Gas lift anchoring tool for gas well fracturing well completion

By designing the gas lifting anchor tool for completion of gas well fracturing, the combination of the pressure plate and the pressure sleeve can achieve smooth recovery of anchor claws, and the circulation channel of the gas lifting and drainage gas extraction process is provided through the pressure sleeve and circulation hole, and the air lifting and drainage gas extraction process can be solved The problem of complex tool structure and lack of circulation channels in the prior art has been improved, and construction efficiency and safety are improved.

CN119021608APending Publication Date: 2024-11-26DAQING OILFIELD CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310599441.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the existing gas well fracturing and completion technology, the tool structure and construction process are complex, and the anchoring pipe string and anti-blocking cannot be achieved at the same time, and the function of providing gas lifting circulation channels is lacking.

Method used

A gas lifting anchor tool for gas well fracturing completion is designed, including anchor body, bushing, anchor claw, pressure plate, pressure sleeve and C-type locking ring. The anchor claw is realized through the cooperation of the pressure plate and the pressure sleeve. Smoothly recycling, and a circulation channel for the gas lifting and drainage gas extraction process is provided through the pressure bearing sleeve and circulation hole.

Benefits of technology

The anchor claw recycling process is simplified, construction efficiency and safety is improved, construction costs are reduced, and circulation channels for air lifting and drainage processes are realized, making operation simple and safe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021608A_ABST
    Figure CN119021608A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of petroleum and natural gas extraction, in particular to a gas lift anchoring tool for gas well fracturing well completion. The gas lift anchoring tool for gas well fracturing well completion comprises an anchor body, an upper connector is arranged at the upper end of the anchor body, and a lower connector is arranged at the lower end of the anchor body; a lining is sleeved with the anchor body, a plurality of rows of through holes are formed in the area, corresponding to the lining, of the anchor body, and anchor flukes are arranged in the through holes. A pressing plate groove is formed in the connecting line of the center points of each column of anchor flukes, and a pressing plate is arranged in each pressing plate groove. A pressure-bearing sleeve is sleeved on the anchor body; a C-shaped locking ring is arranged at the lower end of the pressure-bearing sleeve and is sleeved on the lower joint; a limiting step is arranged on the lower joint; the lower end of the pressing plate is connected with a pressure-bearing sleeve, and a circulating hole is formed in the contact position of the pressure-bearing sleeve and the anchor body. According to the gas lift anchoring tool for gas well fracturing well completion, smooth recovery of the hydraulic anchor flukes is guaranteed through the pressing plate and the pressure bearing sleeve; through the pressure-bearing sleeve and the circulating hole, a circulating channel is provided when the gas lift and drainage gas recovery process is implemented; the anchor fluke is convenient to recycle, the drainage process is simple, the structure and operation are simple, and the construction efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil and natural gas exploitation, and in particular to a gas lift anchoring tool for gas well fracturing and completion. Background Art

[0002] After gas well fracturing, replacing the fracturing string with a production string will cause secondary pollution to the reservoir. To avoid this problem, the gas fields currently mainly adopt the transformation process of directly putting it into production after fracturing, that is, one trip of the string completes fracturing and completion. In the prior art, the main methods of preventing sticking are to use a ball to release the anchor, reduce the resistance of anchor claw reset, and replace the spring with vacuum negative pressure. However, the tool structure and construction process in the above method are relatively complex, and it is impossible to provide a gas lift circulation channel for the implementation of the gas lift process after fracturing while taking into account the anchoring string and preventing sticking. Therefore, in view of the above shortcomings, a gas lift anchoring tool for gas well fracturing completion is proposed. Summary of the invention

[0003] 1. Technical issues to be resolved In view of the deficiencies in the prior art, the present invention provides a gas lift anchoring tool for gas well fracturing completion, which solves the problems that the tool structure and construction process in the existing device are relatively complex, and the spring elastic force is reduced and the anchor claw cannot be reset and the function of providing a gas lift circulation channel cannot be solved at the same time.

