Budget auditing method, device and equipment and storage medium
Through early warning analysis, qualitative analysis and quantitative reduction of budget audit methods, the problem of low budget audit efficiency is solved, automated audit is realized, and audit efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202411064657.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The budget auditing efficiency is low, and is affected by factors such as network bandwidth, external system interfaces and server processing speed, resulting in slow auditing speed and difficult to achieve accurate and efficient auditing.
Provide a budget review method, by obtaining the data of the budget items to be reviewed, determining whether there are budget review rules, conducting early warning analysis, qualitative analysis and quantitative reduction, generating aggregate reports, and improving audit efficiency. This method includes obtaining budget project data, determining whether it is filled in intact, determining whether it is a new project, obtaining the unpaid amount in the previous year, performing quantitative reduction, and generating a report based on early warning information, qualitative analysis results and annual budget totals.
It realizes the automation of budget audits, improves audit efficiency, reduces the time-consuming and difficult of manual audits, ensures the accuracy of audits, and solves the problems of time-consuming, labor-intensive and inaccurate audits.
Smart Images

Figure CN119027047A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computers, and in particular to a budget review method, device, equipment and storage medium. Background Art
[0002] Budgeting is a systematic method for allocating a company's financial, physical and human resources to achieve its strategic goals. Budgeting can help companies monitor the progress of strategic goals, help control expenses, and predict the company's cash flow and profits.
[0003] During the budget compilation process, it is necessary to capture the performance information of previous projects, previous years' expenditure progress, existing stock assets, project performance evaluations, unit performance evaluations, unit internal control scores, etc., and then verify them through various rules. The process will be affected by network bandwidth, external system interfaces, and server processing speed, resulting in slow budget review. Summary of the invention
[0004] The main purpose of the present invention is to solve the technical problem of low budget review efficiency.
[0005] A first aspect of the present invention provides a budget review method, the budget review method comprising:
[0006] Obtaining the budget item data to be reviewed, and determining whether there is a budget review rule corresponding to the budget item data to be reviewed;
[0007] If so, a warning analysis is performed on the budget item to be reviewed according to the budget review rules and the budget item data to be reviewed, and a warning information is generated;
[0008] Acquire attribute information corresponding to the budget item to be reviewed, and perform qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rule to obtain a qualitative analysis result;
[0009] Obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reduce the budget amount of the budget item to be reviewed based on the unpaid amount of the previous year's budget to obtain the total annual budget;
[0010] An aggregate report is generated based on the early warning information, the qualitative analysis results, and the total annual budget.
[0011] Optionally, in a first implementation of the first aspect of the present invention, performing early warning analysis on the budget items to be reviewed according to the budget review rules and the budget item data to be reviewed, and generating early warning information includes:
[0012] According to the budget review rules, determining whether the budget item data to be reviewed is complete, and if not, generating a first warning message;
[0013] Determine whether the budget item to be reviewed is a new item of the current year. If so, generate the second warning information;
[0014] The first warning information and the second warning information are sent to a preset warning object.
[0015] Optionally, in a second implementation of the first aspect of the present invention, the acquiring of attribute information corresponding to the budget item to be reviewed, and performing a qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rule, to obtain a qualitative analysis result includes:
[0016] Obtaining attribute information corresponding to the budget item to be reviewed;
[0017] Determine whether the project type of the budget item to be reviewed is a project expenditure. If so, perform a qualitative analysis on the project type of the budget item to be reviewed based on the attribute information of the budget item to be reviewed and the budget review rules to obtain a qualitative analysis result of the project type;
[0018] The historical budget data of the budget items to be reviewed under the budget unit are obtained, and a qualitative analysis is performed on the budget unit based on the historical budget data and the budget item data to be reviewed of the budget unit to obtain a qualitative analysis result of the budget unit.
