extends to the working surface of the mobile shelf, and the second part is installed on the load-bearing frame.
[0013] In an optional embodiment, a gap is maintained between the bottom of the fixed high-level shelf and the ground, and a second traffic lane is formed for the second transport robot to shuttle.
[0014] In an optional embodiment, the first handling robot includes a gantry, a sliding mechanism, a lifting mechanism and a picking mechanism; the gantry is slidably connected to the guide rail, and the sliding mechanism is configured to provide sliding force to the gantry; the picking mechanism is slidably installed on the gantry, and the picking mechanism is configured to be horizontally retractable and used to pick up and place material boxes; the lifting mechanism is arranged on the gantry and connected to the picking mechanism; the lifting mechanism is used to provide driving force to the picking mechanism so that the picking mechanism moves up and down relative to the gantry in the height direction.
[0015] In an optional embodiment, the second transport robot includes a lifting mechanism, a pallet and a mobile chassis; the lifting mechanism is arranged between the pallet and the chassis in the height direction, and the lifting mechanism is used to lift the pallet; the pallet is used to carry the mobile shelf, and the mobile chassis is used to install the lifting mechanism and the pallet.
[0016] In an optional embodiment, the warehousing system further includes a buffer area; the buffer area is arranged close to the sorting area, and the buffer area is used to temporarily store the mobile shelves; the buffer area is located on a moving path of the second transport robot from the sorting area to the sorting area.
[0017] A second aspect of the embodiment of the present application provides an order processing method, including:
[0018] Obtaining a set of pending orders, and inventory information of a storage area and a tally area, wherein the set of pending orders is processed at the same sorting workbench, the storage area is provided with at least one fixed high-level shelf, and the tally area is provided with at least one mobile shelf;
[0019] Determine the storage location of each target material box requested by the pending order set, any of the storage locations being located on the fixed high shelf or the mobile shelf;
[0020] Determine the target mobile rack with the highest target bin hit rate;
[0021] The target mobile shelf is transferred to a sorting workbench located in a sorting area.
[0022] The order processing method provided in the embodiment of the present application sets up fixed high-level shelves in the storage area and mobile shelves in the sorting area, so that the target material boxes on the fixed high-level shelves can be transferred to the target mobile shelves, and further transferred to the sorting workbench in the sorting area through the target mobile shelves. Since the fixed high-level shelves have a higher layer height and a larger storage capacity than the mobile shelves, they can accommodate a larger number of material boxes, thereby improving the storage capacity of the warehousing system.
[0023] Furthermore, the order processing method can transfer the target mobile shelf with the highest target order hit rate to the sorting workbench, thereby improving the hit rate of the target material box, so that a single transfer of the target mobile shelf can hit more target material boxes, thereby improving the outbound efficiency.
[0024] In an optional embodiment, the fixed high-level shelf is equipped with a first handling robot, the first handling robot is a rail-type handling robot, the first handling robot slides along the length extension direction of the fixed high-level shelf, and can slide to the working surface of the mobile shelf; the first handling robot is used to transfer the target material box between the storage area, the tally area, and / or between the storage area and the tally area; the mobile shelf is transferred between the tally area, and / or between the sorting area and the tally area by a second handling robot, and the second handling robot moves along the ground;
[0025] The step of transferring the target mobile shelf to a sorting workbench in a sorting area comprises:
[0026] If the target mobile shelf includes all target material boxes, mobilizing the second transport robot to transfer the target mobile shelf to the sorting workbench;
[0027] If the target mobile rack includes a first portion of target boxes, the first transport robot and / or the second transport robot is mobilized to transfer a second portion of target boxes that are not located on the target mobile rack to the target mobile rack.
[0028] In an optional embodiment, along the length extension direction of the fixed high shelf, the mobile shelf is arranged on one side of the fixed high shelf to form an operation channel;
[0029] The step of mobilizing the first transport robot and / or the second transport robot to transfer the second part of the target material boxes that are not located on the target mobile shelf to the target mobile shelf includes:
[0030] If the storage location where the second part of the target boxes are located is in the same operating channel as the target mobile shelf, mobilizing the first handling robot to transfer the second part of the target boxes to the target mobile shelf;
[0031] If the storage location where the second part of the target boxes are located is in a different operating channel from the target mobile shelf, the first handling robot and the second handling robot are mobilized to transfer the second part of the target boxes to the target mobile shelf.
[0032] In an optional embodiment, the step of mobilizing the first handling robot and the second handling robot to transfer the second part of the target material boxes to the target mobile shelf includes:
[0033] Determine the operation channel where the second part of the target material boxes are located;
[0034] Using a second transport robot to transfer the target mobile shelf to the operating channel where the second part of target boxes are located;
[0035] The first handling robot is used to transfer the second part of the target material boxes to the target mobile shelf. In an optional embodiment, the target mobile shelf has the first part of the target material boxes, and the storage space on the target mobile shelf is full;
[0036] The step of mobilizing the first transport robot and the second transport robot to transfer the second part of the target material boxes that are not located on the target mobile shelf to the target mobile shelf includes:
[0037] Transferring the non-target material boxes on the target mobile shelf to the non-target mobile shelf or the fixed high shelf to form an empty storage space;
[0038] At least one second portion of the target container is transferred to a storage location of the target mobile rack.
