Production-type park electric power carbon footprint data monitoring method and device
By constructing the topology of the park's power grid and calculating carbon emissions, identifying carbon emission abnormal information of power consumption nodes and parks, the accuracy and monitoring of park power carbon emission data monitoring in the existing technology is solved, and high-accurate data is achieved Support and real-time feedback.
Patent Information
- Application Number
- CN202411502627.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the monitoring of power carbon emission data at the park level lacks accuracy and cannot effectively meet the decision-making needs of carbon emission optimization. The monitoring method is relatively single, so it is impossible to reasonably and effectively monitor carbon emission abnormalities.
By obtaining the information of the net transfer power and power consumption nodes of the park, building the topology of the park's power grid, calculating the power loss and carbon emissions of each power consumption node, identifying the carbon emission abnormal information of the power consumption nodes and the park, and generating Exception warning.
Real-time monitoring of the overall carbon emissions of the park and the abnormal carbon emissions of various types of nodes is realized, providing high-accurate data support, suitable for daily monitoring and real-time data feedback of the park, and has stronger popularization.
Smart Images

Figure CN119026957A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electricity carbon emission measurement and monitoring, and in particular to a method and device for monitoring electricity carbon footprint data in a production park. Background Art
[0002] With the requirements of industrial upgrading and environmental protection in my country, carbon footprint and carbon emission monitoring related to industrial production and park production and operation has gradually become an indispensable requirement for social and economic development. At present, the carbon footprint evaluation standard of products has been implemented for many years. It mainly evaluates the carbon footprint of the entire life cycle of products or services, including the raw material supply, manufacturing, consumption and waste treatment of specific industrial products.
[0003] Among the relevant technologies, carbon footprint accounting for production is mainly focused on the level of industrial enterprises. For example, it considers comprehensive operating costs, energy loss, safety and environmental protection issues in the planning stage, and considers guiding planning and design through optimizing operating strategies. However, it is not suitable for monitoring the carbon emissions of individual electricity consumption nodes at the overall park level, resulting in a lack of objectivity in carbon footprint monitoring in production and daily operations, and limited comprehensive economic benefits. Some methods mainly calculate, analyze and manage the greenhouse gas emissions of the entire process of the enterprise, but lack consideration of changes in carbon emissions during the use of enterprise equipment and power grid equipment, and cannot adapt well to the current optimization requirements for "dual carbon".
[0004] However, the carbon emission monitoring methods for industrial parks in related technologies are relatively simple, and often only focus on the rough calculation of the overall carbon emissions. There is a lack of reasonable, effective and timely monitoring of the abnormal carbon emissions of the overall industrial park and the abnormal carbon emissions of various types of internal nodes. As a result, the current monitoring of electricity carbon emission data at the industrial park level lacks accuracy and cannot effectively meet the optimization decision-making needs of industrial park operations for carbon emissions, which needs to be solved urgently. Summary of the invention
[0005] The present invention provides a method and device for monitoring the carbon footprint data of electricity in a production park, so as to solve the problem that the carbon emission monitoring method for the park in the related technology is relatively single, often only roughly calculating the overall carbon emissions, and lacks reasonable and effective timely monitoring of the abnormal situation of the overall carbon emissions of the park, as well as the abnormal carbon emissions of various types of nodes inside. As a result, the current monitoring of electricity carbon emission data at the park level lacks accuracy and cannot effectively meet the optimization decision-making needs of park operations for carbon emissions.
[0006] A first aspect of the present invention provides a method for monitoring electricity carbon footprint data in a production park, comprising the following steps: obtaining the net amount of power transferred into the target park and the node information of each power consumption node, so as to construct a park power grid topology structure in combination with the total output power of the target park; calculating the power loss of each power consumption node according to the park power grid topology structure; obtaining the carbon emissions of each power consumption node and the total carbon emissions of the target park according to the power loss, and identifying abnormal carbon emission information of at least one power consumption node according to the carbon emissions and / or identifying abnormal carbon emission information of the target park according to the total carbon emissions.
[0007] Optionally, in one embodiment of the present invention, identifying the abnormal carbon emission information of the power consumption node based on the carbon emissions includes: calculating the carbon emission change rate and the carbon emission abnormality index of the power consumption node based on the carbon emissions; obtaining monitoring data of the power consumption node based on the carbon emission change rate and the carbon emission abnormality index of the power consumption node; and determining the abnormal carbon emission information of the power consumption node based on the monitoring data.
[0008] Optionally, in one embodiment of the present invention, identifying the abnormal carbon emission information of the target park based on the total carbon emissions includes: calculating the carbon emission change rate and the carbon emission abnormality index of the target park based on the total carbon emissions and the carbon emission growth rate of the target park; obtaining the total monitoring data of the target park based on the carbon emission change rate and the carbon emission abnormality index of the target park; and determining the abnormal carbon emission information of the target park based on the total monitoring data.
[0009] Optionally, in one embodiment of the present invention, it is characterized in that it also includes: generating an abnormal warning of the power consumption node or the target park according to the abnormal carbon emission information of the power consumption node and the abnormal carbon emission information of the target park.
[0010] Optionally, in one embodiment of the present invention, the calculation formula for the total carbon emissions of the target park can be expressed as:
[0011] in, is the total carbon emissions of the park, I Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
[0012] The second aspect of the present invention provides a production-type park electricity carbon footprint data monitoring device, including: an acquisition module, used to obtain the net amount of power transferred into the target park and the node information of each power consumption node, so as to construct a park power grid topology structure in combination with the total output power of the target park; a calculation module, used to calculate the power loss of each power consumption node according to the park power grid topology structure; a monitoring module, used to obtain the carbon emissions of each power consumption node and the total carbon emissions of the target park according to the power loss, and identify the abnormal carbon emissions information of at least one power consumption node according to the carbon emissions and / or identify the abnormal carbon emissions information of the target park according to the total carbon emissions.
[0013] Optionally, in one embodiment of the present invention, the monitoring module includes: a first calculation unit, used to calculate the carbon emission change rate and the carbon emission anomaly index of the power consumption node based on the carbon emissions; a first processing unit, used to obtain the monitoring data of the power consumption node based on the carbon emission change rate and the carbon emission anomaly index of the power consumption node; and a first determination unit, used to determine the carbon emission anomaly information of the power consumption node based on the monitoring data.
