Method and system for processing return-loss leakage
By designing a combination of drillable drill pipes, safety joints and conventional drill pipes, the leak plugging tool used to mix the bottom of the well and the initiator to form a leak plug, which solves the problem of loss of recurrence during drilling and improves the Leak plugging effect and safety.
Patent Information
- Application Number
- CN202310604292.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
During the drilling process, the abrupt leakage phenomenon leads to a large amount of leakage of drilling fluid, the existing leakage plugging measures are not effective, and the long solidification time of the cement slurry affects the leakage plugging effect.
Design a leak-blocking drill tool combination including drillable drill pipe, safety joint and conventional drill pipe, and pump the leak-blocking agent and initiator respectively through the drill tool water hole and the annular space to mix at the bottom of the well to form a leak-blocking plug , and push the leakage into the leakage layer through drilling fluid to plug the leakage, control the mixing ratio and speed to shorten the solidification time and improve the success rate of leakage.
It effectively shortens the solidification time of the leak plugging agent, improves the success rate of leak plugging, avoids the impact of the strength of the leak plug structure, and ensures construction safety.
Smart Images

Figure CN119021631A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of oil drilling, and in particular relates to a method and a system for processing lost return leakage. Background Art
[0002] With the increase in drilling and development, the problem of formation pressure deficit has become increasingly prominent. When drilling into pressure-deficient layers, the risk of loss of return increases. At the same time, with the deepening of oil and gas resource exploration and development, the probability of drilling into large fractures and karst cave formations continues to increase, which is prone to loss of return (drilling fluid leaks into the formation in large quantities during drilling, and no drilling fluid returns from the wellhead).
[0003] At present, measures such as bridge slurry plugging and cement plugging are usually adopted to deal with lost return well leakage. However, due to the fast leakage rate, large leakage volume, and difficulty in accumulating plugging agents, the plugging agents cannot stop near the entrance of the leaking layer and cannot play a plugging role. In order to ensure construction safety, the conventional operation method is to lower the plugging drill bit to 200 to 300 meters from the top of the leaking layer and inject plugging slurry. Such construction may cause a large amount of mixing of plugging slurry and bottom hole fluid, affecting the plugging effect. In addition, there are some problems when using cement slurry for plugging. For example, in order to prevent the drill bit from being fixed at the bottom of the well, the solidification time of the cement slurry cannot be too short. As the solidification time of the cement slurry increases, the drilling fluid and formation fluid will continue to dilute the cement slurry. The final mixed cement slurry will affect the structural strength of the formed cement plug, resulting in plugging failure. Summary of the invention
[0004] In order to solve the above problems, an embodiment of the present invention provides a method for dealing with lost-return leakage, comprising: designing a plugging drill tool combination that meets the current lost-return leakage, wherein the plugging drill tool combination includes a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; lowering the drillable drill pipe end in the plugging drill tool combination to the bottom of the leaking layer, and then pumping a plugging agent through the water eye of the plugging drill tool combination, and pumping an initiator from the annulus between the plugging drill tool combination and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug; pumping drilling fluid from the water eye and the annulus respectively to push the plugging plug into the leaking layer for plugging.
[0005] Preferably, the length of the drillable drill rod is between 300 and 500 m.
[0006] Preferably, in the process of pumping the plugging agent through the water hole of the plugging drill assembly and pumping the initiator from the annulus between the plugging drill assembly and the well wall, it includes: controlling the rotation of the plugging drill assembly so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80 to 140 r / min.
[0007] Preferably, the method further comprises: calculating the pumping timing and pumping speed of the plugging agent and the initiator according to actual well logging information, so as to pump the plugging agent and the initiator into the bottom of the well simultaneously.
[0008] Preferably, during the process of mixing the plugging agent and the initiator at the bottom of the well, the initiator is located at the annular region corresponding to the drillable drill pipe.
[0009] Preferably, the method further comprises: controlling the mixing ratio of the initiator and the plugging agent to ensure that the plugging plug formed by the mixture solidifies and generates sufficient strength after 30 to 50 minutes.
