Temporary plugging ball setting hole simulation method in horizontal well temporary plugging fracturing
By establishing the coupling between the perforation physical model and the temporary plug ball model of the horizontal well, the migration of the temporary plug ball in different perforation clusters is simulated, and the problem of narrow and blindness in the existing technology is solved, and the horizontal well is achieved. Real-time tracking of the movement trajectory of the temporary plug ball and the prediction of the seating and sealing position improve the accuracy and predictability of the temporary plugging and fracturing of the wellbore.
Patent Information
- Application Number
- CN202310606261.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
When studying the migration of temporary plug balls on the wellbore, the model only considers the migration of temporary plug balls in the last cluster of perforations. The research scope is narrow, and the migration of temporary plug balls in the horizontal well is relatively studied. There are few, and there is blindness, making it difficult to judge the position of the temporarily blocked ball and the hole.
By establishing the coupling between the horizontal well perforation physical model and the temporary plug ball model, the CFD-DEM solid-liquid bidirectional coupling calculation is performed using the fluid dynamics software FLUENT and the discrete element software EDEM to simulate the migration of the temporary plug ball in different perforation clusters. , and visually track its movement trajectory in real time, and predict the temporary blocking of the ball and sealing hole.
The simulation and prediction of the migration of the temporary plug ball in the horizontal well and the seating situation are achieved, the accuracy and predictability of the temporary plugging and fracturing process of the wellbore is improved, and the actual production is guided.
Smart Images

Figure CN119026491A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of petroleum and natural gas fracturing, and more specifically to a method for simulating a temporary plugging ball sealing hole in temporary plugging fracturing of a horizontal well. Background Art
[0002] Unconventional resources such as shale oil and gas and tight gas have special storage space and formation process, with low porosity, low permeability, strong plane and vertical heterogeneity, and large differences in the development of natural fractures. Most shale gas wells need to undergo reservoir transformation technologies such as hydraulic fracturing to obtain commercial mining value. However, during the fracturing process, due to the mutual interference of stress between multiple clusters of fractures, the expansion between fractures is uneven, and the reservoir transformation degree is low. The wellbore temporary plugging fracturing technology can seal the dominant holes and promote the balanced expansion of fractures. It has been widely used in the industrial exploitation of unconventional reservoirs. However, due to the certain randomness of the contact relationship between the perforation blasthole and the fracture, the wellbore temporary plugging is blind, and it is difficult to judge the sealing situation of the temporary plugging ball on the hole.
[0003] Many scholars at home and abroad have conducted research on the problem of temporary plugging of wellbore. Fang Yuyan, Zhou Jianping, Erbstoesser et al. conducted indoor temporary plugging simulation experiments by establishing a temporary plugging ball migration experimental device to observe the migration of temporary plugging balls and analyze the factors affecting the temporary plugging ball seating and sealing of holes. Glasbergen and Buijse used a carbonate matrix acidizing simulation device to simulate the migration of temporary plugging balls in vertical wells and analyzed the effect of the number of temporary plugging balls on the sealing efficiency. Lix and Chen Z established a temporary plugging ball migration model to study the factors affecting the temporary plugging ball seating and verified the possibility of temporary plugging of holes by temporary plugging balls in horizontal wells. Wang He et al. studied the factors affecting the temporary plugging ball seating and sealing of holes based on the production dynamic data and gas production profile test data of typical wells in the Fuling shale gas block, combined with the pore pressure distribution of each cluster, and used the analysis and research of case wells to guide the implementation of repeated fracturing in field production. Li Hao, Fu Qiang, Sun Tongwen and others used numerical simulation software to establish a model of temporary plugging ball migration in vertical wells, and studied the effects of temporary plugging ball density, temporary plugging ball number, temporary plugging ball injection timing, hole diameter, etc. on the temporary plugging ball sealing efficiency. Zheng Zhibing calculated the stress of the temporary plugging ball in the wellbore and compiled corresponding software to obtain the effects of the density difference between the temporary plugging ball and the fluid, the number of holes, and the fluid viscosity on the temporary plugging ball sealing efficiency, and successfully used it in practice.
