Transformer neutral point overvoltage evaluation method and system
By acquiring power system data for scenario assessment and simulation, a distributed power supply combination scheme is constructed, and the transformer neutral point voltage is accurately evaluated. This solves the problem of inaccurate evaluation of transformer neutral point overvoltage in existing technologies and reduces the misjudgment rate and cost of discharge gap installation.
Patent Information
- Application Number
- CN202411122432.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-26
Smart Images

Figure CN119026347A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a method and system for evaluating a neutral point overvoltage of a transformer. Background Art
[0002] As the penetration rate of distributed generation (DG) in 10kV distribution network continues to increase, for the transformer that is not directly grounded on the 110kV side connected to the distribution network, when a single-phase grounding fault occurs in the 110kV line and the circuit breaker on one side of the line is actuated, the DG connected to the 10kV distribution network will reversely supply energy to the 110kV side and may generate overvoltage at the neutral point of the transformer. In the actual power system, accurately evaluating the impact of DG grid connection on the neutral point voltage of the transformer and taking relevant measures have gradually become practical engineering problems that need to be studied and solved.
[0003] However, the current prior art lacks an accurate method for evaluating the neutral point overvoltage of the transformer, and usually uses a single rule or a few rules to determine whether gap installation is required, which lacks comprehensive considerations and results in a large amount of cost waste. Summary of the invention
[0004] In order to solve the above-mentioned problems in the prior art, the present invention provides a method and system for evaluating neutral point overvoltage of a transformer:
[0005] A first aspect of the present invention provides a method for evaluating a neutral point overvoltage of a transformer, comprising:
[0006] S1: Obtain the operation data of the power system;
[0007] S2: Performing scenario judgment based on the operation data to determine whether the operation data meets the first preset condition; if so, proceeding to the next step; otherwise, determining that the discharge gap does not need to be installed;
[0008] S3: Perform simulation based on the operation data to determine the distributed power supply combination plan;
[0009] S4: making a comprehensive judgment based on the distributed power supply combination scheme to determine whether the distributed power supply combination scheme meets the second preset condition; if so, determining that the discharge gap does not need to be installed; otherwise, proceeding to the next step;
[0010] S5: Build a simulation environment based on the distributed power supply combination solution;
[0011] S6: In the simulation environment, a single-phase grounding fault is set;
[0012] S7: Determine the neutral point voltage of the transformer at the time of the fault according to the simulation result of the single-phase grounding fault;
[0013] S8: Determine whether the neutral point voltage of the transformer during a fault is greater than the power frequency withstand voltage; if so, it is determined that a discharge gap needs to be installed; otherwise, it is determined that a discharge gap does not need to be installed.
[0014] A second aspect of the present invention provides a transformer neutral point overvoltage assessment system, comprising:
[0015] An acquisition module, used for acquiring operation data of the power system;
[0016] A scene judgment module is used to perform scene judgment based on the operation data to determine whether the operation data meets the first preset condition; if so, proceed to the next step; otherwise, it is determined that the discharge gap does not need to be installed;
[0017] The simulation module is used to perform simulation based on the operation data and determine the distributed power supply combination scheme;
[0018] A comprehensive judgment module is used to make a comprehensive judgment based on the distributed power supply combination scheme to determine whether the distributed power supply combination scheme meets the second preset condition; if so, it is determined that the discharge gap does not need to be installed; otherwise, proceed to the next step;
[0019] A building module is used to build a simulation environment according to a distributed power supply combination scheme;
[0020] A setting module is used to set a single-phase ground fault in a simulation environment;
[0021] A determination module, used to determine the neutral point voltage of the transformer at the time of the fault according to the simulation result of the single-phase grounding fault;
[0022] The tolerance judgment module is used to judge whether the neutral point voltage of the transformer during a fault is greater than the power frequency tolerance voltage; if so, it is determined that a discharge gap needs to be installed; otherwise, it is determined that a discharge gap does not need to be installed.
[0023] The beneficial effect of the present invention is that a simulation environment is constructed according to a distributed power supply combination scheme, and then a single-phase grounding fault is set in the simulation environment. According to the simulation result of the single-phase grounding fault, the neutral point voltage of the transformer at the time of the fault can be accurately determined, thereby improving the accuracy of the neutral point overvoltage assessment of the transformer. Through scene judgment, comprehensive judgment, and judgment of comparing the single-phase grounding fault simulation with the power frequency withstand voltage, it is comprehensively considered whether the discharge gap of the installation package needs to be installed, which can improve the accuracy of the discharge gap installation assessment and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A schematic flow chart of a method for evaluating neutral point overvoltage of a transformer provided by the present invention;
[0025] Figure 2A schematic diagram of the structure of a transformer neutral point overvoltage assessment method provided by the present invention;
[0026] Figure 3 A schematic diagram of a flow chart of a method for generating a distributed power supply combination scheme provided by the present invention;
[0027] Figure 4 This is a structural schematic diagram of a transformer neutral point overvoltage assessment system provided by the present invention. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Example 1
[0030] Reference Manual Attached Figure 1 , showing a flow chart of a transformer neutral point overvoltage assessment method provided by the present invention.