[0019] Optionally, in a third implementation of the first aspect of the present invention, the obtaining of the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reducing the budget amount of the budget item to be reviewed according to the unpaid amount of the previous year's budget, to obtain the total annual budget includes:
[0020] Obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed;
[0021] Based on the unpaid amount of the previous year's budget, determine whether to quantitatively reduce the budget amount of the budget item to be reviewed;
[0022] If so, the total annual budget is obtained based on the unpaid amount of the previous year's budget to achieve a quantitative reduction in the total budget of the budget items to be reviewed.
[0023] Optionally, in a fourth implementation of the first aspect of the present invention, obtaining the annual budget amount according to the unpaid amount of the previous year's budget to achieve quantitative reduction of the total budget amount of the budget item to be reviewed includes:
[0024] Obtain the amount payable in the previous year's budget for the budget item to be reviewed;
[0025] The total annual budget is calculated based on the amount to be paid in the previous year's budget, the amount not paid in the previous year's budget, and a preset fixed reduction ratio to achieve a quantitative reduction in the total budget of the budget items to be reviewed.
[0026] Optionally, in a fifth implementation of the first aspect of the present invention, if present, then performing a warning analysis on the budget item to be reviewed according to the budget review rule and the budget item data to be reviewed, and before generating the warning information, the method further includes:
[0027] Obtaining a budget item control scope, where the budget item control scope is used to select a scenario corresponding to the budget item;
[0028] According to the control scope of the budget item, the corresponding budget unit and the budget item to be reviewed are obtained.
[0029] Optionally, in a sixth implementation of the first aspect of the present invention, the quantitatively reducing the budget amount of the budget item to be reviewed to obtain the total annual budget further includes:
[0030] Obtaining a control number corresponding to the total budget amount of the budget item to be reviewed, wherein the control number is used to control the total budget amount;
[0031] According to the control number, determine whether to adjust the total budget of the budget item to be reviewed;
[0032] If so, the total budget of the budget item to be reviewed is adjusted according to the control number.
[0033] The second aspect of the present invention provides a budget audit device, comprising: a memory and at least one processor, wherein instructions are stored in the memory, and the memory and the at least one processor are interconnected via lines; the at least one processor calls the instructions in the memory so that the budget audit device executes the above-mentioned budget audit method.
[0034] A third aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the above-mentioned budget review method.
[0035] In an embodiment of the present invention, the data of the budget item to be audited is obtained, and it is determined whether there is a budget audit rule corresponding to the data of the budget item to be audited; if there is, then according to the budget audit rule and the data of the budget item to be audited, an early warning analysis is performed on the budget item to be audited, and an early warning information is generated; the attribute information corresponding to the budget item to be audited is obtained, and according to the attribute information and the budget audit rule, a qualitative analysis is performed on the budget item to be audited to obtain a qualitative analysis result; the unpaid amount of the previous year's budget corresponding to the budget item to be audited is obtained, and according to the unpaid amount of the previous year's budget, the budget amount of the budget item to be audited is quantitatively reduced to obtain the annual budget total; according to the early warning information, the qualitative analysis result, and the annual budget total, an aggregate report is generated. In the present invention, when auditing a budget item, the budget audit rule corresponding to the data of the budget item to be audited is read, and according to the budget audit rule, the data of the budget item to be audited is automatically audited, so as to realize the early warning reminder, qualitative analysis, and quantitative reduction of the budget item to be audited, and solve the problems of time-consuming and labor-intensive audit, high audit difficulty, and inaccurate audit in the budget preparation process, thereby improving the efficiency of budget audit. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 A schematic diagram of an embodiment of a budget review method in an embodiment of the present invention;
[0037] Figure 2 A schematic diagram of an embodiment of a budget review device in an embodiment of the present invention;
[0038] Figure 3 It is a schematic diagram of an embodiment of a budget review device in an embodiment of the present invention. DETAILED DESCRIPTION
[0039] Embodiments of the present invention provide a budget review method, apparatus, device and storage medium.
