MES control system and method based on Internet of Things

Through the Internet of Things-based MES control system, combining production demand and production line information, initial production plans and management plans are formulated, which solves the problem of overproduction or insufficient production, and improves production efficiency and scientific management.

CN119024777APending Publication Date: 2024-11-26SUZHOU WEIYUANSHI INFORMATION TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411017016.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-28
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, production volume or initial production plan is often due to misest estimates by managers, which cannot meet both customer needs and production efficiency, resulting in overproduction or insufficient production.

Method used

Using the Internet of Things-based MES control system and method, the initial production plan is determined by obtaining production demand and production line information, and the initial worker management plan and real-time warehousing management plan are formulated based on the initial production plan, and the production plan is dynamically adjusted to deal with production changes. Ensure flexibility and consistency in production.

Benefits of technology

It has achieved accurate acquisition of market demand and production line information, optimized production scheduling, reduced production surplus and insufficient production, improved per capita production efficiency and work satisfaction, reduced warehousing costs, and enhanced the scientificity and accuracy of production management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024777A_ABST
    Figure CN119024777A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of production management methods, in particular to an MES control system and method based on the Internet of Things. The method comprises the steps of obtaining a production demand and production line information, and determining an initial production plan according to the production demand and the production line information; determining an initial worker management scheme according to the initial production plan; obtaining warehouse space data; determining a real-time warehouse management scheme according to the warehouse space data and the initial production plan; and determining a real-time production plan and a real-time worker management scheme according to the production demand, the initial production plan, the initial worker management scheme and the real-time warehouse management scheme. The production capacity and state of a production line are mastered in real time, excessive production and insufficient production are avoided, a production plan capable of meeting market requirements and fully utilizing the capacity is formulated, an initial production plan is dynamically adjusted according to actual conditions so as to cope with changes and emergencies in production, the flexibility and continuity of the initial production plan are ensured, and the production efficiency is improved. And the production efficiency and the work satisfaction degree are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of production management methods, and in particular to an MES control system and method based on the Internet of Things. Background Art

[0002] The MES (Manufacturing Execution System) control system includes work time planning and cost control, storage space and material management, multi-production line coordination and worker efficiency improvement, production volume and economic production batch calculation, equipment maintenance and care, quality control and inspection, material procurement and supply management, and data security and privacy protection.

[0003] Reasonable formulation of production volume can ensure that enterprises produce according to market demand. In the existing technology, the production volume or initial production plan formulated is often unable to meet both customer demand and production efficiency due to incorrect estimates by managers, resulting in overproduction or underproduction. Summary of the invention

[0004] The present application provides an MES control system and method based on the Internet of Things to solve the above problems.

[0005] In a first aspect, the present application provides an MES control method based on the Internet of Things, the method comprising: obtaining production demand and production line information, and determining an initial production plan according to the production demand and the production line information;

[0006] Determining an initial worker management plan based on the initial production plan;

[0007] Acquire warehouse space data; determine a real-time warehouse management plan based on the warehouse space data and the initial production plan;

[0008] A real-time production plan and a real-time worker management plan are determined according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan.

[0009] Through the above technical solutions, we can accurately obtain market demand and production line information, grasp the production capacity and status of the production line in real time, reduce overproduction and underproduction, ensure the feasibility of the initial production plan, optimize scheduling and dispatching according to production demand and production line information, generate the optimal initial production plan that can both meet market demand and fully utilize production capacity, and reasonably arrange the initial worker management plan such as workers' shifts, work content and training needs according to the initial production plan. The data of existing warehouse space data can be obtained in real time, and the storage space can be effectively used. The initial production plan can be dynamically adjusted according to the actual situation to cope with changes and emergencies in production, ensure the flexibility and consistency of the initial production plan, improve per capita production efficiency and job satisfaction, and reduce production stagnation caused by storage problems.

[0010] Optionally, determining an initial production plan according to the production demand and the production line information includes:

[0011] Analyze the production demand to obtain product information, order quantity and delivery time;

[0012] Determine the production volume according to the order volume and the production line information;

[0013] Determine the production batch and batch output according to the production volume and the delivery time;

[0014] Determining an available production line according to the product information, the production line information and the production volume;

[0015] The product information, the order quantity, the delivery time, the production volume, the production batch, the batch output and the available production lines are used as an initial production plan.

[0016] Through the above technical solution, through the analysis of production demand, a foundation is laid for the formulation of a reasonable initial production plan. According to the order quantity and delivery time, the actual production volume is calculated to ensure the rationalization of production volume and avoid overproduction or underproduction. According to the production volume and delivery time, the production batches and batch outputs are divided, and the production batches are optimized to provide a basis for balancing production efficiency and inventory management; according to the production volume and production batches, available production lines are selected for production to ensure efficient use of the production lines, reduce idle equipment and waste of production capacity, and integrate product information, order quantity, delivery time, production volume, production batches and batch outputs, and available production lines into a comprehensive initial production plan to provide a basis for achieving accurate and flexible production scheduling and maximizing production efficiency.

[0017] Optionally, determining an initial worker management plan according to the initial production plan includes:

[0018] Matching production line workers according to the available production lines;

[0019] Analyze the workers of the production line to obtain the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate of workers in each production position;

[0020] Establishing a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency;

[0021] Establishing a relationship between the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and fatigue;

[0022] Predict the production defect rate within a preset time based on the proficiency relationship and fatigue relationship;

[0023] Determine the optimal working time and the optimal working cycle of the workers according to the proficiency relationship, the fatigue relationship and the production defect rate;

[0024] The initial worker management plan is determined according to the optimal working hours and the optimal working cycle of the workers.

[0025] Through the above technical solution, the possible changes in workers' production efficiency and quality under different working hours and working cycles are clarified. By considering the workers' proficiency and fatigue, a more reasonable initial production plan is formulated to improve production efficiency, predict and control the production defective rate, and reduce quality problems caused by worker fatigue or lack of skills. According to the above proficiency model and fatigue model, a scientific initial worker management plan is formulated to find the working hours and cycles that can balance worker efficiency and production quality, set scientific scheduling plans, arrange rest time, set chicken production capacity targets and other specific initial worker management plans, improve worker satisfaction and work efficiency, and reduce the company's labor costs.

[0026] Optionally, the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and the proficiency are related to each other, referring to the following formula:

[0027]

[0028] Among them, L i+1 is the proficiency on the i+1th day; L i is the proficiency on the i-th day; α is the growth coefficient of proficiency; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; L max is the maximum proficiency; β is the reduction coefficient of proficiency; k is the number of days of shutdown; S is the historical shutdown time; E is the historical production defect rate.

[0029] Through the above technical solution, by establishing a proficiency relationship through the worker's historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, and the historical production defect rate, the worker's proficiency can be predicted more accurately, thereby providing a basis for predicting the worker's production capacity, thereby providing a scientific basis for arranging the worker's work time.