[0031] Reference Manual Attached Figure 2 , showing a structural schematic diagram of a transformer neutral point overvoltage assessment method provided by the present invention.
[0032] An embodiment of the present invention provides a method for evaluating a neutral point overvoltage of a transformer, comprising:
[0033] S1: Obtain the operating data of the power system.
[0034] Among them, the operating data specifically includes: distribution network main transformer, system impedance, line impedance, distribution transformer and load information.
[0035] S2: Based on the operation data, a scenario judgment is performed to determine whether the operation data meets the first preset condition. If yes, proceed to the next step. Otherwise, it is determined that the discharge gap does not need to be installed.
[0036] The first preset condition specifically includes: satisfying the following conditions at the same time:
[0037] In the operation mode plan formulated by the dispatching agency, the transformer was operated ungrounded for a long time;
[0038] After a ground fault occurs on the high voltage side, the system will be partially ungrounded due to line protection;
[0039] There is distributed power access on the medium and low voltage sides of the transformer, and when the system is partially ungrounded, the distributed power will not be short-term cut off by the loss of ground protection action.
[0040] In the present invention, through scene judgment, those situations that do not require further evaluation can be quickly screened out before entering the next step, saving time and resources. For situations that do not meet the first preset condition, it is determined that there is no need to install the discharge gap, which can avoid unnecessary operations and waste of resources, and improve the practicality and economy of the method. Scene judgment can make a preliminary assessment of the possibility of whether the discharge gap needs to be installed according to the actual situation, which helps to reduce the risk of misjudgment and decision-making in subsequent steps.
[0041] S3: Perform simulation based on the operating data to determine the distributed power supply combination plan.
[0042] In actual application, in view of the data fitting requirements of different distributed power sources, the present invention designs a multi-dimensional distributed power source data fitting algorithm, which generates a data combination that meets the system requirements to adapt to the required judgment information under different working conditions and scenarios.
[0043] Specifically, the multi-dimensional distributed power data fitting algorithm aims to generate and fit the combined data of different distributed power sources into the standard or model required by the system to support the accuracy and reliability of the logical decision-making system.
[0044] Furthermore, considering the complexity of the system, the algorithm needs to handle multiple combinations of parameters, including distributed generation type, control method, capacity, access location, etc. Each parameter has multiple possible value ranges, and there are dependencies between parameters. For example, the value range of some parameters is restricted by the values of other parameters. The algorithm needs to consider this dependency to ensure that the generated combination is reasonable.
[0045] Reference Manual Attached Figure 3 , showing a flow chart of a method for generating a distributed power supply combination scheme provided by the present invention.
[0046] In a possible implementation, S3 specifically includes sub-steps S301 to S303:
[0047] S301: Define distributed power system parameters:
[0048] S T ={T1, T2, ..., T m}
[0049] S C ={C1, C2, ..., C n}
[0050] SP = {P1, P2, ..., P k}
[0051] S W = {W1, W2, ..., W o}
[0052] Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access location, and o represents the total number of access locations.
[0053] It should be noted that by defining the distributed power system parameters and randomly selecting parameter values, the method can be made more configurable and flexible. The parameters can be flexibly adjusted according to actual conditions to generate different combination schemes to adapt to different power system requirements.
[0054] S302: According to the operating data and the dependency relationship between the distributed power system parameters, randomly select parameter values from the value range of the distributed power system parameters:
[0055] T~Uniform(S T )
[0056] C~Uniform(S C )
[0057] P~Uniform(S P )
[0058] W~Uniform(S W )
[0059] Among them, T represents the type of distributed power supply, C represents the control method, P represents the capacity, W represents the access location, and Uniform() represents the random selection operation.
[0060] It should be noted that considering the dependency between parameters can ensure that the generated combination is reasonable. Taking the control mode as an example, only the IIDG type has a fitting control mode, and the rotating DG does not need a fitting control mode. Therefore, when generating a combination, the value range of the control mode C needs to be determined according to the value of the DG type T. If T = "IIDG", the value range of C is S_C, otherwise the value of C is fixed to the rotating type.
[0061] In the present invention, when generating a distributed power supply combination scheme, the dependency between parameters is taken into account to ensure that the generated combination is reasonable, which helps to avoid generating an infeasible or unreasonable scheme and improves the feasibility and practicality of the scheme.
[0062] Furthermore, the random selection of parameter values can ensure that the generated random combinations have a certain degree of randomness and avoid repeated combinations. At the same time, it can also ensure that the generated combinations can cover all possible situations. It can avoid the tediousness and subjectivity of manually selecting parameter values, reduce the influence of human factors, and improve the objectivity and consistency of the results.
[0063] S303: Determine a plurality of distributed power source combination schemes by combining the randomly selected parameter values.
[0064] In the present invention, by randomly selecting parameter values and considering the dependencies between parameters, diverse and reasonable distributed power supply combination schemes can be generated, thereby improving the search efficiency and search quality of the method.
[0065] In a possible implementation manner, after S303, S3 further includes:
[0066] S304: Perform condition checks on multiple distributed power source combination schemes to determine whether each distributed power source combination scheme meets the third preset condition. If yes, retain it. Otherwise, delete it.