[0004] In summary, previous researchers have mostly used indoor tests and numerical simulation methods to conduct relevant research on temporary plugging of wellbore, but the research model only considers the migration of temporary plugging balls in the last cluster of perforations, and the research scope is relatively narrow, and the research on the situation of temporary plugging balls in other perforation clusters is relatively insufficient. In addition, previous studies have mostly focused on vertical wells, and there are relatively few studies on the migration of temporary plugging balls in horizontal wells. At present, most unconventional oil and gas reservoirs are also produced by horizontal wells, and the movement of temporary plugging balls in horizontal wells is also more complicated. Summary of the invention
[0005] In order to overcome the defects existing in the above-mentioned prior art, the present invention discloses a method for simulating the sealing of a temporary plugging ball in temporary plugging fracturing of a horizontal well. The present invention simulates the migration of the temporary plugging ball in different perforation clusters, and visualizes and tracks the migration trajectory of the temporary plugging ball in the horizontal well in real time, thereby predicting the situation of the temporary plugging ball sealing the hole position.
[0006] In order to achieve the above objectives, the technical solution adopted by the present invention is: A method for simulating the temporary plugging ball seating of a hole in a horizontal well during temporary plugging fracturing comprises the following steps: 1. Establishment of physical model for horizontal well perforation S1. Obtain the wellbore parameters, hole parameters, construction displacement and fracturing fluid parameters of the target work area, and use the obtained engineering parameters to establish a horizontal well perforation physical model in the fluid dynamics software; In the above steps, the purpose of establishing the horizontal well perforation physical model is to be used for subsequent research on the fluid flow field distribution in the wellbore.
[0007] Preferably, in step S1, the wellbore parameters include wellbore diameter and wellbore length; the hole parameters include hole diameter, perforation density and hole phase angle; the fracturing fluid parameters include fracturing fluid density and fracturing fluid viscosity; and the fluid dynamics software is FLUENT software.
[0008] Preferably, in the step S1, the wellbore bottom of the established horizontal well perforation physical model is not closed, and is used to simulate the migration and setting of temporary plugging balls in different perforation clusters.
[0009] Preferably, in the step S1, the horizontal well perforation physical model is an incompressible fluid and a transient solid-liquid two-phase flow model. The horizontal well perforation physical model includes a continuity equation, a momentum conservation equation, and a fluid turbulence equation. The fluid turbulence equation adopts a standard k-ε model. The forces acting on particles in the horizontal well perforation physical model include drag force and additional mass force.
[0010] In the above method, the fluid medium selected in the simulation process is an incompressible fluid, and the horizontal well perforation physical model is set to a transient solid-liquid two-phase flow model in order to be able to couple with the temporary plugging ball model established by the EDEM software in the future and to consider the influence of the temporary plugging ball on the fluid when performing fluid domain calculations in Fluent.
[0011] The horizontal well perforation physical model includes the continuity equation, momentum conservation equation, and fluid turbulence equation because: the horizontal well perforation physical model established using Fluent software regards the fluid as a continuous medium and calculates the fluid flow field distribution based on the continuity equation, momentum conservation equation, and fluid turbulence equation. The standard k-ε model is used in the fluid turbulence equation because: after simulation with different turbulence equations, it is found through comparison that the standard k-ε model has the best calculation stability and the calculation results are closest to the actual situation.
[0012] The force on particles in the horizontal well perforation physical model includes drag force and additional mass force because: through the force analysis of the temporary plugging ball in the horizontal well migration process, it is found that the movement of the temporary plugging ball will cause the fluid to generate corresponding drag force and additional mass force on the temporary plugging ball. Therefore, the influence of drag force and additional mass force is taken into account for the force on particles in the physical model, which makes the simulation more consistent with the actual situation and increases the simulation accuracy.
[0013] Preferably, in the horizontal well perforation physical model of step S1, the grids of the inner wall of the horizontal wellbore and the perforation boundary layer are encrypted. The encryption of the grid of the inner wall of the horizontal wellbore is to increase the accuracy of the simulation when the temporary plugging ball collides with the inner wall of the wellbore; the encryption of the grid of the perforation boundary layer is because the hole size is much smaller than the overall wellbore size, and encryption thereof can increase the accuracy of the simulation of the movement of the temporary plugging ball near the hole boundary, avoiding large errors in the simulation calculation results of the temporary plugging ball setting at the hole due to the inadequate hole boundary grid.