[0004] (II) Technical solution In order to solve the above problems, the present invention provides a gas lift anchoring tool for gas well fracturing completion, comprising: An anchor body and a bushing, an upper joint is provided above the anchor body, and a lower joint is provided below the anchor body; the anchor body, the upper joint and the lower joint are hollow tubular; the bushing is tubular and is inserted into the anchor body; a plurality of rows of through holes are opened on the anchor body in the area corresponding to the bushing, and an anchor claw is provided in each through hole; a pressure plate groove is provided on the line connecting the center points of each row of anchor claws on the anchor body, and a pressure plate is provided in the pressure plate groove; a pressure sleeve is provided at the lower part of the anchor body, and the lower end of the pressure plate is connected to the pressure sleeve; the cross-sectional area of ​​the upper half of the pressure sleeve is larger than that of the lower half; the pressure sleeve is fixed to the anchor body by shear pins, and the lower half of the pressure sleeve is sleeved on the lower joint; a C-shaped locking ring is provided below the pressure sleeve, and a circulation hole is provided in the area corresponding to the anchor body and the pressure sleeve; a limiting step is provided below the lower joint.

[0005] Preferably, the upper joint is connected to the anchor body by threads and fixed by an anti-rotation pin; the lower joint is connected to the anchor body by threads and fixed by an anti-rotation pin.

[0006] Preferably, the cross-sections of the pressing plate and the pressing plate groove are in an inverted T-shape, and the pressing plate is inserted into the pressing plate groove from bottom to top.

[0007] Preferably, the pressure plate is connected to the pressure sleeve via fixing pins.

[0008] Preferably, the inner wall of the upper part of the pressure-bearing sleeve is closely attached to the anchor body, and there is a gap between the lower part of the pressure-bearing sleeve and the anchor body.

[0009] Preferably, the bushing is evenly provided with slits.

[0010] Preferably, a leaf spring is provided under each fluke.

[0011] Preferably, the pressure plate and the fluke are provided with an outer auxiliary recovery surface and an inner auxiliary recovery surface respectively.

[0012] Preferably, the outer auxiliary recovery surface and the inner auxiliary recovery surface correspond in position and cooperate with each other.

[0013] (III) Beneficial effects The gas lift anchoring tool for gas well fracturing completion provided by the present invention ensures the smooth recovery of hydraulic anchor claws after fracturing through the cooperation of the pressure plate and the pressure sleeve; through the cooperation of the pressure sleeve and the circulation hole, a circulation channel can be provided when the gas lift and water drainage gas production process are implemented according to actual needs; in the present invention, the anchor claws are easy to recover and the water drainage process is simple, which greatly improves the construction efficiency and saves the construction cost. At the same time, the operation is simple and the safety is good. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the structure of the gas lift anchoring tool for gas well fracturing completion of the present invention; Figure 2 The gas lift anchoring tool for gas well fracturing completion of the present invention Figure 1 AA surface cross-section diagram in; Figure 3 A three-dimensional structural diagram of a pressure plate of a gas lift anchoring tool for gas well fracturing completion of the present invention; Figure 4 A three-dimensional structural diagram of the anchor claw of the gas lift anchor tool for gas well fracturing completion of the present invention; Figure 5 This is a structural diagram of a C-type locking ring of a gas lift anchoring tool for gas well fracturing completion of the present invention; Figure 6 This is a position relationship diagram of the gas lift anchoring tool for gas well fracturing completion of the present invention and the pressure plate when the anchor claw is in the anchoring state; Figure 7 This is a state diagram of the gas lift anchor tool for gas well fracturing completion of the present invention when the anchor claw is fully recovered by the pressure plate.