[0067] Among them, the third preset condition is to screen the generated simulation data to filter out data that does not meet the comparison of the distributed power supply combination scheme.
[0068] Optionally, the third preset condition is specifically: the distributed power supply combination scheme satisfies the power supply combination constraint.
[0069] It should be noted that after the random combination is generated, a condition check needs to be performed again to ensure that the combination meets the system requirements.
[0070] In the present invention, the conditional check can ensure that the selected distributed power supply combination scheme meets the safety and reliability requirements of the system, and exclude those schemes that do not meet the system requirements, thereby improving the accuracy of the evaluation and helping to avoid wasting time and resources in subsequent steps to further evaluate and process the schemes that do not meet the requirements.
[0071] In a possible implementation, S3 specifically includes:
[0072] S301: Define distributed power system parameters:
[0073] S T ={T1, T2, ..., T m}
[0074] S C ={C1, C2, ..., C n}
[0075] S P = {P1, P2, ..., P k}
[0076] SW={W1,W2,...,W o}
[0077] Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access location, and o represents the total number of access locations.
[0078] S302: According to the operating data and the dependencies between the parameters of each distributed power system, with the value range of the distributed power system parameters as a constraint condition and with the goal of minimizing the complexity of the power system, a plurality of distributed power combination schemes are determined through a particle swarm optimization algorithm.
[0079] Among them, Particle Swarm Optimization (PSO) is an optimization algorithm based on swarm intelligence, inspired by the observation of group behavior in nature such as bird flocks or fish schools. The PSO algorithm finds the optimal solution to the problem by simulating the movement of individuals (particles) in the search space.
[0080] In the present invention, by combining the definition of distributed power system parameters with the goal of power system complexity, the impact of multiple factors on the distributed power combination scheme is considered, which helps to generate a more comprehensive and reasonable scheme, making the generated scheme more in line with actual conditions and system requirements.
[0081] In a possible implementation, S302 specifically includes:
[0082] With the goal of minimizing the complexity of the power system, the objective function is constructed:
[0083] F(θ)=min{σ(θ)}
[0084] Among them, F() represents the objective function, θ represents the distributed generation combination scheme, min represents minimization, and σ represents the complexity of the power system.
[0085] The complexity of the power system is as follows:
[0086]
[0087] Among them, n i represents the number of the i-th distributed generation type, a i represents the complexity contribution value of the i-th distributed generation type, S T Indicates the type of distributed power supply, n j represents the number of the jth control mode, b j represents the complexity contribution value of the j-th control method, S C Indicates the control mode, n k represents the number of k-th capacity, c k represents the complexity contribution value of the k-th capacity, S P Indicates capacity, n u represents the number of u-th access locations, d u represents the complexity contribution value of the u-th access position, S W represents the access location, μ1 represents the weight coefficient of the distributed power type, μ2 represents the weight coefficient of the control method, μ3 represents the weight coefficient of the capacity, and μ4 represents the weight coefficient of the access location.
[0088] Among them, those skilled in the art can set the weight coefficient μ1 of the distributed power type, the weight coefficient μ2 of the control method, the weight coefficient μ3 of the capacity and the weight coefficient μ4 of the access location according to actual conditions, and the present invention does not limit this.
[0089] It should be noted that the type, control method, capacity and access location of distributed power sources used in the distributed power generation combination scheme will affect the complexity of the power system. Different types of distributed power sources (such as photovoltaic, wind power, fuel cells, etc.) have different power generation characteristics, response speed, power volatility, etc., so they will bring different challenges in system integration and operation. For example, daily changes and weather changes in photovoltaic systems may lead to frequent adjustments of the system, while fuel cell systems may require special hydrogen supply and processing equipment, which increase the complexity of the system. The control method determines the operation strategy and behavior of distributed power sources. Different control methods may require different supporting facilities such as monitoring and control systems, communication protocols and scheduling algorithms. For example, centralized control methods may require more complex communication networks and monitoring systems to achieve centralized management of multiple distributed power sources, while decentralized control methods may require more local control and coordination. The capacity of distributed power sources directly affects the power balance, voltage stability and power supply capacity of the system. Larger capacity distributed power sources may require more complex power scheduling and distribution network planning to ensure the stability and safety of the system. The access location of distributed power sources determines how they are connected to the power system and the degree of their impact on the system. Distributed power sources connected to different locations may result in different voltage, current and power load distributions, which will affect system stability, voltage regulation and fault recovery.
[0090] According to the operating data and the dependencies between the parameters of each distributed power system, the particle swarm is initialized with the value range of the distributed power system parameters as a constraint condition. The particle swarm includes multiple particles, and each particle represents a feasible distributed power combination scheme.
[0091] In the present invention, the complexity of the power system depends not only on the type of distributed power source, but also on factors such as control mode, capacity and access location. By taking these factors into consideration, the complexity of the system can be evaluated more comprehensively, which helps to find potential problems and optimization space.
[0092] The inverse of the objective function is used as the fitness function of the particle swarm optimization algorithm:
[0093]
[0094] Among them, f() represents the fitness function.