[0040] The embodiments disclosed in the present invention will be described in more detail below with reference to the accompanying drawings. Although certain embodiments disclosed in the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be construed as being limited to the embodiments described herein, which are instead provided for a more thorough and complete understanding of the present invention. It should be understood that the drawings and embodiments disclosed in the present invention are only for exemplary purposes and are not intended to limit the scope of protection disclosed in the present invention.
[0041] In the description of the embodiments disclosed in the present invention, the term "including" and similar terms should be understood as open inclusion, that is, "including but not limited to". The term "based on" should be understood as "based at least in part on". The term "one embodiment" or "the embodiment" should be understood as "at least one embodiment". The terms "first", "second", etc. may refer to different or the same objects. Other explicit and implicit definitions may also be included below.
[0042] For ease of understanding, the specific process of the embodiment of the present invention is described below. Figure 1 , an embodiment of the budget review method in the embodiment of the present invention includes:
[0043] S100, obtaining budget item data to be reviewed, and determining whether there is a budget review rule corresponding to the budget item data to be reviewed.
[0044] In this embodiment, after the budget unit prepares the department budget, it is submitted to the audit post for review. The audit post conducts the review in two ways: manual review and intelligent review. When conducting the budget review, first obtain the budget item data to be reviewed, and then determine whether the budget item data to be reviewed is configured with the corresponding budget review rules. If the corresponding budget review rules are configured, intelligent review can be performed. If the corresponding budget review rules are not configured, manual review is performed.
[0045] S200: If it exists, then according to the budget review rules and the data of the budget items to be reviewed, a warning analysis is performed on the budget items to be reviewed, and warning information is generated.
[0046] In this embodiment, if there is a budget audit rule corresponding to the data of the budget item to be audited, according to the budget audit rule, an early warning analysis is performed on the budget item to be audited. The early warning analysis is to analyze the possible risk information of the budget item to be audited, and the problems that affect the audit and normal budget process such as the unclear supplementary information to remind the user. There are a variety of corresponding configured rule categories in the budget audit rules to automatically prompt, analyze, and warn the problems that may exist in the budget items during the preparation process. Through flexible rule configuration, fast and intelligent audit can be achieved to solve the problems of time-consuming and labor-intensive audit, high audit difficulty, and inaccurate audit in the budget preparation process. The rule category is obtained through rule classification. The rule category refers to the classification according to the different audit requirement rules. For example, the integrity check of the filled data belongs to the basic information warning in the audit basis. These rules can be enabled or disabled in the rule library. When enabled, appropriate prompts or warnings are automatically given on the audit page during the audit process. During configuration, different budget units can choose to use different budget audit rules, or they can choose to apply and copy, and configure flexibly.
[0047] S300, obtaining attribute information corresponding to the budget item to be reviewed, and performing qualitative analysis on the budget item to be reviewed according to the attribute information and budget review rules to obtain qualitative analysis results.
[0048] In this embodiment, a qualitative analysis is performed on the budget items to be audited based on their project type, budget unit, whether they are purchased, data from previous years, and other characteristics. The qualitative analysis of the budget items to be audited refers to obtaining report information on the project by analyzing the various attributes of the budget items to be audited. The qualitative analysis of the budget items to be audited can help auditors quickly understand the project and speed up the audit speed and accuracy.
[0049] S400, obtaining the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reducing the budget amount of the budget item to be reviewed based on the unpaid amount of the previous year's budget to obtain the total annual budget.
[0050] In this embodiment, quantitative reduction refers to reducing the budget amount by a fixed amount according to policy basis or regulatory documents such as government official documents.
[0051] S500,generates an aggregate report based on early warning information, qualitative analysis results, and annual budget totals.
[0052] In this embodiment, early warning information, qualitative analysis results, and the total annual budget are summarized to generate an aggregate report, which includes but is not limited to basic project attributes, execution rates of the project budget indicators in previous years, project performance evaluations in previous years, procurement plan information in previous years, government investment information, etc.
