Stratum water injection blocking impedance force simulation experiment device and experiment method

By designing a experimental device for blocking impedance force simulation of formation water injection, the water injection impedance force is monitored using the completion assembly and multiple sets of formation simulation components, which solves the blockage problem during the water injection process and improves the recovery rate.

CN119023531APending Publication Date: 2024-11-26CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411159730.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the petroleum industry, the reaction between mixed water and formation sand during the water injection process leads to blockage, which leads to an increase in injection pressure, which in turn affects the recovery rate. How to control the smooth implementation of water injection and predict the blockage impedance force during the water injection process is a key issue.

Method used

Design an experimental device for stratigraphic water injection blocking impedance force simulation. By setting up a completion assembly and multiple sets of stratigraphic simulation components, injecting fluid using a constant flow pump, and monitoring the pressure difference of each set of stratigraphic simulation components through a pressure gauge and a data acquisition and analysis system. Calculate the water injection impedance force of the entire device, provide reference data for actual water injection, and improve the control process.

Benefits of technology

The device can effectively simulate the resistance of each component during the water injection process, provide more comprehensive and reliable water injection resistance parameters, help control the water injection process and improve recovery rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119023531A_ABST
    Figure CN119023531A_ABST
Patent Text Reader

Abstract

The invention relates to a formation water injection blocking impedance force simulation experiment device and method. The device comprises a liquid storage tank, a constant flow pump, a well completion assembly and at least two formation simulation assemblies which are connected in sequence. A pressure gauge is arranged between the constant flow pump and the well completion assembly and on each group of stratum simulation assembly, the pressure gauges are used for acquiring pressure data in each assembly, and all the pressure gauges are connected with a data acquisition and analysis system; the device is provided with a well completion assembly and a plurality of stratum simulation assemblies, and a constant flow pump injects fluid into all the stratum simulation assemblies in sequence; the pressure difference of each stratum simulation assembly after water injection is observed, then the water injection resistance of the whole well completion assembly and the stratum is obtained, reference data is provided for actual water injection, the control process of water injection is perfected, and the recovery efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas well exploitation engineering, and in particular relates to a formation water injection plugging impedance simulation experimental device and an experimental method. Background Art

[0002] In the petroleum industry, improving the recovery rate of oil and gas wells is currently a top priority research topic, and water injection to improve oil and gas recovery is one of the most common and important measures among all measures to improve oil and gas recovery. Water injection to improve oil and gas recovery is to inject mixed water into the formation, and use the injection pressure of the injected mixed water to drive the oil and gas in the pores of the rock out of the pores, into the wellbore, and out of the ground, thereby improving the recovery rate. However, in the current field of petroleum engineering, the injected water is mostly a mixed water formed by clean water and treated sewage as the liquid injected into the formation. Before the injected water is injected into the formation, it must pass through the screen pipe, the annulus between the formation and the screen pipe. Since the screen pipe part will have formation sand spitting back, the formation sand is mixed with mud. Therefore, when the mixed water is injected into the screen pipe, the water will react with the mud, blocking the screen pipe, resulting in an increase in injection pressure.

[0003] In addition, the injected water is injected into the formation only after passing through the screen pipe, the annulus between the formation and the screen pipe. The mixed water contains a variety of impurities. The impurities will block the formation pores during the injection process of the injected water, making it difficult to inject formation water into the formation.

[0004] The increase in injection pressure causes the formation injection pressure to increase. When the injection pressure increases to a certain value, it is difficult to inject further. This leads to the failure of the plan to increase the recovery rate through water injection. The main reason for the increase in injection pressure is the increase in water injection plugging resistance. How to control the smooth implementation of water injection and predict the water injection plugging resistance during the water injection process is the key.