[0030] Optionally, the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and the fatigue degree are related to each other, referring to the following formula:

[0031]

[0032] Among them, F i+1 F is the fatigue degree on the i+1th day; i is the fatigue degree on the i-th day; γ is the cumulative coefficient of fatigue degree; T i is the actual working time on the ith day; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; E is the historical production defect rate; δ is the recovery coefficient of fatigue; k is the number of days of downtime; μ is the influence coefficient of the number of days of downtime on fatigue recovery.

[0033] Through the above technical solution, the fatigue changes in future time periods can be predicted, so that production tasks can be arranged more reasonably, avoiding poor completion of production tasks when employees are highly fatigued, or even causing negative benefits. It provides a basis for modifying the initial production plan according to employee fatigue, and the initial worker management plan that appropriately reduces the workload of jobs with higher fatigue or arranges rest is more humane and helps to improve employee satisfaction.

[0034] Optionally, the production defect rate within a preset time is predicted based on the proficiency relationship and the fatigue relationship, referring to the following formula:

[0035]

[0036] Among them, E i is the production defect rate on the i-th day; L i is the proficiency on the i-th day; F i is the fatigue degree on the i-th day; ω1 is the influence coefficient of proficiency on the defective rate; ω2 is the influence coefficient of fatigue degree on the defective rate.

[0037] Through the above technical solution, the production defect rate of the i-th day is predicted by the formula, so that the production defect rate is kept within a reasonable range. By predicting the production defect rate, the working hours and cycles of worker efficiency and production quality are balanced to calculate the economy of the initial production plan. By reducing the production fluctuations caused by proficiency and fatigue, production efficiency is improved and production costs are reduced.

[0038] Optionally, determining a real-time warehouse management solution according to the warehouse space data and the initial production plan includes:

[0039] Determine the shelf life of the intermediate materials produced by the production line and the preset material preparation space at the post according to the available production line and the product information;

[0040] Analyze the product information, determine the production process and product shelf life, and determine the production position sequence based on the production process and the available production lines;

[0041] Determine the usage of the material preparation space at the previous production position based on the historical individual production capacity of the worker at the previous production position, the historical production defect rate of the worker at the previous production position, and the historical individual production capacity of the worker at the current position;

[0042] Parsing the warehouse space data to determine the remaining space in the warehouse;

[0043] Predict the remaining space available for storage within a preset time based on the product shelf life, the delivery time, the production batch, the batch output, the intermediate material shelf life, the use of the preparation space and the remaining space;

[0044] A real-time warehouse management plan is determined based on the remaining space that can be reserved, the historical individual production capacity of workers in each production position, and the historical production defective rate of workers in each production position.

[0045] Through the above technical scheme, the shelf life of intermediate materials and the preparation space of each production position are determined to ensure the proper storage and management of intermediate materials in the production process to avoid expiration or waste; the production process and product shelf life are determined to provide basic data for the initial production plan to ensure the rationality of the production process and the stability of product quality; the use of the preparation space at the position is determined to ensure the rational use of the preparation space to avoid material shortages or surpluses; the remaining space that can be reserved within the preset time is predicted to provide a decision-making basis for warehouse management to ensure the rational use of warehouse space data; a real-time warehouse management plan is determined to optimize warehouse management, improve inventory turnover, and reduce inventory costs.

[0046] Optionally, determining a real-time production plan and a real-time worker management plan according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan includes:

[0047] Obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity;

[0048] Predicting the real-time production volume to be completed based on the unfinished volume in the order volume and the production defect rate;

[0049] The initial production plan and the initial worker management plan are adjusted according to the production volume to be completed, the optimal working time of the workers, the optimal working cycle of the workers, and the remaining space that can be reserved.

[0050] Through the above technical solution, the unfinished amount in the order volume is determined, the gap between the current production progress and the order demand is clarified, the real-time to-be-completed production volume is predicted, and data support is provided for the real-time adjustment of the production plan to ensure that production can meet production demand on time; the initial production plan and the initial worker management plan are adjusted, the initial production plan is optimized, and production efficiency is improved; reasonable arrangements for workers' work are achieved, work efficiency is improved, and overproduction or underproduction is avoided.

[0051] Optionally, the unfinished quantity in the order quantity is obtained by using the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position, and the order quantity, referring to the following formula:

[0052]

[0053] Among them, U is the unfinished quantity in the order volume; N is the order volume; P a is the historical individual productivity of the ath position; E a is the historical production defect rate of the a-th position;

[0054] The real-time production volume to be completed is predicted based on the unfinished volume in the order volume and the production defect rate, referring to the following formula:

[0055]

[0056] Among them, M is the real-time production volume to be completed; U is the unfinished volume in the order volume; E ai is the production defect rate of the a-th position on the i-th day; m is the remaining production schedule days; n is the total number of positions in the last production process.

[0057] Through the above technical solution, by calculating the unfinished order volume, the enterprise can clearly understand the gap between the current production progress and the order volume. By calculating the real-time to-be-completed production volume, the enterprise can clearly understand how much production volume needs to be completed in the remaining time to meet the order volume. It provides important data support for enterprise managers, helping them to formulate more reasonable initial production plans and adjustment strategies. Understanding the unfinished order volume helps enterprises optimize resource allocation, ensure that production can meet order requirements on time, and avoid overproduction or underproduction.

[0058] In a second aspect, the present application provides an MES control system based on the Internet of Things, the system comprising:

[0059] An initial production plan determination module is used to obtain production requirements and production line information, and determine an initial production plan based on the production requirements and the production line information;

[0060] A worker management module, used to determine an initial worker management plan according to the initial production plan;

[0061] A warehouse management module is used to obtain warehouse space data; determine a real-time warehouse management plan based on the warehouse space data and the initial production plan;

[0062] The initial plan adjustment module is used to determine the real-time production plan and the real-time worker management plan according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan.

[0063] Optionally, the initial production plan determination module is specifically used to:

[0064] Analyze the production demand to obtain product information, order quantity and delivery time;

[0065] Determine the production volume according to the order volume and the production line information;

[0066] Determine the production batch and batch output according to the production volume and the delivery time;

[0067] Determining an available production line according to the product information, the production line information and the production volume;

[0068] The product information, the order quantity, the delivery time, the production volume, the production batch, the batch output and the available production lines are used as the initial production plan

[0069] Optionally, the worker management module is specifically used to: match production line workers according to the available production lines;

[0070] Analyze the workers of the production line to obtain the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate of workers in each production position;

[0071] Establishing a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency;

[0072] Establishing a relationship between the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and fatigue;

[0073] Predict the production defect rate within a preset time based on the proficiency relationship and fatigue relationship;

[0074] Determine the optimal working time and the optimal working cycle of the workers according to the proficiency relationship, the fatigue relationship and the production defect rate;

[0075] The initial worker management plan is determined according to the optimal working hours and the optimal working cycle of the workers.

