Combined slotting hole distribution structure and hole distribution method for reverse tunneling

By designing a joint groove-excavation hole structure in reverse excavation scenarios, determining the groove-excavation type in combination with surrounding rock properties, and using a combination of large-aperture hollow holes and wedge-shaped groove-excavation holes, the poor reverse excavation blasting effect in the existing technology is solved. The problem of this achieves an effective bottom-up blasting effect.

CN119022741APending Publication Date: 2024-11-26YUNNAN CHIHONG ZN & GE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411415750.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The prior art is difficult to effectively design the groove-excavation hole for bottom-up reverse excavation scenarios, especially when the surrounding rock properties are complex, it cannot meet the needs of different surrounding rock properties, resulting in poor blasting effect.

Method used

A combined groove opening hole structure was designed, including large-aperture hollow holes, straight-eye hollow holes and wedge-shaped hollow holes. By collecting the solidity coefficient and properties of the surrounding rock, the target joint hole opening type is determined and according to different The hole design is designed, using three rows and two rows of large-size holes and wedge-shaped slot holes to form multiple straight-eye and wedge-shaped slot holes to improve the blasting effect.

Benefits of technology

The blasting of two straight-eye slot holes forms a small free surface, and the four wedge-shaped slot holes throw out the rock, increasing the reflection of explosive stress waves and crack expansion, realizing shallow hole blasting in the reverse excavation scene from bottom to top, improving the Rock breaking efficiency and blasting effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022741A_ABST
    Figure CN119022741A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of shallow hole blasting, in particular to a combined slotting hole distribution structure and method for reverse tunneling. The combined slotting hole distribution structure comprises large-aperture empty holes, straight slotting holes and wedge-shaped slotting holes, wherein the large-aperture empty holes are arranged in three rows and two columns; two wedge-shaped slotting holes which are horizontally and symmetrically arranged and a straight slotting hole which is formed in the horizontal middle position of the two wedge-shaped slotting holes are formed between any two rows of large-aperture empty holes, and the wedge-shaped slotting distance between the two wedge-shaped slotting holes is larger than the empty hole distance between the two large-aperture empty holes; the invention aims to solve the problem of how to carry out slotting and hole distribution design on a reverse tunneling scene from bottom to top.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of shallow hole blasting, and in particular to a combined grooving and hole arrangement structure and a hole arrangement method for reverse excavation. Background Art

[0002] The main function of the slot hole is to form a new free surface, creating favorable conditions for blasting other blastholes. During tunneling or rock excavation, the slot hole first breaks and throws out part of the rock on the working surface, thereby forming a second free surface on the working surface, improving rock breaking efficiency and cycle footage. In addition, the formation of the slot hole also increases the free surface for blasting, which helps to improve the effect of the entire blasting operation.

[0003] In the relevant technical scheme, the Chinese patent with application number CN201810230331.2 discloses a slot blasting structure and a blasting method combining straight-eye blastholes and oblique-eye blastholes. By using the arrangement of a combination of straight-eye blastholes and oblique-eye blastholes, the resistance of the wedge-shaped slot blasting products to work is reduced, thereby improving the cavity expansion effect of the slot blasting; the straight-eye blastholes and the oblique-eye blastholes are detonated separately, so that the first blasting part reduces the resistance of the subsequent blasting part, and at the same time, it guides the subsequent blasting part, thereby improving the work effect of the blasting gas products of the subsequent blasting part, and reducing the length of the residual eye of the slot hole.

[0004] However, the excavation scenario considered in the above scheme is set based on the top-down forward excavation scenario. For the bottom-up reverse excavation scenario, the surrounding rock properties involved in the reverse excavation process are more complex, and different slotting and hole layout designs are required according to different surrounding rock properties.

[0005] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0006] The main purpose of this application is to provide a combined grooving and hole arrangement structure for reverse excavation, aiming to solve the problem of how to design a grooving and hole arrangement for a bottom-up reverse excavation scenario.

[0007] To achieve the above-mentioned purpose, the present application provides a combined slotting hole arrangement structure for reverse excavation, wherein the combined slotting hole arrangement structure comprises: large-diameter empty holes, straight-eye slotting holes and wedge-shaped slotting holes; wherein:

[0008] The large-aperture holes are arranged in three rows and two columns;

[0009] Two horizontally symmetrically arranged wedge-shaped groove holes are arranged between any two rows of the large-diameter empty holes, and the straight-eye groove hole is arranged at the horizontal middle position of the two wedge-shaped groove holes, and the wedge-shaped groove spacing between the two wedge-shaped groove holes is greater than the hole spacing between the two large-diameter empty holes.