[0014] Optionally, in one embodiment of the present invention, the monitoring module includes: a second calculation unit, used to calculate the carbon emission change rate and the carbon emission anomaly index of the target park based on the total carbon emissions and the carbon emission growth rate of the target park; a second processing unit, used to obtain the total monitoring data of the target park based on the carbon emission change rate and the carbon emission anomaly index of the target park; a second determination unit, used to determine the carbon emission anomaly information of the target park based on the total monitoring data.
[0015] Optionally, in one embodiment of the present invention, it is characterized in that it also includes: a generation module, which is used to generate an abnormal warning for the power consumption node or the target park based on the abnormal carbon emission information of the power consumption node and the abnormal carbon emission information of the target park.
[0016] Optionally, in one embodiment of the present invention, the calculation formula for the total carbon emissions of the target park can be expressed as:
[0017] in, is the total carbon emissions of the park, I Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
[0018] A third aspect of the present invention provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for monitoring electricity carbon footprint data in a production park as described in the above embodiment.
[0019] A fourth aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned method for monitoring electricity carbon footprint data in a production park.
[0020] A fifth aspect of the present invention provides a computer program product, including a computer program, which, when executed, is used to implement the above-mentioned method for monitoring electricity carbon footprint data in a production park.
[0021] The embodiment of the present invention can calculate the amount of power loss of each power node in the target park, obtain the carbon emissions of each power node and the total carbon emissions of the target park, and finally identify the abnormal carbon emission information of the power node according to the carbon emissions, and identify the abnormal carbon emission information of the target park according to the total carbon emissions. In this way, it is realized that the abnormal situation of the overall carbon emissions of the park and the abnormal carbon emissions of various types of nodes inside are reasonably and effectively monitored in real time under the consideration of multiple factors, which is convenient for obtaining real-time data indicators of carbon emissions, so as to find data targets that need to be monitored or optimized, and provide high-accuracy data support for the optimization decision-making needs of park operations for carbon emissions. The accounting method is simpler, more suitable for daily monitoring and real-time data feedback of the park, and has stronger scalability. Therefore, it solves the problem that the carbon emission monitoring method for the park in the related technology is relatively single, often only for the rough accounting of the overall carbon emissions, lacks reasonable and effective timely monitoring of the abnormal situation of the overall carbon emissions of the park, and the abnormal carbon emissions of various types of nodes inside, resulting in the lack of accuracy of the current monitoring of power carbon emissions data at the park level, and cannot effectively meet the optimization decision-making needs of park operations for carbon emissions.
[0022] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which: Figure 1 A flowchart of a method for monitoring electricity carbon footprint data in a production park according to an embodiment of the present invention; Figure 2 A schematic diagram of a campus power grid topology structure according to an embodiment of the present invention; Figure 3 A schematic diagram of a carbon emission monitoring method according to an embodiment of the present invention; Figure 4 Schematic diagram of the structure of a production park power carbon footprint data monitoring device according to an embodiment of the present invention; Figure 5 FIG. 4 is a schematic diagram of the structure of an electronic device according to an embodiment of the present invention.
[0024] Reference numerals: 10-Production-type park electricity carbon footprint data monitoring device: 100-acquisition module, 200-calculation module, 300-monitoring module; 501-memory, 502-processor, 503-communication interface. DETAILED DESCRIPTION
[0025] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0026] The following describes the production park electricity carbon footprint data monitoring method and device of the embodiment of the present invention with reference to the accompanying drawings. In view of the fact that the carbon emission monitoring method for the park in the related technology mentioned in the above background technology is relatively simple, and often only focuses on the rough calculation of the overall carbon emissions, lacks reasonable and effective timely monitoring of the abnormal situation of the overall carbon emissions of the park, and the abnormal situation of carbon emissions of various types of internal nodes, resulting in the current lack of accuracy in the monitoring of electricity carbon emissions data at the park level, and the inability to effectively meet the optimization decision-making needs of the park operation for carbon emissions. The present invention provides a production park electricity carbon footprint data monitoring method, in which the power loss of each power node in the target park can be calculated, and the carbon emissions of each power node and the total carbon emissions of the target park can be obtained. Finally, the carbon emission abnormal information of the power node is identified according to the carbon emissions, and the carbon emission abnormal information of the target park is identified according to the total carbon emissions. This makes it possible to conduct reasonable and effective real-time monitoring of the abnormalities of the overall carbon emissions of the park and the abnormalities of carbon emissions of various types of nodes within the park while considering multiple factors, making it easier to obtain real-time data indicators of carbon emissions in order to discover data targets that need to be monitored or optimized, and provide highly accurate data support for the park's operation to optimize its decision-making needs for carbon emissions. The accounting method is simpler and more suitable for the park's daily monitoring and real-time data feedback, and has stronger scalability. This solves the problem that the carbon emission monitoring methods for parks in related technologies are relatively single, often only focusing on the rough calculation of the overall carbon emissions, and lack reasonable, effective and timely monitoring of the abnormalities of the overall carbon emissions of the park and the abnormalities of carbon emissions of various types of nodes within the park, resulting in the current lack of accuracy in the monitoring of electricity carbon emissions data at the park level, and the inability to effectively meet the park's operation's optimization decision-making needs for carbon emissions.
[0027] Specifically, Figure 1 The present invention provides a flowchart of a method for monitoring electricity carbon footprint data in a production park according to an embodiment of the present invention.
[0028] like Figure 1 As shown, the production park electricity carbon footprint data monitoring method includes the following steps: In step S101, the net amount of power transferred into the target park and the node information of each power-consuming node are obtained to construct a park power grid topology structure in combination with the total output power of the target park.
[0029] It is understandable that the target park here can be understood as a production-oriented industrial park that needs to be managed by power grid data processing, power grid data monitoring or carbon footprint monitoring. With the continuous development of my country's industry, industrial production parkization has gradually evolved into the main trend of my country's industrial development. Industrial parks generally use electricity consumption to count related industrial conditions. Their power grid data can well reflect the changes in carbon emissions in industrial parks. Therefore, quantitative research on power carbon emissions in industrial parks has become an important part of comprehensive carbon monitoring.