[0039] In an optional embodiment, the step of transferring the target mobile shelf to the sorting workbench includes:
[0040] If the target mobile shelf includes some target material boxes and meets the order hit rate threshold, the second transport robot is mobilized to transfer the target mobile shelf to the sorting workbench;
[0041] The order hit rate is the ratio of the number of some target boxes on the target mobile shelf to all target boxes requested by the set of pending orders.
[0042] In an optional embodiment, the step of mobilizing the first transport robot and / or the second transport robot to transfer the second part of the target boxes that are not located on the target mobile shelf to the target mobile shelf includes:
[0043] If the target mobile shelf includes a first part of target containers, tallying the second part of target containers that are not located on the target mobile shelf within a preset time to transfer at least one of the second part of target containers to the target mobile shelf;
[0044] If the preset time is reached, the second transport robot is mobilized to transfer the target mobile shelf to the sorting workbench.
[0045] In addition to the technical problems solved by the embodiments of the present application, the technical features that constitute the technical solutions, and the beneficial effects brought about by the technical features of these technical solutions described above, other technical problems that can be solved by the warehousing system and order processing method provided by the embodiments of the present application, other technical features included in the technical solutions, and the beneficial effects brought about by these technical features will be further described in detail in the specific implementation methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0047] Figure 1 A top view of the overall layout of the storage system provided in the embodiment of the present application;
[0048] Figure 2 A side view of the overall arrangement of the storage system provided in the embodiment of the present application;
[0049] Figure 3 A schematic diagram of the arrangement of fixed high-level shelves in the storage area and mobile shelves in the tally area provided in an embodiment of the present application;
[0050] Figure 4 A schematic diagram of the movement of a second transport robot carrying a mobile shelf provided in an embodiment of the present application;
[0051] Figure 5 A schematic diagram of the guide rail arrangement provided in an embodiment of the present application;
[0052] Figure 6 A schematic diagram of installing the first handling robot provided in an embodiment of the present application on a guide rail;
[0053] Figure 7 Schematic diagram of the order processing method provided in the embodiment of the present application Figure 1 ;
[0054] Figure 8 Schematic diagram of the order processing method provided in the embodiment of the present application Figure 2 ;
[0055] Fig. 9 Schematic diagram of the order processing method provided in the embodiment of the present application Figure 3 .
[0056] Description of reference numerals:
[0057] 10-Fixed high shelf;
[0058] 20-Mobile shelves;
[0059] 30- first handling robot;
[0060] 31-gantry; 32-cargo picking mechanism; 33-lifting mechanism; 34-sliding mechanism;
[0061] 40- second handling robot;
[0062] 50-operation channel;
[0063] 60-Material box;
[0064] 70-guide rail;
[0065] 81- first traffic lane; 82- second traffic lane;
[0066] 90-carrying frame;
[0067] 100-warehouse system;
[0068] 101-storage area; 102-tallying area; 103-buffer area; 104-sorting area. DETAILED DESCRIPTION
[0069] The current storage system including movable shelves and automatic guided transport robots has the problem of small storage capacity. The reason for this problem is that the movable shelves are used to store material boxes. When sorting out of the warehouse, the movable shelves are carried to the sorting area by the automatic guided transport robot. The sorted material boxes are further sorted and shipped out of the warehouse through the sorting workbench. However, due to the limited carrying capacity of the automatic guided transport robot and the limited height of the movable shelves, the current storage system has a small storage capacity.
[0070] In view of the above technical problems, the warehousing system provided in the embodiment of the present application is provided by setting fixed high-level shelves in the storage area, setting mobile shelves in the sorting area, and transferring the material boxes from the fixed high-level shelves to the mobile shelves by the first handling robot, and further carrying the mobile shelves to the sorting area by the second handling robot. In this arrangement, since the fixed high-level shelves have a higher layer height and a larger storage capacity than the mobile shelves, they can accommodate more material boxes, thereby increasing the storage capacity of the warehousing system.
[0071] In order to make the above-mentioned purposes, features and advantages of the embodiments of the present application more obvious and understandable, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of this application.
[0072] To facilitate the description of the embodiments of the present application, the coordinate system in the accompanying drawings is first defined, wherein the X-axis direction is the first direction, which is defined as the horizontal movement direction of the first handling robot; the Y-axis direction is the second direction, which is defined as the direction of picking up and placing the material box by the first handling robot; the Z-axis direction is the third direction, which is defined as the height direction of the first handling robot.
[0073] like Figure 1 and Figure 2 As shown, the warehousing system 100 provided in the embodiment of the present application includes a storage area 101, a sorting area 102, a sorting area 104, a first handling robot 30 and a second handling robot 40, wherein the storage area 101 is provided with at least one fixed high-level shelf 10, the fixed high-level shelf 10 is fixed to the ground of the storage area 101, and the fixed high-level shelf has a higher storage position than the mobile shelf, and can store more material boxes 60.
[0074] The tallying area 102 is provided with at least one mobile shelf 20. The mobile shelf 20 is limited by its height and has fewer storage locations than the fixed high-level shelf 10. The mobile shelf 20 is usually used to temporarily store and transfer boxes to be sorted or boxes to be stored. The sorting area 104 is provided with a sorting workbench, which can be used to pick the items in the sorting box 60 to complete the delivery.