[0010] Optionally, the spacing between the large-aperture holes is set to 0.4 m, and the row spacing is set to 0.3 m.

[0011] Optionally, the spacing between the straight-eye cutout holes and the wedge-shaped cutout holes is set to 0.4 m, and the row spacing is set to 0.3 m.

[0012] Optionally, the row spacing between the wedge-shaped cutout holes and the large-diameter holes is set to 0.15 m.

[0013] Optionally, the construction angle of the wedge-shaped slotting hole is 4°28′2″, and the over-depth of the blasting hole construction is greater than or equal to 0.2 m.

[0014] In addition, to achieve the above-mentioned purpose, the present application provides a combined grooving and hole arrangement method for reverse excavation, the method comprising:

[0015] Collect the surrounding rock strength coefficient and / or surrounding rock properties where the holes and cuts are to be placed;

[0016] Determining a target combined hollow hole cut type in the reverse tunneling process according to the surrounding rock strength coefficient and / or the surrounding rock properties;

[0017] Based on the selected target combined with the empty hole cutting type, cutting and drilling are carried out.

[0018] Optionally, the step of determining the target combined hollow hole cutting type in the reverse tunneling process according to the detected surrounding rock strength coefficient and / or surrounding rock properties includes:

[0019] When the surrounding rock strength coefficient is within a preset coefficient range, a straight-hole combined hollow-hole cut and a wedge-shaped-hole combined hollow-hole cut are selected as the target combined hollow-hole cut types;

[0020] When the surrounding rock strength coefficient is less than the lower limit of the preset coefficient interval, and / or the fissures and / or faults of the surrounding rock joints are in a relatively developed state, the straight-hole combined hollow-hole cutout is selected as the target combined hollow-hole cutout type.

[0021] Optionally, the preset coefficient interval is 8 to 10.

[0022] This application has at least the following beneficial effects:

[0023] A small free surface is formed by blasting two straight-hole slots, and part of the rock is ejected by blasting four wedge-shaped slots to increase the blasting free surface. The large-aperture empty holes increase the reflection of the explosion stress wave and the expansion of the cracks, and can also play a role in compensating the space, thereby realizing shallow hole blasting in the bottom-up reverse excavation scenario. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the combined grooving and hole arrangement structure involved in the first embodiment of the present application;

[0025] Figure 2 This is a schematic diagram of the combined grooving and hole arrangement involved in the second embodiment of the present application;

[0026] Figure 3 A side view of the combined grooving arrangement involved in the second embodiment of the present application;

[0027] Figure 4 A top view of the combined grooving and hole arrangement involved in the second embodiment of the present application;

[0028] Figure 5 It is a schematic flow chart of the combined grooving and hole arrangement method for reverse excavation involved in the third embodiment of the present application.

[0029] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0030] In order to better understand the above technical solution, exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0031] First embodiment

[0032] Reference Figure 1 A schematic diagram of a combined grooving and hole arrangement structure is shown. In this embodiment, the combined grooving and hole arrangement structure includes: large-diameter empty holes 1, straight-eye groove holes 2 and wedge-shaped groove holes 3, wherein the large-diameter empty holes 1 are arranged in three rows and two columns, two horizontally symmetrically arranged wedge-shaped groove holes 2 are arranged between any two rows of the large-diameter empty holes 1, and the straight-eye groove hole 3 is arranged at the horizontal middle position between the two wedge-shaped groove holes 2.

[0033] In this embodiment, the wedge-shaped groove spacing between the two wedge-shaped groove holes 3 is greater than the hole spacing between the two large-diameter holes 1, that is, a1>b1, a2>b2.

[0034] In the technical solution provided in this embodiment, a small free surface is formed by blasting two straight-hole slots, and part of the rock is ejected by blasting four wedge-shaped slots to increase the blasting free surface. The large-aperture empty holes increase the reflection of the explosion stress wave and the expansion of the cracks, and can play a role in compensating the space, thereby realizing shallow hole blasting in a bottom-up reverse excavation scenario.

[0035] Second embodiment

[0036] Based on the first embodiment, refer to Figure 2 A schematic diagram of combined grooving and hole arrangement is shown. In this embodiment, the combined grooving is 2 straight-eye charging holes, 4 wedge-shaped charging holes and 6 large-diameter empty holes, which are arranged in a grooving area consisting of a semicircle + rectangle with a width of 4.35m and a length of 4.2m. The spacing between the large-diameter empty holes is set to 0.4m, and the row spacing is set to 0.3m. The spacing between the straight-eye grooving holes and the wedge-shaped grooving holes is set to 0.4m, and the row spacing is set to 0.3m. The row spacing between the wedge-shaped grooving holes and the large-diameter empty holes is set to 0.15m.