[0053] In an optional implementation of the first aspect of the present invention, according to the budget review rules and the budget item data to be reviewed, early warning analysis is performed on the budget item to be reviewed, and the early warning information is generated, including:
[0054] According to the budget review rules, determine whether the data of the budget item to be reviewed is complete. If not, generate the first warning information; determine whether the budget item to be reviewed is a new item added in the year. If so, generate the second warning information; send the first warning information and the second warning information to the preset warning object.
[0055] In this embodiment, the early warning analysis is to analyze the completeness of the data reporting, that is, whether the data of the budget project to be reviewed is complete, and whether the budget project to be reviewed is a new project of the year. If the data of the budget project to be reviewed is not complete, a first early warning message is generated. If the budget project to be reviewed is not a new project of the year, a second early warning message is generated. Specifically, the completeness of the data reporting refers to the various materials filled in when the budget is compiled and declared, including but not limited to project system information, project calculation information, project performance information, budget sub-item information, budget sub-item procurement information, budget sub-item purchase service information, budget sub-item asset configuration information, etc. The early warning reminder will verify the integrity of various materials according to the configuration, and make an early warning reminder during the audit. For example: a rule is configured in the audit configuration rule as [reasonableness analysis of non-staff personnel], and a reasonable number of non-staff personnel is set. When the budget unit reports basic expenditures, the system will automatically check whether the number of non-staff personnel in the basic expenditure item exceeds the reasonable number of non-staff personnel configured in the rule. If the budget project to be reviewed is a new project of the year, because there is no information in previous years (payment progress, performance evaluation, etc.), it will be prompted during the audit that this project is a new project. When budget units apply for new projects, the total fiscal expenditure will increase, so the finance department will strictly control the new projects added in that year. During the review process, the early warning reminders will also include reminders about new projects added next year.
[0056] In an optional implementation of the first aspect of the present invention, attribute information corresponding to the budget item to be reviewed is obtained, and a qualitative analysis is performed on the budget item to be reviewed according to the attribute information and the budget review rule, and the qualitative analysis results obtained include:
[0057] Obtain the attribute information corresponding to the budget item to be reviewed; determine whether the project type of the budget item to be reviewed is project expenditure. If so, conduct a qualitative analysis on the project type of the budget item to be reviewed based on the attribute information of the budget item to be reviewed and the budget review rules, and obtain the qualitative analysis result of the project type; obtain the historical budget data of the budget item to be reviewed under the budget unit, conduct a qualitative analysis on the budget unit based on the historical budget data and the budget item data to be reviewed of the budget unit, and obtain the qualitative analysis result of the budget unit.
[0058] In this embodiment, the qualitative analysis includes qualitative analysis of project types and qualitative analysis of budget units, wherein the qualitative analysis of project types will distinguish between basic expenditures and project expenditures, wherein project expenditures will be refined into special funds, government investment, other projects, etc. For the project type of the budget project to be reviewed, the project is analyzed to see whether it is strictly controlled, whether the special funds are included in the unified platform, whether they are tracked, and other attributes. For example, the project type of the budget project to be reviewed is a special fund type, and it is included in the unified platform, and whether it is tracked is yes. These three are the attributes of the project, so during the review, the auditor will be prompted with the difference from the general project. Special funds refer to the funds of the entire project that are used for a specific matter, such as bridge and road repairs, poverty alleviation subsidies, etc., and inclusion in the unified platform refers to whether the project is managed on the special fund unified platform. If included, the project can only be paid on the unified platform, and the procurement and contracts involved in the project cannot be paid in other ways. As for whether to track this attribute, if it is yes, the project is a transfer payment project reported by the unit at this level, and it needs to be linked to the superior transfer payment project. In addition, the budget of this project will generally be filtered when it is converted into a formal indicator at a unified time, and the indicator transfer operation cannot be performed. It is necessary to wait for the superior transfer payment project to be issued before payment can be made. The above attributes are obtained by qualitative analysis of the system, which is different from general projects and will be clearly marked in the aggregation report.