[0010] Preferably, the method further comprises: when the plugging drill assembly cannot be pulled out due to premature solidification of the plugging slurry, pulling out the plugging drill assembly by opening the safety joint backwards.
[0011] On the other hand, the present invention also provides a system for dealing with lost return leakage, the system comprising the following modules: a drill tool assembly design module, which is used to design a plugging drill tool assembly that meets the current lost return leakage, wherein the plugging drill tool assembly comprises a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; a plugging plug formation control module, which is used to lower the drillable drill pipe end in the plugging drill tool assembly to the bottom of the leaking layer, and then pump a plugging agent from the water eye of the plugging drill tool assembly, and pump an initiator from the annulus between the plugging drill tool assembly and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug; a plugging control module, which is used to pump drilling fluid from the water eye and the annulus respectively to push the plugging plug into the leaking layer for plugging.
[0012] Preferably, the plugging plug forming control module further comprises: a rotation speed control unit, which is used to control the rotation of the plugging drill assembly so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80-140 r / min.
[0013] Preferably, the processing system further comprises: a mixing control module, which is used to control the mixing ratio of the initiator and the plugging agent to ensure that the plugging plug formed by the mixture solidifies and has sufficient strength after 30 to 50 minutes.
[0014] Compared with the prior art, one or more embodiments of the above scheme may have the following advantages or beneficial effects:
[0015] The present invention proposes a method and system for dealing with lost return leakage. The method optimizes the plugging drill tool combination that meets the current lost return leakage, designs a plugging drill tool combination including a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; then, by lowering the plugging drill tool combination to the bottom of the leaking layer, and pumping a plugging agent and an initiator into the bottom of the well through the drill water eye and the annulus between the plugging drill tool combination and the well wall, the plugging agent and the initiator are mixed at the bottom of the well to form a plugging plug; finally, the plugging plug is pushed into the leaking layer for plugging. The present invention adopts a drillable drill pipe with a specific length, which is convenient for dealing with solidified drill pipe accidents that may occur during plugging. At the same time, the present invention mixes the plugging material (plugging agent) with the initiator at the leaking layer, shortens the solidification time of the plugging agent, and solidifies to form a plugging layer before the formation fluid has an adverse effect on the plugging layer, thereby improving the plugging success rate.
[0016] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0018] Figure 1 A step diagram of a method for processing loss of return according to an embodiment of the present application.
[0019] Figure 2 A schematic diagram of plugging a leak in a method for handling lost return leakage according to an embodiment of the present application.
[0020] Figure 3 It is a schematic diagram of a method for handling lost return leakage in an embodiment of the present application in which a drillable drill pipe cannot be normally pulled out.
[0021] Figure 4 The module block diagram of the system for processing loss of return according to an embodiment of the present application. DETAILED DESCRIPTION
[0022] The following will describe the implementation methods of the present invention in detail with reference to the accompanying drawings and embodiments, so that the implementation process of how the present invention applies technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly. It should be noted that as long as there is no conflict, the various embodiments of the present invention and the various features in the embodiments can be combined with each other, and the technical solutions formed are all within the protection scope of the present invention.
[0023] In addition, the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be performed in an order different from that shown here.
[0024] With the increase in drilling and development, the problem of formation pressure deficit has become increasingly prominent. When drilling into pressure-deficient layers, the risk of loss of return increases. At the same time, with the deepening of oil and gas resource exploration and development, the probability of drilling into large fractures and karst cave formations continues to increase, which is prone to loss of return (drilling fluid leaks into the formation in large quantities during drilling, and no drilling fluid returns from the wellhead).