[0095] Calculate the fitness of each particle.
[0096] Determine the individual optimal position and the global optimal position.
[0097] Each particle updates its speed and position based on its individual optimal position and the global optimal position:
[0098]
[0099] in, represents the velocity of the i-th particle at the t+1th iteration, represents the velocity of the i-th particle at the t-th iteration, ω represents the inertia weight factor, c1 represents the individual optimal acceleration factor, c2 represents the global optimal acceleration factor, r1 and r2 both represent random numbers between 0 and 1, represents the individual optimal position of the i-th particle at the t-th iteration, represents the global optimal position at the tth iteration, represents the position of the i-th particle at the t-th iteration, represents the position of the i-th particle at the t+1th iteration.
[0100] It should be noted that, through the guidance of individual optimal positions and global optimal positions, the particle swarm algorithm can achieve a balance between global exploration and local optimization in the search process. The individual optimal position helps particles move in a better direction in their own search space, while the global optimal position guides the entire particle swarm to move towards the direction of the global optimal solution, thereby effectively avoiding falling into the local optimal solution.
[0101] Among them, those skilled in the art can set the size of the inertia weight factor ω according to actual conditions, and the present invention does not limit this.
[0102] Optionally, the inertia weight factor ω is specifically:
[0103]
[0104] Among them, ω t represents the inertia weight factor at the tth iteration, t max represents the maximum number of iterations, t represents the current number of iterations, λ represents the decrease coefficient, and exp represents the exponential function with the natural constant e as the base.
[0105] It should be noted that as the number of iterations t increases, the value of the inertia weight factor ω gradually decreases, which helps to improve the exploratory nature of particles in the early stages of the algorithm and increase the algorithm's ability to search extensively in the solution space. In the later stages of the iteration, the inertia weight factor ω decreases, which helps particles concentrate on searching for local optimal solutions and improves the convergence of the algorithm.
[0106] Determine whether the current number of iterations has reached the maximum number of iterations. If so, output the distributed power supply combination solutions represented by the first Z particles in the queue sorted from high to low according to fitness. Otherwise, return to the step of speed and position update and continue iteration.
[0107] In the present invention, the particle swarm optimization algorithm can achieve a balance between global search and local optimization in the search process through the speed and position update mechanism, the adjustment of inertia weight and the guidance of global and local optimal positions, improve the convergence speed and global search capability of the algorithm, and has high efficiency in practice.
[0108] S4: Based on the distributed power supply combination scheme, a comprehensive judgment is made to determine whether the distributed power supply combination scheme meets the second preset condition. If so, it is determined that the discharge gap does not need to be installed. Otherwise, proceed to the next step.
[0109] Optionally, when the insulation level is 60 kV, the second preset condition is specifically: the distributed power source has only a rotary DG or an IIDG with V / f control in the master-slave control mode.
[0110] Optionally, when the insulation level is 44 kV, the second preset condition is specifically: the distributed power source has only a rotary DG or an IIDG with V / f control in the master-slave control mode.
[0111] In a possible implementation, S4 specifically includes: according to the distributed power combination scheme, comprehensively judging the type of distributed power, judging whether the type of distributed power is only a rotary distributed power. If so, determining that the discharge gap does not need to be installed. Otherwise, proceeding to the next step.
[0112] Specifically, after generating random combinations, conditional checks are required to ensure that the combinations meet system requirements. According to the rule conditions we set, that is, for 110kV ungrounded transformers with 60kV and 44kV insulation levels (in operation or to be built), distributed power generation rotary DG, IIDG with island operation switching capability (master-slave control mode and other modes), IIDG without island operation switching capability (always taking PQ control or other control), there are both rotary DG and inverter DG (including control mode). The condition is expressed as a logical expression C(x), where x represents a random combination, C(x) = True means that the combination meets the condition, and C(x) = False means that the combination does not meet the condition.
[0113] Furthermore, random combinations that meet the conditions are added to the result set to ensure that the combinations in the result set have a certain degree of randomness and coverage. The result set can be represented as a set R, which contains all random combinations that meet the conditions. The generated data results are input into the intelligent analysis algorithm.
[0114] In the present invention, by comprehensively judging and checking the conditions of the distributed power supply combination scheme, it can be ensured that the selected scheme meets the system requirements and preset conditions. This can avoid the emergence of inappropriate or unfeasible schemes in the subsequent implementation process and improve the reliability and stability of the system. Adding random combinations that meet the conditions to the result set can form a data set containing multiple suitable schemes. Such a data set can provide rich data resources for subsequent intelligent analysis algorithms, enhance the effectiveness and reliability of data analysis, and provide strong support for system optimization and decision-making.
[0115] Furthermore, before building the simulation environment, a preliminary condition determination can be made. If the DG type is only rotary DG, IIDG (master-slave control mode) with island operation switching capability, and there are both rotary DG and inverter DG at 60kV, it can be directly determined that the discharge gap does not need to be installed. Then the simulation environment can be built.
[0116] S5: Build a simulation environment based on the distributed power supply combination solution.
[0117] S6: In the simulation environment, set a single-phase grounding fault.