[0076] Optionally, the worker management module is specifically used to: establish a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency, referring to the following formula:

[0077]

[0078] Among them, L i+1 is the proficiency on the i+1th day; L i is the proficiency on the i-th day; α is the growth coefficient of proficiency; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; L max is the maximum proficiency; β is the reduction coefficient of proficiency; k is the number of days of shutdown; S is the historical shutdown time; E is the historical production defect rate.

[0079] Optionally, the worker management module is specifically used to: establish a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and fatigue, referring to the following formula:

[0080]

[0081] Among them, F i+1 F is the fatigue degree on the i+1th day; i is the fatigue degree on the i-th day; γ is the cumulative coefficient of fatigue degree; T i is the actual working time on the ith day; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; E is the historical production defect rate; δ is the recovery coefficient of fatigue; k is the number of days of downtime; μ is the influence coefficient of the number of days of downtime on fatigue recovery.

[0082] Optionally, the worker management module is specifically used to: predict the production defect rate within a preset time according to the proficiency relationship and the fatigue relationship, referring to the following formula:

[0083]

[0084] Among them, E i is the production defect rate on the i-th day; L i is the proficiency on the i-th day; F iis the fatigue degree on the i-th day; ω1 is the influence coefficient of proficiency on the defective rate; ω2 is the influence coefficient of fatigue degree on the defective rate.

[0085] Optionally, the warehouse management module is specifically used to:

[0086] Determine the shelf life of the intermediate materials produced by the production line and the preset material preparation space at the post according to the available production line and the product information;

[0087] Analyze the product information, determine the production process and product shelf life, and determine the production position sequence based on the production process and the available production lines;

[0088] Determine the usage of the material preparation space at the previous production position based on the historical individual production capacity of the worker at the previous production position, the historical production defect rate of the worker at the previous production position, and the historical individual production capacity of the worker at the current position;

[0089] Parsing the warehouse space data to determine the remaining space in the warehouse;

[0090] Predict the remaining space available for storage within a preset time based on the product shelf life, the delivery time, the production batch, the batch output, the intermediate material shelf life, the use of the preparation space and the remaining space;

[0091] A real-time warehouse management plan is determined based on the remaining space that can be reserved, the historical individual production capacity of workers in each production position, and the historical production defective rate of workers in each production position.

[0092] Optionally, the warehouse management module is specifically used to:

[0093] Obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity;

[0094] Predicting the real-time production volume to be completed based on the unfinished volume in the order volume and the production defect rate;

[0095] The initial production plan and the initial worker management plan are adjusted according to the production volume to be completed, the optimal working time of the workers, the optimal working cycle of the workers, and the remaining space that can be reserved.

[0096] Optionally, the initial plan adjustment module is specifically used to obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity, referring to the following formula:

[0097]

[0098] Among them, U is the unfinished quantity in the order volume; N is the order volume; P a is the historical individual productivity of the ath position; E a is the historical production defect rate of the a-th position;

[0099] The real-time production volume to be completed is predicted based on the unfinished volume in the order volume and the production defect rate, referring to the following formula:

[0100]

[0101] Among them, M is the real-time production volume to be completed; U is the unfinished volume in the order volume; E ai is the production defect rate of the a-th position on the i-th day; m is the remaining production schedule days; n is the total number of positions in the last production process. BRIEF DESCRIPTION OF THE DRAWINGS

[0102] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0103] Figure 1 A schematic diagram of an application scenario provided for an embodiment of the present application;

[0104] Figure 2 A flowchart of an MES control method based on the Internet of Things provided in one embodiment of the present application;

[0105] Figure 3 A schematic diagram of the structure of an MES control system based on the Internet of Things is provided in one embodiment of the present application. DETAILED DESCRIPTION

[0106] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0107] In addition, the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.

[0108] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.

[0109] In the prior art, due to incorrect estimates by managers, the formulated production volume or initial production plan is often unable to meet both customer demand and production efficiency, resulting in overproduction or underproduction.

[0110] Based on this, the present application provides an MES control system and method based on the Internet of Things, which integrates and analyzes production demand and production line information, arranges the initial production plan, formulates the initial worker management plan through the initial production plan, allocates human resources, and ensures the reasonable allocation and scheduling of workers, which can not only improve production efficiency, but also reduce worker fatigue and improve work quality by reasonably arranging working hours and tasks. By combining warehouse space data and the initial production plan to formulate a real-time warehouse management plan, warehouse resources can be effectively managed and utilized, and backlogs and shortages of raw materials or finished products can be avoided, and warehouse costs can be reduced. The initial production plan is dynamically adjusted according to the data and feedback of production demand, initial production plan, initial worker management plan and real-time warehouse management plan, which can respond more flexibly to production changes and abnormal situations in the production process, ensure the continuity and efficiency of production, make decisions based on data, and reduce the possibility of human misjudgment. Through the analysis of historical data and real-time data, demand can be accurately predicted, production can be arranged, management personnel can be managed and inventory can be optimized. The application in MES improves the scientificity and accuracy of production management, improves the coordination and efficiency of the entire production process, and thus brings obvious competitive advantages to enterprises.

[0111] Figure 1A schematic diagram of an application scenario provided for the present application, when an enterprise formulates production volume according to production demand, the method provided by the present application is applied, the method provided by the present application is applied to any server, the server interacts with the order system, obtains production demand from the order system, retrieves production line information from a preset database, determines the initial production plan according to production demand and production line information, and determines the initial worker management plan according to the initial production plan; through the initial worker management plan, human resources are allocated to ensure the reasonable allocation and scheduling of workers, which can not only improve production efficiency, but also reduce worker fatigue and improve work quality by reasonably arranging working hours and tasks; through the real-time warehouse management plan, warehouse resources are effectively managed and utilized to avoid backlog and shortage of raw materials or finished products and reduce warehouse costs; the initial production plan is dynamically adjusted according to the data and feedback of production demand, initial production plan, initial worker management plan and real-time warehouse management plan, which can more flexibly respond to production changes and abnormal situations in the production process, ensure the continuity and efficiency of production, make decisions based on data, and reduce the possibility of human misjudgment.

[0112] For specific implementation methods, please refer to the following embodiments.

[0113] Figure 2 This is a flowchart of an MES control method based on the Internet of Things provided in an embodiment of the present application. The method of this embodiment can be applied to the server in the above scenario. Figure 2 As shown, the method includes:

[0114] S201. Obtain production demand and production line information, and determine an initial production plan based on the production demand and production line information.

[0115] Production demand can be market demand obtained from the sales department, order system or market analysis system.