[0025] At present, measures such as bridge slurry plugging and cement plugging are usually adopted to deal with lost return well leakage. However, due to the fast leakage rate, large leakage volume, and difficulty in accumulating plugging agents, the plugging agents cannot stop near the entrance of the leaking layer and cannot play a plugging role. In order to ensure construction safety, the conventional operation method is to lower the plugging drill bit to 200 to 300 meters from the top of the leaking layer and inject plugging slurry. Such construction may cause a large amount of mixing of plugging slurry and bottom hole fluid, affecting the plugging effect. In addition, there are some problems when using cement slurry for plugging. For example, in order to prevent the drill bit from being fixed at the bottom of the well, the solidification time of the cement slurry cannot be too short. As the solidification time of the cement slurry increases, the drilling fluid and formation fluid will continue to dilute the cement slurry. The final mixed cement slurry will affect the structural strength of the formed cement plug, resulting in plugging failure.
[0026] Therefore, in order to solve the above problems, an embodiment of the present invention proposes a method and system for dealing with lost return leakage. The method optimizes the plugging drill tool combination that meets the current lost return leakage, and designs a plugging drill tool combination including a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; then, the plugging drill tool combination is lowered to the bottom of the leaking layer, and a plugging agent and an initiator are pumped into the bottom of the well through the drill water eye and the annulus between the plugging drill tool combination and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well to form a plugging plug; finally, the plugging plug is pushed into the leaking layer for plugging. The present invention uses a drillable drill pipe with a specific length. If a solidified drill pipe accident occurs during plugging, the upper drill tool can be removed through the safety joint, and then the drill bit can be lowered to remove the plugging plug and the drillable drill pipe. At the same time, the present invention mixes the plugging material (plugging agent) with the initiator at the leaking layer, shortens the solidification time of the plugging agent, and solidifies to form a plugging layer before the formation fluid has an adverse effect on the plugging layer, thereby improving the plugging success rate.
[0027] Embodiment 1
[0028] Figure 1 This is a step diagram of a method for processing lost return leakage according to an embodiment of the present application. Figure 1 To illustrate the various steps of this method.
[0029] like Figure 1 As shown, in step S110, a plugging drilling tool assembly that meets the current loss of return is designed, wherein the plugging drilling tool assembly includes a drillable drill pipe, a safety joint and a conventional drill pipe that are connected in sequence. Figure 2 Schematic diagram of plugging leakage of the method for processing lost return leakage in the embodiment of the present application. Figure 2 In the embodiment of the present application, a plugging drill tool assembly that meets the current loss of return is designed, and then the currently designed plugging drill tool assembly is lowered into the well section to be plugged (the drillable drill pipe end is at the bottom), and after the plugging drill tool assembly is lowered to the target position, the plugging drill tool assembly is used to release the plugging agent and the initiator into the leaking layer at the bottom of the well, and then the plugging plug formed by the mixture of the plugging agent and the initiator is used to achieve the plugging target. The plugging drill tool assembly includes a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence, wherein the drillable drill pipe end is close to the bottom of the well, the conventional drill pipe is close to the wellhead, the safety joint is used to connect the drillable drill pipe and the conventional drill pipe, and the conventional drill pipe is other drill pipe that does not belong to the drillable drill pipe. In addition, the end of the drillable drill pipe that is not connected to the safety joint is located at the bottom of the leaking layer at the bottom of the well.
[0030] In a specific embodiment of the present application, the length of the drillable drill pipe is between 300 and 500 m.
[0031] Further, in step S120, the drillable drill pipe end in the plugging drill assembly is lowered to the bottom of the leaking layer, and then the plugging agent is pumped into the plugging drill assembly through the water hole, and the initiator is pumped into the annulus between the plugging drill assembly and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug. Specifically, after the plugging drill assembly is lowered to the bottom of the leaking layer (target position), the plugging agent is pumped into the water hole of the plugging drill assembly, so that the plugging agent reaches the leaking layer at the bottom of the well. Among them, the plugging drill assembly water hole is located on the conventional drill pipe. At the same time, the initiator is pumped into the annulus between the plugging drill assembly and the well wall, so that the initiator also reaches the leaking layer at the bottom of the well along the annulus between the plugging drill assembly and the well wall. Accordingly, the mixing of the plugging agent and the initiator in the plugging layer at the bottom of the well is achieved. Finally, the plugging agent and the initiator are directly solidified after mixing, thereby forming a plugging plug.