[0118] Specifically, in the constructed simulation environment, a single-phase grounding fault was set on the 110kV side and a simulation experiment was carried out.
[0119] S7: According to the simulation result of the single-phase grounding fault, determine the neutral point voltage of the transformer at the time of the fault.
[0120] In a possible implementation manner, S7 specifically includes: determining the neutral point overvoltage of the transformer during a fault according to the following formula:
[0121]
[0122] Among them, V fault Indicates the transformer neutral point overvoltage during a fault, V source represents the voltage disturbance, Z fault Indicates the line impedance change, Z total Represents the total impedance.
[0123] In the present invention, by determining whether the neutral point of the transformer is overvoltage during a fault, potential risks and problems in the system can be discovered in time, and corresponding control measures can be taken to reduce the adverse effects of the fault on the system operation and improve the reliability and stability of the system.
[0124] S8: Determine whether the neutral point voltage of the transformer during the fault is greater than the power frequency withstand voltage. If so, it is determined that a discharge gap needs to be installed. Otherwise, it is determined that a discharge gap does not need to be installed.
[0125] Among them, installing a discharge gap refers to installing a device or apparatus in the power system to deal with overvoltage problems in the power system. The main function of the discharge gap is to provide a reliable discharge path when an overvoltage occurs in the power system, so that the overvoltage can be discharged safely, thereby protecting the power equipment and system from damage. Specifically, the discharge gap is usually a device composed of two or more electrodes, with a certain gap between the electrodes to form a discharge channel. When an overvoltage occurs in the power system, the gas or other medium in the discharge gap will undergo breakdown or corona discharge, discharging the overvoltage to the ground or other places, thereby protecting the system equipment from damage.
[0126] Among them, those skilled in the art can set the magnitude of the power frequency withstand voltage according to actual conditions, and the present invention does not limit this.
[0127] In a possible implementation manner, the power frequency withstand voltage is determined by: determining the power frequency withstand voltage according to the insulation level of the transformer in the distributed power supply combination solution:
[0128] V withstand =(1+λ)V insulation
[0129] Among them, V withstand Indicates the power frequency withstand voltage, V insulation It represents the insulation grade of transformer and λ represents the safety factor.
[0130] Among them, those skilled in the art can set the size of the safety factor λ according to actual conditions, and the present invention does not limit it.
[0131] It should be noted that the insulation level of the transformer reflects the voltage tolerance of the equipment. Generally, the higher the insulation level, the stronger the voltage tolerance of the equipment. Therefore, by determining the power frequency withstand voltage according to the insulation level, the characteristics of the equipment itself can be better considered to ensure that the power frequency withstand voltage matches the insulation capacity of the equipment.
[0132] In a possible implementation manner, the power frequency withstand voltage is determined as follows:
[0133] When the insulation level of the transformer in the distributed power generation combination scheme is 44kV, the power frequency withstand voltage is determined to be 80.75kV.
[0134] When the insulation level of the transformer in the distributed power generation combination scheme is 60kV, the power frequency withstand voltage is determined to be 119kV.
[0135] In the present invention, the power frequency withstand voltage is a measure of the tolerance of the equipment under the power frequency disturbance of the power grid. Therefore, directly determining the power frequency withstand voltage according to the insulation level of the transformer is a direct and feasible method, which can fully consider the insulation performance of the equipment.
[0136] The beneficial effect of the present invention is that a simulation environment is constructed according to a distributed power supply combination scheme, and then a single-phase grounding fault is set in the simulation environment. According to the simulation result of the single-phase grounding fault, the neutral point overvoltage of the transformer at the time of the fault can be accurately determined, thereby improving the accuracy of the neutral point overvoltage assessment of the transformer. Through scene judgment, comprehensive judgment, and judgment of comparing the single-phase grounding fault simulation with the power frequency withstand voltage, it is comprehensively considered whether the discharge gap of the installation package needs to be installed, which can improve the accuracy of the discharge gap installation assessment and reduce costs.
[0137] Example 2
[0138] Reference Manual Attached Figure 4 , showing a schematic structural diagram of a transformer neutral point overvoltage assessment system provided by the present invention.
[0139] An embodiment of the present invention provides a transformer neutral point overvoltage assessment system 20, comprising:
[0140] An acquisition module 201 is used to acquire operation data of the power system;
[0141] The scene judgment module 202 is used to perform scene judgment based on the operation data to determine whether the operation data meets the first preset condition; if so, proceed to the next step; otherwise, determine that the discharge gap does not need to be installed;
[0142] The simulation module 203 is used to perform simulation according to the operation data to determine the distributed power supply combination scheme;
[0143] The comprehensive judgment module 204 is used to make a comprehensive judgment based on the distributed power supply combination scheme to determine whether the distributed power supply combination scheme meets the second preset condition; if so, it is determined that the discharge gap does not need to be installed; otherwise, proceed to the next step;
[0144] A construction module 205 is used to construct a simulation environment according to the distributed power supply combination scheme;
[0145] A setting module 206 is used to set a single-phase ground fault in a simulation environment;
[0146] A determination module 207, configured to determine the neutral point voltage of the transformer at the time of the fault according to the simulation result of the single-phase grounding fault;
[0147] The tolerance judgment module 208 is used to judge whether the neutral point voltage of the transformer during a fault is greater than the power frequency tolerance voltage; if so, it is determined that a discharge gap needs to be installed; otherwise, it is determined that a discharge gap does not need to be installed.