[0030] In some embodiments, the target park's electricity type and electricity node type are different, and correspondingly, the carbon emissions are also differentiated. In order to determine the target park's electricity carbon emissions, it is necessary to determine the source of the target park's incoming electricity.
[0031] Based on this, the embodiment of the present invention can first obtain the net incoming power of the target park and the node information of different power consumption nodes, and construct the park power grid topology structure of the target park in combination with the total output power of the target park, which is convenient for defining the power grid scope of the target park, and can realize separate carbon emission footprint monitoring of different power consumption nodes, which is helpful for adjusting or deleting power consumption nodes in the target park, and updating the park topology structure of the target park in real time.
[0032] For example, for a large industrial park, the net power input can be divided into but not limited to two types: external power grid supply and the park’s own clean energy such as solar energy.
[0033] Figure 2 FIG. 1 is a topological diagram of a campus according to an embodiment of the present invention. Figure 2 As shown, for the power supply of the external power grid, the embodiment of the present invention can be based on the power meter at the receiving end of the park distribution station power grid. In the Metering sampling cycle The electricity received by the distribution station The amount of electricity received for use in the park is The total number of all supply distribution stations is , then we can A distribution station is used as the external power supply point of the park, that is, the power supply starting point of the park power grid. It should be noted that in the embodiment of the present invention, the carbon emissions caused by the power loss of the distribution station are not included in the carbon emissions of the park, and it is only used as the starting point for the calculation of electricity consumption.
[0034] Next, determine each power consumption node in the park. The power consumption nodes include but are not limited to factories and unit power consumption nodes in the target park that are equipped with independent power collection equipment. The specific determination process can be expressed as follows: First, the embodiment of the present invention can, but is not limited to, consider the industrial power consumption nodes in the target park, that is, the core power consumption entities of the production park, and use each industrial power consumption node as the core power consumption node. Indicates that the total number of power consumption nodes is Indicates that each node In the Metering sampling cycle The power consumed by express.
[0035] Furthermore, the embodiments of the present invention also take into account nodes in the target park that use clean energy as a power supply. For example, the power supply within a general production park includes but is not limited to general clean energy power supplies, such as wind power, solar power, etc., as well as a certain amount of energy storage equipment power supplies. In the embodiments of the present invention, clean energy power supplies can be uniformly regarded as a type of power supply, and the carbon emissions of this type of power supply in the power generation link can be ignored. Here, it can be assumed that the total number of clean energy power supply nodes in the park is , each node In the Metering sampling cycle The amount of electricity generated (delivered to the park) is .
[0036] Furthermore, the embodiment of the present invention can regard the energy storage equipment in the target park as a special power consumption node and can use a fixed sampling period The actual power loss is calculated by the loss ratio of the stored power value and the released power value. Here, it can be assumed that the total amount of energy storage nodes in the park is , a single energy storage node In the Metering sampling cycle The amount of electricity stored in the storage (i.e., the amount of electricity in the energy storage node during charging) is , a single energy storage node The energy release efficiency (i.e. the ratio between the electric energy stored in the energy storage device and the actual corresponding electric energy that can be released, generally a value less than 1) is . Given that the general energy efficiency can be solved by the rated energy storage efficiency and energy loss rate of the energy storage node, or directly obtained by querying the energy efficiency calibrated by the equipment. Then, the energy storage device In the Metering sampling cycle The power loss generated in the Moreover, since the electric energy of general energy storage equipment needs to be consumed within a certain period of time, that is, it will be consumed preferentially in the park, such as public electricity or emergency electricity, in order to facilitate the monitoring of the power consumption of the park, the embodiment of the present invention can assume that in the time period The electric energy stored in the cycle will also be released in this cycle, so the released electric energy is equivalent to the power supply of a power supply device, and its electric quantity can be expressed as .
[0037] Furthermore, when constructing the park topology structure, the embodiment of the present invention also needs to summarize the overall output power of the park. At this time, after clearly defining each node within the park, the nodes within the park that have power transmission relationships with other nodes outside the park can be sorted out, and power detection equipment can be set at the output ends of these nodes to record the power passing through the node during the sampling period. The amount of electricity transmitted from the campus to the outside. Here we can assume that the total amount of this type of node is , where a single node In the sampling time period The amount of electrical energy transmitted from the park to the outside is .
[0038] It should be noted that when setting the sampling period, the embodiments of the present invention may, but are not limited to, use a continuous monitoring period as the sampling period, such as monitoring in units of continuous months, or uninterrupted monitoring in units of continuous 15 days, etc.; or for individual special parks, discrete sampling may be used for monitoring, such as intermittent monitoring in units of a certain number of days. The specific setting and adjustment can be made by professional and technical personnel in this field according to the actual situation of the target park or the monitoring needs, etc., and the embodiments of the present invention are only for illustrative purposes and are not specifically limited.
[0039] The embodiments of the present invention can construct a park power grid topology structure of the target park in combination with the net power input of the target park, the node information of the power consumption nodes and the total output power. The park power grid topology structure reasonably divides the carbon emission detection objects of the park, which is convenient for monitoring the total carbon emissions and abnormal carbon emissions of power consumption nodes of, for example, a single enterprise or an entire enterprise, so that the overall monitoring classification of the park is more reasonable, and it is convenient to obtain real-time data indicators of carbon emissions to discover data targets that need to be monitored or optimized.
[0040] Step S102: Calculate the power consumption of each power consumption node according to the topological structure of the park power grid.
[0041] In the actual implementation process, for the operation of the park, only when the carbon emissions corresponding to the power consumption of various types of power consumption nodes can be accurately monitored, can practical guidance be given to the park operation, power scheduling, industry matching adjustment, etc. Therefore, the embodiment of the present invention can calculate the power consumption amount for different types of power consumption nodes in the park.
[0042] First, for the target park as a whole, the power loss of the transmission line from the distribution station to the park should be included in the total power loss of the park. The overall power consumption can be expressed as: , in, Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from within the park to outside the park.