[0005] Therefore, it is urgent to develop a device that can simulate the screen pipe, the annulus between the formation and the screen pipe, and the integrated combination of multiple types of characteristic formations, so as to predict the water injection plugging resistance, and then control the water injection process and improve the recovery rate. Summary of the invention

[0006] In response to at least one of the problems in the above-mentioned prior art, the purpose of the present invention is to provide a formation water injection blockage impedance simulation experimental device and experimental method. The device is equipped with a completion component and multiple groups of formation simulation components, and a constant flow pump injects fluid into all of the formation simulation components in sequence; the pressure difference of each group of formation simulation components after water injection is observed, and then the water injection impedance of the entire completion component and the formation is obtained, which provides reference data for actual water injection, improves the water injection control process, and increases the recovery rate.

[0007] To achieve the above object, the present invention adopts the following technical solutions: A formation water injection plugging impedance simulation experimental device comprises a liquid storage tank, a constant flow pump, a completion assembly and at least two groups of formation simulation assemblies connected in sequence; pressure gauges are arranged between the constant flow pump and the completion assembly and on each group of the formation simulation assemblies, and all the pressure gauges are connected to a data acquisition and analysis system.

[0008] Preferably, a screen tube protective shell and a screen tube mesh are provided in the completion assembly.

[0009] Preferably, the last group of formation simulation components is connected to a recovery tank.

[0010] Preferably, a pressure gauge is provided between the last group of formation simulation components and the recovery tank.

[0011] Preferably, a flow meter is provided between the constant flow pump and the completion assembly, and the flow meter is connected to the data acquisition and analysis system.

[0012] Preferably, the formation simulation components include four groups, namely, type I formation simulation components, type II formation simulation components, type III formation simulation components and type IV formation simulation components.

[0013] Preferably, the simulated formations in different formation simulation components are mixed with quartz sand and clay in different proportions.

[0014] A formation water injection plugging impedance simulation experiment method is based on any one of the formation water injection plugging impedance simulation experiment devices described above, and comprises the following steps: Filling the completion assembly with a set ratio of quartz sand and clay; A set ratio of quartz sand and clay is placed in each formation simulation component to mix into formation sand; Starting the constant flow pump to inject fluid into all the formation simulation components in sequence; Observe the pressure gauge between the constant flow pump and the completion assembly. When the pressure value reaches the set value, stop the constant flow pump from pressurizing and record the pressure values ​​of all other pressure gauges. According to the pressure value of each pressure gauge, the pressure difference of each formation simulation component can be obtained, and the permeability of each formation simulation component can be calculated; The water injection impedance of each formation simulation component is calculated according to the permeability of each formation simulation component, and the water injection impedance of all the formation simulation components is summed to obtain the water injection impedance of the entire device.

[0015] Preferably, when injecting fluid into all the formation simulation components in sequence, the fluid medium is changed, so that the water injection impedance of the entire device under different fluid media can be obtained.

[0016] Preferably, when injecting fluid into all the formation simulation components in sequence, the injection flow rate of the fluid is changed, so that the water injection impedance of the entire device at different flow rates can be obtained.

[0017] The present invention adopts the above technical solution, which has the following advantages: 1. The formation water injection blockage impedance simulation experimental device provided by the present invention is configured with a completion assembly and multiple groups of formation simulation assemblies, and a constant flow pump injects fluid into all the formation simulation assemblies in sequence; the pressure difference of each group of formation simulation assemblies after water injection is observed, and then the water injection impedance of the entire completion assembly and the formation is obtained, so as to provide reference data for actual water injection, improve the control process of water injection, and enhance the recovery rate.

[0018] 2. The formation water injection blockage impedance simulation experimental device provided by the present invention can provide reference water injection resistance mechanical parameters for the entire formation including the completion components, annulus and formation combination during the actual water injection process; the simulation experimental device can restore the resistance of each component encountered by the fluid flowing through the completion screen, annulus to the formation during the water injection process, thereby making the measured water injection resistance more comprehensive and reliable.