[0148] In a possible implementation, the simulation module 203 is specifically used for:
[0149] Define distributed power system parameters:
[0150] S T ={T1, T2, ..., T m}
[0151] S C ={C1, C2, ..., C n}
[0152] S P = {P1, P2, ..., P k}
[0153] S W = {W1, W2, ..., W o}
[0154] Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access position, and o represents the total number of access positions;
[0155] According to the operating data and the dependencies between the distributed power system parameters, the parameter values are randomly selected from the value range of the distributed power system parameters:
[0156] T~Uniform(S T )
[0157] C~Uniform(S C )
[0158] P~Uniform(S P )
[0159] W~Uniform(S W )
[0160] Wherein, T represents the type of distributed power source, C represents the control mode, P represents the capacity, W represents the access location, and Uniform() represents the random selection operation;
[0161] According to the combination of randomly selected parameter values, a variety of distributed power supply combination schemes are determined.
[0162] In a possible implementation, the simulation module 203 is further used for:
[0163] A condition check is performed on a plurality of distributed power source combination schemes to determine whether each distributed power source combination scheme meets a third preset condition; if so, it is retained; otherwise, it is deleted.
[0164] In a possible implementation manner, the simulation module 203 is specifically used for:
[0165] Define distributed power system parameters:
[0166] S T ={T1, T2, ..., T m}
[0167] S C ={C1, C2, ..., C n}
[0168] S P = {P1, P2, ..., P k}
[0169] S W = {W1, W2, ..., W o}
[0170] Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access position, and o represents the total number of access positions;
[0171] According to the operating data and the dependencies between the parameters of each distributed power system, taking the value range of the distributed power system parameters as constraints and minimizing the complexity of the power system as the goal, a variety of distributed power combination schemes are determined through the particle swarm optimization algorithm.
[0172] In a possible implementation, the simulation module 203 is specifically used for:
[0173] With the goal of minimizing the complexity of the power system, the objective function is constructed:
[0174] F(θ)=min{σ(θ)}
[0175] Among them, F() represents the objective function, θ represents the distributed generation combination scheme, min represents minimization, and σ represents the complexity of the power system;
[0176] The complexity of the power system is as follows:
[0177]
[0178] Among them, n i represents the number of the i-th distributed generation type, a i represents the complexity contribution value of the i-th distributed generation type, S T Indicates the type of distributed power supply, n j represents the number of the jth control mode, b j represents the complexity contribution value of the j-th control method, S C Indicates the control mode, n k represents the number of k-th capacity, c k represents the complexity contribution value of the k-th capacity, S P Indicates capacity, n u represents the number of u-th access locations, d u represents the complexity contribution value of the u-th access position, S W represents the access location, μ1 represents the weight coefficient of the distributed power type, μ2 represents the weight coefficient of the control method, μ3 represents the weight coefficient of the capacity, and μ4 represents the weight coefficient of the access location;
[0179] According to the operating data and the dependencies between the parameters of each distributed power system, the particle swarm is initialized with the value range of the distributed power system parameters as a constraint condition. The particle swarm includes multiple particles, and each particle represents a feasible distributed power combination scheme.
[0180] The inverse of the objective function is used as the fitness function of the particle swarm optimization algorithm:
[0181]
[0182] Where f() represents the fitness function;
[0183] Calculate the fitness of each particle;
[0184] Determine individual optimal positions and global optimal positions;
[0185] Each particle updates its speed and position based on its individual optimal position and the global optimal position:
[0186]
[0187] in, represents the velocity of the i-th particle at the t+1th iteration, represents the velocity of the i-th particle at the t-th iteration, ω represents the inertia weight factor, c1 represents the individual optimal acceleration factor, c2 represents the global optimal acceleration factor, r1 and r2 both represent random numbers between 0 and 1, represents the individual optimal position of the i-th particle at the t-th iteration, represents the global optimal position at the tth iteration, represents the position of the i-th particle at the t-th iteration, represents the position of the i-th particle at the t+1th iteration;
[0188] Determine whether the current number of iterations has reached the maximum number of iterations; if so, output the distributed power supply combination scheme represented by the first Z particles in the queue sorted from high to low according to fitness; otherwise, return to the speed and position update step and continue iterating.
[0189] In a possible implementation, the comprehensive determination module 204 is specifically configured to:
[0190] According to the distributed power supply combination plan, make a comprehensive judgment on the type of distributed power supply to determine whether the type of distributed power supply is only a rotary distributed power supply; if so, determine that there is no need to install a discharge gap; otherwise, proceed to the next step.
[0191] In a possible implementation, the determination module 207 is specifically configured to:
[0192] Determine the transformer neutral point overvoltage during a fault according to the following formula:
[0193]
[0194] Among them, V fault Indicates the transformer neutral point overvoltage during a fault, V source represents the voltage disturbance, Z fault Indicates the line impedance change, Z total Represents the total impedance.