[0043] Furthermore, the embodiment of the present invention can include the available electric energy generated by the energy storage element into the total power loss of the park. Then, the park The overall power consumption can be expressed as: , in, Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside.
[0044] Next, the embodiment of the present invention sorts out the power consumption of each power consumption node type.
[0045] (1) Industrial electricity consumption nodes The industrial nodes required for normal production and operation of the park mainly include but are not limited to the power consumption nodes of various manufacturers or offices, which are also the main body of the park's power consumption. Based on the analysis of the previous embodiment, the calculation of the overall power consumption of the industrial power consumption nodes in the park can be expressed as follows: , in, Indicates the total number of power consumption nodes in the park. Indicates each power consumption node In the Metering sampling cycle The amount of electricity consumed within.
[0046] (2) Energy storage nodes For a special energy storage node, the calculation of the power loss during the energy storage process and the energy release process can be expressed as follows: , in, Indicates the total number of energy storage nodes in the park, Represents a single energy storage node In the Metering sampling cycle The amount of electricity stored in the memory, Represents a single energy storage node energy release efficiency.
[0047] During the energy storage device's energy release, the embodiments of the present invention can incorporate the released energy into the actual park's electricity source, so as to be included in the calculation equivalent to the content of the previous embodiments.
[0048] (3) Public electricity In general, during normal operations within a park, public electricity consumption is required, including but not limited to general lighting, public equipment consumption within the park (such as shared water supply equipment, shared power equipment, etc.), and power transmission consumption between power grids. Taking this type of consumption into consideration, if separate monitoring and collection equipment is used, it will increase corporate costs due to the variety of types and regions of public electricity consumption. Therefore, the embodiment of the present invention can use an indirect accounting method to measure the public electricity consumption in the daily operation and maintenance of this type of park as a whole. That is, the total electricity consumption can be deducted from the power consumption of industrial power nodes and energy storage nodes to make a brief conversion. In the sampling time period, The public electricity consumption in the country can be expressed as follows: , in, Represents a public power node In the sampling time period Public electricity consumption within the country.
[0049] Step S103, obtaining the carbon emissions of each power consumption node and the total carbon emissions of the target park based on the power loss, and identifying abnormal carbon emission information of at least one power consumption node based on the carbon emissions and / or identifying abnormal carbon emission information of the target park based on the total carbon emissions.
[0050] As a possible implementation method, after determining the calculation method of the power consumption of each main type of node in the target park and the overall power consumption of the target park, the present invention can sort out the monitoring data of each power consumption type node used in the monitoring process, as well as the calculation of the monitoring data of the park as a whole.
[0051] Based on the relevant descriptions of other embodiments, it can be understood that the present invention can monitor the carbon footprint from the electricity consumption of the target park. Specifically, in the park carbon footprint monitoring, it is necessary to convert the electricity consumption of various types of power nodes into carbon emissions. In the embodiments of the present invention, the standard electricity carbon emission factor can be used, but is not limited to As a basis for conversion, the electricity emission factor can be, but is not limited to, the accounting data provided by the Ministry of Environment. For example, the national average carbon dioxide emission factor for electricity in 2021 can be taken as 0.5568 kg. e / kWh.
[0052] Finally, after obtaining the carbon emissions of each power-consuming node in the target park and the total carbon emissions of the entire target park, the embodiment of the present invention can monitor whether any power-consuming node in the target park has generated abnormal carbon emissions based on the carbon emissions of each power-consuming node, or monitor whether the entire target park has generated abnormal carbon emissions based on the total carbon emissions of the entire target park.
[0053] It should be noted that in the embodiment of the present invention, in the monitoring of the carbon emissions of the park, the monitoring is mainly but not limited to two aspects: one is the monitoring of the carbon emissions, and the other is the monitoring of abnormal changes in carbon emissions. Figure 3 As shown, it is a schematic diagram of the framework of the carbon emission method of an embodiment of the present invention.
[0054] For monitoring carbon emissions, the present invention can monitor the total carbon emissions of the entire park and obtain the corresponding specific carbon emissions value; at the same time, the main carbon emission entities can be classified and monitored, that is, the carbon emissions of production power nodes, energy storage nodes, and public power consumption can be monitored and obtained in real time, so that real-time comparison and accounting can be performed to obtain the corresponding carbon emissions. Correspondingly, for monitoring abnormal carbon emissions, the embodiments of the present invention can also monitor abnormal carbon emissions at the overall level of the park and at individual power consumption nodes.
[0055] The process is further explained below.
[0056] Optionally, in one embodiment of the present invention, abnormal carbon emission information of a power consumption node is identified based on the carbon emissions, including: calculating the carbon emission change rate and the carbon emission abnormality index of the power consumption node based on the carbon emissions; obtaining monitoring data of the power consumption node based on the carbon emission change rate and the carbon emission abnormality index of the power consumption node; and determining the abnormal carbon emission information of the power consumption node based on the monitoring data.
[0057] In some embodiments, when monitoring the carbon emissions and abnormal carbon emission changes of each power consumption node in the target park, the carbon emission change rate and carbon emission abnormality index of the corresponding power consumption node can be calculated based on the carbon emissions of each power consumption node, and then the monitoring data of each power consumption node can be obtained, thereby determining the abnormal carbon emission information of each power consumption node.
[0058] Specifically, when calculating carbon emissions, for different power consumption nodes, their actual carbon emissions can be calculated by multiplying their power loss by the power carbon emission factor. Next, the embodiment of the present invention can calculate the carbon emission monitoring amount for different types of power consumption nodes and make appropriate corrections. The specific process can be expressed as follows: A single industrial power consumption node at sampling time Carbon emissions It can be expressed as: , in, Represents a single industrial power consumption node at sampling time Carbon emissions, Indicates the total number of power consumption nodes in the park. Indicates each power consumption node In the Metering sampling cycle The power consumed in Represents the standard electricity carbon emission factor.