[0075] Furthermore, the mobile shelf 20 is arranged corresponding to the fixed high shelf 10, and the mobile shelf 20 can receive and temporarily store the boxes from the fixed high shelf 10, and further transfer the boxes to the sorting workbench to complete the outbound delivery. Alternatively, the boxes to be stored can be temporarily stored on the mobile shelf 20, and further transferred to the fixed high shelf 10 to complete the storage.
[0076] The mobile rack 20 and its corresponding fixed high-level rack 10 are located in the same operation channel 50. For example, along the extension direction of the operation channel 50, the tally area 102 is set on one side of the storage area 101; in other words, along the outbound path of the material box 60, the mobile rack 20 is set on one side or both sides of the fixed high-level rack 10. The first handling robot moves in the operation channel 50 to transfer the material box between the mobile rack 20 and the fixed high-level rack 10; and / or, the first handling robot 30 can transfer the material box 60 between each fixed high-level rack 10; and / or, the first handling robot 30 can transfer the material box 60 between each mobile rack 20.
[0077] Specifically, the first handling robot 30 is configured as a rail-type handling robot; accordingly, the storage system 100 has a rail (not shown) adapted to the first handling robot 30. The first handling robot 30 is slidably mounted on the rail and can move along the extension direction of the rail, and the extension direction of the rail can be the arrangement direction of the mobile shelf 20 relative to the fixed high-level shelf 10.
[0078] For example, Figure 1 As shown, the working channel 50 extends along the X-axis direction, and the guide rail can be arranged horizontally on the fixed high-level shelf 10, and the extension direction of the guide rail is consistent with the X-axis direction, that is, the extension direction of the guide rail is consistent with the extension direction of the working channel 50. The guide rail can be set on the fixed high-level shelf 10, and the guide rail extends along the X-axis to the working surface of the mobile shelf, so that the first handling robot 30 can cover the fixed high-level shelf and the mobile shelf, and then realize the operation of the material boxes on the fixed high-level shelf 10 and the mobile shelf 20. It should be noted that the "working surface" of the mobile shelf 20 is defined as the plane where the entrances and exits of each storage position on the mobile shelf 20 are located, and the plane is usually located on the side of the mobile shelf 20.
[0079] Along the extension direction of the guide rail, the mobile shelf 20 is arranged on one side of the fixed high shelf 10, and forms an operation channel 50. Along the extension direction of the guide rail, a first traffic channel 81 is provided on the side of the mobile shelf 20 away from the fixed high shelf 10, and the extension direction of the first traffic channel 81 is perpendicular to the extension direction of the operation channel 50, and the first traffic channel is connected to the operation channel. It can be understood that the first handling robot slides along the X-axis direction in the operation channel 50, and the first traffic channel 81 can be a moving channel for the second handling robot 40.
[0080] like Figure 3 and Figure 4As shown, in the embodiment of the present application, the second handling robot 40 can be an AGV handling robot, which carries the mobile shelf and moves along the ground. For example, the second handling robot 40 can move according to a planned path or autonomously select a path. The mobile shelf 20 is arranged in cooperation with the second handling robot 40, and the second handling robot 40 can move to the bottom of the mobile shelf 20, lift the mobile shelf 20, further transfer the mobile shelf 20 from the tallying area 102 to the sorting area 104, and pick the material box 60 on the mobile shelf 20.
[0081] Exemplarily, the second handling robot 40 includes a lifting mechanism, a pallet, and a mobile chassis; wherein the mobile chassis serves as a bearing unit, the mobile chassis carries the pallet and the lifting mechanism, and the mobile chassis can drive the second handling robot 40 to move. Along the height direction of the second handling robot 40, the lifting mechanism is arranged between the pallet and the chassis, the lifting mechanism is retractable along the height direction, and can lift the pallet. The pallet is used to carry the mobile shelf 20, and under the action of the lifting mechanism, the pallet lifts the mobile shelf 20 so that the mobile shelf 20 is separated from the ground, and the mobile shelf 20 is further moved.
[0082] In the related art, the storage system includes movable shelves and automatic guided transport robots. The movable shelves are used to store material boxes. When sorting out of the warehouse, the automatic guided transport robot carries the movable shelves to the sorting area, and the sorting material boxes are further sorted and shipped out through the sorting workbench. However, due to the limited carrying capacity of the automatic guided transport robot and the limited height of the movable shelves, the storage capacity of the current storage system is relatively small.
[0083] The storage system 100 provided in the embodiment of the present application has a fixed high shelf in the storage area 101, a mobile shelf in the sorting area 102, and a first handling robot 30 to transfer the material box 60 from the fixed high shelf 10 to the mobile shelf 20; and further, a second handling robot 40 carries the mobile shelf to the sorting area 104. In this arrangement, since the fixed high shelf 10 has a higher layer height and a larger storage capacity than the mobile shelf 20, it can accommodate more material boxes 60, thereby increasing the storage capacity of the storage system 100.