[0116] The production line information may include specific production lines in the factory, equipment information in the production line, corresponding worker information for equipment management, operating status of the production line, equipment utilization, failure rate, and other information, which may be stored in a preset database.

[0117] The initial production plan can be a specific plan based on current production needs, including production batches, production task priorities, start time and end time, etc.

[0118] Specifically, production demand is obtained from the order system, and data such as the production capacity, operating status, equipment utilization, failure rate, worker information, etc. of the production line are obtained in real time. The APS (Advanced Planning and Scheduling) module integrated in the MES system is used to formulate a specific initial production plan based on production demand and production line information, including reasonable production batches, production task priorities, batch start time, and batch end time, which can both meet market demand and make full use of production capacity.

[0119] S202. Determine an initial worker management plan based on the initial production plan.

[0120] The initial worker management plan can be a specific plan to improve per capita productivity and job satisfaction by arranging workers' shifts, work content and training needs.

[0121] Specifically, workers' shifts, work content and training needs are reasonably arranged according to the initial production plan to improve per capita production efficiency and job satisfaction.

[0122] For example, according to the initial production plan, workers' shifts can be flexibly arranged, such as reducing overtime, reducing the length of night shifts, and other specific arrangements to improve production efficiency and increase workers' job satisfaction.

[0123] S203, obtaining warehouse space data; determining a real-time warehouse management plan based on the warehouse space data and the initial production plan.

[0124] Warehouse space data can be obtained in real time from existing warehouse space data, including total warehouse space, available warehouse space, space utilization, inventory turnover rate and other data.

[0125] A real-time warehouse management solution can be a management solution that uses warehouse space data based on the initial production plan to solve the backlog of raw materials and the accumulation of finished products.

[0126] Specifically, by integrating the WMS (Warehouse Management System) module into the MES system, the existing warehouse space data can be obtained in real time, and a real-time warehouse management plan can be formulated based on the warehouse space data and the production line production capacity in the initial production plan.

[0127] For example, the use of warehouse space can be estimated based on the available warehouse space, space utilization and initial production plan in the warehouse space data. If the available warehouse space cannot meet the initial production plan, a real-time warehouse management plan should be formulated to improve inventory turnover and space utilization to free up more available warehouse space to meet production needs.

[0128] S204. Determine a real-time production plan and a real-time worker management plan based on production demand, an initial production plan, an initial worker management plan, and a real-time warehouse management plan.

[0129] Specifically, monitor the production progress in real time and compare it with the planned production progress, monitor the worker status and warehousing situation in real time, use feedback mechanism and automated adjustment function to dynamically adjust according to actual conditions, and continuously optimize the initial production plan and initial worker management plan.

[0130] Through the method provided in this embodiment, market demand and production line information can be accurately obtained, the production capacity and status of the production line can be mastered in real time, overproduction and underproduction can be reduced, the feasibility of the initial production plan can be ensured, and the dispatching and scheduling can be optimized according to the production demand and production line information to generate the optimal initial production plan that can both meet the market demand and fully utilize the production capacity. According to the initial production plan, the initial worker management plan such as workers' shifts, work content and training needs can be reasonably arranged, the data of existing warehouse space data can be obtained in real time, the storage space can be effectively used, and the initial production plan can be dynamically adjusted according to the actual situation to cope with changes and emergencies in production, ensure the flexibility and consistency of the initial production plan, improve per capita production efficiency and job satisfaction, and reduce production stagnation caused by storage problems.

[0131] In some embodiments, production demand is analyzed to obtain product information, order quantity and delivery time; production volume is determined based on order quantity and production line information; production batches and batch output are determined based on production volume and delivery time; available production lines are determined based on product information, production line information and production volume; product information, order quantity, delivery time, production volume, production batches, batch output and available production lines are used as an initial production plan.

[0132] Product information can be basic information about the product, such as product name, production process, quality standards, product shelf life, etc.

[0133] The order quantity can be the specific quantity of products actually required in the production demand.

[0134] The delivery time can be the time node in the production demand when the delivery needs to be completed.

[0135] The production volume can be the production volume that the factory needs to arrange production based on the estimated order volume.

[0136] The production batch can be the total number of production batches in an order when production is divided into multiple batches.

[0137] Batch output can be the production volume that needs to be completed in a production batch.

[0138] The available production line may be a production line suitable for this production.

[0139] Specifically, use language analysis methods to extract keywords from production needs and obtain information on product, order quantity and delivery time. Preprocess the information and estimate the actual production volume through mathematical analysis based on order volume and production line information. Then set production batches and batch outputs reasonably based on production volume and delivery time. Use product information and production line information to determine which production lines in the factory can be used to meet current production needs. Integrate product information, order quantity, delivery time, production volume, production batches, batch outputs and available production lines as factors in the initial production plan to formulate a reasonable initial production plan.

[0140] Through the method provided in this embodiment, through the analysis of production demand, a foundation is laid for formulating a reasonable initial production plan, the actual production volume is calculated according to the order quantity and delivery time, the production volume is ensured to be rationalized, and overproduction or underproduction is avoided. According to the production volume and delivery time, the production batches and batch outputs are divided, and the production batches are optimized to provide a basis for balancing production efficiency and inventory management; according to the production volume and production batches, available production lines are selected for production to ensure efficient use of the production lines, reduce idle equipment and waste of production capacity, and integrate product information, order quantity, delivery time, production volume, production batches and batch outputs, and available production lines into a comprehensive initial production plan, which provides a basis for achieving accurate and flexible production scheduling and maximizing production efficiency.

[0141] In some embodiments, the production line workers are matched according to the available production lines; the production line workers are analyzed to obtain the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defective rate of workers in each production position; the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defective rate are related to proficiency; the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defective rate are related to fatigue; the production defective rate within a preset time is predicted based on the proficiency relationship and the fatigue relationship; the optimal working hours and the optimal working cycle of the workers are determined based on the proficiency relationship, the fatigue relationship and the production defective rate; the initial worker management plan is determined based on the optimal working hours and the optimal working cycle of the workers.

[0142] Worker conditions can be the individual characteristics and working status of production line workers.

[0143] The historical working time may be the worker's past working time, which may be stored in a preset database.

[0144] The historical downtime may be the time when workers stop working due to various reasons (such as rest leave, equipment failure, material shortage, etc.), and may be stored in a preset database.

[0145] Historical personal capacity can be the product capacity completed by the worker per unit time in the past, which can be stored in a preset database.

[0146] The job difficulty level can be a rating of the difficulty of a production job, reflecting the job's skill requirements for workers.

[0147] The historical production defect rate can be the proportion of defective products in the products produced by workers in the past or the proportion of defective products per unit time.

[0148] Proficiency can be a measure of a worker's mastery of production job skills and work efficiency.

[0149] Fatigue can be the degree to which a worker is physically and mentally exhausted after working for long hours.