[0059] A single energy storage node at sampling time Carbon emissions It can be expressed as: , in, Represents a single energy storage node At sampling time Carbon emissions, Indicates the total number of energy storage nodes in the park, Represents a single energy storage node In the Metering sampling cycle The amount of electricity stored in the memory, Represents a single energy storage node The energy release efficiency, Represents the standard electricity carbon emission factor.
[0060] Public power nodes at sampling time Carbon emissions It can be expressed as: , in, Represents a public power node At sampling time Carbon emissions within.
[0061] At this point, various types of carbon emission data within a fixed single data sampling period can be obtained. Based on this, the embodiment of the present invention further calculates the monitoring data of various types of carbon emission data.
[0062] (1) Carbon emission monitoring of industrial electricity consumption nodes General production enterprises all have industrial and industry cycle characteristics. On an annual basis, there are usually cyclical characteristics of strong and gentle market demand, which is reflected on the production side as cyclical fluctuations in electricity demand. Therefore, when monitoring the carbon emissions of such industrial electricity consumption nodes, the embodiments of the present invention can monitor the fluctuations in electricity consumption in multiple sampling cycles within a certain time period (for example, on an annual basis), so as to determine a reasonable fluctuation range, so as to conduct reasonable fluctuation monitoring on the carbon emissions of the electricity users of this industry type. In addition, it is also possible to more fully understand the reasonable range and total amount of carbon emission demands of the electricity users of this industry type in actual production, and provide better data support for the reasonable configuration of park operations and carbon emission indicators.
[0063] For example, when determining the carbon emission monitoring index of a power consumption node of a certain enterprise type on an annual basis, the embodiment of the present invention can first determine the carbon emission change rate of a single power consumption unit, and the calculation can be expressed as follows: , in, Indicated in The carbon emission change rate of a single electricity unit within a sampling period, Represents a single industrial power consumption node at sampling time Carbon emissions, Represents a single industrial power consumption node at sampling time Carbon emissions within.
[0064] On this basis, we continue to analyze and calculate the abnormal index of individual electricity users and the change data of corporate carbon emissions. In order to obtain the change information more clearly and intuitively, the historical data of the enterprise can be introduced here as the basic data for assessing its changes in the current year or the current monitoring stage. For example, the average change rate obtained in each monitoring sampling period of the previous year is used as one of the reference data, which can be expressed as follows: , in, is the total number of samplings in the previous year, Indicated in The carbon emission change rate of a single electricity consumption unit within a sampling time period. As an indicator reflecting the abnormal carbon emission of electricity consumption enterprises, the embodiment of the present invention can uniformly calculate the monitoring data, extreme value data, and data in the previous monitoring period of the current year to solve their changes. In the During the monitoring sampling period, the carbon emission abnormality index It can be expressed as: , in, The current year ends on At the time of sampling, the enterprise power consumption node It should be noted that in the actual park carbon emission scheduling, the embodiment of the present invention takes into account that some enterprises may have a certain amount of annual growth or change indicators. Therefore, an adjustment coefficient can be added in the actual monitoring and supervision. , all within the normal adjustment range of the adjustment coefficient can be considered as normal adjustment. Therefore, in a more preferred or alternative monitoring mode, the embodiment of the present invention can introduce a correction index (ie, adjustment coefficient) of the carbon emission abnormality index. In addition, the embodiment of the present invention allows but is not limited to adjusting the annual index of the enterprise's carbon emissions (the annual carbon emissions growth rate of the enterprise) ) as the main basis for calculating the correction index: , in, Represents the correction index of carbon emission anomaly index, Indicates that the enterprise is allowed to use electricity nodes The annual carbon emission growth rate is the growth rate of the carbon emissions of the enterprise in the current year. In consideration of the correction index, the carbon emission anomaly index of the enterprise monitored in the embodiment of the present invention can be adjusted to: .
[0065] It should be noted that in the carbon emission monitoring of enterprises in the park, the correction index does not have to be increased, and can be adjusted according to the specific carbon emission monitoring needs of the park for the enterprises. The embodiments of the present invention are only used for illustrative purposes and no specific restrictions or requirements are made.
[0066] Additionally, on this basis, the embodiments of the present invention may also set a reasonable range of monitoring and evaluation according to the carbon emission anomaly index of the enterprise, such as setting a monitoring threshold for a single enterprise, etc., to determine the carbon emission anomaly information of the enterprise.
[0067] (2) Carbon emission monitoring of energy storage nodes The change in carbon emissions of energy storage nodes is generally caused by the frequency of use of the equipment and the aging of the equipment. As for the carbon emissions caused by equipment maintenance, the production and distribution of its accessories are generally included in the carbon emission indicators of the original supplier, so they are not included in the scope of the park carbon emission monitoring in the embodiment of the present invention. At this time, the carbon emission change rate of a single energy storage unit (in the sampling time period) can be expressed as: , in, Indicates that a single energy storage unit is The carbon emission change rate within a sampling period, Indicates that a single energy storage node is at sampling time Carbon emissions, Indicates that a single energy storage node is at sampling time Carbon emissions within.
[0068] Using the abnormal index principle for carbon emission monitoring of park enterprises in the previous embodiment, historical data also needs to be considered here, that is, the average value of the change rate obtained in each monitoring sampling period of the previous year, which can be expressed as: , in, Indicates that a single energy storage unit is The carbon emission change rate within a sampling period.
[0069] The focus of abnormal carbon emission monitoring of energy storage nodes is on changes caused by failures, damage, aging, etc. during the operation of energy storage nodes. In daily operation, the abnormal change rate of energy storage nodes is relatively small. Except for the fluctuation of monitoring indicators caused by the high operation rate of energy storage nodes caused by major failures in individual parks, there are generally no peak-shaped abnormal points. Therefore, the embodiment of the present invention can calculate the carbon emission abnormality index of energy storage nodes based on the following method: : , in, The current year ends on During the sampling, the energy storage node The absolute value of the maximum carbon emission change rate.
[0070] Furthermore, based on the operating characteristics of the energy storage node, the embodiment of the present invention can set a change threshold based on the average of historical data in previous years, and determine the abnormal index according to the change threshold. Conduct daily monitoring.