[0014] 2. Establishment of temporary blocking ball model and migration model S2. Obtain the temporary plugging ball parameters, and use the temporary plugging ball parameters to establish a temporary plugging ball model in discrete element software, then compile the coupling interface between the temporary plugging ball model and the horizontal well perforation physical model, and perform solid-liquid two-phase coupling calculation to establish a temporary plugging ball migration model in the horizontal well, and use the migration model to simulate the migration and sealing of the temporary plugging ball in different perforation clusters; In the above steps, the purpose of establishing the temporary plugging ball model is to simulate the temporary plugging ball in temporary plugging fracturing of horizontal wells; the purpose of compiling the coupling interface between the temporary plugging ball model and the horizontal well perforation physical model is to realize the sharing of particle information between the temporary plugging ball model and the horizontal well perforation physical model. The purpose of establishing the migration model of the temporary plugging ball in the horizontal well using the temporary plugging ball model and the horizontal well perforation physical model is to simulate the migration and sealing of the temporary plugging ball in different perforation clusters.
[0015] Preferably, in the step S2, the temporary blocking ball parameters include temporary blocking ball diameter, temporary blocking ball density, temporary blocking ball elastic modulus and Poisson's ratio, and the discrete element software is EDEM software.
[0016] Preferably, in the step S2, a method combining discrete element software EDEM and fluid dynamics software FLUENT is adopted, EDEM software is used to establish a temporary plugging ball particle model, FLUENT software is used to compile a coupling interface to couple with the temporary plugging ball model, and the momentum exchange between the temporary plugging ball and the fluid is performed through the built-in SCALARS of FLUENT, so as to realize CFD-DEM solid-liquid bidirectional coupling calculation, simulate the migration and sealing of the temporary plugging ball in different perforation clusters, and obtain the position and velocity parameters of the particles in real time.
[0017] In the above method, the momentum exchange between the temporary blocking ball and the fluid is performed to realize the CFD-DEM solid-liquid bidirectional coupling calculation because: in actual situations, the solid and liquid phases influence each other when the temporary blocking ball migrates in the horizontal well. The momentum exchange equation between the solid particles and the fluid medium can be used to link the migration of the temporary blocking ball and the movement of the fluid medium, thereby realizing the solid-liquid two-phase flow simulation in which the temporary blocking ball and the fluid medium influence each other, which is more in line with the actual situation.
[0018] The purpose of simulating the migration and sealing of temporary plugging balls in different perforation clusters is to study the migration of temporary plugging balls in multi-cluster perforation sections of actual horizontal wells and analyze the conditions under which temporary plugging balls can be sealed. The purpose of obtaining the position and velocity parameters of particles is to visualize the migration trajectory of temporary plugging balls and analyze the physical process of temporary plugging ball migration in horizontal wells and the influence of fluid media on temporary plugging balls.
[0019] Preferably, in the step S2, the migration model is transiently solved using a double-precision solver, and considering that the ball will collide with the wall, the wall enhancement function is selected, and the algorithm is SIMPLE; the horizontal well perforation physical model is calculated using a standard k-ε turbulence model, and its momentum equation, volume fraction equation, turbulent kinetic energy equation, and turbulent dissipation rate equation all use a first-order upwind method.
[0020] Preferably, in the step S2, the momentum exchange between the fluid (continuous phase) and the particles (discrete terms) in the horizontal well perforation physical model in the migration model is: Where F is the momentum transfer from the continuous phase to the discrete phase, (kg·m) / s; μ is the viscosity of the fluid, (N·S) / m 2 ρ p is the particle density kg / m 3 ;d p is the particle diameter, m; Re is the relative Reynolds number, dimensionless; up and u are the particle velocity and fluid velocity, m / s; C D is the drag coefficient, dimensionless; q p is the mass flow rate of particles, kg / s; △t is the time step, s; F 其他 is the other force per unit mass, N / kg.
[0021] In the above method, the purpose of calculating the momentum exchange between the particles and the fluid is to take into account the influence of the temporary blocking ball on the fluid in the process of calculating the fluid field, so as to realize the coupling of the temporary blocking ball to the fluid.