[0150] The production defect rate can be the ratio of the number of defective products generated during the production process to the total production quantity.

[0151] The production defect rate within the preset time may be the production defect rate of the product predicted for a period of time in the future.

[0152] The optimal working hours can be the maximum time a worker should work per day or per week while ensuring worker productivity and product quality.

[0153] The optimal work cycle can be the working period during which workers need to rest after completing a certain amount of work.

[0154] The initial worker management plan can be a specific plan such as shift scheduling, rest time arrangements and capacity target setting.

[0155] Specifically, according to the available production lines, the list of workers and their positions on each production line is determined, and the historical working time, historical downtime, historical personal production capacity, job difficulty level, historical production defect rate and other data of the workers corresponding to these positions are retrieved from the preset database, and the data are preprocessed and analyzed to establish the relationship between proficiency and historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate, and the relationship between fatigue and historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate; thereby obtaining the proficiency relationship and fatigue relationship of each position, using the proficiency relationship and fatigue relationship to predict the production defect rate of each position within the preset time, determine the optimal working hours and work cycle of workers in a certain position, and formulate a detailed initial worker management plan based on the workers' optimal working hours and work cycle.

[0156] For example, when the difficulty level of a worker in a certain position is high and long-term work is prone to overload, in order to avoid irreversible damage to the worker's health, a shorter working time can be arranged for him. However, some positions have a high degree of repetition and the working state is in an urgent state for a long time, which is easy to cause the production defect rate to increase after long-term work, which is not conducive to the economic benefits of the factory. Therefore, the working hours are reduced, and workers can take a short rest and adjustment after working for a certain period of time in a shift, so as to reduce the worker's fatigue, improve work efficiency, and relax the worker's working state, so as to achieve mutual benefits for workers and factories.

[0157] Through the method provided in this embodiment, the possible changes in workers' production efficiency and quality under different working hours and working cycles are clarified. By considering the workers' proficiency and fatigue, a more reasonable initial production plan is formulated, thereby improving production efficiency, predicting and controlling the production defective rate, and reducing quality problems caused by worker fatigue or lack of skills. According to the above-mentioned proficiency model and fatigue model, a scientific initial worker management plan is formulated, and the working hours and cycles that can balance worker efficiency and production quality are found. Specific initial worker management plans such as scientific scheduling plans, rest time arrangements and production capacity target setting are set to improve worker satisfaction and work efficiency, while reducing the company's labor costs.

[0158] In some embodiments, a relationship is established between historical working time, historical downtime, historical personal productivity, job difficulty level, historical production defect rate and proficiency, referring to the following formula (1):

[0159]

[0160] Among them, L i+1 is the proficiency on the i+1th day; L i is the proficiency on the i-th day; α is the growth coefficient of proficiency; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; L max is the maximum proficiency; β is the reduction coefficient of proficiency; k is the number of days of shutdown; S is the historical shutdown time; E is the historical production defect rate.

[0161] The proficiency growth coefficient may be used to measure the rate at which the proficiency of a worker in a production task increases over time. The historical personal productivity score may be an evaluation score generated by quantifying the historical personal productivity of a worker.

[0162] The maximum proficiency can be the highest proficiency that a worker can achieve when producing a task.

[0163] The proficiency reduction coefficient can reflect the rate at which a worker's proficiency decreases when he or she does not perform a certain production task for a long time.

[0164] The duration of the work stoppage can be the specific number of days that the worker is stopped from work due to various reasons.

[0165] Specifically, the provided formula (1) is used to define the change in proficiency. According to formula (1), for each day, the new proficiency L of the worker is calculated. i+1 If the worker is working, the working part of the formula is used; if the worker is off work, the off work part is used.

[0166] For example: the same production batch needs to last for many days, and the workers' proficiency has periodic increases and fluctuations. The proficiency is the highest after finishing work today, but it will drop slightly on the second day, and will continue to increase on the second day until it reaches a constant value; with high proficiency, efficiency will also increase, but the proficiency of the next batch will drop as the workers do not work for many days. For example, in cross-batch production, the proficiency of low-difficulty production positions will drop significantly after a few months, while the proficiency of high-difficulty positions will drop significantly after a few weeks.

[0167] Through the method provided in this embodiment, by establishing a proficiency relationship through the worker's historical working time, historical downtime, historical personal productivity, job difficulty level, and historical production defective rate, the worker's proficiency can be predicted more accurately, thereby providing a basis for predicting the worker's productivity and providing a scientific basis for arranging the worker's work time.

[0168] In some embodiments, a relationship is established between historical working time, historical downtime, historical personal productivity, job difficulty level, historical production defect rate and fatigue, referring to the following formula (2):

[0169]

[0170] Among them, F i+1 F is the fatigue degree on the i+1th day; i is the fatigue degree on the i-th day; γ is the cumulative coefficient of fatigue degree; T i is the actual working time on the ith day; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; E is the historical production defect rate; δ is the recovery coefficient of fatigue; k is the number of days of downtime; μ is the influence coefficient of the number of days of downtime on fatigue recovery.

[0171] The cumulative coefficient of fatigue can be the degree of influence of working time on the accumulation of fatigue. The higher the difficulty level of the position, the greater the cumulative coefficient of fatigue in the same working time.

[0172] The recovery coefficient of fatigue can be the degree of influence of downtime on fatigue recovery.

[0173] The influence coefficient of the duration of work stoppage on fatigue recovery may be the additional influence of the duration of work stoppage on fatigue recovery.

[0174] Specifically, formula (2) is used to calculate the daily fatigue of employees and the fatigue changes of workers in different jobs.

[0175] For example: as the working hours of workers increase, their fatigue gradually accumulates, their work efficiency decreases, the probability of making mistakes increases, and the defective rate also increases. The higher the difficulty level of the job, the greater the cumulative coefficient of fatigue in the same working time. Therefore, the working hours of jobs with high difficulty levels should be shortened accordingly, or a break should be set in the middle. This formula reflects the effect of rest on recovery by directly reducing fatigue in the case of a work stoppage day. Considering the weights of consecutive work stoppage days and historical work stoppage time, the recovery process depends not only on the current rest situation, but also on historical rest habits and cumulative effects. After the workers start working, the recovery effect decreases according to the law over time. In the process of gradual recovery, the initial recovery speed is faster, and the closer to full recovery, the more obvious the effect.

[0176] By predicting fatigue changes in future time periods through the method provided in this embodiment, production tasks can be arranged more reasonably to avoid poor completion of production tasks when employees are highly fatigued, or even causing negative benefits. This provides a basis for modifying the initial production plan based on employee fatigue, and the initial worker management plan that appropriately reduces the workload of jobs with higher fatigue or arranges rest is more humane and helps to improve employee satisfaction.