[0071] (3) Public power nodes In the embodiment of the present invention, the carbon emissions of public electricity are calculated indirectly. The change of public electricity consumption is similar to that of energy storage equipment. Before obtaining the abnormal carbon emissions, the carbon emission abnormality index of public electricity can be calculated. , which can be expressed as follows: , in, The current year ends on The absolute value of the maximum carbon emission change rate of public electricity consumption at the time of sampling, and , , in, Indicates that a single public electricity unit is The carbon emission change rate within a sampling period, Indicates that a single public electricity unit is The carbon emission change rate within a sampling period, Indicates the public power node at sampling time Carbon emissions, Indicates the public power node at sampling time Carbon emissions, It represents the mean value of the rate of change obtained in each monitoring sampling period of the previous year.
[0072] Similarly, the embodiment of the present invention can also set the change threshold based on the average of historical data in previous years, and the abnormal index Conduct daily monitoring.
[0073] In this way, each power consumption node in the target park can be monitored to obtain monitoring data, and then the abnormal carbon emission information of each power consumption node in the target park can be determined based on the monitoring data.
[0074] The embodiments of the present invention can set different carbon emission abnormality indicators according to the data characteristics of different electricity users, fully consider the factors of historical data and the data change factors of different electricity consumption nodes themselves, and effectively improve the accuracy and reliability of abnormal indicator monitoring.
[0075] Optionally, in one embodiment of the present invention, identifying the abnormal carbon emission information of the target park according to the total carbon emission amount includes: calculating the carbon emission change rate and the carbon emission abnormality index of the target park according to the total carbon emission amount and the carbon emission growth rate of the target park; obtaining the total monitoring data of the target park according to the carbon emission change rate and the carbon emission abnormality index of the target park; and determining the abnormal carbon emission information of the target park based on the total monitoring data. The calculation formula of the total carbon emission of the target park can be expressed as:
[0076] in, is the total carbon emissions of the park, Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
[0077] In other embodiments, the present invention can also identify abnormal carbon emission information of the target park based on the total carbon emissions, that is, first calculate the carbon emission change rate and carbon emission abnormality index of the target park based on the total carbon emissions, and thereby obtain the total monitoring data of the target park, and finally combine the carbon emission growth rate indicator and monitoring threshold of the target park to determine the abnormal carbon emission information of the target park.
[0078] Specifically, the overall carbon emission anomalies in the embodiment of the present invention need to be calculated based on the annual allowable carbon emission growth rate index of the park. In addition to the need to survey the carbon emissions, an important role of the park's carbon emissions monitoring is to monitor the distribution and changes of the park's carbon emissions, so as to make reasonable adjustments based on the carbon emission index control and carbon emission index scheduling in the subsequent park operations. Therefore, for the overall carbon emissions of the park, the embodiment of the present invention can calculate a reasonable monitoring time period according to the annual allowable carbon emissions adjustment rate, such as the annual carbon emissions increase or decrease requirements. T The total amount of carbon emissions within the park can be determined to determine whether the carbon emissions of various types of electricity consumption nodes in the park do not meet the carbon emission requirements for a long time, and to screen out the carbon emission nodes that need to be focused on, that is, the electricity consumption nodes.
[0079] Among them, the calculation formula for the total carbon emissions of the target park can be expressed as: , in, is the total carbon emissions of the park, Indicates the total number of distribution stations in the park. Indicates power distribution station i In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
[0080] Assume that the annual carbon emission increment of the park is , then each sampling period The growth rate within It can be expressed as: , In the park carbon emission monitoring, the embodiment of the present invention needs to calculate the carbon emission growth rate As an important parameter, it is used to calculate the overall carbon emission anomaly index of the park. situation.
[0081] Since the park is operating as a whole, it focuses on the total amount of carbon emissions, and unlike a single power node, it does not need to focus on the changes caused by the equipment. Therefore, when defining the carbon emission change rate of the park as a whole, the embodiment of the present invention needs to consider the cumulative total amount of changes. The carbon emission change rate can be expressed as: , in, Indicates that the park as a whole is in the sampling monitoring cycle The rate of change of carbon emissions within Indicates that the park as a whole is at the sampling time Carbon emissions, Indicates that the park as a whole is at the sampling time Carbon emissions within.
[0082] Similarly, the mean value of the change rate obtained in each monitoring sampling period of the previous year can be expressed as: , Then, the carbon emission anomaly index of the park can be calculated based on the following method: for: .
[0083] Similarly, the embodiment of the present invention can still set the change threshold based on the average of historical data in previous years, and the abnormal index Daily monitoring is carried out based on the comparison relationship with the threshold.
[0084] In this way, the entire target park can be monitored to obtain the total monitoring data, and then the abnormal carbon emission information of the target park can be determined based on the total monitoring data.
[0085] Optionally, in one embodiment of the present invention, it also includes: generating an abnormal warning for the power consumption node or the target park based on the abnormal carbon emission information of the power consumption node and the abnormal carbon emission information of the target park.
[0086] Based on the relevant explanations of other embodiments, it can be understood that after realizing the monitoring of the overall carbon emission abnormalities of the park and the carbon emission abnormalities of industrial power nodes, energy storage nodes and public power nodes, it is possible to pay attention to the carbon emission abnormalities of various types of power nodes and the carbon emission abnormalities of the entire target park in a timely manner when abnormalities occur in the monitoring data.
[0087] In some embodiments, based on the abnormal carbon emission information of each power consumption node and the abnormal carbon emission information of the target park, the present invention can determine the source of the abnormal carbon emission. Furthermore, it can also generate certain abnormal warnings based on the power consumption node or the target park that generates the abnormal carbon emission information.
[0088] For example, after obtaining abnormal carbon emission information of a certain power consumption node or the entire target park, the present invention can set a monitoring threshold based on historical data of previous years to provide timely reminders when abnormal carbon emissions occur at a certain power consumption node or the entire target park.