[0022] Preferably, in step S2, the mass exchange between particles (discrete terms) and fluid (continuous phase) in the temporary blocking ball model in the migration model is: Where M is the mass transfer from the discrete phase to the continuous phase, kg / s 2 ; △m p With q p,0 They represent the change in mass flow rate of particles and the initial mass flow rate of particle injection, kg / s; m p,0 is the initial mass of the particle, kg.
[0023] In the above method, the purpose of calculating the mass exchange from particles to fluid is to take into account the influence of fluid on temporary blocking balls in the process of calculating the migration of temporary blocking balls using EDEM software, so as to achieve the coupling of fluid to temporary blocking balls. The two models are combined to realize the solid-liquid bidirectional coupling calculation of CFD-DEM.
[0024] 3. Prediction of temporary blocking of the ball and sealing of the hole S3. Use discrete element software to track the migration trajectory of the temporary plugging ball in the horizontal well simulated by the migration model in real time, and use the real-time tracking information to predict the situation of the temporary plugging ball sealing the hole during the actual temporary plugging fracturing process.
[0025] In the step S3, the migration trajectory of the temporary plugging ball in the horizontal well is tracked in real time and the actual temporary plugging ball sealing position is predicted to guide the actual production. For example, under given engineering conditions (such as pumping displacement, temporary plugging ball density, temporary plugging ball diameter, etc.), the temporary plugging ball's migration trajectory and the change in the temporary plugging ball's speed are calculated to obtain the position of the temporary plugging ball in the horizontal well perforation model. When it is observed that the temporary plugging ball's trajectory stops at a certain hole and the speed at that location is 0, it can be determined that the temporary plugging ball has sealed the hole.
[0026] Preferably, in step S3, in the temporary blocking ball model, the motion trajectory of the temporary blocking ball is predicted and calculated by balancing various forces acting on the temporary blocking ball particles in the Lagrangian reference system; and Newton's second law is used to control the motion of the temporary blocking ball.
[0027] Preferably, in step S3, the use of Newton's second law to control the movement of the temporary blocking ball is: Where m is the mass of the particle, kg; x is the displacement of the particle from position 1 to position 2, m; t is the time taken to move from position 1 to position 2, s; V is the vector velocity of the particle, m / s; F 拖曳力 、F 附加质量力 、F 重力 With F 其他 are the drag force, additional mass force, gravity and other forces acting on the particle, respectively, N; d is the hole diameter, m; u is the particle diameter, m; p and u are the particle velocity and fluid velocity, m / s; ρ f Fluid density, kg / m 3 ;εParticle acceleration relative to the fluid, m / s 2 ;d p is the particle diameter, m; ρ p is the particle density, kg / m 3 .
[0028] Preferably, the step S3 further comprises: calculating the ratio of the number of sealed holes to the total number of holes to evaluate the effect of sealing holes with temporary plugging balls.
[0029] Beneficial effects of the present invention: The method for simulating the seating of temporary plugging balls in temporary plugging fracturing of horizontal wells provided by the present invention can simulate the migration and seating of temporary plugging balls in different perforation clusters, and visualize and track the movement trajectory of the temporary plugging balls in the horizontal well in real time, thereby predicting the seating of temporary plugging balls in the actual temporary plugging fracturing process to guide actual production. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 is a flow chart of the present invention; Figure 2 The horizontal well perforation physical model 1 of the present invention; Figure 3 It is the horizontal well perforation physical model 2 of the present invention; Figure 4 It is a schematic diagram of the temporary plugging ball sealing result of the present invention. DETAILED DESCRIPTION
[0031] The concept, specific structure and technical effects of the present invention will be clearly and completely described below in combination with the embodiments and drawings to fully understand the purpose, characteristics and effects of the present invention.
[0032] Example 1 A method for simulating the temporary plugging ball sealing holes in temporary plugging fracturing of horizontal wells, such as Figure 1-4 As shown, the following steps are included: S1. Obtain the wellbore parameters, hole parameters, construction displacement and fracturing fluid parameters of the target work area, and use the obtained engineering parameters to establish a horizontal well perforation physical model in the fluid dynamics software; S2. Obtain the temporary plugging ball parameters, and use the temporary plugging ball parameters to establish a temporary plugging ball model in discrete element software, then compile the coupling interface between the temporary plugging ball model and the horizontal well perforation physical model, and perform solid-liquid two-phase coupling calculation to establish a temporary plugging ball migration model in the horizontal well, and use the migration model to simulate the migration and sealing of the temporary plugging ball in different perforation clusters; S3. Use discrete element software to track the migration trajectory of the temporary plugging ball in the horizontal well simulated by the migration model in real time, and use the real-time tracking information to predict the situation of the temporary plugging ball sealing the hole during the actual temporary plugging fracturing process.