[0177] In some embodiments, the production defect rate within a preset time is predicted based on the proficiency relationship and the fatigue relationship, referring to the following formula (3):

[0178]

[0179] Among them, E i is the production defect rate on the i-th day; L i is the proficiency on the i-th day; F i is the fatigue degree on the i-th day; ω1 is the influence coefficient of proficiency on the defective rate; ω2 is the influence coefficient of fatigue degree on the defective rate.

[0180] The coefficient of influence of proficiency on defective rate can be used to evaluate the influence of workers' proficiency on defective rate in the production process.

[0181] The influence coefficient of fatigue on the defective rate can be used to evaluate the influence degree of worker fatigue on the defective rate during the production process.

[0182] Specifically, formula (3) is used to predict the production defect rate on the i-th day. The two parameters of the influence coefficient of proficiency on the defect rate and the influence coefficient of fatigue on the defect rate are fitted through historical data. This can accurately determine the relationship between proficiency, fatigue and production defect rate, and thus predict the production defect rate within a preset time.

[0183] Through the method provided in this embodiment, the production defect rate on the i-th day is predicted by a formula, so that the production defect rate is kept within a reasonable range. By predicting the production defect rate, the working hours and cycles of worker efficiency and production quality are balanced to calculate the economy of the initial production plan. By reducing the production fluctuations caused by proficiency and fatigue, production efficiency is improved and production costs are reduced.

[0184] In some embodiments, the shelf life of intermediate materials produced by the production line and the preset stocking space of the position are determined based on the available production lines and product information; the product information is parsed to determine the production process and the shelf life of the product, and the production position sequence is determined based on the production process and the available production lines; the usage of the stocking space of the position is determined based on the historical personal production capacity of the worker in the previous production position, the historical production defect rate of the worker in the previous production position, and the historical personal production capacity of the worker in the current position; the warehouse space data is parsed to determine the remaining space in the warehouse; the remaining space that can be reserved within the preset time is predicted based on the shelf life of the product, delivery time, production batch, batch output, shelf life of intermediate materials, usage of stocking space and the remaining space; a real-time warehouse management plan is determined based on the remaining space that can be reserved and the historical personal production capacity of the worker in each production position and the historical production defect rate of the worker in each production position.

[0185] The shelf life of intermediate materials can be the longest time that the intermediate materials can maintain their performance and quality during the production process, from production to expiration.

[0186] The position material preparation space can be a space owned by each production position on the production line, which is used to store intermediate materials or raw materials to be used, and can be stored in a preset database.

[0187] The production process can be the entire process starting from raw materials, going through a series of processing steps, and finally obtaining the product.

[0188] The shelf life of a product can be the longest time that the product can maintain its performance and quality under the storage conditions.

[0189] The order of production positions can be that in the production process, each production position is arranged in the order of processing steps.

[0190] The usage situation can be, for example, the usage situation of the material preparation space at a certain position in the actual production process. For example, the material preparation space at a certain position is completely occupied from 8:00 to 10:00 in the morning during a day's production, and its usage gradually decreases from 10:00 to 4:00 in the afternoon, and then increases from 4:00 to 6:00.

[0191] The remaining space may be the space in the factory's warehouse that has not been used.

[0192] The remaining space available for storage can be the amount of goods that can be stored in the remaining space of the warehouse within the predicted time period. This amount is based on the prediction of the cargo volume, warehouse space data utilization, and future cargo inbound and outbound conditions.

[0193] Specifically, based on the available production lines and product information, the shelf life of intermediate materials and the preparation space for each production position are queried or calculated in the preset database of production specifications and industry standards, product information is parsed, each step in the production process is clarified, and the shelf life of the product is determined; according to the production process and available production lines, the order of production positions is arranged, and the historical personal production capacity, historical production defect rate of the worker in the previous production position and the historical personal production capacity of the worker in the current position are considered to calculate the usage of the preparation space; based on the product shelf life, delivery time, production batch, batch output, intermediate material shelf life, preparation space usage and the remaining space in the warehouse, the remaining space in the warehouse is predicted to be available for storage in the future; based on the remaining space that can be stored and the historical personal production capacity and historical production defect rate of the worker in each production position, a real-time warehousing management plan is formulated.

[0194] For example, in production, it often happens that the raw material consumption, job complexity and material accumulation space of each position are inconsistent, resulting in the output of the previous position cannot be effectively consumed in the next position, resulting in abundant raw materials accumulation in the next position. When the overall production line production efficiency is coordinated, there is generally no need to increase the number of workers. This is why materials with abundant preparation space are often transferred to the warehouse for temporary storage. In other cases, for example, some raw materials in production need to be stored under specific conditions. When the production capacity of the next position is insufficient, they may deteriorate rapidly and become unusable. They should also be stored in a take-as-you-go manner.

[0195] Through the method provided in this embodiment, the shelf life of intermediate materials and the preparation space for each production position are determined to ensure proper storage and management of intermediate materials in the production process to avoid expiration or waste; the production process and product shelf life are determined to provide basic data for the initial production plan to ensure the rationality of the production process and the stability of product quality; the use of the preparation space at the position is determined to ensure the rational use of the preparation space to avoid material shortages or surpluses; the remaining space that can be reserved within the preset time is predicted to provide a decision-making basis for warehouse management to ensure the rational use of warehouse space data; a real-time warehouse management plan is determined to optimize warehouse management, improve inventory turnover, and reduce inventory costs.

[0196] In some embodiments, the unfinished quantity in the order volume is obtained based on the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position, and the order volume; the real-time production volume to be completed is predicted based on the unfinished quantity in the order volume and the production defect rate; the initial production plan and the initial worker management plan are adjusted based on the production volume to be completed, the optimal working hours of the workers, the optimal working cycle of the workers, and the remaining space reserve.

[0197] The unfinished quantity in the order quantity may be the quantity of products in the order quantity that have not yet been completed.

[0198] The real-time to-be-completed production volume can be the production volume that needs to be completed within a certain period of time in the future, calculated in real time based on the current production status (such as the production defect rate, etc.) and the unfinished quantity in the order volume.

[0199] Specifically, the historical individual production capacity and the corresponding historical production defect rate of each of the above-mentioned production positions can be stored in a preset database and can be retrieved when needed. According to the last link of the production process, the historical individual production capacity and the corresponding historical production defect rate of each production position are retrieved from the preset database. Compare these data with the order quantity to calculate the unfinished part of the order; predict the production volume that needs to be completed in real time based on the unfinished amount in the order quantity and the current production defect rate; adjust the initial production plan, initial worker management plan and real-time warehouse management plan based on the production volume to be completed, the optimal working hours and optimal working cycle of the workers, and the remaining space available for storage in the warehouse.