[0032] In the process of pumping the plugging agent from the water eye of the plugging drill assembly and pumping the initiator from the annulus between the plugging drill assembly and the well wall, the embodiment of the present invention controls the plugging drill assembly to rotate so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80 to 140 r / min. Specifically, in the process of pumping the plugging agent from the water eye of the plugging drill assembly and pumping the initiator from the annulus between the plugging drill assembly and the well wall, the plugging agent pumped from the plugging drill assembly to the bottom of the well and the flow rate of the initiator pumped from the annulus between the plugging drill assembly and the well wall are controlled by controlling the plugging drill assembly to rotate in real time at a specific rotation speed, thereby achieving even and full mixing of the plugging agent and the initiator at the bottom of the well. Among them, the preferred rotation speed is 80 to 140 r / min.
[0033] Next, according to the actual logging information, the pumping timing and pumping speed of the plugging agent and the initiator are calculated to pump the plugging agent and the initiator into the bottom of the well at the same time. In the embodiment of the present application, according to the actual logging information, the well section size, the plugging agent flow rate, the initiator flow rate and other data are determined, and the pumping timing and pumping speed of the plugging agent and the initiator are calculated when the plugging agent and the initiator are pumped into the bottom of the well at the same time, and then the plugging agent and the initiator are pumped into the bottom of the well according to the calculation results, so that the plugging agent and the initiator can reach the bottom of the well at the same time.
[0034] Based on the currently calculated pumping timing and pumping speed of the plugging agent and the initiator, the embodiment of the present invention also controls the mixing ratio of the initiator and the plugging agent to ensure that the plugging plug formed by the mixture solidifies and produces sufficient strength after 30 to 50 minutes. Specifically, after the calculated pumping timing and pumping speed of the plugging agent and the initiator, the present embodiment further calculates the mixing ratio of the initiator and the plugging agent based on the pumping timing and the pumping speed, so as to ensure that the plugging plug formed by the mixture solidifies and begins to have sufficient strength after 30 to 50 minutes by controlling the mixing ratio of the initiator and the plugging agent, thereby preventing the solidification time of the plugging slurry formed by the initiator and the plugging agent from being out of the expected range, or the formed plugging slurry enters the plugging drill assembly due to pressure changes before solidification to solidify and cause a "sausage stuffing" accident, thereby affecting the plugging performance. This embodiment avoids the continuous dilution of drilling fluid and formation fluid caused by the long time of forming the plugging plug, so that the finally obtained mixed cement slurry affects the structural strength of the formed cement plug. At the same time, it also leaves a certain time for injecting the plugging slurry and raising the plugging drill tool assembly, effectively preventing the plugging drill tool assembly from being solidified at the bottom of the well.
[0035] Further, in step S130, drilling fluid is pumped into the water hole and the annulus respectively to push the plugging plug into the leaking layer for plugging. After the plugging plug is formed, in this embodiment, drilling fluid is pumped into the water hole and the annulus of the plugging drill assembly respectively, and the initiator and the plugging agent that are not mixed and solidified are squeezed by the drilling fluid to indirectly push the formed plugging plug into the leaking layer, thereby pushing the plugging plug into the leaking layer for plugging. In a specific embodiment of the present application, after the plugging plug is pushed into the leaking layer, the length of the plugging plug retained at the bottom of the well is controlled to exceed the top of the leaking layer by 10 to 20 meters.
[0036] In addition, this embodiment cleans the wellbore and the wellbore wall by flowing the plugging slurry and rotating the drill bit at the leaking layer, thereby improving the cleanliness of the leaking layer and effectively preventing the strength of the plugging slurry and the bonding effect with the formation from being affected by the mud skin on the wellbore wall and the drilling fluid retained on the crack wall.
[0037] During the mixing of the plugging agent and the initiator at the bottom of the well, the initiator is located in the annular region corresponding to the drillable drill pipe. When the initiator is pumped into the bottom of the well, this embodiment ensures that the drillable drill pipe is surrounded by the initiator (the initiator is located in the annular region corresponding to the drillable drill pipe), and ensures that there is no safety joint in the plugging plug formed after solidification.