[0033] The simulation method provided in this embodiment can simulate the migration and sealing of temporary plugging balls in different perforation clusters, and visualize and track the running trajectory of the temporary plugging balls in the horizontal well in real time, so as to predict the sealing position of the temporary plugging balls during the actual temporary plugging and fracturing process to guide actual production.
[0034] Example 2 This embodiment further elaborates on step S1 based on embodiment 1. In step S1, the wellbore parameters include wellbore diameter and wellbore length; the hole parameters include hole diameter, perforation density and hole phase angle; the fracturing fluid parameters include fracturing fluid density and fracturing fluid viscosity; and the fluid dynamics software is FLUENT software.
[0035] In the step S1, the wellbore bottom of the established horizontal well perforation physical model is not closed, and is used to simulate the migration and setting of temporary plugging balls in different perforation clusters.
[0036] In the step S1, the horizontal well perforation physical model is an incompressible fluid and transient solid-liquid two-phase flow model. The horizontal well perforation physical model includes a continuity equation, a momentum conservation equation, and a fluid turbulence equation. The fluid turbulence equation adopts a standard k-ε model. The particle forces in the horizontal well perforation physical model include drag force and additional mass force.
[0037] In the horizontal well perforation physical model of step S1, the grids of the inner wall of the horizontal wellbore and the perforation boundary layer are encrypted, such as Figure 3 shown.
[0038] Example 3 This embodiment further elaborates on step S2 based on embodiment 2. In step S2, the temporary blocking ball parameters include temporary blocking ball diameter, temporary blocking ball density, temporary blocking ball elastic modulus and Poisson's ratio. The discrete element software is EDEM software.
[0039] In the step S2, a method combining discrete element software EDEM and fluid dynamics software FLUENT is adopted, and a temporary plugging ball particle model is established by using EDEM software. The coupling interface compiled by FLUENT software is coupled with the temporary plugging ball model, and the momentum exchange between the temporary plugging ball and the fluid is performed through the built-in SCALARS of FLUENT, so as to realize CFD-DEM solid-liquid bidirectional coupling calculation, simulate the migration and sealing of the temporary plugging ball in different perforation clusters, and obtain the position and velocity parameters of the particles in real time.
[0040] In the S2 step, the migration model is transiently solved using a double-precision solver. Considering that the ball will collide with the wall, the wall enhancement function is selected and the algorithm is SIMPLE. The horizontal well perforation physical model is calculated using the standard k-ε turbulence model, and its momentum equation, volume fraction equation, turbulent kinetic energy equation, and turbulent dissipation rate equation all use the first-order upwind method.
[0041] In the step S2, the momentum exchange between the fluid (continuous phase) and the particles (discrete terms) in the horizontal well perforation physical model in the migration model is: Where F is the momentum transfer from the continuous phase to the discrete phase, (kg·m) / s; μ is the viscosity of the fluid, (N·S) / m 2 ρ p is the particle density kg / m 3 ;d p is the particle diameter, m; Re is the relative Reynolds number, dimensionless; u p and u are the particle velocity and fluid velocity, m / s; C D is the drag coefficient, dimensionless; q p is the mass flow rate of particles, kg / s; △t is the time step, s; F 其他 is the other force per unit mass, N / kg.
[0042] In the step S2, the mass exchange between the particles (discrete terms) and the fluid (continuous phase) in the temporary blocking ball model in the migration model is: Where M is the mass transfer from the discrete phase to the continuous phase, kg / s 2; △m p With q p,0 They represent the change in mass flow rate of particles and the initial mass flow rate of particle injection, kg / s; m p,0 is the initial mass of the particle, kg.