[0015] Among them, 1. upper joint; 2. anti-rotation pin; 3. anchor body; 4. pressure plate; 5. bushing; 6. anchor claw; 7. leaf spring; 8. fixing pin; 9. pressure sleeve; 10. C-type locking ring; 11. lower joint; 12. shear pin; 13. circulation hole; 14. limiting step; 15. external auxiliary recovery surface; 16. internal auxiliary recovery surface. Implementation

[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] In the description of the present invention, it is necessary to understand that the orientations or positional relationships indicated by “upper”, “lower”, “inside”, “outside”, “top”, “bottom”, etc. are all based on the orientations or positional relationships shown in the accompanying drawings. The purpose is only to facilitate the description of the present invention and simplify the description. It does not indicate or imply that the referred parts must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0018] like Figure 1-7 As shown, the present invention provides a gas lift anchoring tool for gas well fracturing completion, specifically comprising: an anchor body 3, an upper joint 1 is provided at the upper end of the anchor body 3, and a lower joint 11 is provided at the lower end; the upper joint 1 and the lower joint 11 are used to connect the anchor body 3 to an external device.

[0019] The anchor body 3, the upper joint 1 and the lower joint 11 are tubular, and after being connected together, the inner space is used to inject the working medium.

[0020] It should be noted that the upper joint 1 is connected to the anchor body 3 by threads and fixed at the connecting head by an anti-rotation pin 2, and the lower joint 11 is connected to the anchor body 3 by threads and fixed at the connecting head by an anti-rotation pin 2, to prevent rotation during work that may cause parts to fall off, resulting in work suspension or accidents, thereby improving the stability and safety of the device.

[0021] In the present invention, a bushing 5 is sleeved inside the anchor body 3, and a plurality of rows of through holes are arranged in the region of the anchor body 3 corresponding to the bushing 5, and an anchor claw 6 is arranged in each through hole.

[0022] Among them, a plurality of slits are evenly arranged on the bushing 5. When liquid is pressurized in the anchor body 3, the liquid pushes the anchor claw 6 to pop out through the slits on the bushing 5 to anchor the pipe column, which is simple to operate. At the same time, the slits can filter out particulate matter in the internal pressurized liquid to prevent particulate matter from entering the gap between the anchor claw 6 and the anchor body 3, causing the anchor claw 3 to fail to pop out or retract normally, thereby reducing the failure rate of the device.

[0023] It should be noted that a leaf spring 7 is provided between each anchor claw 6 and the bushing 5 to assist in the recovery of the anchor claw 6; a sealing ring is provided on the side of each anchor claw 6 to ensure the airtightness of the contact surface between the anchor claw 6 and the anchor body 3, to prevent the liquid in the anchor body 3 from being poorly sealed, resulting in unstable pressure on the anchor claw 6 and the inability to anchor the pipe column normally, thereby improving the working efficiency of the device.

[0024] like Figure 1 As shown, a pressure plate groove is provided on the anchor body 3 at the connection line of the center points of each column of anchor claws 6, and a pressure plate 4 is provided in the pressure plate groove. The cross-section of the pressure plate 4 and the pressure plate groove is an inverted T-shape. When the pressure plate 4 is inserted into the pressure plate groove, the position is fixed and will not be pushed away from the anchor body 3 due to the pressure of the anchor claws 6.

[0025] Among them, an inner auxiliary recovery surface 16 is provided above the anchor claw 6, and an outer auxiliary recovery surface 15 is provided on the pressure plate 4 at a position corresponding to the anchor claw 6. When the pressure plate 4 moves downward, the inner auxiliary recovery surface 16 contacts the outer auxiliary recovery surface 15, and the pressure plate 4 pushes the anchor claw 6 to be recovered to its original position.

[0026] In the present invention, a pressure sleeve 9 is sleeved under the anchor body 3, and the cross-sectional area of ​​the upper part of the pressure sleeve 9 is larger than that of the lower part. After the device is installed on the pipe string and lowered into the well, liquid pressurization is performed in the annular space between the anchor body 3 and the casing. At this time, the pressure sleeve 9 is subjected to different pressures in the upper and lower directions under the same pressure due to the difference in upper and lower cross-sectional areas, resulting in a pressure difference. Under the action of the pressure difference, the pressure sleeve 9 moves downward.