[0195] In a possible implementation manner, the power frequency withstand voltage is determined as follows:
[0196] Determine the power frequency withstand voltage according to the insulation level of the transformer in the distributed power supply combination solution:
[0197] V withstand =(1+λ)V insulation
[0198] Among them, V withstand Indicates the power frequency withstand voltage, V insulationIt represents the insulation grade of transformer and λ represents the safety factor.
[0199] In a possible implementation manner, the power frequency withstand voltage is determined as follows:
[0200] When the insulation level of the transformer in the distributed power supply combination scheme is 44kV, the power frequency withstand voltage is determined to be 80.75kV;
[0201] When the insulation level of the transformer in the distributed power generation combination scheme is 60kV, the power frequency withstand voltage is determined to be 119kV.
[0202] A transformer neutral point overvoltage assessment system 20 provided in an embodiment of the present invention can implement the steps and effects of the transformer neutral point overvoltage assessment method in Example 1. To avoid repetition, the present invention will not elaborate on them.
[0203] The beneficial effect of the present invention is that a simulation environment is constructed according to a distributed power supply combination scheme, and then a single-phase grounding fault is set in the simulation environment. According to the simulation result of the single-phase grounding fault, the neutral point voltage of the transformer at the time of the fault can be accurately determined, thereby improving the accuracy of the neutral point overvoltage assessment of the transformer. Through scene judgment, comprehensive judgment, and judgment of comparing the single-phase grounding fault simulation with the power frequency withstand voltage, it is comprehensively considered whether the discharge gap of the installation package needs to be installed, which can improve the accuracy of the discharge gap installation assessment and reduce costs.
[0204] In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "center", "top", "bottom", "top", "bottom", "inside", "outside", "inner side", "outer side" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Among them, "inside" refers to an internal or enclosed area or space. "Periphery" refers to the area surrounding a specific component or a specific area.
[0205] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0206] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", and "assemble" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0207] In the description of the embodiments of the present invention, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.
[0208] In the description of the embodiments of the present invention, it is to be understood that "-" and "~" represent the range between two values, and the range includes the endpoints. For example: "AB" represents a range greater than or equal to A and less than or equal to B. "A~B" represents a range greater than or equal to A and less than or equal to B.
[0209] In the description of the embodiments of the present invention, the term "and / or" herein is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.
[0210] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for evaluating neutral point overvoltage of a transformer, characterized in that: include: S1: Obtain the operation data of the power system; S2: Performing scene judgment according to the operation data to determine whether the operation data meets a first preset condition; If yes, go to the next step; otherwise, it is determined that there is no need to install a spark gap; S3: Perform simulation according to the operation data to determine a distributed power supply combination solution; S4: Performing a comprehensive judgment based on the distributed power supply combination scheme to determine whether the distributed power supply combination scheme meets the second preset condition; if so, determining that a discharge gap does not need to be installed; Otherwise, proceed to the next step; S5: constructing a simulation environment according to the distributed power supply combination scheme; S6: In the simulation environment, a single-phase grounding fault is set; S7: Determine the neutral point voltage of the transformer at the time of the fault according to the simulation result of the single-phase grounding fault; S8: Determine whether the neutral point voltage of the transformer during a fault is greater than the power frequency withstand voltage; if so, it is determined that a discharge gap needs to be installed; otherwise, it is determined that a discharge gap does not need to be installed.
2. The transformer neutral point overvoltage assessment method according to claim 1, characterized in that: The S3 specifically includes: S301: Define distributed power system parameters: S T ={T1,T2,...,T m } S C ={C1,C2,...,C n } S P ={P1,P2,...,P k } S W ={W1,W2,...,W o } Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access position, and o represents the total number of access positions; S302: According to the operating data and the dependency relationship between the distributed power system parameters, randomly select a parameter value from a value range of the distributed power system parameter: T~Uniform(S T ) C~Uniform(S C ) P~Uniform(S P ) W~Uniform(S W ) Among them, T represents the type of distributed power supply, C represents the control mode, P represents the capacity, W represents the access location, and Uniform() represents the random selection operation; S303: Determine a plurality of distributed power source combination schemes by combining the randomly selected parameter values.
3. The transformer neutral point overvoltage assessment method according to claim 2, characterized in that: After S303, S3 further includes: S304: Perform conditional checks on multiple distributed power source combination schemes to determine whether each distributed power source combination scheme meets a third preset condition; if so, retain it; otherwise, delete it.
4. The transformer neutral point overvoltage assessment method according to claim 1, characterized in that: The S3 specifically includes: S301: Define distributed power system parameters: S T ={T1,T2,...,T m } S C ={C1,C2,...,C n } S P ={P1,P2,...,P k } S W ={W1,W2,...,W o } Among them, S T Indicates the type of distributed power supply, T i represents the i-th distributed power type, m represents the total number of distributed power types, S C Indicates the control mode, C i represents the i-th control mode, n represents the total number of control modes, S P Indicates capacity, P i represents the i-th capacity, k represents the total capacity, S W Indicates the access location, W i represents the i-th access position, and o represents the total number of access positions; S302: According to the operating data and the dependencies between the distributed power system parameters, with the value range of the distributed power system parameters as constraints and with the goal of minimizing the complexity of the power system, multiple distributed power combination schemes are determined through a particle swarm optimization algorithm.