[0043] Example 4 This embodiment further elaborates on step S3 based on embodiment 3. In step S3, the migration trajectory of the temporary plugging ball in the horizontal well is tracked in real time and the actual position of the temporary plugging ball is predicted to guide the actual production. For example, under given engineering conditions (such as pumping displacement, temporary plugging ball density, temporary plugging ball diameter, etc.), the migration trajectory of the temporary plugging ball and the change in the speed of the temporary plugging ball are formed by calculating the position of the temporary plugging ball in the horizontal well perforation model. When it is observed that the trajectory of the temporary plugging ball stops at a certain hole and the speed at that place is 0, it can be determined that the temporary plugging ball has sealed the hole.
[0044] In the step S3, different parameters are set to simulate the migration of temporary plugging balls in different perforation clusters, and the movement trajectory of the temporary plugging balls is tracked in real time by discrete element software (e.g. Figure 4 As shown in the figure, the temporary plugging ball can be used to predict the situation of the temporary plugging ball sealing hole position in the actual temporary plugging fracturing construction, and the ratio of the number of sealed holes to the total number of holes can be calculated to evaluate the effect of the temporary plugging ball sealing holes.
[0045] In the step S3, the motion trajectory of the temporary blocking ball is predicted and calculated by balancing various forces acting on the temporary blocking ball particles in the Lagrangian reference system in the temporary blocking ball model; and Newton's second law is used to control the motion of the temporary blocking ball.
[0046] In step S3, the motion of the temporary blocking ball is controlled by using Newton's second law: Where m is the mass of the particle, kg; x is the displacement of the particle from position 1 to position 2, m; t is the time taken to move from position 1 to position 2, s; V is the vector velocity of the particle, m / s; F 拖曳力 、F 附加质量力 、F 重力 With F 其他 are the drag force, additional mass force, gravity and other forces acting on the particle, respectively, N; d is the hole diameter, m; u is the particle diameter, m; p and u are the particle velocity and fluid velocity, m / s; ρ f Fluid density, kg / m 3 ;εParticle acceleration relative to the fluid, m / s 2 ;d p is the particle diameter, m; ρ p is the particle density, kg / m3 .
[0047] Different from the prior art, the present invention provides a method for simulating the sealing of perforations by temporary plugging balls in temporary plugging fracturing of horizontal wells. The method simulates the migration of temporary plugging balls in different perforation clusters by establishing a CFD-DEM solid-liquid two-phase coupled temporary plugging ball migration model in horizontal wells. The migration trajectory of the temporary plugging balls is tracked in real time, thereby predicting the sealing of perforations by temporary plugging balls in actual temporary plugging fracturing.
[0048] The above is a specific description of the implementation mode of the present invention, but the present invention is not limited to the described embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention, and these equivalents or substitutions are all included in the scope defined by the claims of the present invention.
Claims
1. A method for simulating the temporary plugging ball sealing of a hole in a horizontal well during temporary plugging and fracturing, characterized in that: The following steps are involved: S1. Obtain the wellbore parameters, hole parameters, construction displacement and fracturing fluid parameters of the target work area, and use the obtained engineering parameters to establish a horizontal well perforation physical model in the fluid dynamics software; S2. Obtain the temporary plugging ball parameters, and use the temporary plugging ball parameters to establish a temporary plugging ball model in discrete element software, then compile the coupling interface between the temporary plugging ball model and the horizontal well perforation physical model, and perform solid-liquid two-phase coupling calculation to establish a temporary plugging ball migration model in the horizontal well, and use the migration model to simulate the migration and sealing of the temporary plugging ball in different perforation clusters; S3. Use discrete element software to track the migration trajectory of the temporary plugging ball in the horizontal well simulated by the migration model in real time, and use the real-time tracking information to predict the situation of the temporary plugging ball sealing the hole during the actual temporary plugging fracturing process.
2. The temporary plugging ball sealing hole simulation method according to claim 1, characterized in that: In the step S1, the wellbore parameters include the wellbore diameter and the wellbore length; the hole parameters include the hole diameter, the perforation density and the hole phase angle; the fracturing fluid parameters include the fracturing fluid density and the fracturing fluid viscosity; the fluid dynamics software is FLUENT software; the bottom of the wellbore of the established horizontal well perforation physical model is not closed.