[0027] Among them, the pressure sleeve 9 and the anchor body 3 are fixed by the shear pins 12. When the pressure sleeve 9 needs to move downward during work, the annular space between the anchor body 3 and the casing is pressurized. When the pressure is greater than the shear stress of the shear pin 12, the shear pin 12 breaks, and the pressure sleeve 9 moves downward at this time, preventing the pressure sleeve 9 from moving downward due to changes in external space pressure without pressurization during work, thereby ensuring the stability of the work process. At the same time, the downward movement of the pressure sleeve 9 can be completed by only pressurizing, and the operation is simple.

[0028] It should be noted that the lower end of the pressure plate 4 is connected to the pressure sleeve 9 via the fixing pin 8. When the pressure sleeve 9 moves downward, it drives the pressure plate 4 downward so that the outer auxiliary recovery surface 15 and the inner auxiliary recovery surface 16 contact each other, pushing the anchor claw 6 to be retracted.

[0029] The outer auxiliary recovery surface 15 is a downward inclined surface, and the inner auxiliary recovery surface 16 is of the same shape as the outer auxiliary recovery surface 15 and is in an opposite direction. When the pressure plate 4 moves downward, the outer auxiliary recovery surface 15 contacts the inner auxiliary recovery surface 16. Since the pressure plate 4 is inserted in the pressure plate groove, the outer auxiliary recovery surface 15 pushes the inner auxiliary recovery surface 16 to move into the through hole for reset. When the outer auxiliary recovery surface 15 and the inner auxiliary recovery surface 16 are separated, the anchor claw 6 returns to its original position.

[0030] like Figure 1 As shown, the upper part of the pressure sleeve 9 is in close contact with the anchor body 3, and a gap is left between the lower part of the pressure sleeve 9 and the anchor body 3; a circulation hole 13 is provided in the area on the anchor body 3 corresponding to the upper part of the pressure sleeve 9, and an inward connecting hole is provided at the position corresponding to the gap between the anchor body 3 and the lower part of the pressure sleeve 9.

[0031] Among them, sealing rings are respectively provided on the upper and lower parts of the circulation hole 13. When the pressure sleeve 9 remains in place, the circulation hole 13 is closed, and the lower connecting hole is opened. When the anchor body 3 is pressurized, the pressure liquid enters the gap through the connecting hole, supports the pressure sleeve 9 upward, and prevents the pressure sleeve 9 from moving downward during the fracturing process.

[0032] It should be noted that when the anchor body 3 is pressurized outside, the pressure sleeve 9 moves downward, and the gas or liquid in the gap is discharged into the anchor body 3 along the connecting hole, preventing the pressure sleeve 9 from being unable to fall normally due to the compression of the liquid or gas in the gap; after falling, the circulation hole 13 opens, and the interior of the anchor body 3 is connected with the external space through the circulation hole 13 to form a circulation channel.

[0033] In the present invention, a C-type locking ring 10 is provided at the lower half of the pressure sleeve 9, and the diameter of the C-type locking ring 10 is slightly smaller than the lower joint 11. A limiting step 14 is provided on the lower joint 11, and the diameter of the limiting step 14 is smaller than the lower joint 11; when the pressure sleeve 9 moves downward, the C-type locking ring 10 is driven downward, and when the pressure sleeve 9 moves to the lowermost end, the C-type locking ring 10 moves to the position of the limiting step 14, and the C-type locking ring 10 shrinks due to its own elastic force. At this time, a part of the C-type locking ring 10 is in the limiting step 14, and a part of it is in the pressure sleeve 9, which fixes the position of the pressure sleeve 9 to prevent the pressure sleeve 9 from being forced upward in subsequent work, causing the circulation hole 13 to close and destroy the established circulation channel.

[0034] The gas lift anchoring tool for gas well fracturing completion provided by the present invention can ensure the smooth recovery of hydraulic anchor claws after fracturing and can provide a circulation channel for the implementation of gas lift and drainage gas production processes according to actual needs. The anchor claws are easy to recover and the drainage process is simple. The specific operation process of the device is as follows: Step 1: After assembling the gas lift anchoring tool for gas well fracturing completion, install it above the fracturing packer and lower it into the well along with the tubing.