[0200] Through the method provided in this embodiment, the unfinished amount in the order volume is determined, the gap between the current production progress and the order demand is clarified, the real-time production volume to be completed is predicted, and data support is provided for the real-time adjustment of the production plan to ensure that production can meet production demand on time; the initial production plan and the initial worker management plan are adjusted, the initial production plan is optimized, and production efficiency is improved; the workers' work is reasonably arranged, work efficiency is improved, and overproduction or underproduction is avoided.

[0201] In some embodiments, the unfinished quantity in the order quantity is obtained according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity, referring to the following formula (4):

[0202]

[0203] Among them, U is the unfinished quantity in the order volume; N is the order volume; P a is the historical individual productivity of the ath position; E a is the historical production defect rate of the a-th position;

[0204] The real-time production volume to be completed is predicted based on the unfinished volume in the order volume and the production defect rate, referring to the following formula (5):

[0205]

[0206] Among them, M is the real-time production volume to be completed; U is the unfinished volume in the order volume; E ai is the production defect rate of the a-th position on the i-th day; m is the remaining production schedule days; n is the total number of positions in the last production process.

[0207] The remaining production schedule days can be the number of days left to complete production, which can be directly obtained from the initial production plan analysis.

[0208] Specifically, the number of non-defective products that can actually be completed by each position is subtracted from the order quantity by formula (4) to obtain the unfinished quantity in the order quantity. Formula (5) is used to calculate, combining the unfinished order quantity, the daily production defect rate of each position, the remaining production schedule days and the total number of positions, to predict the real-time to-be-completed production volume that needs to be completed within the remaining time.

[0209] Through the method provided by this embodiment, by calculating the uncompleted order volume, the enterprise can clearly understand the gap between the current production progress and the order volume. By calculating the real-time to-be-completed production volume, the enterprise can clearly understand how much production volume needs to be completed in the remaining time to meet the order volume. It provides important data support for enterprise managers, helping them to formulate more reasonable initial production plans and adjustment strategies. Understanding the uncompleted order volume helps enterprises optimize resource allocation, ensure that production can meet order requirements on time, and avoid overproduction or underproduction.

[0210] Figure 3 A schematic diagram of a structure of an MES control system based on the Internet of Things provided in one embodiment of the present application is shown in FIG. Figure 3 As shown, the IoT-based MES control system 300 of this embodiment includes: an initial production plan determination module 301 , a worker management module 302 , a warehouse management module 303 and an initial plan adjustment module 304 .

[0211] The initial production plan determination module 301 is used to obtain production requirements and production line information, and determine the initial production plan according to the production requirements and the production line information;

[0212] A worker management module 302, used to determine an initial worker management plan according to the initial production plan;

[0213] The warehouse management module 303 is used to obtain warehouse space data; determine a real-time warehouse management plan based on the warehouse space data and the initial production plan;

[0214] The initial plan adjustment module 304 is used to determine the real-time production plan and the real-time worker management plan according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan.

[0215] Optionally, the initial production plan determination module 301 is specifically used to:

[0216] Analyze the production demand to obtain product information, order quantity and delivery time;

[0217] Determine the production volume according to the order volume and the production line information;

[0218] Determine the production batch and batch output according to the production volume and the delivery time;

[0219] Determining an available production line according to the product information, the production line information and the production volume;

[0220] The product information, the order quantity, the delivery time, the production volume, the production batch, the batch output and the available production lines are used as the initial production plan

[0221] Optionally, the worker management module 302 is specifically used to: match the production line workers according to the available production lines;

[0222] Analyze the workers of the production line to obtain the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate of workers in each production position;

[0223] Establishing a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency;

[0224] Establishing a relationship between the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and fatigue;

[0225] Predict the production defect rate within a preset time based on the proficiency relationship and fatigue relationship;

[0226] Determine the optimal working time and the optimal working cycle of the workers according to the proficiency relationship, the fatigue relationship and the production defect rate;

[0227] The initial worker management plan is determined according to the optimal working hours and the optimal working cycle of the workers.

[0228] Optionally, the worker management module 302 is specifically used to: establish a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency, referring to the following formula:

[0229]

[0230] Among them, L i+1 is the proficiency on the i+1th day; L i is the proficiency on the i-th day; α is the growth coefficient of proficiency; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; L max is the maximum proficiency; β is the reduction coefficient of proficiency; k is the number of days of shutdown; S is the historical shutdown time; E is the historical production defect rate.

[0231] Optionally, the worker management module 302 is specifically used to: establish a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and fatigue, referring to the following formula:

[0232]

[0233] Among them, F i+1 F is the fatigue degree on the i+1th day; i is the fatigue degree on the i-th day; γ is the cumulative coefficient of fatigue degree; T i is the actual working time on the ith day; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; E is the historical production defect rate; δ is the recovery coefficient of fatigue; k is the number of days of downtime; μ is the influence coefficient of the number of days of downtime on fatigue recovery.

[0234] Optionally, the worker management module 302 is specifically used to: predict the production defect rate within a preset time according to the proficiency relationship and the fatigue relationship, referring to the following formula:

[0235]

[0236] Among them, E iis the production defect rate on the i-th day; L i is the proficiency on the i-th day; F i is the fatigue degree on the i-th day; ω1 is the influence coefficient of proficiency on the defective rate; ω2 is the influence coefficient of fatigue degree on the defective rate.

[0237] Optionally, the warehouse management module 303 is specifically used to:

[0238] Determine the shelf life of the intermediate materials produced by the production line and the preset material preparation space at the post according to the available production line and the product information;

[0239] Analyze the product information, determine the production process and product shelf life, and determine the production position sequence based on the production process and the available production lines;

[0240] Determine the usage of the material preparation space at the previous production position based on the historical individual production capacity of the worker at the previous production position, the historical production defect rate of the worker at the previous production position, and the historical individual production capacity of the worker at the current position;

[0241] Parsing the warehouse space data to determine the remaining space in the warehouse;

[0242] Predict the remaining space available for storage within a preset time based on the product shelf life, the delivery time, the production batch, the batch output, the intermediate material shelf life, the use of the preparation space and the remaining space;

[0243] A real-time warehouse management plan is determined based on the remaining space that can be reserved, the historical individual production capacity of workers in each production position, and the historical production defective rate of workers in each production position.

[0244] Optionally, the warehouse management module 303 is specifically used to:

[0245] Obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity;

[0246] Predicting the real-time production volume to be completed based on the unfinished volume in the order volume and the production defect rate;

[0247] The initial production plan and the initial worker management plan are adjusted according to the production volume to be completed, the optimal working time of the workers, the optimal working cycle of the workers, and the remaining space that can be reserved.