5. The transformer neutral point overvoltage assessment method according to claim 3, characterized in that: The S302 specifically includes: With the goal of minimizing the complexity of the power system, the objective function is constructed: F(θ)=min{σ(θ)} Among them, F( ) represents the objective function, θ represents the distributed generation combination scheme, min represents minimization, and σ represents the complexity of the power system; The power system complexity is specifically: Among them, n i represents the number of the i-th distributed generation type, a i represents the complexity contribution value of the i-th distributed generation type, S T Indicates the type of distributed power supply, n j represents the number of the jth control mode, b j represents the complexity contribution value of the j-th control method, S C Indicates the control mode, n k represents the number of k-th capacity, c k represents the complexity contribution value of the k-th capacity, S P Indicates capacity, n u represents the number of u-th access locations, d u represents the complexity contribution value of the u-th access position, S W represents the access location, μ1 represents the weight coefficient of the distributed power type, μ2 represents the weight coefficient of the control method, μ3 represents the weight coefficient of the capacity, and μ4 represents the weight coefficient of the access location; Initializing a particle swarm according to the operating data and the dependencies between the distributed power system parameters and taking the value range of the distributed power system parameters as a constraint condition, wherein the particle swarm includes a plurality of particles, and each particle represents a feasible distributed power combination scheme; The inverse of the objective function is used as the fitness function of the particle swarm optimization algorithm: Where f() represents the fitness function; Calculate the fitness of each particle; Determine individual optimal positions and global optimal positions; Each particle updates its speed and position based on its individual optimal position and the global optimal position: in, represents the velocity of the i-th particle at the t+1th iteration, represents the velocity of the i-th particle at the t-th iteration, ω represents the inertia weight factor, c1 represents the individual optimal acceleration factor, c2 represents the global optimal acceleration factor, r1 and r2 both represent random numbers between 0 and 1, represents the individual optimal position of the i-th particle at the t-th iteration, represents the global optimal position at the tth iteration, represents the position of the i-th particle at the t-th iteration, represents the position of the i-th particle at the t+1th iteration; Determine whether the current number of iterations has reached the maximum number of iterations; if so, output the distributed power supply combination scheme represented by the first Z particles in the queue sorted from high to low according to fitness; otherwise, return to the speed and position update step and continue iterating.
6. The transformer neutral point overvoltage assessment method according to claim 1, characterized in that: The S4 specifically includes: According to the distributed power supply combination scheme, a comprehensive judgment is made on the type of distributed power supply to determine whether the type of distributed power supply is only a rotary distributed power supply; if so, it is determined that there is no need to install a discharge gap; otherwise, proceed to the next step.
7. The transformer neutral point overvoltage assessment method according to claim 1, characterized in that: The S7 is specifically: Determine the transformer neutral point overvoltage during a fault according to the following formula: Among them, V fault Indicates the transformer neutral point overvoltage during a fault, V source represents the voltage disturbance, Z fault Indicates the line impedance change, Z total Represents the total impedance.
8. The transformer neutral point overvoltage assessment method according to claim 1, characterized in that: The power frequency withstand voltage is determined as follows: According to the insulation level of the transformer in the distributed power supply combination solution, the power frequency withstand voltage is determined: V withstand =(1+λ)V insulation Among them, V withstand Indicates the power frequency withstand voltage, V insulation It represents the insulation grade of transformer and λ represents the safety factor.
9. The transformer neutral point overvoltage assessment method according to claim 8, characterized in that: The power frequency withstand voltage is determined as follows: When the insulation level of the transformer in the distributed power supply combination scheme is 44kV, the power frequency withstand voltage is determined to be 80.75kV; When the insulation level of the transformer in the distributed power supply combination solution is 60 kV, the power frequency withstand voltage is determined to be 119 kV.
10. A transformer neutral point overvoltage assessment system, characterized in that: include: An acquisition module, used for acquiring operation data of the power system; A scene judgment module, used to perform scene judgment according to the operation data, and judge whether the operation data meets a first preset condition; If yes, go to the next step; Otherwise, it is determined that there is no need to install a spark gap; A simulation module, used to perform simulation according to the operation data to determine a distributed power supply combination scheme; A comprehensive judgment module is used to make a comprehensive judgment based on the distributed power supply combination scheme to determine whether the distributed power supply combination scheme meets the second preset condition; if so, it is determined that there is no need to install a discharge gap; Otherwise, proceed to the next step; A construction module, used to construct a simulation environment according to the distributed power supply combination scheme; A setting module is used to set a single-phase ground fault in a simulation environment; A determination module, used to determine the neutral point voltage of the transformer at the time of the fault according to the simulation result of the single-phase grounding fault; The tolerance judgment module is used to judge whether the neutral point voltage of the transformer during a fault is greater than the power frequency tolerance voltage; if so, it is determined that a discharge gap needs to be installed; otherwise, it is determined that a discharge gap does not need to be installed.