[0084] In some embodiments, the storage area 101 in the embodiment of the present application includes a plurality of fixed high-level shelves 10, which are arranged in an array and form the above-mentioned working channel 50 and the first traffic channel 81, wherein the first traffic channel 81 is connected to the working channel 50, wherein the working channel 50 is configured as a moving channel for the first handling robot, and the first traffic channel 81 is a moving channel for the second handling robot 40.
[0085] For example, a plurality of fixed high-level racks 10 are arranged to form a plurality of operating channels 50, each operating channel 50 extends along the X-axis direction, and a plurality of operating channels 50 are arranged along the Y-axis direction. Along the Y-axis direction, the fixed high-level racks 10 are arranged on both sides of the operating channel 50, and a first handling robot 30 may be arranged in each operating channel 50. The fixed high-level racks 10 located on both sides of the operating channel 50 may share a first handling robot 30 to take and place material boxes.
[0086] like Figure 5 As shown, the first handling robot 30 operates in the working channel 50, at least part of the guide rail 70 is fixed on the fixed high shelf 10, and the extension direction of the guide rail 70 is consistent with the length extension direction of the working channel 50. For example, the guide rail 70 can be fixed on the crossbeam of the fixed high shelf 10 and arranged horizontally along the first direction. The first handling robot 30 is slidably mounted on the guide rail 70 and moves along the working channel 50.
[0087] It should be noted that part of the guide rail 70 extends to the sorting area 102 so that the first handling robot 30 can pick up and put down the material box 60 on the mobile shelf 20. Based on this, the storage system 100 provided in the embodiment of the present application also includes a carrier 90, and the carrier 90 is used to install the guide rail 70 extending to the sorting area. The guide rail 70 includes a first part and a second part, and the extension direction of the first part is consistent with the extension direction of the second part, and the first part and the second part are connected.
[0088] Exemplarily, the first part and the second part are configured as an integral structure, or the first part and the second part are arranged horizontally and located at the same level, so that the first handling robot can slide between the first part and the second part without obstacles.
[0089] The first part of the guide rail 70 located in the same working channel 50 is installed on the fixed high-level shelf 10. For example, the first part is fixed to the side of the fixed high-level shelf 10 facing the working channel 50. The second part extends to the working surface of the mobile shelf and is fixed to the support frame 90; along the extension direction of the working channel 50, the support frame 90 is located on one side of the fixed high-level shelf 10, and the support frame 90 is set in the tally area 102.
[0090] For example, the carrier 90 is fixed to the ground of the tallying area 102, and along the second direction, the carrier 90 is located on one side of the mobile shelf 20. The carrier 90 includes at least one column, one end of the second part is fixed to the column, and the other end of the second part can be fixed to the fixed high shelf 10 and connected to the first part. It can be understood that the first handling robot 30 can slide from the first part to the second part, or slide from the second part to the first part.
[0091] like Figure 6 As shown, the first handling robot 30 provided in the embodiment of the present application includes a gantry 31, a sliding mechanism 34, a lifting mechanism 33 and a picking mechanism 32; wherein the gantry 31 is slidably connected to the guide rail 70, and the sliding mechanism 34 is disposed on the gantry 31 and is used to provide a sliding force to the gantry 31 so that the gantry 31 can slide relative to the guide rail 70. The picking mechanism 32 is slidably mounted on the gantry 31 and can slide relative to the gantry 31 along the height direction of the gantry 31.
[0092] The picking mechanism 32 is configured to be horizontally retractable and extend into the storage space of the shelf to pick up and place the material box 60. The lifting mechanism 33 is arranged on the door frame 31 and connected to the picking mechanism 32. The lifting mechanism 33 is configured to provide a lifting force to the picking mechanism 32 so that the picking mechanism 32 moves up and down relative to the door frame 31 in the height direction, so that the picking mechanism 32 can operate on the material boxes 60 located at different heights.
[0093] On the basis of the above embodiment, in order to improve the outbound efficiency of the warehousing system 100, a gap is maintained between the bottom of the fixed high-level shelf 10 and the ground, and a second traffic channel 82 is formed for the second handling robot 40 to shuttle, that is, when the second handling robot 40 is not carrying the mobile shelf 20, it can move freely at the bottom of the fixed high-level shelf 10; of course, when the second handling robot 40 is not carrying the mobile shelf 20, it can also move freely at the bottom of the mobile shelf 20.
[0094] Continue reading Figure 1 and Figure 2 In order to improve the picking efficiency, the storage system 100 provided in the embodiment of the present application further includes a buffer area 103, which is arranged near the sorting area 104, and the buffer area 103 is located on the moving path of the second handling robot 40 from the tallying area 102 to the sorting area 104. For example, the buffer area 103 is located between the sorting area 104 and the tallying area 102 near the sorting area 104.
[0095] Furthermore, the buffer area 103 is used to temporarily store the mobile shelves 20 to be moved to the sorting area 104. The mobile shelves 20 queue in the buffer area 103 to be picked, so that the material boxes 60 of the mobile shelves 20 to be picked can be picked in order to improve the picking efficiency.
[0096] In the process of picking goods, the distribution of the inventory bins 60 affects the efficiency of picking and dispatching. To further improve the efficiency of picking, the distribution of the inventory bins 60 in the storage area and the tallying area can be adjusted, especially the distribution of the inventory bins 60 in the storage area can be adjusted to match the orders that have not been picked. For example, the inventory bins 60 to be picked can be adjusted to the shelves of the tallying area 102 to facilitate dispatching.