[0019] 3. The formation water injection blockage impedance simulation experimental device provided by the present invention takes into account the complexity of the formation by setting up multiple groups of formation simulation components, and can simulate the media of different formations to obtain the water injection impedance of the completion component and the formation; by changing the fluid medium and flow rate, the water injection impedance of the entire completion component and the formation under different fluid media and different flow rates can be obtained. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of a formation water injection plugging impedance simulation experimental device provided in Example 1 of the present invention.

[0021] Figure 2 It is a cross-sectional schematic diagram of the well completion assembly provided in this embodiment of the present invention.

[0022] Figure 3 It is a cross-sectional schematic diagram of a type of formation simulation component provided in this embodiment of the present invention.

[0023] Figure 4 It is a cross-sectional schematic diagram of the second type of formation simulation components provided in this embodiment of the present invention. Figure 5 It is a cross-sectional schematic diagram of three types of formation simulation components provided in this embodiment of the present invention.

[0024] Figure 6 It is a cross-sectional schematic diagram of four types of formation simulation components provided in this embodiment of the present invention. Figure 7 It is a flow chart of the formation water injection plugging impedance simulation experimental method provided in Example 2 of the present invention.

[0025] Markings in the accompanying drawings: 1 is a liquid storage tank; 2 is a constant flow pump; 3 is a completion assembly; 4 is a screen protection shell; 5 is a screen mesh; 6 is a type I formation simulation assembly; 7 is a type II formation simulation assembly; 8 is a type III formation simulation assembly; 9 is a type IV formation simulation assembly; 10 is a flow meter; 11 is a first pressure gauge; 12 is a second pressure gauge; 13 is a third pressure gauge; 14 is a fourth pressure gauge; 15 is a fifth pressure gauge; 16 is a sixth pressure gauge; 17 is a data acquisition device; 18 is a data analysis computer; 19 is a recovery tank. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0027] In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "front", "back", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the system or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "assembly", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] The present invention provides a formation water injection plugging impedance simulation experimental device and an experimental method. The device sets a completion component and multiple groups of formation simulation components, observes the pressure difference of each group of formation simulation components after water injection, and then obtains the water injection impedance of the entire completion component and the formation, provides reference data for actual water injection, improves the water injection control process, and increases the recovery rate.

[0030] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0031] Example 1 Please refer to Figures 1 to 6The present embodiment provides a formation water injection plugging impedance simulation experimental device, comprising a liquid storage tank 1, a constant flow pump 2, a completion component 3 and at least two groups of formation simulation components connected in sequence; a pressure gauge is arranged between the constant flow pump 2 and the completion component 3 and on each group of formation simulation components, and the pressure gauge is used to collect pressure data in each component, and all pressure gauges are connected to a data acquisition and analysis system.

[0032] In a specific application, the fluid storage tank 1 is used to store the fluid to be injected, and the constant flow pump 2 and the fluid storage tank 1 are connected by a pipeline. The constant flow pump 2 extracts fluid from the fluid storage tank 1 and injects it into the completion component 3 and the formation simulation component.

[0033] The completion assembly 3 has an inner cavity, in which a sieve protection shell 4 and a sieve screen 5 are installed. The sieve protection shell 4 is circular, and the sieve screen 5 is disc-shaped. A plurality of sieve holes are provided on the sieve screen 5, and the outer diameters of the two are equal to the inner diameter of the completion assembly 3. The sieve protection shell 4 and the sieve screen 5 are fixedly installed in the completion assembly 3 by bolts. One end of the completion assembly 3 is provided with an external thread connected to the formation simulation assembly. The fluid enters the formation simulation assembly from the constant flow pump 2 through the sieve protection shell 4 and the sieve screen 5 in the completion assembly 3.

[0034] Quartz sand and clay are selected in a set ratio, mixed into formation sand, and filled into the cavity behind the screen 5 of the well completion assembly 3.