[0059] Qualitative analysis of budget units refers to the qualitative analysis of budget units based on the budget unit dimension, combined with the budget unit's expenditure progress, project performance evaluation and other information in previous years. For example, in the budget review system, after all projects are reported and enter the next link, the system will collect all existing projects of the unit for summary analysis, and then conduct qualitative analysis based on the unit's data in previous years. For example, if a unit reports a total budget of 1 million yuan this year, and the total expenditure progress of the unit's projects last year was 90%, and the overall performance evaluation was good, then the reference analysis result obtained by the unit in the review system is that the budget expenditure must be reduced and new projects cannot be reported.
[0060] In an optional implementation of the first aspect of the present invention, the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed is obtained, and the budget amount of the budget item to be reviewed is quantitatively reduced according to the unpaid amount of the previous year's budget, and the total annual budget is obtained, including:
[0061] Obtain the unpaid amount of the previous year's budget corresponding to the budget item to be audited; determine whether to quantitatively reduce the budget amount of the budget item to be audited based on the unpaid amount of the previous year's budget; if so, obtain the annual budget amount based on the unpaid amount of the previous year's budget to achieve quantitative reduction of the total budget amount of the budget item to be audited.
[0062] In this embodiment, the unpaid amount of the budget of the previous year corresponding to the budget item to be reviewed is obtained. If there is any remaining unpaid amount of the budget of the previous year, it means that the budget amount of the budget item to be reviewed in the previous year has not been used up. In this case, the project is quantitatively reduced to compress the budget amount of the project this year. Specifically, if the unpaid amount of the budget of the previous year is not 0, it is determined that the budget amount of the budget item to be reviewed needs to be quantitatively reduced. Based on the unpaid amount of the budget of the previous year, the annual budget total is calculated, and the annual budget total is the annual budget amount after the quantitative reduction.
[0063] In an optional implementation of the first aspect of the present invention, obtaining the annual budget amount according to the unpaid amount of the previous year's budget to achieve quantitative reduction of the total budget amount of the budget item to be reviewed includes:
[0064] Obtain the amount payable in the previous year's budget for the budget items to be reviewed; calculate the total annual budget based on the amount payable in the previous year's budget, the amount not paid in the previous year's budget, and the preset fixed reduction ratio to achieve quantitative reduction in the total budget of the budget items to be reviewed.
[0065] In this embodiment, the amount payable in the previous year's budget for the budget item to be reviewed is obtained. The amount payable in the previous year's budget may also be the budget amount of the previous year. A fixed reduction ratio is configured, and the annual budget total = (1-(total unpaid amount last year / total payable amount last year)*fixed reduction ratio). For example, a policy stipulates that projects that lag behind the average expenditure schedule should have a fixed reduction of 30% of the unpaid portion. The total budget of a project subject to a fixed reduction last year was RMB 1 million, and the total unpaid budget was RMB 200,000. This year's budget application is RMB 1 million. This year, the project will be automatically reduced by 100-(20 / 100)*30%=940,000 yuan in the review system.
[0066] In an optional implementation manner of the first aspect of the present invention, if present, then according to the budget review rules and the budget item data to be reviewed, a warning analysis is performed on the budget item to be reviewed, and before generating the warning information, the method further includes:
[0067] Get the budget item control scope, which is used to select the scenario corresponding to the budget item. Get the corresponding budget unit and budget item to be reviewed based on the budget item control scope.
[0068] In this embodiment, the configuration rules can be selected for scenarios of budget items or budget sub-items, and different control ranges can be selected. The specific control ranges are, from large to small, first-level departments, units, second-level projects, and budget sub-items. For example, if you need to configure rules to limit a unit from reporting the total amount of transfer payment funds issued at the beginning of the year, and transfer payment funds generally refer to budget sub-items whose nature of funds is subsidies from superiors, you can select a unit in the configuration interface, and then add a rule. In the rule, select the control range as budget sub-items, and fill in the control amount for control. For example, if you need to control a special fund project, select the control range as the second-level project in the rule, and the associated project type as the special fund project, and then fill in the control amount or control formula. The configuration rules can be carried forward on an annual basis without repeated configuration.