[0097] like Figure 7 As shown, the embodiment of the present application provides an order processing method, comprising the following steps:
[0098] S100: Obtain a set of pending orders and inventory information of the storage area 101 and the tally area 102.
[0099] Specifically, the to-be-processed order set refers to an order set consisting of orders for picking items, and the processing order set is sorted at the same sorting workbench. The inventory information refers to the inventory information of items stored in the storage area 101 and the tally area 102, including but not limited to the type of items, the bin 60 where they are located, and the storage location (location information).
[0100] The storage area 101 is provided with at least one fixed high-level shelf 10, and the sorting area 102 is provided with at least one mobile shelf 20; the mobile shelf 20 is limited by its height, and the number of storage locations it has is less than that of the fixed high-level shelf 10. The mobile shelf 20 usually temporarily stores and transfers material boxes to be sorted or to be stored.
[0101] Furthermore, the mobile shelf 20 is arranged corresponding to the fixed high shelf 10, and the mobile shelf 20 can receive and temporarily store the material boxes 60 from the fixed high shelf 10, and further transfer the material boxes 60 to the sorting workbench to complete the outbound. Alternatively, the material boxes 60 to be stored in the warehouse can be temporarily stored in the mobile shelf 20, and further transferred to the fixed high shelf 10 to complete the storage.
[0102] Optionally, mobile racks can also be used to store bins permanently, such as those that are subject to higher temperatures.
[0103] It should be noted that before adjusting the distribution of inventory bins 60, it is necessary to first obtain a set of pending orders and inventory information, so that the inventory distribution of the inventory area can be adjusted based on the set of pending orders and inventory information to achieve centralized distribution of inventory bins 60 and improve outbound efficiency.
[0104] S200: Determine the storage location of each target material box requested by the pending order set, any of which is located on a fixed high-bay shelf 10 or a mobile shelf 20 .
[0105] Specifically, based on the set of pending orders, each target material box requested by the set of pending orders is obtained, and further based on the inventory information of the storage area 101 and the tallying area 102, the shelf position of each target material box and the storage position on the shelf are determined, wherein the above-mentioned shelves include a fixed high-level shelf 10 located in the storage area 101 and a mobile shelf 20 located in the tallying area 102, that is, each target material box is located on the fixed high-level shelf 10, or on the mobile shelf 20.
[0106] S300: Determine the target mobile rack with the highest target bin hit rate.
[0107] Specifically, in the embodiment of the present application, the set of pending orders corresponds to multiple target boxes, and the multiple target boxes are usually dispersed in the sorting area 102 and the storage area 101. For example, some of the target boxes are located on at least one mobile shelf 20, and some of the target boxes are located on at least one fixed high shelf 10. If the number of target boxes on the mobile shelf 20 accounts for the largest proportion, then the mobile shelf 20 is the target mobile shelf.
[0108] S400: Transfer the target mobile shelf to the sorting workbench located in the sorting area 104 .
[0109] Specifically, the warehousing system 100 provided in the embodiment of the present application includes a control center, which may be a remote control computer, etc. The control center is used to dispatch the first handling robot 30 and the second handling robot 40 to transfer the target bin to be picked and transfer it to the sorting area 104 for picking, so as to complete the picking and delivery of the items.
[0110] The first handling robot 30 is a rail-type handling robot, which slides along the length extension direction of the fixed high-level shelf 10 and can slide to the working surface of the mobile shelf 20; the first handling robot 30 is used to transfer the target material box between the storage area 101, the tally area 102, and / or the storage area 101 and the tally area 102, that is, the first handling robot 30 can transfer the target material box in the storage area 101, transfer the target material box in the tally area 102, and transfer the target material box between the storage area 101 and the tally area 102.
[0111] The mobile shelf 20 is transferred between the tally area 102 and / or the sorting area 104 and the tally area 102 by the second transport robot 40, that is, the second transport robot 40 transfers the mobile shelf 20 within the tally area 102, and / or, transfers the mobile shelf 20 between the tally area 102 and the sorting area 104. The second transport robot moves along the ground, and when the target mobile shelf is determined, the control center dispatches the second transport robot 40 to transfer the target mobile shelf to the sorting workbench of the sorting area 104 for sorting to complete the delivery.
[0112] With such an arrangement, the order processing method provided in the embodiment of the present application sets a fixed high-level shelf 10 in the storage area 101 and a mobile shelf 20 in the sorting area 102, so as to be able to transfer the target material box on the fixed high-level shelf 10 to the target mobile shelf, and further transfer it to the sorting workbench in the sorting area 104 through the target mobile shelf. Since the fixed high-level shelf 10 has a higher layer height and a larger storage capacity than the mobile shelf 20, it can accommodate a larger number of material boxes, thereby increasing the storage capacity of the warehousing system.
[0113] Furthermore, the order processing method can transfer the target mobile shelf with the highest target order hit rate to the sorting workbench, thereby improving the hit rate of the target material box, so that a single transfer of the target mobile shelf can hit more target material boxes, thereby improving the outbound efficiency.