[0089] Specifically, the abnormal conditions of different types of carbon emission entities and target parks are monitored. After obtaining abnormal carbon emission information of production power nodes, energy storage nodes, public power consumption, and target parks, abnormal warnings can be generated based on, but not limited to, the following conditions: When abnormal information is found in the carbon emissions of each power consumption node, but the total carbon emissions of the target park are normal, focus on tracking and monitoring the situation of individual power consumption nodes or conduct field investigations, and generate abnormal alerts for individual power consumption nodes; When abnormal information is found in the carbon emissions of a single power consumption node and the total carbon emissions of the target park, an abnormal warning will be generated for the single power consumption node and a reminder for key rectification will be issued; When there is no abnormal information in the carbon emissions of a single power consumption node, but there is abnormal information in the total carbon emissions of the park, an abnormal warning or a reminder to check the changes in the power consumption node will be generated for the single power consumption node.
[0090] Additionally, the embodiments of the present invention may also display the carbon emission data and abnormal information of each power consumption node or the entire park on the terminal using methods such as visualization based on a combination of the topological structure and the target park map.
[0091] According to the method for monitoring the carbon footprint data of electricity in a production park proposed in an embodiment of the present invention, the amount of power loss of each power node in the target park can be calculated to obtain the carbon emissions of each power node and the total carbon emissions of the target park. Finally, the abnormal carbon emission information of the power node is identified based on the carbon emissions, and the abnormal carbon emission information of the target park is identified based on the total carbon emissions. In this way, reasonable and effective real-time monitoring of the abnormal carbon emissions of the park as a whole and the abnormal carbon emissions of various types of nodes inside is achieved while considering multiple factors, which makes it easy to obtain real-time data indicators of carbon emissions, so as to find data targets that need to be monitored or optimized, and provide highly accurate data support for the optimization decision-making needs of park operations for carbon emissions. The accounting method is simpler, more suitable for daily monitoring of the park and real-time data feedback, and has stronger scalability. This solves the problem that the carbon emission monitoring methods for industrial parks in related technologies are relatively simple and often only roughly calculate the overall carbon emissions. There is a lack of reasonable, effective and timely monitoring of abnormal carbon emissions in the overall industrial park and abnormal carbon emissions at various types of internal nodes. As a result, the current monitoring of electricity carbon emission data at the industrial park level lacks accuracy and cannot effectively meet the optimization decision-making needs of industrial park operations for carbon emissions.
[0092] Next, the production park electricity carbon footprint data monitoring device proposed in accordance with an embodiment of the present invention will be described with reference to the accompanying drawings.
[0093] Figure 4 It is a structural schematic diagram of a production park power carbon footprint data monitoring device according to an embodiment of the present invention.
[0094] like Figure 4 As shown, the production park electricity carbon footprint data monitoring device 10 includes: an acquisition module 100, a calculation module 200 and a monitoring module 300.
[0095] The acquisition module 100 is used to acquire the net amount of power transferred into the target park and the node information of each power-consuming node, so as to construct the park power grid topology structure in combination with the total output power of the target park.
[0096] The calculation module 200 is used to calculate the power consumption of each power consumption node according to the topological structure of the park power grid.
[0097] The monitoring module 300 is used to obtain the carbon emissions of each power consumption node and the total carbon emissions of the target park based on the power loss, and to identify abnormal carbon emissions information of at least one power consumption node based on the carbon emissions and / or identify abnormal carbon emissions information of the target park based on the total carbon emissions.
[0098] Optionally, in one embodiment of the present invention, the monitoring module 300 includes: a first calculation unit, a first processing unit and a first determination unit.
[0099] Among them, the first calculation unit is used to calculate the carbon emission change rate and carbon emission anomaly index of the power consumption node according to the carbon emission amount.
[0100] The first processing unit is used to obtain monitoring data of the power consumption node according to the carbon emission change rate and carbon emission abnormality index of the power consumption node.
[0101] The first determining unit is used to determine abnormal carbon emission information of the power consumption node based on the monitoring data.
[0102] Optionally, in one embodiment of the present invention, the monitoring module 300 includes: a second calculation unit, a second processing unit and a second determination unit.
[0103] Among them, the second calculation unit is used to calculate the carbon emission change rate and carbon emission anomaly index of the target park based on the total carbon emissions.
[0104] The second processing unit is used to obtain the total monitoring data of the target park according to the carbon emission change rate and the carbon emission abnormality index of the target park.
[0105] The second determination unit is used to determine the carbon emission abnormality information of the target park based on the total monitoring data in combination with the carbon emission growth rate index and the monitoring threshold of the target park.
[0106] Optionally, in one embodiment of the present invention, it is characterized in that it also includes: a generation module.
[0107] Among them, the generation module is used to generate abnormal warnings for power consumption nodes or target parks based on the abnormal carbon emission information of the power consumption nodes and the abnormal carbon emission information of the target park.
[0108] Optionally, in one embodiment of the present invention, the total carbon emissions calculation formula of the target park can be expressed as:
[0109] in, is the total carbon emissions of the park, Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
[0110] It should be noted that the above explanation of the embodiment of the method for monitoring carbon footprint data of electricity in a production park is also applicable to the device for monitoring carbon footprint data of electricity in a production park of this embodiment, and will not be repeated here.
[0111] According to the production park electricity carbon footprint data monitoring device proposed in the embodiment of the present invention, the power loss of each power node in the target park can be calculated to obtain the carbon emissions of each power node and the total carbon emissions of the target park, and finally the abnormal carbon emission information of the power node can be identified according to the carbon emissions, and the abnormal carbon emission information of the target park can be identified according to the total carbon emissions. In this way, reasonable and effective real-time monitoring of the abnormal carbon emissions of the park as a whole and the abnormal carbon emissions of various types of nodes inside can be achieved under the consideration of multiple factors, so as to facilitate the acquisition of real-time data indicators of carbon emissions, so as to find data targets that need to be monitored or optimized, and provide high-accuracy data support for the optimization decision-making needs of park operations for carbon emissions. The accounting method is simpler, more suitable for daily monitoring of the park and real-time data feedback, and has stronger scalability. This solves the problem that the carbon emission monitoring methods for industrial parks in related technologies are relatively simple and often only roughly calculate the overall carbon emissions. There is a lack of reasonable, effective and timely monitoring of abnormal carbon emissions in the overall industrial park and abnormal carbon emissions at various types of internal nodes. As a result, the current monitoring of electricity carbon emission data at the industrial park level lacks accuracy and cannot effectively meet the optimization decision-making needs of industrial park operations for carbon emissions.