[0069] In an optional implementation manner of the first aspect of the present invention, the budget amount of the budget item to be reviewed is quantitatively reduced to obtain the annual budget amount, which further includes:
[0070] The control number corresponding to the total budget of the budget item to be reviewed is obtained. The control number is used to control the total budget. According to the control number, it is determined whether the total budget of the budget item to be reviewed needs to be adjusted. If so, the total budget of the budget item to be reviewed is adjusted according to the control number.
[0071] In this embodiment, in combination with references and policy documents in the budget review process, configurable rule classification is used to automatically prompt, analyze, and warn of possible problems in the budget items during the preparation process, and provide suggestions such as reducing the budget or adjusting the control number. Adjusting the control number refers to a control rule that the finance or first-level department will configure for the units under its jurisdiction before the budget unit submits the budget. For example, if a unit is controlled to have a special fund control number of 1 million yuan, then the unit can only apply for a maximum of 1 million yuan in special fund projects this year. The control number is equivalent to the existence of a quota, and adjusting the control number is equivalent to adjusting the quota of the unit or project.
[0072] See also Figure 2 According to a second aspect of the present invention, there is provided a budget audit device, the budget audit device comprising:
[0073] The budget data judgment module 10 is used to obtain the budget item data to be reviewed and judge whether there is a budget review rule corresponding to the budget item data to be reviewed;
[0074] The early warning information generation module 20 is used to perform early warning analysis on the budget items to be reviewed according to the budget review rules and the data of the budget items to be reviewed, and generate early warning information, which is used to warn of problems existing in the budget items to be reviewed;
[0075] The qualitative analysis module 30 is used to obtain the attribute information corresponding to the budget item to be reviewed, and to perform a qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rules to obtain a qualitative analysis result;
[0076] The quantitative reduction module 40 is used to obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reduce the budget amount of the budget item to be reviewed according to the unpaid amount of the previous year's budget to obtain the total annual budget;
[0077] The report generation module 50 is used to generate an aggregate report based on the early warning information, the qualitative analysis results, and the total annual budget.
[0078] In an optional implementation of the second aspect of the present invention, the warning information generation module 20 is also used to determine whether the data of the budget item to be reviewed is complete based on the budget review rules, and if not, generate a first warning message; determine whether the budget item to be reviewed is a new project added that year, and if so, generate a second warning message; and send the first warning information and the second warning information to the preset warning object.
[0079] In an optional implementation of the second aspect of the present invention, the qualitative analysis module 30 is also used to obtain attribute information corresponding to the budget item to be audited; determine whether the project type of the budget item to be audited is project expenditure, and if so, perform a qualitative analysis on the project type of the budget item to be audited based on the attribute information of the budget item to be audited and the budget audit rules to obtain a qualitative analysis result of the project type; obtain historical budget data of the budget item to be audited under the budget unit, and perform a qualitative analysis on the budget unit based on the historical budget data and the budget item data to be audited of the budget unit to obtain a qualitative analysis result of the budget unit.
[0080] In an optional implementation of the second aspect of the present invention, the quantitative reduction module 40 is also used to obtain the unpaid amount of the budget of the previous year corresponding to the budget item to be audited; based on the unpaid amount of the budget of the previous year, determine whether to quantitatively reduce the budget amount of the budget item to be audited; if so, obtain the annual budget amount based on the unpaid amount of the budget of the previous year to achieve quantitative reduction of the total budget of the budget item to be audited.
[0081] In an optional implementation of the second aspect of the present invention, the quantitative reduction module 40 is also used to obtain the amount of the budget payable in the previous year for the budget item to be reviewed; based on the amount of the budget payable in the previous year, the amount of the budget unpaid in the previous year, and a preset fixed reduction ratio, the total annual budget is calculated to achieve a quantitative reduction in the total budget of the budget item to be reviewed.