[0248] Optionally, the initial plan adjustment module 304 is specifically used to obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity, referring to the following formula:

[0249]

[0250] Among them, U is the unfinished quantity in the order volume; N is the order volume; P a is the historical individual productivity of the ath position; E a is the historical production defect rate of the a-th position;

[0251] The real-time production volume to be completed is predicted based on the unfinished volume in the order volume and the production defect rate, referring to the following formula:

[0252]

[0253] Among them, M is the real-time production volume to be completed; U is the unfinished volume in the order volume; E ai is the production defect rate of the a-th position on the i-th day; m is the remaining production schedule days; n is the total number of positions in the last production process.

[0254] The system of this embodiment can be used to execute the method of any of the above embodiments. The implementation principles and technical effects are similar and will not be repeated here.

Claims

1. A MES control method based on the Internet of Things, characterized in that: include: Obtaining production demand and production line information, and determining an initial production plan based on the production demand and the production line information; Determining an initial worker management plan based on the initial production plan; Get warehouse space data; Determine a real-time warehouse management plan based on the warehouse space data and the initial production plan; A real-time production plan and a real-time worker management plan are determined according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan.

2. The method according to claim 1, characterized in that Determining an initial production plan according to the production demand and the production line information includes: Analyze the production demand to obtain product information, order quantity and delivery time; Determine the production volume according to the order volume and the production line information; Determine the production batch and batch output according to the production volume and the delivery time; Determining an available production line according to the product information, the production line information and the production volume; The product information, the order quantity, the delivery time, the production volume, the production batch, the batch output and the available production lines are used as an initial production plan.

3. The method according to claim 2, characterized in that Determining an initial worker management plan according to the initial production plan includes: Matching production line workers according to the available production lines; Analyze the workers of the production line to obtain the historical working time, historical downtime, historical personal production capacity, job difficulty level and historical production defect rate of workers in each production position; Establishing a relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency; Establishing a relationship between the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and fatigue; Predict the production defect rate within a preset time based on the proficiency relationship and fatigue relationship; Determine the optimal working time and the optimal working cycle of the workers according to the proficiency relationship, the fatigue relationship and the production defect rate; The initial worker management plan is determined according to the optimal working hours and the optimal working cycle of the workers.

4. The method according to claim 3, characterized in that The relationship between the historical working time, the historical downtime, the historical personal production capacity, the job difficulty level, the historical production defect rate and the proficiency is established by referring to the following formula: Among them, L i+1 is the proficiency on the i+1th day; L i is the proficiency on the i-th day; α is the growth coefficient of proficiency; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; L max is the maximum proficiency; β is the reduction coefficient of proficiency; k is the number of days of shutdown; S is the historical shutdown time; E is the historical production defect rate.

5. The method according to claim 4, characterized in that The relationship between the historical working time, the historical downtime, the historical personal productivity, the job difficulty level, the historical production defect rate and fatigue is established by referring to the following formula: Among them, F i+1 F is the fatigue degree on the i+1th day; i is the fatigue degree on the i-th day; γ is the cumulative coefficient of fatigue degree; T i is the actual working time on the ith day; W is the historical working time; C is the historical personal productivity score; D is the job difficulty level; E is the historical production defect rate; δ is the recovery coefficient of fatigue; k is the number of days of downtime; μ is the influence coefficient of the number of days of downtime on fatigue recovery.

6. The method according to claim 5, characterized in that The production defect rate within a preset time is predicted based on the proficiency relationship and the fatigue relationship, referring to the following formula: Among them, E i is the production defect rate on the i-th day; L i is the proficiency on the i-th day; F i is the fatigue degree on the i-th day; ω1 is the influence coefficient of proficiency on the defective rate; ω2 is the influence coefficient of fatigue degree on the defective rate.

7. The method according to claim 3, characterized in that Determining a real-time warehouse management solution according to the warehouse space data and the initial production plan includes: Determine the shelf life of the intermediate materials produced by the production line and the preset material preparation space at the post according to the available production line and the product information; Analyze the product information, determine the production process and product shelf life, and determine the production position sequence based on the production process and the available production lines; Determine the usage of the material preparation space at the previous production position based on the historical individual production capacity of the worker at the previous production position, the historical production defect rate of the worker at the previous production position, and the historical individual production capacity of the worker at the current position; Parsing the warehouse space data to determine the remaining space in the warehouse; Predict the remaining space available for storage within a preset time based on the product shelf life, the delivery time, the production batch, the batch output, the intermediate material shelf life, the use of the preparation space and the remaining space; A real-time warehouse management plan is determined based on the remaining space that can be reserved, the historical individual production capacity of workers in each production position, and the historical production defective rate of workers in each production position.

8. The method according to claim 4, characterized in that Determining a real-time production plan and a real-time worker management plan according to the production demand, the initial production plan, the initial worker management plan, and the real-time warehouse management plan includes: Obtain the unfinished quantity in the order quantity according to the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity; Predicting the real-time production volume to be completed based on the unfinished volume in the order volume and the production defect rate; The initial production plan and the initial worker management plan are adjusted according to the production volume to be completed, the optimal working time of the workers, the optimal working cycle of the workers, and the remaining space that can be reserved.

9. The method according to claim 5, characterized in that The unfinished quantity in the order quantity is obtained by the historical individual production capacity of each position in the last production process of the production process, the historical production defect rate corresponding to each position and the order quantity, referring to the following formula: Among them, U is the unfinished quantity in the order volume; N is the order volume; P a is the historical individual productivity of the ath position; E a is the historical production defect rate of the a-th position; The real-time production volume to be completed is predicted based on the unfinished volume in the order volume and the production defect rate, referring to the following formula: Among them, M is the real-time production volume to be completed; U is the unfinished volume in the order volume; E ai is the production defect rate of the a-th position on the i-th day; m is the remaining production schedule days; n is the total number of positions in the last production process.

10. A MES control system based on the Internet of Things, characterized in that: include: An initial production plan determination module is used to obtain production requirements and production line information, and determine an initial production plan based on the production requirements and the production line information; A worker management module, used to determine an initial worker management plan according to the initial production plan; Warehouse management module, used to obtain warehouse space data; Determine a real-time warehouse management plan based on the warehouse space data and the initial production plan; The initial plan adjustment module is used to determine the real-time production plan and the real-time worker management plan according to the production demand, the initial production plan, the initial worker management plan and the real-time warehouse management plan.

Citation Information

Patent Citations

  • Intelligent management system of flexible production enterprise

    CN104331770A

  • Intelligent flexible manufacturing factory and production method

    CN113902336A

  • Intelligent production and manufacturing management method applying Internet of Things technology

    CN114841403A

  • Intelligent production planning and scheduling method and system, computer equipment and storage medium

    CN117010613A

  • System and method for manufacturing planning and control

    US20050137732A1

Cited By

  • Enterprise digital risk prevention and control system construction method and system

    CN119273165A

  • Methods and Systems for Building Enterprise Digital Risk Prevention and Control System

    CN119273165B

  • MES system-based intelligent storage area management and control method and system

    CN120181748A