[0112] Figure 5 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. The electronic device may include: A memory 501 , a processor 502 , and a computer program stored in the memory 501 and executable on the processor 502 .
[0113] When the processor 502 executes the program, the production park electricity carbon footprint data monitoring method provided in the above embodiment is implemented.
[0114] Furthermore, the electronic device further comprises: The communication interface 503 is used for communication between the memory 501 and the processor 502 .
[0115] The memory 501 is used to store computer programs that can be executed on the processor 502 .
[0116] The memory 501 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.
[0117] If the memory 501, the processor 502 and the communication interface 503 are implemented independently, the communication interface 503, the memory 501 and the processor 502 can be connected to each other through a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0118] Optionally, in a specific implementation, if the memory 501, the processor 502 and the communication interface 503 are integrated on a chip, the memory 501, the processor 502 and the communication interface 503 can communicate with each other through an internal interface.
[0119] The processor 502 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present invention.
[0120] An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-mentioned method for monitoring electricity carbon footprint data in a production park.
[0121] An embodiment of the present invention also provides a computer program product, including a computer program, which can run computer instructions. When the computer instructions are executed by a processor, the production park electricity carbon footprint data monitoring method provided by the embodiment of the present invention is implemented.
[0122] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0123] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "N" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0124] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0125] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be specifically implemented in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples (non-exhaustive list) of computer-readable media include the following: an electrical connection with one or N wirings (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways as necessary and then storing it in a computer memory.
[0126] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. If implemented by hardware, as in another embodiment, it can be implemented by any one or a combination of multiple of the following technologies known in the art: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0127] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0128] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0129] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A method for monitoring electricity carbon footprint data in a production park, characterized in that: The following steps are involved: Obtaining the net amount of power transferred into the target park and node information of each power consumption node, so as to construct a park power grid topology structure in combination with the total output power of the target park; Calculating the power consumption of each power consumption node according to the park power grid topology structure; The carbon emissions of each power consumption node and the total carbon emissions of the target park are obtained based on the electric energy loss, and abnormal carbon emission information of at least one power consumption node is identified based on the carbon emissions and / or abnormal carbon emission information of the target park is identified based on the total carbon emissions.
2. The method for monitoring power carbon footprint data in a production park according to claim 1 is characterized in that: The identifying the abnormal carbon emission information of the power consumption node according to the carbon emission amount includes: Calculate the carbon emission change rate and carbon emission anomaly index of the power consumption node according to the carbon emission; Obtaining monitoring data of the power consumption node according to the carbon emission change rate and carbon emission abnormality index of the power consumption node; Abnormal carbon emission information of the power consumption node is determined based on the monitoring data.
3. The method for monitoring power carbon footprint data in a production park according to claim 1, characterized in that: Identifying abnormal carbon emission information of the target park according to the total carbon emission amount includes: Calculate the carbon emission change rate and carbon emission anomaly index of the target park according to the total carbon emission and the carbon emission growth rate of the target park; Obtaining total monitoring data of the target park according to the carbon emission change rate and carbon emission anomaly index of the target park; The abnormal carbon emission information of the target park is determined based on the total monitoring data.
4. The method for monitoring power carbon footprint data in a production park according to claim 3 is characterized in that: Also includes: Based on the abnormal carbon emission information of the power consumption node and the abnormal carbon emission information of the target park, an abnormal warning of the power consumption node or the target park is generated.
5. The method for monitoring power carbon footprint data in a production park according to claim 3 is characterized in that: The calculation formula for the total carbon emissions of the target park is: in, is the total carbon emissions of the park, I Indicates the total number of distribution stations in the park. Indicates power distribution station In the Metering sampling cycle The amount of electricity received, Indicates the total number of clean energy power nodes in the park, Represents each node In the Metering sampling cycle The amount of electricity generated within Indicates the total number of energy storage nodes in the park, Energy storage equipment In the Metering sampling cycle The electrical energy released inside Indicates the total number of power supply nodes in the park that have power transmission relationship with nodes outside the park. Represents a single node In the sampling time period The electrical energy transmitted from the park to the outside of the park, Represents the standard electricity carbon emission factor.
6. A production park electricity carbon footprint data monitoring device, characterized in that: include: An acquisition module is used to acquire the net amount of power transferred into the target park and the node information of each power consumption node, so as to construct a park power grid topology structure in combination with the total output power of the target park; A calculation module, used to calculate the power consumption of each power consumption node according to the park power grid topology; A monitoring module is used to obtain the carbon emissions of each power consumption node and the total carbon emissions of the target park based on the power loss, and to identify abnormal carbon emissions information of at least one power consumption node based on the carbon emissions and / or identify abnormal carbon emissions information of the target park based on the total carbon emissions.
7. The production park electricity carbon footprint data monitoring device according to claim 6 is characterized in that: The monitoring module comprises: A calculation unit, used to calculate the carbon emission change rate and the carbon emission abnormality index of the power consumption node according to the carbon emission; A processing unit, configured to obtain monitoring data of the power consumption node according to the carbon emission change rate and the carbon emission abnormality index of the power consumption node; A determination unit is used to determine the abnormal carbon emission information of the power consumption node based on the monitoring data.
8. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for monitoring electricity carbon footprint data in a production park as described in any one of claims 1 to 5.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: The computer program is executed by a processor to implement the method for monitoring electricity carbon footprint data in a production park as described in any one of claims 1 to 5.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed, it is used to implement the production park electricity carbon footprint data monitoring method as described in any one of claims 1-5.
Citation Information
Patent Citations
Near-zero-carbon park electricity utilization carbon emission monitoring method
CN113128856A
Method, device and equipment for monitoring carbon emission of power distribution network and storage medium
CN116231633A
Enterprise carbon quota prediction method based on enterprise operation data
CN116681187A
Method and device for calculating real-time carbon emission parameters of industrial park
CN117290652A
Online monitoring method for carbon emission data of electric park based on acquisition terminal
CN117592847A