[0082] In an optional implementation manner of the second aspect of the present invention, the budget review device further includes:
[0083] The project control module is used to obtain the budget project control scope, which is used to select the scenario corresponding to the budget project; according to the budget project control scope, the corresponding budget unit and the budget project to be reviewed are obtained.
[0084] In an optional implementation manner of the second aspect of the present invention, the budget review device further includes:
[0085] The total budget adjustment module is used to obtain the control number corresponding to the total budget of the budget item to be reviewed. The control number is used to control the total budget; based on the control number, it is determined whether the total budget of the budget item to be reviewed needs to be adjusted; if so, the total budget of the budget item to be reviewed is adjusted based on the control number.
[0086] Figure 3 : is a structural diagram of a budget audit device provided by an embodiment of the present invention. The budget audit device 500 may have relatively large differences due to different configurations or performances, and may include one or more processors (central processing units, CPU) 510 (for example, one or more processors) and a memory 520, and one or more storage media 530 (for example, one or more massive storage devices) storing application programs 533 or data 532. Among them, the memory 520 and the storage medium 530 may be short-term storage or permanent storage. The program stored in the storage medium 530 may include one or more modules (not shown in the figure), and each module may include a series of instruction operations in the budget audit device 500. Furthermore, the processor 510 may be configured to communicate with the storage medium 530 to execute a series of instruction operations in the storage medium 530 on the budget audit device 500.
[0087] The budget audit device 500 may also include one or more power supplies 540, one or more wired or wireless network interfaces 550, one or more input and output interfaces 560, and / or one or more operating systems 531, such as Windows Serve, Mac OS X, Unix, Linux, Free BSD, etc. It will be appreciated by those skilled in the art that Figure 3 The budget audit device structure shown does not constitute a limitation on the budget audit device, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.
[0088] The present invention also provides a computer-readable storage medium, which may be a non-volatile computer-readable storage medium or a volatile computer-readable storage medium. Instructions are stored in the computer-readable storage medium. When the instructions are executed on a computer, the computer executes the steps of the budget review method.
[0089] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0090] In addition, although each operation is described in a specific order, this should be understood as requiring such operation to be performed in the specific order shown or in a sequential order, or requiring that all illustrated operations should be performed to obtain desired results. Under certain circumstances, multitasking and parallel processing may be advantageous. Similarly, although some specific implementation details are included in the above discussion, these should not be interpreted as limiting the scope of the present disclosure. Some features described in the context of a separate embodiment can also be implemented in a single implementation in combination. On the contrary, the various features described in the context of a single implementation can also be implemented in multiple implementations individually or in any suitable sub-combination mode.
[0091] Although the subject matter has been described in language specific to structural features and / or methodological logical actions, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or actions described above. On the contrary, the specific features and actions described above are merely example forms of implementing the claims.
Claims
1. A budget review method, characterized in that: The budget review method includes: Obtaining the budget item data to be reviewed, and determining whether there is a budget review rule corresponding to the budget item data to be reviewed; If so, a warning analysis is performed on the budget item to be reviewed according to the budget review rules and the budget item data to be reviewed, and a warning information is generated; Acquire attribute information corresponding to the budget item to be reviewed, and perform qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rule to obtain a qualitative analysis result; Obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reduce the budget amount of the budget item to be reviewed based on the unpaid amount of the previous year's budget to obtain the total annual budget; An aggregate report is generated based on the early warning information, the qualitative analysis results, and the total annual budget.
2. The budget review method according to claim 1, characterized in that: The generating of early warning information by performing early warning analysis on the budget items to be reviewed according to the budget review rules and the budget items to be reviewed data includes: According to the budget review rules, determining whether the budget item data to be reviewed is complete, and if not, generating a first warning message; Determine whether the budget item to be reviewed is a new item of the current year. If so, generate the second warning information; The first warning information and the second warning information are sent to a preset warning object.