[0038] Furthermore, in the case where the plugging drill assembly cannot be pulled out due to premature solidification of the plugging slurry (for example, the lower part of the plugging drill assembly is fixed by the plugging slurry when pulling out the drill), the plugging drill assembly is pulled out by opening the safety joint. Specifically, after the plugging plug is pushed into the leaking layer, it is necessary to pull out the drill. If the lower plugging drill assembly (drillable drill pipe) can move freely up and down, all the drilling tools in the well (the entire plugging drill assembly) can be directly pulled out. Figure 3 This is a schematic diagram of a method for handling lost return leakage according to an embodiment of the present application in which a drillable drill pipe cannot be normally pulled out. Figure 3 If the lower plugging drill assembly (drillable drill pipe) cannot be pulled out due to premature solidification of the plugging slurry, it is only necessary to pull out the conventional drill pipe by opening the safety joint, and then use the drill bit to drill out the drillable drill pipe left at the bottom of the well, and then the plugging drill assembly can be pulled out. In this embodiment, the conventional drill pipe is taken out after opening the safety joint, and then the drillable drill pipe and the plugging plug are drilled out together by replacing the drill tool (lower drill bit), thereby completing the entire plugging process.
[0039] Furthermore, in a specific embodiment of the present application, if the formation corresponding to the leaking layer section is unstable, the plugging drilling tool assembly is lowered to a position 10 to 20 meters above the unstable formation to perform plugging operations.
[0040] Embodiment 2
[0041] Based on the method for processing loss of return described in the first embodiment, the embodiment of the present invention further provides a system for processing loss of return. Figure 4 The module block diagram of the system for processing loss of return according to an embodiment of the present application.
[0042] like Figure 4 As shown, the system for processing lost return leakage in the embodiment of the present invention includes: a drilling tool assembly design module 41, a plugging plug forming control module 42 and a plugging plug control module 43. Specifically, the drilling tool assembly design module 41 is implemented according to the method described in step S110 above, and is configured to design a plugging drilling tool assembly that meets the current lost return leakage, wherein the plugging drilling tool assembly includes a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; the plugging plug forming control module 42 is implemented according to the method described in step S120 above, and is configured to lower the drillable drill pipe end in the plugging drilling tool assembly to the bottom of the leaking layer, and then pump a plugging agent from the water hole of the plugging drilling tool assembly, and pump an initiator from the annulus between the plugging drilling tool assembly and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug; the plugging control module 43 is implemented according to the method described in step S130 above, and is configured to pump drilling fluid from the water hole and the annulus respectively to push the plugging plug into the leaking layer for plugging.
[0043] Furthermore, the plugging plug forming control module 42 in the embodiment of the present invention further includes a rotation speed control unit 421. The rotation speed control unit 421 is used to control the rotation of the plugging drilling tool assembly so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80-140 r / min.
[0044] Furthermore, the treatment system described in the embodiment of the present invention further comprises a mixing control module. The mixing control module is used to control the mixing ratio of the initiator and the plugging agent to ensure that the plugging plug formed by the mixture solidifies and has sufficient strength after 30 to 50 minutes.
[0045] The present invention proposes a method and system for dealing with lost return leakage. The method optimizes the plugging drill tool combination that meets the current lost return leakage, designs a plugging drill tool combination including a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; then, by lowering the plugging drill tool combination to the bottom of the leaking layer, and pumping a plugging agent and an initiator into the bottom of the well through the drill water eye and the annulus between the plugging drill tool combination and the well wall, the plugging agent and the initiator are mixed at the bottom of the well to form a plugging plug; finally, the plugging plug is pushed into the leaking layer for plugging. The present invention uses a drillable drill pipe with a specific length. If a solidified drill pipe accident occurs during plugging, the upper drill tool can be opened upside down through the safety joint to remove the plugging plug and the drillable drill pipe, and then the drill bit is lowered to sweep the plugging plug and the drillable drill pipe. At the same time, the present invention mixes the plugging material (plugging agent) with the initiator at the leaking layer, shortens the solidification time of the plugging agent, and solidifies to form a plugging layer before the formation fluid has an adverse effect on the plugging layer, thereby improving the plugging success rate.