[0114] like Figure 8 As shown, the order processing method provided by the embodiment of the present application, step S400: transferring the target mobile shelf to the sorting workbench of the sorting area 104, includes:
[0115] Step S410: If the target mobile shelf includes all the target material boxes, then execute step S420: mobilize the second transport robot 40 to transfer the target mobile shelf to the sorting workbench.
[0116] Specifically, if all target boxes requested by the pending order set are located on the target mobile shelf, the control center can dispatch the second transport robot 40 to transfer the target mobile shelf to the sorting workbench for sorting to complete the outbound delivery of all target boxes requested by the pending order set.
[0117] On the contrary, among all the target boxes requested by the pending order set, some of the target boxes are located on the target mobile shelf, then step S430 is executed: the first handling robot 30 and / or the second handling robot 40 are mobilized to transfer some of the target boxes that are not located on the target mobile shelf to the target mobile shelf.
[0118] Specifically, all target containers requested by the pending order set include a first part of target containers and a second part of target containers, wherein the first part of target containers are located on the target mobile shelf, and the second part of target containers are not located on the target mobile shelf. For example, if the second part of target containers are located on a fixed high shelf 10 or other mobile shelf 20, the control center dispatches the first handling robot 30 and / or the second handling robot 40 to transfer the second part of target containers to the target mobile shelf.
[0119] In detail, Fig. 9As shown, step S430 includes step S431: if the storage location where the second part of the target material boxes are located is in the same operating channel 50 as the target mobile shelf, step S432 is executed: the first handling robot 30 is mobilized to transfer the second part of the target material boxes to the target mobile shelf.
[0120] For the convenience of describing the embodiments of the present application, Figure 1 The multiple operating channels 50 are defined as the first operating channel to the fifth operating channel in sequence along the Y-axis direction, wherein the first operating channel is located at the lowermost side and the fifth operating channel is located at the uppermost side.
[0121] For example, the target mobile shelf where the first part of the target boxes are located is located in the second operating channel, and the storage location where the second part of the target boxes are located is also located in the second operating channel. In other words, the storage location where the second part of the target boxes are located can be picked up and placed by the first handling robot 30 in the second operating channel, so that the first handling robot 30 moves along the second operating channel toward the position where the target mobile shelf is located, and can transfer the second part of the target boxes to the target mobile shelf.
[0122] On the contrary, if the storage location where the second part of the target boxes are located is in a different operating channel 50 from the target mobile shelf, step S433 is executed: the first handling robot 30 and the second handling robot 40 are mobilized to transfer the second part of the target boxes to the target mobile shelf.
[0123] In this case, first determine the operating channel where the second part target box is located, and then use the second handling robot to move the target mobile shelf to the operating channel where the second part target box is located based on the operating channel where the second part target box is located; finally, use the first handling robot in the operating channel where the second part target box is located to transfer the second part target box to the target mobile shelf.
[0124] For example, the target mobile shelf where the first part of the target boxes are located is located in the second operating channel, and the second part of the target boxes are in other operating channels. The embodiment of the present application is explained by taking the second part of the target boxes as an example on the fixed high shelf 10 in the first operating channel.
[0125] The control center dispatches the second handling robot to transfer the target mobile shelf in the second operating channel to the first operating channel, and the target mobile shelf is located on one side of the fixed high shelf 10 of the first operating channel. The first handling robot 30 in the first operating channel picks up the second part of the target material box; after picking up, the first handling robot 30 moves along the first operating channel toward the location of the target mobile shelf, and can transfer the second part of the target material box to the target mobile shelf.
[0126] In some embodiments, the target mobile shelf has a first portion of target boxes, and the storage locations on the target mobile shelf are full. In this case, the step of mobilizing the first handling robot 30 and the second handling robot 40 to transfer the second portion of target boxes that are not located on the target mobile shelf to the target mobile shelf includes: transferring the non-target boxes on the target mobile shelf to a non-target mobile shelf or a fixed high shelf to form an empty storage location; transferring part of the second portion of target boxes to the storage location of the target mobile shelf.
[0127] Specifically, the first part of the target boxes are on the target mobile shelf, and all the storage locations on the target mobile shelf are full, that is, the target mobile shelf includes the first part of the target boxes and other non-target boxes, and the second part of the target boxes can no longer be stored. Therefore, it is necessary to transfer the non-target boxes on the target mobile shelf to the storage locations of other non-target mobile shelves 20 or fixed high shelves 10 through the first handling robot 30 and / or the second handling robot 40 to form a number of empty storage locations on the target mobile shelf; further, at least one second part of the target boxes is transferred to the empty storage location formed by the target mobile shelf through the first handling robot 30 and / or the second handling robot 40.
[0128] In some embodiments, step S400: the step of transferring the target mobile shelf to the sorting workbench includes: if the target mobile shelf includes some target material boxes and meets the order hit rate threshold, mobilizing the second transport robot to transfer the target mobile shelf to the sorting workbench.
[0129] Specifically, the set of pending orders corresponds to multiple target boxes, some of which are located on the target mobile shelf, and the target mobile shelf meets the order hit rate threshold. It should be noted that the order hit rate is the ratio of the number of some target boxes on the target mobile shelf to all target boxes requested by the set of pending orders.