3. The budget review method according to claim 1, characterized in that: The acquiring of attribute information corresponding to the budget item to be reviewed, and performing qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rule, to obtain a qualitative analysis result includes: Obtaining attribute information corresponding to the budget item to be reviewed; Determine whether the project type of the budget item to be reviewed is a project expenditure. If so, perform a qualitative analysis on the project type of the budget item to be reviewed based on the attribute information of the budget item to be reviewed and the budget review rule to obtain a qualitative analysis result of the project type; The historical budget data of the budget items to be reviewed under the budget unit are obtained, and a qualitative analysis is performed on the budget unit based on the historical budget data and the budget item data to be reviewed of the budget unit to obtain a qualitative analysis result of the budget unit.
4. The budget review method according to claim 1, characterized in that: The obtaining of the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reducing the budget amount of the budget item to be reviewed according to the unpaid amount of the previous year's budget, to obtain the total annual budget includes: Obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed; Based on the unpaid amount of the previous year's budget, determine whether to quantitatively reduce the budget amount of the budget item to be reviewed; If so, the total annual budget is obtained based on the unpaid amount of the previous year's budget to achieve a quantitative reduction in the total budget of the budget items to be reviewed.
5. The budget review method according to claim 4, characterized in that: The method of obtaining the annual budget amount based on the unpaid amount of the previous year's budget to achieve quantitative reduction of the total budget amount of the budget items to be reviewed includes: Obtain the amount payable in the previous year's budget for the budget item to be reviewed; The total annual budget is calculated based on the amount to be paid in the previous year's budget, the amount not paid in the previous year's budget, and a preset fixed reduction ratio to achieve a quantitative reduction in the total budget of the budget items to be reviewed.
6. The budget review method according to claim 1, characterized in that: If it exists, then according to the budget review rules and the budget item data to be reviewed, a warning analysis is performed on the budget item to be reviewed, and before generating the warning information, the following is also included: Obtaining a budget item control scope, where the budget item control scope is used to select a scenario corresponding to the budget item; According to the control scope of the budget item, the corresponding budget unit and the budget item to be reviewed are obtained.
7. The budget review method according to claim 1, characterized in that: The quantitative reduction of the budget amount of the budget item to be reviewed to obtain the total annual budget also includes: Obtaining a control number corresponding to the total budget amount of the budget item to be reviewed, wherein the control number is used to control the total budget amount; According to the control number, determine whether to adjust the total budget of the budget item to be reviewed; If so, the total budget of the budget item to be reviewed is adjusted according to the control number.
8. A budget review device, characterized in that: The budget review device comprises: A budget data judgment module is used to obtain the budget item data to be reviewed and judge whether there is a budget review rule corresponding to the budget item data to be reviewed; A warning information generation module is used to, if it exists, perform a warning analysis on the budget item to be reviewed according to the budget review rules and the budget item data to be reviewed, and generate warning information; A qualitative analysis module, used to obtain the attribute information corresponding to the budget item to be reviewed, and to perform a qualitative analysis on the budget item to be reviewed according to the attribute information and the budget review rule to obtain a qualitative analysis result; A quantitative reduction module is used to obtain the unpaid amount of the previous year's budget corresponding to the budget item to be reviewed, and quantitatively reduce the budget amount of the budget item to be reviewed according to the unpaid amount of the previous year's budget to obtain the total annual budget; A report generation module is used to generate an aggregate report based on the early warning information, the qualitative analysis results, and the total annual budget.
9. A budget review device, characterized in that: The budget audit device comprises: a memory and at least one processor, the memory stores instructions, and the memory and the at least one processor are interconnected via a line; The at least one processor calls the instructions in the memory to enable the budget auditing device to execute the budget auditing method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the budget review method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Project budget generation method and device, terminal equipment and storage medium
CN116862444A
Investment budget centralized editing and auditing method and device, storage medium and terminal equipment
CN116933753A