[0035] The formation simulation components include four groups, namely, a type I formation simulation component 6, a type II formation simulation component 7, a type III formation simulation component 8, and a type IV formation simulation component 9. The formation simulation components are all T-shaped cylindrical structures, with an internal thread at one end and an external thread at the other end; quartz sand and clay are selected in a set proportion, mixed into formation sand, and loaded into the cylinder of the formation simulation component; different formation simulation components can also use different proportions of quartz sand and clay to form formation sand with different permeabilities, which can simulate formations in various situations. The completion component 3, the type I formation simulation component 6, the type II formation simulation component 7, the type III formation simulation component 8, and the type IV formation simulation component 9 are connected as a whole through threads.

[0036] The pressure gauge between the constant flow pump 2 and the completion assembly 3 is the first pressure gauge 11, the pressure gauge on the first type formation simulation assembly 6 is the second pressure gauge 12, the pressure gauge on the second type formation simulation assembly 7 is the third pressure gauge 13, the pressure gauge on the third type formation simulation assembly 8 is the fourth pressure gauge 14, and the pressure gauge on the fourth type formation simulation assembly 9 is the fifth pressure gauge 15.

[0037] A recovery tank 19 is connected to the end of the fourth type of formation simulation component 9, and the recovery tank 19 is used to recover the fluid flowing through the formation simulation component.

[0038] A sixth pressure gauge 16 is installed in the pipeline between the fourth type formation simulation component 9 and the recovery tank 19 .

[0039] A flow meter 10 is connected to the pipeline between the constant flow pump 2 and the completion assembly 3 to measure the flow rate of the liquid in the pipeline.

[0040] The data acquisition and analysis system includes a data acquisition device 17 and a data analysis computer 18 which are interconnected. All pressure gauges and flow meters 10 are connected to the data acquisition device 17. The data acquisition device 17 collects data from the pressure gauges and flow meters 10 and transmits the data to the data analysis computer 18. Using these data, the data analysis computer 18 can calculate the water injection impedance of the entire simulation experimental device.

[0041] Example 2 Please refer to Figure 7 The formation water injection plugging impedance simulation experimental method provided in this embodiment is completed using the formation water injection plugging impedance simulation experimental device as in Example 1, and includes the following steps: S01, loading a set ratio of quartz sand and clay into the completion assembly 3; S02, adding a set ratio of quartz sand and clay into each formation simulation component to mix into formation sand; S03, start the constant flow pump 2 to inject the fluid into all the formation simulation components in sequence; S04, observe the pressure gauge between the constant flow pump 2 and the completion assembly 3. When the pressure value reaches the set value, stop the constant flow pump 2 from pressurizing and record the pressure values ​​of all other pressure gauges; S05, according to the pressure value of each pressure gauge, the pressure difference of each formation simulation component can be obtained, and the permeability of each formation simulation component can be calculated; S06, calculating the water injection impedance of each formation simulation component according to the permeability of each formation simulation component, and summing up the water injection impedance of all formation simulation components to obtain the water injection impedance of the entire device.

[0042] In a specific application, the fluid in the storage tank 1 is pumped into the completion assembly 3, the first type of formation simulation assembly 6, the second type of formation simulation assembly 7, the third type of formation simulation assembly 8 and the fourth type of formation simulation assembly 9 through the constant flow pump 2, and the fluid finally enters the recovery tank 19. The completion assembly 3 and the four groups of formation simulation assemblies will form a flow-blocking channel. The fluid passes through the first pressure gauge 11, the second pressure gauge 12, the third pressure gauge 13, the fourth pressure gauge 14, the fifth pressure gauge 15 and the sixth pressure gauge 16. When the first pressure gauge 11 reaches the set value of 10MPa, the constant flow pump 2 is stopped to continue pressurizing. The data acquisition device 17 records the pressure values ​​of the six pressure gauges at this time to obtain the pressure difference of the fluid flowing through each component. The data analysis computer 18 calculates the permeability of each component according to the Darcy's law formula through pressure difference measurement. The permeability calculation formula is as follows:

[0043] In the formula, is the flow rate through the test sample; ; ; is the pressure difference across the sample.