[0130] Accordingly, the control center sets an order hit rate threshold. If the order hit rate on the target mobile shelf is greater than or equal to the order hit rate threshold, the control center can dispatch the second handling robot 40 to transfer the target mobile shelf to the sorting workbench for sorting. In this way, the target material boxes are concentrated on the target mobile shelf as much as possible, so that the target mobile shelf can meet the minimum order hit rate requirement in a single transfer, thereby reducing the number of transfers of the target mobile shelf and improving the outbound efficiency.
[0131] In other embodiments, the set of pending orders corresponds to multiple target boxes, wherein a first portion of the target boxes are located on a target transfer shelf, and a second portion of the target boxes are not located on the target mobile shelf. In this case, the first handling robot 30 and / or the second handling robot 40 needs to be mobilized to transfer the second portion of the target boxes that are not located on the target mobile shelf to the target mobile shelf.
[0132] Specifically, the first handling robot 30 and / or the second handling robot 40 are used to sort the second part of the target boxes, so as to transfer at least one of the second part of the target boxes to the target mobile shelf. The specific implementation scheme is not described in detail here. The control center is set with a preset time for the sorting, that is, the second part of the boxes are sorted within the preset time.
[0133] If the preset time is reached, the tallying is stopped, and the second handling robot 40 is mobilized to transfer the target mobile shelf to the sorting workbench. In this way, the moving frequency of the transfer target mobile shelf can be controlled to avoid delaying the target material box out of the warehouse due to long-term tallying, thereby affecting the out of warehouse efficiency.
[0134] The various embodiments or implementation methods in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments, and the same or similar parts between the various embodiments can be referenced to each other.
[0135] It should be noted that the embodiments represented by "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments", etc. mentioned in the specification may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, such phrases do not necessarily refer to the same embodiment. In addition, when describing specific features, structures or characteristics in conjunction with an embodiment, it is within the knowledge of those skilled in the art to implement such features, structures or characteristics in conjunction with other embodiments that are explicitly or not explicitly described.
[0136] In general, terms should be understood, at least in part, by the context in which they are used. For example, the term "one or more" as used herein may be used to describe any feature, structure, or characteristic in a singular sense, or may be used to describe a combination of features, structures, or characteristics in a plural sense, depending, at least in part, on the context. Similarly, terms such as "a" or "" may also be understood to convey singular usage or to convey plural usage, depending, at least in part, on the context.
[0137] In addition, spatially relative terms, such as "below", "below", "beneath", "above", "above", etc., may be used herein for ease of description to describe the relationship of one element or feature relative to other elements or features as shown in the figures. The spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation shown in the figures.
[0138] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A storage system, characterized in that: include: A storage area provided with at least one fixed high-level shelf; A tally area, which is provided with at least one mobile shelf, wherein the mobile shelf and the corresponding fixed high-level shelf are arranged along the extension direction of the operation channel; A first handling robot and a guide rail adapted therefor, wherein the extension direction of the guide rail is consistent with the extension direction of the working channel; the guide rail is arranged on the fixed high-level shelf and extends to the working surface of the mobile shelf; the first handling robot is slidably mounted on the guide rail and moves along the extension direction of the guide rail; the first handling robot is configured to transfer the material box between the storage area and the tallying area; A second transport robot is used to transfer the mobile shelf within the tally area and / or between the tally area and the sorting area; The sorting area is provided with a sorting workbench, and the sorting workbench is used to sort the goods in the material box.
2. The storage system according to claim 1, characterized in that: Along the extension direction of the guide rail, the mobile shelf is arranged on one side of the fixed high-level shelf to form the operating channel; Along the extension direction of the guide rail, a first traffic channel is provided on the side of the mobile shelf away from the fixed high-level shelf. The extension direction of the first traffic channel is perpendicular to the extension direction of the guide rail, and the first traffic channel is connected to the operating channel.
3. The storage system according to claim 2, characterized in that: The guide rail comprises a first part and a second part which are connected; The storage system further comprises a load-bearing rack, which is arranged on one side of the fixed high-level shelf along the extension direction of the operation channel; In the same working channel, the first part is installed on the fixed high-level shelf, the second part extends to the working surface of the mobile shelf, and the second part is installed on the supporting frame.
4. The storage system according to claim 1, characterized in that: A gap is maintained between the bottom of the fixed high-level shelf and the ground, and a second traffic channel is formed for the second transport robot to shuttle.
5. The storage system according to claim 1, characterized in that: The first handling robot includes a gantry, a sliding mechanism, a lifting mechanism and a picking mechanism; The door frame is slidably connected to the guide rail, and the sliding mechanism is configured to provide a sliding force to the door frame; The picking mechanism is slidably mounted on the door frame, and the picking mechanism is configured to be horizontally retractable and used for picking up and placing the material box; The lifting mechanism is arranged on the door frame and connected with the picking-up mechanism; the lifting mechanism is used to provide driving force to the picking-up mechanism so that the picking-up mechanism moves up and down relative to the door frame in the height direction.