[0035] Step 2: When fracturing, hydraulic pressure is injected into the anchor body. The hydraulic pressure acts on the anchor claws through the slits on the bushing, pushing the anchor claws outward and embedding them into the casing to achieve the function of anchoring the pipe column.

[0036] Step three, after the fracturing is completed, hydraulic pressure is injected into the annular space between the anchor body and the casing. Due to the different upper and lower cross-sectional areas, the downward pressure on the pressure sleeve is greater than the upward pressure. When the upper and lower pressure difference is greater than the shear pin, the shear pin is sheared off, the pressure sleeve moves downward, the circulation hole opens, and the space inside and outside the anchor body is connected through the circulation hole to form a circulation channel; at this time, the C-type locking ring below the circulation hole moves to the limit step, and the C-type locking ring shrinks, with part of it stuck in the limit step and part still stuck in the pressure sleeve, fixing the position of the pressure sleeve and preventing the pressure sleeve from moving up, ensuring the stability of the circulation channel, and at the same time the pressure plate moves downward, and the outer auxiliary recovery surface squeezes the inner auxiliary recovery surface to push the anchor claw back to a fully contracted state.

[0037] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A gas lift anchoring tool for gas well fracturing completion, characterized in that: include: An anchor body (3) and a bushing (5), wherein an upper joint (1) is provided on the upper part of the anchor body (3) and a lower joint (11) is provided on the lower part; the anchor body (3), the upper joint (1) and the lower joint (11) are hollow tube-shaped; the bushing (5) is tube-shaped and is inserted into the anchor body (3); a plurality of rows of through holes are opened in the region corresponding to the bushing (5) on the anchor body (3), and an anchor claw (6) is provided in each through hole; a pressure plate groove is provided on the line connecting the center points of each row of anchor claws (6) on the anchor body (3), and a pressure plate (4) is provided in the pressure plate groove; the anchor body (3) ) is sleeved with a pressure sleeve (9) at the lower part, and the lower end of the pressure plate (4) is connected to the pressure sleeve (9); the cross-sectional area of ​​the upper part of the pressure sleeve (9) is larger than the cross-sectional area of ​​the lower part; the pressure sleeve (9) is fixed to the anchor body (3) by a shear pin (12), and the lower part of the pressure sleeve (9) is sleeved on the lower joint (11); a C-shaped locking ring (10) is provided below the pressure sleeve (9), and a circulation hole (13) is provided in the area corresponding to the anchor body (3) and the pressure sleeve (9); and a limiting step (14) is provided below the lower joint (11).

2. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The upper joint (1) is connected to the anchor body (3) by means of threads and is fixed by means of an anti-rotation pin (2); the lower joint (11) is connected to the anchor body (3) by means of threads and is fixed by means of an anti-rotation pin (2).

3. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The cross-sections of the pressing plate (4) and the pressing plate groove are in an inverted T shape, and the pressing plate (4) is inserted into the pressing plate groove from bottom to top.

4. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The pressure plate (4) is connected to the pressure sleeve (9) via a fixing pin (8).

5. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The inner wall of the upper part of the pressure-bearing sleeve (9) is closely attached to the anchor body (3), and there is a gap between the lower part of the pressure-bearing sleeve (9) and the anchor body (3).

6. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The bushing (5) is evenly provided with slits.

7. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: A leaf spring (7) is provided below each of the flukes (6).

8. The gas lift anchoring tool for gas well fracturing completion according to claim 1, characterized in that: The pressure plate (4) and the anchor claw (6) are respectively provided with an outer auxiliary recovery surface (15) and an inner auxiliary recovery surface (16).

9. The gas lift anchoring tool for gas well fracturing completion according to claim 9, characterized in that: The outer auxiliary recovery surface (15) and the inner auxiliary recovery surface (16) correspond in position and cooperate with each other.