3. The temporary plugging ball sealing hole simulation method according to claim 1, characterized in that: In the step S1, the horizontal well perforation physical model is an incompressible fluid and transient solid-liquid two-phase flow model. The horizontal well perforation physical model includes the continuity equation, the momentum conservation equation, and the fluid turbulence equation. The fluid turbulence equation adopts the standard k-ε model. The particle forces in the horizontal well perforation physical model include drag force and additional mass force. In the horizontal well perforation physical model, the grids of the inner wall of the horizontal wellbore and the perforation boundary layer are encrypted.
4. The temporary plugging ball sealing hole simulation method according to claim 1, characterized in that: In the step S2, the temporary blocking ball parameters include temporary blocking ball diameter, temporary blocking ball density, temporary blocking ball elastic modulus and Poisson's ratio, and the discrete element software is EDEM software; In the step S2, a method combining discrete element software EDEM and fluid dynamics software FLUENT is adopted, and a temporary plugging ball particle model is established by using EDEM software. The coupling interface compiled by FLUENT software is coupled with the temporary plugging ball model, and the momentum exchange between the temporary plugging ball and the fluid is performed through the built-in SCALARS of FLUENT, so as to realize CFD-DEM solid-liquid bidirectional coupling calculation, simulate the migration and sealing of the temporary plugging ball in different perforation clusters, and obtain the position and velocity parameters of the particles in real time.
5. The temporary plugging ball sealing hole simulation method according to claim 4, characterized in that: The migration model uses a double-precision solver for transient solution, which selects the wall enhancement function and the SIMPLE algorithm; the horizontal well perforation physical model uses a standard k-ε turbulence model for calculation, and its momentum equation, volume fraction equation, turbulent kinetic energy equation, and turbulent dissipation rate equation all use a first-order upwind method.
6. The temporary plugging ball sealing hole simulation method according to claim 5, characterized in that: In the step S2, the momentum exchange between the fluid and the particles in the horizontal well perforation physical model in the migration model is: Where F is the momentum transfer from the continuous phase to the discrete phase, (kg·m) / s; μ is the viscosity of the fluid, (N·S) / m 2 ρ p is the particle density kg / m 3 ;d p is the particle diameter, m; Re is the relative Reynolds number, dimensionless; u p and u are the particle velocity and fluid velocity, m / s; C D is the drag coefficient, dimensionless; q p is the mass flow rate of particles, kg / s; △t is the time step, s; F 其他 is the other force per unit mass, N / kg.
7. The temporary plugging ball sealing hole simulation method according to claim 6, characterized in that: In the step S2, the mass exchange between particles and fluid in the temporary blocking ball model in the migration model is: Where M is the mass transfer from the discrete phase to the continuous phase, kg / s 2 ; △m p With q p,0 They represent the change in mass flow rate of particles and the initial mass flow rate of particle injection, kg / s; m p ,0 is the initial mass of the particle, kg.
8. The temporary plugging ball sealing hole simulation method according to claim 1, characterized in that: In the step S3, the motion trajectory of the temporary blocking ball is predicted and calculated by balancing various forces acting on the temporary blocking ball particles in the Lagrangian reference system in the temporary blocking ball model; and Newton's second law is used to control the motion of the temporary blocking ball.
9. The temporary plugging ball sealing hole simulation method according to claim 8, characterized in that: In step S3, the motion of the temporary blocking ball is controlled by using Newton's second law: Where m is the mass of the particle, kg; x is the displacement of the particle from position 1 to position 2, m; t is the time taken to move from position 1 to position 2, s; V is the vector velocity of the particle, m / s; F 拖曳力 、F 附加质量力 、F 重力 With F 其他 are the drag force, additional mass force, gravity and other forces acting on the particle, respectively, N; d is the hole diameter, m; u is the particle diameter, m; p and u are the particle velocity and fluid velocity, m / s; ρ f Fluid density, kg / m 3 ;εParticle acceleration relative to the fluid, m / s 2 ;d p is the particle diameter, m; ρ p is the particle density, kg / m 3 .
10. The temporary plugging ball sealing hole simulation method according to claim 1, characterized in that: The step S3 also includes: calculating the ratio of the number of sealed holes to the total number of holes to evaluate the effect of sealing holes with temporary plugging balls.