6. The storage system according to claim 1, characterized in that: The second handling robot comprises a lifting mechanism, a pallet and a mobile chassis; The lifting mechanism is arranged between the tray and the chassis in the height direction, and the lifting mechanism is used to lift the tray; The pallet is used to carry the mobile shelf, and the mobile chassis is used to install the lifting mechanism and the pallet.
7. The storage system according to any one of claims 1 to 6, characterized in that: The storage system also includes a buffer area; The buffer area is arranged close to the sorting area, and the buffer area is used to temporarily store the mobile shelves; The buffer area is located on a moving path of the second transport robot from the tallying area to the sorting area.
8. An order processing method, characterized in that: include: Obtaining a set of pending orders, and inventory information of a storage area and a tally area; wherein the set of pending orders is processed at the same sorting workbench, the storage area is provided with at least one fixed high-level shelf, and the tally area is provided with at least one mobile shelf; Determine the storage location of each target material box requested by the pending order set, any of the storage locations being located on the fixed high shelf or the mobile shelf; Determine the target mobile rack with the highest target bin hit rate; The target mobile shelf is transferred to a sorting workbench located in a sorting area.
9. The order processing method according to claim 8, characterized in that: The fixed high-level shelf is equipped with a first handling robot, which is a rail-type handling robot. The first handling robot slides along the length extension direction of the fixed high-level shelf and can slide to the working surface of the mobile shelf. The first handling robot is used to transfer the target material box between the storage area, the tally area, and / or between the storage area and the tally area. The mobile shelf is transferred in the tally area, and / or between the sorting area and the tally area by a second transport robot, and the second transport robot moves along the ground; The step of transferring the target mobile shelf to a sorting workbench in a sorting area comprises: If the target mobile shelf includes all target material boxes, mobilizing the second transport robot to transfer the target mobile shelf to the sorting workbench; If the target mobile rack includes a first portion of target boxes, the first transport robot and / or the second transport robot is mobilized to transfer a second portion of target boxes that are not located on the target mobile rack to the target mobile rack.
10. The order processing method according to claim 9, characterized in that: Along the length extension direction of the fixed high-level shelf, the mobile shelf is arranged on one side of the fixed high-level shelf to form an operation channel; The step of mobilizing the first transport robot and / or the second transport robot to transfer the second part of the target material boxes that are not located on the target mobile shelf to the target mobile shelf includes: If the storage location where the second part of the target boxes are located is in the same operating channel as the target mobile shelf, mobilizing the first handling robot to transfer the second part of the target boxes to the target mobile shelf; If the storage location where the second part of the target boxes are located is in a different operating channel from the target mobile shelf, the first handling robot and the second handling robot are mobilized to transfer the second part of the target boxes to the target mobile shelf.
11. The order processing method according to claim 10, characterized in that: The step of mobilizing the first handling robot and the second handling robot to transfer the second part of the target material boxes to the target mobile shelf includes: Determine the operation channel where the second part of the target material boxes are located; Using a second transport robot to transfer the target mobile shelf to the operating channel where the second part of target boxes are located; The second part of the target material boxes is transferred to the target mobile shelf by using the first transport robot.
12. The order processing method according to claim 9, characterized in that: The target mobile shelf has a first portion of target material boxes, and the storage spaces on the target mobile shelf are full; The step of mobilizing the first transport robot and the second transport robot to transfer the second part of the target material boxes that are not located on the target mobile shelf to the target mobile shelf includes: Transferring the non-target material boxes on the target mobile shelf to the non-target mobile shelf or the fixed high shelf to form an empty storage space; At least one second portion of the target container is transferred to a storage location of the target mobile rack.
13. The order processing method according to claim 8, characterized in that: The step of transferring the target mobile shelf to the sorting workbench comprises: If the target mobile shelf includes some target material boxes and meets the order hit rate threshold, the second transport robot is mobilized to transfer the target mobile shelf to the sorting workbench; The order hit rate is the ratio of the number of some target boxes on the target mobile shelf to all target boxes requested by the set of pending orders.
14. The order processing method according to claim 9, characterized in that: The step of mobilizing the first transport robot and / or the second transport robot to transfer the second part of the target material boxes that are not located on the target mobile shelf to the target mobile shelf includes: If the target mobile shelf includes a first part of target containers, tallying the second part of target containers that are not located on the target mobile shelf within a preset time to transfer at least one of the second part of target containers to the target mobile shelf; If the preset time is reached, the second transport robot is mobilized to transfer the target mobile shelf to the sorting workbench.
Citation Information
Patent Citations
Cargo processing method, system and device, storage medium and electronic equipment
CN113537868A
Order sorting system and sorting method
CN115245911A
Order sorting method and device, computing equipment, storage medium and program product
CN118114915A
Warehousing device, warehousing system, warehousing method and ex-warehouse method
CN118458195A
Warehouse dispatching system
CN215709060U
Cited By
Method and device for warehousing sorting and warehousing system
CN119796751A
Methods and apparatus for warehouse picking, and warehouse systems
CN119796751B
Warehouse storage equipment, warehouse storage systems, and order processing, receiving, and shipping methods.
JP2026517040A
Warehouse storage equipment, warehouse storage systems, and order processing, receiving, and shipping methods.
JP7891587B2
Warehouse device, warehouse system, and order-processing, storage and retrieval method
WO2025218332A1