[0044] According to the permeability of each component, the water injection impedance of each component is calculated, and the water injection impedance of all components is summed to obtain the water injection impedance of the entire completion component and formation. The water injection impedance formula of the entire formation is as follows:

[0045] In the formula, is the water injection resistance; is the permeability of the sample under a certain water content; ;

[0046] .

[0047] When the completion assembly 3 and the formation simulation assembly pile bodies remain unchanged, fluid is injected into all the formation simulation assemblies in sequence, the fluid medium is changed, and steps S01 to S06 are repeated to obtain the water injection impedance of the entire device under different fluid media.

[0048] Similarly, when the completion assembly 3 and the pile of the formation simulation assembly remain unchanged, the fluid injection flow rate is changed and steps S01 to S06 are repeated to obtain the water injection impedance of the entire device at different flow rates.

[0049] The media in the completion assembly 3 and each formation simulation assembly, such as the mixing ratio of quartz sand and clay, are changed, and steps S01 to S06 are repeated to obtain the water injection impedance of the entire completion assembly 3 and the formation under different media.

[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A formation water injection plugging resistance simulation experimental device, characterized in that: It comprises a fluid storage tank, a constant flow pump, a completion assembly and at least two groups of formation simulation assemblies connected in sequence; pressure gauges are arranged between the constant flow pump and the completion assembly and on each group of the formation simulation assemblies, and all the pressure gauges are connected to a data acquisition and analysis system.

2. The formation water injection plugging resistance simulation experimental device according to claim 1 is characterized in that: The well completion assembly is provided with a screen tube protection shell and a screen tube screen.

3. The formation water injection plugging resistance simulation experimental device according to claim 1 is characterized in that: The last group of formation simulation components is connected to a recovery tank.

4. The formation water injection plugging resistance simulation experimental device according to claim 3 is characterized in that: Finally, a pressure gauge is provided between the group of formation simulation components and the recovery tank.

5. The formation water injection plugging resistance simulation experimental device according to claim 1 is characterized in that: A flow meter is provided between the constant flow pump and the well completion assembly, and the flow meter is connected to the data acquisition and analysis system.

6. The formation water injection plugging resistance simulation experimental device according to claim 1 is characterized in that: The formation simulation components include four groups, namely, a first-class formation simulation component, a second-class formation simulation component, a third-class formation simulation component and a fourth-class formation simulation component.

7. The formation water injection plugging resistance simulation experimental device according to claim 6 is characterized in that: Different formation simulation components contain simulated formations mixed with quartz sand and clay in different proportions.

8. A formation water injection plugging resistance simulation experimental method, characterized in that: The formation water injection plugging resistance simulation experimental device according to any one of claims 1 to 7 is completed, comprising the following steps: Filling the completion assembly with a set ratio of quartz sand and clay; A set ratio of quartz sand and clay is placed in each formation simulation component to mix into formation sand; Starting the constant flow pump to inject fluid into all the formation simulation components in sequence; Observe the pressure gauge between the constant flow pump and the completion assembly. When the pressure value reaches the set value, stop the constant flow pump from pressurizing and record the pressure values ​​of all other pressure gauges. According to the pressure value of each pressure gauge, the pressure difference of each formation simulation component can be obtained, and the permeability of each formation simulation component can be calculated; The water injection impedance of each formation simulation component is calculated according to the permeability of each formation simulation component, and the water injection impedance of all the formation simulation components is summed to obtain the water injection impedance of the entire device.

9. The formation water injection plugging resistance simulation experimental method according to claim 8, characterized in that: By injecting fluid into all the formation simulation components in sequence and changing the fluid medium, the water injection impedance of the entire device under different fluid media can be obtained.

10. The formation water injection plugging resistance simulation experimental method according to claim 8, characterized in that: By injecting fluid into all the formation simulation components in sequence and changing the fluid injection flow rate, the water injection impedance of the entire device at different flow rates can be obtained.