[0046] The above description is only a specific implementation case of the present invention, and the protection scope of the present invention is not limited thereto. Any modification or replacement of the present invention by any technician familiar with the present technology within the technical specifications described in the present invention should be within the protection scope of the present invention.
[0047] Of course, the present invention may have many other embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art may make various corresponding changes and modifications based on the present invention, but these corresponding changes and modifications should all fall within the scope of protection of the claims of the present invention.
[0048] It should be understood by those skilled in the art that the modules or steps of the present invention described above can be implemented by a general-purpose computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0049] Although the embodiments disclosed in the present invention are as above, the above contents are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.
Claims
1. A method for handling loss of return, It is characterized in that include: Design a plugging drilling tool assembly that meets the current loss of return, wherein the plugging drilling tool assembly includes a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; The drillable drill rod end of the plugging drilling tool assembly is lowered to the bottom of the leaking layer, and then a plugging agent is pumped into the plugging drilling tool assembly through the water hole, and an initiator is pumped into the annulus between the plugging drilling tool assembly and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug; Drilling fluid is pumped into the water hole and the annulus respectively to push the plug into the leaking layer to plug the leak.
2. The method according to claim 1, It is characterized in that The length of the drillable drill rod is between 300 and 500 m.
3. The method according to claim 1 or 2, It is characterized in that The process of pumping the plugging agent through the water hole of the plugging drilling tool assembly and pumping the initiator from the annulus between the plugging drilling tool assembly and the well wall includes: The plugging drill assembly is controlled to rotate so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80-140 r / min.
4. The method according to any one of claims 1 to 3, It is characterized in that The method further comprises: According to the actual well logging information, the pumping timing and pumping speed of the plugging agent and the initiator are calculated, so as to pump the plugging agent and the initiator into the bottom of the well at the same time.
5. The method according to any one of claims 1 to 4, It is characterized in that During the mixing of the plugging agent and the initiator at the bottom of the well, the initiator is located at the annular region corresponding to the drillable drill pipe.
6. The method according to any one of claims 1 to 5, It is characterized in that The method further comprises: The mixing ratio of the initiator and the plugging agent is controlled to ensure that the plugging plug formed by the mixture solidifies and has sufficient strength after 30 to 50 minutes.
7. The method according to any one of claims 1 to 6, It is characterized in that The method further comprises: In the case that the plugging drill assembly cannot be pulled out due to premature solidification of the plugging slurry, the plugging drill assembly is pulled out by opening the safety joint backwards.
8. A system for handling loss of return, It is characterized in that The system includes the following modules: A drilling tool assembly design module, which is used to design a plugging drilling tool assembly that meets the current loss of return, wherein the plugging drilling tool assembly includes a drillable drill pipe, a safety joint and a conventional drill pipe connected in sequence; A plugging plug forming control module is used to lower the drill rod end of the plugging drilling tool assembly to the bottom of the leaking layer, and then pump a plugging agent from the water hole of the plugging drilling tool assembly, and pump an initiator from the annulus between the plugging drilling tool assembly and the well wall, so that the plugging agent and the initiator are mixed at the bottom of the well, thereby forming a plugging plug; The plugging control module is used to pump drilling fluid from the water hole and the annulus respectively to push the plugging plug into the leaking layer to plug the leak.
9. The processing system according to claim 8, It is characterized in that The leak plug forming control module also includes: A rotation speed control unit is used to control the rotation of the plugging drill assembly so that the plugging agent and the initiator are evenly and fully mixed, wherein the rotation speed is 80-140 r / min.
10. The processing system according to claim 8 or 9, It is characterized in that The processing system further comprises: A mixing control module is used to control the mixing ratio of the initiator and the plugging agent to ensure that the plugging plug formed by the mixture solidifies and has sufficient strength after 30 to 50 minutes.