[0037] In this embodiment, the blastholes are constructed using a rock drilling rig, with the diameter of the straight-eye and wedge-shaped slots being 40 mm, and the diameter of the empty holes being 100 mm; reverse uncoupled continuous charging and micro-difference millisecond blasting are used; the length of the borehole mud plugging is not less than 0.3 m.

[0038] In addition, refer to Figure 3 The side view of the combined cutting hole arrangement is shown and Figure 4 The top view of the combined slotting arrangement is shown, the length of the rectangle is 3m, the construction angle of the wedge-shaped slotting hole is 4°28′2″, and the over-depth of the blasting hole construction is greater than or equal to 0.2m.

[0039] The working principle is as follows: 2 straight-hole slots are blasted to form a small free surface, 4 wedge-shaped slots are blasted to eject part of the rock to increase the blasting free surface, and 6 large-aperture empty holes are used to increase the reflection of the explosion stress wave and crack expansion, and can also play a role in compensating space, thereby realizing shallow hole blasting in a bottom-up reverse excavation scenario.

[0040] Third embodiment

[0041] Reference Figure 5 Based on any of the above embodiments, in this embodiment, the combined grooving and hole arrangement method for reverse excavation includes the following steps:

[0042] Step S10, collecting the surrounding rock solidity coefficient and / or surrounding rock properties at the location where the holes and cuts are to be arranged;

[0043] In this embodiment, a field survey is conducted in the area where the holes and grooves are to be drilled and cut, and the lithology, structural characteristics, crack distribution and other information of the surrounding rock are recorded. The collected surrounding rock samples are sent to the laboratory for analysis, and the uniaxial compressive strength σ of the surrounding rock samples is collected. c , calculate the robustness coefficient f, where the expression of the robustness coefficient f is:

[0044]

[0045] In this embodiment, the surrounding rock properties include but are not limited to lithology, uniaxial compressive strength, tensile strength, shear strength, elastic modulus, number, density, orientation, length and filling condition of cracks; thickness, dip and inclination of stratification; folds, porosity and permeability, etc.

[0046] Step S20, determining a target combined hollow hole cut type in the reverse tunneling process according to the surrounding rock strength coefficient and / or the surrounding rock property;

[0047] In this embodiment, the target combined hollow hole cutting type in the reverse tunneling process is determined according to the surrounding rock strength coefficient and / or the surrounding rock properties.

[0048] Optionally, when the surrounding rock strength coefficient is within a preset coefficient range, straight eye combined with hollow hole cutting and wedge-shaped eye combined with hollow hole cutting;

[0049] Optionally, when the surrounding rock strength coefficient is less than the lower limit of the preset coefficient interval, and the fissures and / or faults of the surrounding rock joints are in a relatively developed state, a straight-hole combined with an empty hole cutout is selected.

[0050] Optionally, the preset coefficient interval is 8 to 10, that is, when the surrounding rock strength coefficient is less than 8, and the cracks and / or faults of the surrounding rock joints are in a relatively developed state, straight-hole combined with hollow-hole cutting is selected.

[0051] It should be noted that when the surrounding rock strength coefficient is within the preset range, it means that the surrounding rock has a certain hardness and strength. In this case, the selection of slotting type requires balancing the following factors: 1. Crushing efficiency: It is necessary to effectively crush the rock to loosen the rock around the slot hole, so as to facilitate subsequent mining operations; 2. Slotting stability: Avoid excessive crushing or landslides during the slotting process to ensure the stability of the slot hole.

[0052] Straight holes combined with empty holes can generate sufficient crushing force through the combined action of multiple straight holes, while wedge-shaped holes combined with empty holes are suitable for surrounding rocks with higher hardness and requiring larger crushing surfaces and spaces. The wedge-shaped holes create larger cutting spaces to more effectively crush the surrounding rocks. Therefore, when the surrounding rock strength coefficient is within the preset range, straight holes combined with empty holes and wedge-shaped holes combined with empty holes can be selected for joint blasting.

[0053] When the surrounding rock strength coefficient is low and joints, fissures and faults are developed, the surface surrounding rock is relatively weak and the structure is unstable. The surrounding rock is soft and easy to break, which means that excessive breakage or collapse may be more likely to occur during the trenching process, and it is easy to break or slide along these weak surfaces during the trenching process.

[0054] In this case, choosing a straight-eye cut can better control the crushing range and avoid causing large-scale surrounding rock crushing or landslides. At the same time, since the setting of the straight-eye cut is relatively simple, the construction operation is relatively more controllable.

[0055] Step S30, performing joint grooving and hole arrangement based on the selected target joint empty hole grooving type.

[0056] In this embodiment, after selecting the target combined empty hole slotting type, the location, number, diameter and depth of the slotting holes are determined according to the surrounding rock properties of the site where the holes are to be arranged, ensuring that there is enough space between the slotting holes to form an effective crushing zone.

[0057] Then, locate the position of the slot hole according to the design plan, mark the drilling point, and use drilling equipment to carry out drilling operations to ensure that the depth and diameter of each hole obtained in the operation meet the design requirements in the design plan.

[0058] Then, according to the type of slot, select the appropriate explosives and blasting sequence to carry out joint slot blasting. After blasting, check whether the expected broken zone is formed in the slot after blasting. If not, adjust the hole arrangement plan and repeat the implementation.

[0059] In the technical solution provided in this embodiment, the appropriate type of combined empty hole cutting is selected for cutting and drilling according to the surrounding rock solidity coefficient and surrounding rock structure characteristics. When the solidity coefficient is high, straight eye combined empty hole cutting and wedge eye combined empty hole cutting are selected for combined cutting and drilling. When the solidity coefficient is low and / or the cracks and / or faults of the surrounding rock joints are in a relatively developed state, straight eye combined empty hole cutting is selected to ensure that shallow hole blasting in the bottom-up reverse excavation scenario can be achieved under different surrounding rock conditions.

[0060] It should be noted that due to the structure or method provided by the embodiments of the present application, in the claims, any reference symbol between brackets should not be constructed as a limitation on the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "one" or "an" preceding a component does not exclude the presence of multiple such components. The present invention can be implemented with the aid of hardware comprising several different components and with the aid of appropriately programmed computers. In a unit claim that lists several devices, several of these devices may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names.

[0061] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0062] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A combined grooving and hole arrangement structure for reverse excavation, characterized in that: The combined slotting hole arrangement structure includes: large-diameter empty holes, straight-eye slotting holes and wedge-shaped slotting holes, wherein: The large-aperture holes are arranged in three rows and two columns; Two horizontally symmetrically arranged wedge-shaped groove holes are arranged between any two rows of the large-diameter empty holes, and the straight-eye groove hole is arranged at the horizontal middle position of the two wedge-shaped groove holes, and the wedge-shaped groove spacing between the two wedge-shaped groove holes is greater than the hole spacing between the two large-diameter empty holes.

2. The structure according to claim 1, characterized in that The spacing between the large-diameter holes is set to 0.4m, and the row spacing is set to 0.3m.

3. The structure according to claim 1, characterized in that The spacing between the straight-eye cutout holes and the wedge-shaped cutout holes is set to 0.4m, and the row spacing is set to 0.3m.

4. The structure according to claim 1, characterized in that The row spacing between the wedge-shaped cutout holes and the large-diameter holes is set to 0.15m.

5. The structure according to claim 1, characterized in that The construction angle of the wedge-shaped slotting hole is 4°28′2″, and the over-depth of the blasting hole is greater than or equal to 0.2m.

6. A combined grooving and hole arrangement method for reverse excavation, characterized in that: The method comprises the following steps: Collect the surrounding rock strength coefficient and / or surrounding rock properties where the holes and cuts are to be placed; Determining a target combined hollow hole cut type in the reverse tunneling process according to the surrounding rock strength coefficient and / or the surrounding rock properties; Based on the selected target combined with the empty hole cutting type, cutting and drilling are carried out.

7. The method according to claim 6, characterized in that The step of determining the target combined hollow hole cutting type in the reverse excavation process according to the detected surrounding rock strength coefficient and / or surrounding rock properties includes: When the surrounding rock strength coefficient is within a preset coefficient range, a straight-hole combined hollow-hole cut and a wedge-shaped-hole combined hollow-hole cut are selected as the target combined hollow-hole cut types; When the surrounding rock strength coefficient is less than the lower limit of the preset coefficient interval, and / or the fissures and / or faults of the surrounding rock joints are in a relatively developed state, the straight-hole combined hollow-hole cutout is selected as the target combined hollow-hole cutout type.

8. The method according to claim 7, characterized in that The preset coefficient range is 8 to 10.

Citation Information

Patent Citations

  • Parallel cut blastholes and oblique cut blastholes combined cut blasting structure and blasting method

    CN108253856A

  • Go up big gun hole arrangement structure to medium -length hole undercutting blasting

    CN205561688U